An Account of the Bell Rock Light-House Robert Stevenson 1007 downloads.pdf

657 pages · Make another flipbook

Page 1

Page 2

Page 3

The Project Gutenberg eBook of An Account of the Bell Rock
Light-House
This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online at
www.gutenberg.org. If you are not located in the United States, you
will have to check the laws of the country where you are located
before using this eBook.

Title: An Account of the Bell Rock Light-House

Author: Robert Stevenson

Release date: March 5, 2015 [eBook #48414]
Most recently updated: October 24, 2024

Language: English

Other information and formats: www.gutenberg.org/ebooks/48414

Credits: E-text prepared by Henry Flower and the Online Distributed
Proofreading Team (http://www.pgdp.net) from page images
generously made available by Internet Archive
(https://archive.org)

*** START OF THE PROJECT GUTENBERG EBOOK AN ACCOUNT
OF THE BELL ROCK LIGHT-HOUSE ***

Page 4

The Project Gutenberg eBook, An Account of the Bell Rock Light-House,
by Robert Stevenson

Note: Images of the original pages are available through Internet Archive. See
https://archive.org/details/stevensonbell1824stev

Page 5

In this html version of this e-book, plates are linked to larger versions of the illustrations.
Click on the illustration to see the larger image.

Page 6

BELL ROCK LIGHT HOUSE
DURING A STORM FROM THE NORTH EAST.
Drawn by J. M. W. Turner R. A.
Engraved by J. Horsburgh.

Page 7

AN

ACCOUNT

OF THE

BELL ROCK LIGHT-HOUSE,

INCLUDING THE
DETAILS OF THE ERECTION AND PECULIAR STRUCTURE
OF THAT EDIFICE.

TO WHICH IS PREFIXED A
HISTORICAL VIEW OF THE INSTITUTION AND PROGRESS
OF THE
NORTHERN LIGHT-HOUSES.

ILLUSTRATED WITH TWENTY-THREE ENGRAVINGS.

DRAWN UP BY DESIRE OF
THE COMMISSIONERS OF THE NORTHERN LIGHT-HOUSES,

BY
ROBERT STEVENSON,
CIVIL ENGINEER;
FELLOW OF THE ROYAL SOCIETY OF EDINBURGH;
MEMBER OF THE SOCIETY OF SCOTISH ANTIQUARIES, OF THE WERNERIAN NATURAL
HISTORY SOCIETY,

Page 8

AND OF THE GEOLOGICAL SOCIETY OF LONDON;
ENGINEER TO THE NORTHERN LIGHT-HOUSE BOARD, AND TO THE CONVENTION
OF ROYAL BOROUGHS OF SCOTLAND.

EDINBURGH:
PRINTED FOR ARCHIBALD CONSTABLE & CO. EDINBURGH;
HURST, ROBINSON & CO. 90. CHEAPSIDE; AND JOSIAH TAYLOR,
50. HIGH HOLBORN,
LONDON.
1824.

Page 9

TO

THE KING.
SIRE,
It is with much diffidence that the author now lays before Your Majesty, an
Account of the arduous national undertaking of erecting a Light-house on
the Bell Rock,—a sunk reef, lying about eleven miles from the shore, and so
situated as to have long proved an object of dread to mariners on the
eastern coast of Scotland, especially when making for the Friths of Forth
and Tay.
This edifice being of the utmost consequence to the safety of Your Majesty’s
Ships of War upon the North Sea station, and of the commercial shipping of
this part of the empire, he presumes to hope for Your Majesty’s favourable
acceptance of his work. From the known partiality, also, of Your Majesty for
naval excursions, which so recently led the Royal Squadron within a
comparatively short distance of the Bell Rock Light-house, in the course of
Your Majesty’s most gracious Visit to your ancient Kingdom of Scotland, he
flatters himself that Your Majesty may feel an additional interest in the
subject of this volume.
The Introduction to this work brings generally under Your Majesty’s notice,
the important labours of the Scottish Light-house Board, appointed by an
act of the 26th Parliament of Your Majesty’s illustrious Father. Since that
period, Light-house stations have been partially extended over the whole
northern shores of Your Majesty’s British dominions, from Inchkeith in the
Firth of Forth, to the Isle of Man in the Irish Sea, including in this circuit
the Hebrides, and Orkney and Shetland Islands. Much, however, still
remains to be done; and the Board is gradually proceeding, as the state of
its funds will permit, in placing additional Sea-Lights on certain
intermediate points of the coast.
It cannot fail to be gratifying to Your Majesty to learn, as the result of the
exertions of this Board, that the mariner may now navigate those regions

Page 10

with a degree of security and confidence quite unknown to Your Majesty’s
Royal Ancestor James the Fifth, when he sailed around this coast in the
16th century, or even, at a recent period, to Your Majesty’s Royal Brother
William Henry Duke of Clarence, when in early life he traversed those seas.
With unfeigned sentiments of loyalty and attachment, the author subscribes
himself,
Your Majesty’s
Most devoted Subject and Servant,
ROBERT STEVENSON.

Page 11

THE

CONTENTS.

INTRODUCTION.
Historical Narrative of the Institution of the Board of Commissioners, and Progress
made in the Erection of the Northern Light-houses.

Page
Early Voyages of the Scots. Extension of Trade. Charts of the Coast. 1–4
1786. Proposition for the establishment of a Light-house Board in Scotland. Original act passed 5–6
in 1786. Commissioners appointed. First Meeting of the Board. Mode of raising Funds.
1787. Kinnaird-Head and Mull of Kintyre Light-houses. 6–8
1788. Light Duty found to be too small. Act of 1788. 9
1789. Island Glass, North Ronaldsay, and Pladda Light-houses. Collectors of the Light-Duties 10–
appointed. 11
1791. Pladda distinguishing Light. Annual Supply and Inspection of the Light-houses. Light- 12–
keepers’ Salary. Economical plan of early Light-houses. 14
1793. Application for Additional Lights. State of the Light-house Funds. 14–
15
1794. Pentland Skerry Light-house. Writer’s first Voyage to the North. Loss of the Sloop 15–
Elizabeth. Mr Balfour and Mr Riddoch of Orkney presented with Pieces of Plate. 17
Act Incorporating the Commissioners into a Board or Body Politic. Additional works at 18–
the Light-houses already built. Proposition for altering Kinnaird-Head Light-house. 19
1801. Numerous Shipwrecks on the Island of Sanday. Proofs of a severe winter in Orkney. 19–
Quarries at Sanday and Eda. Encroachments of the Sea. Remarks on Ruble Building, and 23
Houses with double walls. Foundation-Stone of Start Point Light-house laid. Reverend
Walter Traill’s Address upon this occasion.
1803. Inchkeith Light-house. Originally proposed as a Leading Light. Duty for Inchkeith 24–
modified. Light-keepers Accommodations extended. Construction of Light-rooms and 29
Reflectors improved. Inscription upon Inchkeith Light-house. Pilot’s guard-room.
Shipwrecked Seamen sheltered.
1806. Start-Point Light exhibited, and North Ronaldsay Light-house converted into a Beacon. 30–
List of 22 Shipwrecks on the Island of Sanday, in the course of Twelve Years. Foreman 34
and Artificers lost in the Traveller. Captain Manby’s Apparatus,
Island of May Light-house. Patent ratified 1641; the Duty for that Light complained of 36–
after the Union. Family of Scotstarvet become Proprietors. Chamber of Commerce get 41
that Light improved. Portland Family become Proprietors. Loss of the Nymphen and
Pallas Frigates. Lord Melville, First Lord of the Admiralty, applies to the Light-house

Page 12

Board, by whom the Duties and Island of May are purchased. Additional apartments
provided at the Isle of May. Notice of the alteration of this Light and that of Inchkeith.
Pilot’s guard-room.
1815. Corsewall Light-house. Foundation-stone laid. Light exhibited. 42–
44
1818. Isle of Man Light-houses. Writer’s Report in the year 1802, relative to the erection of 44–
Light-houses on the Isle of Man. Trade of Liverpool applies to the Commissioners to 48
erect them. Act of 1815, obtained by Sir W. Rae, with regard to these Lights. Difficulty of
fixing their Sites. Lights exhibited 1st February 1818. Sum expended by the Light-house
Board, on the East Coast, in the course of 10 years.
1821. Sumburgh-head Light exhibited. This House built with double walls, 52
Carr Rock Beacon. List of 16 vessels wrecked there in the course of nine years. Floating- 56–
Buoy moored off this dangerous Reef. Beacon of Masonry designed, with Tide-machine 62
and Bell-apparatus. Dimensions of Carr Rock. Difficulties of this work. It is frequently
damaged in Storms. The upper part ultimately completed with cast-iron, without the
Alarm-Bell.
Duties exigible. Expence of Management. Accounts of the Light-house Board made 63–
public. Application of the Funds, and disposal of the Surplus. Practical Management. 64

ACCOUNT OF THE BELL ROCK LIGHT-HOUSE.

CHAP. I.
Name, Situation, Dimensions, and Natural History, of the Bell Rock.—Depth of Water,
and Current of the Tides in its Vicinity.
Page
Origin of the Names Inch-Cape and Bell Rock. Tradition of a Bell erected by one of the 67–
Abbots of Aberbrothock. 68
Situation, Dimensions, and Mineralogy of the Rock. Wasting effects of the Sea. Proofs of its 69–
having occupied a higher Level. 71
Plants, Animals, Insect destructive to Timber. Experiment with pieces of Timber fixed to the 72–
Rock. Mussels attempted to be planted upon it. Habits of Fishes. 74
Depth of Water upon the Rock, and at the distance of 100 yards from it. Tides at the Rock. 75–
Not accounted for by Writers on the subject. Progress of the great Waves of the Tide. Periods 81
of High-water at different places in the Firth of Forth. Currents at the Mouth of the River Dee.
Water salt at bottom and fresh at top. Phenomenon of in and off shore Tides. Tides of
Mediterranean and Baltic Seas.
CHAP. II.
Position of the Bell Rock.—Designs for the Light-house.—Bill by Lord Advocate
Hope in 1803.—Bill by Lord Advocate Erskine in 1806.—Report of the Committee of
the House of Commons.—Passing of the Bill.
Dangerous Position of the Rock. Sir Alexander Cochrane’s Letter to the Light-house Board. 81–
Great Storm in 1799. Expence of the Light-house, as estimated by the Public. Designs by 93
Captain Brodie and Mr Cooper. Captain Brodie’s remuneration. The Writer’s first visit to the
Rock in the year 1800. Pillar-formed Building compared with one of Stone. Mr Telford
requested to give a Design. Mr Downie’s Pillar-formed Design.

Page 13

Bell Rock Light-house proposed at the Convention of Royal Burghs. Lord Advocate Hope’s 94–
Bill is lost in the House of Lords in 1803. 95
The Light-house Board consults Mr Rennie, who visits the Rock with Mr Hamilton, and the 94–
Writer. The Commissioners take the sense of certain Ports relative to the measure. Reports of 98
the Traders in Leith and Berwick. Resolution of the Board to apply again to Parliament.
Lord Advocate Erskine’s Bill 1806. Mr Hamilton and the Writer go to London on this 100–
business. Loan from Government doubtful. Board of Trade favourable to the Loan. Memorial 105
to the Board of Trade. Sir Joseph Banks’s exertions. Bill read first and second times. Report
brought up by Sir John Sinclair. Report of the Committee. Bill meets with some opposition at
the third reading, but is passed.
CHAP. III.—1807.
Floating-light Ship.—Commencement of the Operations on the Rock.—Erection of the
Beacon-House, and Progress of the Works.
The Act provides for the mooring of a Floating-Light. Fishing Dogger purchased, fitted out 107–
and moored, under the direction of a Committee of the Trinity-House of Leith, and named the 114
Pharos. Peculiar construction of her Lanterns and Moorings. She sails for her station. A
Committee from Arbroath joins the party at the Isle of May. Is anchored in a temporary birth.
Her moorings unexpectedly slip over-board, and are recovered with much difficulty.
Description of the Pharos.
Commencement of the Operations at the Rock. Sloop Smeaton. Positions of the Beacon and 115–
Light-house fixed upon. First trip of the Artificers to the Rock on the 7th August. Rate of 120
Wages. Letter from Aberdeen Masons. Lines from Dibdin.
Erection of the Beacon-House. Work commenced 18th August. Method of fixing iron-bats 120–
into the Rock. Landing-master’s duty. Indications of the state of the Weather. Dangerous 126
situation of the Rock in Foggy weather. Artificers amuse themselves with fishing while the
Rock is under water. The fixing of the Smith’s Forge completed. Valuable services of the
Smiths on the Bell Rock. Much wanted at the Edystone. The Seals desert the Rock.
Hampered state of the Artificers on ship-board. Inconveniencies of the Pharos as a Tender. 127–
Difficulty of getting on board. Artificers become expert rowers. Their rations of Provisions. 130
“Saturday-Night at Sea.”
Reasons for continuing the works upon the Rock during part of Sundays. Preparations for 131–
having Prayers on deck. Prayer composed by the Reverend Dr A. Brunton. Some of the 135
Artificers decline working on Sunday. Additional Pay for Sunday’s work.
Artificers work knee-deep in water during neap-tides. Operations at the Rock entirely 135–
confined to the Beacon. Description of the operation of boring holes in the Rock. Difficult 137
situation of the Smiths.
Wind-Gauge much wanted, to afford a better nomenclature to Seamen. Difficult passage with 138–
the boats from the Rock to the Tender. Life-Buoy streamed on this occasion. A Tender is 141
ordered exclusively for the service of the Rock. Some of the Artificers apply for leave ashore.
Landing made upon the Rock after a gale.
Method of fixing the great iron-stanchions into the Rock. Longest day’s work hitherto had 142–
upon it. Smeaton brings off a cargo of stones for making the experiment of landing them. 152
Various methods suggested for this critical operation. Stones first landed on the Rock. Mode
originally adopted for attaching the Stone-lighters to their moorings. Smeaton breaks adrift.
Perilous situation of those on the Rock. Pilot-boat fortunately comes to their relief. The Boats
have a rough passage to the Floating-light. The Smeaton bears away for Arbroath.
Indispensable utility of the Beacon-house. Eighteen of the Artificers decline embarking for
the Rock. The boats, nevertheless, proceed with the remaining eight. Captain Pool’s account
of the drifting of the Smeaton,

Page 14

The comparative level of the site of the Building ascertained. Full complement of Buoys 153–
moored. Floating-light rides out a strong gale. State of the vessel. The Writer consults with the 164
Officers of the ship relative to the probable effect of her breaking adrift. The gale takes off.
Appearance of the Sea on the Rock. The Floating-light breaks adrift. Her cables supposed to
have been cut by a piece of wreck. Difficulty of managing this vessel. She is anchored and
moored in a new station. Her Light is first exhibited on the 15th of September 1807.
Light-house Yacht for a time becomes the Tender at the Rock. Artificers agree to continue on 164–
board of her beyond the term of their engagement. An accident happens to one of the Boats. 165
The Smeaton arrives at the Rock, 18th September, with the Beams of the Beacon-house. 166–
Preparations made, and four of the principal ones erected. Method of raising them, and fixing 171
the great Iron-Stanchions. Seven hours’ work upon the Rock in one ebb-tide. The remaining
two principal, and four of the supporting beams, erected.
The Boats have some difficulty in leaving the Rock. Shipping dispersed in a gale. Land again 172–
after an absence of four days. Smith’s Forge removed from the Rock to the Beacon. Writer 174
lands at Arbroath, after having been four weeks afloat.
The vessels are again separated in a gale. A landing effected at the Rock. State of the Beacon. 175–
Working hours extended. Beacon-works finished for the season. Mr John Rennie, and his son 180
Mr George, visit the Rock. Number of days during which the Artificers were at work.
Progress of Operations in the Work-yard. Writer visits the Rock 22d November. State of the 181–
Beacon. Professor Playfair’s observations about the unlocking of Screws. State of the 188
Floating-light.
CHAP. IV.—1808.
Shipping.—Implements.—Building Materials; and Progress of the Works.
Praam-boats built with a water-tight ceiling or lining. Method of mooring the Praam-boats. 187–
Attending boats, one of which is fitted up as a Life-boat. 188
Railways, Waggons, Sheer-crane, Moveable-beam-crane, Sling-cart, Carpenters’ Jack, Lewis- 189–
bat, Moulds, Coffer-dam, Pumps, Winch-machine. 196
Mineralogy of eastern coast. Report of Messrs Rennie and Stevenson, about Stone. The use of 196–
Granite resolved upon. Mortar of the Ancients. Attention of the Moderns to this subject. 204
Mortar of the Edystone and Bell Rock, Lime, Pozzolano, Sand, Water, Cement. Oaken
trenails, and Wedges.
The Writer visits the Rock 30th March. Floating-light’s crew. Light comparatively
feeble. Landing at the Rock difficult. State of the Beacon.
Propriety of converting it into a Barrack. Bread and Water chest. Advantages
of the Beacon to Shipping. 205–
208
Impress-service affects the Operations. Protection-Medal and Descriptive Ticket. Light-house 209–
Yacht on the station as a Tender. Preparatory works. Use of Granite restricted to lower courses 212
of the building. Use of Sandstone extended. Mr Skene’s contract for supplying Granite.
The Sir Joseph Banks Schooner takes her station as Tender at the Rock. The Writer begins the 212–
operations of the season 25th May. State of the Foundation-pit. Difficult landing. It is found 218
necessary to excavate the Rock further, to a greater depth. Artificers much afflicted with sea-
sickness. Misunderstanding about their Pay. Sailors men of all-works,
Mortar Gallery fitted up. Smeaton ballasted from the Bell Rock. Fish caught in great 218–
abundance. 219
First entire course completed in the hewing, and laid on the platform in the Work-yard at 220–
Arbroath, on the 4th June. Its cubical contents. Certainty of commencing the building 226
operations this season. Arrangements with the artificers. How employed. Interesting

Page 15

appearance of the Rock. They remain there all day. Tender bears away for Leith Roads. The
work is continued on the Rock till midnight. Its appearance. Artificers backward in landing,
owing to the appearance of the weather.
First entire course of the building removed from the platform, to be shipped for the Rock, 227–
14th June. Trial of the Landing apparatus. Fifty Artificers land. Small ruble-walls built instead 235
of coffer-dam. Advantages of a Bell as a signal in foggy weather. Force of the Sea upon the
Rock. Artificers sail for Arbroath. Pay and premiums of the Artificers this month. They
embark again for the Rock on the return of Spring-tides. How employed.
Foundation-stone prepared, landed at high-water. Laid 10th July, with masonic ceremony. 235–
237
Price of Granite advanced. A raft of Timber goes adrift. State of things at night on 239–
extinguishing the torches at the Rock. First or foundation course, consisting of 18 stones, 244
finished 26th July. Force of habit exemplified in landing on the Rock. Cargo of the first entire
course landed 28th July. The Smeaton makes a second trip in twenty hours. 4 stones are laid.
Advantage of cranes compared with sheer-poles. Mr Smeaton’s plan in the use of trenails and
wedges followed.
A party of gentlemen have a narrow escape at the Rock. First entire course completed 12th 244–
August. One of the artificers disabled in the work-yard at Arbroath. He receives an annuity. 249
Granite stones much wanted for the work. Second entire course completed. Pumping of water
discontinued at the Rock 10th September. One of the artificers, by an accidental bruise, loses
a finger. Progress of the works stopped for want of Granite. The Building brought to a level
with the higher parts of the Rock.
Great difficulty of landing. Two stones are loosened by the force of the Sea. Praam-boats ride 250–
out a gale with great ease. 31 stones laid in 6½ hours. One of the boats cannot be got out of 253
the eastern-creek. 15 stones laid. Weather very boisterous. Engineer’s Clerk most active.
Unfortunate loss of James Scott, a sailor. His mother gets a small annuity. 17 stones laid. 253–
Building closed for the season 21st September. Summary of Operations. Shipping dispersed 256
in a gale. State of things at the Rock after the gale. The Writer sails on his annual trip to the
Northern Light-houses. Visits the Bell Rock on his return. Arrangements for the Winter
months.
CHAP. V.—1809.
Progress of the Works.
Railways injured. Bracing-chains unlocked. Proofs of strong currents in the Sea. Travellers or 257–
Drift-stones found upon the Rock. Progress of works in the Yard at Arbroath. Exertions in the 262
Quarries. Captain Calder’s letter to Mr Stevenson. Drift-stones removed. Joisting of platform
lifted. A vessel in danger of being wrecked at the Rock. Cast-iron anchors.
Purchase of sloop Patriot. Floating-Light encounters heavy Seas. 12th course completed by 263–
the stone-cutters. Employment of Shipping. Patriot condemned. Opinion of Mr Solicitor- 266
General Boyle. Two Praam-boats launched. Floating-light under the charge of Mr John Reid.
Two sets of moorings laid down. Tender slips her moorings. Other three sets of moorings are
laid down.
Artificers cannot land. The sailors account for the unsettled state of the weather. The Writer 266–
visits the Rock 1st May. Some timber is landed. Tender in danger of drifting upon the Rock. 271
Joiners and millwrights get high premiums. Works make rapid progress. One of the floating-
buoys gets water-logged. Great exertions made to complete the circular reach of the railway
laid round the Building. Attempt made to erect a crane.
The Smeaton sails for the Rock with the first cargo of stones this season. Floating-Light’s 272–
moorings examined. State of her moorings. Plants and Animals observed on the building. 277
Builders commence operations 27th May. Lay 5 stones. Tender rides out a hard gale.

Page 16

Apparatus on the Rock, and state of the Sea, viewed from a boat at a distance. Landing very
difficult. State of the Weather.
Zeal of the Writer’s Assistants. Eleven Artificers left upon the Beacon. They encounter a 276–
severe gale. The Tender at this time is very uncomfortable. Artificers relieved. Mr P. Logan’s 284
account of the Beacon during the gale. James Glen’s exertions. State of matters at the Rock
after the gale. Tender obliged to leave her station. Progress of the works at Arbroath. Patriot
slips her moorings. Artificers divided into squads. Shipping belonging to the Light-house
service. Building goes on, laying at the rate of from 12 to 20 blocks per day. Great exertions
made to supply materials.
Artificers are unavoidably left all night upon the Beacon. Smeaton and Patriot slip their 284–
moorings. Remarkable breach of the Sea upon the Rock. 3 stones are in danger of being 290
washed away. Great waste of mortar. 57 stones are laid in one day. Cooking commenced on
the Beacon 24th June. Situation of mortar-makers and smiths upon the Beacon. Rope-ladder
extended between the Beacon and Building. Work stopped by a simple mistake. 66 stones
landed, and 38 laid on the 27th of June. The work can now be continued after the Rock is
overflowed by the tide.
One of the artificers meets with a severe accident, of which, however, he recovers. Have 10 290–
hours’ work to-day, and lay 59 stones. Writer visits the Carr Rock, with a view to the erection 294
of a Beacon. Joiners, at their own desire, are now left on the Beacon. Considered a favourable
omen for the inhabitation of the Light-house.
Tide for the first time does not overflow the building, 8th July. Number of joiners reduced. 294–
Balance-crane begun to be made. Tenth course completed. Building at the rate of 29 to 52 298
stones per day. The stone-lighters not loaded at Arbroath on Sundays,
William Walker, accidentally killed at Arbroath. His widow receives an annuity. One of the 298–
artificers remains alone on the Beacon. Artificers take possession of it, along with Peter 300
Fortune. His character. The Praam-boats cannot approach the Rock.
An embargo is laid on shipping throughout the Kingdom. Mr Sheriff Duff’s exertions to get 300–
the Light-house shipping relieved. Operations at the Rock while the vessels are detained in 306
port. The embargo is taken off the Light-house shipping. The propriety of stopping the Bell
Rock vessels doubted. 78 stones landed, and 40 built, on the 1st August. Twenty-four
artificers inhabit the Beacon-house. Mr Sheriff Duff visits the Rock. Building proceeds at the
rate of from 22 to 23 stones per day. The Fly of Bridport narrowly escapes shipwreck on the
Bell Rock. Mr Sheriff Hamilton visits the Rock. Additional supports for the Beacon-house
landed. Sheer-crane broken. Some of the artificers get alarmed, and leave the Beacon. Effects
of the late gale.
The Writer takes possession of his cabin on the Beacon 15th August. 52 stones landed, and 306–
eight built. One of the boats of the Floating-light loses her way in thick weather. An entire 311
course of the building is laid in one day. Prayers read for the first time in the Beacon-house.
The Smeaton arrives with the last cargo of stones for the solid part of the Building. Building
operations for the season concluded, 25th August. Notice of the very proper conduct of the
artificers. Floating-light breaks adrift. Probable height of the waves of the sea in free space.
Inducements for stopping the building at this early period of the season. The Tender continues
on the station, and the artificers occupy the Beacon-house for a time. Experience bad weather.
The Writer makes a trip to see the distinguishing-light at Flamborough-head in Yorkshire. Is 311–
overtaken with a gale, which he describes. Great want of a Public Harbour on the eastern 313
coast of England. Progress of this gale traced from Shetland to Yarmouth Roads. Mr B. Mills
of Bridlington, probably the first who suggested Distinguishing-lights with red colour.
The Writer sails for the Northern Lights. State of the works when closed for the season. Stool 313–
or prop for a crane upon the Rock demolished in a gale of wind. Artificers visit the Rock. 315

Page 17

Large Buoy has drifted and Floating-light has had bad weather.
CHAP. VI.—1810.
Progress and Completion of the Works.
The Tender visits the Rock and Floating-light, 5th January. The Artificers cannot land again 317–
until the 11th March. Beacon rendered very secure. Landing extremely precarious in winter. 319
Retrospective view of the works. Mylnefield and Craigleith quarries. Practical inferences 320–
about concluding the works. Timber Gangway or Bridge. Operations commence for the 324
season. Bridge erected at the Rock. One of the artificers gets himself hurt.
Writer proceeds to the Rock to begin the building operations, 1st May. Praam-boats ride 324–
easily. State of the Building, Beacon and Timber-bridge. Balance-crane landed upon the Rock. 329
Position of the entrance-door. Artificers take possession of the Beacon for the working season.
The Smeaton arrives with the first cargo of stones for the season. No communication with the 329–
Rock, 12th May. Balance-crane ready for use. Theory of Sea and Land breezes. Smeaton slips 331
her moorings, and is driven up to Leith.
Patriot sent to Mylnefield quarry for the last cargo of stones to be carried to Arbroath for the 332–
Light-house, 17th May. State of the lower part of the Beacon, from the effects of a marine 336
insect. 23 blocks of stone landed, and raised with the new tackle. One of the stones in danger
from the breaking of a bolt. The Smeaton makes rapid trips from Arbroath to the Rock with
materials. Prayers read for the first time on the Building. Exertions of Landing-master’s crew.
35th course completed. Arrangements for the conduct of the works, and safety of the Beacon.
Balance-crane shaft unfortunately breaks.
The Writer is welcomed in at the door of the Light-house, 26th May. Fixtures of the Hinges of 336–
the Door and Windows. Great expedition of the Shipping with the Materials. Patriot makes 339
one trip in 33 hours. 36th course laid. King’s Birth-day observed, 4th June.
Stair-case of the Light-house completed, 5th June. Progress of works at Edinburgh. Artificers 340–
liable to accident. Boat and Life Buoy provided for the Beacon. Trenailing of the stones of the 342
building discontinued. Number of persons inhabiting the Beacon. Fitting of the window-
hinges tedious. Comforts of good weather. Balance-crane shifted.
Moveable beam-crane erected on Western Wharf. 2 stones upset by the force of the sea. A 341–
praam-boat is sent from the Rock without delivering her cargo. Floor of the Lightroom-store 344
laid, 13th June. Mr John Reid gets leave on shore, after having been about three months
afloat.
First letter written from the Bell Rock Light-house. Its floors, and those of the Edystone 344–
described. 31 persons lodged in the Beacon. Pay and premiums of the artificers at the Rock. 347
Seamen find one of the lost sets of moorings. Experiment of collecting Gas from Fishes.
Cause of ground swells.
Landing-master’s dress, and activity of his crew. Want of the Western Wharf seriously felt. 347–
Operation of shifting the Balance-crane. Western Wharf finished, 17th June. Remarkable state 352
of the sea at the Rock. Landing-master’s crew have now more leisure. Disagreeable state of
the weather. Responsible situation of the principal workmen.
Carpenter of Floating-light leaves the service. Patriot makes a trip to and from Arbroath in 24 352–
hours. Attempts made to land stones at high water with the bridge apparatus. Process of 357
landing stones. Seamen become discontented. The Writer’s correspondence on this occasion.
He goes on board of the Tender. Dismisses two of the seamen.
Progress of the works at Arbroath. 62d course built at the Rock. The artificers are wetted by 357–
the sea on the top of the walls. Mr John Reid’s report regarding the Floating-light. Narrow 361
escape of William Kennedy, one of the masons.
Writer describes his cabin. The distressing case of George Dall, an impressed seaman. 362–
Magistrates of Arbroath visit the Rock. Number of artificers reduced to 22. Narrow escape of 365

Page 18

the Smeaton at the Bell Rock. Advantage of alarm-bells. Artificers in the Beacon-house
greatly alarmed.
Progress of the Light-room works. Mrs Dixon, the late Mr Smeaton’s daughter, visits the Bell 365–
Rock works at Edinburgh. Mr D. Logan joins the works at the Rock. The Patriot is 7 days in 369
being cleared of a cargo. Progress of raising the stones to the top of the Light-house,
Last cargo of stones at Arbroath shipped for the Rock, 9th July. Library floor laid. Ring-bar- 369–
course laid. The Dome-course occupies much time in building. 372
Landing-master’s crew reduced in number. Patriot driven from the Rock. Ceremony observed 372–
at loading the last stone at Leith. Many strangers visit the works in their present state. 377
Difficulty of raising and laying the stones of the cornice. 84th course completed. Eight stones
of Balcony course laid. This course completed 27th July. Ceremony at landing the last stone.
Machinery partly dismantled, 31st July. Foot of Balance-crane taken down. The Earl of 377–
Kellie, and Mr Sheriff Monypenny, land at the Rock. Centre-stone of floor laid 3d August. 379
Artificers leave the Rock. The Writer meets with his Assistants at Arbroath.
Plans arranged for building the Houses at Arbroath for the families of the Light-keepers. The 379–
duty on stone charged upon these buildings. Three years of the unexpired lease of the work- 383
yard given up. Base-line measured on the Sands of Barry. Trigonometrical Survey of Great
Britain alluded to.
Artificers return to the Rock. Smeaton obliged to leave her station. Mortar gallery completely 383–
broken up by the sea. The Tender returns to the Rock. The Smith’s anvil and bellows washed 386
off the Beacon.
Light-room sash-frames landed 23d August. Captain Wilson is accidentally hurt by one of 386–
them. Last stone of the Light-house laid, 2d September. 388
The Sir Joseph Banks Tender sails for Leith to be sold. Praam-boat drifts from the Rock. 388–
Artificers for the erection of the Light-room landed upon the Rock on the 14th of October. 394
The Writer sails for the Northern Light-houses, accompanied by his friends Dr Barclay, Mr
Oliphant, and Mr Neill. Progress of the Light-room works on his return. Unfortunate loss of
Charles Henderson. Difficulty of procuring red-coloured glass. Ventilating or Finishing ball
fixed upon the Cupola of the Light-room, 22d October. Light-room glazed. Light-house Yacht
loses one of her boats off the Bell Rock. Great dexterity of the Landing-master and his crew.
State of the Railways, Beacon, and Light-house. Condition of the several apartments. House 394–
put under the charge of Mr Reid, principal Light-keeper, 30th September. Small boat washed 399
off the Beacon. Sprays rise 104 feet upon the Light-house. Seas fly from stem to stern of the
Floating-light. Mr Reid left with Peter Fortune in charge of the Light-house. They experience
a severe gale. Their description of the effects of the Sea.
The Red-coloured Glass arrives at Edinburgh, 6th December. Reflecting apparatus shipped for 399–
the Rock, and landed on the 15th. The Light is advertised to the Public on the 17th. List of 402
Newspapers in which the advertisement is inserted. The Light-keepers are left in possession
of the House, together with Mr Forrest, general superintendant.
CHAP. VII.—1811.
Account of the Bell Rock Light-House, from its completion till the Year 1823,
including Statements of the Expence, Quantity of Materials and Workmanship
connected with the Work.
1811. The Light is exhibited on the 1st of February, when the Floating-Light is extinguished. 404–
A Storm occurs on the night that the House is lighted. Floating-Light puts into Anstruther, on 405
her return voyage to Leith. State of her bottom.
The Light-keepers get their turns of liberty on shore. Letter from Mr Forrest to the writer. 406–
Effects of the Sea on the building. State of the Railways and Wharfs. Remarkable force of the 410
Sea in lifting a large piece of lead. Direction of the Seas which have the greatest effect upon

Page 19

the Light-house. Comfortable state of the building. Qualifications of the Light-keepers. Mr
Forrest leaves them in full possession of the house.
Progress of Ulterior works. Lord Boyle and a party land at the Rock. Boats suitable for 411–
landing there. Bruce’s “two-half Boat.” Light-house stove takes fire. Sprays rise to the height 413
of the Light-room. Advantage of double windows.
1812. Light-house excites much interest. Sir William Rae and Mr Duff, visit the Rock. The 414–
Beacon is taken down, and removed from the Rock. Mode of securing timber against the 416
Oniscus insect. Light-house encounters another gale. Remarkable shock of the Sea. Professor
Robison’s opinion on this subject. State of the Sea from which the Frontispiece is delineated.
It overruns the Rock at low-water. Mode in which the Light is attended.
1813. Establishment of the Light-keepers at Arbroath completed. Signals observed at the 417–
Rock. Thunder-rod. Method of fixing it. 418
1814. A party of the Commissioners, with Sir Walter Scott, visit the Light-house. 419
1815. Permanent Railways begun to be fitted up. Lord President Hope visits the Rock. 419
1816. Pharos Tender built. Exterior of Light-house painted. 419
1818. Fuci disappear from the Rock. 420
1819. Permanent Railways completed. Improved Access to the Light-house by a brazen 421
ladder. Sprays rise 105 feet. A piece of the highest part of the rock carried away by the
violence of the Sea.
1820. Improvements on the Light-house. Inner door of brass, &c. 421
1821. A new Machine for taking up the Stores. Mr John Reid retires from the Light-house 421
service on half-pay.
1822. Light-house Works and Model completed. Design for Wolf Rock. 422
1823. Severe Storm. Carrier-pigeons sent from the Rock. Expence of the Work. Cubic 423
contents of the Materials.

APPENDIX.

Page
No I. Additional Light-houses proposed on the Coast. Light-Keepers’ Instructions. Rations 425–
of Provisions at the Bell Rock. Monthly, and Ship-wreck Returns. 437
II. Poem on Sir Ralph the Rover, extracted from Mr Southey’s Works. 438
III. Abstract Account of Light-house Duties. 439
IV. Reports relative to the Bell Rock Light-house, by Mr Rennie, and the Writer. 440–
468
V. Remarks relative to the Ground-Swells of the Sea. 469–
470
VI. Schedules of Materials and Workmanship. 471–
474

Page 20

VII. Abstract Account of Expence. Average Price Provisions. 475–
483

DESCRIPTION OF PLATES.

Plate I. Inchkeith Light-house. 487
II. Carr Rock Beacon. 487–489
III. Chart of Great Britain, with Sections of the Depths of the Sea. 490
IV. Chart, shewing the position of the Bell Rock, in relation to the opposite Shores. 490
V. Chart, shewing the Position of the Rock, in relation to the Shipping. 491
VI. Plan of the Rock, shewing the Position of the Light-house. 492–499
VII. Original Designs for the Light-house. 499–501
VIII. Beacon House. 501–503
XI. Progress of the Works. 503–505
X. Implement and Apparatus connected with the Work. 505–508
XI. Sheer-crane, Praam-boat discharging, &c. 508–510
XII. Work-yard, Light-Keepers’ Houses at Arbroath. 511
XIII. Plan of the several Courses of the Masonry of the Light-house. 511–515
XIV. Moveable Beam Crane. 515–517
XV. Foundation-Pit of the Light-house. 518
XVI. Elevation and Section of the Light-house. 518–519
XVII. Balance-Crane. 520–522
XVIII. General View of the Works. (See page 424.) 520–523
XIX. Door and Window Hinges, and Thunder-rod. 523–525
XX. Balcony and Light-Room. 526–529
XXI. Frontispiece explained. (See Title-page.) 529
XXII. Vignette on Second Title-page. (See page 62.) 530
XXIII. Design for a Light-house, suggested on visiting the Wolf Rock, 530–533

Page 21

INTRODUCTION.
ACCOUNT OF THE INSTITUTION OF THE BOARD OF
COMMISSIONERS AND OF THE PROGRESS MADE IN THE
ERECTION OF THE NORTHERN LIGHT-HOUSES.
Among the Nations of Europe, the Scots have always
Institution of Board of
Northern Light-
been allowed to possess a considerable share of
houses. maritime enterprise. The local situation and
circumstances of Scotland necessarily directed the
genius of its people to the pursuit of nautical affairs. Their voyages to the
Hanseatic Towns, and to all the commercial countries of Europe, were
naturally longer than those of their more southern neighbours of England,
who were separated from the Continent only by a narrow channel, which
must have rendered their communication in the rude periods of maritime
discovery comparatively easy. The voyages of the Scots even to the most
contiguous parts of France and the Low Countries were upwards of 140
leagues, along a coast intersected by innumerable shoals; and, in the time of
war, lay so open to the attacks of English ships, that, in prosecuting them,
the navigators were obliged to abandon the usual track, and hold a course
far from the shelter of the land, exposed to all the dangers of the seas and
the vicissitudes of the weather.
In those early periods of our national history, when Britain was divided into
two separate and independent states, jealous of each other, it became
necessary for Scotland to form alliances with foreign powers, when distant
voyages, and much intercourse by sea was indispensable. The frequent
struggles with the marauding powers of the North, obliged her to keep a
more considerable navy than would otherwise have been required for the
protection of her commerce. The connection likewise, with Denmark and
Norway, through the marriage of James III. with Margaret daughter of
Christian I., in 1469, was attended with the final annexation of the Orkney
and Shetland Islands to the Crown of Scotland;—circumstances which

Page 22

naturally extended her foreign traffic, and completely united the dominion
and the navigation of the whole line of her coast.
It was reserved, however, for the influence and happy effects of the Union
of the Crowns and Kingdoms of England, Scotland and Ireland, to draw
forth the full energies of these countries. During the long and glorious reign
of his late Majesty, the name and character of the United Kingdom have
been highly advanced in arms, while her works of industry, have not only
flourished at home, but been extended to the remotest parts of the world.
About the middle of the last or eighteenth century, the
Improvement of the
Highlands.
true value of the Highlands of Scotland, and the best
interests of these extensive districts, may be said for the
first time to have been understood. Since that period, the object of the
Government has been more especially directed to the industry of the
inhabitants, in giving every encouragement and facility to the establishment
of fisheries, towns and harbours, along the shores of the north and west of
Scotland; and in opening interior communications, by the introduction of a
system of roads, the formation of an extensive inland navigation, and the
execution of other national works.
Soon after the internal disturbances which marked the
Extension of Trade.
year 1745, the trade on the coast of Scotland with
sloops or vessels of small tonnage, became
considerable, in consequence of the bounties and encouragement given to
the extension of the British fisheries. About this time also, the important
manufacture of kelp or marine alkali, from certain species of fuci abundant
on the northern and western shores of Scotland, was introduced. Besides
carrying the kelp to market, a considerable number of small vessels was
employed in conveying salt and other articles required for the fisheries,—in
the Irish coasting trade,—in carrying slates from Argyleshire,—and in
transporting the rich iron-ore of Cumberland to the foundries on the eastern
shores of the kingdom. A trade was likewise carried on from the Firth of
Clyde, Liverpool, and the west of England in general, and north of Ireland,
with Norway, the Baltic, and the other States in the north of Europe, in
timber, iron, tar and other commodities; and in exchange for these were
received coal, salt, and the various exports of Britain. These all became
sources of commerce, which created a demand for shipping, and promoted
numerous voyages along the northern and western coasts of Scotland,

Page 23

which now became more known and frequented. But such was the length
and peril of a voyage round the coast of Scotland, by the Orkneys and
Western Islands, without the aid of light-houses, or even of correct charts,
that the traffic along these shores was still comparatively small.
It was to remove these difficulties in some measure,
Inland Navigation.
that the formation of a navigable canal between the
Friths of Forth and Clyde, had long been in agitation;
and in the year 1767, the measure was brought forward in the House of
Commons. This canal, upon a voyage from the Forth to the Clyde, is
calculated to save no less than about 628 miles; the distance, by the inland
navigation being reduced to about 35 miles. This work having been carried
into execution, was opened from sea to sea in 1790, forming an important
step in the progressive intercourse by water-carriage, a system which has
since been so remarkably extended to all parts of the united kingdom. But
the usefulness of the Forth and Clyde Canal was greatly marred by an
unfortunate error in its construction, its depth having been limited to 9 feet,
and its consequent incapacity for carrying sea-borne ships of large burden;
so that the inconveniences of a circuitous voyage round Scotland still
remains for all the larger classes of shipping. In the formation of the
Caledonian Canal, the error of the Forth and Clyde navigation has been
avoided; this noble work being capable of receiving ships which draw 21
feet of water.
Notwithstanding these great improvements, it was still
Voyage of James V. in
1540.
found necessary, from the increasing state of trade, to
give further facilities to the navigation of the northern
shores, by the Orkney and Western Islands. The first step taken towards this
object, was to procure accurate surveys of the coast; for it is a curious fact,
deserving of notice, that the little journal and chart of the enterprising
voyage of James V., with many of the Scottish Nobles, from the Firth of
Forth to the Solway Firth , by the Orkneys, was long consulted as the only
guide for these seas. This voyage, so honourable to the naval annals of
Scotland, was undertaken by James with twelve ships in the year 1540,
under the direction of Alexander Lindsay, the most skilful pilot of his time.
At the request of the Philosophical Society (now the
Original Charts.
Royal Society) of Edinburgh, the Rev. Alex. Bryce of
Kirknewton, about the year 1740, made a geometrical

Page 24

survey of the North-west coast of Scotland, including the shores of
Caithness and Sutherland. This paved the way for the more extensive
labours of Mr Murdoch Mackenzie, who, after finishing his excellent charts
of the Orkney Islands in the year 1750, was employed by Government in a
survey of the whole of the Western Highlands and Islands, from Cape Wrath
in Sutherlandshire to the Mull of Kintyre. But long after the publication of
these valuable charts, the navigation of the sounds and sheltered seas of this
district was seldom ventured upon by the larger class of shipping employed
in foreign trade. The danger of falling in prematurely with the land during
the night, and the rapidity of the tides on these shores, induced the mariner
to keep along the extreme points and headlands of the coast, holding his
course even to the northward of Orkney and Shetland, and to the westward
of the Lewis Isles by St Kilda, exposed to the heavy seas of the Atlantic
Ocean. In this way, much hazard to shipping, and loss of time, were
incurred; and when overtaken with gales of wind, such vessels were unable
to avail themselves of the numerous bays and anchorages of the Highlands;
—considerations of much importance to heavy laden ships, but especially to
the smaller classes of coasting and fishing vessels. It therefore appeared,
that nothing but the erection of Lighthouses, by which the mariner might
identify the land under night, would render this navigation at all a safe one.
Representations had often been made by shipmasters to
Proposition of a
Light-house Board.
their owners, of the difficulties and dangers
encountered in sailing along the coast of Scotland. The
establishment of a Light-house Board, and the erection of Light-houses on
our Northern Shores, became the topic of conversation among mercantile
men; and the subject was at length brought forward at the meeting of the
Convention of the Royal Boroughs of Scotland, in the year 1784, by the late
Mr Dempster of Dunnichen, then Provost of Forfar, and Member of
Parliament, as worthy of the notice of the Legislature.
A bill was accordingly framed by the late Mr John
Passing of the
Original Act, 1786.
Gray, writer to the Signet, agent for the Royal
Boroughs, which was brought into Parliament by Mr
Dempster, in the session of 1786. By this act, the 26th Geo. III. chap. 101.,
a Board was appointed, for the erection of Light-houses on the coast of
Scotland; the preamble stating that “it would conduce greatly to the security
of navigation and the fisheries, if four lighthouses were erected in the

Page 25

northern parts of Great Britain,” viz. one on Kinnaird Head, in
Aberdeenshire; one on the Orkney Islands; one on the Harris Isles, and one
at the Mull of Kintyre, in Argyleshire; for which a duty of one penny per
register ton, for British, and twopence per ton upon foreign ships, should be
paid by every ship or decked vessel which should pass one or all of these
lights.
The Commissioners appointed for putting this act in
Commissioners ex execution, are, “His Majesty’s Advocate and Solicitor-
Officio.
General for Scotland; the Lord Provost and First Bailie
of Edinburgh; the Lord Provost and First Bailie of Glasgow; the Provosts of
Aberdeen, Inverness and Campbeltown; the Sheriffs of the Counties of
Edinburgh, Lanark, Renfrew, Bute, Argyle, Inverness, Ross, Orkney,
Caithness, and Aberdeen;” and to these have since been added, the Sheriffs
of the Counties of Ayr, Fife, Forfar, and Wigton, agreeably to a clause
which authorises the Commissioners to add to their number.
The first meeting of the Commissioners was held at
First Meeting of the
Board.
Edinburgh on the 1st day of August 1786; and consisted
of the following members:
His Majesty’s Solicitor-General, Robert Dundas of Arniston.
The Lord Provost of Edinburgh, Sir James Hunter-Blair, Bart.
The First Bailie of Edinburgh, James Dickson, Esq.
The Sheriff of the County of Bute, Bannatyne Macleod, Esq.
The Sheriff of the County of Aberdeen, Alexander Elphinston, Esq.
The Sheriff of the County of Lanark, Sir William Honyman, Bart.
The meeting having elected Sir James Hunter-Blair to
Mode of raising
Funds.
be their Preses, and appointed Mr Gray to be their
Secretary, deliberated upon the measures to be taken for
giving effect to the statute. The first object of the Board was to borrow the
sum of L. 1200, which they were authorised to raise. As all the
Commissioners were acting ex officio, it was suggested, that the most
convenient method of arranging the security for the funds to be borrowed,
would be for the Magistrates of the five boroughs mentioned in the act to
become security, upon assignment of the duties leviable for the lights,—a
mode which was accordingly adopted.

Page 26

The preses informed the meeting, that he had
Progress of Northern corresponded with persons the most likely to afford
Light-houses.
information relative to the best construction of Light-
houses, and had received answers from Liverpool to a
Information about
Light-houses. variety of queries regarding Light-houses, where the
use of coal-fires had been laid aside, and where oil
lights, with reflectors, had been introduced: That he had also got various
plans and estimates for Light-houses lighted with oil: That the Chamber of
Commerce of Edinburgh had furnished a plan of the Light-house on the
Island of May, in the Firth of Forth, and also a description of the light on
the Island of Cumbraes, in the Firth of Clyde, both of which were then open
coal-fires: In particular, that he had received from the late Mr Thomas Smith
of Edinburgh, plans and observations on the construction of Light-houses
with Lamps and Reflectors; which having been ultimately approved of, Mr
Smith was nominated Engineer to the Board. After appointing a Committee
for preparing matters for a general meeting, they adjourned till the 23d of
January 1787.
In pursuance of the act of Parliament, the
Transactions of 1787.
Commissioners gave directions that a correspondence
should be opened with the several proprietors of the
land where the four original Light-houses were specified to be erected. An
answer was immediately received from Mr Traill of Westness in Orkney,
requesting the Board’s free acceptance of the ground necessary for erecting
the Light-house proposed for the Northern Isles of Orkney, on any part of
his property. Application was made to the Duke of Argyle, as to the ground
for the erection of a Light-house on the Mull of Kintyre; to Lord Saltoun,
relative to the station of Kinnaird-Head, in Aberdeenshire; and to Mr
Macleod of Harris, as to the site of a Light-house on Island Glass. Measures
were also taken for obtaining fit persons to contract for erecting the
necessary buildings, and for conducting the operations at the different
stations.

Kinnaird Head.

The result of the correspondence with Lord Saltoun, was the purchase of the
old building of Kinnaird Castle from his Lordship, on which a lantern or

Page 27

light-room was erected. After encountering
Kinnaird-Head Light- considerable difficulties in the outset of this
house.
establishment, the house was got ready for the
exhibition of the light by the month of December 1787, and the following
notice to mariners was officially given by the Secretary in the London
Gazette, and in the Edinburgh, Glasgow, and Aberdeen newspapers.
“By order of the Commissioners appointed by Act of Parliament for
erecting four Light-houses in the northern parts of Great Britain, a Light-
house is now erected on Kinnaird Castle, at Kinnaird-Head, near
Fraserburgh, in the county of Aberdeen, Lat. 57° 42´, and Long. 2° 19´ West
of London, Cairnbulg from the Light-house bearing, by compass, S.E.,
distant 2 miles; and Trauphead W.NW., distant 9 miles. The lantern is 120
feet above the level of the sea at high-water, and will be seen from SE. to
W.NW. and intermediate points of the compass on the north of these points.
The lantern will be lighted on the night of the first day of December 1787,
and every night thereafter, from the going away of day-light in the evening
till the return of day-light in the morning.”

Mull of Kintyre.

At the Mull of Kintyre, one of the most inaccessible
Mull of Kintyre
Light-house.
and difficult of the Northern Light-house stations, the
buildings were nearly prepared for the light-room by
the month of November; but the season being too far advanced, and it
appearing from Mr Smith’s report, that there would be some risk in
conveying the apparatus to the light-house at this inclement season, the
Commissioners resolved to delay the further progress of the work at Kintyre
till the following spring.
The operations at the Mull of Kintyre were
1788.
recommenced in the month of April, but, owing chiefly
to the inaccessible great difficulty that was experienced
in transporting the building materials connected with the lantern or light-
room, over the mountainous district of Kintyre, it was the month of October
before the light could be announced for exhibition, when public
advertisement was made of the lighting of the house to the following effect.

Page 28

“The Mull of Kintyre Light-house is situated immediately above the rocks
known to mariners by the name of The Merchants, in North Lat. 55° 17´,
and Long. 5° 42´ west of London; the eastern entrance of the Sound of Isla,
bearing from the Light-house by compass, N. by E., distant 33 miles; the
Mull of Kinho in the Island of Isla N. NW., distant 25 miles; and the
northern extremity of Rathlin Island, on the coast of Ireland, NW. ½ W.
distant 13 miles; the Maiden Rocks S. by W. ½ W., distant 21 miles; and
Copland Light-house S. by W. ½ W., distant 40 miles. The light-room is
elevated 240 feet above the medium level of the sea, and will be seen from
N. NE. to S. by W., and all intermediate points of the compass north of
these points. The light will be exhibited on the 1st day of December 1788,
and every night thereafter, from the going away of day-light in the evening
till the return of day-light in the morning.”
In the progress of the works of the Northern Light-
Light-house duty too
small.
houses, it soon became evident, from the diminished
state of the funds, that the light-house duty of 1d. per
ton upon British vessels, and 2d. upon foreign bottoms, was too small. By
the original act, also, this duty was only to be levied after the whole of the
lights at the four stations had been exhibited to mariners; but the Board
having found that it would be expedient to commence the collection of the
duties so soon as two were lighted, resolved on applying to Parliament for a
new act.
A bill was accordingly brought into the House of
Act of 1788.
Commons by Sir Ilay Campbell, M. P., when Lord
Advocate for Scotland, and ex officio one of the
Commissioners of the Northern Light-houses, which passed in the session
of 1788, empowering the Commissioners to levy a duty of 1½d., or one
halfpenny more per ton upon British ships, and 3d., or one penny per ton
additional upon foreigners; and, in the mean time, to commence collecting
half duties till the whole of the four light-houses mentioned in the former
act were lighted, when the full duties were to become exigible. Already
about L. 4000 had been expended on the light-houses of Kinnaird-Head and
Kintyre. By this new act, however, the Commissioners being empowered to
borrow a further sum of L. 3000, were not only enabled to forward the
operations already commenced, but, with this additional duty, it was

Page 29

expected that they would soon be in a condition to answer the calls of the
shipping interest for additional erections on the coast.

Island Glass.

Considerable progress had been made in the course of
1789.
the former season with the erection of the Light-house
at Island Glass in Harris, which was finished and
lighted on the 10th day of October 1789, the following being its
specification:—The Point of Island Glass, one of the Harris Isles, is situated
in North Lat. 57° 50´, and Long. 6° 33´ west of London. Ru-Ushiness bears
from the light-house, per compass, E. NE. ½ E., distant 8 miles; northern
extremity of Shiant Isles E., ½ S., southern extremity of ditto E. by S. ½ S.,
distant 11 miles; Skerne Rock SE., ½ E., distant 3 miles; Skergraidish Rock
S. SE. ¼ E., distant 9 miles; Point of Trotternish in Sky S. SE. ¼ E., distant
16 miles; Point of Vaternish S. SW. ¼ W., distant 15 miles; Dunvegan-Head
SW. ½ S., distant 20 miles; Point of Roudil, at the entrance of the Sound of
Harris, W. by S., distant 14 miles. The light-room is elevated 70 feet above
the medium level of the sea, and will be seen from E. NE. ½ E., from W. by
S., and intermediate points of the compass south of these points.
While the works of Island Glass were proceeding, a
North Ronaldsay
Light-house.
light-house was also erected, and lighted 10th October
1789, on the island of North Ronaldsay, in Orkney; but,
as the light at this station was afterwards removed to the neighbouring
island of Sanday, it will fall more properly to be noticed in the form of a
Tower or Beacon, into which the building was converted, after a Light-
house had been established at the Start Point of Sanday.

Pladda.

The erection of the four light-houses of Kinnaird Head,
Application for North Ronaldsay, Island Glass, and the Mull of Kintyre,
Pladda Light-house.
completed the operations of the Northern Light-house
Board, referred to in the original act of 1786; and at the time of passing that

Page 30

act, it was not foreseen that a greater number would be required on the coast
of Scotland for a series of years. But the benefit of the lights which had
already been erected, in affording much greater safety and facility to the
mariner in those dangerous seas, became so apparent, that they were no
sooner exhibited than applications from different quarters for new erections
followed. Among these, a memorial was presented to the Commissioners by
the Merchants’ House of Greenock, accompanied by a letter from the
Chamber of Commerce of Glasgow, setting forth the advantages which the
shipping of the Clyde would derive from the erection of a light-house upon
the small island of Pladda, situated at the southern extremity of the island of
Arran, and entrance of the Firth of Clyde. This memorial concluded by
requesting, that the Commissioners would “take such measures as should to
them seem most proper, for procuring an act of Parliament, in order to carry
the erection of a light-house on the island of Pladda into execution as soon
as possible.”
An act was accordingly obtained, in the session of
Act of 1789.
1789, not only for the erection of Pladda Light-house,
but for extending the powers of the Commissioners to
the erection of such other light-houses on the coast of Scotland as to them
should seem necessary, whenever the free produce of the duties of 1½d. and
3d. per ton respectively on British and foreign ships should enable the
Board to do so. In consequence of the act of 1788,
Collectors appointed.
authorising the collection of half duties so soon as two
of the four light-houses mentioned in the original act
should be lighted, collectors at the different customhouses of all the ports of
Great Britain were appointed to receive the Northern Light-house duty, and
for their trouble they were to be paid at the rate of 10 per cent. upon the
sums they should respectively receive: But the business being scarcely
organized in 1789, and only half duties being exigible, the whole money
collected in that year amounted but to L. 290:14:6, and even this small sum
formed part of two years’ collection. From the smallness of the duties, and
the extent of the operations which the Commissioners had now on hand,
they were much pressed for the necessary funds, and but for the liberality of
their bankers Sir William Forbes and Company, the operations of the Board
must have been greatly hampered. Indeed, Sir James Hunter Blair, one of
the partners of that house, when Lord Provost of Edinburgh, and ex officio a
member of the Board, had been highly instrumental in forwarding the

Page 31

establishment of the Northern Light-houses; and it was, perhaps, from such
adventitious circumstances, together with the economy of the measures
originally pursued, that the progress of the Light-house works proceeded,
without experiencing any interruption from want of funds.
1790. The light-house of Pladda was finished in the course of
the year 1790, and lighted on the 1st day of October. As
before noticed, it is situated in the Firth of Clyde, on the small island of
Pladda, near the south-west point of the island of Arran, in North Lat. 55°
30´ and Long. 5° 4´ west of London; the entrance of Campbeltown Loch
bearing, by compass, W.NW. ¼ N., distant 18 miles; Island of Sana W.,
distant 20 miles; Craig of Ailsa SW. by S., distant 15 miles; entrance to
Loch Ryan S.SW., distant 25 miles; and the Heads of Ayr E.SE., distant 16
miles. The light-room is elevated above the medium level of the sea 70 feet;
and the light is seen from NE. by E. to NW. by W. and intermediate points
of the compass south of these points.
In order to distinguish Pladda Light-house from the
1791.
light upon the Promontory of Kintyre on the one hand,
and that upon the island of Cumbrae, further up the
Distinguishing light at Firth of Clyde, and also from the Copeland light on the
Pladda.
Irish coast, it was found necessary, in the course of the
year 1791, to erect a small Light-room, immediately under the principal
light, that, by shewing two distinct lights at this station, the one 20 feet
higher than the other, it might be distinguishable from those above alluded
to. This small light-room being rather of a temporary construction, the
Board have it in view to erect one upon a more efficient plan, when certain
repairs which are in contemplation at Pladda shall be made.
The Northern Light-houses being situated in parts of
Annual supply and
inspection of the
the country remote and inaccessible, it became
Lights. necessary to arrange some systematic and proper plan
for managing the ordinary business of the Board,
which, at this time, had only one stated meeting, held by act of Parliament
in the month of July annually. A special meeting was accordingly convened
by the Secretary, in the month of March 1791; at which there were present,
the Lord Advocate of Scotland; the Lord Provost of Edinburgh; the Sheriff
of Aberdeen; the Sheriff of Renfrew; and the Sheriff of Orkney, Mr Charles
Hope, now Lord President of the Court of Session. This meeting having

Page 32

taken into consideration the proper mode of supplying the light-houses, and
of attending to the conduct of the light-keepers, it was resolved, That the
engineer should charter a vessel annually, to carry a full complement of
stores and other necessaries for the use of the lights, and such artificers,
implements and materials as might, from time to time, be found necessary
for making repairs at the light-houses; and also, that the engineer should
annually visit each light-house, and report upon the state and condition of
the buildings, and upon the conduct of the respective light-keepers in
keeping the lights, and in the management of the stores and appurtenances
committed to their charge; with power to dismiss them for neglect of duty.
The light-keepers already engaged in the service, had
Light-keepers’ Salary.
been verbally informed by the engineer, that they would
be paid L. 30 of yearly salary; and this meeting having
before it a range of salaries paid to light-keepers both in England and
Scotland, varying from L. 20 to upwards of L. 70, it was resolved, That in
ordinary situations, the salary of the light-keepers in the service of the
Northern Light-houses should be L. 30 per annum, with a piece of garden-
ground and pasture for a cow, and a sufficient quantity of fuel for the use of
their families.
In consequence of this arrangement, a vessel of about
First voyage of the 100 tons burden was chartered and fitted out with stores
Engineer.
and other necessaries for the use of the Northern Light-
houses; and in the course of the summer of 1791, Mr Smith made his first
annual visit by sea to the light-houses—the journeys of the engineer having
hitherto been performed chiefly by land. On this voyage, every thing was
reported to be in good order at the several stations, excepting at the Light-
house of North Ronaldsay, which he found to be very improperly kept: it
appeared also that the light-keeper at this station had been embezzling the
stores committed to his charge. This person was formerly a ship-master,
who, finding it difficult to get employment in the line of his profession, had
been very improperly recommended to the attention of the Light-house
Board. Under circumstances of such misconduct, the
Light-house keeper engineer immediately dismissed him from the service,
dismissed the service.
and his conduct was further taken cognizance of by the
Sheriff of the county.

Page 33

The business of the Light-houses was now so arranged,
Economical plan of that matters went on in a very prosperous and
the early Light-
houses. successful manner. So well, indeed, had the plans and
buildings of their engineer been considered, and made
to meet the slender funds of the Board, that, with an expenditure of little
more than L. 10,000, five lights had been exhibited upon the coast. Though
these buildings were unavoidably very much circumscribed in their
accommodations, and even temporary in their construction, yet the speedy
exhibition of the lights was of great benefit to navigation, while the
improving state of the light-house duties enabled the Commissioners to
extend their influence along a greater range of coast; and the different
buildings have since been enlarged and completed in a much more
substantial manner, by applying the surplus funds to these purposes.
In the year 1793, the prosperous state of funds induced
1793.
and enabled the Commissioners to attend to the
applications of mariners for additional light-houses on
Application for the coast. In particular a letter, to be afterwards more
additional light-
houses. fully noticed, was addressed to the Light-house Board
by Admiral Sir Alexander Cochrane, then commanding
his Majesty’s ship Hind upon the Leith station, setting forth the great
benefit that would accrue to shipping, from the erection of a light-house
upon the Bell Rock. Representations were likewise made at this time by the
merchants of Liverpool, regarding the propriety of erecting a light-house
upon the Skerries, situated in the middle of the Pentland Firth , which
separates the Orkney Islands from the Mainland of Caithness. The object of
a light here, was to open this Firth as a passage to shipping in general, and
to enable the mariner to avoid a circuitous and dangerous voyage to the
northward of the Orkney Islands.
At this period, however, the Commissioners could not
State of the Light-
house funds.
venture to undertake a work of such magnitude and
difficulty, as the erection of a light-house upon the Bell
Rock. The amount of the light-house duties at first was extremely limited;
and though in a progressive state, yet, for 1789, as before stated, they only
amounted to L. 249:14:6. For 1790, the sum was L. 1477:5:1; for 1791, it
was L. 2736:9:2; for 1792, it rose to L. 3160:18:1. But in the year 1793, of
which we are now treating, the duties rather declined, and they only netted

Page 34

L. 2868, 3s. 5d. The Commissioners were nevertheless enabled to pay off
L. 4200, which, by the acts of 1786 and 1788, they had been empowered to
borrow, and likewise to discharge the advances made by Sir William Forbes
and Company; still leaving a balance of about L. 2000 of surplus duties in
the hands of their treasurer. The funds being, therefore, still very limited,
and only in a condition to enable the Board to erect a light-house of the
ordinary construction, the erection of the light-house on the Pentland
Skerries was resolved on; and the further consideration of the Bell Rock
light-house reserved, until the funds should be in a more advanced state.

Pentland Skerries.

Some difference of opinion arising among the
Regarding the site of
the Pentland Firth
gentlemen and merchants of Orkney, whether the light-
Light-house. house proposed for the Pentland Skerries should not
rather be erected upon the island of Copinsha, situate
about fifteen miles northward of the Portland Firth , the matter was referred
to the opinion of the Association of Ship-owners of Liverpool, and to the
Chambers of Commerce of Glasgow and Greenock, when these public
bodies unanimously and strongly recommended the erection of the light-
house on the Pentland Skerries, as the site best calculated for a direction to
the Pentland Firth ; which was accordingly fixed upon by the Board. To
mark this Light-house from the other lights upon the coast, it was necessary
to make it a Distinguishing-light, which was effected by the erection of a
higher and lower light-house tower, respectively 80 and 100 feet above the
medium level of the sea, built at the distance of 60 feet asunder, and each
having a light-room with reflectors, so as to show two distinct stationary
lights, for as yet the Revolving-light had not been introduced upon this
coast.
The works at the Pentland Skerries were begun early in
1794.
the spring of 1794. The masonry was executed by
builders of Orkney; and the materials having been
The author’s first prepared, were partly landed on these small islands in
voyage to the north.
the course of the preceding summer. The Skerries
consist of two uninhabited islands, with some contiguous sunken rocks.
They lie exposed to the uninterrupted force of the waves of the North Sea,

Page 35

and to the rapid tides and currents of the Pentland Firth , and present many
convincing proofs of the wasting state of the land, by the action of the sea.
The works here had been so laid out, that the towers should be in readiness
for the erection of the light-rooms by the month of August; and it was
expected that the lights would be ready for exhibition in the month of
October. The author, to whose superintendance the completing of these
light-houses was to be entrusted, as his first work for the Board, sailed from
Leith on this service on the 2d July 1794; and after touching at Kinnaird
Head Light-house, he landed at the Pentland Skerries on the 11th of that
month, and found the masonry of the two light-house towers in such a state
of forwardness, as to be then nearly ready for the light-rooms. In the month
of September, these works were completed, and the lights were exhibited on
the 1st day of October 1794.
These lights are from oil, with reflectors, and may be described as erected
on the largest of the Pentland Skerries, in Lat. 58° 43´ and Long. 3° 3´ west
of London; the northmost or highest light-room being elevated 100 feet, and
the lower light-room 80 feet above the medium level of the sea. The two
light-rooms, relatively to each other, bear S. SW. and N. NE., distant 60
feet. The bearings, as taken from the highest light-room, by compass, are
the western extremity of the Little Pentland Skerry S. by W., distant 1¼
mile; extremity of the foul ground off that Skerry SE., distant 1½ mile;
Duncan’s Bay Head in Caithness; W. SW. distant 4½ miles; Noss Head SW.
by W., distant 14 miles; northmost point of the Island of Stroma NW. by W.,
distant 6½ miles; south-western extremity of the Loather Rock on the
Orkney shore N. by W., distant 3½ miles; Island of Copinsha NE. by E. ¼
E., distant 17 miles.
The author, having remained to complete the works at
Loss of the sloop
Elizabeth.
the Pentland Skerries, and to see the house lighted,
sailed from Orkney on the 9th of October, in the sloop
Elizabeth of Stromness. On the following day, the vessel got within three
miles of Kinnaird Head Light-house, in Aberdeenshire; but the wind having
suddenly shifted to the south-east, Mr Sinclair, the master, with much
attention and kindness, landed the author, who continued his journey to
Edinburgh by land. A very different fate, however, awaited his shipmates;
for the Elizabeth having put back to Cromarty Roads, was afterwards driven
to Orkney, and ultimately lost, when all on board perished.

Page 36

In the affairs connected with the erection of light-
Mr Balfour and Mr houses in Orkney, Mr Balfour of Elwick, and Mr
Riddoch presented
Riddoch, collector of the customs at Kirkwall, having
with pieces of Plate.
respectively taken much friendly interest and trouble in
the advancement of the Light-house works in the Orkney islands, the
Commissioners of the Light-houses presented a small piece of plate to each
of these gentlemen, with a suitable inscription, in testimony of the services
they had thus rendered to the public.
Some inconveniency having been experienced in
Act for Incorporatingconducting the business of the Light-house Board, in
the Commissioners.
consequence of its not being an incorporated body, and
not having a common seal, particularly in the holding of stock and other
property, in laying out and investing the surplus funds arising from the
light-house duties, application was made to Parliament, and an act passed in
1798, 38th Geo. III. c. 57. erecting the Commissioners into a Board or
Body-politic, by the name of “The Commissioners of the Northern Light-
houses;” and under that title to have perpetual succession, and hold a
common seal.
After the completion of these two light-houses on the
Additional Works at
Pentland Skerries in 1794, a period of ten years elapsed
the first erected Light-
houses. before the erection of any additional light-house was
undertaken on the coast of Scotland. This delay was
rendered necessary, chiefly on account of the necessity of extending the
accommodation of the light-keepers at the different stations,—in making
landing places and roads,—enclosing grounds,—and, in short, putting the
whole establishment of the light-houses into a more complete and finished
state.
In the mean time, several propositions for new light-
Light-House proposed
as a direction for
houses were brought under the notice of the
Cromarty Firth . Commissioners. In the year 1797, for example, the late
Mr Dempster of Dunnichen proposed the erection of a
light-house as a direction for the entrance of Cromarty Firth , one of the
principal inlets for shipping on the eastern coast of Great Britain. Mr
Dempster also suggested, in connection with this, that a Beacon should be
erected, and a floating buoy moored, to point out the dangerous channel of
Dornoch Firth , which is too often fatally mistaken for the entrance to

Page 37

Cromarty Firth . The proposition of a beacon and buoy for Dornoch, was
considered by the Commissioners as not strictly in the high seas, and
therefore not properly belonging to the concerns of the Board, and, together
with the light-house, were delayed for the present, that attention might be
paid to more urgent demands on other parts of the coast.
Notwithstanding the benefit derived from the erection
Proposition for of Kinnaird Head light-house, shipwrecks were still
altering the site of
Kinnaird Head Light- occurring on a dangerous reef of rocks called Rattray
House. Brigs, situate about 12 miles southward of Kinnaird
Head, and 6 miles north of Peterhead. In the year 1798,
petitions were presented to the Commissioners from certain merchants and
traders, setting forth, that the light-house upon Kinnaird Head would be
much more beneficial to shipping, were it removed to Rattray Head. This
matter was remitted to the author to report upon, who accordingly made a
survey of this part of the coast. After maturely considering the subject, it
was deemed advisable to decline the removal of the light-house from
Kinnaird Head, which was found to be extremely useful for directing ships
into the Moray and Cromarty Friths, and also to vessels making the land
from the northward. Although it might not, perhaps, be so useful to coasters
bound from the south, yet the Commissioners found, that it would be better,
under all circumstances, to preserve Kinnaird Head as a light-house station,
and, at some future period, to erect an additional light upon this important
part of the coast, at or near Peterhead, in a position calculated to be useful
as a guide for the sunken reef of Rattray Brigs, and also for the south-
eastern shores of Aberdeenshire.

Start Point Beacon.

Among the several applications brought before the
1801.
Board for additional light-houses, something still
appeared to be necessary for averting the misfortunes
Numerous Wrecks on which were annually happening on the low shores of
the Island of Sanday.
the Northern Isles of Orkney. It had now been found, by
the experience of about twelve years, that the light-house of North
Ronaldsay was not calculated to prevent the numerous wrecks on the
islands of Sanday and Stronsay. In the year 1796, when the author was on

Page 38

his annual visit to the Northern Light-houses, he was struck at seeing the
wreck of three homeward-bound ships upon the island of Sanday, though
situate only about eight miles southward of the light-house of North
Ronaldsay. Again, in 1797, he found one wrecked ship on Sanday; but in
1798 he saw the remains of no fewer than five vessels upon that fatal
island; and, in the month of December 1799, two of the numerous vessels
which were driven from Yarmouth Roads in a dreadful gale of wind at
south-east, were also wrecked there. The author having laid this continued
and alarming state of things before the Light-house Board, in his annual
report of 1801, it was resolved, that a beacon or tower of masonry should be
erected upon the Start Point or eastern extremity of the low shores of the
island of Sanday; the building to be constructed in such a manner that it
might, if found necessary, be converted into a light-house.
In the year 1802, the author sailed on his annual voyage
1802.
to the Northern Light-houses so early as the 14th of
April, in the Pharos of Leith, carrying with him a
Proofs of a severe foreman and sixteen artificers, to commence the works
winter in Orkney.
of the Start Point Tower. After rather a boisterous
passage, the vessel reached Orkney in six days, and, at this advanced period
of the season, these Islands were found covered to the depth of six inches
with snow. This, at any time, is rather uncommon in Orkney; but such had
been the severity of the season in the northern regions, that a flock of wild
swans which, in severe winters, visit this country, were still seen in
considerable numbers upon the fresh-water lakes of Sanday. These large
birds are supposed to migrate from Iceland, but are rarely seen here later
than the month of March, so that their appearance in the latter end of the
month of April, was considered by the Orcadians as a mark of a very severe
and long-continued winter in the higher latitudes.
It having been ascertained that there was no workable
Quarries at Sanday
and Eda.
sandstone on the island of Sanday, where the Beacon
was to be erected, permission was granted by Mr Laing,
the proprietor of the contiguous island of Eda, to open a quarry at Calf
Sound, where sandstone of a pretty good quality was obtained. With a view
to render this building substantially water-tight, it had been originally
intended to make it wholly of hewn stone, built in regular courses,
technically called ashlar or aisler-work, a term derived from the aisle of a

Page 39

church, where this sort of masonry predominates; but the quarry of Eda
being about fourteen miles distant from the work, the stones had to be
brought by sea through rapid tides; and there being but indifferent creeks or
havens both at the quarry and at the Start Point, it was found necessary to
make only the principal stones of hewn-work, while the body of the work
was executed in ruble-building, for which excellent materials were got at
the Start Point, the property of the Right Honourable Lord Dundas,
consisting of sandstone-slate, of a greyish-smoke colour, intermixed with
shining particles of mica. The rock here is disposed in strata, from 1 to 8
inches in thickness, and could easily be raised in pieces containing from 15
to 20 square feet. Indeed, the encroachments of the sea
Encroachments of the had heaped up immense quantities of these schistose
Sea upon the Land.
stones at high-water mark, all round the Start Point, the
shores of which appeared like the ruins of the wall of some large city. These
stones, however, were more applicable for the purposes
Of Ruble Building. of dike-building, or interior walls, than for external
work; for, after having been exposed on the beach for
ages to the alternate changes of moisture and dryness, heat and cold, they
were found to have many small fissures, or were split horizontally; and
although the pieces still seemed to adhere closely, yet they were sufficiently
open to admit moisture into the heart of the walls, which, in these stormy
and exposed situations, is forced through the building: hence it is, that
houses built with drift-stones of this description, are said by the cottagers of
these islands to keep out moisture much better when built with puddle or
clay, than with the best lime-mortar, which, under certain circumstances, is
known to attract moisture, while the clay resists it. But after all the care that
can be taken in building with these slaty stones, even when taken fresh from
the quarry, they still have a tendency to split into lamellæ, after they are
built in the walls. Experienced builders, therefore, generally lay the outward
stones of such walls with a slight inclination downwards, or dip, as the
workmen term it, the more readily to prevent the admission of wetness. I
have been thus particular, because it is hardly possible
Houses built with to prevent walls built of these materials from drawing
Double walls.
moisture, until they have been rough cast,—an
operation which is so very troublesome, from requiring to be occasionally
renewed, that I have found it necessary, in these exposed situations, to build

Page 40

the outward walls double, as the only effectual method of obtaining a
comfortable house free of dampness.
Laying the foundationThe weather continued to be so extremely boisterous
stone of Beacon. here, that it was the middle of the month of May before
a sufficient stock of materials was laid down for
commencing the building at the Start Point. A wish having been expressed
by the workmen, to have the foundation-stone of the Beacon laid with
masonic ceremony; and considering the dreary prospect which the artificers
had before them, the author was the more willing to embrace so fair an
opportunity of affording them the enjoyment of a little convivial happiness.
The influx of so many strangers to the island of Sanday for this work, and
the novelty of the intended ceremony, made the news soon find its way to
every house. Preparations were accordingly made;—the year of our Lord
1802, was cut upon the foundation-stone, in which a hole was perforated for
depositing a glass phial, containing a small parchment scroll, setting forth
the intention of the building; the official constitution of the Commissioners
of the Northern Light-houses; and the name of their Engineer. It also
contained several of the current coins of George III. in gold, silver, and
copper. The day fixed for the ceremony was the 15th of May. The weather
was dry and tolerably agreeable, though cold, with snow upon the ground;
the thermometer by Fahrenheit’s scale indicating 35° in the shade at noon.
A number of the principal inhabitants, and a crowd of cottagers assembled.
Things being arranged for the ceremony, the author, assisted by Mr James
Cleghorn, foreman for the works, applied the square and plummet-level to
the foundation-stone, in compliance with the ancient custom of the craft.
The phial was then deposited in the cavity prepared for it in the stone, and
carefully covered up with sand, when the masonic ceremony concluded in
the usual manner. The Reverend Walter Traill, minister of the parish, who
obligingly attended on this occasion, now stood forward, and, after a most
impressive prayer, imploring the blessing of heaven upon the intended
purposes of the building, delivered an address, which, from the singularity
of the subject, and the excellency of the matter, shall here be inserted.
“This moment is auspicious. The foundation-stone is
Rev. Walter Trail’slaid of a building of incalculable value;—a work of use,
Address.
not of luxury. Pyramids were erected by the pride of
kings, to perpetuate the memory of men, whose ambition enslaved and

Page 41

desolated the world. But it is the benevolent intention of our Government,
on this spot to erect a tower, not to exhaust, but to increase the wealth, and
protect the commerce of this happy kingdom.—To the goodness of God, in
the first place, we are indebted for a degree of prosperity unknown to other
nations. In the next place, we owe our happiness to our insular situation,
and attention to maritime affairs. Faction and civil war have, at this period,
laid waste the fairest countries of Europe; while peace has flourished within
our walls. Agriculture, commerce, and their kindred arts, have prospered in
our land. British oak hath triumphed; victory hath been attached to the
British flag; and British fleets have ridden triumphant on the wings of the
wind.—Consider the great national objects for which this building will be
erected. To protect commerce, and to guard the lives of those intrepid men
who for us cheerfully brave the fury of the waves, and the rage of battle.
The mariner, when he returns to the embraces of his wife and children, after
ascribing praise to the Great Giver of safety, shall bless the friendly light
which guided him over the deep, and recommend to the protection of
heaven, those who urged, who planned, and who executed the work.—This
day shall be remembered with gratitude. It shall be recorded, that at the
beginning of a new century, the pious care of Government was extended to
this remote island. Those rocks, so fatal to the most brave and honourable
part of the community, shall lose their terror, and safety and life shall spring
from danger and death.—Even you, my friends, who are employed in the
execution of this work, are objects of regard and gratitude. You have, for a
season, left the society of your families and friends, to perform a work of
high interest to your country and to mankind. I am confident, that you will
act, in all respects, so as to deserve and obtain the esteem of the people who
now surround you. I hope that they will discharge to you every duty of
Christian hospitality, and that you will have no occasion to feel that you are
strangers in a strange land.—It becomes us to remember, that all the affairs
of men are dependent on Providence. We may exert talents and industry, but
God only can bless our exertions with success. Let our trust be in him. Let
us humbly hope that he will bless this day and this undertaking. Through his
aid, may there arise from this spot, a tower of safety and protection to the
mariner of every tongue and nation.”
The whole of this scene was very impressive; and the plain, decent, and
respectable appearance of the people collected on the occasion, was none of
the least interesting parts of it.

Page 42

Having now got the works at the Start Point of Sanday
Beacon Completed. fairly commenced, and some progress made in opening
the quarries, the author left the Orkney Islands, and
continued his voyage westward to the other Light-houses on the coast.
Every thing having succeeded well at the Start Point, the Beacon was
finished in the month of September. It was terminated at the height of 100
feet above the medium level of the sea, with a circular ball of masonry
measuring fifteen feet in circumference.—But this tower having been
afterwards converted into a light-house, it seems to be unnecessary here to
enter into a more particular specification of the building.

Inchkeith Light-house.

Much inconveniency had been experienced, and many
1803.
fatal accidents had occurred, in the Firth of Forth, from
the want of a light to direct ships past the island of
Inchkeith into the Roads of Leith. In the course of the winter of 1801, from
this cause, a very severe misfortune happened at the rocks lying off
Kinghornness, on the Fifeshire coast, by the loss of the smack Aberdeen,
Freeman, master, one of the traders bound from Aberdeen to London. This
vessel had been put up the Firth in a storm, loaded with a general cargo,
which was valued at upwards of L. 10,000, and had on board 13 passengers,
besides the ship’s crew, all of whom perished, excepting the master, the
mate, and a lady. So very distressing an accident, with other instances of a
similar nature, produced a strong sensation with the public. It was also
found, that vessels which, by the direction of the light of May, had entered
the Firth of Forth in the course of a long winter night, could not yet venture
to hold on their course, up the Firth , owing to the difficulty of passing the
island of Inchkeith, and the foul and rocky ground in its neighbourhood.
The mariner was thus obliged to lie off and on in this narrow sea, without
being able to run for the anchorage of Leith Roads till day-light: but, before
morning, the wind perhaps had shifted; and, instead of being in a safe
anchorage, he was too often driven to sea. The author has, indeed, known of
a ship in this situation, which drifted before the wind even to the coast of
Norway.

Page 43

It was from considerations of this kind that an
Inchkeith Light-house application was brought forward by the Corporation of
resolved on.
the Trinity House of Leith, for the erection of a light-
house upon Inchkeith; and the Commissioners of the Northern Light-
houses, also viewing Leith Roads as a naval station and rendezvous for his
Majesty’s ships on the North Sea station, resolved upon the propriety and
expediency of this measure in the year 1802. Various difficulties occurred
about procuring the ground necessary for this establishment, not indeed
with the noble proprietor of the island, the Duke of Buccleuch, who
forthwith ordered every facility to be given to the work; but time was lost in
arranging matters with his Grace’s agent. It was not, therefore, till the
summer of the year 1803, that the building on Inchkeith commenced, and
the masonry of the light-house was not ready for the light-room till the
following year, when the light was exhibited on the 1st day of September
1804. Its position is described as follows:
“The Light-house erected on the island of Inchkeith,
Description of
Inchkeith Light-
situate in the Firth of Forth and county of Mid-Lothian,
house. in North Lat. 56° 2´, and Long. 3° 8´. west of London,
is elevated 220 feet above the medium level of the sea,
of which height the building forms 45 feet. The light is from oil with
reflectors, and will be seen from every point of the compass as a Stationary
light” (since altered to a Revolving light, as shall be afterwards noticed).
“From the light-house Ely-ness bears, by compass, E. NE., distant 16 miles;
Light of May E. ½ N., distant 23 miles; Fidra Island E. by S., distant 14
miles; Craig Waugh Rock SE. by S. ½ S., distant 4¾ miles; Leith-Harbour
Light SW. ¼ S., distant 3½ miles; Gunnet Rock W., distant 1½ mile; Ox-
Scares W. by N. ½ N., distant 4½ miles; Inchcolm W. NW. ¼ N., distant 6½
miles; Pettycur Light N. NW. ¼ N., distant 2½ miles; Kinghorn-ness N.
NW. ¾ N. distant 2¼ miles.”
This light-house was originally proposed to have been
Originally proposed
made a double or leading light, to guide ships up the
to be a Leading light.
Firth , and especially past the dangerous rock called the
Ox-Scares, to the anchorage above Queensferry; but it was thought
advisable to erect a light, in the first instance, upon the top of the island,
and to defer the erection of a lower or western light till the effect of a single
light should be tried. Such, however, appears to have been the benefit of the

Page 44

light on the top of the island, together with a cast-iron Beacon, which, at
this time, was erected on the Ox-Scares, that the want of a second light-
house on Inchkeith does not seem to have been much felt.
By the existing acts of Parliament, the light-house
Light duty for
Inchkeith modified.
Board is entitled to take the full duties of three
halfpence per ton, from the local trade of the Firth of
Forth, for the light of Inchkeith, instead of which, only one halfpenny per
ton is exacted from such vessels as are not liable to the duty, in consequence
of passing some other of the Northern Light-houses. The great utility of this
light-house, and the equitable and liberal manner in which these duties are
exacted, gave much satisfaction to the maritime and commercial interests of
the country.
It may here be proper to observe, that the erection of
Accommodation of
Light-keepers’ houses
Inchkeith Light-house, forms a new era in the works of
extended. the Commissioners of the Northern Light-houses;
which, as formerly observed, had been necessarily
executed on the smallest, plainest and most simple plan that could be
devised, and with such materials as could be easily transported, and most
speedily erected, so as to meet the urgent calls of shipping, and answer the
very limited state of the funds. But from the thriving condition of the trade
of the country, the yearly duties which, in 1790, amounted only to
L. 1477:5:1; in the year 1802 encreased to L. 4386:7:5. It was, therefore,
considered advisable, from its being ultimately more economical, to erect
and finish the several works of the light-house Board in the most substantial
manner, and more like the buildings of a permanent National Establishment.
From the vicinity of Inchkeith to sandstone quarries, the
Houses covered with buildings there were executed of aislar masonry. A
leaden roofs.
platform roof covered with lead, and defended by a
parapet wall, was adopted for the light-keepers’ house, instead of a slated
roof, with garrets of the common construction; a slated roof being not only
more liable to be injured by high winds, but when the attic apartments of
such houses are occupied, the premises became more exposed to accident
from fire. The slated roof, with iron nails, is also
Disadvantage of subject to decay, owing to the saline particles with
slated roofs.
which the air is impregnated, and the sprays of the sea,
which, even in such situations as Inchkeith, are often blown over the island,

Page 45

though the site of the light-house is about 175 feet in height. Indeed, at all
the original light-house stations in the north, the nails were soon rusted, and
the slates getting loose, were often blown off in great numbers, so that in
the very depth of Winter, the light-keepers have been obliged to make such
a requisition as the following: “A slater is much wanted here, to repair the
roof of the house, as upwards of 50 slates have been blown away during the
late gales.” Instead, also, of a dwelling-house consisting of only two small
apartments as formerly, the house at Inchkeith has four rooms, with other
conveniencies, laid out for the accommodation of the families of a principal
light-keeper and an assistant, who are now appointed to the charge of each
of the Northern Light-houses.
An entire change also took place at this period upon the
Construction of Light construction of the Light-rooms and the reflecting
rooms improved.
apparatus, as well as in the extension and enlargement
of the accommodation for the light-keepers. The early light-rooms were
constructed wholly of timber, excepting the window-sash frames, which
were made of cast-iron. The outside of the wooden cupola, covered with
sheet copper, and the ceiling and floor with fire-proof plates of tinned iron.
But it soon appeared that this construction was liable to great objections,
particularly to the risk of accidental fire. The timber roof being also
unavoidably shut up from the air, and exposed to a degree of heat sufficient
to dry it to the state of tinder, its strength and fibrous qualities were soon
lost, and the buildings in danger of being destroyed by the storms of winter.
At Inchkeith, on the contrary, the roof is framed of iron,
Rendered Fire-proof. and covered with copper, and the floor is laid with flag-
stones; while the window-frames, and all the materials
exposed to the immediate action of the weather, are made of copper; the
windows are glazed with plates of polished glass, measuring 29 inches by
18 inches, and ¼ of an inch in thickness, instead of sash panes of crown-
glass, measuring only 12 inches by 8 inches, by which so many astragals
were unavoidably introduced into the windows, that much of the light was
obstructed and lost.
The reflectors of the first of the Northern Light-houses
Reflectors of Silvered were formed to the parabolic curve, upon principles
Mirror-glass.
susceptible of considerable accuracy; their powers
were, however, small from their reflecting surfaces being composed of
facets of silvered mirror-glass, and one point only of each facet coinciding

Page 46

with the curve of the parabola. As many of the rays are thus lost or
weakened by transmission through the glass of the reflector, the light is
much less brilliant than when reflected from a metallic speculum of a
uniform parabolic figure, of a more white and dense body, such as silver.
Another objection to mirror-glass reflectors, is the great number of
interstices or subdivisions between the pieces of glass, which unavoidably
induces a want of cleanliness and uniformity in the reflecting surface as a
whole. The improvement upon this part of the reflecting
Reflectors of Copper, apparatus, as more recently fitted up, consists in
plated with Silver.
employing sheets of copper, plated or coated with
silver, which, with much labour and great nicety of workmanship, are
formed as nearly as may be into the parabolic curve,—a subject to which
we shall again recur, in treating of the reflectors for the Bell Rock Light-
house. Instead, also, of whale oil, and the use of the
The use of Argand Common lamp, spermaceti oil, and the Argand lamp,
lamps and Spermaceti
Oil introduced. were introduced at Inchkeith. Upon these principles, all
the new erections of the Northern Light-houses are
constructed; and such of the original light-houses, as require considerable
repairs, are directed by the Board to be altered to the improved
construction. But the erection of such a light-house as that of Inchkeith, in
place of requiring an expenditure of only about L. 1000 like the original
establishments, cost upwards of L. 5000.
Inscription on The light-house of Inchkeith having been erected before
Inchkeith Light- the late Mr Smith, the author’s predecessor, had retired
house. from the situation of Engineer for the Northern Light-
houses, and being the first of the light-houses erected
upon the coast of Scotland on the recently improved principles, it is thought
proper to give a plan and elevation of the house and offices, in one of the
plates of this work, as a specimen of what is considered a very complete
light-house establishment. It may also be noticed here, that the elevation of
the light-house tower bears a tablet with the following inscription:—“For
the direction of Mariners, and for the benefit of Commerce, this Light-
house was erected by order of the Commissioners of the Northern Light-
houses. It was founded on the 18th day of May, in the year 1803, and
lighted on the 1st of September 1804. Thomas Smith, Engineer.”

Page 47

As part of the establishment at Inchkeith, a guard-room
Pilots and is provided for pilots. In the event also of shipwreck
Shipwrecked Seamen
receive shelter. upon the coast, in the neighbourhood of any of the
light-house stations, from the more extended state of
the buildings, the unfortunate seamen are not only directed to be lodged in
the best manner that the circumstances of the case will admit, but, in
necessitous cases, ship-wrecked mariners have even been allowed a sum of
money by the Light-house Board, to clothe and carry them to their
respective homes. In this way, it has not unfrequently fallen to the lot of the
keepers of the Northern Light-houses, to save the lives of perishing seamen,
to succour many poor fishermen and pilots, as well as the half starved and
unlucky individuals of water parties, when driven by stress of weather to
these lone places of abode, for safety and shelter. In these varied forms, it
will not be too much to suppose, that the practice of protecting the
navigator in distress, which is said to have formed a chief part of the design
of the Fire Towers and Nautical Colleges of the ancients, is thus in some
measure restored.

Start Point Light-house.

Notwithstanding the precautions which had been taken
1806.
to prevent the frequent occurrence of shipwreck upon
the island of Sanday, by the erection of a Beacon or
Shipwrecks still take Tower of masonry on the Start Point, the loss of ships
place on Sanday.
did not appear to be diminished. It had even become
proverbial with some of the inhabitants to observe, “that if wrecks were to
happen, they might as well be sent to the poor island of Sanday as any
where else.” On this and the neighbouring islands, the inhabitants have
certainly had their share of wrecked goods; for here the eye is presented
with these melancholy remains in almost every form.
Striking examples of
this.
For example, although quarries are to be met with
generally in these islands, and the stones are very
suitable for building dikes, yet instances occur of the land being inclosed,
even to a considerable extent, with ship timbers. The author has actually
seen a park paled round, chiefly with cedar wood and mahogany from the
wreck of a Honduras built ship; and in one island, after the wreck of a ship

Page 48

laden with wine, the inhabitants have been known to take claret to their
barley meal porridge, instead of their usual beverage. On complaining to
one of the pilots of the badness of his boat’s sails, he replied to the author
with some degree of pleasantry, “Had it been His (God’s) will that you
came na here wi’ these lights, we might a’ had better sails to our boats and
more o’ other things.” It may further be noticed, that when some of Lord
Dundas’s farms are to be let in these islands, a competition takes place for
the lease, and it is bona fide understood, that a much higher rent is paid than
the lands would otherwise give, were it not for the chance of making
considerably by the agency and advantages attending shipwrecks on the
shores of the respective farms. The author was so struck with some of these
circumstances, that he collected, and shall here insert a list of shipwrecks
for the twelve years immediately following the erection of North Ronaldsay
light-house, in procuring which he was obligingly assisted by the Rev.
William Grant, minister of Cross-kirk parish, including the island of North
Ronaldsay, and part of Sanday.
LIST OF WRECKS on the contiguous islands of North Ronaldsay,
List of Shipwrecks for Sanday and Stronsay, during a period of Twelve Years, immediately
Twelve Years. after the erection of North Ronaldsay Light-house, in 1789.

Year. Voyage. Cargo. Tonnage. Supposed Value of Ship
and Cargo.
1789. Norway to America, Spirits, &c. 150 L. 3500 0 0
1790. Hamburgh to do. Cordage, &c. 100 2800 0 0
1792. Norway to Wales, Wood and Iron, 90 1100 0 0
—— Sweden to Liverpool, Grain, 120 3100 0 0
—— Do. to Greenock, Timber, 400 3400 0 0
1793. Norway to Spain, Fish and Oil, 100 2000 0 0
Copenhagen to Santa
—— Silks, &c. 250 35,000 0 0
Cruz,
Copenhagen to
1794. Muslins, &c. 250 20,000 0 0
Surinam,
—— Do. to Dundee, Flax, &c. 90 2000 0 0
1795. Do. to America, Cloth, &c. 300 12,200 0 0
1796. Do. to Liverpool, Timber, 250 2500 0 0
—— Do. to Whitehaven, Timber, 150 1300 0 0
—— Liverpool to Ostend, Wine and Rum, 400 15,300 0 0
1797. Baltic to Liverpool, Grain, 120 3000 0 0
Timber and
1798. Sweden to Hull, 200 2500 0 0
Iron,
—— Norway to Liverpool. Timber, 200 1800 0 0

Page 49

—— Do. to America, Cloth, &c. 200 5000 0 0
Spirits and
—— Altona to Do. 450 18,000 0 0
Cloth,
—— London to Gibraltar, Stores, 300 5000 0 0
1799. Do. to Dublin, Staves, 150 2200 0 0
Hamburgh to Cambric and
1800. 200 45,000 0 0
America, Linen,
—— Dantzic to Liverpool, Timber, 900 10,000 0 0
22 vessels wrecked in 12 years, supposed value L. 196,400 0 0
This list of shipwrecks strongly points out the
Start Point Tower dangerous nature of the navigation of the seas and friths
proposed to be
converted into a of the northern islands of Orkney. From a consideration
Light-house. of these numerous accidents, being almost at the rate of
two wrecks in the year, and seeing the mangled remains
of some fine ships which still appeared upon the island of Sanday, the
author was induced to bring this matter again under the notice of the
Commissioners of the Northern Light-houses, in his report to the Board in
the year 1805, when he proposed that the Start Point Beacon should be
converted into a light-house, and that North Ronaldsay light should be
discontinued, and its tower converted into a beacon, as wrecks were found
to happen comparatively seldom upon that island, while hardly a year
passed without instances of this kind on the island of Sanday; for, owing to
the projecting points of this strangely formed island, the lowness and
whiteness of its eastern shores, and the wonderful manner in which the
scanty patches of land are intersected with lakes and pools of water, it
becomes even in day-light a deception, and has often been fatally mistaken
for an open sea. The removal of the light from North
North Ronaldsay Ronaldsay to Sanday, was also calculated to be equally,
Light-house to be
converted into a if not more, useful to the navigation of North
Beacon. Ronaldsay Firth ; the Start Point being only four miles
from the sunken rock called the Reef-dyke, as will be
seen from the general chart of the coast which accompanies this work. It
therefore appeared that if only a single light were allowed for the protection
of this coast, it would be much better upon Sanday than on North
Ronaldsay.
On this subject, however, the author was instructed to take the opinion of
persons acquainted with the navigation of these seas. Accordingly, when on
his annual voyage to the Northern Light-houses, he submitted the subject to

Page 50

the consideration of Mr William Ellis, Commander of
Opinion of persons the Ross Revenue Cutter, who had then been cruising
conversant with the
Navigation of these for several months off these islands, by order of
Seas. Government, for intelligence relative to the motions of
the Dutch fleet, which then threatened to attempt a
landing on the Western Coast of Ireland. It was also submitted to Mr
Riddoch, Collector, and Mr Manson, Comptroller of the Customs, at
Kirkwall; to Mr John Traill, Mr Fotheringham, and Mr Strang of Sanday;
and to the ship-masters of Kirkwall and Stromness. These gentlemen all
united in opinion as to the superior usefulness of a light upon the island of
Sanday.
This measure having been resolved on by the Board,
Light-house resolvedthe plans were remitted, with powers to proceed, to Mr
on.
William Rae, (now Sir William Rae, Bart. Lord
Advocate of Scotland,) who was then Sheriff of the county of Orkney. The
works at the Start Point were accordingly commenced early in the summer
of 1805; by the month of November the light-room was finished, and the
light exhibited on the 1st day of January 1806. Intimation was at the same
time given to the public, that the beacon or tower of masonry erected in the
year 1803, upon the island of Sanday, having been found insufficient for
preventing the numerous shipwrecks upon the low shores of that island, had
been converted into a light-house.
The Start Point of Sanday is situate in the county of
Description of Start
Point Light.
Orkney, in North Lat. 59° 20´, and Long. 2° 34´ west of
London, from which North Ronaldsay light-house
Tower bears by compass, N. NE. ½ E., distant 8 miles, and the Lamb Head
of Stronsay SW., distant 15 miles. The light at the Start Point is from oil
with reflectors, elevated 100 feet above the medium level of the sea, and is
visible from all points of the compass, at the distance of 15 miles, in a
favourable state of the atmosphere. To distinguish this light from the other
lights on this coast, it is known to mariners as a Revolving light, without
colour, exhibiting a brilliant light once in every minute, and becoming
gradually less luminous; to a distant observer it totally disappears. In this
manner, each periodic revolution of the reflector-frame, alternately shows a
brilliant light, and a light becoming fainter and more obscure, until it be
totally eclipsed.

Page 51

The alteration of the Start Point beacon into a light-
The Foreman and house, and the erection of houses for the light-keepers,
Artificers sail for
were placed under the management of Mr George
Leith in the Traveller.
Peebles, an experienced mason, and executed with
every possible attention. When the works were completed, he, and such of
the artificers as had been retained, proceeded to Stromness on the mainland
of Orkney, from whence they were most likely to get a passage to the
southward. The party consisted of six in number; and Charles Peebles, the
foreman’s brother, wishing to go directly to his native place, took his
passage in a vessel bound from Stromness to Anstruther, while Mr George
Peebles, and the remaining four men, embarked on board of a schooner,
called the Traveller, Cruickshanks master, bound for Leith.
This vessel sailed with a fair wind early on the 24th of
The Traveller is
wrecked.
December 1806. On the following morning they got
sight of Kinnaird Head light-house, in Aberdeenshire,
and had the prospect of speedily reaching the Firth of Forth; but the wind
having suddenly shifted to the south-east, increased to a tremendous gale,
which did much damage on the coast. The Traveller immediately put about,
and steered in quest of some safe harbour in Orkney. At two o’clock in the
afternoon, she passed through the Pentland Firth , and got into the bay of
Long Hope; but could not reach the proper anchorage; and, at three o’clock,
both anchors were let go in an outer roadstead. The storm still continuing
with unabated force, the cables parted or broke, and the vessel drifted on the
island of Flotta. The utmost efforts of those on board to
Captain Manby’s
Apparatus much
pass a rope to the shore, with the assistance of the
wanted. inhabitants of the island, proved ineffectual, (for want
of some apparatus like Captain Manby’s); the vessel
struck upon a shelving rock, and, night coming on, sunk in three fathoms
water.
Some of the unfortunate crew and passengers attempted
The Foreman and four
to swim ashore, but in the darkness of the night, they
of the Artificers are
drowned. either lost their way, or were dashed upon the rocks by
the surge of the sea; while those who retained hold of
the rigging of the ship, being worn out with fatigue and the piercing
coldness of the weather during a long winter night, died before morning,—
when the shore presented the dreadful spectacle of the wreck of no fewer

Page 52

than five vessels, with many lifeless bodies, the mournful subjects of the
care and pity of the islanders. In one of these wrecks, all on board were lost;
and, in the Traveller, only the cabin-boy escaped. This poor boy, from
whom these particulars were learned, had, for a time, been sheltered from
the severity of the blast, by one of the crew, but being at length left alone,
he clung to the top-mast, from which he was with great difficulty removed
in the morning, when the storm had somewhat abated.
A very trifling circumstance prevented the vessel bound for Anstruther,
from leaving Stromness along with the Traveller, so that Charles Peebles
escaped this gale, and arrived with the sad tidings of the fate of his brother
and companions. In Mr George Peebles, the light-house service lost a most
active and faithful servant, whose next charge would have been at the
operations of the Bell Rock light-house. From the peculiar circumstances of
this case, the Commissioners were pleased to grant small annuities to the
mother of the foreman, and also to the family of another of the sufferers.

Bell Rock Light-house.

In the prosecution of the plan of this introductory
1807.
account of the Northern Light-houses, we may observe
that the attention of the Commissioners was occupied
with the erection of the Bell Rock Light-house, during the years 1807, 8, 9,
and 10. But as the detail of the operations of these four years forms the
chief object of this work, it is not necessary that they should be further
noticed here. We therefore proceed to the next operations of the Board, in
the order of time.

North Ronaldsay Beacon.

It having been considered superfluous to have two
1809. light-houses on this part of the coast, within 8 miles of
each other, the Light-house Board resolved to
North Ronaldsay extinguish North Ronaldsay light, and convert its tower
Light extinguished,
and its Tower into a sea-mark, or beacon without a light. It was

Page 53

converted into a accordingly intimated in the newspapers of the
Beacon.
principal ports of the United kingdom that the light on
the Island of North Ronaldsay, in Orkney, situated in North Lat. 59° 40´,
Long. 2° 15´ west of London, would be discontinued, and cease to be
lighted from and after the 1st day of June 1809; but that the Light-house
Tower would be preserved as a Beacon on the coast, by the erection of a
Circular Ball of masonry, measuring 8 feet in diameter, instead of a Light-
room. This beacon bears from the revolving light on the Start Point of
Sanday, N.NE., ½ E. by compass, distant 8 miles, which continues to be
lighted as heretofore, the Start Point having been found the most centrical
position for a light-house to warn the mariner of his approach to the low
shores of the North Isles of Orkney.

Isle of May.

The island of May holds a prominent position at the
1814.
entrance of the Firth of Forth, as will be seen by
referring to the charts of the coast which accompany
Light of May first this work. From its connection also with the estuary
Lighted 1635.
leading to the Capital of Scotland, and the principal
ports of her commerce, the light of May seems to have been the earliest
public light on our shores. Over the entrance door of the old light-house
tower, a stone, neatly cut into the figure by which the sun is usually
represented, bears the date 1635. It appears, also, from the printed acts of
the Scottish Parliament, Vol. v. p. 585., that power was granted, in the reign
of Charles I., to James Maxwell of Innerwick, and John Cunninghame of
Barnes, to erect a light-house upon the Isle of May, and collect certain
duties from shipping for its maintenance: The patent for
Patent ratified 1641.
this purpose, was ratified by the Scots Parliament in
1641.
The duties leviable for the light of May produced much
Much complained of
after the Union.
dissatisfaction after the Union, English and Irish vessels
having been charged with double rates, as foreigners.
There was, besides, a general dislike to any thing that was payable in the
form of a tax being held as private property. This light being also a coal-
fire, exposed in an open choffer to the vicissitudes of the weather, was

Page 54

found to be very insufficient. After the appointment of a Light-house Board
in Scotland, in the year 1786, the shipping interest often expressed a desire
that the light of May should be included as one of the Northern Lights; that
it might undergo the most recent improvements; that, according to the spirit
and conditions of the Northern Light-house acts, the invidious distinction
between the shipping of the same kingdom, with regard to the light-house
duties, might be done away; and also that there might be some prospect of
the duties being modified, and ultimately ceasing. In the year 1809, the
author foreseeing, that notwithstanding the erection of the Bell Rock light-
house, the navigation of this part of the coast would still be very
incomplete, unless the light of May were improved, took an opportunity of
bringing this subject under the notice of the Commissioners of the Northern
Light-houses; but it did not then appear that this could be taken up by the
Board, unless it were at the instance of the proprietor.
The family of Scotstarvit, into whose hands the
Family of Scotstarvit property of the island and light of May came by
become Proprietors of
the Island. purchase, in 1714, along with the estate of Westbarnes,
in East Lothian, had long been solicited by the trade of
the Firth of Forth, to have the light made better, either by enlarging the
choffer for containing the coals, or by altering it to an oil light with
reflectors. Statements to this effect having been laid
Chamber of before the proprietor, by the Chamber of Commerce of
Commerce get the
Light Improved. Edinburgh, a Committee of that body visited the island
in the year 1786, and reported on the state of the light.
In consequence of the representation of this Committee, the choffer was
enlarged to the capacity of a square of three feet; and, instead of about 200
tons of coal per annum, formerly consumed, the quantity of fuel was now
doubled. The Chamber further recommended, that the
Wemyss Coal stock of coals, hitherto exposed to the open air on the
preferred for the
Lights. island, should in future be kept under cover, and that
the supply should be invariably got from the collieries
of Wemyss, which were preferred as fittest for maintaining a steady light,
Wemyss coal being then used at Heligoland, and other coal-lights upon the
Continent.
These conditions were most readily complied with by
Light of May the tutors of Miss Scott, the proprietor; and the light of
considered the best
May, from that period, was found to be very

Page 55

Coal-Light in the considerably improved, the choffer for containing the
kingdom.
fuel being about double the capacity of any other light-
house choffer on the coast of Great Britain. The light of May, from this
period, may therefore be described as the most powerful coal-light in the
kingdom, although, from its exposure, it was still found to be very unsteady,
in bad weather, when most required by the mariner. Lime-kilns and other
accidental open fires upon the neighbouring shores, were also apt to be
mistaken for the Isle of May choffer. To obviate such dangerous mistakes,
there was no other method but the introduction of a light from oil, with
reflectors, inclosed in a glazed light-room. The Trinity-
Portland Family get house of Leith, in the year 1790, presented a memorial
possession of the
Island. to this effect, to the Duke of Portland, into whose
possession the light and Isle of May had come by his
Grace’s marriage with Miss Scott of Scotstarvit. But after many fruitless
applications urged from time to time by the Merchants of Leith, to have the
light altered, the measure was at length given up by them as hopeless.
Early in the morning of the 19th day of December
Loss of the Nymphen 1810, however, two of his Majesty’s ships, the frigates
and Pallas Frigates.
Nymphen and Pallas, had the misfortune to be wrecked
near Dunbar, in consequence, it is believed, of the light of a lime-kiln on the
coast of Haddingtonshire having been mistaken for the coal light of the
island of May. These frigates having come along the northern coast of
Scotland, their situation, as may be seen from the annexed maps, was very
different from that of ships approaching the land from a distant voyage,
who are much more liable to mistakes of this kind. But
Their prize-ship what renders the error in this instance more
arrives in safety.
unaccountable is, that one of the ships had even sent a
boat ashore at Johnshaven, on the opposite coast of Kincardineshire, in the
afternoon of the day preceding their loss; and the other, about the same time
and place, dispatched a small prize for Leith Roads, under the command of
a Midshipman,—who, in his course up the Firth of Forth, saw the Bell Rock
floating light, (for at this time the light-house was not completed),—then
the lights on the islands of May and Inchkeith in succession, and before
day-light in the morning of the 19th he anchored his little vessel in the
Roads. In reporting the prize to the Admiral at Leith, this young gentleman
expressed his surprise that the frigates had not reached their station before
him. In the course of the forenoon of the same day, however, an express

Page 56

arrived, stating the circumstance of the loss of the Pallas, which had
happened in the course of the night, about two miles to the eastward of
Dunbar. Soon afterwards, another notice arrived announcing to the Admiral
the loss of the Nymphen Frigate in the same manner, and from the same
mistake. It is not a little surprising, that although these ships had sailed in
company, and were wrecked within a few miles of each other, their similar
fate was perfectly unknown by the respective crews, till late in the day on
which the accidents happened. It was, however, so far
Nine men drowned. fortunate, that although the ships became total wrecks,
only nine men were lost of their joint crews, amounting
to about 600 men; all of whom might probably have perished, from the
rocky and exposed shore on which they were stranded, had not the weather
been very moderate.
Immediately after the loss of these two fine frigates,
Lord Melville applies valued at not less than L. 100,000, Lord Viscount
to the Light-house
Board about the Isle Melville, first Lord of the Admiralty, applied to the
of May Light. Commissioners of the Northern Light-houses,
proposing that the light of May should be assumed as
one of the northern lights, and forthwith put under proper regulations. It
may here be proper to notice, that, prior to this accident,
Duke of Portland the Duke of Portland entertained serious intentions of
proposes to alter the
Light; altering this light; and the author had been employed to
report to his Grace on its alteration, from the use of pit-
coal to oil, with reflectors, the expence of which he had estimated at the
annual sum of L. 600. The communication from the
And proposes that the Admiralty gave rise to a correspondence between the
Commissioners
should become Light-house Commissioners and the Duke of Portland,
Lessees, which is who proposed to give the Light-house Board an
rejected.
allowance of L. 600 per annum, for taking burden of
the light of May, while his Grace was to continue to
levy the duties. This proposal was rejected on the part of the
Commissioners, who declined becoming lessees, under the existing acts or
constitution of their Board; and it was ultimately concluded, that they could
only take up this measure as purchasers for the public, in order to abolish
the charge on English and Irish vessels paying as foreigners, and to lessen
the duty for that light to the trade in general. In the present state of the light-
house funds, this purchase could only be made by a special act of

Page 57

Parliament, and with pecuniary aid from Government:
The Duke demands as the sum demanded by the Duke for the island, and
L. 63,000 for the
Light duties and the right to the light-duties, was unavoidably great,
Island. amounting to no less than Sixty Thousand Guineas.
In the mean time, Mr Cuningham, Secretary to the
Memorial presented Light-house Board, was directed to acquaint Mr
to the Admiralty. Walker, the Duke of Portland’s agent, that the
Commissioners could not treat for upholding the light
of May for payment of an annual sum. A memorial was then drawn up for
the Admiralty, of the whole proceedings in this measure, which was
presented by Sir William Rae, Bart., on the part of the Light-house Board;
when their Lordships were pleased to give their countenance and support to
a bill for the purchase of the light duties and island of May. This bill was
accordingly brought into Parliament, and passed in the
Isle of May and Session of 1814, authorising a loan of L. 30,000 to be
Duties purchased at
L. 60,000. made from the Treasury to the Commissioners of
Northern Light-houses, and empowering them to make
the purchase from the Duke of Portland, for the sum of L. 60,000.
Duty of the Light ofThis important transaction having been closed, the
May reduced by the Light-house Board, in terms of this act (46th George
Act of 1814. III. chap. cxxxvi.) were empowered to reduce the light-
duty of the Isle of May, to all British vessels, from one
penny half-penny, as collected heretofore, to one penny per ton, when
English and Irish ships were no longer treated as foreigners, by paying
double dues. Immediate measures were also taken for altering and
improving the light. It was, however, too late at the end of the session of
1814, to commence operations on the island; but, in the following summer,
the new light-house was erected, and a light from oil with reflectors was
exhibited, on the 1st day of February 1816, after a coal-light had been
continued here for 181 years, or from 1635.
As the island of May lies about half way between the
Additional
Apartments at the Isle
light-houses of Inch Keith and the Bell Rock, it was
of May. thought proper to have two or three apartments in the
May Light-house for the reception of such members of
the Light-house Board, as might happen to be detained by contrary winds in
occasional visits to the Bell Rock, upon which landing is often very difficult

Page 58

and precarious, depending both on the state of the weather and the tides.
The dwelling-house at the Isle of May, therefore, is larger than would
otherwise have been required for the accommodation of the two light-
keepers and their families.
In consequence of this change upon the light of May,
Notice given of the
notice was given to the public, that it had been assumed
alterations at Isle of
May and Inchkeith. one of the Northern Light-houses, and that the
Commissioners had directed a new light-house, upon
improved principles, to be erected, which would not only alter its former
appearance, but also occasion a change on the light of Inchkeith, situate
about twenty-two miles farther up the Firth of Forth. The following
description of the Isle of May light was published.
“The light-house on the Island of May, is situate at the
Description of the
Light of May.
entrance of the Firth of Forth, in North Lat. 56° 12´,
and Long. 2° 36´ west of London. From the light-house,
Fifeness bears, by compass, N. by E. ½ E., distant five miles, and the Staple
Rocks lying off Dunbar, S. by W. ½ W., distant ten miles. The light being
formerly from coal, exposed to the weather in an open grate or choffer, was
discontinued on the night of the 1st day of February 1816, when a light
from oil, with reflectors, known to mariners as a Stationary Light, was
exhibited. The new light-house tower, upon the Island of May, is contiguous
to the site of the old one, and is elevated 240 feet above the medium level of
the sea, of which the masonry forms 57 feet, and is therefore similar to the
old tower in point of height. The new light is defended from the weather in
a glazed light-room, and has a uniformly steady appearance, resembling a
star of the first magnitude, and is seen from all points of the compass, at the
distance of about seven leagues, and intermediately according to the state of
the atmosphere.”— The old light-house tower on the
Old Light-house
converted into a
Island of May, has been reduced in height to about 20
Pilot’s Guard-room. feet, and by directions of the Light-house Board, it has
been converted into a guard-room like that upon
Inchkeith, for the use and conveniency of pilots and fishermen.

Inchkeith Revolving Light.

Page 59

The above description, in so far as regards the
Description of appearance of the light of May being exactly applicable
Inchkeith Revolving
Light. to that of Inchkeith, described at page 25. of this
Introduction, it was found expedient to alter it from a
stationary to a revolving light, that it might be distinguished from the light
of May, where a revolving light would have been liable to be mistaken for
the Bell Rock light, owing to the more contiguous position of the May
island to the Bell Rock.
The light upon Inchkeith, hitherto a stationary light from oil, with
reflectors, was therefore altered and converted into that description of light
known to mariners as a Revolving light without colour, on the same night
that the change took place upon the Isle of May. The light of Inchkeith is
seen from all points of the compass, at the distance of five leagues in
favourable weather, exhibiting a bright light once in every minute, and
gradually becoming less luminous, it totally disappears to a distant
observer. In this manner, each periodic revolution of the reflector-frame,
alternately shows a brilliant light, which becomes fainter, and more obscure,
until it is totally eclipsed. By this alteration, the same description and
appearance of the other lights upon the coast is preserved, and the
possibility of mistaking Inchkeith light for the numerous lights on the land,
with which it is surrounded, is now also effectually prevented.

Corsewall.

It had long been the wish of the mercantile interest of
1815.
the Firth of Clyde and St George’s Channel, to have a
light on the coast of Galloway, to direct ships, on the
Additional Light Scotch side, into the Irish Channel. From the great
proposed for the
western coast on amount of light-house duties collected upon the western
Corsewall Point. coast, and the extent of light-house works which had of
late years been erected upon the eastern shores,
including the Bell Rock and Isle of May light-houses, the Commissioners
were desirous of accommodating the trade of the western coast, as far as the
demands of shipping required, or the state of the light-house funds would
permit. It was accordingly resolved, that a report upon this subject, made to
the Light-house Board by the author, should be submitted to the trade of

Page 60

Liverpool, Glasgow and Greenock, for their observations. Having in this
manner procured the necessary information, it was resolved that a light-
house should be erected for the benefit of this coast, upon the northern
extremity of the Mull of Galloway in Wigtonshire, on the point of
Corsewall; because, in addition to the advantages of this situation, as an
excellent direction both for the entrance of the Irish Channel and Firth of
Clyde, it would answer as a guide to the Roadstead or anchorage of Loch
Ryan.
In the course of the correspondence on this subject, it
Light-houses
necessary for the
had been stated by Mr Quintin Leitch, Chief Magistrate
of Greenock, a gentleman well acquainted with the
navigation of the Irish
Channel. navigation of these seas, that if light-houses were
erected upon the Isle of Man, these, with the lights of
Copeland and Kilwarlin, on the Irish side of the channel, together with the
proposed light on Corsewall Point, and another on the Hulin or Maiden
rocks, off the coast of Antrim, would fully protect this important part of the
coast.
After considering the subject in its various bearings, the
Foundation-stone of
Corsewall Light-
Board resolved, as before noticed, on the erection of a
house laid. light-house on Corsewall Point, in the month of January
1815, and on the 17th day of June following, the
foundation-stone was laid, by Mr Quintin Leitch, as master mason, when
Mr James Spreull, Chamberlain of the city of Glasgow, Mr Lachlan
Kennedy, under whose charge the works were placed, and the Engineer,
assisted at the ceremony. In the course of the Summer and Autumn, the
tower of this light-house was got to the height of 35 feet, and some progress
was also made with the walls of the house for the light-keepers.
The works at Corsewall being suspended during winter,
1816.
were again resumed in the ensuing spring. The light-
room was completed in the autumn, and the light was
Light-house finished. exhibited to the public on the night of the 15th day of
November 1816, agreeably to the following description.
“Corsewall light-house is situate in the county of
Description of
Corsewall Light.
Wigton, in North Lat. 55° 1´, and West Long. 5° 5´. It
bears by compass, from Millour Point, on the western

Page 61

side of the channel leading into Loch Ryan, W. by S., distant about two
miles; from Turnberry Point, SW. 21 miles; from the Craig of Ailsa SS. W.
15 miles; from the Mull of Kintyre S. E. S. 31 miles; from the Hulin or
Maiden rocks on the coast of Antrim, E. by S. 20 miles; from Copeland
Light-house, near the entrance of Belfast loch, NE. ½ E. 22 miles, and from
Laggan point in Galloway, NE., distant 3½ miles. To distinguish this light,
which is from oil, with a reflecting and revolving apparatus, from the other
lights upon the coast, it is known to mariners as a Revolving light with
colour, and exhibits from the same light-room a light of the natural
appearance, alternating with a light tinged with a red colour. These lights,
respectively, attain their greatest strength, or most luminous effect, at the
end of every two minutes. But, in the course of each periodic revolution of
the reflector-frame, the lights become alternately fainter and more obscure,
and, to a distant observer, are totally eclipsed for a short period. The light-
room at Corsewall is glazed all round, but the light is hid from the mariner
by the high land near Laggan Point, towards the south, and by Turnberry
Point towards the north. This light is elevated 112 feet above the medium
level of the sea, and its most luminous side may be seen like a star of the
first magnitude, at the distance of five or six leagues, but the side tinged red
being more obscured by the colouring shades, is not seen at so great a
distance.”

Isle of Man.

The subject of the erection of the light-houses on the
Rate of Light-house
Isle of Man, having again been agitated by the
duties for the Isle of
Man. merchants of Liverpool, the rates of duty which would
probably be demanded for the erection of a light-house
upon the Calf of Man, was procured from one of the agents of the Trinity-
House of London upon that coast. This schedule of duties appearing to be
high, a correspondence took place between Mr William Laird of Liverpool,
and Mr Quintin Leitch of Greenock, respecting the rate of Scotch light-
house duties, which was ultimately brought under the notice of the
Commissioners of the Northern Light-Houses, by Sir William Rae, Bart.
Reference having been made to the author relative to the expence of
erecting a light-house upon the Calf of Man, he stated to the Board, that, in

Page 62

the course of a tour which he had made in the year
1802. 1802, round the coast of Great Britain, he visited the
Isle of Man, with a view to ascertain the most eligible
Author’s Report on places for light-houses on that island, where he
this subject.
considered two light-house stations to be indispensably
necessary, viz. one on the Calf of Man, to the south, and another on the
Point of Ayre, towards the north of the island. From the numerous shipping
of that district, he only calculated upon the duty of one farthing per ton
upon shipping for the light-houses of both stations. The Commissioners
took this matter under consideration at the time, as appears from their
minutes of the 14th January 1803, which state, that “Mr Stevenson had
reported very strongly of the great utility which would attend the erection of
light-houses on the Isle of Man; but that island not being within the
jurisdiction either of the Commissioners of the Northern Light-houses or
Trinity Board of London, both boards seem thereby to be prevented from
accomplishing an object so much wished for by mariners, as such an
improvement upon the coast would prove a great additional security to the
navigation of those seas, and especially to the trade of a great number of the
ports of England and Ireland. In order, therefore, that this circumstance
might not be overlooked, the Commissioners direct this notice to be taken
of it in their minutes, that if an application to Parliament should, at a future
period, be deemed necessary, they may judge how far it may not be proper
in them to apply for power to erect lights upon the Isle of Man.”
When these circumstances were intimated to the
Scotch Light-house
Board applied to for
merchants of Liverpool, and especially that the rate of
lights on the Isle ofone farthing per ton was considered a sufficient rate of
Man. duty, the business was brought under the notice of the
Association of Shipowners and other public bodies of
Liverpool, by Mr John Gladstone, when a representation and petition from
them was presented to the Commissioners of the Northern Light-houses,
praying, that they would bring a bill into Parliament, to enable them to erect
the necessary light-houses on the Isle of Man.
This application having been complied with, Sir
Act of 1815.
William Rae was requested to attend to the progress of
the bill, and to take the assistance of any of the other
members of the light-house board who might happen to be in London at the

Page 63

time. The Isle of Man Light-house Bill was accordingly brought forward by
Mr Huskisson, in absence of Mr Canning, member of Parliament for
Liverpool, as a measure in which that port was specially interested. But
when the subject was communicated to the late Mr Rose, M. P., one of the
elder brethren of the Trinity House of London, he requested that nothing
might be done in this measure, until he should have an opportunity of
consulting with the gentlemen of the Trinity-House, as he considered the
Isle of Man to be within the district of that board. After repeated meetings,
at which Mr Rose attended, he ultimately stated, that the Trinity Board did
not consider the Isle of Man as coming under their line of coast; and that the
Commissioners of the Northern Light-houses might, therefore, go on with
their bill. It was accordingly brought forward in the House of Commons,
and the author attended to prove the preamble of the bill in the House of
Lords; and in June 1815 it received the Royal assent.
In returning towards Scotland, I embarked in the Light-
Difficulty in fixing
house Yacht at Liverpool, and visited the Isle of Man. It
the position of the Isle
of Man lights. appeared, on examining the site for the erection of a
light-house on the Point of Ayre, or northern extremity
of the island, that there would be no difficulty in fixing its place. But the
case was different at the Calf Island, as there seemed an evident advantage
in having the house on a low situation, to keep it more free from fog, and
where it might also be more in the line of direction with a dangerous reef
called the Chickens, lying about a mile into the offing. On this low position,
called Kaager Point, the high land of the Calf would have shut in the light
very much from the northward. Another situation, however, presented itself;
but, as this last station was considerably higher, it might perhaps be found
more uncertain with regard to fog resting upon it in thick and hazy weather;
and it was therefore thought prudent to place a trusty person on the island,
with directions for observing and communicating the state of the weather
for about six months, previously to determining the site of the light-house
on the Calf of Man. This mode of inquiring into the subject, was
strengthened by the report of some intelligent persons relative to the
prevailing state of the weather at the Isle of Man, who represented that the
Calf Island was less liable to be enveloped in fog than the higher parts of
the Main Island.

Page 64

In the month of August 1815, when Sir William Rae,
A person stationed onBart. then Sheriff of the shire of Edinburgh, Mr Robert
the Island to observe
the state of the Hamilton, Sheriff of Lanarkshire, and Mr Adam Duff,
weather. Sheriff of Forfarshire, Commissioners of the Northern
Light-houses, visited this island, they concurred in
judging it highly proper to make special observations on the state of the
weather at the Calf Island. In the beginning of November following, the
author accordingly sent Mr Macurich, a shipmaster in the light-house
service, to that island, with directions to reside there, and make monthly
returns of the state of the weather, agreeably to a printed form. During his
stay of seven months, it appears, upon the whole, that the fog rested only
twice upon the highest land of the Calf, while it cleared partially below. On
one of these occasions, I was on board of the Light-house yacht, then at
anchor off the island, when the fog was for a time general; and as the
weather became clear, I observed that it first disappeared upon the lower
parts of the island; and that in half an hour the whole of the Calf was seen.
In the journal of the weather alluded to, the Calf Island is represented as
often perfectly free of fog, while the higher parts of the opposite mainland
of Man, was hid in mist. To account for this, it may be noticed, that the
mass of matter in the Calf island is much less, and the land is also much
lower, than in the main island. Part of this effect may also be ascribed to the
rapidity of the tides, which create a current of wind, particularly in the
narrow channel between the Main and Calf islands; which have a direct
tendency to clear away the fog; as I have observed at the Skerries in the
Pentland Firth , and in similar situations on different parts of the coast,
where rapid currents prevail.
From these observations, the author was led to report to
1816.
the Commissioners, that the light-house on the Calf of
Man should hold an intermediate position between the
Distinguishing Light highest part of the island, called Bushel’s Hill, and the
for the Calf of Man.
lower site called Kaager Point; and, further, that by
erecting two light-house towers in a certain relative position to each other,
they would point out the line of direction of the dangerous sunken rocks
called the Chickens, and by adopting that description of light known to
mariners as a Revolving light without Colour, this station would be
sufficiently distinguished from the lights which surround the Isle of Man on
the Scotch, Irish, and English shores.

Page 65

A difficulty occurred in proceeding with the Isle of Man
1817. light-houses, from the want of funds to enable the
Commissioners to proceed with the works. The Board
Lights of the Isle of had already become liable for a large sum to liquidate
Man completed.
the payment of the purchase-money of the private right
of the Portland Family to the duties of the light of May. On this measure,
and in the erection of the Bell Rock light-house, as before noticed, there had
been expended upwards of L. 160,000 in the course of the last ten years; so
that it became necessary to borrow L. 10,000, agreeably to the act, for the
Isle of Man. In this state of things, the works at the Isle of Man were
delayed for a time; but, in the month of August 1816, they were
commenced. The light-rooms were completed in the month of December
1817; and, on the night of the 1st of February 1818, the lights, both at the
stations of the Point of Ayre, and Calf Island, were exhibited to the public,
agreeably to the following descriptions.

Point of Ayre.

The only consideration to be taken into view in fixing
1818.
the site of the Point of Ayre Light-house, was the
wasting appearance of the shores by the effects of the
Description of the sea at this part of the coast. Although, therefore, it
Point of Ayre Light-
house. would have answered fully better, for the purposes of
the light, to have erected the tower close upon high-
water-mark, yet the beach being composed of a loose shifting gravel, it
became a matter of prudence rather to keep the buildings at some distance
from it.
“The Point of Ayre light-house is situate about 650 feet from the sea, at
high-water of spring tides, upon an extensive plain in the Main Island of
Man, in north latitude 54° 27´, and longitude 4° 20´ west of London. The
light-house bears, by compass, from the Mull of Galloway, S. S. E. and is
distant 22 miles; from Burrowhead, S. S. W. ½ W. distant 16 miles; from St
Bees, in Cumberland, W. by N. ¾ N. distant 29 miles; and from Rue Point,
E. by S. distant 4 miles.

Page 66

“The light is from oil, with a reflecting and revolving apparatus, and is
known to mariners as a “Revolving-coloured-light,” exhibiting from the
same Reflector-frame a light of the natural appearance, alternating with one
tinged red. These lights respectively attain their most luminous effect, at the
end of every two minutes. But, in the course of each periodic revolution of
the reflector-frame, both lights become alternately fainter and more
obscure, and, to a distant observer, are totally eclipsed for a short time.
“The Light-room at the Point of Ayre is glazed all round, but the light is hid
from the mariner by the high land of Maughold Head towards the south,
and by Rue Point towards the west. Being elevated 106 feet above the
medium level of the sea, its most luminous side may be seen, like a star of
the first magnitude, at the distance of five leagues; but the side tinged red,
being somewhat obscured by the coloured shades, cannot be seen at so great
a distance.”

Calf of Man.

“There are two leading lights on the Calf of Man,
Description of Calf of
Man Light.
situate on the western side of the small island called the
Calf, in north Lat. 54° 5´, and Long. 4° 46´ west of
London. These two light-houses are distant from each other 560 feet. The
higher light bears by compass from the Mull of Galloway, S. SW. distant 37
miles; Peelhead, in the Isle of Man, SW. distant 11 miles; Langness Point,
W. by N. ½ N. distant 6 miles; and from the sunken rocks, called the
Chickens, NE. ⅓ E. distant about 1¼ mile.
“These lights are from oil, each light-room being furnished with a distinct
reflecting and revolving apparatus, by which they are distinguished from
the other lights on the coast, and rendered useful as leading lights for
passing the dangerous rocks called the Chickens. The light-house towers, as
before noticed, are built at the distance of 560 feet apart, bearing from each
other NE. ⅓ E. and SW. ¼ W. Consequently, to an observer, in the direction
of the Chickens, both lights will appear in one, or be seen in the same line
of direction, and be known to mariners as “Double-revolving and Leading-
lights without colour.” These lights will respectively attain their most
luminous effect at the end of every two minutes; but, in the course of each

Page 67

periodic revolution of the reflector frames, they alternately become fainter
and more obscure, and, to a distant observer, are totally eclipsed for a short
time. The two light-rooms at the Calf of Man are glazed all round, but are
hid from the mariner by the high land of Peel Head towards the NE. and by
Spanish Head in an eastern direction; both lights, however, will be visible at
about ¼ of a mile from Langness Point. The lower light is elevated 305 feet
above the medium level of the sea, and the high light 396 feet, and they will
be seen like two stars of the first magnitude, at the distance of six or seven
leagues, in a favourable state of the atmosphere.”
By the extension of the works of the Scotch Light-
Extension of the
house Board to the Isle of Man, the system of the
Northern Lights to the
Irish Sea. Northern Light-houses may now be said, in a general
way, to extend over the whole of the coast of Scotland,
while the lights of Man are of immediate importance to the extensive
shipping of the coasts of England and Ireland, which bound the Irish Sea.
The trade of Dublin and Newry, &c. on the one side, and of Liverpool,
Lancaster, Whitehaven, and Workington, &c. on the other, find the traffic
with those ports much more safe since the erection of these lights. Instead
of shunning the Isle of Man, as formerly, owing to the projecting points,
sunken rocks, and sand-banks connected with it, the mariner now steers
boldly for this island, and takes shelter under it in stormy weather.

Sumburgh Head.

According to the existing acts of Parliament relative to
Shetland Islands.
the Northern Lights, no additional duty is exigible for
any new erections of the Board, as the only part of the
coast not liable, prior to the extension of the Scots Light-house Acts to the
Isle of Man, was that of the Solway Firth , now also subject to the duty.
These acts, however, empower the Commissioners to erect additional light-
houses; and when a sufficient number shall have been exhibited on the
coast, and a surplus fund provided for their maintenance, the duty on
shipping is ultimately to cease, and be no longer payable. Presuming,
therefore, upon the prosperity of the commerce of the country, for an
increase of funds, the Commissioners, though there were large sums to pay,
both in the form of interest for Government loans, and instalments for

Page 68

borrowed money, taking into consideration the unprotected state of the
Shetland Islands, a part of their district still without the immediate benefit
of light-houses, had in view to erect an additional Light-house, as soon as
their funds would admit, on some of the most prominent points of that
group of Islands. The winters of 1817 and 1818 having been very
unfortunate to the shipping of the North Seas, and some very distressing
shipwrecks having occurred at Shetland, Mr William Erskine, now Lord
Kineddar, then Sheriff of the County of Orkney and Shetland, and ex officio
one of the Commissioners, brought the subject again under the notice of the
Board; and, in the month of January 1819, it was finally resolved that a
Light-house should be erected on Sumburgh Head in Shetland, the position
of which will be seen by inspecting Plate III. This work having been
accordingly contracted for by Mr John Reid, builder, of Peterhead, the first
stone of the building was laid on the 10th day of May 1820, and the light
exhibited on the night of the 15th day of January 1821, agreeably to the
following specification of the position of the house, and appearance of the
light:
“Sumburgh Head Lighthouse is situate on the southern
Description of
Sumburgh Head
promontory of the Mainland of the Shetland Islands, in
Light-house. north latitude 59° 52´, and longitude 1° 15´ west of
London. The Lighthouse, by compass, bears from
Hangcliff-head in Noss Island SW. by W. ¼ West, distant 21 miles. From
Fair Island NE. by E. ½ East, 26 miles. And from the Island of Foula, SE.
by S. ¼ South, distant 28 miles. In reference to these bearings, the light is
visible to the mariner from the southward, between Noss and Foula Islands.
This light is known to mariners as a “Stationary light from oil with
reflectors;” and being elevated 300 feet above the medium level of the sea,
it is seen, like a star of the first magnitude, at the distance of seven or eight
leagues, and at intermediate distances, according to the state of the
atmosphere.”
From the very exposed situation of the promontory of
Built with double
walls.
Sumburgh Head, and the great difficulty experienced in
preserving the walls of light-houses in a water-tight
state, the writer followed a new plan with the buildings at this station, in
having made the whole of the external walls double; the masonry of the
outward wall being lined with brick instead of lath-work, with a space of

Page 69

three inches left between the double walls. This method was of course,
more expensive in the first instance, but will ultimately be much more
economical, as repairs, in these remote situations, are unavoidably very
expensive. This house is free of dampness, and has not admitted a single
drop of water through any part of the walls during the storms of two
successive winters, although the force of the wind is such, that the light-
keepers, when out of doors, are frequently obliged to move upon their
hands and knees, to prevent their being blown off the high land. In such
states of the weather, accompanied by rain, it is hardly possible to prevent a
single wall from admitting water.

Carr Rock.

The Carr forms the seaward termination of a reef of sunken rocks which
appear at low-water, extending about a mile and three quarters from the
shore of Fifeness, on the northern side of the entrance of the Firth of Forth.
The very dangerous position of this rock, as a turning point, in the
navigation of the northern-bound shipping of the Firth , will be seen from
the chart of the coast, Plate IV. It seemed necessary, therefore, for the safety
of navigation, that the Carr Rock, in connection with the several light-
houses of the Bell Rock, Isle of May, and Inchkeith, should be made as
easily distinguishable to the mariner as possible.
The author, while occupied with the works at the Bell
Shipwrecks at the
Carr Rock.
Rock, having been often struck with the frequent and
distressing occurrence of shipwreck at the Carr Rock,
was induced to collect information as to the probable numbers of these
wrecks; and he accordingly obtained, from persons who had good access to
know, the following list of wrecked vessels, for a period of nine years prior
to the commencement of the works at the Carr Rock.

List of Shipwrecks off Fifeness, between the Years 1800 and 1809.
Vessels’ Names. Masters’ Names. Descriptions. Port belonging to.
Unknown. Simpson. Sloop. South Ferry.
Martha. Clark. Do. Crail.
Leven. Phillip. Do. Leven.
Neptune. Finlay. Do. Dundee.

Page 70

Unknown. Brown. Do. Kincardine.
Aurora. Leslie. Brig. Arbroath.
Lady Charlotte. Duncan. Sloop. Aberdeen.
Two Brothers. Carfrae. Brig. Dundee.
Expedition. Nicol. Sloop. Kincardine.
Isabella. Rintoul. Do. Perth.
Unknown. Johnston. Do. Do.
Do. Unknown. Do. John’s Haven.
New Deer. Banks. Do. Kirkaldy.
Unknown. Hamson. Galliot. Christiansand.
Countess of Elgin. Gowans. Sloop. John’s Haven.
Unknown. Small. Do. South Ferry.

By this melancholy list we find, that no fewer than
Floating-buoy moored sixteen vessels have, in the course of nine years, been
off the Carr.
either lost or stranded on the Carr Rocks, being almost
at the rate of two wrecks in the year. From this alarming state of things, it
was thought advisable to bring the subject under the notice of the
Commissioners of the Northern Light-houses, when the Board immediately
ordered a Floating-buoy, of a large size, to be moored off the Carr. The
moorings for this buoy were laid down, upon the 18th of September 1809,
in 10 fathoms water, at the distance of about 200 fathoms, in a north-eastern
direction, from the rock. But, owing to the heavy swell of sea, and the rocky
sandstone bottom on this part of the coast, it was found hardly possible to
prevent the buoy from occasionally drifting, even although it had been
attached to part of the great chain, made from bar-iron, measuring 1½ inch
square, with which the Bell Rock floating light had been moored for
upwards of four years, without injury. The moorings of the Carr Rock-buoy,
from the continual rubbing upon the sandstone bottom, were worn through
with the friction in the course of ten months; and during the four years
which it rode here, though regularly examined and replaced, in the proper
season of the year, it was no less than five times adrift, to the great
inconveniency and hazard of shipping.
Under these circumstances, the Light-house Board was
A Beacon of masonry
is resolved on.
induced to erect a Beacon of masonry upon the Carr
Rock itself, instead of the Floating-buoy. This work was
commenced in the month of June, in the year 1813, under the direction of
the writer. The stone for this building was taken from an excellent
sandstone quarry on the property of Lord Kellie, near the mouth of Pitmilly

Page 71

Burn: But, owing to the smallness of the rock, the depth of water upon it,
and the exposed nature of the situation, the work was afterwards attended
with very great difficulty.
The length of the Carr Rock, from south to north,
Dimensions of the
Carr Rock.
measures 75 feet; but its greatest breadth, as seen at
low-water of spring-tides, being only 23 feet, it was
found to be impracticable to obtain a base for a building of greater diameter
than 18 feet. Such also was the fractured and rugged state of the surface of
this rock, that it became necessary to excavate part of the foundation-pit of
the building to the depth of seven feet. The difficulties of this part of the
work were also greatly increased, owing to the foundation, on the eastern
side, being under the level of the lowest tides: so that it became necessary to
construct a coffer-dam. Part of this coffer-dam it was necessary to remove,
and carry ashore, after each tide’s work; and on the return of the workmen
at ebb-tide, a considerable time was unavoidably occupied in fixing the
moveable part of the coffer-dam, and in pumping the water out of the
foundation-pit.
But, to enable the reader to form a comparative
Difficulties of this
work compared with
estimate of the difficulties attending the early stages of
those of the Bell the Carr Rock Beacon, with those of the Bell Rock
Rock. Light-house, it may be noticed, that the period which
the artificers were actually at work upon the Carr Rock,
as ascertained by the foreman during the first season, or the summer of
1813, was 41 hours; and in 1814, after the experience of one year’s work,
these were only extended to 53 hours. Now, if we compare 1807 and 1808,
the two first years’ work at the Bell Rock, we find the artificers were
respectively about 180 and 265 hours upon that rock. The first two years at
the Carr Rock were entirely occupied in excavating and preparing the
foundation, and in laying 10 stones, or the half-course of masonry, which
brings the foundation to a uniform level, for the first entire course of the
building, as shewn in Plate II.; while, at the Bell Rock, in the two first
seasons three courses were erected, as represented in Plate IX., of a building
situate 12 miles from the shore, and measuring 42 feet in diameter at the
base, besides the erection of a Beacon-house or Barrack for the workmen.
The establishment for the works at the Bell Rock was of course on a much
larger scale than that of the Carr Rock; but still the latter was equally

Page 72

effective, and the same apparatus, artificers and seamen, were employed at
both.
During the third year’s work, or 1815, the second
Third year’s work at
the Carr Rock.
course of the masonry was completed upon the Carr,
and nine stones of the third course had been got laid by
the 3d of October, when a heavy ground-swell obliged the artificers
precipitately to leave the rock and take to their boats. This swell was
immediately accompanied by a gale of easterly wind, and before the cement
had taken bond or firmness, the surge of the sea washed it out; when the
oaken trenails, used as a temporary fixture during the progress of the work,
were wrenched off, and the stone-joggles broken asunder. The whole of the
nine blocks of stone were thus swept off the rock and lost in deep water,
though they had been completely dove-tailed, and fitted on the same
principles as the masonry of the Bell Rock Light-house, where not a single
stone was lost during the whole progress of the work.
In the year 1816, or fourth season, the work was
Fourth year’s work.
continued till the month of November, when the
building had attained the height of about 20 feet, or the
16th course, and still wanting 18 courses to complete the masonry. In this
state, it was left till the following season, having been previously loaded
with about four tons of lead, cast in suitable pieces, and suspended within
the void or central hollow of the building. The operations of the fourth
season had been also much retarded by several untoward accidents. In
particular, a heavy gale overtook the workmen while they were laying the
7th course, which obliged them to leave the rock before the precautionary
measures could be taken, for closing and completing the work immediately
in hand; in consequence of which, the stones on the eastern, or weather-side
of this course, were lifted off their bases, the oaken trenails broken, and five
of the blocks of stone swept away. At another period, the Pozzolano mortar
of the beds of two of the stones was washed out, and so much injured, that
the stones required to be lifted and relaid. The works were this season
intended to have been closed early in the month of October, when another
unlucky gale sprung up, just as the sixteenth course had been laid, which
lifted seven of the stones off their beds; but they were fortunately held by
the oaken trenails, and in this state they remained for about three weeks,
before a landing could possibly be effected, to replace them.

Page 73

In the month of June 1817, the fifth year’s work was
Fifth year’s work. begun, and the remaining courses of the masonry were
built; but in the month of November, the coast was
visited with a gale of wind at south-east, accompanied with a heavy swell of
sea, which, unfortunately, washed down the upper part of the building, and
reduced it to the height of the fifth course, which formed part of the fourth
year’s work.
Instead, therefore, of completing this Beacon with
Beacon finished with
cast-iron pillars and
masonry, as had been originally intended, and providing
ball. the Machine and large Bell, which was to have
measured 5 feet across the mouth, to be tolled by the
alternate rise and fall of the tide, it now became a matter of consideration in
what form the upper part of this design should be finished. The Board
ultimately determined on the erection of six columns of cast-iron upon the
remaining courses of masonry. These columns are put together with spigot
and facet joints, strongly connected with collars and horizontal bars of
malleable iron; the whole terminating with a cast-iron ball, formed in ribs,
elevated about 25 feet above the medium level of the sea. In this manner the
Carr Rock Beacon was at length completed, in the month of September
1821, after six years work. The following is the notice and description of it
given to the public:
“The Carr Rock forms the seaward ledge of a range of sunken rocks,
Bearings and extending about two miles from Fifeness, on the eastern coast of
Description of the Scotland, in North Latitude 56° 17’, and Longitude 2° 35´ west of
Carr Rock Beacon. London. By compass the Carr Rock Beacon bears SW. by W. from
the Bell Rock, distant 11 miles; and from the Isle of May Light-house
N.N.E. ¼ E., distant 6 miles.
“The lower part of the beacon is a circular building of masonry, 18 feet in diameter,
forming a basement for six pillars of cast-iron, terminating in a hollow ball of that metal,
which measures 3 feet across, and is elevated about 25 feet above the medium level of the
sea.
“The erection of this beacon has been attended with much difficulty, having occupied six
years in building; in the course of which the works sustained occasional damage. Mariners
are therefore warned, when they run for the Carr Rock Beacon, to do so with caution, both
on account of its exposure to the breach of the sea, and its liability to receive damage from
vessels under sail.”

The form and construction of the Carr Rock Beacon,
Application of the
tide-machine both as originally intended, and ultimately executed,
described. will be better understood by referring to Plate II., and to

Page 74

the annexed Description of the Plates. The motion to be given to the bell-
apparatus, or tide-machine, was to be effected by admitting the sea water
through a small aperture, of three inches in diameter, perforated in the solid
masonry, communicating with a cylindrical chamber, in the centre of the
building, measuring two feet in diameter, in which a float or metallic air-
tank, was to rise and fall with the tide. The train of machinery for this
apparatus was calculated for a perpendicular rise of only six feet, being
equal to the lowest neap-tides on this coast. During the period of flood-tide,
the air-vessel, in its elevation, by the pressure of the water, was to give
motion to machinery for tolling the bell, and winding up a weight; which
last, in its descent, during ebb-tide, was to continue the motion of the
machine, until the flood-tide again returned to perform the joint operation
of tolling the bell and raising the weight. A working model of a machine
upon this principle having been constructed, it was kept in motion for a
period equal to several months: this was effected by water run through a
succession of tanks, raised by a pump from the lower one to the higher, thus
producing the effect of flood and ebb tides. The time during which this
apparatus was in action, having been ascertained by an index, a constant
attendance upon the machine, during this protracted experiment, became
unnecessary.
The upper termination of the Beacon, in its present
General application of
tide-machinery.
form, does not admit of the application of the tide-
machine with the bell-apparatus. Experiments as
applicable to this have, however, been tried with a wind-instrument, to be
sounded by the pressure of the sea water; but it has not succeeded to the
extent that seems necessary for a purpose of this kind. We have indeed
thought, that the application of pressure as a power, communicated by the
waters of the ocean, in mechanical operations, might be carried to almost
any extent, by simply providing a chamber or dock, large enough for the
reception of a float or vessel, of dimensions equivalent to the force
required. This description of machinery is more particularly applicable in
situations where the tides have a great rise, as in the Solway Firth , Bristol
Channel, and other parts of the British seas; and at St Malo, on the coast of
France.
A Beacon of any form, unprovided with a light, must always be considered
an imperfect land-mark, and therefore various modes have been

Page 75

contemplated, for more completely pointing out the
Leading Lights position of the Carr Rock. It has been proposed that
suggested.
phosphoric lights should be exhibited from the top of
the Building. This object, however, would be more certainly accomplished,
by the erection of leading lights, upon the Island of May and Mainland of
Fife. But these, with other plans which have been under the writer’s
consideration, would necessarily be attended with a great additional
expence, which, in the present instance, it is not thought advisable to incur.
Owing to the necessarily slow progress of the
Expence of the Carr
Rock works.
operations at the Carr Rock, the works were carried on
partly in connection with the new Light-house on the
Isle of May, and with the assistance of the ordinary shipping of the Light-
house establishment. This renders it difficult to give a distinct estimate of
the expence of the Beacon; but in so far as it can be collected, it may be
stated, including all charges, at about L. 5000.

Stations on the Coast of Scotland, where Light-houses have been
suggested as still necessary.

Having now taken notice of the works of the Light-house Board, so far as
they have been completed, up to and including part of the year 1823. We
may farther advert to the Light-house on the Rhins of Ilay, founded on the
23d of August last. The Northern Light-houses accordingly amount to
seventeen, erected at fourteen stations; and besides these, there are the
Beacons of North Ronaldsay and the Carr Rock. The position of these
establishments has not been chosen in regard to their respective distances
from each other, but agreeably to the commercial importance and dangers
connected with particular parts of the coast. Six of them, for instance, are
on the Friths of Forth and Clyde, at not more than from 20 to 25 miles
apart; while Kinnaird-Head, on the east coast, is about 72 miles from the
Bell Rock, and 70 miles from the Pentland Skerries. The Light-house upon
Island Glass, is about 130 miles south-west from the Pentland Skerries, and
120 miles northward from the Rhins of Ilay, being a stretch of 250 miles of
coast, with only one Light-house intervening. It must therefore be obvious,
that fourteen Light-house stations, which include two on the Isle of Man,

Page 76

are too few for the Scottish coast, rendered formidable and dangerous, by a
vast number of islands and sunken rocks. The Commissioners have still,
accordingly, a wide field of operations before them, which they are
gradually occupying, as their funds will admit, and as the demands of
navigation and commercial intercourse seem to require. In the Appendix,
No. I. notice is taken of the most prominent points of land on the coast,
which have been brought under consideration as fit Stations for additional
Light-houses; and of these, one at Buchan-Ness, on the east coast, has
already been fixed on by the Board.

Constitution of the Board, and System of Management.

The affairs of the Northern Light-houses are managed
Constitution of the
Board.
by the Commissioners named in the different acts
already noticed; but the direction of the whole concerns
of the establishment almost entirely devolves upon the Commissioners
resident in Edinburgh, viz. The Lord Advocate and Solicitor-General, the
Lord Provost, and Senior Magistrate of that City, and the different Sheriffs,
Commissioners ex officio, who attend the Courts of Law. They hold
frequent meetings, and bestow their time and labour without any salary or
remuneration whatever. At their Meetings, all matters falling under the
economy, and connected with the arrangement of the Light-houses, are
regulated; full powers being conferred upon them as a Board to erect and
maintain such additional Light-houses as they shall deem necessary; so that
the system in this respect will at no very distant period be rendered
complete.
By the Statutes, the general rate of duty upon British
Rate of Duties.
ships is 2d. per register ton for passing one of, or all the
Scottish Lights; together with certain local duties of
½d. per ton, connected with the Lights of May and Inchkeith; and for
vessels which only pass the Lights on the Isle of Man, one farthing per ton
is the sole duty. Foreign ships in all cases pay double rates. These duties are
exigible at all the Ports in the United Kingdom, and are remitted to the
General Collector at Edinburgh, at the end of three or six months, according
to the extent of the respective collections.

Page 77

The application of the Funds, and disposal of the Surplus, are fixed by the
Acts; which also require, that an account of the moneys received and
expended by the Board, be annually presented to the Lords of the Treasury,
the Convention of Royal Burghs of Scotland, and that two copies be sent to
the Board of Customs at Edinburgh, to be laid before both Houses of
Parliament.
The only permanent expence of management in the way
Expence of of remuneration to the Officers of the Board, are a
Management, &c.
salary of L. 500 to the Engineer; L. 380 to the Clerk,
who is also Cashier, and a fee of 50 guineas to the Auditor or Accountant.
The revenue of the Board may be stated at about L. 24,000 yearly; and as
the department of the Engineer is unconnected with the financial
arrangements, this fund is, in fact, managed for about L. 432, 10s. per
annum.
As to the practical arrangement, the Engineer visits all the Light-houses
annually, and Reports to the Board upon the various works and operations
connected with the different Light-houses,—the conduct of the light-
keepers,—and also upon the stores and supplies required for the ensuing
year,—and these, when approven of, are authorised and ordered by the
Commissioners. All accounts for supplies are laid before the Board, and
paid twice in the year.
At each ordinary Light-house, a Principal and an Assistant Light-keeper are
appointed, whose salaries are respectively L. 45, and L. 35 per annum,
besides a piece of ground, not less than 10 acres, with fuel, a suit of uniform
clothes every three years, and some other small perquisites. At the Bell
Rock, there are four light-keepers, three of whom are always at the Light-
house, while one is, by rotation, on shore at the establishment at Arbroath
for the families of the light-keepers. Their salaries are respectively L. 63,
and L. 57, 15s., and for each of the two ordinary Assistants L. 52, 10s. with
provisions for themselves while at the Rock, and apartments for their
families ashore. The light-keepers act under certain Instructions, and make
Monthly Returns to the Engineer’s office, copies of which will be found
under Appendix, No. I.
The shipping belonging to the Light-house service,
Shipping of the
Establishment.
besides attending boats, for visiting Light-houses on

Page 78

insulated situations, consists of a vessel of about 50 tons register, which is
chiefly employed in attending the Bell Rock, to supply the house with
necessaries, and relieve the light-keepers in their turn. For general service,
another vessel of 140 tons is kept, which carries oil and other stores for the
lights, together with fuel and necessaries, for the use of the light-keepers,
and artificers, with their implements and apparatus, for making repairs at
the different stations. The Engineer makes his annual voyage of inspection
in this vessel, which is provided with cabins suitable for the reception of
such of the Commissioners as may occasionally visit the Light-houses.
This duty has been undertaken by various members of
Voyages of
Inspection.
the Board. In the Summer of 1814 a Committee,
consisting of Mr Hamilton, Sheriff of Lanarkshire, Mr
Erskine, Sheriff of Orkney, and Mr Duff, Sheriff of Forfarshire, with the
Engineer, made a voyage to inspect the different Light-houses already
erected, as also the most prominent of the stations on the coast, suggested
for the erection of Additional Lights. They sailed from Leith in the Yacht,
having for their companion Mr Walter Scott, and having visited the Light-
houses on the Isle of May and Bell Rock, with the establishment at
Arbroath, and that upon Kinnaird-Head in Aberdeenshire, they next landed
at Sumburgh-head in Shetland, on which a Light-house has since been
erected. Returning southward, they visited the Light-houses on the Start
Point of Sanday, and the Pentland Skerries in Orkney. Then steering
westward, they landed at Cape Wrath, one of the projected Stations for a
Light-house. They next touched at the Light-house on Island-Glass, one of
the Harris Isles. From thence they proceeded and landed upon the Rock
called Skerryvore, lying off the Island of Tiree, and were satisfied of the
practicability of erecting a Light-house there. Having visited the Light-
house on Ennistrahul, on the coast of Donegal, one of the Irish Lights, and
inspected their own establishments on the Mull of Kantire and Isle of
Pladda, the Commissioners landed at Greenock, after a voyage of nearly
seven weeks.
In July 1815, Mr Hamilton and Mr Duff, accompanied by the writer, sailed
in the Yacht from the Troon for Liverpool, where they were joined by Sir
William Rae; and after having had a meeting with Mr Gladstone on the
subject of the Lights on Man, they sailed thither, and fixed on the Stations
for the Lights on that Island, and on the Calf. They then proceeded to

Page 79

Dublin, and communicated with the Irish Board for the affairs of Light-
houses, regarding certain arrangements for the advancement of the public
service committed respectively to their charge. Mr Crossthwaite, and other
Members of the Irish Board, accompanied them to the Light-house upon
Houth: and having visited the Tuskar Light-house, situate on an insulated
rock off the coast of Wexford, they bent their course to Holyhead, landed at
the Light-house on the South Stack; and on their return surveyed the
operations at the Light-house at Corsewall in Galloway then building, and
having visited Pladda, landed at Greenock.
In the Summer of 1818, Messrs Hamilton and Duff, with the writer, sailed
from Clyde, and inspected the Light-houses of Corsewall and on the Isle
and Calf of Man. The Yacht being then bound through the British Channel,
they availed themselves of the opportunity to visit some of the English
Light-houses, particularly the Smalls, off St David’s Head, the Longships,
off the Land’s End, the Edystone, the Caskets off Alderney, Hurst Castle,
Dungeness, and the North Foreland. By these voyages, the Commissioners
greatly enlarged their knowledge of the important concerns entrusted to
their charge. Some of them had thus seen and examined all the Light-houses
already established on the coast of Scotland, and most of the Sites in
contemplation for new erections on the northern parts of the Island.

Page 80

ACCOUNT
OF THE
BELL ROCK LIGHT HOUSE

Page 81

Drawn by Miss Stevenson.
Engraved by J. Horsburgh.

Page 82

Pharos loquitur
Far in the bosom of the deep
O’er these wild shelves my watch I keep
A ruddy gem of changeful light
Bound on the dusky brow of Night
The Seaman bids my lustre hail
And scorns to strike his timorous sail

See page 530.

BELL ROCK LIGHT-HOUSE.

Page 83

ACCOUNT
OF THE
BELL ROCK LIGHT-HOUSE.

CHAPTER I.
NAME OF THE ROCK,—SITUATION AND DIMENSIONS,—NATURAL HISTORY,—
DEPTH OF WATER, AND CURRENT OF TIDES.

In the Introduction, I have given an account of the institution of the Board
of Commissioners of the Northern Light-houses; of the progress made in
the erection of Light-houses on the coast of Scotland; the probable future
operations of the Board, and the general economy or management of its
affairs. I now come to treat in detail of the Bell Rock Light-house, as the
chief object of this work; and, in the present chapter, I propose to give the
general history, and a description of this dangerous Rock.

Name of the Rock.

There is perhaps nothing in history more arbitrary, or
Name. difficult to account for, than the origin of proper names,
nor, in general, any research more unsatisfactory, than a
Origin of the Name. prolix inquiry into their etymology. The charts of the
nautical surveyor are the proper records for the names
of places upon the sea-coast; but such maps are comparatively of late
invention. The first sea-chart which we hear of in England, was that brought
from Spain in 1489, by Bartholomew Columbus, to illustrate his brother’s
theory of the discovery of America; and the earliest, applicable to the coast
of Scotland, is the chart of the voyage of James V., from the Firth of Forth,
by the Orkney and Western Islands, to the Firth of Clyde and coast of
Galloway, in the year 1540. This map was published at Paris by Nicolay
D’Arfiville, Seigneur Du d’Aulphinois, &c. chief Cosmographer to the

Page 84

King of France, in 1583; and afterwards in Edinburgh, in the year 1688, by
John Adair, F. R. S., Geographer for Scotland.
The French writer gives a hydrographical description of
Inch Cape.
the coast of Scotland, in relation to the Royal voyage,
from Leith to the Solway Firth , noticing the distances
of places, the tides, and the rocks and sand-banks, or “dangers,” as they are
more generally termed, which it was necessary to avoid. In adverting to the
course from Leith by the east coast to Duncansby-Head, in Caithness, he
observes, “Entre Finismes [Fifeness] et la pointe nommé Redde, xii mille à
l’est sud-est du costé de la dicte pointe Redde, gist un danger appelé
Inchkope.” This is unquestionably the Bell Rock, the inch or island of the
Cape, and with a reference to the Redhead, to the north of Aberbrothock,
the highest and most remarkable point on that coast. In Adair’s collection of
nautical charts, and descriptive account of the eastern coast of Scotland,
published in 1703, the Bell Rock is indifferently termed Scape and Cape;
and the fishermen on the shores of Angus uniformly call it the Cape Rock.
In some old charts, particularly by the Dutch, whose name for a headland is
kappe, it is also called skape and scaup. It does not, however, seem that any
inference can be drawn from these various appellations; and, although it
were to be conjectured, that the Inch Cape was, at a very remote period,
permanently above water, and in all respects an island, the most rational
hypothesis would still remain, and be indeed confirmed, that this name was
given it on account of the relation it bore, especially in situation, to the cape
of Redhead.
It is perhaps more difficult to assign the true origin for
Bell Rock.
the modern term of Bell Rock, by which this dangerous
reef is now universally known. There is a tradition, that
an Abbot of Aberbrothock directed a bell to be erected on the Rock, so
connected with a floating apparatus, that the winds and sea acted upon it,
and tolled the bell, thus giving warning to the mariner of his approaching
danger. Upon similar authority, the bell, it is said, was afterwards carried off
by pirates, and the humane intentions of the Abbot thus frustrated. This
story has, by a modern poet, been made the subject of the ballad of “Sir
Ralf the Rover,” which, for the reader’s amusement, is inserted in the
Appendix, No. II.

Page 85

Of the erection of the Bell, and of the machinery by
Erection of a Bell. which it was rung, if such ever existed, it would have
been interesting to have had some authentic evidence.
But, though a search has been made in the chartularies of the Abbey of
Aberbrothock, preserved in the Advocates’ Library, and containing a variety
of grants and other deeds, from the middle of the 13th to the end of the 15th
century, no trace is to be found of the Bell Rock, or any thing connected
with it. The erection of the bell is not, however, an improbable conjecture;
and we can more readily suppose that an attempt of that kind was made,
than that it had been intentionally removed, which in no measure accords
with the respect and veneration entertained by seamen of all classes for
land-marks; more especially, as there seems to be no difficulty in
accounting for the disappearance of such an apparatus unprotected, as it
must have been, from the raging element of the sea. It is not therefore
unlikely, that the popular appellation by which this Rock has more recently
been known, may owe its origin to the tradition of the Abbot’s humanity
and public spirit; and when we consider that the churchmen of those days
were well acquainted with the history of the celebrated Pharos of
Alexandria, and may have heard of the fire-towers and sea-marks, which
Mr Bryant, in his Mythology, conjectures existed in very remote times, it is
natural to suppose, that these learned persons had, at a pretty early period,
turned their attention to the subject, and had attempted, in the mode which
has been figured, to point out and guard against the danger.
Amidst these speculations, it must not, however, be overlooked, that this
Rock may have acquired its present name from its shape or figure; for at the
commencement of the author’s operations, he remarked, that the site of the
light-house, at some distance, had much the appearance of a large bell; and
although this part was not more than four feet above the general level of the
Rock, yet by supposing it to have been the nucleus of a larger mass, in the
central part of the Rock, gradually wasted away by the washing of the sea,
it may at a former period, from that resemblance, have obtained the
appellation it now retains.

Situation and Dimensions.

Page 86

The Bell Rock may be described as a most dangerous
Situation. sunken reef, situate on the northern side of the entrance
of the great estuary or arm of the sea called the Firth of
Forth; and as such directly affecting the safety of all vessels entering the
Firth of Tay. Its position, as will be seen from the Charts, Nos. 3. and 4.,
which accompany this work, is in west longitude from Greenwich 2° 22´,
and in north latitude 56° 29´. From St Abb’s Head in Berwickshire, it bears
north by east per compass, (variation 27° 20´ west in the year 1819), and is
distant about 30 miles; from the Island of May north-east 17 miles; and
from the promontory or cape called the Redhead, in Forfarshire, it bears
south-west, and is distant 14 miles. But in easterly directions no land
intervenes between the Bell Rock and the coasts of Norway, Denmark,
Germany and Holland.
The dimensions of the north-eastern or higher
Dimensions.
compartment of the Rock where the light-house is built,
are about 427 feet in length, and 230 feet in breadth.
Besides these dimensions, the south-western reef extends about 1000 feet
from the main rock. The greatest length, therefore, of the Bell Rock, which
may be said to be dangerous to shipping, is about 1427 feet, and its greatest
breadth is about 300 feet; but the outline or margin of the Rock is quite
irregular, as will be seen from the Plates marked Nos. 5. and 6.

Natural History.

The Bell Rock consists of sandstone of a reddish
Mineralogy.
colour, which in some places contains whitish and
greenish spots of circular and oval forms, irregularly
interspersed through the rock. It is of a fine granular texture, containing
minute specks of mica. It is very hard, and, in the language of the artificer,
is tough, and rather difficult to work; and in some parts it is found to rise in
masses having a conchoidal fracture. Its angle of inclination with the
horizon is about 15 degrees, dipping towards the south-east. The strata are
thick and unequal, strongly cemented together, and running in the direction
of north-east and south-west. The surface of the Rock is rugged, and full of
cavities, so that walking upon it becomes rather difficult. A longitudinal
section of the Bell Rock, taken in a north-easterly and south-westerly

Page 87

direction, may be described as consisting of a higher and a lower level. The
cross section, taken in a south-easterly and north-westerly direction,
exhibits the abrupt and pointed terminations of the strata, though it appears
level when seen from a distance.
It would be a speculation highly interesting to the
Wasting effects of the
Sea.
geologist, to inquire into the probable early history of
the Bell Rock, and the changes produced on it by the
wasting effects of the waters of the ocean. When we
Natural History.
consider the similarity of the red sandstone of this rock
with the Redhead of Forfarshire, and opposite shores of Berwick in the
neighbourhood of Dunglass, and take into view that there is a ridge or
shallower part of the bottom, which extends a considerable way from the
Bell Rock in the direction of these shores, we may infer, that the Rock itself
had extended at one time much further. We are also enabled to trace the
same formation, penetrating to the northward through Ross-shire, and quite
across the kingdom, in a southern direction, to Cumberland. At a period
indefinitely remote in the history of the globe, we may therefore imagine
that one continuous bed of red sandstone had stretched across the Firth ,
forming a barrier by which the great collection of waters of the Forth and
Tay have been pent up.
Proofs of the Sea In support of this opinion, we have the most
having occupied a unequivocal proofs of the waters of those friths having
higher level. formerly occupied a much higher level. Of these we
may notice the general appearance of their water-worn
shores, and a bed of oyster-shells near Borrowstounness, which has been
traced to the extent of three miles in length, and about two fathoms in
thickness, lying in their natural state, but now upwards of 35 feet above the
present level of the sea. Under these circumstances, and many others which
might be adduced, it is not improbable that the Bell Rock has at one time
been connected with the opposite coasts; and when we consider the general
waste of the land, which is apparent in all directions from the impulse of the
sea, it may at least be concluded, that at no very remote period, the Rock
has been of much greater superficial extent, and above the level of the
highest tides. Nor need we be surprised that such changes upon this remote
and insulated spot should have been lost sight of, owing to their gradual and

Page 88

almost imperceptible effects, compared with the short period of the life of
man, and in absence of all testimony excepting that which is oral.
With regard to the marine Plants which grow upon the
Plants.
Bell Rock, we may observe that the lower parts of it are
covered with the stronger or larger sorts, as the great
tangle, Fucus digitatus, the roots of which rarely appear above the water,
while it is seen at the depth of several fathoms, growing with the greatest
luxuriance, and has often been observed by the author from a boat in fine
weather, as a means for ascertaining, by the direction of the leaf, the
changes of the currents of the tide at the bottom. The Badderlock, or
Henware, Fucus esculentus, is found only on the north-eastern and south-
eastern extremities of the Rock, growing at low water-mark of spring-tides,
and seems to prefer the most rapid currents of the sea, and places where the
heaviest breach takes place. In such situations it grows in great abundance
at the Bell Rock, where it has been measured of the length of eighteen feet,
and of proportionally increased breadth. Perhaps some of these plants are of
considerable age; but at the works of the Carr Rock Beacon, off Fifeness, it
was found that the growth of the badderlock was so very rapid, that the
plant attained to the length of seven feet upon the new building, in the
course of the winter and spring months. The higher parts of the Bell Rock
abound with the smaller fuci, as Fucus mamillosus, and F. palmatus, or
common dulse. F. lycopodiodes, alatus, and coccineus, are found on the
older stalks of the great tangle, and F. subfuscus and confervoides occupy
the smaller pools. In some places, the rocks are rendered slippery with Ulva
compressa and umbilicalis; and the higher parts of the Rock, and the
basement or lower courses of the light-house, are so covered with Conferva
rupestris, as to produce the appearance of a sward of grass.
Of the feathered tribe of animals at the Bell Rock, we
Animals.
notice the shag, cormorant, and herring-gull, which
sometimes rest upon the Rock when in search of
codlings and other small fishes. It also formed the resting-place of
numerous seals at the commencement of the operations of the Light-house,
but these amphibious animals, as well as the birds, have now almost
entirely left it. The common crab and lobster are sometimes found here in
the crevices of the rock. The Lepas balanoides, or acorn-shell, the common
limpet, mussels of a small size, and the white buckey or Buccinum lapillus,

Page 89

abound on the rock. The Actinia crassicornis, Asterias glacialis and
oculata, are common. A minute crustaceous insect, called, by Dr Leach,
Limnoria terebrans (Lin. Trans, vol. XI. p. 371.), appeared in great numbers
in the submersed wood work of the temporary erections on the Rock.
So destructive to timber is this small insect, that the
Insect destructive to
Timber.
Norway logs, laid down to support the temporary
railways in 1807, when lifted in 1811, were found to
have been reduced by its ravages from 10 inches square to 7 inches, or at
the rate of about an inch in the year. The author having had occasion
afterwards to examine the timber-bridge of Montrose, found the attacks of
this insect upon the wooden piers to be so alarming as to endanger that
fabric; and after many trials for the preservation of timber in such
situations, the Trustees were ultimately induced to cover the upright beams
with sheet-copper. Upon another occasion, when the author was called to
inspect the Crinan Canal, he found the gates of the sea-locks so destroyed,
chiefly by this little animal, that the locks lost seven feet of their depth of
water in the course of the night. It is further remarked, that the deserted
cavities, formed by the perforations of the Limnoria, frequently become the
residence of larger marine insects, belonging to the Linnæan genus Oniscus.
In the year 1814, with a view to experiment on the
Experiments with
pieces of timber
effects of these destructive vermes, I fixed down
specimens of teak-wood, oak, black birch, Memel and
trenailed to the Rock.
Norway fir timber, on the Bell Rock. The only
specimen which remained imperforate till 1820, was the teak-wood. The
rest were almost entirely destroyed in the course of two or three years. This
may be regarded as a matter of some importance, in a national point of
view, in directing the employment of teak-wood for the sea-lock gates of
canals and for ship-timbers. From the excellency of the situation of the Bell
Rock for such experiments, I have caused another set of timbers to be
trenailed to the rock, in a situation where, like the former, they are
occasionally uncovered by the water. These last pieces of timber were laid
down in the month of October 1821. They are eighteen in number, each
measuring 5 inches square, and 30 inches in length; and are of the following
kinds, viz. British and American oaks and firs, Memel fir, Scotch elm,
beech, sycamore, larch, teak-wood, mahogany, bullet-tree, locust-wood, and
blue gum-wood from Van Dieman’s Land.

Page 90

When the workmen first landed upon the Bell Rock,
Attempt to plant limpets of a very large size were common, but were
Muscles on the Rock.
soon picked up for bait. As the limpets disappeared, we
endeavoured to plant a colony of muscles, from beds at the mouth of the
river Eden, of a larger kind than those which seem to be natural to the rock.
These larger muscles were likely to have been useful to the workmen, and
might have been especially so to the light-keepers, the future inhabitants of
the rock, to whom that delicate fish would have afforded a fresh meal, as
well as a better bait than the limpet; but the muscles were soon observed to
open and die in great numbers. For some time this was ascribed to the
effects of the violent surge of the sea, but the Buccinum lapillus having
greatly increased, it was ascertained that it had proved a successful enemy
to the muscle. The buccinum being furnished with a proboscis capable of
boring, was observed to perforate a small hole in the shell, and thus to suck
out the finer parts of the body of the muscle; the valves of course opened,
and the remainder of the fish was washed away by the sea. The perforated
hole is generally upon the thinnest part of the shell, and is perfectly circular,
of a champhered form, being wider towards the outward side, and so
perfectly smooth and regular, as to have all the appearance of the most
beautiful work of an expert artist. It became a matter extremely desirable to
preserve the muscle, and it seemed practicable to extirpate the buccinum.
But after we had picked up and destroyed many barrels of them, their
extirpation was at length given up as a hopeless task. The muscles were thus
abandoned as their prey: and in the course of the third year’s operations, so
successful had the ravages of the buccinum been, that not a single muscle of
a large size was to be found upon the rock; and even the small kind which
breed there, are now chiefly confined to the extreme points of the rock,
where it would seem their enemy cannot so easily follow them.
In speaking of the habits of fishes, it deserves notice
Habits of Fishes.
that they have their particular grounds and shores which
they frequent; for while the vessels attending the works
at the Bell Rock were stationed there, different kinds of fish were caught as
the depth and bottom varied. About high-water, and especially during ebb-
tide, when the sea is smooth on the rock, the Podley (chiefly the fry of the
coal-fish, but including also the young of the Gadus virens) is so numerous,
as almost entirely to cover it from view. Near the rock, the small red cod is
often found in abundance: at some distance, as the bottom, which is covered

Page 91

with marine plants near the rock, alters to coral, gravel, shell sand, fine sand
and mud, all of which occur in a range of depths from 4 to 23 fathoms
towards the north, different kinds of fish are found; first, the codling, which
ceases to be wholly red, but becomes only speckled with reddish spots;
then, upon the finer or mud grounds in the track of the tides of the Firth of
Tay, whiting, haddock, flounder, and occasionally the sole. On the southern
side of the rock, where the water deepens to 35 fathoms, the large white
cod, in company with ling, conger-eel, halibut, skate, thornback, plaise,
turbot, wolf-fish and large coal-fish are found. The dog-fish appears to be
very general, and seems to prey chiefly upon the haddock and cod. The
mackerel and gurnard are found together near the surface, and do not seem
to be confined to particular grounds, but occur wherever the water is of a
considerable depth. Herrings are found in the bays of the opposite shores in
great abundance at the fishing season, when they are understood to be
migrating towards the south. It has often been observed, in the course of the
Bell Rock operations, that, during the cold weather of spring and autumn,
and even at all seasons, in stormy weather, when the sea is much agitated by
wind, the fishes disappear entirely from the vicinity of the rock, probably
retreating into much deeper water, from which they do not seem to return,
until a change of weather has taken place; so much was this attended to by
the seamen employed on this service, that they frequently prognosticated
and judged of the weather from this habit of the fishes, as well as from the
appearances of the sky.

Depth of Water.

At the time of high-water of spring-tides, the south-
Depth of Water.
western reef is about 16 feet, or nearly the whole rise of
the tide, under the surface of the water; while the part
Depth of Water upon of the rock on which the light-house is built, is about 12
the Bell Rock.
feet below high water-mark of spring-tides: At low-
water of neap-tides, hardly any part of the rock is visible: But at low-water
of spring-tides, the general level of the north-eastern end where the light-
house is built, is about four feet perpendicular above the level of the sea,
though particular points measure six or even seven feet in height above the
low-water mark of spring-tides.

Page 92

At the distance of about 100 yards from the rock in all
Depth at the distancedirections, excepting on the south-western reef, there is
of 100 yards, and
upwards from it. a depth of water varying from two to three fathoms at
low water of spring tides. On the north-west side, or in
the direction of the shores of Forfar and Fife, the greatest depth is 23
fathoms; but on the south-eastern or seaward side, in the direction of the dip
or inclination of the strata, the water deepens more suddenly to 35 fathoms;
in the same direction from the rock, however, the soundings again become
less, being only 22 fathoms upon Mars Bank, distant about 33 miles; this
bank appears to be a deposition formed by the joint operation of the waters
of the Friths of Forth and Tay, influenced by the great tidal wave of the
German Ocean. It may here be noticed as a fact connected with the depth of
the German Ocean, that at Queensferry passage, in the Firth of Forth, the
depth of the water is about 35 fathoms, while the greatest depth of the sea
across to Denmark, does not exceed 45 fathoms. The depths of the German
Ocean will be seen, by inspecting Chart No. 3., where sectional lines are
delineated between various points of Great Britain and the opposite
Continent, on which the reader will see the relative depths marked by
shaded lines, in a new and it is hoped a perspicuous manner.

Current of the Tides.

The tides at the Bell Rock, are observed to follow the
Currents of the Tide.
same laws as on the opposite shores of the Firth of
Forth. The currents along the coast take their direction
Tides at the Bell from the figure of the land, and, in their course, they are
Rock.
therefore occasionally deflected from, and inclined
towards it. At the Bell Rock the flood-tide sets south-west, and the ebb-tide
north-east, being nearly in the direction of the shores of Forfar and
Kincardine. The velocity of the water in spring-tides, or when the sun and
moon are in conjunction, and in opposition, is about three miles per hour,
but in neap-tides, or at the quadratures of the moon, the current is only at
the rate of about one mile per hour. On the days of new and full moon it is
high-water upon the Bell Rock at half past one o’clock, being about the
same periodic time as at the harbour of Arbroath, or nearest point of the
mainland. In the ordinary state of the weather, the perpendicular rise and

Page 93

fall of the sea at the Bell Rock, in spring-tides, is 15 feet, and in neap-tides,
8 feet; but so much depends upon the direction of a prevailing tract of
winds, that the tides are often found to vary from 1 to 3 feet above and
below these numbers. This irregularity in the tides of the German Ocean
and its subsidiary friths or inland seas will be easily accounted for, by
considering the effect of westerly winds passing for a length of time over
the Atlantic, which must naturally force an undue quantity of water from
thence into the entrance of the North Sea, between the coasts of Scotland
and Norway; while the Strait of Dover, to the southward, from the same
cause, is gorged by the surplus waters of the British Channel flowing in an
opposite direction, and checking the tide of the German Ocean. When the
winds blow from southerly and easterly directions, the reverse of this
happens, and the waters are then proportionally low.
A curious anomaly connected with the flowing and
In and Off shore
Currents.
ebbing of the sea, in the early part of each tide, is
observable in the contrary currents which take place
along the shore, and at a distance from it. For example, the flood-tide
begins to flow in many situations two or even three hours sooner on the
shore than at the distance of from one mile to four miles in the offing. The
same thing also happens with regard to the ebb-tide, which begins to fall
and run in a contrary direction to the flood-tide, two or three hours sooner
on the shore than at a distance. These effects are very different from the
state of things three or four leagues from the land, or in the open sea, where
the lateral motion of the tide-waters is scarcely sensible. That an extensive
tract of coast should produce changes on the current of the tides, is perhaps
what we should expect; but it is somewhat curious to find the same
appearances connected with small islets, and, as in the case of the Bell
Rock, even with an insulated reef, situate at the distance of 12 miles from
the land, and sunk to the depth of from 2 to 3 fathoms under the surface of
high-water. So strikingly observable is this, that the tide begins to ebb about
two hours sooner on the Bell Rock than at the short distance of one mile
from it. In the course of the light-house operations this was rendered
sufficiently obvious, by the swinging round of the several vessels at their
moorings according to the flood and ebb tides. For example, the Floating
Light-ship was moored about three miles in a north-west direction from the
Bell Rock, and the moorings of the Tender and two Stone Lighters, were
respectively laid down at the distance of ¾ and ½ mile from it, as will be

Page 94

seen from Plate V. Now, these vessels were all found to swing to the tide at
periods proportional to their distance from the rock. Although it may,
therefore, seem strange, that this comparatively small object should affect
the tides in its vicinity in a manner similar to the shores of an extensive
coast; yet, as the rock shelves outwards, with an extensive base, especially
on the northern side, it must impede the under current of the tide, and
indeed forcibly proves the existence of such under currents.
To account for these in and off shore tides, or central
Not accounted for by
Writers on the
and marginal streams, would be interesting. But to what
subject. cause shall we ascribe them? Sir Isaac Newton, and the
other eminent philosophers who have followed that
great man in considering the theory of the tides, confine their attention
chiefly to an explanation of the influences of the sun and moon, and the
laws of gravitation, in affecting the waters of the ocean, leaving it to the
result of experience and observation to account for such anomalies as those
to which we now allude. It is noticed by Adair, Mackenzie, and other
nautical surveyors, that the tides run longer upon the shore than in the
offing, and the advantage of working a ship with in and off shore tides, is
familiar to every mariner. The existence of these opposite currents was also
known to the author, prior to the commencement of the Bell Rock works,
but they had not struck him so forcibly till that period. For here, even after
the flood-tide had overflowed the rock, and put a stop to the operations, the
boats in carrying the artificers on board of the Tender, had still to row
against the current of a strong ebb-tide.
It would be foreign to this work to enter into the theory
Currents along Shore
considered as Eddy-
of the tides generally; all, therefore, that is here
tides. proposed, is to endeavour to account for these in and
off shore currents. In doing this, however, it will be
necessary to observe, that the great wave or “theoretical tide,” as it has been
termed by the late eminent Professor Robison, is produced by the united
attraction of the sun and moon, which, between the Tropics, has been
calculated by philosophers to raise the water from 8 to 14 feet
perpendicularly. It is observable, that the attractions of these heavenly
bodies elevate the parts of the ocean to which they are vertical, without
having any direct tendency to progressive or lateral motion. The currents
along our coasts, may therefore be considered merely as Eddy-tides,

Page 95

occasioned by the interposition of the land, which obstructs the undulating
motion incident to the rise or fall of a fluid. In this manner the land may be
said to displace a portion of the tidal waters which have been elevated
above the medium level of the sea; and were it not for such obstruction, the
great waves of the tide might be supposed to undulate indefinitely over the
expanse of the ocean. To compare small things with great, these effects may
be conceived as in some degree exemplified, by the disturbing effect of a
vessel passing along a navigable canal, or the undulations which are
observable in the wake of a ship or wheels of a steam-boat in motion on a
smooth sea.

Page 96

The great wave which supplies the British tides,
Progress of the Great appears to be propagated between the coast of Labrador
Waves of the Tides.
and Greenland, on the one hand, and the European
shores on the other; and this great wave seems to be divided into two lesser
waves. One of these flows between Ireland and the coast of France, into the
British and St George’s Channels; while the other enters by the North Sea
into the German Ocean; and in its course from north to south, supplies all
the friths, rivers, and bays connected with it, invariably in the form of In
and Off shore tides, which are every where observable along the margin of
this great basin. This northern wave is found to occupy about 12 hours in
flowing southward from the 58th to the 52d degree of latitude, or from the
Orkney Islands to the numerous Sand-banks which pervade and encumber
the apex of the German Ocean, where the currents become extremely
desultory and irregular. The coast of the British Isles, accordingly, may be
said to, displace a portion of this northern wave, and thus to produce the
irregularities which we are endeavouring to account for.
At present, we shall confine our attention to the tides of
Progressive periods of
High-Water in the
the Firth of Forth. Here, as on other parts of the coast,
Firth of Forth. the tidal waters have a tendency to flow towards the
shores and higher parts of the Forth, till the instant of
high-water upon the shore, when the tide begins to ebb, and run in a
contrary direction. A central stream, however, continues to run with
unabated force, as flood-tide, during two or even three hours longer, as
before noticed, according to the situation and local circumstances of the
coast. It appears, from a comparison of the several periods of high-water on
the shores of the Firth of Forth, as nearly as some of them could be
ascertained, that the precise time of high-water becomes later and later in
the same tide, as we proceed westward; at the Bell Rock, for example, it is
high-water on the days of new and full moon, as before noticed, at ½ past 1
o’clock; at the Carr Rock, at ¾ past 1; at Elie, still further up the Firth , at 2;
Kinghornness, at ¼ past 2; Queensferry, at ¾ past 2; and at Alloa, at ¾ past
3 o’clock. The off-shore stream of the tide continues to flow proportionally
longer till it has supplied the higher parts of this estuary with its portion of
tidal waters; and in like manner, the central stream of ebb-tide continues its
course till these waters are again run off.

Page 97

In many points, it is found, that the operation of the
Currents at the Mouth tidal waters of extensive arms of the sea, bears a close
of the Dee and other
Rivers. resemblance to what is observable upon the small scale
in the currents of rivers, especially at their junction with
the ocean. An interesting example of this occurs on the river Dee, which
falls rapidly into the harbour of Aberdeen. Here the author having occasion
to make some observations on the tides in the summer of 1812, stationed
several assistants at low-water mark, between the entrance of the harbour
and the bridge, about two miles up the river. The waters of the Dee, even at
the entrance of the harbour, have almost a constant current seaward,
notwithstanding the opposite direction of the flood-tide of the Ocean. On
the occasion alluded to, one of his assistants, a very intelligent shipmaster,
continued at his post while the water flowed up to his middle; and, when
accosted about his situation, he significantly observed, “That it was rather
extraordinary, as the stream had never ceased to indicate the continuance of
an ebb-tide, while the water was still rising upon his body.”
In connection with these observations on the tides,
Water salt at bottom
and fresh at top.
some experiments were also made with an instrument
adapted for lifting water from considerable depths,
without the possibility of its intermingling with the surface water. By means
of this instrument, the water at the bottom of the Dee, at Aberdeen, was
found to be salt, while that at the surface was quite fresh. These streams of
fresh and salt water run in distinct currents, and in contrary directions, the
salt water, from its greater specific gravity, flowing at the bottom of the
river, and fluctuating with the level of the ocean, while the fresh water is
actually lifted upwards, and continues all the while to flow seaward on the
surface of the salt water. Towards the point of high-water, however, the
flood-tide gains strength on the margin of the basin of the harbour, where
the water becomes salt, and forms an eddy-tide in a contrary direction to the
central stream, which is observed still to run toward the sea. Having made
similar observations on the waters of the Thames, the Garonne, and other
rivers, with nearly the same results, after making allowance for the more
level state of the country, in the track of these great streams,—it is
concluded, that the currents at the embouchure of rivers bear a strong
resemblance to the operation of the in and off shore tides of the ocean.

Page 98

We further observe, that the great wave of the German
Phenomena of in and Ocean produces its tides in regular succession, and at
off shore Tides
accounted for. stated periods, as it moves from north to south; but the
tides of the more inland seas are subject to many
irregularities, both in their periodic times, and in the direction of their
currents. Let us suppose, then, that we have arrived at the instant of high-
water on the shores at the entrance of the Firth of Forth, and that the tidal
waters are then moving in a body, and with a certain pressure, towards the
higher parts of the Firth , and even affecting the river above the bridge of
Stirling. We find, that at the entrance of this estuary, on the days of new and
full moon, it is high-water at a quarter past one o’clock; but at Alloa, situate
70 miles above the Bell Rock, it is not high-water till about two hours and a
half later. The in-shore tidal waters having to encounter the shelving shores,
islands, sunken rocks, and projecting points of land, which lie in their
course up the Firth , acquire lateral as well as perpendicular motion, and
being thus checked in their progress, are brought sooner to a maximum state
than the off-shore stream, which flows in deeper water, and comparatively
free of obstruction, till it reaches its ultimate limits; though it gradually
diminishes in breadth, till the stream of the new tide gaining strength
becomes general; and the central current, formerly running in a contrary
direction, at length disappears, and takes the course of the new tide.
We would, therefore, be understood to ascribe this anomaly in the flowing
and ebbing of the sea, to the obstruction which the current of its waters
meets not only at the surface or margin, but at the bottom, which, from the
variety of the soundings of the depths, appears to be as various as the face
of the land. A striking proof of this is afforded at the Bell Rock: on the
northern side of which there are 11 fathoms, at the distance of about three
quarters of a mile; while, on the southern side, and at a similar distance, the
water deepens to 35 fathoms; so that a perpendicular section of this rock
under water forms a precipitous declivity, such as we are quite accustomed
to see on the land. Now, if we apply this irregular conformation of the
bottom of the sea, to the production of the in and off shore tides, and
conceive that the tidal currents extend their motion to the bottom, it must be
evident, that this obstruction presented to the stream will bring the tides to a
maximum state sooner on the northern side of the rock, where the water is
so much shallower, than on the southern side. This is also agreeable to
observation; for, the tides upon the Bell Rock begin to flow and ebb one

Page 99

hour sooner than at the distance of about three quarters of a mile from it on
the northern side, and about two hours and a half sooner than at the same
distance on the southern side. The marginal current is thus checked by the
shallowness of the water, and the projecting points of land; while the central
stream, flowing comparatively without obstruction, continues to run till the
most inland creeks are supplied with tidal water; and vice versâ, it continues
its stream outwards, till these waters are again run off.
The progressive times of high-water, at intermediate
Progressive times of
high-water.
points between the Bell Rock and the port of Alloa in
the Firth of Forth, appear to follow the same general
law, as the great wave of the German Ocean in its progress from the
Orkneys southward. These observations on the tides of the Forth apply
equally to the Firth and River of Tay, and indeed to all the tributary streams
and arms of the sea which communicate with the German Ocean, according
to their local situations and magnitudes.
If due allowance be made for the peculiar situation and
Tides of the
Mediterranean and
circumstances of the Mediterranean and Baltic seas, it
Baltic Seas. is apprehended, from all that we have been able to learn
of the operation of the currents at the Strait of Gibraltar,
and Sound of the Cattigate, that these seas are supplied and discharged by in
and off shore tides or currents, under certain modifications, and making due
allowance for local circumstances, in the same manner as on all other parts
of the coast.
I have been thus particular relative to the in-shore and off-shore tides,
because they appear in a very puzzling form to the mariner, while writers on
the theory of the tides are almost silent on this subject.

Page 100

CHAPTER II.
DANGEROUS POSITION OF THE BELL ROCK.—SIR ALEXANDER COCHRANE’s
LETTER TO THE LIGHT-HOUSE BOARD.—DESIGNS FOR THE BELL ROCK
LIGHT-HOUSE.—BILL BY LORD ADVOCATE HOPE IN 1803.—REPORT OF
TRADERS OF LEITH.—RESOLUTION OF THE LIGHT-HOUSE BOARD TO APPLY
AGAIN TO PARLIAMENT.—MEMORIAL TO THE BOARD OF TRADE.—BILL BY
LORD ADVOCATE ERSKINE.—REPORT OF THE COMMITTEE OF THE HOUSE OF
COMMONS.—THE BILL PASSED.

Dangerous Position of the Bell Rock.

Whatever may have been the early state of the Inch
Dangerous Position of
Cape or Bell Rock, as an Island, its present character is
the Bell Rock.
strictly that of a sunken rock; and, as such, its relative
situation on the eastern shores of Great Britain has long rendered it one of
the chief impediments to the free navigation of that coast. It is almost
unnecessary to remark, that there are only three great inlets or estuaries
upon this coast, to which the mariner steers, when overtaken by easterly
storms in the North Sea or German Ocean. These are the Humber, and the
Friths of Forth and Moray; of which the Firth of Forth is the principal
rendezvous. The mouth of the River Thames, excepting in certain narrow
and intricate channels, has not a sufficient depth of water, and is so much
encumbered with sand-banks, that no vessel can enter it under night, or
approach it in bad weather. On the coast and shores in the neighbourhood of
the Humber, the land is flat, and defective in those bold and characteristic
features which are essential to the situation of an anchorage for ships in bad
weather when they cannot keep at sea. The entrance of the Humber is also
considerably obstructed with sand-banks, of which the mariner is, if
possible, more afraid than of rocks, because more liable to uncertainty, by
the shifting of their position, and thereby changing the direction of the
accustomed channels. The great places of resort for ships, therefore, in the
North Sea, are the Roads of Leith and Cromarty, lying in the Friths of Forth
and Moray, as will be seen from Plate III., in both of which we find the
natural advantages of an ample entrance, and a coast so strongly marked as
to be easily recognised by the mariner. But from the dangerous position of

Page 101

the Bell Rock, his approach to the shores of this coast, prior to the erection
of the Light-house there, was liable to the greatest peril and uncertainty.
A memorable example of this occurred during a storm
Great storm in
December 1799.
from the south-east, in the month of December 1799.
This storm having continued with little intermission for
three days; a number of vessels were driven from their moorings in the
Downs and Yarmouth Roads; and these, together with all vessels navigating
the German Ocean at this time, were drifted upon the coast of Scotland.
Many found shelter, both in Leith and Cromarty Roads, which, from the
state of the winds, lay quite open for their reception. But still, from the
dread of the Bell Rock, in the one case, and the danger of mistaking the
entrance to the Firth of Dornoch for that of Moray, by taking the northern
instead of the southern side of Tarbetness, in the other, a great number of
vessels were lost, or much hardship was sustained by the mariner in seeking
safety in higher latitudes. It has even been reckoned, that seventy sail of
ships were either stranded or lost upon the eastern coast of Scotland during
that gale, when many of their crews perished.
At the Bullers of Buchan, near Peterhead, alone, on the first night of this
storm, the wrecks of seven vessels were found in a small cove, without one
survivor of the crews, to give an account of their disaster. As a remarkable
instance of escape on this occasion, it may be mentioned, that a coal-ship,
in ballast, returning from London to Newcastle, was carried completely
round the coast of Great Britain and Ireland, the first land made by this
vessel, after leaving Flamborough Head in Yorkshire, being the Land’s End
of Cornwall. Having put into Falmouth to refit the ship and refresh the
exhausted crew, she continued her voyage up the British Channel to the
Straits of Dover, and so to Newcastle, thus making a complete circuit of the
British shores. In the summer of 1800, the writer saw the wrecks of two fine
vessels on the Orkney Islands; one of which, on her way to Gibraltar, had
been as far as Ushant on the coast of France, when, by contrary winds, she
had been driven back to the Downs, and, in the month of December 1799,
she was ultimately stranded on the Island of Sanday, along with the other
vessel, which in that gale had been driven from Yarmouth Roads.
From the situation and circumstances attending the Bell Rock, it may well
be supposed, that this dangerous sunken reef was found to be either the
direct or ultimate cause, in many cases of shipwreck upon the eastern coast

Page 102

of Great Britain, and as such, every scheme which had for its object the
fixing of some distinguishing mark upon it, was regarded as a matter of
public interest, claiming a degree of attention proportionate to its apparent
practicability and usefulness. The traditionary story of the Bell said to have
been erected by the Abbots of Aberbrothock upon this rock may, perhaps,
have given rise to many plans of this nature. But, on account of the limited
advantages which must have attended any erection merely in the form of a
beacon, without a light, upon a sunken rock, at so great a distance from
land,—none of the many proposals of this kind which were from time to
time suggested, ever met with the serious attention of the public. It was
evident, that nothing but a light-house could not be essentially useful, and
that all temporary erections in a situation of this kind were to be avoided.
The following letter from Sir Alexander Cochrane,
Sir Alex. Cochrane’s
Letter.
while stationed on the eastern coast in the year 1793, is
particularly deserving of a place in this work, as well
from being the first official application made to the Commissioners on the
subject of the Bell Rock, as on account of that officer’s great experience in
nautical affairs, and the clear and decided manner in which the advantages
which would result from the erection of a light-house there, are pointed out.
“On board his Majesty’s ship Hind, Leith Roads, January 7. 1793.
Gentlemen, I think it a duty I owe to the public, to call your attention, as
Trustees for the Northern Lights, to the great hazard and peril that the trade
of the east of Scotland is subject to, from the want of a light-house being
erected on the Bell or Cape Rock, the only dangerous one upon this coast,
from the Staples to Duncansbay-head, except the Carr, which lies so close
to Fifeness and the Isle of May as to render it comparatively of less
consequence.
“The situation of the Cape being about 12 miles from the nearest shore,
bearing off the Redhead, by compass, S. ¾ W.—Taybar, SE. by E. ¼ E.—
Fifeness, NE. by E.—Isle of May Light, NE. 17 miles, (consequently, too
distant to be useful to shipping during the night); this rock is therefore
placed in the most dangerous situation possible, for the trade of the Friths of
Forth and Tay; the more so, from the prevailing winds on the coast, being
from the W.NW. to SW., which occasion vessels bound inwards, to stretch
across from shore to shore, that is, from the south to the north, or the
opposite, according to their situations. This they can do in the day time; but

Page 103

at night, the danger of falling in with the Cape Rock, prevents them from
standing to the northward of the Firth of Forth, and they are thereby
prevented from taking the advantage of working up under the land in St
Andrew’s Bay, by which they would get into smooth water, and avoid the
heavy swell and gusts of wind that are always met with in the opening of
this Firth .
“Ships from the Baltic, which have not made the land, are often driven off
the coast, from the caution they are obliged to take, in consequence of their
not knowing what their situation is respecting this rock; which, from being
covered early in the tide, and having little or no sea or breakers on it in
moderate weather, the wind being off the shore, the soundings are no guide
whatever; for, within one mile of the south-east side, the depth of water is
32 fathoms, (the general soundings on the coast); from all which
circumstances, a ship standing in for the shore, perhaps without having had
an observation of the sun for some days, runs the utmost danger of being
wrecked. From the experience I have, in consequence of cruizing on this
coast, I give it as my most decided opinion, that the greatest good
consequence would arise to the trade of Scotland, were a light-house
erected on it; but, in the event of its being so, a distinction must be made
between it and the light of May, such as is adopted at Scilly and the
Caskets, the light on which revolves, I believe, once in a minute, so as to be
obscured and visible alternately.”
Although the subject of this letter had occasionally
Expence of a Light-
house on the Bell
occupied the attention of the Commissioners of the
Rock, as estimated byNorthern Light-houses, yet the Bell Rock, as the site of
the Public. a light-house, was then for the first time brought
formally under the notice of the Board; and some
erection there, was considered a primary object, whenever the funds should
be in a state to meet the expence of such a work. But, the estimates for such
an undertaking admitted of an almost unlimited range of amount, both from
the nature of the buildings which were proposed, and on account of works
of this kind being subject to unavoidable risk in all their stages, from the
commencement till the completion. In conversation, it was common to
compare the situation of the Bell Rock with the rocks of the Eddystone off
Plymouth Sound, and Corduan at the mouth of the Garonne. The expence of
erecting a light-house on the Eddystone, though understood to have been

Page 104

about L. 20,000, has never been communicated to the
Designs for the Bell public by the lessees of the light-house duties, from the
Rock Light-house.
consideration, perhaps, of their being obliged, by their
agreement with the Trinity Board of London, to erect and uphold the
building, and also from claims which they afterwards made, for having the
value of the light-house reimbursed to them at the end of their lease; but it
was well known that the present building is no less than the third erection
which the lessees had made upon the Eddystone, between 1696 and 1759,
or in the space of 63 years. It was therefore natural to conclude that a
building on the Bell Rock, situate under a greater depth of water, being
nearly on a level with low-water mark, would be a work of greater difficulty
and expence, than the Eddystone light-house, where the top of the rock is
on a level with high-water mark. We are also left in the dark in forming any
opinion on the important point of expence with regard to the French work at
Corduan, but we know that it met with repeated misfortunes while in
progress, and that it occupied from 1584 till 1610, or 26 years in building.
The main rock here is about a mile in length, and half a mile in breadth,
and, in its position as a sunken reef, it resembles the Bell Rock more than
the Eddystone. From the difficulties which attended the erection of these
two celebrated light-houses,—both of which the writer has visited,—the
erection of a light-house upon the Bell Rock, in comparison with these, was
estimated by the public at so wide a range as from L. 20,000 even to
L. 100,000.
Funds for the Light- In the year 1793, when Admiral Cochrane addressed his
house Board letter to the Light-house Board, its surplus funds
inadequate. amounted only to a few hundred pounds; a sum so
inadequate to meet the necessary expenditure of such a
work, that the Commissioners judged it better for the interests of
navigation, to go forward with the less expensive improvements on other
parts of the coast, aware that nothing essential could be undertaken at the
Bell Rock without the effectual aid of Government.
In this state, matters were allowed to rest till the great storm in December
1799, already noticed, which roused the public mind to fresh speculations
about the necessity of some erection being made upon the Bell Rock; not
merely as a local improvement, but as one essentially calculated to benefit
the ships navigating the German Ocean, by opening the Firth of Forth more

Page 105

effectually as a place of safety in easterly storms, so that the Bell Rock, in
place of being the dread of mariners, might in future become a point from
which they would take their departure, and for which they might steer in
sailing for the coast. Nautical and commercial men, especially, were
interested, and felt this state of things in its fullest extent. Remarks were
accordingly made in several of the periodical publications of the day,
calling the attention of the public to the erection of a light-house there, as a
subject of national importance.
In order to advance this object, the Corporation of the Trinity-House of
Leith, made public advertisements, calling on persons likely to produce
some practical plan that might lead to the means of making the erection in
question. This, of course, produced various propositions on the subject.

Designs for the Bell Rock Light-house.

The late Captain Joseph Brodie of the Royal Navy,
Designs by Captain
Brodie and Mr
prepared and brought forward a model of a cast-iron
Couper. light-house, supported upon four pillars, to be built and
connected together in a very strong manner. This model
was made by Mr Joseph Couper, Iron-Founder in Leith, who, in conjunction
with Captain Brodie, proposed to erect a light-house on this plan on the Bell
Rock, on being authorised to draw certain duties from shipping for their
mutual remuneration. With this view, they sent their model, and made
certain propositions to the different commercial towns on the coast, as
Newcastle, Dundee, and Aberdeen. After having been at considerable
trouble and expence with this scheme, as a private adventure, these
gentlemen applied to the Commissioners of the Northern Light-houses,
requesting their inspection of this model. The design, however, was not
altogether approved of by the Light-house Board, in the form in which it
had been modelled; yet such was the confidence of its projectors, that at
different times, in pursuance of their plan, they erected two temporary
beacons, constructed with spars of fir-timber; these unfortunately were
almost immediately washed down. The Merchants of Leith, applauding the
great perseverance of these gentlemen, aided their exertions by a
subscription of about L. 150, when they erected a third beacon on the Bell
Rock on a more extended scale. It consisted of four spars of fir-timber, each

Page 106

about 40 feet in length, strengthened by flat bars of iron, laid the lengthway
of the spars, which were kept in their places by rings or hoops of iron,
firmly wedged over them. These spars, when erected upon the rock, formed
a common diameter of about 20 feet at the base, and crossed each other
about 6 feet from the top. They were let into holes made in the rock, of
about ten inches in depth, and were fixed by straps of iron, forming bats of
about two inches square, and about six inches in length, which were also let
into the rock, and run up with melted lead. At the place of junction, near the
top, the spars were bolted together with iron, and above this, they were
connected with small pieces of timber, nailed to the principal spars. After
much labour and difficulty, with the assistance of a number of workmen,
this temporary erection was fixed on the Bell Rock, in the month of July
1803. In the month of August the writer landed on the rock and examined it;
but when the gales of winter set in, this erection also disappeared, having
never been seen after the 20th of December. Nothing further was attempted
to be done upon the Bell Rock till the author commenced the Light-house
operations in the year 1807, by direction of the Commissioners of the
Northern Light-houses.
Not discouraged, however, by the failure of these
Make further
proposals to the
trifling works, Captain Brodie and Mr Couper
Light-house Board. addressed a letter to the Light-house Board, in which an
offer was made to erect a cast-iron light-house, in the
space of two years, agreeably to the model already alluded to, and on the
following terms, viz. L. 6000 to be paid over to them during the first year of
the work, together with the produce of a certain Duty for the erection, to be
exacted from shipping, as a Northern Light, until the original cost of the
work should be paid off. But this description of building having been
considered objectionable, Captain Brodie proposed to construct a new
model, upon an improved plan, by which the base of the building, instead of
being raised on pillars, was to be continuous, with small interstices or holes
in its circumference, or outer casing, to admit the water into the interior
void, with a view to lessen the weight and expence of metal, and check the
force of the sea. But this also appeared to the Commissioners to be
defective, when compared with an erection of stone, like the Eddystone and
Tour de Corduan Light-houses.

Page 107

Captain Brodie having, however, shewn a most
Captain Brodie’s laudable zeal in this work, and considering that he must
remuneration.
have expended a sum of money beyond what had been
subscribed for the erection of the Spar Beacon, the Commissioners
proposed to make him a liberal allowance for the last model, to the
preparation of which they had given their countenance. He was accordingly
requested to state the expence of this model, with a view to his
reimbursement. But, under an erroneous impression, he brought forward an
account, containing an enumeration of charges connected with the Bell
Rock, from the year 1792; and by applying these items to the imaginary
profits of trade, the sum amounted to several thousand pounds. This
appeared so contrary to the views of the Commissioners, that the account
was returned, with an offer of L. 400 in full of all claims. This sum,
however, was refused, and another proposition made, that the Board should
apply to Government to have his services publicly rewarded. But it was
finally intimated, that L. 400 were at his disposal; and here the matter rested
till after Captain Brodie’s decease, when that sum, with interest, was, in
1816, paid to his widow.
In noticing the progress of the designs of the Bell Rock
The Author’s early
designs for the Bell
Light-house, it will here be necessary to give some
Rock Light-house. detail of the writer’s own exertions in the preliminary
stages of this measure, in his capacity of Engineer for
the Light-house Board. In the summer of 1794, when on a voyage to the
Northern Light-houses, in passing the Bell Rock, he directed the vessel to
be brought near it, when he had an opportunity of observing the sea
breaking heavily upon it. From this period, the difficulties which must
attend the erection of a habitation on this rock, appeared in a stronger point
of view than they had hitherto done. He, nevertheless, was resolved to
embrace every opportunity of forwarding this great object. In the year 1796,
he visited the operations of the Kilwarlin light-house, then erecting on the
South Rock, a sunken reef, situate three miles off the coast of Downshire in
Ireland, as a work resembling that which was in contemplation for the Bell
Rock.
The disastrous shipwrecks which occasionally
His pillar-formed
Light-house.
happened at the entrance of the Friths of Forth and Tay,
deeply impressed every one conversant in nautical

Page 108

affairs, with the most convincing proofs of the necessity for some
distinguishing mark being erected upon the Bell Rock. As yet, the writer
had not landed upon the rock; though he had begun to prepare a model of a
pillar-formed light-house, to be supported upon six columns of cast-iron,
under the impression that this description of building was alone suitable to
its situation. The general features of this model may be understood, by
examining Plate VII., which represents the author’s original designs for the
Bell Rock Light-house.
In the summer of the year 1800, this model was presented to the Light-
house Board, when an official application was made to the Commissioners
of his Majesty’s Customs, for the use of the Osnaburgh cutter, then lying in
the harbour of Elie, on the coast of Fife, to carry the writer to the Bell Rock,
that, by landing there, he might be enabled to judge of the applicability of
his pillar-formed design to the situation of the rock. Upon reaching Elie, the
Osnaburgh was found to be under repair, and could not possibly go to sea
for several days, by which time the spring-tides would be over. On
consulting with the commander, as to the most advisable course to be
followed, in order to avoid losing these tides, it was resolved to go to St
Andrew’s in quest of a boat; but being there also disappointed, the journey
was continued along the coast to West Haven, on the northern side of the
Firth of Tay, where a large boat was procured, and manned with fishermen
who were in the habit of visiting the rock to search for articles of
shipwreck.
On this first visit to the Bell Rock, the writer was
His first visit to the
Bell Rock, with Mr
accompanied by his friend Mr James Haldane,
Haldane, architect. architect, formerly principal assistant to the late
eminent Mr John Baxter. The crew being unwilling to
risk their boat into any of the creeks in the rock, very properly observing
that the lives of all depended upon her safety, and as we could only remain
upon the rock for two or three hours at most, we landed upon a shelving
part on the south side of the rock, at the spot marked “First Landing” on
Plate VI. Having been extremely fortunate both as to the state of the
weather and tides, an opportunity was afforded of making a sketch of the
rock at low water: meantime, the boatmen were busily employed in
searching all the holes and crevices in quest of articles of shipwreck, and by
the time that the tide overflowed the rock, they had collected upwards of 2

Page 109

cwt. of old metal, consisting of such things as are used on shipboard. A few
of these were kept by the writer, such as a hinge and lock of a door, a ship’s
marking-iron, a piece of a ship’s coboose (or kambuis, cover of the
cooking-place), a soldier’s bayonet, a canon ball, several pieces of money, a
shoe-buckle, &c.; while the heavier and more bulky articles, as a piece of a
kedge-anchor, cabin-stove, crowbars, &c. were left with the crew, who
were, however, disposed to make very light of their booty, when it was
urged in extenuation of an extravagant demand which they made for the
boat’s freight, being at the rate of one guinea per man, and one guinea for
the use of the boat, besides expences, amounting altogether to about eleven
guineas.
The immediate result of this visit on the mind of the
He concludes that a writer and of Mr Haldane, was a firm conviction of the
building of stone is
practicability of erecting a building of stone upon the
most suitable for the
Bell Rock. Bell Rock; and from that moment the idea of a pillar-
formed light-house was rejected, as unsuitable to the
situation. This opinion was chiefly founded upon the area or extent of the
part which dried, or was exposed to view in the spring-tides, being found to
measure about 280 by 300 feet, and consequently affording a sufficient
space for a foundation, and even a degree of shelter from the force of the
waves, for the lower courses of a building.
The depth at high-water upon the Bell Rock was much
Pillar-formed building
compared with one of
against the design of a building with pillars, as a vessel
stone. drawing 12 feet water, and loaded with 100 or even 200
tons, may come with full sail against any erection made
there. Were such a circumstance to happen to a pillar-formed building, and
a ship to get thus entangled among the openings of the under part of the
light-house, there is little doubt that the event would prove fatal to a
building of that construction, however strongly framed. On the contrary,
supposing a vessel to strike a building of stone, under these circumstances,
it is not at all likely, that she could have any effect upon a mass of matter
extending to 2000 or 3000 tons, so as to injure such a fabric.
Under these impressions, the writer, after his first visit
Author’s designs and
models of a stone-
to the Bell Rock, in the year 1800, made a variety of
building. drawings, and constructed new models for a building of
stone, shewing various methods of connecting the

Page 110

stones, by dove-tailing them laterally, like those of the Eddystone light-
house, and also course to course into one another perpendicularly. Other
methods were likewise modelled, for connecting the whole building in a
more simple manner, by means of joggles, or square blocks of stone, and
also by dove-tailed bats of iron cased in lead, as delineated in the various
designs of Plate VII. These plans and models were duly submitted to the
Light-house Board, accompanied with estimates of the expence, amounting
to the maximum sum of L. 42,685, 8s.
Sir William Pulteney having taken an interest in
Mr Telford requested
forwarding a bill for this measure in Parliament in the
to visit the Bell Rock.
year 1803, gave Mr Thomas Telford, engineer,
instructions to inquire into the circumstances of the Bell Rock, in the course
of his journey to the Works of the Caledonian Canal. Mr Telford had
accordingly taken some preparatory steps for making a Design; and, with
this view, he had engaged Mr Murdoch Downie, author of several Marine
Surveys, to accompany him to the Bell Rock. But the weather proved
unfavourable at the time for effecting a landing upon the rock; and, the bill
then in progress having been withdrawn before another opportunity
occurred, Mr Telford’s visit was not resumed.
Mr Downie, however, who had previously been upon
Mr Downie’s pillar-
formed Light-house
the rock, when making his Nautical Survey of the
of Stone. Eastern Coast of Scotland, prepared a drawing and an
estimate of the expence of erecting a light-house upon
it, which he stated at about L. 29,000. His light-house was to have consisted
of eight columns of stone, of an elliptical or egg form, as he expressed it,
ranged round a common centre, having the longer axis and smaller end
towards a circular column in the centre of the plan. These columns were to
support a circular building of stone for the habitation of the light-keepers
and the site of the light room. By this plan it was meant to give less
resistance to the waves. But it did not seem to be well adapted for the
situation, as it wanted that solidity and unity of parts which are so essential
to the stability of a building upon a sunken rock. Such a work would have
been of difficult execution. It would have required similar apparatus with
the solid masonry for its construction, and while in progress, it would have
been in greater danger of being destroyed than a solid fabric. There seemed,
therefore, upon the whole, to be but two opinions as to the proper

Page 111

description of a light-house for this situation, viz. either that it should be
constructed of iron, as was maintained by Captain Brodie, or of solid
masonry, as proposed by the writer.

Bill by Lord Advocate Hope.

The erection of a light-house upon the Bell Rock had
Bell Rock Light-
house proposed at a
been occasionally alluded to at the Convention of the
Meeting of the Royal Royal Burghs of Scotland, which meets annually at
Burghs. Edinburgh; and, in consequence of recent losses on that
reef, the Convention of 1802 was moved, by Provost
Duncan of Arbroath, to take this subject under its serious consideration. It
was accordingly resolved, That the Lord Advocate Hope, one of the
Commissioners of the Northern Light-houses, and Member of Parliament
for the City of Edinburgh, should be requested to use his influence in
forwarding this desirable object. His Lordship being present, readily
engaged to undertake the measure, and declared that he would not allow it
to rest until something satisfactory should be done.
The Commissioners of the Light-houses having afterwards furnished the
particulars, the heads of a bill were arranged, which, in the session of 1803,
was brought forward by his Lordship and the late Sir William Pulteney, who
took a great interest in the Scotch business before the House of Commons.
This bill had for its object to empower the Commissioners to borrow
L. 30,000, and to exact the Northern Light-duty of 1½d. per ton upon
British shipping, and 3d. per ton upon Foreigners, from all vessels bound to
or from any port on the eastern coast of Great Britain, that should cross the
latitude of the Bell Rock.
This bill passed the House of Commons in the session
Bill lost in the House
of Lords.
of 1803; but having met with opposition from the
corporation of the City of London, as including too
great a range of coast in the collection of the duties, such amendments and
alterations were proposed in the House of Lords, as rendered it necessary
for the Lord Advocate to withdraw the bill.
The expectations of nautical and commercial men were severely
disappointed by the loss of this bill, which occasioned a delay of several

Page 112

years in the prosecution of the object. It was obvious,
Works proposed of that, without considerable funds at command, it was
less expence than a
stone building. impossible to undertake a work of such magnitude. The
annual funds of the Light-house Board at this period
amounted only to about L. 4000, and the maintenance of the light-houses
already erected was equal to one-half of this sum, which would leave a
surplus fund of about L. 2000 per annum. But, as the Commissioners found
it to be their duty to go on with their improvements on the other parts of the
coast, without confining their attention to one object, however important, it
was impossible that this great work could be undertaken for a series of
years, without the direct aid of the Government, or an extension of the
Light-house duties, on the security of which money might be borrowed. In
consequence of the loss of this bill, the dangers of the Bell Rock now
became very generally the topic of conversation; and various schemes were
again suggested for constructing economical and temporary buildings to
remedy the evil.
In a work of so much apparent difficulty, it was not
Difficulty of
determining among
easy for the Light-house Board to determine what was
these proposals. the most advisable design. The pillar-formed building
was supported by many arguments. It would have been
executed in a very short period, and would not, perhaps, have cost one-sixth
part of the expence of a building of stone. A light-house, supported upon
wooden pillars, had also stood for many years, and still remains, upon the
Smalls Rocks, off St David’s-Head, in Pembrokeshire, although the sea, in
high tides, and stormy weather, occasionally breaks over the building. But a
fabric of stone, for such a situation as the Bell Rock, was evidently
preferable, and the examples of the Tour de Corduan, the Eddystone, and
the Kilwarlin light-houses, already noticed, were all in favour of it.
Amidst a diversity of opinion as to the practicability of
Mr Rennie consulted
and agrees with the
the undertaking, and especially as to the description of
Author in the building, whether it should be of cast-iron or stone,
recommending a and in the form of pillars or solid, the Commissioners
building of stone.
ultimately determined upon submitting the several
views of the subject to Mr John Rennie, engineer. In the
year 1804, Mr Rennie and the writer accompanied Mr Hamilton, Sheriff of
Lanarkshire, one of the Commissioners, and who had turned much of his

Page 113

attention to the subject, on a visit to the Bell Rock. They made a favourable
landing; and Mr Rennie had only been a short time upon the rock, when he
gave his decided opinion upon the practicability of the proposed erection of
stone. He had examined the author’s designs and models, and afterwards
made a Report, in which he coincided with him in recommending to the
Board the adoption of a building of stone, on the principles of the
Eddystone Light-house. Sanctioned with such authority, the Commissioners
were finally confirmed in the resolution, that the Bell Rock Light-house
should be a tower of masonry similar to that of the Eddystone.
Hitherto the general opinion throughout the country,
The Light-house
Board takes the sense
and especially at all the sea-ports, had been anxiously
of the Mercantile expressed for the erection of a light-house of some kind
Interest in this on the Bell Rock. But before going a second time to
measure.
Parliament with this measure, the Commissioners
thought it advisable to take the sense of the mercantile
interest at the ports more immediately connected with the navigation of the
Firth of Forth, such as Leith, Aberdeen, Dundee, Montrose, Arbroath, and
Berwick-upon-Tweed, as to the utility of the light-house, and the propriety
of obtaining an act of Parliament, to empower them to levy duties for the
erection and maintenance of the proposed building. A number of Reports
were accordingly received, all approving of the measure; but one of these
only need be inserted, from the Corporation of Traders in Leith, as it may
be considered as conveying the sentiments of all the others.
Report of the Committee appointed by the Incorporation of the
Report of the Traders Traders in Leith, relative to the expediency of erecting a Light-house
of Leith. on the Cape or Bell Rock.
“The Committee, justly sensible of the great importance of the object
referred to their consideration, have endeavoured to inform themselves, more especially on
those points to which their attention is particularly called by the letter of the
Commissioners.
“The result of these inquiries, as far as regards the number of vessels known, from the
safety of the crews, to have been wrecked upon the Bell Rock, within these last ten years,
amount to four, viz. two smacks trading between London and Banff, one brig from
Holland, and a sloop from Hamburgh.
“These losses, although the vessels were all valuable, may at first view appear
comparatively small, but to your Committee, they serve as a powerful evidence, in support
of the opinion given by all maritime people, of the fatal position and nature of this rock,
where, from the tremendous sea which even a moderate gale occasions, total destruction is
almost the inevitable consequence of any vessel striking upon it.

Page 114

“Situate off the openings of the two Friths of Tay and Forth, the Bell Rock stands a
frightful bar, to deter vessels making the land from attempting it in the night-time, when
they require most to seek its shelter; and, if unhappily overtaken with a gale at SE., when
near the latitude of this rock, the alternative, dangerous as it must appear, of stretching to
the northward, along a scarce less frightful coast, to gain the Murray Firth , is frequently, in
such perilous cases, had recourse to.
“In the beginning of 1800, fifty or sixty vessels were cast away; and, from the
circumstances of most of them being bound south of the Forth, but driven towards it by the
violence of the storm, there can be no reason to doubt, that, had it been possible for these
vessels to have attempted with safety the shelter of the Firth of Forth, many lives and much
property would by this means have been preserved.
“The dread, however, of the Bell Rock, induced them on that occasion to prefer hauling to
the northward, and encountering a sea and tide surpassed in few places of the globe. This
fatal apprehension was followed by the disastrous consequences already mentioned.
“The Committee have, indeed, no hesitation in giving it as their opinion, that the greater
part of the losses which occur, even from the Coquet Island, as far as the Murray Firth ,
arise from vessels either actually striking upon, or from an over-solicitude to keep at a
distance from, this fatal rock. To the latter cause, there is great reason to believe, from
many concurrent circumstances attending her loss, and from parts of her wreck being
washed ashore near Buchanness, his Majesty’s ship York, of 64 guns, fell a sacrifice, with
all her crew. Indeed, if the number of vessels is calculated, which, within these last ten
years, have been cast away within the above-mentioned extent of coast, they will be found
to amount to more than one hundred.
“That the erection of a light-house upon the Bell Rock would obviate many of these
dangers is sufficiently evident, and merchants, as well as seafaring men, trading to the east
coast of Scotland, as well as to the north of England, are alike interested in the
accomplishment of this desirable object.
“In a national point of view, the advantages that would result from it are incalculable; but
none more forcible need be adduced, than that of its serving as the direct means of
preservation to the invaluable lives of numerous British seamen.
“All these considerations induce your Committee to give this measure their full
approbation; and that such a necessary object has not been sooner attained, must rather
have proceeded from the supposed difficulty of the execution, than any hesitation as to the
expediency of it.
“Your Committee, in reply to that part of the letter of the Commissioners, in which the
Traffickers of Leith are required to signify, in the event of their concurrence in the
measure, whether they will support the application of the Commissioners by petition to
Parliament, have again to state, that giving, as they do, their full approbation to the
expediency of erecting a light-house on the Bell Rock, they can have no hesitation in
joining in any petition to Parliament to that effect. But the funds of this Incorporation being
appropriated to specific purposes, no pecuniary aid can be afforded by them as a Society.
“To so great a national benefit as this will certainly prove, they will contribute, by willingly
submitting to a tax on all shipping passing the Bell Rock, provided the duty so imposed
does not exceed that laid on for any light in England, whose situation may bear
resemblance to that to be erected upon the Bell Rock.

Page 115

“The Trinity-House of Leith, to whom, the Committee is informed, the Commissioners
have likewise applied, must be supposed better qualified to give detailed information upon
the whole of this subject than your Committee; and the more especially, as one among their
number has, for a period exceeding twenty years, made the dangers of the Bell Rock, and
the means to be applied to avoid or lessen them, his peculiar study. Captain Joseph Brodie
has, at great risk, and certainly at no little expence, and without any expectation of
recompence, beyond that of having served his country, frequently visited the Bell Rock,
and at one time succeeded in erecting a Beacon upon it, which withstood the fury of the sea
for several months.
“The Committee, therefore, consider him well qualified to give the Commissioners
information on the subject; and the various models of light-houses applicable to this rock,
which, with much labour and ingenuity, he has invented, will be found highly valuable,
whenever the execution of the business shall come to be taken into final consideration.—
(Signed) James Searth, Master; Wm. Mowbray, Assist.; Wm. Dougal, Assist.; Arch.
Geddes, James Pillans junior.”

Report of the The dangerous situation of the Bell Rock, and the
Merchants of losses which have either occurred upon, or in
Berwick. consequence of it, were also strongly expressed in all
the other documents communicated to the Light-house
Board; and we may further form a judgment of the extent of the serious
consequences of this rock to the shipping on the coast, by what was stated
in the communication from Berwick-upon-Tweed. It was therein mentioned,
that two vessels had struck upon this rock in one night; and that other two,
which had been built at Berwick, and sold to a Shipping Company at Banff,
were afterwards lost upon the same reef. It also deserves notice, that
Captain Allardice, who commanded one of those vessels, had the
misfortune, in the course of his profession, to have been twice wrecked
upon the Bell Rock.
These statements, furnished upon unquestionable
Resolution of the
Light-house Board to
authority, of the losses occasioned by the Bell Rock,
apply again to satisfied the Commissioners of the propriety of
Parliament. persisting in their original plan of obtaining an act of
Parliament and a loan for this special purpose. After
various meetings of the Board, for adjusting the heads of a bill, the measure
was finally resolved upon at a meeting, held on the 19th February 1806, at
which the following members were present: Mr James Clerk, Sheriff-
Depute of Edinburghshire, Mr Robert Hamilton, Sheriff-Depute of
Lanarkshire, Mr William Rae, Sheriff-Depute of Orkney and Shetland, Mr
James Trail, Sheriff-depute of Caithness, Mr John Connell, Sheriff-Depute

Page 116

of Renfrewshire, Mr Edward M’Cormick, Sheriff-Depute of Ayrshire, and
Mr David Monypenny, Sheriff-Depute of Fife.
This meeting having also taken into consideration a memorial, prepared by
Mr Hamilton, pointing out the importance and urgency of the measure,
ordered it to be printed; and requested him to proceed to London, to submit
the memorial, and the documents on which it was founded, to the
consideration of His Majesty’s Ministers, and other Members of Parliament.
Mr Hamilton went to London in the month of April
Mr Hamilton and the
Author go to London.
1806, when the author also attended, with his plans and
estimates, to prove the preamble of the bill. Mr
Hamilton having transmitted the memorial to the heads of the departments
of the Treasury, the Admiralty, and the Board of Trade, requested an
audience from them on the subject. He had a meeting with the Board of
Trade, and urged the proposition for a loan, or advance from Government,
of L. 25,000, on the security of the duties which the proposed light-house
would produce. It was, however, recommended that application should also
be made to the other two Boards. Some time thereafter, a conference on the
matter was held with Lord Howick, then at the head of the Admiralty, and
Admiral Markham,—when the plans of the projected building were shewn
to them,—it was stated that all that was wanting to enable the work to be
proceeded with, was the advance from Government,—and the importance
of the proposed light-house was at this interview pointed out, not only as to
trade, but as a guide and protection for the Navy while cruising in the
German Ocean. But their Lordships still considered the undertaking chiefly
as of a local nature, and comparatively of little benefit to the Navy. Not
discouraged, however, by this unsuccessful application, Mr Hamilton soon
after obtained an audience of Lord Grenville, First Commissioner of the
Treasury, who examined the charts, plans, elevations and sections of the
projected building with much attention,—declared himself fully convinced
of the importance and expediency of the measure,—and promised that the
loan by Government, and every other expedient for the advancement of the
design, should have his support. The patronage of the First Minister of State
having been thus obtained, Mr Hamilton returned to his public duties in
Scotland, leaving the farther proceedings in the application to the charge of
the writer, with the assistance of Mr Longlands, solicitor for the Light-
house Board in London.

Page 117

Bill by Lord Advocate Erskine.

The Hon. Henry Erskine, Lord Advocate of Scotland,
The Loan from
Government becomes
took charge of the Bill in Parliament. But,
doubtful. notwithstanding his Lordship’s attention to the
business, so much time was lost in furnishing various
statements, relative to the probable amount of the new duties to be levied,
and the security to be given for repayment of the loan, that little progress
was made with the bill, till the middle of the month of June. By this time,
the prospect of the loan became so doubtful, that it was thought advisable
by some friends to the measure to take the bill without it. But the
Commissioners, after considering the tendency of such a bill, in tying up
their funds for an indefinite period for one object, and thus preventing the
extension of the benefit of additional light-houses to other parts of the coast,
were of opinion, that, unless the loan was granted, they must withdraw their
petition for the bill, and allow the business to lie over till the duties were in
such a condition as to enable the work to be undertaken. The author was
therefore directed to consider himself as at liberty to leave London, if it
should appear that the loan could not be obtained.
Lord Auckland, President of the Board of Trade, was
Board of Trade
favourable to the
favourable to the proposal of the loan; and Sir Joseph
Loan. Banks, the Vice-President, having entered warmly into
the measure, and at a meeting of the 7th June, urged its
necessity so strongly, that the Board desired a Memorial to be presented on
the following points:—Of the coast to be subjected to the Duty of the
Northern Lights, by the erection of the Bell Rock light-house;—of the trade
and mercantile interest to pay this additional duty;—of the security to be
given to Government for the repayment of the loan of L. 25,000;—and of
the assurance to be given, that this sum, together with the surplus funds in
the possession of the Commissioners, would accomplish a building of so
much hazard.
The following Memorial was accordingly presented.
“To the Right Hon. the Lords of the Committee of Council, relating to Trade,—The
Humble Memorial of the Commissioners, for erecting Light-Houses on the Northern parts
of Great Britain;
Sheweth,

Page 118

“That the memorialists have taken the liberty of stating, in a
Memorial to the former Memorial hereunto annexed, the reasons that have
Board of Trade. induced them to apply to the Lords Commissioners of his
Majesty’s Treasury, for their support to an application to
Parliament, for the loan of so much money as will enable them to build a light-house upon
the Cape or Bell Rock,—an object of much consequence to the navigation of the North
Sea, from the many fatal shipwrecks it has occasioned. The Memorialists have been much
pressed and solicited by the commercial interest of the country, to get this accomplished;
and by opening the Firth of Forth as a place of safety, by the erection of this light-house,
the navigation of the northern coasts of the kingdom will be greatly facilitated.
“It now appears, by the accompanying Custom-House returns, on an average of three
years, that the duties which would be received for a light-house on the Bell Rock would
amount to L. 2617:3:9½; and by the accounts of the Commissioners of Northern Lights,
annually laid before Parliament, it will be seen, that the memorialists have of annual
surplus duties L. 1350, amounting together to L. 3967, which, it is thought, will be
considered a sufficient security for the interest of the sum that may be advanced by the
public.
“On erecting a light-house on the Bell Rock, the Commissioners, by the existing acts,
would be empowered to levy the above duties of L. 2617, 3s. 9½d.; and it appears by the
representations from the ports more immediately interested, that they highly approve of the
measure.
“The memorialists have received several estimates of the expence of erecting a light-house
upon the Bell Rock. They have more particularly had recourse to the professional abilities
and advice of Mr Rennie and Mr Stevenson, Civil Engineers, from whose reports they have
reason to believe that the sum will not exceed L. 48,000. The memorialists have already in
the 3 per cent. consols L. 28,000 of surplus duties, (about L. 16,800). If the public,
therefore, are induced to advance L. 25,000 by instalments in the course of three years,
making together about L. 41,800, the memorialists presume, that, with the application of
the whole surplus duties for a time, this sum will be perfectly sufficient to enable them to
complete a work so long recommended, and so anxiously desired.” (For the statements
above referred to, see Appendix, No. III.)

Sir Joseph Banks Observations by the several members of the Board of
makes further Trade having been made upon this memorial, it was
exertions for the more especially referred to Sir Joseph Banks, to give an
Loan.
opinion, as having himself sailed along that coast. Sir
Joseph, knowing from experience the horrors of sunken rocks, supported
the proposition of the loan, not only as one of expediency, but of necessity
and humanity to the seafaring people of a great portion of the kingdom, and
gave his most decided and hearty concurrence to the recommendation to the
Treasury. After describing the extensive advantages to be derived by
shipping from the establishment of a light-house upon the Bell Rock, he
pointedly alluded to the probable loss of the York Man-of-war upon it; and
observed, that the security and facility to be derived to the extensive
shipping of this coast, should not be overlooked for the advance of so small

Page 119

a sum as L. 25,000. After the matter had been deliberated on for some time
at the Board, Lord Auckland intimated to Mr Longlands, and the author,
that a report would be made to the Treasury.
This was communicated to the Lord Advocate, who, at
Bill Read a first time
in the House of
an early day, moved for leave to bring in a bill, “To
Commons. enable the Commissioners of the Northern Light-houses
to levy certain duties upon the shipping, and also to
enable the Lords of His Majesty’s Treasury to grant a loan of L. 25,000
from the 3 per cent. consolidated fund for the erection of a light-house upon
a certain dangerous sunken reef, called the Bell Rock, lying at the distance
of twelve miles from the nearest land, at the entrance of the Friths of Forth
and Tay, upon the eastern coast of Scotland.” His Lordship had no sooner
made the motion, than Lord Henry Petty, then Chancellor of the Exchequer,
stated, that he could not answer for the support which this bill might
ultimately meet with from his Majesty’s Ministers;—that he spoke not from
his own knowledge of the subject, but merely from the views of the First
Lord of the Admiralty, who had expressed his doubts as to the propriety of
the loan in the then low state of his Majesty’s Exchequer, and the great
demands which were made upon the country; but that he did not mean to
oppose the present motion, only, under these circumstances, he thought it
proper to state this much, in absence of the noble Lord alluded to. Leave
having been given to bring in the bill, it was accordingly read a first time.
On the second reading of the bill, the Lord Advocate
Second Reading of
the Bill.
introduced the business with his usual display of
eloquence, pointing out, in forcible language, the
horrors of a sunken rock so situate as the Bell Rock; and concluded, by
observing, that, as there could be but one opinion as to the important object
of this bill, he hoped, through the exertions of the Light-house Board, to
which he had the honour to belong, and of other public functionaries,
appointed for similar purposes, on other parts of the coast, the day would
come, when every sunken rock and dangerous shoal, of similar importance
to navigation, would be distinctly pointed out to the mariner. The only reply
made was by Mr Spencer Perceval, who remarked, that he had no intention
to oppose the present measure, the importance of which he would not call in
question, but he must agree with those who thought that this was not a
favourable time for granting loans of public money. The bill was then read a

Page 120

second time. In its progress through the House of Commons, it was
detained, from various causes, beyond the regular time. The Lord Advocate
had also unfortunately been taken ill; but in his absence, Sir John Sinclair
attended to the bill in the Committee, of which he was chairman, and
brought up the following Report:

Report of the Committee of the House of Commons.

“The Committee, to whom was referred the Petition of the
Report of the Commissioners of the Northern Light-houses, and to report the
Committee. matter to the House, as it shall appear to them,
“Proceeded to examine Mr Robert Stevenson, Civil Engineer,
who, in his capacity of engineer for the Northern Light-houses,
Report brought up by
has erected six light-houses in the northern parts of the
Sir John Sinclair.
kingdom; and has made the erection of a light-house on the
Cape or Bell Rock, more particularly his study,—especially,
since the loss of about 70 sail of vessels, in a storm which happened upon the coast in the
month of December 1799, by which numerous ships were driven from their course along
the shore, and from their moorings in Yarmouth Roads, and other places of anchorage,
southward of the Firth of Forth, and wrecked upon the eastern coast of Scotland, as
referred to in the report made to this House, in the month of July 1803; the particulars of
which he also confirms: That the Bell Rock is most dangerously situate, lying in a track
which is annually navigated by no less than about 700,000 tons of shipping, besides his
Majesty’s ships of war, and revenue cutters: That its place is not easily ascertained, even by
persons well acquainted with the coast, being covered by the sea about half flood, and the
land-marks, by which its position is ascertained, being from 12 to 20 miles distant from the
site of danger.
“That from the inquiries he made at the time the York Man-of-war was lost, and pieces of
her wreck having drifted ashore upon the opposite and neighbouring coast; and from an
attentive consideration of the circumstances which attend the wreck of ships of such
dimensions, he thinks it probable that the York must have struck upon the Bell Rock,
drifted off, and afterwards sunk in deep water: That he is well acquainted with the situation
of the Bell Rock, the yacht belonging to the light-house service, having, on one occasion,
been anchored near it for five days, when he had an opportunity of landing upon it every
tide: That he has visited most of the light-houses on the coast of England, Wales and
Ireland, particularly those of the Eddystone, the Smalls, and the Kilwarlin or South Rock,
which are built in situations somewhat similar to the Bell Rock: That at high-water, there is
a greater depth on the Bell Rock than on any of these, by several feet: and he is therefore
fully of opinion, that a building of stone, upon the principles of the Eddystone light-house,
is alone suitable to the peculiar circumstances which attend this rock, and has reported his
opinion accordingly to the Commissioners of the Northern Light-houses as far back as the
year 1800; and having given the subject all the attention in his power, he has estimated the
expence of erecting a building of stone upon it at the sum of L. 42,685, 8s.
“Your Committee likewise examined Mr John Rennie, civil-engineer, who, since the report
made to this House in 1803, has visited the Bell Rock, who confirms the particulars in said
report, and entertains no doubt of the practicability of erecting a light-house on that rock, is

Page 121

decidedly of opinion that a stone light-house will be the most durable and effectual, and
indeed the only kind of building that is suited to this situation: That he has computed the
expence of such a building, and, after making every allowance for contingencies, from his
own experience of works in the sea, it appears to him that the estimate or expence will
amount to L. 41,843, 15s.
“It appears further to your Committee, from the accounts presented to this House by the
Commissioners of the Northern Light-houses, in the years 1803, 1804, and 1805, that, on
an average of these years, the surplus duties arising from the light-houses already erected
by that Board, is L. 512:18:8. But your Committee find, that the average of general
expenditure for these years has been higher than usual, owing to the erection of additional
light-houses, viz. one on the Island of Inchkeith, in the Firth of Forth, and a revolving light
upon the Start-Point of Sanday, one of the Orkney Islands, on which there was expended,
during these years, about L. 4800, causing an annual extra charge of L. 1600 upon the
duties collected in that period.
“That, agreeably to the act of the 26th of the King, the said Commissioners of the Northern
Light-houses have invested in the public Funds L. 28,000, affording dividends to the
annual amount of L. 840.
“That the duties that would be collected for the Bell Rock light, as appears by the returns
from the customs presented to this House, and the resolution they have come to, would
amount to about L. 2617: 3: 9 annually.
“That if the sum of L. 25,000 was to be advanced, by way of loan, from the consolidated
fund, this, with the L. 28,000 now invested in the 3 per cent. Consolidated Annuities,
would enable the Commissioners to erect the proposed light-house, and that there would
remain a sufficient fund for the payment of interest of the loan from the surplus duties, as
well as for the repayment of the principal, in a reasonable time.”

Bill meets with some The bill passed through the Committee of the
Commons without any impediment, but, on the third
opposition at the third
reading. reading, it met with some opposition in the House, upon
new and unexpected grounds. One of the members for
Liverpool opposed the loan, on the ground that that Port maintained its own
sea-lights, and that the trade of the Firth of Forth ought also to support its
lights. But this objection was withdrawn, upon explaining the position of
the Bell Rock relatively to the Firth of Forth, and the difficulty and expence
of the proposed building, and shewing that the collection of its Light-duties
were proportionally as much confined to the Firth of Forth, though
extending between Berwick to the south, and Peterhead to the north, as the
more limited sphere of the Liverpool lights were to the ports and havens in
the Mersey. This difficulty was no sooner got over, than the bill was likely
to have met with another check, from a clause which had been introduced,
exempting this work from the duty on stone carried coastwise, which, it was
calculated, would have amounted to between L. 2000 and L. 3000. This

Page 122

clause was withdrawn, by the advice of Mr Vansittart, Secretary to the
Treasury, as being improper to appear in the shape of an enactment.
The bill then went through the third reading, and passed
Is Passed, and
receives the Royal
the House Commons on the 16th of July. It was
Assent. afterwards brought up to the House of Lords, where it
went through the Committee, and the several readings;
and having received the Royal Assent, became an act of the Legislature.
The writer immediately returned to Scotland, with feelings of the greatest
satisfaction, on the accomplishment of a measure which, in its tendency,
was so eminently calculated to meet the wishes of the mercantile interest of
the country. But, along with these sensations, there was also a degree of
responsibility, and a crowd of difficulties, which still presented themselves,
in the execution of a work of so peculiar a nature. Hitherto this undertaking
had been viewed only at a distance, clogged with many previous obstacles,
which, by the passing of the bill, were removed; and the whole measure
now pressed fully upon his mind.

Page 123

CHAPTER III.
PHAROS FLOATING LIGHT-SHIP.—COMMENCEMENT OF THE OPERATIONS ON
THE BELL-ROCK.—ERECTION OF THE BEACON-HOUSE, AND FURTHER
PROGRESS OF THE LIGHT-HOUSE WORKS IN 1807.

The Act of Parliament, by which the Commissioners of
Floating-Light.
the Northern Light-houses were empowered to
undertake the works at the Bell Rock, having only received the Royal
Assent late in the month of July 1806, there was not sufficient time for
making the necessary preparations for their commencement that season. But
the writer, on his return from London, received instructions from the Board
to have such preliminary steps in view, as would enable him to begin the
operations early in the summer of 1807. This being arranged, he sailed in
the month of August, on his annual voyage, for the inspection of the
Northern Light-houses.
The bill for the Bell Rock Light-house was drawn up,
Act provides for a
Floating-Light and
under a strong impression of the uncertainty which
Beacon. must attend the whole of the works at the rock, and
doubts were accordingly entertained as to the estimated
expence being adequate to the accomplishment of the undertaking. A clause
had, therefore, been introduced, authorising the collection of the light-house
duties of one penny halfpenny per register ton from British vessels, and
threepence per ton from foreigners, “immediately upon mooring or
anchoring a ship or vessel, and exhibiting a floating or other light, at or near
the Bell Rock,” and “half the amount of the said duties respectively,” on the
erection of “a proper beacon or distinguishing mark or object on the said
Bell Rock.” The measures first in order were, consequently, to fit out and
moor a floating-light and to erect a beacon on the Bell Rock, that shipping
might derive immediate advantage from them, while the light-house was in
progress; and also that the funds of the Board might, as early as possible,
have the benefit of the additional duties. We therefore proceed to give an
account of the outfit and mooring of this vessel, and of the erection of the
beacon-house, without attending strictly to the chronological order of the
works.

Page 124

The writer had frequent communications with the late Captain Huddart, of
the Trinity-House of London, and other nautical men, both as to the form of
a vessel, and the moorings proper for a situation like the Bell Rock: here the
depth of water could not be less than from seventeen to nineteen fathoms at
the lowest tide, whereas, on the English coast, the depth where floating
lights are, in general, moored, does not exceed seven or eight fathoms, and
their moorings, consequently, much more easily managed. The writer had
also visited the floating light of the Nore, at the entrance of the river
Thames; and he was induced, upon the whole, to conclude, that a vessel
built after the manner and construction of the Dutch fishing-doggers, would
be the most suitable for riding at anchor in the open sea, and that her
moorings should consist partly of an iron chain, and partly of a hempen
cable.

Pharos Floating Light-ship.

In the year 1806, a great number of vessels were taken
Fishing Dogger
purchased, and named
by our cruizers, upon the coasts of Holland, Denmark,
The Pharos. and Norway, many of which were carried into Leith to
be sold. One of these, a Prussian, which happened to be
captured while fishing on the Dogger Bank, was purchased for the Bell
Rock service. This vessel was of a flat construction, rounded off both at the
stem and stern, agreeably to the ordinary make of these doggers. She was
called the Tonge Gerrit, but was afterwards named the Pharos, in allusion to
the celebrated Pharos of Alexandria. She measured 67 feet in length, and 16
feet in breadth, upon deck, 8 feet depth of hold, and was 82 tons register. It
was, however, only the form of her hull that fitted her for our purpose; her
rigging and whole equipment having to undergo a complete alteration, for
the light-house service.
The establishing of a floating-light being quite new
Fitted out under the
direction of the
upon the coast of Scotland, and that every thing
Trinity-House, Leith.connected with this vessel might be done upon the best
principles, the writer procured the assistance of Mr
Joseph Webb, an experienced pilot of Yarmouth, who had attended the
fitting up of one of the floating lights stationed off that coast, and who had
been recommended by the Trinity Board of London as a person of skill, for

Page 125

instructing the master of the vessel in all the details of the service. Several
of the Captains of the Trinity-House of Leith also obligingly formed
themselves into a committee, and from time to time assisted in giving
directions as to the necessary repairs and outfit of the vessel.
Agreeably to this arrangement, the Prussian dogger was put into one of the
graving docks of Leith, in the month of March 1807, and underwent a
complete examination, when it was found that she required a few new
timbers in her bottom; and that to strengthen her upper works, several new
beams and additional knees were necessary. Her bottom had to be new
trenailed and caulked, and then sheathed with fir plank. Her ceiling, or
interior lining, was also caulked, and made water-tight, in case of accident
to the outer plank, in the event of her breaking adrift, and getting upon the
Bell Rock. Her deck-plank and upper works were also entirely renewed;
and from stem to stern, under deck, her accommodations were laid out
anew. She was furnished with three masts, of a length calculated to enable
her to ride with as little incumbrance as possible in a storm; the main-mast
being only thirty-five feet above the deck, while the fore and mizen masts
were each twenty-five feet. The rigging was also made of light cordage, and
she was provided with storm-sails, to be used in the event of her breaking
adrift in bad weather. By the time, therefore, that this vessel came from the
hands of the carpenters, very little of the old work remained, as nothing had
been omitted, which could, in any manner, add to her strength and
durability. She was fitted up with births for about thirty artificers, besides
her ordinary crew and officers, amounting to thirteen in number,
independently of her hold for oil and stores of various descriptions. In the
distribution of these, the fore-peak of the ship was allotted for the sailors;
the waist for the artificers; and galley appropriated to the cooking of the
victuals. Next to this, a large cabin was set off for the master, mate, and
principal light-keeper, and for the foremen of the works; while the after or
stern part of the ship formed a cabin for the use of the engineer.
The Pharos was furnished with a large copper lantern
Peculiar construction
of Lanterns.
for each mast, containing ten lamps, with small silver-
plated reflectors, ranged upon a chandelier, moveable at
pleasure, in a horizontal direction, for the conveniency of turning the lamps
to trim them and clean the reflectors. To make the vessel ride as easily as
possible, in a situation so exposed, the lanterns were made of a peculiar

Page 126

construction, so as to screw together upon the masts, in two pieces,
longitudinally, as represented in Plate X., Figs. 1, 2, and 3. By these means,
the light could be seen in every direction, without the necessity of
suspending them in the usual manner from yards, or other weighty
apparatus, which tend not only to obscure the light, but also to make the
ship ride heavily in bad weather.
The moorings of the floating light consisted of a large
Construction of
Moorings.
mushroom anchor, of cast-iron, weighing about a ton
and a half, and made with a shank and head, resembling
in form, as nearly as may be, the vegetable from which it takes its name.
This anchor was made with a malleable iron shank, but latterly these
mushroom anchors were made wholly of cast-iron, as represented in Plate
X., Fig. 4. A chain of fifty fathoms in length, was attached to the anchor,
made of inch and half bars of iron, to which a hempen cable, of 14 inches in
circumference, and 120 fathoms in length, was connected, to be veered out
according to the state of the weather.
The Pharos being ready for sea, was, on the 9th of July,
Pharos is towed to the
Roads.
towed out of the harbour of Leith to the Roads, by the
Light-house Yacht, a cutter-rigged vessel attached to the
general service of the Northern Light-houses. The Yacht had the Pharos’
moorings on board, and was appointed to conduct her to the Bell Rock, and
lay them down. A curious enough circumstance took place, when the crew
of the floating-light was mustered, before leaving the harbour: two of the
seamen having taken alarm, at the destination of the ship, and the nature of
the service in which they were about to embark, suddenly turned about, and,
to the great surprise of their comrades, ran with the utmost precipitation
from the ship; to which they never again returned. Their places, however,
were supplied with others, without much inconvenience.
As the gentlemen of the Trinity-house of Leith, had all
Committee of the
Trinity-House go to
along taken a particular interest in the fitting out of the
the Bell Rock. floating-light, the Commissioners requested their
assistance in fixing upon the precise spot in which she
should be moored, for the direction of ships passing the Bell Rock. This
they readily complied with, suggesting, at the same time, that some of the
shipmasters of Arbroath, who were locally acquainted with the coast,
should also be invited to give their opinion and advice upon this point. A

Page 127

few of the most experienced ship-masters and merchants of Arbroath were
accordingly invited to come off, when the floating light should make her
appearance in their neighbourhood. Matters being thus arranged, the writer
went on board of the Light-house Yacht, on the 10th, accompanied by Mr
Thomas Grindlay, master of the Trinity-house of Leith, with Mr John Hay,
and Mr Thomas Ritchie, Assistant-Masters.
At 8 a. m. the Pharos got under way in Leith Roads, and
Pharos sails for the
Bell Rock.
sailed for her station at the Bell Rock, under the
command of Mr George Sinclair, with a crew of twelve
in number. But as she sailed very heavily, the Yacht, with her party, did not
follow till noon, and about 2 p. m. came up with her, and took her in tow,
when it came to blow fresh breezes from SW. At 6, both vessels anchored
for the night on the eastern side of the Isle of May, as, by continuing our
course, we should have reached the Bell Rock under night, which was then
an object of terror to every seaman, and must have been attended with
danger, from its then undistinguished state.
While the Yacht and Pharos lay at anchor at the Isle of
Committee from
Arbroath join the
May, Mr David Balfour, Mr Andrew Duncan, Mr David
party. Cargill, Mr John Fleming, and Mr William Kidd, as a
Committee from Arbroath, having hired a vessel, left
that place in the morning, and hailed the Yacht, soon after she came to an
anchor, when some of their party joined us on board. As the
accommodations of the floating light were very ample, having only the
ship’s company on board, it was proposed that the whole party should meet
in her, and pass the night; but she rolled from side to side, in so
extraordinary a manner, that even the most sea-hardy of our number were
content to remain in a state of separation, rather than accept of the best birth
in the floating light. It was humorously observed of this vessel, “that she
was in some danger of making a round turn, and appearing with her keel
uppermost.” Another said, “she would roll out her masts;” and a third that
she would “even turn a halfpenny, if laid upon deck.” These, and such like
remarks, afforded much pleasantry on board of the Light-house Yacht, and
were suggested by the manner in which the Pharos rolled and yawed about,
when compared with the more easy motion of the other vessels. Being then
in light ballast trim to fit her for riding in bad weather, and very flat in the
bottom, the smallest wave set her in motion, when at anchor; and when

Page 128

under way, she was little better, for she answered the helm with so much
difficulty, that a large decked Praam-boat, which she had in tow, was upset
in the passage from Leith. The writer is the more particular on this subject,
as the rolling motion of the floating-light became proverbial in the Light-
house service, and continued a source of much trouble and uneasiness to all
concerned, especially while she was used as a tender or store-ship for the
works.
Early in the morning of the 11th, the vessels left their
Pharos anchors in a
temporary birth.
anchorage at the Isle of May, and sailed for the Bell
Rock; but on reaching it, in the course of the forenoon,
the wind came to the eastward, accompanied with thick hazy weather, and
drizzling showers of rain, which so completely hid the distant landmarks
from view, that there was a necessity for ordering the Pharos to come to an
anchor with her best bower, on the smoothest spot of ground that could be
found, until a change of weather should admit of her being moored in a
proper manner. The weather afterwards became so foggy that every object
was lost sight of. The vessel which had brought our friends from Arbroath,
put into that harbour in the course of the evening, but the Light-house Yacht
kept at sea till the morning of the 12th, when it came to blow so fresh, that
she also went into that harbour, to wait a change of weather. On the 14th, it
improved, and the Yacht again sailed for the Bell Rock. On returning to the
floating light, we were happy to find that all was well on board, though Mr
Sinclair and Mr Webb, the pilot, complained that their anchorage was not
very good, as the bottom was hard, and the soundings or particles brought
up with the lead exhibited sharp coral and coarse gravel. After plying about
for some time with the Yacht, and sounding in every direction, a place was
at length fixed upon, about a mile and a half in a north-westerly direction
from the Bell Rock. The Yacht, as before noticed, having on board the
floating-light’s moorings, anchored on the spot most approved of for laying
them down.
Some arrangements having been made among the
In laying down her
Moorings, the whole
nautical gentlemen, as to the precise mode of going
chain goes overboard. about this operation, it was resolved to suspend the
mushroom anchor over the gunwale of the Yacht, and
before letting it into the water, to bring the greater part of the chain upon
deck, taking the precaution to make the further end of it fast to the lower

Page 129

part of the mast, in the vessel’s hold, with a very strong and perfectly new
stopper, or piece of rope, measuring 7 inches in circumference. It was not
doubted but that this strong rope would have held the chain against any
strain that might have been brought upon it, in the process of letting down
the moorings. But the mushroom-anchor was no sooner let go from the
ship’s tackle, than the part of the chain which had been coiled upon deck
went overboard with such velocity, that it communicated a similar impetus
to the remainder of the chain in the hold, and the strain coming ultimately
upon the stopper, snapped through the several parts which fixed the end of
the chain to the mast, and, consequently, the whole went to the bottom with
the mushroom-anchor.
This untoward circumstance greatly disconcerted and
Moorings recovered
with great difficulty.
embarrassed the operations of mooring the floating-
light, as the chain had now to be fished or hooked at the
bottom, and raised from the depth of seventeen fathoms. After many trials,
we at length succeeded in hooking it with a grappling-iron, but as it
happened to lay hold only a few fathoms from the anchor, it required all the
purchase-blocks and tackle of the Yacht and Pharos to raise it: for the
weight, including the anchor, and so large a portion of the chain, could not
be less than about three tons. This operation was begun at mid-day, and,
although the united force of the crews of both ships was fully mustered, it
was not till two o’clock on the following morning,—being a period of
fourteen hours,—that the moorings were got up, and the Pharos brought
alongside of the Yacht, to receive the hempen cable, which was made fast to
the clinch, or great ring, connected with the chain moorings. The weather
was fortunately the most favourable that could have been desired for this
operation; and it is impossible for the writer to describe the anxiety and
exertions of all on board in getting this matter adjusted. Were he to judge by
his own feelings, he has no doubt that all on board would join in saying,
that it was one of the most painfully laborious days they had spent in the
course of their existence. For the space of about twenty hours, the crews of
both ships had never been off deck, and during twelve of these the hand-
spike, or the tackle, had not been five minutes together out of their hands, as
the refreshments which they got were served up at the windlass. The same
observations are literally applicable to the gentlemen of the quarter-deck,
who divided their attention severally to the different tackles and purchases
employed in raising the moorings.

Page 130

The perplexing and tedious business of mooring the floating-light having
been happily got over, it was judged necessary to see how she would ride at
anchor for a time, before advertising the light to the public. The writer
accordingly returned on board in the course of three weeks, and examined
the moorings, which were found in good order. The anchorage ground was
also considered of a very proper description, in so far as observations, made
during a tract of favourable weather, had afforded the means of judging.
The vessel lay in an excellent position for the direction of shipping; and
being at this time only about a mile from the Bell Rock, her situation as a
hulk or store-ship for the light-house operations, was as favourable as the
relative position of the rock would admit. In this state of things, notice to
the following effect was given in the newspapers, for the direction of
mariners, and along with a copy of the notice, a chart or sketch of the
opposite coast was sent to the different Custom-houses.
“In virtue of an Act of Parliament of the 46th year of
Description of the
Floating-Light.
Geo. III. chap. 132. authorising the Commissioners of
the Northern Light-houses to erect a Light-house on the
Bell Rock, to place a floating light there, and to collect duties thereupon,—
notice is hereby given, that a vessel, fitted out for a floating-light, is now
moored off the Cape or Bell Rock, situate at the entrance of the Friths of
Forth and Tay, in North Lat. 56° 27´, and West Long. 2° 27´.
“The moorings of the floating-light consist of a mushroom anchor, and
chain, laid down in 17 fathoms water, the Bell Rock bearing, by compass,
E. S. E. distant one mile; the Red Head, N. by E. ¼ E. distant thirteen miles;
Fifeness, S. W. ¾ W. distant twelve miles; and the island of May S. W. ¾ S.
distant seventeen miles.
“A light from oil, with reflectors, will be exhibited upon the night of the
15th day of September 1807, and thereafter every night, from the going
away of day-light in the evening, till the return of day-light in the morning.
To distinguish this light from the double lights at the entrance of the Firth of
Tay, and on the Scares off the coast of Northumberland, and also from the
single light on the Island of May, three distinct lights will be shown from
the Bell Rock Floating-light, by a lantern hoisted to the top of each mast,
which will be visible from every point of the compass, at the distance of
from two to three leagues; the lanterns on the fore and mizen masts being
elevated 23 feet, and that on the main mast 31 feet, above the vessel’s deck;

Page 131

the lights, when seen from either side of the ship, have the appearance of a
triangle, but if seen end-on, they appear as two lights, the one above the
other.
“This vessel is called the Pharos; she was formerly a fishing dogger, and
appears like a ship under jury masts; during the day-time, a blue flag, with a
light-house in the field, will be displayed from the main-mast; and, in thick
and foggy weather, a bell will be tolled, night and day, on board, with an
interval of about one minute.
“Although this vessel has been fitted out in the completest manner, and
every attention paid to mooring her properly, yet, as all floating-lights are
liable to break adrift in tempestuous weather, mariners are requested not to
neglect their landmarks, and to run with caution for the floating-light.
“The Pharos being also intended to answer the purpose of a store-ship,
while the light-house is building on the Bell Rock, it may be found
necessary, in the course of the works, to alter her present station, of which
due notice will be given.”

Commencement of the Operations on the Bell Rock.

As the commencement of works of masonry, requiring
1807, August. stones of large dimensions, is unavoidably tedious,
especially in the collecting of materials, we shall at
present only notice, that the Light-house Board having resolved on the use
partly of granite and partly of sandstone, for the erection at the Bell Rock,
measures were duly taken for procuring a supply of the former from the
quarry of Rubeslaw near Aberdeen, and of the latter from Mylnefield near
Dundee. But, instead of following out this part of our subject in its order,
we shall first proceed to a detail of the operations afloat, as they may be
termed, or of the works upon the rock itself, during the season of 1807,—
particularly of the erection of the principal beams of the beacon-house, or
temporary residence for the artificers on the rock, and of the progress made
in the preparation of the foundation or site of the main building.
We therefore observe, that a vessel had been built at
Sloop Smeaton.
Leith, in the course of the spring, expressly for the Bell

Page 132

Rock service, to be employed as a tender for the floating-light, and as a
stone-lighter for the use of the work. This vessel was launched in the month
of June; she measured 40 tons register, was rigged as a sloop, and fitted in
all respects in the strongest manner, to adapt her as much as possible for the
perilous service in which she was to be employed. She was called The
Smeaton,—a name which the writer had great pleasure in suggesting, as a
mark of respect for the memory of the celebrated engineer of the Eddystone
Light-house, whose narrative was to become a kind of text-book for the
Bell Rock operations. The Smeaton was ready for sea in the beginning of
August, and reached Arbroath upon the 5th day of that month. Arbroath
being the most contiguous harbour to the Bell Rock, naturally pointed out
itself as the proper place for establishing the works, and preparing the
materials, before shipping them for the rock. The writer had, accordingly,
been here for some time, making the necessary preparations; and when the
Smeaton arrived, he found himself in a condition for commencing the
operations, in a systematic manner, upon the rock itself.
The floating-light rode in safety at her moorings, and
The Positions of the
Light-House and
had hitherto been supplied with necessaries by the
Beacon fixed on. Yacht belonging to the general service of the Light-
house Board. In this vessel, occasional trips had also
been made to the rock; but on the arrival of the Smeaton, the Yacht sailed
on a voyage, with stores for the use of the Northern Light-houses. In these
preliminary trips, the writer had fixed, in his own mind, upon the parts of
the rock most favourable for the position of the light-house, and on the
south-west of it, he chose the site of the beacon-house, that it might be
sheltered, in some measure, from the breach of the north-east sea; and by
placing them contiguous, or about twenty-five feet apart, they admitted of a
ready communication with each other in the more advanced stages of the
work.
The Smeaton having got on board necessaries for the
1807, 7th August.
floating-light, and three sets of chain-moorings with
mushroom-anchors, and large floating buoys, the writer
First trip of the sailed on another preliminary visit to the Bell Rock on
Artificers to the Bell
Rock. the 7th day of August, carrying with him Mr Peter
Logan, foreman builder, and five artificers, selected, on
this occasion, from their having been somewhat accustomed to the sea; the

Page 133

writer being aware of the distressing trial which the floating-light would
necessarily inflict upon landsmen, from her rolling motion. Here he
remained till the 10th, and as the weather was favourable, a landing was
effected daily, when the workmen were employed in cutting the large sea-
weed from the sites of the light-house and beacon, which were respectively
traced with pick-axes upon the rock. In the mean time, the crew of the
Smeaton was employed in laying down the several sets of moorings within
about half a mile of the rock, for the conveniency of vessels riding at the
buoys by a hawser, instead of letting go an anchor, which, in that situation,
could seldom have been purchased or lifted again, as it would constantly
have hooked the rocky bottom, a disadvantage to which the mushroom
anchor, from its figure and construction, is not liable, as will be understood
by examining the diagram representing it in Plate X. Fig. 4. The artificers
having fortunately experienced moderate weather, returned to the work-yard
at Arbroath, with a good report of their treatment afloat; when their
comrades ashore began to feel some anxiety to see a place of which they
had heard so much, and to change the constant operation with the iron and
mallet in the process of hewing, for an occasional tide’s work on the rock,
which they figured to themselves as a state of comparative ease and
comfort.
In answer to some advances which had been made on
Rate of Artificers’
wages fixed on.
this subject by the artificers, the foreman was instructed
to select fourteen of the stone-cutters, who had been
accustomed to the use of the pick-axe, and to boring or drilling holes with a
jumper, after the manner of quarriers, to go off to the rock in the course of a
few days. When these men, however, came to be spoken to more closely,
some of them were disposed to hold their services rather at a high rate,
demanding two guineas per week if they were to find their own provisions,
and L. 1, 10s. if provisions were found to them. But they were informed,
that the nominal rate of wages was to be L. 1 per week, being the same for
those employed at the rock, as for those in the work-yard at Arbroath. The
artificers at the rock were, in addition, to have their provisions, with certain
premiums, to be arranged in the further progress of the work, particularly
for each tide’s work on Sunday, which was to be accounted and paid for as
a day’s work. After a good deal of trouble, two or three of the men acceded
to the foreman’s proposals, others refused to engage themselves, excepting
at the highest rate; while a third party objected only to working on Sunday.

Page 134

In any agreement to be entered into, it was held as an express condition,
“That every man who embarked for the work at the Bell Rock, should
remain for the space of four weeks, without returning ashore.” Those
chiefly wanted at this time were masons from Aberdeen, who were
accustomed to the use of the boring-iron and pick, in working granite.
Being engaged only from week to week in the work-yard, they were
desirous of knowing the reason for remaining a month at the rock; when
they were informed that it was not unlikely some of them might suffer from
sea sickness, and wearying of confinement on board of ship, might wish to
return ashore, which would be attended with much inconveniency to the
work, by too frequent a change of hands. They were further told, that, by
continuing for one month afloat, they would, in the course of that time,
become so sea-hardy as probably to feel no desire to return till the end of
the working-season, which, at this advanced period, could not last for many
weeks. This condition was considered of importance in the commencement
of the work, and it was the more readily agreed to, as the writer assured
them that he should himself remain with them during that period. As one
condition, however, had been made to the Aberdeen masons, they felt no
hesitation in proposing another on their own part, and they accordingly
handed the following offer of service, addressed to the foreman, dated 12th
August 1807, which, from the tenor of the document, we shall here insert.
“In consequence of our communing with one another
Letter from the
Aberdeen Masons.
concerning the Bell Rock, we hereby agree to stay with
you from the above date, till August 1808, being twelve
months certain, and to take our turn at whatever work may start up
concerning the Bell Rock business,—only, it is to be understood, that the
rest of the masons must take turn and turn about with us: the terms of our
agreement to be 20s. per week, summer and winter, wet and dry, with free
quarters ashore, and likewise our victuals when we are at the rock.—As for
the Sunday’s work and premiums, we leave that to the honour of our
employers. (Signed) William Bonyman, John Bruce, John Cruickshanks,
Alexander Sherif, John Bonyman, Alexander Davidson, James Macdonald,
Robert Ferres, John Mason, William Chalmers.”
Every thing being arranged for sailing to the rock on Saturday the 15th, the
vessel might have proceeded on the Sunday; but understanding that this
would not be so agreeable to the artificers it was deferred until Monday.

Page 135

Here we cannot help observing, that the men allotted for the operations at
the rock seemed to enter upon the undertaking with a degree of
consideration, which fully marked their opinion as to the hazardous nature
of the undertaking on which they were about to enter. They went in a body
to church on Sunday, and whether it was in the ordinary course, or designed
for the occasion, the writer is not certain, but the service was, in many
respects, suitable to their circumstances. Indeed, the Reverend Mr Gleg, the
minister of the parish, was in the constant habit of enquiring after the
success and safety of the works. Throughout this day the weather was
remarkably serene, and the best hopes were entertained of a favourable tract
of weather, which the inhabitants of Arbroath were disposed to consider as
an omen of good fortune.
The tide happening to fall late in the evening of
Monday, 17th. Monday the 17th, the party, counting twenty-four in
number, embarked on board of the Smeaton about 10
Twenty-four o’clock p. m., and sailed from Arbroath with a gentle
Artificers embark for
the Rock. breeze at west. Our ship’s colours having been flying
all day in compliment to the commencement of the
work, the other vessels in the harbour also saluted, which made a very gay
appearance. A number of the friends and acquaintances of those on board
having been thus collected, the piers, though at a late hour, were perfectly
crowded, and just as the Smeaton cleared the harbour, all on board united in
giving three hearty cheers, which were returned by those on shore in such
good earnest, that, in the still of the evening, the sound must have been
heard in all parts of the town, re-echoing from the walls and lofty turrets of
the venerable Abbey of Aberbrothwick. The writer felt much satisfaction at
the manner of this parting scene; though he must own, that the present
rejoicing was, on his part, mingled with occasional reflections upon the
responsibility of his situation, which extended to the safety of all who
should be engaged in this perilous work. With such sensations he retired to
his cabin; but as the artificers were rather inclined to move about the deck
than to remain in their confined births below, his repose was transient, and
the vessel being small, every motion was necessarily heard. Some who were
musically inclined occasionally sung; but he listened with peculiar pleasure
to the sailor at the helm, who hummed over Dibdin’s characteristic air,

“They say there’s a Providence sits up aloft,

Page 136

To keep watch for the life of Poor Jack.”

Erection of the Beacon-House.

The weather had been very gentle all night, and, about four in the morning
of the 18th, the Smeaton anchored on the spot where it was intended to lay
down an additional set of chain-moorings which she had on board.
Agreeably to an arranged plan of operations, all hands were called at 5
o’clock, a. m., just as the highest part of the Bell Rock began to shew its
sable head among the light breakers, which occasionally whitened with the
foaming sea. The two boats belonging to the floating-light attended the
Smeaton, to carry the artificers to the rock, as her boat could only
accommodate about six or eight sitters. Every one was more eager than his
neighbour to leap into the boats, and it required a good deal of management
on the part of the coxswains, to get men unaccustomed to a boat, to take
their places for rowing and at the same time trimming her properly. The
landing-master and foreman went into one boat, while the writer took
charge of another, and steered it to and from the rock. This became the more
necessary in the early stages of the work, as places could not be spared for
more than two, or at most three seamen to each boat, who were always
stationed, one at the bow, to use the boat-hook in fending or pushing off,
and the other at the aftermost oar, to give the proper time in rowing, while
the middle oars were double banked, and rowed by the artificers.
As the weather was extremely fine, with light airs of
Tuesday, 18th.
wind from the east, we landed without difficulty upon
the central part of the rock at half-past 5, but the water
Commence work at 6 had not yet sufficiently left it for commencing the work.
a. m.
This interval, however, did not pass unoccupied; the
first and last of all the principal operations at the Bell Rock were
accompanied by three hearty cheers from all hands, and, on occasions like
the present, the steward of the ship attended, when each man was regaled
with a glass of rum. As the water left the rock about 6, some began to bore
the holes for the great bats or holdfasts, for fixing the beams of the Beacon-
house, while the smith was fully attended in laying out the site of his forge,
upon a somewhat sheltered spot of the rock, which also recommended itself
from the vicinity of a pool of water for tempering his irons. These

Page 137

preliminary steps occupied about an hour, and as nothing further could be
done during this tide towards fixing the forge, the workmen gratified their
curiosity, by roaming about the rock, which they investigated with great
eagerness till the tide overflowed it. Those who had been sick picked dulse
(Fucus palmatus), which they ate with much seeming appetite; others were
more intent upon collecting limpets for bait, to enjoy the amusement of
fishing when they returned on board of the vessel. Indeed none came away
empty handed, as every thing found upon the Bell Rock was considered
valuable, being connected with some interesting association. Several coins,
and numerous bits of shipwrecked iron were picked up, of almost every
description; and, in particular, a marking-iron lettered James,—a
circumstance of which it was thought proper to give notice to the public, as
it might lead to the knowledge of some unfortunate shipwreck, perhaps
unheard of till this simple occurrence led to the discovery. When the rock
began to be overflowed, the landing-master arranged the crews of the
respective boats, appointing twelve persons to each. According to a rule,
which the writer had laid down to himself, he was always the last person
who left the rock. Another maxim was, to allow the landing-master’s boat to
proceed about twice or three times her own length a-head of the other boats,
that in case of accident he might be ready to assist; and when he had thus
cleared the rock, he waited till the others got out of the respective creeks;
after which they proceeded in company. Upon the present occasion, the
boats reached the tender about half-past 8, after having been two hours
upon the rock, and three hours absent from the ship.
In a short time, the Bell Rock was laid completely under water, and the
weather being extremely fine, the sea was so smooth, that its place could
not be pointed out from the appearance of the surface,—a circumstance
which sufficiently demonstrates the dangerous nature of this rock, even
during the day, and in the smoothest and calmest state of the sea. During the
interval between the morning and the evening tides, the artificers were
variously employed in fishing and reading, others were busy in drying and
adjusting their wet clothes, and one or two amused their companions with
the violin and German-flute.
About 7 in the evening the signal bell for landing on the
Method of fixing
iron-bats into the
rock was again rung, when every man was at his
Rock. quarters. In this service it was thought more appropriate

Page 138

to use the bell than to pipe to quarters, as the use of this instrument is less
known to the mechanic than the sound of the bell. The landing, as in the
morning, was at the eastern harbour. During this tide, the sea-weed was
pretty well cleared from the site of the operations, and also from the tracks
leading to the different landing-places; for walking upon the rugged surface
of the Bell Rock, when covered with sea-weed, was found to be extremely
difficult, and even dangerous. Every hand that could possibly be occupied,
was now employed in assisting the smith to fit up the apparatus for his
forge. The frame-work of iron, forming the hearth, was now got into its
place; and the four legs which supported it were let into holes, bored from
six to twelve inches into the rock, according to the inequalities of the site:
and then firmly wedged, first with wood, and then with iron, a method
followed in all the operations of batting at the Bell Rock, and found greatly
preferable to running in melted lead. The block of timber for supporting the
anvil was fixed in the same manner, on which the anvil was simply laid,
without any other fixture than the small stud, fitted as usual into its seat,
depending upon the gravity of the mass for preserving its place against the
effects of the sea. In this state things were left on the rock at 9 p. m., when
the boats returned to the tender, after other two hours work, in the same
order as formerly, perhaps as much gratified with the success that attended
the work of this day, as with any other in the whole course of the
operations. Although it could not be said that the fatigues of this day had
been great, yet all on board retired early to rest. The sea being calm, and no
movement on deck, it was pretty generally remarked in the morning, that
the bell awakened the greater number on board from their first sleep; and,
though this observation was not altogether applicable to the writer himself,
yet he was not a little pleased to find, that thirty people could all at once
become so reconciled to a night’s quarters within a few hundred paces of
the Bell Rock.
It was a rule laid down and adhered to by the writer,
Wednesday, 19th.
throughout the whole of the Bell Rock works, that, as
far as possible, the charge should be arranged into
Landing-master’s departments. It therefore fell to the officer termed the
duty.
Landing-master, who was also master of the Floating-
light, to take the responsibility of the safe and proper landing of the
artificers and materials upon the rock. With him, the writer generally
arranged the business of the following day; his crew watched the ebbing of

Page 139

the water, and the appearance of the rock, and from the state of the weather,
he judged of the proper time for causing the signal bell to be rung, when the
boats were to leave the ship for the rock. It was also a special injunction
laid upon him to say, from the state of the weather, when it was necessary
for the boats to leave the rock and return to the tender.
Being extremely anxious at this time to get forward
Indications of the
weather.
with fixing the smith’s forge, on which the progress of
the work at present depended, the writer requested that
he might be called at day-break to learn the landing-master’s opinion of the
weather, from the appearance of the rising sun, a criterion by which
experienced seamen can generally judge pretty accurately of the state of the
weather for the following day. About 5 o’clock, on coming upon deck, the
sun’s upper limb or disk had just begun to appear, as if rising from the
ocean; and in less than a minute he was seen in the fullest splendour; but
after a short interval he was enveloped in a soft cloudy sky, which was
considered emblematical of fine weather. His rays had not yet sufficiently
dispelled the clouds which hid the land from view, and the Bell Rock being
still overflowed, the whole was one expanse of water. This scene in itself
was highly gratifying; and when the morning bell was tolled, we were
gratified with the happy forebodings of good weather, and the expectation
of having both a morning and an evening tide’s work on the rock.
The boats left the ship at a quarter before 7 this
Wednesday, 19th.
morning, and landed upon the rock at 7. The water had
gone off the rock sooner than was expected, for, as yet,
the seamen were but imperfectly acquainted with its periodic appearance,
and the landing-master being rather late with his signal this morning, the
artificers were enabled to proceed to work without a moment’s delay. The
boat which the writer steered happened to be the last which approached the
rock at this tide; and, in standing up in the stern, while at some distance, to
see how the leading boat entered the creek, he was astonished to observe
something in the form of a human figure, in a reclining posture, upon one of
the ledges of the rock: he immediately steered the boat through a narrow
entrance to the eastern harbour, with a thousand unpleasant sensations in his
mind. He thought a vessel or boat must have been wrecked upon the rock
during the night; and it seemed probable that the rock might be strewed
with dead bodies, a spectacle which could not fail to deter the artificers

Page 140

from returning so freely to their work. Even one individual found in this
situation, would naturally cast a damp upon their minds, and, at all events,
make them much more timid in their future operations. In the midst of these
reveries, the boat took the ground at an improper landing place; but, without
waiting to push her off, he leapt upon the rock, and making his way hastily
to the spot which had privately given him alarm, he had the satisfaction to
ascertain, that he had only been deceived by the peculiar situation and
aspect of the smith’s anvil and block, which very completely represented
the appearance of a lifeless body upon the rock. The writer carefully
suppressed his feelings, the simple mention of which might have had a bad
effect upon the artificers, and his haste passed for an anxiety to examine the
apparatus of the smith’s forge, left in an unfinished state at the evening tide.
After an excellent tide’s work of three hours at the
Dangerous situation
in foggy weather.
forge, and boring the bat-holes for fixing the Beacon-
house, we again took to our boats, and left the rock at
10 o’clock, the one boat preceding and waiting for the other till it cleared
the rock, as formerly. In the course of this morning’s work, two or three
apparently distant peals of thunder were heard, and the atmosphere
suddenly became thick and foggy. But as the Smeaton, our present tender,
was moored at no great distance from the rock, the crew on board continued
blowing with a horn, and occasionally fired a musket, so that the boats got
to the ship without difficulty. The occurrence of thick weather, however,
became a serious consideration, in looking forward to the necessary change
of quarters to the Pharos, distant about one mile from the rock, instead of a
few hundred yards, as in the case of the Smeaton.
The continuation of the thick and foggy weather was
Artificers amuse
themselves with
transient, being what seamen term an easterly hoar,
fishing. arising from the heat of the weather, which disappeared
soon after mid-day. The weather being clear in the
evening, the boats landed again at half-past 6 o’clock, when the artificers
were employed for two hours, as in the morning, and returned again to the
ship about a quarter past 8. The remainder of the day-light was eagerly
spent in catching fish, which were got, at this time, in great abundance, both
alongside of the vessel and in the boats at a distance; and in the course of an
hour about five dozen of codlings were caught, which not only afforded an

Page 141

agreeable relaxation, but afforded a plentiful dish of fish for the different
messes on board.
The wind this morning inclined from the north-east, and
Thursday, 20th.
the sky had a heavy and cloudy appearance, but the sea
was smooth, though there was an undulating motion on
Complete the fixing the surface, which indicated easterly winds, and
of the smith’s forge.
occasioned a slight surf upon the rock. But the boats
found no difficulty in landing at the western creek at half-past 7, and, after a
good tide’s work, left it again about a quarter from 11. In the evening the
artificers landed at half-past 7, and continued till half-past 8, having
completed the fixing of the smith’s forge, his vice, and a wooden board or
bench, which were also batted to a ledge of the rock, to the great joy of all,
under a salute of three hearty cheers. From an oversight on the part of the
smith, who had neglected to bring his tinder-box and matches from the
vessel, the work was prevented from being continued for at least an hour
longer.
It may here be proper to notice, that although a
Valuable services of
the smith at the Bell
considerable quantity of jumpers or boring-irons, picks,
Rock. and other quarry-tools, had been brought, in good order,
for the use of the work; yet, from the extent of work in
preparing the foundations, together with the hard and compact nature of the
sandstone, of which the Bell Rock is composed, the tools soon became
blunt, and the work must have often been completely at a stand, had it not
been for the conveniency of having a smith and his forge so near at hand.
The writer doubts not that his readers may be at a loss to account for the
operation of the bellows and other apparatus upon a sunken rock, and it
may therefore be necessary, in the accompanying description of the plates
of this work, to give some explanation of this arcanum of Vulcan, on which
the work had so great a dependence. The smith’s shop, represented in Plate
XI. was of course in open space: the large bellows were carried to and from
the rock every tide, for the serviceable condition of which, together with the
tinder-box, fuel and embers of the former fire, the smith was held
responsible. Those who have been placed in situations to feel the
inconveniency and want of this useful artizan, will be able to appreciate his
value in a case like the present. Mr Smeaton often felt the want of a forge
permanently upon the rock, and had the foundation of the Eddystone Light-

Page 142

house required more extensive preparations, this useful
Much wanted at the implement could hardly have been dispensed with; but
Eddystone.
the Eddystone rock was so small as hardly to have
room for it, in addition to other no less necessary apparatus. Could the
operations of the blacksmith, at the Bell Rock, have been continued, from
the commencement of the operations, even for half an hour longer every
tide than the pickmen or quarriers, it would have added much to the
facilities and progress of the work. But a stage or platform, in that case,
must have been erected, to which there were a number of intervening
obstacles, that more than counter-balanced the temporary inconveniency
felt from the want of this additional time. It often happened, to our
annoyance and disappointment, in the early state of the work, when the
smith was in the middle of a favourite heat, in making some useful article,
or in sharpening the tools, after the flood-tide had obliged the pickmen to
strike work, a sea would come rolling over the rocks, dash out the fire, and
endanger his indispensable implement the bellows; or if the sea was
smooth, while the smith often stood at work knee-deep in water, the tide
rose by imperceptible degrees, first cooling the exterior of the fire-place, or
hearth, and then quietly blackening and extinguishing the fire from below.
The writer has frequently been amused at the perplexing anxiety of the
blacksmith, when coaxing his fire, and endeavouring to avert the effects of
the rising tide. In this state of things, the erection of the Beacon was looked
forward to as a happy period, when the smith should be removed above the
reach of the highest tides.
Friday, 21st. The weather still continued to be very fine; though the
winds were variable, they rather prevailed from the
Seals desert the Bell eastward, and were occasionally accompanied with a
Rock. hazy atmosphere, inclining to fog. The boats landed to-
day upon the rock at half-past 7 o’clock a. m., and left it
at a quarter past 11, the artificers having had an excellent tide’s work of
three hours and three-quarters. Every thing connected with the forge being
now completed, the artificers found no want of sharp tools, and the work
went forward with great alacrity and spirit. It was also alleged that the rock
had a more habitable appearance, from the volumes of smoke which
ascended from the smith’s shop; and the busy noise of his anvil; the
operations of the masons; the movements of the boats, and shipping at a
distance, all contributed to give life and activity to the scene. This noise and

Page 143

traffic had, however, the effect of almost completely banishing the herd of
seals which had hitherto frequented the rock as a resting place, during the
period of low water. Though these animals were thus prevented from
reposing upon the higher parts of the rock, yet they ventured, for a time, to
lie upon the more detached outlayers which dry partially: here they seemed
to look with that sort of curiosity which is observable in these animals when
following a boat. But after the smith established himself, it was rare to see
more than one or two of these amphibious animals about the rock, which
seemed to be peculiarly adapted to their habits; for, excepting two or three
days at neap tides, a part of it always dries at low water, at least during the
summer season; and as there was good fishing ground in the
neighbourhood, without a human being to disturb or molest them, it had
become a very favourite residence of the seal, if we may judge from their
numbers, the writer having occasionally counted from fifty to sixty of these
animals playing about the rock at a time. But when they came to be
disturbed every tide, and their seclusion was broke in upon by the kindling
of great fires, together, with the beating of hammers and picks during low
water, after hovering about for a time, they changed their place, and seldom
more than one or two were to be seen about the rock. The writer felt a
desire to protect these animals, with a view to observe their habits, and in
hopes of taming them, at least so far as he had observed was done at the
Small’s Light-house, off the coast of Pembrokeshire, another favourite
resort of seals, where, by gentle treatment, they have become so tame and
familiar as to eat bread out of the hands of the light-keepers. But here,
indeed, they constantly find a resting place, as some of the Small’s rocks are
always above water.
We had now been six days out from Arbroath, and, in
Progress of the work.
that time, had the good fortune to have seven
successive tides’ work upon the rock, during which, the
smith’s forge had been fixed, and twelve holes of 2 inches in diameter and
18 inches in depth, had been bored or drilled into the rock, in the process of
excavating the bat or stanchion-holes for fixing the principal beams of the
Beacon-house. Hitherto the artificers had remained on board of the
Smeaton, which was made fast to one of the mooring buoys, at the distance
only of about a quarter of a mile from the rock, and of course a very great
conveniency to the work. Being so near, the seamen could never be
mistaken as to the progress of the tide, or state of the sea upon the rock, nor

Page 144

could the boats be much at a loss to pull on board of the vessel during fog,
or even in very rough weather; as she could be cast loose from her
moorings at pleasure, and brought to the lee side of the rock. But the
Smeaton being only about forty register tons, her accommodations were
extremely limited. It may, therefore, be easily imagined,
Hampered state of the that an addition of twenty-four persons to her own crew,
artificers.
must have rendered the situation of those on board
rather uncomfortable. This vessel served as a tender only in fine weather,
with the assistance of the boats of the floating-light, for she could not stow
boats sufficiently large for attending the rock with such a complement of
artificers. The only place for the men’s hammocks on board being in the
hold, they were unavoidably much crowded; and if the weather had
required the hatches to be fastened down, so great a number of men could
not possibly have been accommodated. To add to this evil, the co-boose or
cooking place being upon deck, it would not have been possible to have
cooked for so large a company in the event of bad weather.
The stock of water was now getting short, and some necessaries being also
wanted for the floating-light, the Smeaton was dispatched for Arbroath; and
the writer with the artificers, at the same time, shifted their quarters from
her to the floating-light.
The operations still continued to be favoured with
Saturday, 22d.
pleasant weather; to-day there were light airs of wind
from south-east, and the morning bell was rung at 6.
Inconveniencies of Although the rock barely made its appearance at this
the Pharos as a tender.
period of the tides till 8 o’clock, yet, having now a full
mile to row from the floating-light to the rock, instead of about a quarter of
a mile from the moorings of the Smeaton, it was necessary to be earlier
astir, and to form different arrangements; breakfast was accordingly served
up at 7 o’clock this morning. From the excessive motion of the floating-
light, the writer had looked forward rather with anxiety to the removal of
the workmen to this ship. Some among them, who had been congratulating
themselves upon having become sea-hardy while on board of the Smeaton,
had a complete relapse on returning to the floating-light. This was also the
case with the writer. From the spacious and convenient birthage of the
floating-light, the exchange to the artificers was, in this respect, much for
the better. The boats were also commodious, measuring sixteen feet in

Page 145

length on the keel, so that, in fine weather, their complement of sitters was
sixteen persons for each, with which, however, they were rather crowded,
but she could not stow two boats of larger dimensions. When there was
what is called a breeze of wind, and a swell in the sea, the proper number
for each boat could not, with propriety, be rated at more than twelve
persons.
The act of getting into or out of a boat, when alongside of the floating-light,
was at all times attended with more or less difficulty; her rolling motion
was so great, that the gunwale, though about five feet above the surface of
the water, she dipped nearly into it, upon the one side, while her keel could
not be far from the surface on the other. This was her state, even in
moderate weather, in certain directions of the wind, especially for the period
of about an hour, when she was thwarting to the tide, or rode in what sailors
call the trough of the sea. The act of getting on board was then attended
with great difficulty, even to seamen, and was particularly so to landmen,
requiring all the attention which the landing-master could bestow, in getting
the artificers safely transferred from the boats to the ship, and vice versa.
When the tide-bell rung, the boats were hoisted out, and
Difficulty of getting
on board and leaving
two active seamen were employed to keep them from
the Pharos. receiving damage alongside. The floating-light being
very buoyant, was so quick in her motions, that when
those who were about to step from her gunwale into a boat, placed
themselves upon a cleat or step on the ship’s side, with the man or rail ropes
in their hands, they had often to wait for some time, till a favourable
opportunity occurred for stepping into the boat. While in this situation, with
the vessel rolling from side to side, watching the proper time for letting go
the man-ropes, it required the greatest dexterity and presence of mind to
leap into the boat. One who was rather awkward, would often wait a
considerable period in this position: at one time his side of the ship would
be so depressed, that he would touch the boat to which he belonged, while
the next sea would elevate him so much, that he would see his comrades in
the boat on the opposite side of the ship, his friends in the one boat calling
to him to “Jump,” while those in the boat on the other side, as he came
again and again into their view, would jocosely say, “Are you there yet?
You seem to enjoy a swing.” In this situation it was common to see a
person, upon each side of the ship, for a length of time, waiting to quit his

Page 146

hold. A stranger to this sort of motion was both alarmed for the safety, and
delighted with the agility of persons leaping into the boat, under those
perilous circumstances. No sooner had one quitted his station on the
gunwale, than another occupied his place, until the whole were safely
shipped.

Page 147

It also formed a critical operation with the sailors to
Difficulty of keeping keep the boats at a convenient distance from the vessel,
boats alongside.
to guard against being too far off; as, in that case, the
man, in the act of stepping off the ship’s side, might have been in danger of
falling into the sea. If, on the other hand, the boat was allowed to come in
contact with the vessel, she would have been in danger of being staved or
damaged. This state of things was fortunately not what we had to
commence with, as the weather happened to be, as before noticed, serene,
and the Smeaton’s sides were comparatively low in the water. The excessive
rolling of the Pharos did not therefore come upon the artificers all at once,
otherwise some unpleasant accidents must have happened, for in these
rolling operations, if a stranger had, in a moment of alarm, let go his hold,
at an improper time, he must have been pitched with violence into the sea.
The party being seated in their respective boats, they were pulled to the Bell
Rock in about twenty minutes, from the moorings of the Pharos, when the
water was smooth and the wind moderate. This morning the boats reached
the rock at 8 o’clock; the work commenced exactly at a quarter past 8, and
at half-past 11, the water again began to overflow the parts on which the
artificers were at work. Every tide now gave the writer more pleasant
prospects of the progress of the work than another, especially since the
erection of the smith’s forge.
On leaving the rock to-day, a trial of seamanship was
Artificers become proposed amongst the rowers, for by this time the
expert rowers.
artificers had become tolerably expert in this exercise.
By inadvertency, some of the oars provided had been made of fir instead of
ash, and although a considerable stock had been laid in, the workmen, being
at first awkward in the art, were constantly breaking their oars; indeed, it
was no uncommon thing to see the broken blades of a pair of oars floating
astern, in the course of a passage from the rock to the vessel. The men, upon
the whole, had but little work to perform in the course of a day; for though
they exerted themselves extremely hard while on the rock, yet, in the early
state of the operations, this could not be continued for more than three or
four hours at a time, and as their rations were large,
Rations of artificers. consisting of one pound and a half of beef,—one pound
of ship-biscuit,—eight ounces oatmeal,—two ounces
barley,—two ounces butter,—three quarts of beer,—with vegetables and

Page 148

salt, they got into excellent spirits, when free of sea-sickness. The rowing of
the boats against each other became a favourite amusement; which was
rather a fortunate circumstance, as it must have been attended with much
inconvenience, had it been found necessary to employ a sufficient number
of sailors for this purpose. The writer, therefore, encouraged this spirit of
emulation, and the speed of their respective boats became a favourite topic.
Premiums for boat races were also instituted, which were contended for
with great eagerness, and the respective crews kept their stations in the
boats, with as much precision as they kept their beds on board of the ship.
With these, and other pastimes, when the weather was favourable, the time
passed away, among the inmates of the fore-castle and waist of the ship.
The writer looks back with interest upon the hours of solitude which he
spent in this lonely ship, with his small library.
“Saturday night at This being the first Saturday that the artificers were
Sea.” afloat, all hands were served with a glass of rum and
water at night, to drink the sailors favourite toast of
“Wives and Sweethearts.” It was customary, upon these occasions, for the
seamen and artificers to collect in the galley, when the musical instruments
were put in requisition; for, according to invariable practice, every man
must play a tune, sing a song, or tell a story. In this manner Saturday night,
in particular, passed away in a very happy manner, when much boisterous
mirth and loud peals of laughter occasionally broke forth. It is true, that this
could not proceed from a single glass, but every man sat down with a
determination to be pleased. They had, besides, a pretty liberal allowance of
good small beer, which the rations of the sick increased; and they contrived
to make the glass go round, and seemed to feel no want whatever, while the
ship kept from her excessive rolling motion.
The operations at the Bell Rock were still fortunate
Sunday, 23d.
with regard to the weather. The morning of Sunday set
in with light airs from the south-west, which, towards
mid-day, came to what sailors term fresh breezes, but towards evening it
fell calm, and the weather became foggy.
To some, it may require an apology, or, at least, call for
Reasons for
continuing the work
an explanation, why the writer took upon himself to
on Sunday. step aside from the established rules of society, by
carrying on the works of this undertaking during

Page 149

Sundays. Such practices are not uncommon in the dock-yards and arsenals,
when it is conceived that the public service requires extraordinary exertions.
Surely, if, under any circumstances, it is allowable to go about the ordinary
labours of mankind on Sundays, that of the erection of a light-house upon
the Bell Rock, seems to be one of the most pressing calls which could in
any case occur, and carries along with it the imperious language of
necessity. When we take into consideration, that, in its effects, this work
was to operate in a direct manner for the safety of many valuable lives and
much property, the beautiful and simple parables of the Holy Scriptures,
inculcating works of necessity and mercy, must present themselves to every
mind unbiassed by the trammels of form or the influence of a distorted
imagination. In this perilous work, to give up every seventh day, would just
have been to protract the time a seventh part. Now, as it was generally
supposed, after taking all advantages into view, that the work would
probably require seven years for its execution, such an arrangement must
have extended the operation to at least eight years, and have exposed it to
additional risk and danger, in all its stages. The writer, therefore, felt little
scruple in continuing the Bell Rock works in all favourable states of the
weather.
Having, on the previous evening, arranged matters with
Preparations for
reading prayers on
the landing-master as to the business of the day, the
deck. signal was rung for all hands at half past 7 this
morning. In the early state of the spring-tides, the
artificers went to the rock before breakfast, but as the tides fell later in the
day, it became necessary to take this meal before leaving the ship. At 8
o’clock all hands were assembled on the quarter-deck for prayers, a
solemnity which was gone through in as orderly a manner as circumstances
would admit. Round the quarter-deck, when the weather permitted, the flags
of the ship were hung up as an awning or screen, forming the quarter-deck
into a distinct compartment with colours; the pendant was also hoisted at
the main-mast, and a large ensign flag was displayed over the stern; and,
lastly, the ship’s companion, or top of the staircase, was covered with the
flag proper of the Light-house Service, on which the Bible was laid. A
particular toll of the bell called all hands to the quarter-deck, when the
writer read a chapter of the Bible, and, the whole ship’s company being
uncovered, he also read the following impressive prayer, composed by the
Reverend Dr Brunton, one of the ministers of Edinburgh.

Page 150

A Prayer for the use of those Employed at the Erection of the Bell Rock
Light-House.

“Almighty and ever blessed God! Thou art not confined to temples made with man’s
hands: The temple most acceptable to thee is the heart of thy worshipper: Thou hast
promised, that wherever thy servants are assembled, thou wilt be with them, to bless them
and to do them good. Unto us, O our Father! may the promise be fulfilled. Even here,
where no temple invites, and where no ordinances cheer us, be with us, we beseech thee,
while we meet in thy presence; and strengthen us to discharge the duties of thy holy day.
“The Sabbath was appointed to celebrate thy creating power: And here, where the
magnificence of thy works surrounds us,—where we see thy wonders in the deep,—where
we behold every morning thy Sun arise from the world of waters, to spread, as at the first,
light and beauty over Nature,—shall not our souls pour forth abundantly the tribute of
adoration to thee, whose word alone spake the Universe into being!
“The Sabbath commemorates that Providence which watcheth continually over the works
of thy hand: And shall not we, whom dangers so often threaten, and whom difficulties so
often alarm; shall not we, conscious of our frailty, and removed far from human aid; shall
not we raise the voice of thanksgiving to God, who alone protecteth us, and who, even in
the midst of danger, causeth us to dwell in safety!
“The Sabbath was appointed to commemorate the triumphs of redeeming love: And shall
not we hail it with delight, whose earliest infancy was hallowed in the name of Jesus; on
whose opening minds the doctrines of his faith were poured; who, even in this remote
abode, are permitted to call upon thy holy name in prayer,—to read the Oracles of
everlasting truth,—to speak one to another of the God who hath loved and blessed us!
“Our souls do magnify the Lord, our spirits rejoice in God our Saviour; for he that is
mighty hath done great things for his people, and his mercy is on them that fear him. We
bless thee for the doctrines which our Master taught,—for the example which he set before
us,—for the atonement by which he relieves us from the load of guilt,—for the hope which
he hath restored of grace and glory. We bless thee for the institutions which thou hast
appointed for enlightening thy people in religious knowledge, and for training them to lives
of usefulness and purity. With shame we remember how often we have abused our
Christian privileges,—how often we have neglected the exercises of private devotion,—
how often we have failed to study thy holy word,—how often, while yet it was in our
power to go up to the house of God, we have forsaken the assembling of ourselves
together,—how often we have worshipped thee with our lips, while our hearts were far
from thee. Visit us not, O God! in anger, for our transgression; but do thou enable us to
lament and forsake it. Let not the circumstances in which we now are placed, be permitted
to wean our affections from thy worship. But, while the service of humanity calls us to
labour even on this day of rest, save us,—O thou, who wilt have mercy and not sacrifice!—
save us from the temptation which might lead us to forget our God, and the duties which
we owe to him. Rather, while we are deprived of thine ordinances for a season, do thou
give us grace, through prayer and holy meditation, to compensate the loss; that we may,
with delight, look forward to the time when the courts of thy sanctuary shall be opened to
us again; when we, and those whom we love and value, shall again take sweet counsel
together, and walk in company to the house of God. Give to us, even now, O God of our
salvation! those pious and holy dispositions which will prepare us for the nobler worship,
offered to thee by the Angels of Heaven, and by the Spirits of just men made perfect.

Page 151

“We pray to our common Father in behalf of all mankind. May the day-spring from on high
arise on those who now sit in darkness; and, where the light of the Gospel already shines,
may its influences be felt reviving and purifying.
“We pray especially for our native land;—for her peace,—her prosperity,—her liberties,—
and her honour. We pray for our king, and for all who are in authority over us. We pray
particularly for those by whose command we are engaged in this arduous work. Bless them
in their persons, in their families, and in the discharge of their official duty. Prosper, we
beseech thee, the work itself in which we are engaged. May it remain long after our eyes
have ceased to behold it. Long after our ashes are cold in the dust, may he that was ready to
perish have cause to bless the memory of those by whom it was reared.
“We pray for the people of our land. Purify them unto thyself a peculiar people, zealous of
good works: Bless them in their commerce, and in their harvests: Bless them in the pursuits
of honest industry: Bless them in the relations of domestic life: Bless them, above all, with
spiritual blessings in Christ Jesus.
“May the sons and daughters of affliction be enabled to profit by the bitter lesson with
which thou hast seen it meet to visit them. Restore the sick to usefulness, or prepare the
dying for judgment and eternity. May the living lay it to heart that they must die, and act as
it becometh those who know not how soon they shall be called hence.
“Our friends and families, from whom we are separated for a time, we commit to thy
protection, O God of love! Unspeakably precious is the thought, that thou carest for them,
—that thine eye is upon them continually,—and thine everlasting arms around them. Grant
that, in thy good time, we may meet them in peace;—Grant that we may be united
hereafter in that land where separation and pain are unknown for ever.
“Our enemies we beseech thee to forgive and bless. Bless us, even us also, O our Father!
Give us thy grace in every season of trial;—give us thy protection in every hour of danger.
Prepare us for the dispensations of thy Providence;—prepare us for the discharge of duty;
—prepare us for the inheritance of the just.
“And may grace, and mercy, and peace, from the Father, the Son, and the Holy Ghost, be
with us for ever.”

Upon concluding this service, which was attended with
Some of the artificers
decline working on becoming reverence and attention, all on board retired
Sunday. to their respective births to breakfast, and, at half-past
9, the bell again rung for the artificers to take their
stations in their respective boats. Some demur having been evinced on
board, about the propriety of working on Sunday, which had hitherto been
touched upon as delicately as possible, all hands being called aft, the writer,
from the quarter deck, stated generally the nature of the service, expressing
his hopes that every man would feel himself called upon to consider the
erection of a light-house on the Bell Rock, in every point of view, as a work
of necessity and mercy. He knew that scruples had existed with some, and
these had, indeed, been fairly and candidly urged before leaving the shore;
but it was expected, that, after having seen the critical nature of the rock,

Page 152

and the necessity of the measure, every man would now be satisfied of the
propriety of embracing all opportunities of landing on the rock, when the
state of the weather would permit; and, in short, of exerting every effort in
this as a common cause, at least until the Beacon should be erected, being
an undertaking, on which the lives and safety of all connected with these
works had a constant dependence. The writer, farther, took them to witness,
that it did not proceed from want of respect for the appointments and
established forms of religion that he had himself adopted the resolution of
attending the Bell Rock works on the Sunday; but, as he hoped, from a
conviction that it was his bounden duty, on the strictest principles of
morality. At the same time it was intimated, that if any were of a different
opinion, they should be perfectly at liberty to hold their sentiments, without
the imputation of contumacy or disobedience; the only difference would be
in regard to the pay.
Upon stating this much, he stepped into his boat, requesting all who were so
disposed to follow him. The sailors, from their habits, found no scruple on
this subject, and all of the artificers, though a little tardy, also embarked,
excepting four of the masons, who, from the beginning, mentioned that they
would decline working on Sundays. The boats reached the rock at a quarter
past 10 o’clock a. m., and after a very active tide’s work of two hours and a
half, the water again overflowed the rock. It may here be noticed, that
throughout the whole of the operations, it was observable that the men
wrought, if possible, with more keenness upon the Sundays than at other
times, from an impression that they were engaged in a work of imperious
necessity, which required every possible exertion. On returning to the
floating-light, after finishing the tide’s work, the boats were received by the
part of the ship’s crew left on board, with the usual attention of handing
ropes to the boats, and helping the artificers on board; but the four masons
who had absented themselves from the work did not appear upon deck.
As the season advanced, the period of low water
Additional pay on
Sunday.
occurred later, and the writer did not consider it
advisable, in the present state of the works, to land on
the rock under night, there being nothing to mark its place prior to the
erection of the Beacon. Under more favourable circumstances, he would
willingly have landed this evening, to entitle the artificers who
accompanied him in the morning, to additional wages, as every tide’s work

Page 153

on Sunday counted a day, according to the rate of pay and premiums which
he had laid down.
The weather, upon the whole, was very fine to-day, and
Monday, 24th.
the winds, though variable, were gentle; but from the
mildness of the season, it got rather foggy towards the
Neap-tides. Artificers evening. The boats left the floating-light at a quarter
working knee-deep in
water. past 9 o’clock this morning, and the work began at
three-quarters past 9; but as the neap tides were
approaching, the working-time at the rock became gradually shorter, and it
was now with difficulty that two and a half hours work could be got. But, so
keenly had the workmen entered into the spirit of the Beacon-house
operations, that they continued to bore the holes in the rock till some of
them were knee deep in water. In this work the sailors were also engaged,
taking their turns at the boring and other works.
The operations at this time, were entirely directed to the
Operations entirely
confined to the
erection of the beacon, in which every man felt an equal
Beacon. interest, as at this critical period the slightest casualty to
any of the boats at the rock might have been fatal to
himself individually, while it was perhaps peculiar to the writer more
immediately to feel for the safety of the whole. Each log or upright beam of
the beacon, was to be fixed to the rock by two strong and massive bats or
stanchions of iron, of a construction which will be better understood by
inspecting the diagrams on Plate VIII., and the accompanying description.
These bats, for the fixture of the principal and diagonal beams and bracing-
chains, required fifty-four holes, each measuring two inches in diameter,
and eighteen inches in depth. The operation of boring
Description of the
operation of boring
or drilling these deep holes in the rock, was conducted
the rock. with great dexterity in the following manner: Three
men were attached to each jumper or chisel; one placed
himself in a sitting posture, to guide the instrument and give it a turn at each
blow of the hammer; he also sponged or cleaned out the hole, and supplied
it occasionally with a little water; while the other two, with hammers of
sixteen pounds weight, struck the jumper alternately, generally bringing the
hammer with a swing round the shoulder, after the manner of blacksmiths’
work. The three men relieved each other in the operation of guiding the
jumper and striking with the hammers. The forms of the jumper, hammer,

Page 154

and sponging-rod, are represented in Plate X., Figs. 7, 8, and 9. After many
observations, as to the time occupied in boring these holes, the writer found
that, when the tools were of a very good temper, they could be sunk at the
rate of one inch per minute, including stoppages. The holes for the
stanchions, when completed, measured seven inches in length, two inches
in breadth, and eighteen inches in depth. After a jumper had been sunk to
the necessary depth at each end of these holes, the most tedious part of the
operation was to cut out the piece of rock which remained between the two
jumper-holes, so as to clear it fully for the reception of the great iron
stanchions, which were of a dove-tail form.
Progress of the work.There had already been so considerable a progress
made in boring and excavating these holes, that the
writer’s hopes of getting the beacon erected this year, began to be more and
more confirmed, although it was now advancing towards what was
considered the latter end of the proper working season at the Bell Rock. The
foreman joiner, Mr Francis Watt, was accordingly appointed to attend at the
rock to-day, when the necessary levels were taken for the step or seat of
each particular beam of the beacon, that they might be cut to their
respective lengths, to suit the inequalities of the rock; several of the
stanchions were also tried into their places, and other necessary
observations made, to prevent mistakes on the application of the apparatus,
and to facilitate the operations, when the beams came to be set up, which
would require to be done in the course of a single tide.
We had now experienced an almost unvaried tract of
Tuesday 25th.
light airs of easterly wind, with clear weather in the
fore-part of the day, and fog in the evenings. To-day,
however, it sensibly changed; when the wind came to the south-west, and
blew a fresh breeze. At 9 a. m. the bell rung, and the boats were hoisted out,
and though the artificers were now pretty well accustomed to tripping up
and down the sides of the floating-light, yet it required more seamanship
this morning than usual. It therefore afforded some merriment to those who
had got fairly seated in their respective boats, to see the difficulties which
attended their companions, from the hesitating manner in which they
quitted hold of the man-ropes in leaving the ship. As it blew pretty fresh,
the passage to the rock was tedious, and the boats did not reach it till half-
past 10. By working upon the higher parts of the site of the beacon 1¼

Page 155

hours work was got, though not without difficulty, and the men left off at a
quarter past 12 noon, completely drenched in water.
The masons and pickmen were employed in boring the
Difficult situation of
the Smith.
bat-holes, and in dressing and preparing the rock
between the holes, at the places on which the beams of
the beacon-house were to rest. It being now the period of neap-tides, the
water only partially left the rock, and some of the men, who were boring on
the lower ledges of the site of the beacon, stood knee-deep in water. The
situation of the smith to-day was particularly disagreeable, but his services
were at all times indispensable. As the tide did not leave the site of the
forge, he stood in the water, and as there was some roughness on the
surface, it was with considerable difficulty that, with the assistance of the
sailors, he was enabled to preserve alive his fire; and, while his feet were
immersed in water, his face was not only scorched, but continually exposed
to volumes of smoke, accompanied with sparks from the fire, which were
occasionally set up, owing to the strength and direction of the wind.
The wind had shifted this morning to N. NW. with rain,
Wednesday, 26th.
and was blowing what sailors call a fresh breeze,—for
as yet a correct and efficient wind-gauge remains a
Wind-gauge, and desideratum with the mechanical philosopher; and we
nomenclature for the
winds much wanted. have unfortunately no proper or satisfactory
nomenclature for expressing the force of the wind. To
speak, perhaps, somewhat intelligibly to the general reader, the wind was
such, that a fishing-boat could just carry full sail. The weather did not look
very favourable in the morning; but as it was of importance, especially in
the outset of the business, to keep up the spirit of enterprise for landing on
all practicable occasions, the writer, after consulting with the landing-
master, ordered the bell to be rung for embarking, and at half-past 11 the
boats reached the rock, and left it again at a quarter past 12, without,
however, being able to do much work, as the smith could not be set to work
from the smallness of the ebb and the strong breach of sea, which lashed
with great force among the bars of the forge.
Just as we were about to leave the rock, the wind
Difficult passage from
the Rock to the
shifted to the SW., and, from a fresh gale, it became
Floating-Light. what seamen term a hard gale, or such as would have
required the fisherman to take in two or three reefs in

Page 156

his sail. The boats being rather in a crowded state for this sort of weather,
they were pulled with great difficulty towards the floating-light. Though the
boats were handsomely built, and presented little obstruction to the wind, as
those who were not pulling sat low, yet having the ebb-tide to contend with,
the passage was so very tedious, that it required two hours of hard work
before we reached the vessel.
It is a curious fact, before noticed, that the respective tides of ebb and flood
are apparent upon the shore about an hour and a half sooner than at the
distance of three or four miles in the offing. But what seems chiefly
interesting here is, that the tides around this small sunken rock should
follow exactly the same laws as on the extensive shores of the mainland.
When the boats left the Bell Rock to-day, it was overflowed by the flood-
tide, but the floating-light did not swing round to the flood-tide for more
than an hour afterwards. Under this disadvantage the boats had to struggle
with the ebb-tide and a hard gale of wind, so that it was with the greatest
difficulty they reached the floating-light. Had this gale happened in spring-
tides when the current was strong, we must have been driven to sea in a
very helpless condition.
The boat which the writer steered, was considerably
Life-buoy streamed.
behind the other, one of the masons having unluckily
broken his oar. Our prospect of getting on board, of
course, became doubtful, and our situation was rather perilous, as the boat
shipped so much sea that it occupied two of the artificers to bale and clear
her of water. When the oar gave way, we were about half a mile from the
ship, but being fortunately to windward, we got into the wake of the
floating-light, at about 250 fathoms astern, just as the Landing-master’s
boat reached the vessel. He immediately streamed or floated a life-buoy
astern, with a line which was always in readiness, and by means of this
useful implement, the boat was towed alongside of the floating-light, where,
from her rolling motion, it required no small management to get safely on
board, as the men were much worn out with their exertions in pulling from
the rock. On the present occasion, the crews of both boats were completely
drenched with spray, and those who sat upon the bottom of the boats to bale
them, were sometimes pretty deep in the water, before it could be cleared
out. After getting on board, all hands were allowed an extra dram, and

Page 157

having shifted, and got a warm and comfortable dinner, the affair, it is
believed, was little more thought of.
This was the first difficult or tedious passage which had
Tender ordered
exclusively for the
been experienced in landing at the Bell Rock; it was
service of the Rock. also the first time that the writer had really felt the
inconveniency of not having a vessel entirely set apart
for the purposes of a tender. The floating-light, from the construction of her
moorings, and the service for which she was specially employed, could not
be cast loose or brought to the lea side of the rock in any case of emergency.
Neither could she be risked to ride at moorings near enough to the rock, to
place her in a more eligible situation for the purposes of the work. When
these circumstances were brought under the notice of the Commissioners, it
was ordered that a vessel should be provided, exclusively as a tender for the
operations of the rock; and this was accordingly done before the
commencement of the works of another season.
The tides were now in that state which sailors term the
Thursday, 27th.
dead of the neap, and it was not expected that any part
of the rock would be seen above water to-day; at any
Depth of water in the rate, it was obvious, from the experience of yesterday,
site of the building in
Neap-tides. that no work could be done upon it, and therefore the
artificers were not required to land. The wind was at
west, with light breezes, and fine clear weather; and as it was an object with
the writer to know the actual state of the Bell Rock at neap-tides, he got one
of the boats manned, and, being accompanied by the landing-master, went
to it at a quarter past 12. The parts of the rock that appeared above water
being very trifling, were covered by every wave, so that no landing was
made. Upon trying the depth of water with a boat-hook, particularly on the
sites of the Light-house and Beacon, on the former, at low water, the depth
was found to be three feet, and on the central parts of the latter it was
ascertained to be two feet eight inches. Having made these remarks, the
boat returned to the ship at 2 p. m., and the weather being good, the artificers
were found amusing themselves with fishing. The Smeaton came from
Arbroath this afternoon, and made fast to her moorings, having brought
letters and newspapers, with parcels of clean linen, &c. for the workmen;
who were also made happy by the arrival of three of their comrades from
the work-yard, ashore. From these men they not only received all the news

Page 158

of the work-yard, but seemed themselves to enjoy great pleasure in
communicating whatever they considered to be interesting with regard to
the rock. Some also got letters from their friends at a distance, the postage
of which, for the men afloat, was always free, so that they corresponded the
more readily.
To-day the weather was not quite so agreeable as it had
Friday, 28th.
been yesterday, the wind being south-east, and blowing
what sailors term a fresh breeze, by which we
understand a force of wind that would be sufficient to cause the sails of a
fishing-boat to be reefed. At ½ past 1 p. m., the writer again went to the
rock, accompanied by the landing-master, when a depth of about four feet
of water was found upon the site of the Light-house, which may be
considered a medium depth, as nearly as this could be ascertained in its
present unworked state, but there was some surf upon the rock.
In the course of the night, the wind had shifted from
Saturday, 29th.
SE. to SW., and it blew very hard, being technically
termed a stiff gale, or rather too much wind for a
Some of the Artificers fishing-boat. It was therefore considered unsafe for the
wish to go ashore.
Smeaton to continue at her moorings, and the signal
was made for her to sail for Arbroath; she therefore got under way, but
although there was a packet of letters for the shore, and the artificers had
their memorandums in readiness, yet the floating-light rolled so
unmercifully, that it would have been at the imminent hazard of staving or
dashing a boat to pieces, had it been attempted to put one out. This was a
disappointment in one way, though it answered a good purpose in another,
as two of the three men, who had come last from the work-yard, earnestly
entreated that they might be allowed to return, as they could no longer
endure the rolling of the floating-light, a request in which they were
anxiously accompanied by one of the masons, who had all along been much
afflicted with sea-sickness. These applications were necessarily refused;
they then applied to have an interview with the writer, when they urged the
misery they were likely to suffer on board, without their being able to do
any work at the rock. To the two strangers the difficulty and danger of
putting out a boat was stated, as rendering it impossible for them to leave
the ship; while the third person was reminded of his engagement to remain
afloat for one month. In this manner these two men were put off, with the

Page 159

prospect of better weather in the course of a day or two. With regard to the
other, he had suffered so severely, that the writer would have been happy to
have had him ashore, and he was informed that if his comrades would ask
leave for him, it would be granted. This being readily complied with, he
was left at full liberty to return to the work-yard. But, for the present, the
Smeaton was obliged to pass at a considerable distance, without being able
to communicate with the floating-light.
The wind was N.NE. this morning, in light airs, and the
Sunday, 30th.
weather was clear. This being Sunday, the usual
ceremony was observed at 12 noon, when the writer
Land upon the Rock read prayers on the quarter-deck. The ensuing set of
after five days
absence. spring-tides were now coming to hand, and, at 3 p. m.,
all the artificers embarked for the rock, excepting the
four men who had declined it last Sunday. Their places, however, were
willingly taken by the three men who came last from the shore, who were
happy to get relief from the disagreeable motion of the floating-light upon
any terms. The boats reached the rock at half-past 3; but being rather early
in the tide, the men rested on their oars till 4 o’clock, and then landed on the
different spots as they dried, where they remained till the tide ebbed
sufficiently to allow them to commence work. This was the first time the
artificers had landed on the rock for five days, owing to the state of the
weather and tides, and it was not a little flattering, on this occasion, to see
with what eagerness the workmen leaped upon it. Those who were not
troubled with sea-sickness, felt a degree of languor on board from which
their working hours formed rather a relaxation, while the sickly (by far the
greater number) felt immediate relief upon setting their foot upon terra
firma, even in its most circumscribed boundary. While the water was going
off the rock, the workmen were all busily employed in picking dulse, the
Fucus palmatus of botanists, and indeed any other of the marine plants
which happened to lie within their reach. Those who were the greatest
sufferers from sea-sickness always ate the most greedily upon these
occasions. Such incidental circumstances tended greatly to keep up the
desire for landing at the rock, and seemed, in some measure, to compensate
for the labour of rowing to and from it.
The operation of boring the bat-holes being in great forwardness, the men
were now chiefly employed in chiselling or cutting out the piece of rock

Page 160

which remained between each pair of jumper-holes,
Method of fixing the forming a ridge of about two inches in thickness. When
stanchions in the rock.
this was cleared away, the bat-hole was of the proper
form, and, as before noticed, it measured about seven inches in length, two
inches in breadth, and eighteen inches in depth, an excavation which, from
its dimensions, must readily appear to have been attended with much
difficulty. The holes, though bored with the same size of chisels, as nearly
as might be, were not precisely of the same size; but this was not essential,
as the stanchion, when wedged in its place, completely filled the aperture.
This operation of chiselling out the middle piece, and widening the hole in
the form of a dove-tail, was a much more intricate and tedious operation
than boring perpendicularly with the jumper. At that process three men
worked with great celerity, whereas two only could be employed in cutting
out the divisions and widening the holes.
The site of the building having already been carefully traced out with the
pick-axe, the artificers, this day, commenced the excavation of the rock, for
the foundation or first course of the light-house. Four men only were
employed at this work, while twelve continued at the site of the Beacon-
house, at which every possible opportunity was embraced, till this essential
part of the operations should be completed. After having been two hours
upon the rock this tide, the water began to rise upon the smith’s forge and
the site of the Beacon-house, and at ¼ past 6 o’clock p. m. the artificers left
the rock.
The winds varied to-day from N.NE. to S. Though it
Monday, 31st.
blew pretty fresh, it was not accompanied with any
swell in the sea, and the weather upon the whole was
Longest day’s work very pleasant. At half-past 3 in the morning, the writer
hitherto had on the
Bell Rock. was called by the landing-master, to consult about the
state of the weather, and the practicability of landing
upon the rock. After some hesitation, the result was to proceed: the signal
bell for getting the boats ready was rung at 4 a. m., when all hands took to
their respective boats, and at half-past 4 the work commenced at the rock: it
continued till half-past 7, allowing an excellent tide’s work of three hours,
when the artificers again returned to the floating-light, and remained till the
evening tide. At 4 p. m. they landed, but did not begin to work till a quarter
from 5 o’clock, when the water had sufficiently left the rock. At a quarter

Page 161

past 7 it was overflowed, when the boats returned to the ship, and the writer
was not a little elated, as the morning and evening tide had afforded no less
than five and a half hours work, being the greatest day’s work hitherto
obtained on the Bell Rock.
The weather was extremely pleasant throughout these
September, Tuesday,
1st.
twenty-four hours, though the wind veered and shifted
about from N.W. to W.SW. At 4 o’clock this morning
the bell made rather an unwelcome call, but all hands readily turned out. As
before mentioned, when the work commenced at these early hours, a dram
and a biscuit were served out to the artificers; and the writer, upon these
occasions, found a cup of coffee very salutary. Having landed at a quarter
from 5, the work was continued for three and a half hours, four men, as
before noticed, being employed on the site of the Light-house, and twelve at
the Beacon-house. The water overflowed the rock at a quarter past 7, when
the boats returned to the floating-light.
The Smeaton had arrived from Arbroath in the course
Smeaton brings off
the experimental
of the last night, and made fast to her moorings at the
cargo of stone. eastern buoy, which was nearest to the rock, as will be
seen from Plate V. Agreeably to appointment, she had
brought off six blocks of granite, for the purpose of making an experiment
regarding the landing of the stones on the rock. She also had in tow the
praam, or decked boat, brought from Leith astern of the Pharos, of which
mention has already been made. This boat, in smooth water, could carry
about six or seven tons upon deck.
The writer had looked forward to the trial of landing
Various suggestions
about landing the
weighty materials upon the rock, as a matter which was
stones. to determine an important point in the operations of the
Bell Rock light-house, and which could hardly be
resolved by any other means than actual trial. This part of the operation had
always been a matter of the greatest uncertainty with those conversant in
such matters, and it became essential to determine the point at this period,
by actual trial, before proceeding to the preparation of the craft and
apparatus requisite for the works of next season, which it would not have
been safe or prudent to rest upon doubtful hypothesis. In speculating upon
this point, some had suggested that each particular stone should be floated
to the rock, with a cork-buoy attached to it, while others would convert the

Page 162

float into an air-tank for this purpose; a third proposed to sail over the rock
at high water, in a vessel of a flat construction, and drop the stones one after
another, while under way, or at anchor on the rock. Others took up a still
more extraordinary view of the case, and proposed to build so much of the
Light-house ashore, in a kind of coffer-dam or vessel, as would raise the
building to the level of the highest tide, and having previously prepared the
rock for its reception, they would scuttle the vessel, and settle this
ponderous mass, weighing perhaps 1000 tons, at once upon the rock. But it
were endless to follow the various conceptions, even of men of experience,
upon subjects of this kind. Though some of these propositions were
ingeniously conceived, yet they could not be carried into effect in such a
situation as the Bell Rock. Taking into view the uncertain state of the
weather, the brittle nature of stone, when worked to a delicate edge and
formed into angular points,—and, above all, considering the disadvantages
that would attend the loss, even of a single stone, by the unavoidable delay
it would occasion to the work, which might even in some instances hazard a
great part of the building,—the writer judged it safest to keep the vessels
that were to bring the stones from the workyard at moorings, laid down at a
convenient distance from the rock, so as to enable them to clear it, in case
of drifting. He also determined, as the safest method, that their cargoes
should be unloaded at these moorings, laid on decked praam-boats, and
towed to the rock by the landing-master’s crew, at low water, when the
artificers were at work, and ready to lay and secure the stones in their places
on the building. To put this to the test of actual experiment, the trial praam-
boat had been built, and the six rough blocks of stone were brought to the
rock.
The middle part of this day was occupied by the writer
Experiment of landing
on board of the Smeaton, at her moorings, where he
six blocks of Granite.
carefully attended to the process of bringing the praam
alongside, fixing her head and stern-ropes, and stationing the seamen at
their respective posts, for the purpose of landing this small, but, in his view,
important cargo. The mode by which the stones were taken out of the
Smeaton’s hold, and lowered on the praam’s deck, will be understood from
Plate XI. This was done by means of a gaff-boom, which traversed upon the
Smeaton’s mast, with the necessary tackles for guying it. An essential part
of this tackle was a travelling-crance, or ring of iron, by which the stone
might be lifted either at the extremities or at the central parts of the boom,

Page 163

as best suited its position in the ship’s hold, or its intended place on the
praam’s deck. The length of this gaff-boom was thirteen feet, being
sufficient for lowering the stone upon the praam. Another part of this
apparatus, for lifting the stone, was a winch, fixed before the Smeaton’s
mast, consisting of a wheel two feet in diameter, worked by a pinion. The
stone being raised from the vessel’s hold, was laid on her deck, in order to
shift the crance tackle to the extremity of the gaff-boom. The chief charge
of the stone was then taken by the landing-master, till it was laid on the
praam’s deck, landed on the rock, and ultimately delivered over to the
foreman builder. In the act of working this apparatus, one man was placed
at each of the guy-tackles, who also assisted at the purchase-tackle for
raising the stone; and one of the ablest and most active of the crew was
appointed to hold on the end of the tackle-fall or purchase, which often
required all his strength, and his utmost agility in letting go, for the purpose
of lowering the stone at the instant when the word “Lower” was heard.
Much depended upon the promptitude with which this part of the operation
was performed, in a rolling sea, as our nautical readers will readily
understand. For this purpose, the man who held the end of the tackle placed
himself before the mast in a sitting, but more frequently in a lying posture,
with his feet stretched under the winch, and abutting against the mast, as, by
this means, he was enabled to exert his greatest strength. The signal being
given by the men in the hold, that the Lewis-bat was fixed into the stone,
and the tackle hooked, every man took his post. If the stone was very
weighty, the two men who were to receive it on board of the praam, assisted
in working the purchase, till the stone was got out of the hold, to be laid
upon deck, when the word “Lower” was given, in an audible and stern tone
of voice. After the traveller was shifted upon the gaff boom, the praam-men
returned to their post, and the stone was again lifted to a sufficient height, to
clear the vessel’s gunwale, when great attention became necessary in
working the guy-tackles, till the stone was brought over the praam’s deck,
and the watchword “Lower” given, if possible, with greater force than
before. The tackles were then unhooked, and in this manner the operation
proceeded until the stones were got on board of the praam-boat.
This description may seem particular; but the reason will appear obvious,
when it is recollected, that the landing of the materials has been considered
one of the most nice and difficult parts of seamanship, and on which the
best informed seamen were unable to say how it might answer, without

Page 164

great risk to the crew, and damage to the stones, and even occasionally
losing them between the ship and the praam-boat. Both vessels being afloat,
and riding in the open sea, at the distance of about a quarter of a mile from
the Bell Rock, their motion was instantly communicated to the landing-gaff,
and so to the stone in the tackle. The six blocks of granite having been
placed upon the praam’s deck, she was towed to a floating-buoy, where she
was made fast, until the proper time of tide, for taking her into one of the
creeks of the rock.
At a quarter past 4 p. m., the boats, with the artificers,
Stones first landed on
the Rock.
left the floating-light, and the work of the evening tide
commenced at a quarter before 5. The sailors having
previously decorated the ships and the praam-boat with flags, she was
towed to the rock by two boats. The writer having resolved personally to
attend the whole progress of this experiment went on board of the praam-
boat, when she entered the eastern creek, where the foreman builder, at the
head of the artificers, gave three hearty cheers. As the praam had not water
to float her so far up the creek as the site of the building, her cargo was
delivered upon Smith’s Ledge, on the north side of this creek, as marked on
Plate VI. In the present unprepared state of the machinery and implements
upon the rock, the stones, in the present case, were raised with pinches, and
pushed ashore upon planks. The whole of this experiment succeeded to the
writer’s utmost expectation, who was thus led to conclude, that the
materials might be landed with much more expedition and certainty than he
had previously supposed. All hands spontaneously collected to witness the
landing of the first stone, which had no sooner touched the rock, than other
three cheers were given, and, on this occasion, a glass of rum was served
out by the steward. Having continued two hours upon the rock this evening,
the artificers left it at 7, and returned to the floating-light, while the landing-
master’s crew towed the praam-boat off to the Smeaton, that she might be
taken to Arbroath, having completed all that was intended with her, this
season.
The floating-light’s bell rung this morning at half-past 4
1807, September. o’clock, as a signal for the boats to be got ready, and the
landing took place at half-past 5. In passing the
Wednesday, 2d. Smeaton, at her moorings near the rock, her boat
followed with eight additional artificers who had come

Page 165

from Arbroath with her at last trip, but there being no
First mode of room for them in the floating-light’s boats, they had
attaching the vessels
to their moorings. continued on board. The weather did not look very
promising in the morning, the wind blowing pretty
fresh from W.SW.; and had it not been that the writer calculated upon
having a vessel so much at command, in all probability he would not have
ventured to land. The Smeaton rode at what sailors call a salvagee, with a
cross-head made fast to the floating-buoy. This kind of attachment was
found to be more convenient, than the mode of passing the hawser through
the ring of the buoy, when the vessel was to be made fast. She had then only
to be steered very close to the buoy, when the salvagee was laid hold of
with a boat-hook, and the bite of the hawser thrown over the cross-head,
instead of being obliged to put out the boat, in order to pass the rope
through the ring of the buoy. But the salvagee, by this method, was always
left at the buoy, and was, of course, more liable to chaff and wear than a
hawser passed through the ring, which could be wattled with canvas, and
shifted at pleasure. The salvagee and cross method is, however, much
practised; but the experience of this morning showed it to be very
unsuitable for vessels riding in an exposed situation, for any length of time.
Soon after the artificers landed, they commenced work;
Smeaton breaks adrift
from her moorings.
but the wind coming to blow hard, the Smeaton’s boat
and crew, who had brought their complement of eight
men to the rock, went off to examine her riding ropes, and see that they
were in proper order. The boat had no sooner reached the vessel than she
went adrift, carrying the boat along with her, and both had even got to a
considerable distance before this situation of things was observed, every
one being so intent upon his own particular duty, that the boat had not been
seen leaving the rock. As it blew hard, the crew with much difficulty set the
mainsail upon the Smeaton, with a view to work her up to the buoy, and
again lay hold of the moorings. By the time that she was got round to make
a tack towards the rock, she had drifted at least three miles to leeward, with
the praam-boat astern; and having both the wind and a tide against her, the
writer perceived, with no little anxiety, that she could not possibly return to
the rock till long after its being overflowed; for, owing to the anomaly of
the tides formerly noticed, the Bell Rock is completely under water before
the ebb abates to the offing.

Page 166

In this perilous predicament, indeed, he found himself
Perilous situation ofplaced between hope and despair,—but certainly the
those left on the
Rock. latter was by much the most predominant feeling of his
mind,—situate upon a sunken rock in the middle of the
ocean, which, in the progress of the flood-tide, was to be laid under water to
the depth of at least twelve feet in a stormy sea. There were this morning
thirty-two persons in all upon the rock, with only two boats, whose
complement, even in good weather, did not exceed twenty-four sitters; but,
to row to the floating-light with so much wind, and in so heavy a sea, a
complement of eight men for each boat, was as much as could, with
propriety, be attempted, so that, in this way, about one-half of our number
was unprovided for. Under these circumstances, had the writer ventured to
dispatch one of the boats in expectation of either working the Smeaton
sooner up towards the rock, or in hopes of getting her boat brought to our
assistance, this must have given an immediate alarm to the artificers, each
of whom would have insisted upon taking to his own boat, and leaving the
eight artificers belonging to the Smeaton to their chance. Of course, a
scuffle might have ensued, and it is hard to say, in the ardour of men
contending for life, where it might have ended. It has even been hinted to
the writer, that a party of the pickmen were determined to keep exclusively
to their own boat against all hazards.
The unfortunate circumstance of the Smeaton and her boat having drifted,
was, for a considerable time, only known to the writer, and to the landing-
master, who removed to the farther point of the rock, where he kept his eye
steadily upon the progress of the vessel. While the artificers were at work,
chiefly in sitting or kneeling postures, excavating the rock, or boring with
the jumpers, and while their numerous hammers, and the sound of the
smith’s anvil continued, the situation of things did not appear so awful. In
this state of suspense, with almost certain destruction at hand, the water
began to rise upon those who were at work on the lower parts of the sites of
the Beacon and Light-house. From the run of sea upon the rock, the forge
fire was also sooner extinguished this morning than usual, and the volumes
of smoke having ceased, objects in every direction became visible from all
parts of the rock. After having had about three hours work, the men began,
pretty generally, to make towards their respective boats for their jackets and
stockings, when, to their astonishment, instead of three, they found only
two boats, the third being adrift with the Smeaton. Not a word was uttered

Page 167

by any one, but all appeared to be silently calculating their numbers, and
looking to each other with evident marks of perplexity depicted in their
countenances. The landing-master, conceiving that blame might be attached
to him for allowing the boat to leave the rock, still kept at a distance. At this
critical moment, the author was standing upon an elevated part of Smith’s
Ledge, where he endeavoured to mark the progress of the Smeaton, not a
little surprised that her crew did not cut the praam adrift, which greatly
retarded her way, and amazed that some effort was not making to bring at
least the boat, and attempt our relief. The workmen looked steadfastly upon
the writer, and turned occasionally towards the vessel, still far to leeward.
All this passed in the most perfect silence, and the melancholy solemnity of
the group made an impression never to be effaced from his mind.
The writer had all along been considering of various
Pilot boat accidentally
comes to our relief.
schemes,—providing the men could be kept under
command,—which might be put in practice for the
general safety, in hopes that the Smeaton might be able to pick up the boats
to leeward, when they were obliged to leave the rock. He was, accordingly,
about to address the artificers on the perilous nature of their circumstances,
and to propose, That all hands should unstrip their upper clothing, when the
higher parts of the rock were laid under water; that the seamen should
remove every unnecessary weight and encumbrance from the boats; that a
specified number of men should go into each boat, and that the remainder
should hang by the gunwales, while the boats were to be rowed gently
towards the Smeaton, as the course to the Pharos or floating-light lay rather
to windward of the rock. But when he attempted to speak, his mouth was so
parched, that his tongue refused utterance, and he now learned by
experience that the saliva is as necessary as the tongue itself for speech. He
then turned to one of the pools on the rock and lapped a little water, which
produced immediate relief. But what was his happiness, when, on rising
from this unpleasant beverage, some one called out “A boat, a boat!” and,
on looking around, at no great distance, a large boat was seen through the
haze making towards the rock. This at once enlivened and rejoiced every
heart. The timeous visitor proved to be James Spink, the Bell Rock pilot,
who had come express from Arbroath with letters. Spink had, for some
time, seen the Smeaton, and had even supposed, from the state of the
weather, that all hands were on board of her, till he approached more nearly,
and observed people upon the rock; but not supposing that the assistance of

Page 168

his boat was necessary to carry the artificers off the rock, he anchored on
the lee-side and began to fish, waiting, as usual, till the letters were sent for,
as the pilot-boat was too large and unwieldy for approaching the rock, when
there was any roughness or run of the sea at the entrance of the landing
creeks.
Upon this fortunate change of circumstances, sixteen of
The boats have a
rough passage from
the artificers were sent, at two trips, in one of the boats,
the rock. with instructions for Spink to proceed with them to the
floating-light. This being accomplished, the remaining
sixteen followed in the two boats belonging to the service of the rock.
Every one felt the most perfect happiness at leaving the Bell Rock this
morning, though a very hard and even dangerous passage to the floating-
light still awaited us, as the wind, by this time, had encreased to a pretty
hard gale, accompanied with a considerable swell of sea. The boats left the
rock about 9, but did not reach the vessel till 12 o’clock noon, after a most
disagreeable and fatiguing passage of three hours. Every one was as
completely drenched in water as if he had been dragged astern of the boats.
The writer in particular, being at the helm, found, on getting on board, that
his face and ears were completely coated with a thin film of salt from the
sea spray, which broke constantly over the bows of the boat. After much
baling of water and severe work at the oars, the three boats reached the
floating-light, where some new difficulties occurred in getting on board in
safety, owing partly to the exhausted state of the men, and partly to the
violent rolling of the vessel.
As the tide flowed, it was expected that the Smeaton
Smeaton bears away
for Arbroath.
would have got to windward, but, seeing that all was
safe, after tacking for several hours, and making little
progress, she bore away for Arbroath, with the praam boat. As there was
now too much wind for the pilot-boat to return to Arbroath, she was made
fast astern of the floating-light, and the crew remained on board till next
day, when the weather moderated. There can be very little doubt, that the
appearance of James Spink with his boat, on this critical occasion, was the
means of preventing the loss of lives at the rock this morning. When these
circumstances, some years afterwards, came to the knowledge of the Board,
a small pension was ordered to our faithful pilot, then in his seventieth year;

Page 169

and he still continues to wear the uniform clothes and badge of the Light-
house service.
The experience of this day’s hard passage to the
Indispensable utility
of the Beacon-house.
floating-light strongly impressed the writer with the
inconveniency and danger arising from the want of a
proper tender, which could be cast loose at pleasure, and brought to the lee-
side of the rock, and could, at all times, be moored nearer than it would
have been safe or proper to have risked a vessel of the description of the
floating-light. Another circumstance, no less deeply interesting to the safety
of those on the rock, was the erection of the beacon-house, as a place of
refuge in cases like the present. Here the writer could not help
congratulating himself not only upon the near prospect of completing this
work, but also on the perseverance with which he had maintained the
indispensable necessity of the erection of the beacon. He was aware of the
well grounded fears for the safety of all concerned, in the event of its being
washed away by the sea; but, without such an erection on the Bell Rock, it
is impossible to describe the continual hazard which must have attended the
undertaking, or to determine the period when works so peculiarly situate,
and especially so low in the water, might have been brought to a conclusion.
The bell rung this morning at 5 o’clock, but the writer
Thursday, 3d.
must acknowledge, from the circumstances of
yesterday, that its sound was extremely unwelcome.
Eighteen of the This appears also to have been the feelings of the
artificers decline
embarking for the artificers, for when they came to be mustered, out of
rock. twenty-six, only eight, besides the foreman and seamen,
appeared upon deck, to accompany the writer to the
rock. Such are the baneful effects of any thing like misfortune or accident
connected with a work of this description. The use of argument to persuade
the men to embark, in cases of this kind, would have been out of place, as it
is not only discomfort, or even the risk of the loss of a limb, but life itself,
that becomes the question. The boats, notwithstanding
The boats proceed
with eight.
the thinness of our ranks, left the vessel at half-past 5.
The rough weather of yesterday having proved but a
summer’s gale, the wind came to-day in gentle breezes, yet the atmosphere
being cloudy, it had not a very favourable appearance. The boats reached
the rock at 6 a. m., and the eight artificers who landed, were employed in

Page 170

clearing out the bat-holes for the beacon-house, and had a very prosperous
tide of four hours work, being the longest yet experienced by half an hour.
The boats left the rock again at 10 o’clock, and the weather having cleared
up as we drew near the vessel, the eighteen artificers who had remained on
board were observed upon deck; but as the boats approached, they sought
their way below, being quite ashamed of their conduct. This was the only
instance of refusal to go to the rock which occurred during the whole
progress of the work, excepting that of the four men who declined working
upon Sunday, a case which the writer did not conceive to be at all analogous
to the present. It may here be mentioned, much to the credit of these four
men, that they stood foremost in embarking for the rock this morning.
Indeed, it seemed quite evident, that the backwardness of the artificers to-
day arose from certain doubting expressions about the state of the weather,
made through the inadvertency of some of the nautical people on board, in
allusion to the state of the weather of yesterday.
A second landing was made in the evening tide, at a quarter past 6, with
twenty of the artificers, six having been left on board for want of sitting-
room in the boats; but as the work was not carried on with torch-light, till
after the erection of the beacon-house, the boats left the rock again at a
quarter past 7, the men having been employed chiefly at the bat-holes of the
beacon-house.
All hands, twenty-six in number, landed this morning,
Friday, 4th.
having been assisted by the Smeaton’s boat, as she had
again returned from Arbroath to her moorings at the
rock. After three hours’ work, the boats returned to the Pharos at a quarter
past 10, leaving eight hands on board the Smeaton, as formerly, which
preserved a convenient complement of sitters in the other two boats.
From the late accident of the Smeaton’s drifting,
Captain Pool’s
precautionary measures were taken to impress upon
account of the drifting
of the Smeaton. Captain Pool, and his mate Mr Macurich, that their ship
was not once to be put in competition with the safety of
the people on the rock. Orders were also more strictly enforced upon the
landing-master, that on no occasion whatever should the boats attending the
rock be permitted to leave it, without carrying along with them the
complement of men which they respectively brought to the rock. Upon

Page 171

examining the master of the Smeaton as to the circumstances of his vessel
breaking adrift, it appeared that the salvagee had been chaffed, and that it
had given way by the excessive motion of the vessel. Being also examined
as to his intentions with regard to the people left on the rock on the 2d
instant, he stated, that, when tacking the ship, he had seen the Pilot-boat a
considerable time before it was likely that she could be seen at the rock; and
that he was just about to cut the praam adrift, when he got sight of the boat.
After setting sail on the Smeaton, his intentions were to try a tack or two, to
see if she gained to windward, but if, on trial, she appeared to lose way, his
intentions were to lash the helm to leeward, and leaving the boy on board of
the vessel, he was to man the boat and make towards our relief. Captain
Pool, in concluding his account of this matter, added, that “both ship and
praam should have gone to the d——l, rather than that the people upon the
rock should have been left to perish.” But he stated, that he was in much
confusion for a time;—indeed, until he got sight of the pilot boat, that he
was almost in a state of distraction, he and his ship’s company being in a
continual wrangle about what was best to be done in so critical a situation.
This accident put an end to the mode of riding at the Bell Rock floating
buoys by a salvagee and cross-head, the hawser being in future passed
through the ring of the buoy, and the end of it taken on board of the vessel;
which was found to be much more safe, though not quite so expeditious as
the other.
The wind having shifted to N.NW., the weather had a
Saturday, 5th.
favourable appearance this morning. But on landing at
the rock at 7 a. m., there was a considerable swell from
the eastward, so that the boats had some difficulty in approaching the
eastern creek. The artificers, however, had a most excellent tide’s work,
having continued four hours at work, or till 11 o’clock. The boring and
preparations for the Beacon-house being nearly completed, only twelve of
the artificers were employed at this work, while fourteen were excavating
and preparing the site of the Light-house.
This being the third day after new moon, it was
Ascertain the
comparative level of
estimated the lowest ebb of the present spring-tides.
the site of the The writer therefore caused a part of the site of the
building. building to be reduced to what he considered a medium
level of the whole. This he compared with low water-

Page 172

mark, as noted by the landing-master, at the moment when the tide ceased
to ebb and began to flow. An assistant with a rod having been stationed at
low water-mark previously determined, another was placed at the spot
ascertained to be the medium level of the site of the building; a spirit-level
was then set at a convenient position between these upright rods, when the
writer found that the medium height of the site of the building, in the
present rough and irregular state of its surface, was about three feet three
inches above low water-mark of spring tides. By further observation, it was
also found, that the highest part of the foundation of the building, in its
present unprepared state, was six feet above low water-mark. This highest
part consisted of a large rounded mass, which declined gradually on all
sides, excepting on the north-east, where it was more abrupt. The writer had
originally some thought of taking advantage of this part of the rock, by
connecting it, after Mr Smeaton’s plan, with the lower courses of the
building. But after working for some time, with this object in view, it was
found to contain several large fissures, which rendered it more advisable to
clear away the whole, and reduce the site of the building to a uniform level.
Finding it impossible, with any degree of safety, to
Full complement of
Floating Buoys
carry to the floating-light, in the two boats belonging to
moored. this ship, more than eighteen artificers, and four
seamen, together with the landing-master, the foreman
and the writer, eight of the present complement of men were lodged on
board of the Smeaton, and when she went to Arbroath for water and fuel,
they necessarily accompanied her. Before sailing, she laid down a fourth
mushroom-anchor, and mooring-chain, with a floating buoy, for the use of
the praam-boat. It was not at all likely that there would be much use for so
many sets of moorings for the operations of this season; but it was desirable
to have the probable number laid down that might ultimately be required for
the works, in order that the fitness of their respective situations might be
ascertained, before they came to be wanted for the purposes of the building.
This last buoy was laid down in four fathoms water, with twelve fathoms of
chain, at the distance of about ninety fathoms, in a N.E. direction from the
rock. The other three buoys were respectively moored at greater distances
from the rock, in depths varying from seven to eleven fathoms, the
mushroom anchors lying on a hard rocky bottom.

Page 173

As before noticed, the work could not be carried on by
Floating-Light rides torch-light with any degree of safety, till the Beacon
out a heavy gale of
wind. was erected, and the tide fell rather late for landing this
evening. Although the weather would have admitted of
this, yet the swell of the sea, observable in the morning, still continued to
increase. It was so far fortunate that a landing was not attempted, for at 8
o’clock the wind shifted to E. SE. and at 10 it had become a hard gale,
when fifty fathoms of the floating-light’s hempen cable were veered out.
The gale still increasing, the ship rolled and laboured excessively, and at
midnight eighty fathoms of cable were veered out; while the sea continued
to strike the vessel with a degree of force which had not before been
experienced.
During the last night there was little rest on board of the
Sunday, 6th. Pharos, and day-light, though anxiously wished for,
brought no relief, as the gale continued with unabated
violence. The sea struck so hard upon the vessel’s bows, that it rose in great
quantities, or in “green seas,” as the sailors termed it, which were carried by
the wind as far aft as the quarter-deck, and not unfrequently over the stern
of the ship altogether. It fell occasionally so heavily on the skylight of the
writer’s cabin, though so far aft as to be within five feet of the helm, that the
glass was broken to pieces before the dead-light could be got into its place,
so that the water poured down in great quantities. In shutting out the water,
the admission of light was prevented, and in the morning all continued in
the most comfortless state of darkness. About 10 o’clock a. m., the wind
shifted to NE., and blew, if possible, harder than before, and it was
accompanied by a much heavier swell of sea; when it was judged advisable
to give the ship more cable. In the course of the gale, the part of the cable in
the hause-hole had been so often shifted, that nearly the whole length of one
of her hempen cables, of 120 fathoms, had been veered out, besides the
chain-moorings. The cable for its preservation, was also carefully served or
wattled with pieces of canvass round the windlass, and with leather well
greased in the hause-hole. In this state things remained during the whole
day. Every sea which struck the vessel,—and the seas followed each other
in close succession,—causing her to shake, and all on board occasionally to
tremble. At each of these strokes of the sea, the rolling and pitching of the
vessel ceased for a time, and her motion was felt as if she had either broke
adrift before the wind, or were in the act of sinking; but when another sea

Page 174

came, she ranged up against it with great force, and this became the regular
intimation of our being still riding at anchor.
About 11 o’clock, the writer, with some difficulty, got
State of the vessel
during the gale.
out of bed, but in attempting to dress, he was thrown
twice upon the floor, at the opposite side of the cabin.
In an undressed state, he made shift to get about half way up the
companion-stairs, with an intention to observe the state of the sea and of the
ship upon deck, but he no sooner looked over the companion, than a heavy
sea struck the vessel, which fell on the quarter-deck, and rushed down stairs
into the officers’ cabin, in so considerable a quantity, that it was found
necessary to lift one of the scuttles in the floor, to let the water into the
limbers of the ship, as it dashed from side to side in such a manner, as to
run into the lower tier of beds. Having been foiled in this attempt, and being
completely wetted, he again, got below and went to bed. In this state of the
weather the seamen had to move about the necessary or indispensable
duties of the ship, with the most cautious use both of hands and feet, while
it required all the art of the landsman to keep within the precincts of his
bed. The writer even found himself so much tossed about, that it became
necessary, in some measure, to shut himself in bed, in order to avoid being
thrown into the floor. Indeed, such was the motion of the ship, that it
seemed wholly impracticable to remain in any other than a lying posture.
On deck the most stormy aspect presented itself; while below all was wet
and comfortless.
About 2 o’clock p. m., a great alarm was given throughout the ship, from the
effects of a very heavy sea which struck her, and almost filled the waist,
pouring down into the births below, through every chink and crevice of the
hatches and sky-lights. From the motion of the vessel being thus suddenly
deadened or checked, and from the flowing in of the water above, it is
believed there was not an individual on board who did not think, at the
moment, that the vessel had foundered, and was in the act of sinking. The
writer could withstand this no longer, and as soon as she again began to
range to the sea, he determined to make another effort to get upon deck. In
the first instance, however, he groped his way in darkness from his own
cabin through the births of the officers, where all was quietness. He next
entered the galley and other compartments occupied by the artificers: here
also all was shut up in darkness, the fire having been drowned out in the

Page 175

early part of the gale: several of the artificers were employed in prayer,
repeating psalms, and other devotional exercises in a full tone of voice:
others protesting, that if they should fortunately get once more on shore, no
one should ever see them afloat again. With the assistance of the landing-
master, the writer made his way holding on step by step, among the
numerous impediments which lay in the way. Such was the creaking noise
of the bulk-heads or partitions, the dashing of the water, and the whistling
noise of the winds, that it was hardly possible to break in upon such a
confusion of sounds. In one or two instances, anxious and repeated inquiries
were made by the artificers, as to the state of things upon deck, to which the
Captain made the usual answer, that it could not blow long in this way, and
that we must soon have better weather. The next birth in succession, moving
forward in the ship, was that allotted for the seamen. Here the scene was
considerably different. Having reached the middle of this darksome birth,
without its inmates being aware of any intrusion, the writer had the
consolation of remarking, that although they talked of bad weather, and the
cross accidents of the sea, yet the conversation was carried on in that sort of
tone and manner which bespoke an ease and composure of mind, highly
creditable to them, and pleasing to him. The writer immediately accosted
the seamen about the state of the ship. To these inquiries they replied, that
the vessel being light, and having but little hold of the water, no top rigging,
with excellent ground-tackle, and every thing being fresh and new, they felt
perfect confidence in their situation.
It being impossible to open any of the hatches in the fore part of the ship, in
communicating with the deck, the watch was changed by passing through
the several births to the companion-stair leading to the quarter-deck. The
writer, therefore, made the best of his way aft, and on a second attempt to
look out, he succeeded, and saw indeed an astonishing sight. The seas, or
waves, appeared to be ten or fifteen feet in height of unbroken water, and
every approaching billow seemed as if it would overwhelm our vessel, but
she continued to rise upon the waves, and to fall between the seas in a very
wonderful manner. It seemed to be only those seas which caught her in the
act of rising, which struck her with so much violence, and threw such
quantities of water aft. On deck there was only one solitary individual
looking out, to give the alarm, in the event of the ship breaking from her
moorings. The seaman on watch continued only two hours; he who kept
watch at this time, was a tall slender man of a black complexion; he had no

Page 176

great coat nor over-all of any kind, but was simply dressed in his ordinary
jacket and trowsers: his hat was tied under his chin with a napkin, and he
stood aft the foremast, to which he had lashed himself with a gasket or
small rope round his waist, to prevent his falling upon deck, or being
washed overboard. When the writer looked up, he appeared to smile, which
afforded a farther symptom of the confidence of the crew in their ship. This
person on the watch was as completely wetted as if he had been drawn
through the sea, which was given as a reason for his not putting on a great
coat, that he might wet as few of his clothes as possible, and have a dry
shift when he went below. Upon deck, every thing that was moveable was
out of sight, having either been stowed below, previous to the gale, or been
washed overboard. Some trifling parts of the quarter boards were damaged
by the breach of the sea; and one of the boats upon deck was about one-
third full of water, the oyle-hole or drain having been accidentally stopped
up,—and part of her gunwale had received considerable injury. These
observations were hastily made, and not without occasionally shutting the
companion, or covering up the stair-case, to avoid being wetted by the
successive seas which broke over the bows, and fell upon different parts of
the deck, according to the impetus with which the waves struck the vessel.
By this time it was about 3 o’clock in the afternoon, and the gale, which had
now continued with unabated force for 27 hours, had not the least
appearance of going off.
In the dismal prospect of undergoing another night like
Consultation about
the probable event of
the last, and being in imminent hazard of parting from
her breaking adrift. our cable, the writer thought it necessary to advise with
the master and officers of the ship as to the probable
event of the vessel’s drifting from her moorings. They severally gave it as
their opinion, that we had now every chance of riding out the gale, which,
in all probability, could not continue with the same fury many hours longer;
and that even if she should part from her anchor, the storm-sails had been
laid to hand, and could be bent in a very short time. They further stated, that
from the direction of the wind being NE., she would sail up the Firth of
Forth to Leith Roads. But if this should appear doubtful, after passing the
Island and Light of May, it might be advisable at once to steer for
Tyningham Sands, on the western side of Dunbar, and there run the vessel
ashore. If this should happen at the time of high-water, or during the ebbing
of the tide, they were of opinion, from the flatness and strength of the

Page 177

floating-light, that no danger would attend her taking the ground, even with
a very heavy sea. The writer seeing the confidence which these gentlemen
possessed with regard to the situation of things, and their knowledge and
ability, should the ship break adrift, found himself as much relieved with
this conversation, as he had previously been with the seeming indifference
of the forecastle-men, and the smile of the watch upon deck, though
literally lashed to the foremast. From this time he felt himself almost
perfectly at ease; at any rate he was entirely resigned to the ultimate result.
About 6 o’clock in the evening, the ship’s company was
The gale takes off.
heard moving upon deck, which, on the present
occasion, was rather the cause of alarm. The writer
accordingly rung his bell to know what was the matter, when he was
informed by the steward, that the weather looked considerably better, and
that the men upon deck were endeavouring to ship the smoke-funnel of the
galley, that the people might get some meat. This was a more favourable
account than had been anticipated. During the last twenty-one hours he
himself had not only had nothing to eat, but he had almost never passed a
thought on the subject. Upon the mention of a change of weather, he sent
the steward to learn how the artificers felt, and on his return he stated that
they now seemed to be all very happy, since the cook had begun to light the
galley-fire, and make preparations for the suet-pudding of Sunday, which
was the only dish to be attempted for the mess, from the ease with which it
could both be cooked and served up.
The principal change felt upon the ship, as the wind abated, was her
increased rolling motion, but the pitching was much diminished, and now
hardly any sea came farther aft than the foremast; but she rolled so
extremely hard, as frequently to dip and take in water over the gunwales
and rails in the waist, though, as before noticed, she was in light ballast
trim. By 9 o’clock, all hands had been refreshed by the exertions of the
cook and steward, and were happy in the prospect of the worst of the gale
being over. The usual complement of men was also now set on watch, and
more quietness was experienced throughout the ship. Although the previous
night had been a very restless one, it had not the effect of inducing repose in
the writer’s birth on the succeeding night, for having been so much tossed
about in bed, during the last thirty hours, he found no easy spot to turn to,

Page 178

and his body was all sore to the touch, which ill accorded with the
unyielding materials with which his bed-place was surrounded.
This morning about 8 o’clock, the writer was agreeably
Monday, 7th.
surprised to see the scuttle of his cabin sky-light
removed, and the bright rays of the sun admitted.
Appearance of the sea Although the ship continued to roll excessively, and the
upon the Bell Rock.
sea was still running very high, yet the ordinary
business on board seemed to be going forward on deck. It was impossible to
steady a telescope, so as to look minutely at the progress of the waves, and
trace their breach upon the Bell Rock, but the height to which the cross-
running waves rose in sprays, when they met each other, was truly grand,
and the continued roar and noise of the sea was very perceptible to the ear.
To estimate the height of the sprays at forty or fifty feet, would surely be
within the mark. Those of the workmen who were not much afflicted with
sea-sickness, came upon deck, and the wetness below being dried up, the
cabins were again brought into a habitable state. Every one seemed to meet
as if after a long absence, congratulating his neighbour upon the return of
good weather. Little could be said as to the comfort of the vessel, but after
riding out such a gale, no one felt the least doubt or hesitation as to the
safety and good condition of her moorings. The master and mate were
extremely anxious, however, to heave in the hempen cable, and see the state
of the clinch or iron ring of the chain-cable. But the vessel rolled at such a
rate, that the seamen could not possibly keep their feet at the windlass, nor
work the hand-spokes, though it had been several times attempted since the
gale took off.
About 12 noon, however, the vessel’s motion was
Floating-Light breaks
adrift.
observed to be considerably less, and the sailors were
enabled to walk upon deck with some degree of
freedom. But, to the astonishment of every one, it was soon discovered that
the floating-light was adrift! The windlass was instantly manned, and the
men soon gave out that there was no strain upon the cable. The mizzen sail,
which was bent for the occasional purpose of making the vessel ride more
easily to the tide, was immediately set, and the other sails were also hoisted
in a short time, when, in no small consternation, we bore away, about one
mile to the south-westward of the former station, and there let go the best
bower anchor and cable in twenty fathoms water, to ride until the swell of

Page 179

the sea should fall, when it might be practicable to grapple for the
moorings, and find a better anchorage for the ship.
As soon as the deck could be cleared, the cable-end was
Cable supposed to
have been cut by a
hove up, which had parted at the distance of about fifty
piece of wreck. fathoms from the chain-moorings. On examining the
cable, it was found to be considerably chafed, but
where the separation took place, it appeared to be worn through, or cut
shortly off. How to account for this would be difficult, as the ground,
though rough and gravelly, did not, after much sounding, appear to contain
any irregular parts. It was therefore conjectured, that the cable must have
hooked some piece of wreck, as it did not appear, from the state of the wind
and tide, that the vessel could have fouled her anchor, when she veered
round with the wind, which had shifted, in the course of the night, from NE.
to N.NW. Be this as it may, it was a circumstance quite out of the power of
man to prevent, as, until the ship drifted, it was found impossible to heave
up the cable. But what ought to have been the feeling of thankfulness to that
Providence which regulates and appoints the lot of man, when it is
considered, that if this accident had happened during the storm, or in the
night after the wind had shifted, the floating-light must inevitably have
gone ashore upon the Bell Rock. In short, it is hardly possible to conceive
any case more awfully distressing than our situation would have been, or
one more disastrous to the important undertaking in which we were
engaged.
In the present untoward state of things, the writer had chiefly to regret the
necessity of making a permanent change in the position of the moorings of
the floating-light, after her station had been publicly advertised, and within
a week of the time of exhibiting the light. It had also become more evident
that this vessel could not be continued as a tender or store-ship for the work.
The object of consideration, therefore, was to place her in a situation where
she would be most useful to shipping. It was evident that she must now be
stationed at about double her former distance from the rock, or, instead of
one mile, that she must be moored upwards of two miles from it, on ground
formerly ascertained to have been good, but considered too distant from the
operations.
In the evening the Smeaton came off from Arbroath, with provisions and
necessaries for the work. There being little wind, and a heavy swell in the

Page 180

sea, it was not safe that the vessels should come in
Difficulty of manning
contact with each other. Mr Macurich, the mate, who
the Floating-light.
came within hail, in the Smeaton’s boat, informed us,
that two seamen had come off to make up the complement of the crew of
the floating-light, and that they would be brought on board the first
opportunity. From the manner in which this address was made, and the
enquiry as to how we rode out the gale, it was evident that the crew of the
Smeaton were not aware that the floating-light had shifted her place; nor,
indeed, was this at all obvious, unless by a particular observation made by
the mariner’s compass, in reference to the position of the rock.
The peculiarity of this service rendered it difficult to procure good seamen
to embark in it, and the original crew dropped off one after another as the
winter season began to advance; for as yet our naval heroes had not shewn
the possibility of remaining for months together, even off an enemy’s coast.
It was therefore found to be an extremely difficult matter to get the crew of
the floating-light recruited from time to time; and, under the perplexity of
our present situation, it was some alleviation to be told that there were men
voluntarily offering their services.
In the course of this day the wind had veered from N.NW. to NE., but the
weather was mild, and the sea had fallen considerably, so that the boat came
alongside with the two seamen, and a supply of necessaries. The Smeaton
was then dispatched to Arbroath for another set of moorings for the
floating-light, in case of our not finding those from which she had drifted.
Letters were also dispatched to the Light-house Board, intimating the
particulars of the floating-light’s new ground, that additional notice might
be given to shipping.
The weather continued to be extremely agreeable,
Wednesday, 9th.
though the wind kept shifting about. Having got every
thing in readiness for moving to the new station, which
Floating-light had again been carefully sounded, the floating-light was
anchored in her new
station. got under way,—which the author had fondly hoped
never to have seen, till after her purpose as a temporary
light had been supplied by a permanent building upon the Bell Rock. At 9
o’clock a. m. the best bower anchor was let go upon the new ground, in
twenty fathoms water, on clean sand mixed with fine silt or mud, appearing

Page 181

to be the deposited matters borne along by the currents from the river Tay;
the Bell Rock bearing SE. ½ S. distant about 2½ miles.
The Smeaton returned to Arbroath, after landing her
Monday, 14th.
dispatches; but the wind and the swell of the sea having
again increased, she was obliged to remain in port till
It is found the 14th. As the floating-light still rode at single anchor,
impracticable to land
to-day. it was often an anxious wish to have her once more
properly fixed with chain moorings; but, as yet, no
opportunity had occurred for recovering the old chain, and it took some
time to prepare a new one. The Smeaton having returned from Arbroath this
morning, the writer went on board of her, carrying with him all the
artificers. At 6 an attempt was made to land, but the sea ran so heavily, and
the breakers rushed with such fury in every direction, that after rowing all
around the rock, the boats were obliged to return without success. It
deserves remark, however, that this was the first attempt to land this season,
in which it had been found impracticable, after actually embarking in the
boats.
This morning at 5 a. m., the bell rung as a signal for
Tuesday, 15th.
landing upon the rock, a sound which, after a lapse of
ten days, it is believed was welcomed by every one on
State of matters at the board. There being a heavy breach of sea at the eastern
rock, after a lapse of
ten days. creek, we landed, though not without difficulty, on the
western side, every one seeming more eager than
another to get upon the rock, and never did hungry men sit down to a hearty
meal with more appetite than the artificers began to pick the dulse from the
rocks. This marine plant had the effect of reviving the sickly, and seemed to
be no less relished by those who were more hardy.
While the water was ebbing, and the men were roaming in quest of their
favourite morsel, the writer was examining the effects of the storm upon the
forge, and loose apparatus left upon the rock. The six large blocks of granite
which had been landed, by way of experiment, on the 1st instant, were now
removed from their places, and, by the force of the sea, thrown over a rising
ledge into a hole at the distance of twelve or fifteen paces from the place on
which they had been landed. This was a pretty good evidence, both of the
violence of the storm and the agitation of the sea upon the rock. The safety
of the smith’s forge was always an object of essential regard. The ash-pan

Page 182

of the hearth or fire-place, with its weighty cast-iron back, had been washed
from their places of supposed security: the chains of attachment had been
broken, and these ponderous articles were found at a very considerable
distance, in a hole on the western side of the rock; while the tools and picks
of the Aberdeen masons were scattered about in every direction. It is,
however, remarkable, that not a single article was ultimately lost. A
mushroom-anchor, weighing about 22 cwt., had been driven from its station
at some distance, and thrown upon the rock, being found in one of the
landing creeks. The floating-buoy being still attached to it, had received no
material damage, though it had been chafed and was water-logged. This
buoy, with its moorings, consisting of 24 fathoms of chain, and the anchor,
had been given up as lost, ever since the gale; but just as the boats were
about to leave the rock, they were fortunately observed between two ledges
of rock, by one of the seamen.
After having been two hours and a half upon the rock
Work, this tide,
this morning, boats left it at a quarter past 8. At half-
continues only for one
hour. past 6 p. m., they again returned; but the smith having
fallen into the water in landing, got the tinder so wetted,
that he could not strike fire, and the work was left off at 7, after one hour’s
work, for want of sharp tools.—The site of the beacon being now prepared,
and the stanchion-holes excavated, the mode of employing the artificers
was reversed, only four being occupied at the beacon works, and twelve in
preparing the foundation of the light-house.
This being the night on which the floating-light was
Floating-light first advertised to be lighted, it was accordingly exhibited, to
exhibited.
the great joy of every one. For, besides the benefit to be
derived by shipping in general, from this temporary light, it was also to be
of great service to the operations at the Bell Rock, as it became a point of
reference for the conveniency and safety of the light-house vessels, either in
riding at the buoys, or in cruising about the rock. The event of lighting up
this ship, was, therefore, ushered in with three hearty cheers, and a dram
was served out to all hands.
The weather continuing to be moderate, with gentle
Wednesday, 16th.
breezes from NW. to N.NE., this morning the work
commenced at the rock at half-past 6, and the boats left

Page 183

it again at a quarter from 9, after the artificers had been at work two hours
and a half.
The writer was made happy to-day, by the return of the
Light-house Yacht
becomes a Tender to
Light-house Yacht, from a voyage to the Northern
the works. Light-houses. She had sailed from the Bell Rock on the
5th of last month for the Orkneys, and had passed the
Western Islands to the Clyde, returning to the eastern coast by the Forth and
Clyde Canal, after having discharged stores at the several Light-houses in
her track. The arrival of this vessel was a great relief, as she brought a set of
moorings with her for the floating-light, which still rode at single anchor.
Having immediately removed on board of this fine vessel of eighty-one tons
register, the artificers gladly followed, for, though they found themselves
more pinched for accommodation on board of the Yacht, and still more so in
the Smeaton; yet they greatly preferred either of these to the Pharos or
floating-light, on account of her rolling motion, though in all respects fitted
up for their conveniency.
The writer called them to the quarter-deck, and
Artificers agree to
remain at the rock
informed them that having been one month afloat, in
after their engagementterms of their agreement, they were now at liberty to
had expired. return to the work-yard at Arbroath, if they preferred
this to continuing at the Bell Rock. But they replied,
that, in the prospect of soon getting the beacon erected upon the rock, and
having made a change from the floating-light, they were now perfectly
reconciled to their situation, and would remain afloat till the end of the
working season. This was considered a matter of the greatest importance to
the success of the work; for, from the circumstances of the bad weather, and
the drifting of the floating-light, it seemed extremely doubtful but the whole
of the workmen might have been induced to go on shore, which would have
deterred others from embarking in this perilous service, at so advanced a
period of the season. At all events, it must have required no small trouble to
have brought a new set of men to expertness in the minutiæ of the traffic in
boats, and getting in and out of the vessels. Of those who had originally
come off to the work on the 17th of August, only one man, already alluded
to, who was a great martyr to sea-sickness, had returned to the work-yard.
The wind was at NE. this morning, and though there
Thursday, 17th.
were only light airs, yet there was a pretty heavy swell

Page 184

coming ashore upon the rock. The boats landed at half-
Accident happens to past 7 o’clock a. m., at the creek on the southern side of
one of the boats.
the rock, marked Port Hamilton in Plate VI., which to-
day was found to be the most accessible landing-place. But as one of the
boats was in the act of entering this creek, the seaman at the bow oar, who
had just entered the service, having inadvertently expressed some fear, from
a heavy sea which came rolling towards the boat, and one of the artificers
having at the same time looked round and missed a stroke with his oar, such
a preponderance was thus given to the rowers upon the opposite side, that
when the wave struck the boat, it threw her upon a ledge of shelving rocks,
where the water left her, and she having kanted to seaward, the next wave
completely filled her with water. After making considerable efforts, the boat
was again got afloat in the proper track of the creek, so that we landed
without any other accident than a complete ducking. This accident caused
us to lose some time; but, as the boats could not conveniently leave the rock
till flood-tide, and there being no possibility of getting a shift of clothes, the
artificers began with all speed to work, so as to bring themselves into heat,
while the writer, and his assistants, kept as much as possible in motion.
Having remained more than an hour upon the rock, the boats left it at half-
past 9; and after getting on board, the writer recommended to the artificers,
as the best mode of getting into a state of comfort, to strip off their wet
clothes, and go to bed for an hour or two. No farther inconveniency was
felt, and no one seemed to complain of the affection called “catching cold.”
It was a standing order in the landing department, that every man should
use his greatest exertions, in giving the boats sufficient force or velocity to
preserve their steerage-way in entering the respective creeks at the rock,
that the contending seas might not have the command of the boat at places
where the free use of the oars could not be had, on account of the
surrounding rocks. The late accident, accordingly, put all hands more upon
their guard, as such an occurrence might have proved fatal to all on board,
under a very slight change of circumstances.
The first object to be accomplished, with the assistance
Friday, 18th.
of the Light-house Yacht, was to get the floating-light
secured at her new station, an operation which required
Floating-light moored the finest of weather. To-day, the wind was at NE., and
in her new station.
although moderate, it was, of all others, most dreaded at

Page 185

the Bell Rock, the heavy gale of the 6th instant having been from this
direction. The writer, however, judged it advisable to proceed with the
laying down of the new moorings, and in case of any accident by the
slipping of the chain, as formerly, the artificers, instead of going to the rock
this tide, were kept on board, that the seamen and all hands might be on the
spot to render assistance. These new moorings consisted of 40 fathoms of
chain, made from iron-bars of one inch square, with a cast-iron mushroom-
anchor, weighing 1 ton 1 cwt. 2 qrs. 4 lb. This anchor and chain, were let
down in a depth of twenty-one fathoms, the Bell Rock being from the new
station SE. ½ S., distant two and a half miles; Redhead N. by E., distant ten
miles; Arbroath N.NW., distant about ten miles; Fifeness SW. by W., distant
about eleven miles, and Isle of May SW. by S., distant sixteen miles. The
moorings having been laid down on this spot, a buoy was placed upon
them. The Yacht then took the floating-light in tow to her new station,
where she was made fast to the chain, with a new cable measuring sixteen
inches in circumference. This business was successfully accomplished at
about 2 o’clock p. m., after six hours of very hard work.
The first cables of the floating-light were of patent cordage, made of the
very best materials, and most beautifully laid by machinery. But the sailors
complained that these ropes were so stiff and unpliable, that they could
neither be got stowed in the hold, nor run freely out of the hause-holes.
These difficulties were also more felt with the patent laid cables, after the
weather became somewhat cold. It was, therefore, found necessary to get a
new cable, laid in the ordinary way, for the winter months.
Another important occurrence, connected with the
Smeaton arrives with
the beams of the
operations of this season, was the arrival of the
Beacon in tow. Smeaton at 4 p. m., having in tow the six principal
beams of the Beacon-house, together with all the
stanchions and other work on board for fixing it on the rock. The mooring
of the floating-light was a great point gained, but, in the erection of the
beacon at this late period of the season, new difficulties presented
themselves. The success of such an undertaking, at any season, was
precarious; because a single day of bad weather occurring, before the
necessary fixtures could be made, might sweep the whole apparatus from
the rock. Notwithstanding these difficulties, the writer had determined to
make the trial, although he could almost have wished, upon looking at the

Page 186

state of the clouds, and the direction of the wind, that the apparatus for the
beacon had been still in the work-yard.
The weather to-day did not prognosticate any thing
Saturday, 19th.
very favourable; the wind, though in light breezes,
continued at NE., and it was occasionally almost calm.
Preparations for The main beams of the Beacon were made up in two
erecting them.
separate rafts, fixed with bars and bolts of iron. One of
these rafts, not being immediately wanted, was left astern of the floating-
light, and the other was kept in tow by the Smeaton, at the buoy nearest to
the rock. The Light-house Yacht rode at another buoy, with all hands on
board that could possibly be spared out of the floating-light; including also
ten additional men, as carpenters, smiths and sailors, brought off for this
operation. The party of artificers and seamen which landed this morning on
the Bell Rock, counted altogether forty in number. At half-past 8 o’clock, a
Derrick or mast of thirty feet in height, was erected and properly supported
with guy-ropes, for suspending the block for raising the first principal beam
of the beacon; and a winch-machine was also bolted down to the rock for
working the purchase-tackle. The necessary blocks and tackle were likewise
laid to hand and properly arranged. The artificers and seamen were
severally allotted in squads to different stations; some were to bring the
principal beams to hand, others were to work the tackles, while a third set
had the charge of the iron-stanchions, bolts, and wedges, so that the whole
operation of raising the beams, and fixing them to the rock, might go
forward in such a manner that some provision might be made, in every
stage of the work, for securing what had been accomplished, in case of a
change of weather.
Upon raising the derrick, all hands on the rock spontaneously gave three
hearty cheers, as a favourable omen of our future exertions in pointing out
more permanently the position of the rock. Even to this single spar of
timber, could it be preserved, a drowning man might lay hold. When the
Smeaton drifted on the 2d of this month, such a spar would have been
sufficient to save us, till she could have come to our relief. These
preparations for the erection of the Beacon having been previously made,
the writer collected the heads of the several departments on board of the
Light-house Yacht, particularly the foremen of the builders and joiners, and
the masters and mates of the vessels. Here the operation of raising and

Page 187

fixing the first four beams was again talked over and arranged, as, from the
very limited period of working on the rock, every thing required to be
performed in the most prompt and systematic manner, as previously settled.
The wind this morning was variable, but the weather
Sunday, 20th.
continued extremely favourable for the operations
throughout the whole day. At 6 a. m. the boats were in
Four of the principal motion, and the raft, consisting of four of the six
beams erected.
principal beams of the Beacon-house, each measuring
about sixteen inches square, and fifty feet in length, was towed to the rock,
where it was anchored, that it might ground upon it as the water ebbed. At 7
a. m. the boats of the Floating-light, the Yacht, and the Smeaton, arrived at
the rock, when the work immediately commenced. The sailors and
artificers, including all hands to-day, counted no fewer than fifty-two, being
perhaps the greatest number of persons ever collected upon the Bell Rock.
It was early in the tide when the boats reached the rock, and the men
worked a considerable time up to their middle in water, every one being
more eager than his neighbour to be useful. Even the four artificers, who
had hitherto declined working on Sunday, were to-day most zealous in their
exertions; they had indeed become so convinced of the precarious nature
and necessity of the work, that they never afterwards absented themselves
from the rock on Sunday, when a landing was practicable.
Having made fast a piece of very good new line, at
Method of raising the
principal beams of the
about two thirds from the lower end of one of the
Beacon-house. beams, the purchase-tackle of the derrick was hooked
into the turns of the line, and it was speedily raised, by
the number of men on the rock, and the power of the winch tackle. When
this log was lifted to a sufficient height, its foot, or lower end, was stepped
into the spot which had been previously prepared for it. Two of the great
iron stanchions were then set into their respective holes, on each side of the
beam, when a rope was passed round them and the beam, to prevent it from
slipping, till it could be more permanently fixed. The derrick or upright spar
used for carrying the tackle to raise the first beam, was placed in such a
position as to become useful for supporting the upper end of it, which now
became, in its turn, the prop of the tackle for raising the second beam,
which was laid in such a position, that when hoisted up, its foot slipped into
its place, when it was, in like manner, lashed to its great iron stanchions on

Page 188

each side. The first and second beams being lashed to one another at the
top, served as a pair of sheers, from which the purchase tackle was now
suspended, for raising the other two beams, which were also speedily got
into their places. The whole difficulty of this operation was in the raising
and propping of the first beam, which became a convenient derrick for
raising the second, these again a pair of sheers for lifting the third, and the
sheers a triangle for raising the fourth. Having thus got four of the six
principal beams set on end, it required a considerable degree of trouble to
get their upper ends to fit. Here they formed the apex of a cone, and were
all together mortised into a large piece of beechwood, and secured, for the
present, with ropes, in a temporary manner. During the short period of one
tide, all that could further be done for their security, was to put a single
screw-bolt through the great kneed bats or stanchions on each side of the
beams, and screw the nut home. In this manner each beam, with its
respective pair of bats, was fixed, besides being strongly bound together
with ropes.
While one set of the artificers were employed in this
Method of fixing the
great iron stanchions
operation, another fixed the great iron-stanchions into
into the rock. the rock, into which they were sunk to the depth of
about twenty inches. They were of a dove-tail or wedge
form, at the lower end, where they measured an inch and a half in thickness;
were about four inches in their medium breadth; and were let
perpendicularly into the rock, but kneed or bent to suit the angle which the
beams formed with it. These great bats or stanchions had much the figure
and appearance of a soldier’s musket; they were five feet in length, and
weighed about 140 lb. each. Instead of running the bat-holes full of melted
lead, as is common in operations of this kind, but which, in case of friction
or movement, is apt to be squeezed out of the holes, all the bats made use of
at the Bell Rock, as before noticed, were fixed by means of wedges. Several
of the artificers were therefore employed in wedging these stanchions first
with fir-timber, then with oak, and lastly with iron, driven into spaces left
for this purpose, between the bats and the rock. These wedges were driven
so firmly, that although the stanchions were the only fixture for this wooden
house, it had not been found necessary to drive any of the wedges a second
time.

Page 189

In this manner these four principal beams were erected,
Have seven hours and left in a pretty secure state. It, however, required
work upon the rock.
the whole tide to get this much accomplished. Indeed,
the men had commenced during ebb-tide, while there was about two or
three feet water upon the site of the Beacon, and as the sea was smooth,
they continued the work equally long during flood-tide. Two of the boats
being left at the rock to take off the joiners, who were busily employed on
the upper parts till 2 o’clock p. m., this tide’s work may be said to have
continued for about seven hours, which was the longest that had hitherto
been got upon the rock by at least three hours.
When the first boats left the rock with the artificers employed on the lower
part of the work during the flood-tide, the Beacon had quite a novel
appearance. The beams erected, formed a common base of about thirty-
three feet, meeting at the top, which, independently of ulterior works, was
about forty-five feet above the rock, and here half a dozen of the artificers
were still at work. After clearing the rock, the boats made a stop, when three
hearty cheers were given, which were returned with equal good will by
those upon the Beacon, from the personal interest which every one felt in
the prosperity of this work, so intimately connected with his safety.
All hands having returned to their respective ships, they
All hands assemble to
prayers.
got a shift of dry clothes, and some refreshment. Being
Sunday, they were afterwards convened by signal on
board of the Light-house Yacht, when prayers were read; for every heart,
upon this occasion, felt gladness, and every mind was disposed to be
thankful for the happy and successful termination of the operations of this
day. The crews then returned to their respective ships, and as nothing
further could be done to the Beacon during the night tide, there was no
landing made in the evening.
The weather most fortunately continued favourable for
Monday 21st.
the operations, the wind being westerly, with fresh
breezes. The boats landed at half-past 7 a. m., the
number of persons on the rock being, as formerly, fifty-two; the work was
carried on till half-past 12, making four hours and a half upon the rock. The
remaining two principal beams were erected in the course of this tide,
which, with the assistance of those set up yesterday, was found to be a very
simple operation. In hoisting up the sixth and last log, however, and just

Page 190

when it was about to be kanted into its place, the iron-hook of the principal
purchase-block gave way, and this great beam, measuring fifty feet in
length, fell upon the rock with a terrible crash; but what is not a little
wonderful, although there were fifty-two people engaged round the beacon,
yet not one was hurt in the slightest degree by its fall. The beam itself was
only a little shaken near the upper end, but was not materially damaged.
Another block was immediately hooked, in the place of that which had
failed, and the beam was got into its place without much delay. Every
possible exertion was now made to fix the lower ends of the beams to the
rock, by connecting them with their respective stanchions, while three
strong hoops of malleable iron were employed, for securing the whole in
one mass at the top.
The six principal beams of the beacon were thus secured, at least in a
temporary manner, in the course of two tides, or in the short space of about
eleven hours and a half. The only inconveniency attending this operation,
arose from the derrick for raising the first beam being rather too short. It
was only thirty feet in height, whereas it was found that it would have
answered better had it been about forty-five feet. We were also a good deal
troubled and perplexed with the logs afloat, from having the six principal
beams in two rafts: it would have been more convenient had they been
lashed together in pairs, and then rafted in one lot. The writer concludes,
upon the whole, that about eight hours only were actually employed in
raising the beams of the beacon, and fixing them in a temporary manner.
Such is the progress that may be made, when active hands and willing
minds set properly to work in operations of this kind.
Having now got the weighty part of this work over, and
Tuesday, 22d.
being thereby relieved of the difficulty both of landing
and victualling such a number of men, the Smeaton
Four of the supporting could now be spared, and she was accordingly
beams set up.
dispatched to Arbroath, for a supply of water and
provisions, and carried with her six of the artificers who could best be
spared. The wind to-day was due west, and blowing so fresh, that the boats
had some difficulty in landing the remaining thirty-six persons at 8 a. m.
who continued on the rock till half-past 12, having had four and a half hours
work. During this tide four of the struts, or supporting beams, were set up,
butting against the inside of four of the principal beams. These supports

Page 191

were each about twenty feet in length, varying somewhat according to the
inequalities of the rock. At the foot they were fixed to the rock with
stanchions, similar to those of the principal beams, and at the top they were
connected with pieces of oak, strongly strapped with iron, collapsing
around the principal beams to which they were bolted.
Landed at half-past 9 this morning, and succeeded in
Wednesday, 23d.
getting up the two remaining supports, and in fixing
several of the bracing chains. But, instead of entering at
The boats have some present into any farther details about the several parts of
difficulty in leaving
the rock to-day. the beacon, it will be better to refer these to the letter-
press description of Plate VIII. After having been four
and a half hours at work on the rock to-day, the boats left it, though not
without considerable difficulty, as the wind had been blowing fresh all the
last night, and to-day it was shifting and veering about from N.W. to
N.N.E., which had already set up a pretty heavy sea. In going out of the
eastern harbour, the boat which the writer steered shipped a sea, that filled
her about one-third with water. She had also been hid for a short time, by
the waves breaking upon the rock, from the sight of the crew of the
preceding boat, who were much alarmed for our safety, imagining for a time
that she had gone down.
The Smeaton returned from Arbroath this afternoon, but
Shipping separated by
a gale.
there was so much sea that she could not be made fast
to her moorings; she therefore let go her small bower
anchor, in order to get a supply of provisions put on board of the Light-
house yacht, and receive other six of the artificers to carry ashore. But the
anchor was no sooner let go than it broke among the rocks, and the vessel
was obliged to return to Arbroath, without being able either to deliver the
provisions, or take the artificers on board. The Light-house yacht was also
soon obliged to follow her example, as the sea was breaking heavily over
her bows. After getting two reefs in the mainsail, and the third or storm-jib
set, the wind being SW., she beat to windward, though blowing a hard gale,
and got into St Andrew’s Bay, where we passed the night under the lee of
Fifeness. In these circumstances, it was impossible for the writer to divest
himself of much anxiety for the fate of the newly erected beacon, which
was still but imperfectly fixed to the rock.

Page 192

At 2 o’clock this morning we were in St Andrew’s Bay,
Thursday, 24th. standing off and on shore, with strong gales of wind at
SW.; at 7 we were off the entrance of the Tay; at 8 stood
towards the rock, and at 10 passed to leeward of it, but could not attempt a
landing. The beacon, however, appeared to remain in good order, and by 6
p. m. the vessel had again beaten up to St Andrew’s Bay, and got into
somewhat smoother water for the night.
The wind still continues at SW., blowing very hard; at 7
Friday, 25th.
o’clock bore away for the Bell Rock, but finding a
heavy sea running on it, were unable to land. The
writer, however, had the satisfaction to observe, with his telescope, that
every thing about the beacon appeared entire, and although the sea had a
most frightful appearance, yet it was the opinion of every one, that, since
the erection of the beacon, the Bell Rock was divested of many of its
terrors, and, had it been possible to have got the boats hoisted out and
manned, it might have even been found practicable to land: the vessel was,
therefore, kept in the track of the rock, till it could be determined if a
landing might be effected with the afternoon’s tide. The Yacht, in the mean
time, stood towards the Redhead on the opposite shore, and at 5 p. m.
returned; but both the wind and sea had rather increased. At 6 it blew so
hard, that it was found necessary to strike the topmast and take in a third
reef of the mainsail, and under this low canvas we soon reached St
Andrew’s Bay, and got again under the lee of the land for the night. The
artificers being sea-hardy, were quite reconciled to their quarters on board
of the Light-house Yacht; but it is believed that hardly any consideration
would have induced them again to take up their abode in the floating-light.
In the course of the last night, the wind had shifted
Saturday, 26th.
from SW. to W. NW., with moderate weather. At day-
light, the Yacht steered towards the Bell Rock, and at 8
Land on the rock after a. m., made fast to her moorings; at 10, all hands, to the
an absence of four
days. amount of thirty, landed, when the writer had the
happiness to find that the beacon had withstood the
violence of the gale and the heavy breach of sea, every thing being found in
the same state in which it had been left on the 21st. The artificers were now
enabled to work upon the rock throughout the whole day, both at low and
high water, but it required the strictest attention to the state of the weather,

Page 193

in case of their being overtaken with a gale, which might prevent the
possibility of getting them off the rock. To-day, one half of the artificers
remained on the beacon till half-past 6 p. m., having been eight hours and a
half at work upon it.
Two somewhat memorable circumstances in the annals
Smith’s forge
removed from the
of the Bell Rock attended the operations of this day;
rock to the Beacon. one was the removal of Mr James Dove, the foreman
smith, with his apparatus, from the rock to the upper
part of the beacon, where the forge was now erected on a temporary
platform, laid on the cross beams or upper framing. The other was, the
artificers having dined for the first time upon the rock, their dinner being
cooked on board of the Yacht, and sent to them by one of the boats. But
what afforded the greatest happiness and relief, was the removal of the large
bellows, which had all along been a source of much trouble and perplexity,
by their hampering and incommoding the boat which carried the smiths and
their apparatus. The men belonging to that boat were so delighted with this
occurrence, that while the bellows were in the act of being hoisted up to
their new station, they gave three such hearty cheers, from below, as
astonished and surprised those who were working the tackle on the beacon,
to such a degree, that, for a moment, they let the rope slip through their
hands, and had they not speedily caught hold again, this useful implement
might have been dashed to pieces,—which would have been a misfortune of
no small import, considering the state of the works at the present crisis.
It being now the period of neap-tides, other ten of the
Sunday 27th.
artificers were sent ashore to the work-yard at Arbroath,
which reduced our complement at the rock to twenty.
The boats landed the people this morning at 11, but the masons had only
about an hour’s work on the highest part of the foundation of the light-
house, which was only partially left by the water, the joiners and two
blacksmiths being busily employed in completing and securing the several
parts of the beacon, particularly in screwing the bolts of the stanchions and
bracing-chains, and in staying the lower part of the beams. They continued
at these operations till 6 o’clock p. m., having been nine hours upon the
rock.
The joiners and smiths were landed on the beacon at 7
Monday, 28th.
a. m., where they continued all day, and were brought

Page 194

off again at 5 p. m. The Smeaton had just returned from
The writer sails forLeith, where she had been sent for sundry materials
Arbroath after having
been four weeks connected with the work. The joiners and smiths were
afloat. ten hours upon the rock to-day, which was the longest
period they had hitherto been upon it at any one time.
They now had their dinner regularly sent to the beacon, and could continue
at work throughout the whole day, while the weather was sufficiently
moderate to admit of the boats plying to and from the rock. To-day the
water did not leave it, and it was now the seventh day since the lowest part
of the foundation or site of the light-house had been seen. The Beacon being
now in a comparative state of security, the Smeaton was left at the rock as a
tender, and the writer sailed in the Light-house yacht, this afternoon, to
inquire into the operations of the work-yard at Arbroath. After setting sail,
and looking back upon the Bell Rock, it was quite astonishing to observe
the change in the appearance of things, which the erection of these beams
had produced. To shipping they became an excellent beacon; while they
induced the greatest confidence of safety in all who were actively engaged
in this work. The vessel anchored in the bay of Arbroath, at a late hour,
when the writer landed, for the first time since the commencement of the
working season, on the 17th of August; after having been between four and
five weeks afloat.
This morning was occupied in going over the work-
Tuesday, 29th.
yard with Mr David Logan, clerk of works, who had
charge of the hewing department. The first entire course
of the building was now partly laid upon the platform: a few stones of the
second course, and several of the higher courses, were also in progress. But
from the backward state of the quarries in the production of stones of large
dimensions, it was found necessary to make some additional exertions for
procuring a more regular supply, and a person was therefore dispatched to
the quarries of Aberdeen and Mylnefield for this purpose.
Having made some further arrangements in the work-
Sails again for the
Bell Rock.
yard, the writer again embarked in the Yacht, and sailed
for the Bell Rock this forenoon, carrying with him Mr
Peter Logan, the foreman builder, and the artificers who had formerly been
at the rock; but who had expressly stipulated that they were not to be
obliged to continue longer afloat than the approaching spring-tides, when it

Page 195

was expected the Beacon works would be completely secured for the
winter. In the early part of this day, there was little or no wind, but in the
afternoon it came to blow very hard from south by west, and in the evening
it had increased to a hard gale. Having stood off to the Bell Rock, and put
the vessel under low canvas, we hailed the floating-light, and found her
labouring very hard with sixty fathoms of cable out. We then stretched to
the southern side of the Bell Rock, when the vessel was laid to; but the
Smeaton, which was also in company, being a small vessel, and much
hampered with boats, was not in a condition to keep at sea, and as soon as
the gale got up she stood in for Arbroath, and landed Mr Francis Watt, the
foreman-joiner, and the artificers under his charge, to wait a favourable
change of weather.
This morning it was calculated, by Mr Gloag, the
Wednesday, 30th. commander of the Light-house Yacht, that she had
drifted about thirty miles, in a SE. direction from the
The vessels again Redhead. About mid-day, the wind shifted to NW., and
separated by a gale.
we steered for St Abb’s Head, which was seen about
twilight in the evening, and our course was directed across the Firth of
Forth. When in the act of putting about the ship, the stem boat was very
nearly lost, having been struck by a heavy sea which unhooked the fore-
tackle. At midnight we got within a few miles of the light of May, and soon
afterwards found smooth water in St Andrew’s Bay, where we tacked, or
“stood to and again,” as the sailors term it, all night.
This morning the wind shifted to NE. with moderate
1807, October.
breezes. In the course of the forenoon we beat towards
the Bell Rock, and sailed round it, when every thing
October, Thursday appeared to be in good order about the beacon. Having
1st.
no shelter in St Andrew’s Bay with this wind, the Yacht
stood alternately towards Arbroath and the Bell Rock for the night. The
floating-light being a most excellent guide for putting about, before the
vessel got too near to the rock. The older sailors on board of the Yacht, on
this occasion, made frequent observations as to the utility of this temporary
light, expressing their admiration at the change of circumstances which had
led to their cruising with so much confidence, both by day and night, in the
immediate vicinity of this dangerous rock.

Page 196

The wind having come round to NW. with fresh
Friday 2d. breezes, it soon run down the north-easterly swell of the
sea, and at half-past 1 p. m., all hands, to the amount of
Effect a landing at the twenty, landed on the rock, though not without
rock.
difficulty. Twelve of the masons were engaged during
three hours, or till 4 o’clock, in excavating the foundation of the light-
house, while the eight joiners and smiths, who also had arrived with the
Smeaton, were employed at the works of the beacon for nine hours and a
half; and having continued at work by torchlight, they left the rock at half-
past 10 o’clock p. m.
On carefully examining into the state of things at the
State of the Beacon
after the late gale.
Bell Rock, after the late gale, the writer had the
satisfaction to find, that the principal beams of the
beacon, with their diagonal supports, cross-beams and stanchions
connecting them to the rock, had not the smallest appearance of working or
shifting, as mechanics express it. One of the tie chains had indeed given
way, and hung loosely from the beacon, and one of the bracing screws had
wrought off its nut. This was an evidence that the principal beams from the
elasticity of the timber, had been acted upon by the sea, and that they still
required some additional stay in the middle. Such, however, were the
fixtures of the beacon to the rock with the iron stanchions, and its
connection at the top, where it was strongly girt with circular hoops of iron,
that it was perfectly firm at both extremities. The central support was
intended to be effected by means of strong bars of iron, stretching between
the principal beams; but the season was now too far advanced for such an
undertaking, and therefore, the bracing-chains, represented in Plate VIII.,
were attached for the present.
It was not a little remarkable, that notwithstanding the impression which the
sea had produced during the late gale, in shaking the beacon, so as to break
one of the tie-chains, unscrew one of the bracing-bolts, and in shaking
several of the smith’s tools from his hearth on the platform at the top, yet
these tools, and other small articles of iron, were all found lying on the
rock. The nut of the bolt, for example, was got immediately under the chain
from which it had dropped. Several other striking examples of this kind
were observable, shewing how little will shelter articles somewhat
ponderous in themselves, when they lie at a considerable depth in water.

Page 197

The wind being west to-day, the weather was very
Saturday 3d. favourable for the operations at the rock, and during the
morning and evening tides, with the aid of torch-light,
Working hours greatly the masons had seven hours’ work upon the site of the
extended.
building. The smiths and joiners, who landed at half-
past 6 a. m., did not leave the rock till a quarter past 11 p. m., having been at
work, with little intermission, for sixteen hours and three quarters. When
the water left the rock, they were employed at the lower parts of the beacon,
and as the tide rose or fell, they shifted the place of their operations. From
these exertions, the fixing and securing of the beacon made rapid
advancement, as the men were now landed in the morning, and remained
throughout the day. But, as a sudden change of weather might have
prevented their being taken off at the proper time of tide, a quantity of bread
and water was always kept on the Beacon.
The wind was southerly during the fore part of the day,
Sunday 4th.
and towards evening it became quite calm. The boats
landed the artificers this morning at a quarter before 7
o’clock; when the masons had three and a half hours’ work at the
foundation of the building, but the spring-tides were now taking off; the
best of them having unfortunately been lost during the late gale. The smiths
and joiners, however, continued their operations throughout the whole of
the day, and did not leave the rock till half-past 12 at night.
During this period of working at the Beacon all the day, and often a great
part of the night, the writer was much on board of the Tender; but, while the
masons could work on the rock, and frequently also while it was covered by
the tide, he remained on the Beacon; especially during the night, as he made
a point of being on the rock to the latest hour, and was generally the last
person who stepped into the boat. He had laid this down as part of his plan
of procedure; and in this way had acquired, in the course of the first season,
a pretty complete knowledge and experience of what could actually be done
at the Bell Rock, under all circumstances of the weather. By this means also
his assistants, and the artificers and mariners, got into a systematic habit of
proceeding at the commencement of the work, which, it is believed,
continued throughout the whole of the operations.
The external part of the beacon was now finished, with its supports and
bracing-chains, and whatever else was considered necessary for its stability,

Page 198

in so far as the season would permit; and although
Beacon works much was still wanting to complete this fabric, yet it
finished for the
season. was in such a state that it could be left without much
fear of the consequences of a storm. The painting of the
upper part was nearly finished this afternoon; and the Smeaton had brought
off a quantity of brush-wood and other articles, for the purpose of heating or
charring the lower part of the principal beams, before being laid over with
successive coats of boiling pitch, to the height of from eight to twelve feet,
or as high as the rise of spring-tides. A small flag-staff having also been
erected to-day, a flag was displayed for the first time from the Beacon, by
which its perspective effect was greatly improved. On this, as on all like
occasions at the Bell Rock, three hearty cheers were given; and the steward
served out a dram of rum to all hands, while the Light-house Yacht,
Smeaton, and Floating-light, hoisted their colours in compliment to the
Erection.
To-day the wind was westerly, and the weather was
Monday 5th.
very wet; but this was thought nothing of at the Bell
Rock, so long as the wind kept moderate. At a quarter
past 8 a. m. the boats landed the artificers. The masons had only 2½ hours’
work at the site of the building, owing to the smallness of the ebb-tide; but
the joiners and smiths continued their operations till half-past 11 p. m., and
were consequently 15 hours and a quarter upon the Rock.
In the afternoon, and just as the tide’s work was over,
Mr Rennie and one of
his sons visit the
Mr John Rennie, engineer, accompanied by his son Mr
Rock. George, on their way to the harbour-works of
Fraserburgh, in Aberdeenshire, paid a visit to the Bell
Rock, in a boat from Arbroath. It being then too late in the tide for landing,
they remained on board of the Light-house Yacht all night, when the writer,
who had now been secluded from society for several weeks, enjoyed much
of Mr Rennie’s interesting conversation; both on general topics, and
professionally upon the progress of the Bell-Rock works, on which he was
consulted as chief engineer. The weather continued very moderate all night;
but although there was little swell in the sea, yet our quarters on board of
the Yacht were not the most agreeable, especially to strangers. The vessel,
being perfectly new, was so completely water-tight, that it was hardly
possible to keep her free of bilge-water, and so strong was the hydrogenous

Page 199

gas or offensive effluvia arising from it, that it had affected the colour of the
paint of the cabin floor-cloth, and even, to a certain degree, blackened the
silver plate, coins and watch-cases on board, notwithstanding the frequent
pumping of the ship, and other means which were taken to sweeten her.
The artificers landed this morning at 9, after which one
Tuesday 6th.
of the boats returned to the ship for the writer and
Messrs Rennie, who, upon landing, were saluted with a
Works given up for display of the colours from the Beacon, and by three
the season.
cheers from the workmen. Both the weather and the
tide were pretty favourable for the operations, and the masons continued
about three hours at work. Every thing was now in a prepared state for
leaving the rock, and giving up the works afloat for this season, excepting
some small articles, which would still occupy the smiths and joiners for a
few days longer. They, accordingly, shifted on board of the Smeaton, while
the Yacht left the rock for Arbroath, with Messrs Rennie, the writer, and the
remainder of the artificers. But, before taking leave, the steward served out
a farewell-glass, when three hearty cheers were given, and an earnest wish
expressed, that every thing, in the spring of 1808, might be found in the
same state of good order as it was now about to be left.
In concluding the account of the first season’s work, the writer may
observe, that he had not at any time previously to his engaging in the Bell
Rock works, been more than five or six days at sea on a stretch, even in the
course of his voyages to the Northern Light-houses. But on the present
occasion he had now been afloat upwards of seven weeks, with the
exception of a single day spent in the Work Yard. Upon his return to the
shore, therefore, after having successfully closed these critical operations,
he felt a mixed emotion of happiness and gratitude, for so prosperous a
termination; and, participating in those feelings which are known to actuate
the mariner, after a dangerous voyage, he looked with thankfulness to that
Providence which had preserved those engaged in the work under so many
perilous circumstances.
The period during which the works had been continued,
Number of days the
artificers were
appeared of much longer duration to every one than it
actually at work. really was, for, upon calculating the actual time spent
upon the rock, it amounted to about 180 hours, of
which only 133 or about 13½ days, of 10 hours each, could be said to have

Page 200

been actively employed. Upon looking back on this result, the writer is
astonished at what had been accomplished in so short a period; for besides
the erection of the principal beams of the Beacon-house, something
considerable had also been done towards the preparation of the site of the
Light-house. He cannot, therefore, help thinking, that the experience of this
season’s work at the Bell Rock, affords a good example of what may be
executed under similar circumstances, when every heart and every hand is
anxiously and zealously engaged; for the artificers wrought at the erection
of the Beacon as for life; or somewhat like men stopping a breach in a wall
to keep out an overwhelming flood.

Progress of the Work.

In stating the progress of the Bell Rock works at the close of the first
season, it is hardly necessary to say, that, for success, and ultimate utility,
they far exceeded the writer’s most sanguine expectations. By the erection
of the frame-work of the Beacon-house, the rock had in a great measure
been robbed of its terrors to those employed in building the Light-house. At
all times when a boat could be put to sea, or approach this sunken reef,
there was not now that actual danger in landing which formerly presented
itself. Should the Tender in future go a-drift, or a boat happen to be wrecked
on the rock, the Beacon could now be looked to as a place of shelter, till
more efficient means could be resorted to. This work had always been a
great desideratum with the writer, who had now chiefly to consider how the
future steps were to be attained, having much less to occupy his attention in
regard to the safety of the people employed.
The whole of the artificers being collected at the work-yard of Arbroath, in
the latter end of the month of October, their number amounted to forty-four.
It, therefore, became indispensably necessary to get forward with the
quarries, otherwise a number of experienced workmen must have been paid
off, which would have been attended with much disadvantage to the
operations at the rock next year. There was now every prospect that by mid-
summer, the foundation or site of the Light-house would be completely
excavated and ready for commencing the building; while as yet the hewing
of one entire course had not been completed, for want of materials,
although the stones of three or four successive courses were in progress. For

Page 201

example, 10 blocks of granite were still wanting of the first course, 30
blocks of the second, which measured 18 inches in thickness, and 20 blocks
of the third, and so of other courses. The procuring of a sufficient stock of
materials, and getting the quarries into a more regular system of supply,
became an object which we shall more particularly notice under the article
Building Materials, in the following chapter.
The Work-Yard at Arbroath, where the stones were
Work-Yard.
collected and hewn, consisted of an inclosed piece of
ground, extending to about three quarters of an acre,
conveniently situate on the northern side of the Lady Lane, or street,
leading from the western side of the Harbour, being only about 200 yards
distant from the Light-House shipping birth, as will be seen from Plate XII.
Upon this plot of ground there was built a suite or range of barrack-rooms
for the artificers, and the several apartments connected with the engineer’s
office, mould-makers’ drawing-room, stores, work-shops for smiths and
joiners, stable, &c. extending 150 feet along the north side of the work-
yard, which were now fully occupied. Shades of timber were also
constructed for the workmen in wet weather, and a kiln for burning lime. In
a centrical position of this ground, a circular platform of masonry was built,
on which the stones were laid when dressed, and each course tried and
marked, before being shipped for the rock. This platform measured 44 feet
in diameter; it was founded with large broad stones, at the depth of about 2
feet 6 inches, and built to within 10 inches of the surface with ruble work;
on which a course of neatly dressed and well jointed masonry was laid, of
the red sandstone from the quarries to the eastward of Arbroath, which
brought the platform on a level with the surface of the ground. Here the
dressed part of the first entire course of the Light-House was now lying, and
the platform was so substantially built as to be capable of supporting any
number of courses which it might be found convenient to lay upon it, in the
further progress of the work.
Mr Gloag, who commanded the Light-house Yacht, had
1807, November.
been successful in grappling and finding the old
moorings of the Pharos floating-light, from which that
vessel had drifted after the dreadful gale of the 6th of September. These he
had weighed, and removed to within about 400 fathoms of the new ground
taken up by that vessel, and had placed a buoy upon them, that, in case of

Page 202

her again drifting, any vessel carrying the floating-light could immediately
be brought to ride at these spare moorings. The Yacht had also lifted three
of the four floating buoys, with their chains and mushroom anchors, from
the neighbourhood of the Bell Rock, leaving one set for the use of the
vessel occasionally attending for the purpose of inspecting the Beacon. In
the course of the month of November several very severe gales of wind
occurred, and Mr Watt, the foreman joiner, who had been appointed to
examine the rock at spring-tides, when the weather would permit, with three
or four artificers, found some small repairs necessary, in consequence of
damage which the Beacon had sustained.
On the morning of the 22d of this month, the writer
Sunday 22d.
landed at the Bell Rock, when the greater part of the
bracing-chains of the Beacon were in a loosened state,
The Writer visits the and hanging from their eye-bolts, like so much
Rock.
shipwreck. Two of the chain-bats were also drawn,
which had lifted considerable masses of the rock along with them. But after
a most careful and minute examination of the six principal beams of the
beacon, and their respective supports, it was satisfactory to find that the
great iron-stanchions had not the smallest appearance of working or
shifting; the wedges of timber and iron having exactly the same appearance
as when they were at first driven home by the hammer; the coating of pitch
and tar was also as entire upon the seams and joints as when first applied.
Every thing connected with the fixing of the beams at the top was likewise
in good order. Nor was it less surprising, after so much stormy weather, to
find that the ruble building, with Pozzolano’s mortar, used in filling several
holes in the site of the Beacon, remained in its place, having now become
fully as hard as the adjoining parts of the rock.
Although it was found that the bracing-chains could not withstand the
shaking and tremulous motion of the Beacon, yet they were again set up
and tightened, with the exception of the two that had lifted their bats, with a
mass of the rock; which were knocked off altogether. It is here worthy of
remark, that the bolts of the bracing screws had always a tendency to
unlock, and one of the nuts, as before noticed, had even unscrewed no less
than three inches. To prevent this in future, a piece of small wire was turned
round the threads of each screw, which had a tendency to preserve them; but
still the chains stretched, became loose, and broke their eye-bolts, or lifted

Page 203

part of the rock with the strain. The bracing-chains may, however, be
conceived to have had some effect in checking the force of the waves, as
was observable in the operation of the sea upon the extensive beds of
marine plants. It often happened, when heavy seas were rolling along the
Bell Rock, which at a distance threatened to overrun the whole, that, upon
reaching these beds of fuci, with which the flat and level parts of the rock
were thickly coated, the velocity and force of the waves were immediately
checked, and in a great measure destroyed.
The unlocking of screws, where washers had been
Professor Playfair’s
introduced as a security, was rather unexpected, and the
observations about the
unlocking of screws. writer took an opportunity of conversing with his much
respected friend Professor Playfair of Edinburgh,
regarding this circumstance. The Professor observed, that he had
experienced some inconveniency of this kind from the unlocking of almost
all the screws of a telescope, which had been sent to him from London by
the mail-coach. Indeed from the spiral form of the screw, which is, in fact,
an inclined plane, Mr Playfair readily accounted for such an occurrence;
and when reflected upon, it seems to be an effect rather to be looked for,
and is a reason why rivetting the point of a bolt, in preference to screwing
it, should generally be resorted to, where much friction or motion is to be
apprehended.
At this visit to the Bell Rock, the writer went also on
1807, December.
board of the Floating-light, where every thing was
found in good order. On some occasions Mr Sinclair,
State of the Floating- the commander, stated, that the vessel had rolled
light.
excessively hard; that she had shipped two or three very
heavy seas over the waste-boards, and that he had found it occasionally
necessary to veer out 80 fathoms of cable. He also stated, that the floating-
light had been run foul of by a large smack-rigged vessel, with all her
canvas set, though the lights were burning perfectly clear. This vessel had
struck upon the larboard quarter, damaged the taff-rail, and started three of
the floating-lights’ trenails. That they immediately hailed the vessel, but she
sheered-off, and her crew made no reply. The smack was beating to the
northward, and was much lumbered on the quarter-deck with packages of
earthen-ware, which were distinctly seen upon her deck from the brilliancy
of the lights.

Page 204

The sailors on board of the floating-light were all in good health, and
appeared to be satisfied with their situation. The master, however,
mentioned, that his crew, particularly the young men, calculated very
sharply about their turns for leave on shore, which came round in the course
of about six weeks. Indeed, the probability is, that had the seamen not been
rather compelled to this duty, as a protection against the Impress-service, it
might have been found extremely difficult to get able seamen to undertake
so dreary a life as the continual round of riding at anchor in the open sea,
without the company of other shipping, or the pleasure of intercourse with
the shore, as is the case in the ordinary road or anchorage for shipping.
The several departments of the Bell Rock works being arranged for the
winter months, the sloop Smeaton was appointed to make several trips to
the quarries for stones, while the Light-house Yacht, being stationed at
Arbroath, was to attend the Floating-light, and carry off the artificers to
examine the state of the Beacon at spring-tides. The writer having adjusted
these matters, returned to Edinburgh on the 4th of December. Here he was
employed in preparing the necessary implements, procuring materials, and
in other objects connected with the work, which will fall more properly to
be noticed in the transactions of the year 1808.

Page 205

CHAPTER IV.
SHIPPING.—IMPLEMENTS.—BUILDING MATERIALS,—AND PROGRESS OF THE
BELL ROCK WORKS IN THE YEAR 1808.

After taking some notice of the preparations made
1808, January.
during the winter months, or early part of the year
1808, it is proposed, in describing the progress of the works of this season,
to adopt the form of a journal or diary, as in the preceding chapter. The last
year’s operations being more of a preliminary nature, the implements and
apparatus employed were few in number, and simple in their construction.
But the facilities to be afforded by the erection of the Beacon were such,
that not only the site of the building was expected to be prepared, but it was
hoped that some of the courses of masonry would also be laid during the
ensuing summer. It therefore became necessary to be provided with
shipping, and every article, both of implements and building materials,
however small the actual progress of the work might ultimately be.

Shipping.

It has already been noticed, in the course of last year’s
The New Tender. operations, that much inconveniency, and no small
degree of hazard, were experienced in making the
numerous passages between the Bell Rock and the Floating-light, especially
when the boats were crowded with artificers. Not having previously been so
fully aware of these circumstances, and with a view to save expence, the
Floating-light was likewise applied to the purpose of a tender. She was
consequently moored at a more considerable distance from the rock, as will
be understood from Plate V.; but as, from the nature of her tackling, she
could not be cast loose upon any emergency, she was found to be but ill
adapted to the uses of a tender.
The writer having represented this to the Light-house
Is named The Sir Board, was immediately authorised to provide a vessel,
Joseph Banks.
to be exclusively employed for the service of the rock.
He accordingly purchased one upon the stocks at Arbroath, in such

Page 206

forwardness, that she was launched upon the 18th of January 1808. This
vessel was built by a Mr Thomas Fernie, and was considered so complete in
the mould or figure of her hull, that some of the best judges of shipping
have described her as one of the handsomest vessels which perhaps had
hitherto been built in Scotland. On account of the exertions of the late Sir
Joseph Banks, in his capacity of one of the Lords of Trade, in procuring the
loan from Government, for the use of the Bell Rock Light-house, already
alluded to in the Introduction to this work, the writer suggested, as a mark
of respect, that the new tender should be named “The Sir Joseph Banks,” to
which the Light-house Board most readily acceded.
She was no sooner launched, than her rigging and
Is rigged as a
schooner.
equipment, in the best manner, were undertaken by
professional people; but the inspection of the interior
fitting and accommodations was kindly undertaken by the late Provost
Balfour of Arbroath, a gentleman who took great delight in architectural
pursuits, and who, upon all occasions, felt the most lively interest in the
operations of the Bell Rock. In order that this vessel might stow two large
boats upon deck, and be got as quickly as possible under sail, in the event of
her breaking adrift, she was rigged as a schooner; and that, by the
application of a tackle from each mast, the boats might be conveniently
managed, in getting them in and out of the vessel. The Sir Joseph Banks
being only 81 tons register, it was necessary to lay out the births, for the
several departments of the service, with all possible attention to the
economising of room. The forepeak was accordingly fitted up with a
coboose for cooking; immediately aft of this birth, a compartment was set
off for the ship’s company and the landing-master’s crew, with births for
fifteen sailors. But Jack is by no means ill to satisfy with his sleeping-place,
and it was often found necessary to encroach upon the allotted number for
this birth, according to the exigencies of the service. The waist or middle of
the ship was set apart for the artificers, and was capable of containing forty
men. Still proceeding aft, a small birth was set off for the mate and steward,
which communicated both with the artificers’ birth, and also with the cabin
for the engineer’s assistants, the landing-master, and the captain of the
tender. In the sternmost part of the ship, a cabin was fitted up for the use of
the writer; the whole being found extremely commodious and suitable.
From the great proportion of the ship required for the birthage of seamen
and artificers, the hold of this small vessel was much curtailed, there being

Page 207

hardly more room left than was sufficient for containing a stock of
provisions, water and fuel, for any length of time, besides stowing two or
three tiers of casks of lime, cement, and other necessaries for the use of the
work.
Continuing the description of the marine part of the
Praam-boats, or
Stone-lighters.
establishment, we next notice three new praam-boats,
or stone-lighters, built for conveying the building
materials to the Bell Rock, from the vessels employed in bringing them
from the work-yard at Arbroath. The term Praam-boat is applied to a certain
description of Norwegian boats, having their stem and stem rounded after a
peculiar fashion. The introduction of this phrase, in the Bell Rock service,
was purely accidental, having been applied, by Captain Grindlay, Master of
the Trinity-House of Leith, to the first or experimental stone-lighter, from
its resemblance to the praams of Norway. Those now alluded to, however,
were built of a more rounded form, after the Dutch manner. They measured
over all, on deck, about 28 feet by 8 feet 6 inches, and their depth of hold
may be stated at 2 feet, for, being built by different carpenters, they were
not exactly of the same dimensions. They had a considerable spring or
sheer, and were constructed for carrying their cargoes entirely upon deck,
which formed a kind of cockpit in the waist, having a high gunwale on each
side, and a break, both fore and aft, as will be seen in Plate XI., the first tier
of stones seldom reaching above the level of the gunwale. They had,
consequently, little or no hold, having only what was sufficient for stowing
some pig or cast iron ballast, a few empty casks, with the necessary warps,
kedge-anchors, and grappling-irons.
These lighters were built of uncommonly strong
Precautions taken for
materials, both in their timbers, outward planks, and
rendering them water-
tight and buoyant. ceiling or lining, which last was caulked and secured in
a manner similar to that described for the Floating-light,
so that although the outward skin were damaged, by striking or rubbing on
the rock, there would still be an additional defence against sinking. Such,
however, was the presentiment of danger attached to the landing-
department, that besides the precaution of a water-tight lining, each praam
was provided with twelve strong empty casks, which were stowed in the
hold, and were sufficient to float and render her buoyant, in case of

Page 208

accident. The praams, therefore, became so many life-boats moored in the
neighbourhood of the rock.
These praams had but one hawse-hole, and that they
Method of mooring might ride more easily at their moorings in the open
the Praam-boats.
sea, it was placed amid-ships, and as low or near the
water-line as possible. The chain-hawsers with which they were connected
to their respective floating-buoys and mushroom-anchors, were made of
rod-iron, one-half inch in diameter, turned into as short links as possible.
This piece of chain was about five fathoms in length, and was attached to
the praam by a strong hook, connected with her bits, the farther end being
made permanently fast to the mooring-chain of the mushroom-anchor. From
the lowness of the hawse-hole, and its central position in the praam, and
from having only a short piece of chain to carry, which connected the boat
to the mooring-buoy, may be attributed the astonishing ease and safety with
which these boats rode at anchor. So remarkable was this, that while the
tender, and the other vessels in the service, were tossed about, and shipping
a great deal of sea, and even at times obliged to slip their moorings, the
praams floated with an easy undulating motion, and were generally as dry
upon deck during a gale, though loaded with ten tons of stone, as if, to use a
sailor’s phrase, they had been riding in a mill-pond. The facility, also, with
which the praams were attached and disengaged from their moorings, was
another very great conveniency to the work. In unmooring them, all that
became necessary was to unhook the hawser-chain from the bits, and throw
it overboard, with a small floating-buoy attached to it, for the purpose of
suspending the hawser-chain for the time. In the same manner, in making
the praams fast to their moorings, this chain was simply to be laid hold of,
by taking the small floating-buoy on board. The chain was then slipped into
the hawse-hole, by a corresponding slit in the stem of the praam, and then
attached to the bits, when the process was complete. By inspecting the
diagrams in Plate XI., this process will be better understood.
The two cutters or boats employed last year for
Attending Boats.
transporting the artificers from the Floating-light to the
Bell Rock, were found to be rather too small in rough
weather. They measured 16 feet in length of keel, 5 feet 3 inches in breadth,
on the mid-ship thwart or seat, and 2 feet 6 inches in depth. These boats
were of as large dimensions as the floating-light could stow, after making

Page 209

the necessary allowance for ranging her cables on deck. They had square
sterns, were rowed with four oars, and accommodated twelve sitters,
including sailors. But the Sir Joseph Banks being entirely fitted as a tender
for the works, the stowing of large landing-boats became a principal object.
Her boats were therefore made as large as possible, due regard being had to
their convenient management and fitness for the small creeks or landing-
places at the rock. After a careful consideration of these circumstances, it
was resolved that the two new attending-boats should measure 20 feet in
length of keel, 5 feet 8 inches in breadth, and 2 feet 10 inches in depth.
They were rowed with eight oars, double banked, or two upon each thwart,
and could accommodate eighteen sitters each. They were round in the stern,
fitted with a backboard and a convenient seat for the cockswain, who
steered with a yoke and lines, instead of a tiller.
One of these boats was called The Mason, the other The
Life-Boat.
Seaman. The latter was fitted up as a Life-boat,
somewhat after Greathead’s method, being lined and
girded with cork, to the depth of three streaks below the gunwale. In case of
accident, therefore, by the bilging of either boat upon the rock, she was
rendered more buoyant by the cork lining and sheathing. They were built in
Leith, and before being sent to the rock, the buoyancy of the Life-boat was
tried, when it was found that she would float with thirty people on board.

Implements.

From the wasting effects of the sea, the Bell Rock is
Railways.
formed into numerous benches and gullies, and its
surface is consequently extremely rough and irregular.
The site of the Light-house being in a central position on the rock, it
became necessary to make some provision for conveying the large blocks of
stone speedily from the respective landing-places to the site of the building;
or at least within the range of the cranes or machinery to be employed in
laying them. In ordinary situations, the most obvious method would have
been to clear away the inequalities of the rock; but here, from the lowness
of its position in the water, such an operation would have been extremely
tedious and difficult. Besides, every portion of the Bell Rock was held
sacred, excepting in so far as it was absolutely necessary to excavate or

Page 210

remove part of it, in fixing the Beacon-house, and in preparing the
foundation of the Light-house. Instead, therefore, of quarrying the rock, the
writer found that the most advisable process would be, to lay cast-iron
railways round the site of the Light-house, projecting to the several landing-
places, on which waggons could easily be wheeled in all directions, as will
be seen by tracing the dotted lines on Plate VI.
For this purpose, patterns were prepared in the course of the winter, from
which castings of the several compartments of the railways were made by
Mr John Baird, of the Shotts Iron Works. These rails were cast in lengths of
four feet, and supported upon props and frames of cast-iron, varying in
height from six inches to five feet, according to the inequalities of the rock,
that the whole might be laid upon one level. Besides the tracks for the
wheels of the waggons, it was necessary also to provide a tracking-path of
the same metal, which was formed of ribbed work, rested upon the supports
of the rails, as will be understood from the diagrams in Plate X. The
waggon-tracks were of the form technically termed Plate-rails, which were
found convenient for making the necessary fixtures. The edge-rail is less
liable to friction, and is certainly greatly preferable to the plate-rail, where
the track is liable to be impeded with dust, and other adventitious matters;
objections which do not apply at the Bell Rock, where the rails were every
tide considerably under water.
It was necessary that every thing intended to be left on
Waggons.
the Bell Rock during the working season, should have
as little buoyancy as possible, and as it would have
been extremely inconvenient to have removed the waggons from the rock,
which were to be employed in conveying the blocks of stone from the
landing-places to the Light-house, they were constructed entirely of iron,
excepting two pieces of oak timber, which were bolted upon the top, to
form a seat for the stones. These waggons, represented in Plate X., moved
upon four trucks or wheels of cast-iron, measuring one foot two inches in
diameter, placed two feet six inches asunder, being the length of the axle,
and breadth of the railway. Each waggon was provided with a handle,
which shifted at pleasure to either end, for the conveniency of reversing the
motion, without the necessity of turning the vehicle. But what was more
peculiar to these waggons, was a joint in the middle of the perch or double

Page 211

frame, connecting the wheels, by means of which they were made
applicable to the circular tracks of the railway round the site of the building.
Connected with the cast-iron railways, preparations
Triangular Crane.
were also made at the eastern landing place, for lifting
the stones by means of cranes or other machinery from
the Praam-boats, and laying them upon the waggons to be conveyed to the
building. After a good deal of consideration, patterns were prepared for an
apparatus consisting chiefly of six pieces of cast-iron, four of which
measured 12 feet in length, and of a corresponding strength. As will be seen
in Plate XI., these bars met at the top in the form of two sets of sheers, but
their lower ends were placed about 9 feet asunder. Connected with these, a
pair of sheers were set up, which were moveable upon a bolt, and worked
with a crab or winch machine, the whole being strongly batted to the rock.
When the moveable pair of sheers, with their attached chain and hook, were
suspended outwards over the stone to be lifted from the praam, the chain
was hooked to the Lewis-bat, previously inserted into the block. The sheers
were then raised till they were brought to a perpendicular position, when the
motion of the winch was reversed, and the sheers were lowered inwards
upon the wharf, and the stone thus laid upon the waggon. The chain was
then unhooked, and the sheers were ready for lifting another stone, as will
be better understood by referring to Plate XI., with its letter-press
description.
Having, in the foregoing article, described the
Crane with moveable
Beam.
implement employed in landing the stones on the Bell
Rock during the year 1808, we are now to notice the
crane employed in laying or building them. It appears from Mr Smeaton’s
Narrative, that the implements chiefly used for building at the Edystone,
were a pair of moveable sheer-poles and a set of triangles, most ingeniously
applied to their respective purposes. But such implements must have come
far short of the expedition which the writer had conceived to be necessary at
the Bell Rock, both on account of the much greater extent of the building,
and also from its foundation being so much lower in the water. After
considering the subject, and making minute inquiries into the practice at
various public works, he found no implement of the description, which he
considered applicable to his purpose. The common sheer-poles, still chiefly
in use, were recommended as having upon the whole been successfully

Page 212

employed at the Edystone. In some instances, the common crane, with the
beam fixed at the top, at right angles to the shaft, was applied for laying
heavy materials. The writer, however, laid it down as a proposition to
himself, That a more effective mode of building must be adopted at the Bell
Rock than had hitherto been in use, by which all the stones at any time
likely to be landed in the course of a tide, might be built and secured before
the artificers left the rock.
The chief difficulties attending the application of the common crane in such
a situation, consisted in the laying the stones perpendicularly into their
respective places, as they were all of a dove-tail or angular form, as will be
seen from Plate XIII. The fixed beam of the common crane was further
objectionable, from its being more liable to interfere with the guy ropes. It
would also have been difficult to have lifted it either laterally or
perpendicularly upon the building, from one course to another. To these
may also be added the great obstruction which the beam would have
presented to the waves of the sea at high water. All these objections,
however, were in a great measure got over, by substituting a moveable
beam to work upon a bolt at the foot or lower end of the upright shaft,
instead of a fixed beam at the top in the usual manner. But as we shall have
occasion again to notice this machine in the operation of building, we shall
here refer to Plate XIV. with its letter-press description. Three of these
cranes, with moveable beams, were prepared for the work, in the course of
the winter, one with an upright shaft of 28 feet in length, for laying the
prepared stones upon the platform in the work-yard at Arbroath, and other
two, with shafts of 21 feet, for building at the rock.
Though none of the stones of the Bell Rock Light-
Sling Cart.
house were likely to exceed two tons in weight, in their
finished state; yet, in their undressed state, they were
much more ponderous. From the waste attending their dove-tailed form,
and the working them square on all their sides, the blocks from the quarry
were greatly reduced; in many instances, to one-half of the cubical contents
of their quarry dimensions, before they were brought to the size of the
moulds. The stones had not only to be conveyed from the harbour of
Arbroath to the work-yard, a distance of from two to three hundred yards,
but also required to be frequently lifted from place to place; as, for example,
when in a hewn or dressed state, they were removed to the circular

Page 213

platform, in the middle of the work-yard, to be tried and marked;—they
were again shifted from this position, and ultimately carried to the harbour
to be shipped for the rock. From the various movements which each stone
had thus to undergo, it became an object of importance to the facility and
economy of the work, to consider how this could be most conveniently
accomplished. Had a cart or carriage, with four wheels of the ordinary
construction for great loads, been employed, it would have been extremely
troublesome, in all the operations of loading, turning and moving from
place to place. To have attempted to avoid this by the use of waggons with
low wheels, and the introduction of railways along the quays and public
streets of Arbroath, would also have been objectionable, especially as the
object could be much more conveniently obtained by the use of what is
called the Woolwich Sling-cart, represented in Plate X. By this machine, the
weight is simply raised off the ground with a wheel and pinion apparatus
fixed upon the frame of the cart, and in this manner, the stone, instead of
being lifted upon the body of the carriage, had only to be suspended at the
necessary height for overcoming the inequalities of the road. This vehicle
had long been used with great advantage by military engineers, in moving
ordnance; but was probably first employed at Mylnefield Quarry, and the
Bell Rock works, in transporting blocks of stone.
Another implement prepared, in the course of the
Carpenter’s Jack.
winter, for the Bell Rock work-yard, was the
Carpenter’s jack, used for raising ships upon the blocks
or props for the purposes of repair. This machine, which is simple in its
construction, and direct in its application, consists of a rack and pinion,
enclosed in a frame of oak timber, strongly bound with iron, as represented
in Plate X. By working the handle of the jack, the stone-cutter is enabled,
without the assistance of his fellow workmen, to turn and lay the heaviest
stone to his hand. This apparatus the writer first saw used to much
advantage, by the quarriers at Portland Island, in the year 1801; and though
it had not perhaps at that time been put into the hands of the stone-cutter, it
was obvious that it might also be applied to his purpose with equal effect.
It may further be noticed, regarding this useful implement, as strongly
marking the prejudices of habit, that Mr Mylne, the proprietor of
Mylnefield Quarry, who, with enlightened views, furnished his works with
machinery of the very best description, among other articles, provided a

Page 214

number of these jack-machines for his quarriers, but, for a long time, they
could not be induced to make use of them. One of the men, however,
happening, of his own accord, to apply the jack in turning a heavy block, its
utility soon became apparent; and Mr Allan the manager, who had
previously taken considerable pains to get the jack introduced, was at length
not a little pleased to find it, after having been laid up in store as useless, in
much request throughout that extensive quarry.
A Lewis Bat, of some form, for lifting large stones, is
Lewis Bat.
believed to have been known to the ancients. But that
now in common use is generally understood to have
been at least improved by the French engineers, who, in honour of their
Sovereign, gave it the name of Lewis. This useful implement is so
universally known in practice, for its great utility in building with heavy
materials, that it is hardly necessary to do more than simply allude to it. It
consists of five pieces of iron, three of which, forming a dovetail, like an
inverted wedge or the keystone of an arch, are inserted into a corresponding
hole cut in the stone. The fourth is the bolt connecting the shackle-piece, by
which the weight is suspended, as will be better understood by referring to
the sketch or diagram illustrative of it in Plate XI. Of this implement, it
became necessary to furnish several dozens, as well from the variety in the
weight, as from the figure of the stones, many of them requiring two
Lewises to produce a proper balance. But the number was more particularly
encreased, from the different sets required for the workyard, the stone-
lighters, and for the Bell Rock, where it was necessary to provide against
loss, to which this service was so peculiarly liable.
As the whole of the stones of each course or tier of this
Moulds.
building were connected or let into one another, by a
system of dovetails, diverging from the centre to the
circumference, after the manner of the Edystone Light-house, as will be
seen from Plate XIII., each particular stone required to be cut with accuracy,
to fit its precise place in the building; and as even the form into which the
blocks of granite were made, often depended upon the adventitious produce
of the quarries, it became a very considerable operation to prepare the
necessary moulds or patterns for the respective courses. When, therefore,
the thickness was ascertained that a lot of these stones would admit being
dressed, a plan of the particular course was first drawn upon paper by the

Page 215

Clerk of Works; a certain compartment of the course was then protracted of
the full size, upon a platform of polished pavement, measuring 70 feet in
length, and 25 feet in breadth, and occupying part of the ground floor of the
workmen’s barrack. From this enlarged draught, Mr James Slight, the
principal mould-maker, took his dimensions in making the moulds of the
full size of the ground-plan of each stone, on which were marked the
necessary directions for the stone-cutter, both as to the thickness of the
course, and the position of the connecting joggle-holes, trenails and wedges.
These moulds being made with great precision, were carefully marked and
numbered with oil paint, according to the positions which the respective
stones were to occupy. They were made of well seasoned fir timber, and
dressed clean in the form of open frame-work, measuring from three to four
inches in breadth, and from one-half to three-fourths of an inch in thickness.
At the angles and joints, thin plates of iron were screwed upon these frames,
to strengthen and preserve them, while the workmen were making their
draught-lines, and in their numerous applications of them in the process of
hewing the stones. Each course of the solid part of the building required
from three to five moulds, of the form delineated in Plate X., which were
carefully laid aside in sets, till the particular course to which they belonged
should be landed upon the rock, and secured in the building. In a work of
this kind, such a precaution was indispensably necessary; for, in case of loss
or accident to any of the stones, in landing them at the Rock, it would then
only have been necessary to send to the work-yard, referring to the
particular number of the mould, from which another stone could speedily
have been prepared.
In the first designs for the Bell Rock Light-house, the
Cofferdam.
writer had modelled a cofferdam, five feet in height,
intended to have been erected of cast-iron, round the
site of the building, that the work in its early stages might be continued for
a longer period, both during the ebb and flood tides. The experience of last
season’s work, however, shewed that the erection of the proposed
cofferdam would have been attended with considerable difficulty; and, to
have rendered such an apparatus equally useful during ebb-tide as flood-
tide, would have required the pumping of water by machinery more
complicated and powerful than the situation of the Bell Rock would have
admitted.

Page 216

This idea was therefore laid aside, and two Pumps, of a
Pumps. simple construction, were prepared, for clearing the
foundation-pit of water. They measured about twelve
feet in length, and were of a square form, both externally and internally,
having each a void of ten inches. They were made of fir timber, three inches
in thickness, strongly jointed, and put together with white-lead paint, having
also a number of cross bars and bolts of iron, to strengthen them for
withstanding the atmospheric pressure upon so considerable a surface.
These pumps were furnished with a wooden spear or rod, having a cross
head or handle at one end, and a leathern valve attached to the other. This
valve was of a very simple construction; it collapsed when plunged into the
water, and was inflated by the return draught delivering a quantity of water
equal to the cubical contents of the void or chamber of the pump.
There were four Crabs or Winch-machines prepared for
Winch-machines.
working the different purchases required in the various
departments of the work, as, for example, in lifting the
stones from the praam-boats, as represented in Plate XI. Another of these
machines was fixed on the temporary wooden bridge of communication,
erected between the Beacon-house and Light-house, as will be seen in Plate
IX. Other two of these machines are likewise represented for raising the
stones from stage to stage upon the building, as will be more particularly
described in the letter-press description of this Plate. These machines were
made wholly of iron, excepting the bushes for the gudgeons working in,
which were of bell-metal. They were calculated to work with what is called
double and single purchases, according to the weight of the stones to be
lifted. They were very powerful in their operation: the winch or barrel being
twelve inches in diameter, gave the single purchase a power of about fifteen
to one, and the double purchase about sixty to one. These machines were
calculated to work with five tons. The weight of the largest size was
altogether about 10 cwt., so that they were not easily shifted by the impulse
of the sea, when batted to the rock, as represented in Plate XI.

Building Materials.

The Commissioners of the Northern Light-houses, as
Stone.
before noticed, having finally resolved that the erection

Page 217

upon the Bell Rock should be of stone, constructed upon principles similar
to the Edystone Light-house, it became a question of importance in the
economy of the work, to fix the quality and description of stone to be used.
Considering this subject in reference to the Edystone Light-house, it
appears that the hearting or interior of the solid part is of sandstone from
Portland Island, and that the exterior of that building is of Cornish granite,
both of which were highly suitable in quality, and were fortunately
procurable from quarries the most contiguous to Plymouth, where these
works were situate.
It may farther be noticed, that granite is perhaps the
Mineralogy of the
southern and eastern
only stone upon the coast of England, which possesses
shores of Britain. durability for withstanding the effects of the weather in
a situation so exposed, or strength sufficient for
undergoing the process of landing the stones when in their prepared state. In
Scotland, however, the case is widely different, for here, the country
abounds with excellent building materials of almost every description; and
excepting in those districts which produce granite, that stone is rarely had
recourse to for buildings of any description. It is curious to observe, and it
may here not be out of place to remark, in looking into the mineralogy of
the British coast, on the great scale, that we find the shores of the whole
southern parts of the kingdom, or from Portland Island in Dorsetshire, to
Flamborough Head in Yorkshire, consist chiefly of chalk, limestone, clay,
and beds of gravel. But if we continue our course from thence northward, to
Stonehaven in Kincardineshire, including the Firth of Forth, the strata, with
little exception, are sandstone, greenstone, limestone and coal. The
Aberdeenshire coast is chiefly of granite, syenite, and gneiss, while a part of
Banffshire consists of serpentine and porphyry: but here the sandstone again
makes its appearance, and stretches along the northern shores of the Moray
Firth , Caithness and Sutherland, nearly as far to the westward as Cape
Wrath. To this great extent of sandstone country, may also be added the
islands of Orkney and Shetland, with some considerable exceptions,
however, in so far as regards Shetland; but, in Orkney, these are confined to
comparatively small portions of gneiss with granite veins, which occur in
Pomona or the Mainland, and in the Island of Græmsay.
From this state of the mineral strata, it naturally follows, that those who
inhabit the sandstone districts employ that beautiful, easily worked, and, in

Page 218

many instances, highly durable stone, in architecture; and so of the other
districts, according to the predominating species of their stone. For a
building, therefore, in a country situate like that of the Bell Rock,
abounding with sandstone of the first quality, this description of stone
obviously presented itself, both as the most accessible and economical. But
when the importance of this work came to be fully considered in all its
relations, a little additional expence was not to be allowed to regulate a
point so essential, without a due regard to what might ultimately prove the
most durable and permanent fabric.
The attention of the Commissioners was consequently
The use of granite and
directed to the use of granite, as combining the greatest
sandstone is resolved
upon. number of properties for such a building. Some doubts,
however, having existed, as to the certainty of
procuring blocks of that stone of sufficient dimensions, it became a matter
of importance to determine this point, and also to ascertain the quality of
the sandstone, of which it had been proposed to form at least the hearting of
the solid part. The Commissioners, therefore, in the month of November
1806, required a special opinion from Mr Rennie and the writer upon this
subject; who accordingly visited the sandstone quarry of Mylnefield near
Dundee, and the granite quarries in the neighbourhood of Aberdeen, and
made a report to the Board, which is given in the Appendix, No. IV.
This report sets forth, that many granite quarries were
Report of Mr Rennie
and Mr Stevenson.
found in activity at Aberdeen, some of which were
capable of producing larger blocks of stone than are
usually met with, but that still it was doubtful, whether any single quarry
would be found to produce a sufficient number of large blocks for this work
in any reasonable time. Upon the quality of the stones respectively; the
report states, that “the granite of Aberdeen is very strong and durable in its
nature, and having been used in works where the sea has acted upon it for
time immemorial, no doubt can possibly be entertained as to its adaptation
to a work of this kind. There is also every reason to believe that the
Mylnefield stone resists the sea and weather equally well, but we have not
been able to collect such positive proof of this as of the other; for, although
a great number of Mylnefield stones have been used in the piers of the
harbour of Dundee, yet, as these works consist of stones from other
quarries, having the same appearance, and nearly the same composition,

Page 219

there is no possibility of our saying whether some of the stones that appear
in a wasting state, may not have been from that quarry, although we have
great reason to believe they have not. However, where facts cannot be
positively ascertained doubts exist, and we think that a Light-house upon
the Bell Rock is too important a work to permit the leaving of the slightest
doubt about the durability of the materials. We have, therefore, no hesitation
in recommending that the outer part of the building, at least as high as the
first apartment, should be of granite; and as this is the great bulk of the
work, it may be as well to complete the outer course of granite.”
The Reporters then go on to state, from a review of the several quarry
prices, that, for the outer casing, the sum of about L. 2,500 would be saved
by the use of sandstone from Mylnefield, instead of granite from Aberdeen;
and that, for the hearting of the solid part, an additional saving of about
L. 1000 would further be made, if the sandstone of the Redhead quarries, in
the immediate neighbourhood of Arbroath, instead of the Mylnefield stone,
was used. On considering this subject, however, in all its bearings, the
Commissioners resolved that measures should be taken for procuring
granite for the whole outward casing of the Light-house, and that the
Mylnefield sandstone should be used for the interior work. To the other
properties of these stones, one of some consideration for a work of this
description was their ponderosity, there being only about 13½ cubic feet of
Rubislaw granite to the ton, and 15 feet of Mylnefield stone, while the more
common kinds of sandstone contain about 15½ feet to the ton.
These, and other matters of minor importance alluded to in this report,
having been adjusted by the Light-house Board, the writer took the
necessary measures for entering into contracts and agreements for the
supply of stones from these quarries. The difficulties which subsequently
attended the procuring of a regular supply of stones for the work have
already been alluded to; and to this subject we shall again have occasion to
recur, as it was ultimately found necessary to restrict the use of granite to
the outward casing of the first thirty feet or solid part of the building.
The best composition for building-mortar appears to
Mortar of the
ancients.
have been a problem from the earliest history of the
arts. Vitruvius, who lived about 130 years before the
Christian æra, seems to have been practically, as well as scientifically,
acquainted with the whole subject of architecture. But, although he, and

Page 220

other eminent authors who followed him, have minutely treated of the
composition of mortar, stating, no doubt, all that was known of the practice
of the ancients; yet, it has always been a favourite maxim to maintain, that
the secret of compounding mortar has at some period of its history been
irrecoverably lost. It is certainly true, that many of the works of ancient
times exhibit wonderful specimens of the excellency of their building
materials. It may, however, be drawn no less conclusively from the writings
of intelligent travellers, that many of their finest edifices have been subject
to premature decay, which affords a proof that at least no systematic rule
was universally observed in the preparation of their calcareous cements; but
that, like the artists of the present day, the quality of their materials
depended much upon those adventitious circumstances which too often
regulate the views of their successors, by an over-anxious desire for
economy, without keeping duly in view the permanency of their works.
In Great Britain, the composition of mortar does not
Attention of the
moderns to this
seem to have occupied much of the attention of the
subject. learned, prior to the beginning of the 18th century, or
the time of Sir Christopher Wren. And, indeed, the
subject was not pursued with much intelligence and effect, till after the
great discoveries of Dr Black, about the year 1754, which unfolded the
principles of latent caloric, and the expulsion of fixed air, by which
limestone loses about one-half of its weight in the process of calcination.
These discoveries were succeeded by the excellent treatise of Dr Higgins on
Water Cements, published in 1780; and in 1793, Mr Smeaton’s Narrative of
the Edystone Light-house appeared, containing, not only an account of the
preparation of the mortar for that celebrated building, but also of his
experience for thirty-six years, as an engineer of the most extensive practice
of his day. The composition of mortar has also occupied the attention of
several French authors, as Belidor, Loriot, Viccat and others, but without
perhaps adding much to our stock of practical knowledge.
Were the writer permitted to state the result of his
Experience of the
writer.
professional observations for the last twenty years, he
might notice, that no error is more commonly met with
in water buildings, than that of employing house or common mortar in the
erection of sea-walls. It may also be stated, generally, in compounding
mortar, that the cheapest article is too apt to be made use of in the greatest

Page 221

proportion. We accordingly find, that lime is not unfrequently made too
rich, as it is technically termed when a small proportion of sand is applied
to the mixture; an error, which is attended even with worse consequences
than when the lime is made poor, or when too great a proportion of sand is
used. But, perhaps, the worst of all mortar is that wherein very fine pit-
sand, containing a portion of earthy matters, is used, and when the whole is
mixed up with impure water. So little attention is often paid to the quality of
mortar, in common buildings, that one would imagine it were applied, as if
intended more to prevent the sifting winds from penetrating the walls, than
as the medium by which they were ultimately to be bound or formed into a
compact fabric.
It is not possible to give any formula for the composition of mortar which
will apply generally; so much depends upon the quality of the limestone,
the mode of its treatment in burning, the use of clean sharp sand and pure
water. When these ingredients are judiciously selected, duly apportioned,
and well beaten together, they will immediately form a paste of some
tenacity, which will ultimately take bond and give a consistency to the
work. From all the experiments that have been made, it seems to be
essential to the composition of the best water-cements, that the limestone
should contain about one-seventh of alumine or clayey matter. But as this
description of limestone admits of a less proportion of sand in the mortar
compounded of it, than that which is more purely calcareous, it is not so
much in request for the common operations of building, as being less
economical. It may, however, be stated, as a pretty general maxim, that
where comparatively pure calcareous matter is met with, at least three
measures of clean sharp sand, free of earthy particles, mixed with one of
burned lime, in the state of powder, and a due portion of pure water, well
beaten together, will form good mortar for common use.
From the similarity of the situations and the buildings
Mortar of the
Edystone.
upon the Edystone and Bell Rocks, and from Mr
Smeaton’s celebrity as an engineer, his Narrative of the
former work became a text-book to the writer in the erection of the latter. In
considering the importance of this subject, with a view to the erection of the
Bell Rock Light-house, the judicious remarks, and numerous experiments,
of Dr Higgins on water cement, were carefully examined, and they will
always be consulted with interest by the professional reader. The

Page 222

composition of the Edystone mortar consisted of equal portions, by
measure, of Aberthaw lime and Pozzolano earth, both in the state of
powder, mixed up with sea-water. When the writer first visited Plymouth in
the year 1801, the Edystone Light-house had been erected about 42 years;
and he was informed by Mr Tolsher, agent for the establishment, that the
original pointing of the joints of that building had never required repair.
Of the ingredients of the Bell Rock mortar, as the
Bell Rock Mortar.
pozzolano was not only the most expensive, but, from
the distracted state of Europe, during the progress of the
works, could hardly be procured at any price, it became an object to be as
independent of that article as possible. A train of experiments was therefore
undertaken by the writer, when it was ultimately found, that pozzolano and
lime, in the state of a dry impalpable powder, and clean sharp sand, in equal
proportions by measure, mixed with sea-water, formed a mortar equally
good in all respects as when no sand was added. Under favourable
circumstances, this mixture did not seem to be more tardy in fixing, than
when the sand was excluded, while nothing could exceed the compact and
indurated state of the composition. The writer accordingly built some small
rubble-walls with it within sea-mark, which were allowed to stand for a few
months, and when pulled down, they appeared like so many pieces of
conglomerated rock, the mortar being as hard and compact as the sandstone
of good quality with which these little walls were built. From the excellency
of the Bell Rock mortar, it may not be amiss to go a little farther into detail,
by noticing each of the ingredients of which it was composed.
In the course of investigating this subject, specimens of
Lime.
lime, from the counties of Edinburgh, Haddington, Fife
and Forfar, were subjected to various trials with
mixtures of pozzolano and sand. The results were not a little curious, as the
experimental balls, made with different proportions of these limes, did not
set or harden; but, on the contrary, the particles seemed to repel each other
as the mixture became heated, and ultimately crumbled into its constituent
ingredients. From these experiments, it was found advisable to bring a
cargo of limestone from Aberthaw in Wales, being the same as that used for
the Edystone Light-house. This lime is found imbedded in a clayey matrix,
in the state of water-worn nodules, varying in size from a cubic inch to that
of a cubic foot. This limestone is of a bluish or beautiful French grey

Page 223

colour, of the specific gravity of 2.70. It is easily calcined, and in that state
is reducible to the finest powder. It is the mountain or first flœtz limestone
of geologists; and, when broken, it pretty generally displays the Cornua
ammonis, and many other curious animal remains. This limestone is found
in great abundance on the sea-shore at Aberthaw, where the softer matters
being washed away from the lower stratum of certain high cliffs, containing
these rounded masses, the upper parts fall in great quantities, from which
the succeeding tides wash away the earthy matters, leaving the limestone
upon the beach in the state of debris. When a vessel is to load limestone
here, she is grounded on the shore at about half-tide, and loaded when the
water recedes. The price paid to the proprietor for a cargo is at the rate of
one shilling per ton, as a lordship.
Pozzolano, the second mentioned ingredient of the Bell
Pozzolano.
Rock mortar, is a kind of earthy lava, of a brownish red
or greyish colour. It contains in the hundred parts, silica
55, alumina 20, lime 5, and oxide of iron 20. It was not so easily procured
as the limestone from Aberthaw. It is very abundant on the coast of Italy
and shores of Sicily, where it is found in considerable masses, and is usually
imported in a crude earthy state, requiring to be pounded, or beat in a mill,
to fit it for the finer purposes of mortar. It is generally brought to this
country as ballast; and, in time of peace, when the ports are open, is sold for
about L. 5 per ton. During the progress of the Bell Rock works, however,
from the long continued and almost universal restrictions upon British trade
with foreign ports, as much as L. 15 per ton has been paid for pozzolano for
the use of these works. The writer having had great difficulty in procuring a
supply of it for commencing the works, got a quantity of Tarras from
Holland, the Dutch ports being, at this time, open to British vessels. Tarras
or Trass is found near Andernach, and is brought down the Rhine to
Holland. It is very similar in its nature and properties to pozzolano, and,
like it, is of a reddish or greyish colour. It contains 37 parts silica, 28
alumina, 6.5 lime and 8.5 iron. Its property of setting in water is very
remarkable, and, when good, it admits even a greater proportion of lime in
the composition of mortar than pozzolano. The Dutch are very attentive in
ascertaining the quality of the trass before using it in building their dikes.
The following simple experiment is always employed. A small vessel, made
of a mixture of lime and trass, is filled with water, and if at the end of three

Page 224

days the water does not filter through the vessel, the trass is considered
good; if, on the contrary, water passes through, the trass is rejected as bad.
According to Dr Higgins, the sand used for mortar
Sand.
should be free of earthy particles, and have as many
sharp angular points as possible. The writer having
accordingly examined the shores in the neighbourhood of Arbroath, for
sand answerable to this description, he found it of excellent quality about a
mile and a half westward from that place. Upon examining this sand with a
magnifying-glass, its appearance was like so many small shining crystals
shooting into numerous points.—It is often a difficult question with
mineralogists, to account for the production of sand in many situations upon
the coast; but here the question involves no perplexity, as St Andrew’s Bay,
which is generally understood to extend from Fifeness to the Redhead, a
distance of about 25 miles, is not only bounded by sandstone, but forms the
embouchure of the river Tay, and of several other considerable streams,
which fall into the sea upon its shores.
It usually forms a condition in the Specification of
Water.
mortar for house-building, that it shall be mixed with
pure water, free of earthy or saline particles. In
situations where water is scarce, many impurities are apt to be mixed with
it, which injure and even destroy the adhesive quality of the mortar. The use
of sea or salt water is guarded against in these cases, from its liability to
produce an efflorescence on the walls; when the saline particles deliquesce
with the changes of the weather, and produce the appearance of dampness.
To have attempted to avoid the use of salt-water in the preparation of the
mortar for the Bell Rock Light-house,—which was all prepared on the spot,
—independently of the risk of deteriorating the mortar, would have been
attended with much additional trouble and expence. Besides the practice at
the Edystone, the writer had previously ascertained, that the use of sea-
water produced no bad effect upon the tenacity or adhesive quality of the
mortar into which it was introduced, and the object of avoiding the
appearance of dampness in this building was extremely trifling. The stones
were to be very correctly jointed, and the whole of the interior walls to
consist of polished masonry, so that the fine lines of the joints exposed to
the action of the air were so inconsiderable, as hardly to be taken into

Page 225

account. Salt-water was, therefore, uniformly used in the preparation of the
Bell Rock mortar.
The recent discovery of a very excellent water-cement,
Cement.
for which Mr Parker of London obtained a patent,
under the title of “Roman Cement,” became another
matter of importance to the Bell Rock works. This substance is produced
from calcined nodules of argillaceous limestone, found upon the southern
shores of England. It is of a brownish colour, and from its excellent
property of setting in water, when good and fresh, its application as a
mortar, for the lower courses of the Light-house, demanded attention. But,
for general use as a mortar, it would not only have been expensive, but
often highly inconvenient in building, from the speedy manner in which it
hardens. It is also of too brittle a nature to be suitable for the general
purposes of common mortar; though it forms a paste of great value for
lipping or pointing the outward joints of water buildings, not only by
preserving the mortar till it gets into a fixed state, but also as forming a
durable joint. A considerable supply of this cement was accordingly used
throughout the building, for pointing the exterior joints. This cement is sold
at the rate of five shillings per Winchester bushel, in the state of powder,
packed into casks, lined with paper, to prevent it, in some measure, from
imbibing humidity from the atmosphere, by which its adhesive properties
are destroyed.
Following out the principle of the Edystone Light-
Oaken Trenails and
Wedges.
house in most of its details, the oaken trenail and wedge
were used for fixing the stones, till the mortar took
band, and a superincumbent weight was got upon them to prevent the sea
from sweeping them away. These being also introduced into all the lower
courses of the Bell Rock Light-house, a sufficient quantity was procured for
the probable number of courses that might be built during the ensuing
season. The precise lengths of the trenails and wedges could not be fixed,
from the uncertainty of the granite quarries, which regulated the thickness
of the courses of the building; but, for the present, the trenails were
provided of the length of 2 feet, and 1¼th inch in diameter. The wedges
were of the length of 18 inches, measuring 3 inches in breadth, 1 inch in
thickness at the top, and tapering to ¼th of an inch in thickness at the point,

Page 226

as will be seen in Plate X. Figs. 10. and 11. But when we come to speak of
the process of building, their respective uses will be described.
On the writer’s visit to Arbroath, in the end of March,
1808, March.
he was anxious to land upon the Bell Rock, to ascertain
the precise state of the Beacon, after the storms of the
The writer visits the winter, that he might be enabled to judge of the
Bell Rock.
propriety of converting it into a habitable place for the
artificers during the working season. He accordingly sailed from Arbroath
on the 30th current, at 1 a. m. in the Light-house Yacht. The wind was from
E.NE., but the weather, though cold, was upon the whole favourable for the
trip. At 7 the Floating-light was hailed, and all on board found to be well. It
was now unfortunately too late in the tide for landing upon the rock this
morning; and it became necessary to cruise about till the following day,
there being at this season only one tide with daylight. In the mean time, in
sailing round the rock, just as it was beginning to be covered with the tide,
the base of the Beacon was distinctly seen between the rolling seas, which
broke upon it; while at the top, the flag-staff proudly continued to surmount
the whole.
In the course of the day the writer examined the
Floating-Light.
Floating-light, where every thing connected with the
security of the vessel, and her moorings, was in good
order. What seemed chiefly to please Mr Wilson the commander, was a late
improvement in the application of a winch, with wheel and pinion fixed at
the break of the quarter-deck, which was now employed to great advantage
in working the cable with stoppers as on board of war-ships, the hempen
cable, forming part of her moorings, being too thick and unwieldy for
holding-on by hand. The vessel’s manner of riding during some late gales
was described as having been very difficult, and even alarming at times; but
it was nevertheless, added, that nothing had been felt so severely as the gale
of the 6th and 7th of September last, when the writer was on board.
The crew were observed to have a very healthy-like
The crew spend their
time happily.
appearance, and looked better than at the close of the
works upon the rock. They seemed only to regret one
thing, which was the secession of their cook, Thomas Elliot,—not on
account of his professional skill, but for his facetious and curious manner.
Elliot had something peculiar in his history, and was reported by his

Page 227

comrades to have seen better days. He was, however, happy with his
situation on board of the Floating-light, and, having a taste for music,
dancing, and acting plays, he contributed much to the amusement of the
ship’s company, in their dreary abode during the winter months. He had
also recommended himself to their notice as a good shipkeeper, for as it did
not answer Elliot to go often ashore, he had always given up his turn of
leave to his neighbours. At his own desire, he was at length paid off, when
he had a considerable balance of wages to receive, which he said would be
sufficient to carry him to the West Indies, and he accordingly took leave of
the light-house service.
Mr John Reid, the principal light-keeper, stated, that
The Light is
comparatively feeble.
every thing specially connected with his department on
board, answered its purpose to his entire satisfaction. In
stormy weather, however, when the ship rolled much, great difficulty was
experienced in trimming the lights, which often required the assistance of
all hands. In the course of this night’s cruise, the writer had a good
opportunity of observing the lights at different distances from the vessel.
Even at the distance of two or three leagues, it appeared feeble, compared
with a regular reflecting-light. It was also upon the whole so unsteady, from
the rolling motion of the ship, that, in running for it, mariners could never
venture to make very free with their course.
At day-break, on the following morning, the Light-
Landing at the rock
found difficult.
house Yacht, attended by a boat from the Floating-light,
again stood towards the Bell Rock. On coming within a
proper distance of it, the usual tools carried by the artificers on such
occasions were put into this boat, and every thing was got into a state of
readiness for making an attempt to land. The weather felt extremely cold
this morning, the thermometer being at 34 degrees, with the wind at east,
accompanied by occasional showers of snow, and the marine barometer
indicated 29.80. At half-past 7, the sea ran with such force upon the rock,
that it seemed doubtful if a landing could be effected. At half-past 8, when it
was fairly above water, the writer took his place in the Floating-light’s boat
with the artificers, while the Yacht’s boat followed, according to the general
rule of having two boats afloat in landing expeditions of this kind, that in
case of accident to one boat, the other might assist. After several
unsuccessful attempts, the boats for a time were beat back by the breach of

Page 228

the sea upon the rock. On the eastern side, it separated into two distinct
waves, which came with a sweep round to the western side where they met;
and at the instant of their confluence, the water rose in spray to a
considerable height. Watching what the sailors term a smooth, we caught a
favourable opportunity, and in a very dexterous manner the boats were
rowed between the two seas, and made a favourable landing at the western
creek.
At the latter end of last season, as was formerly noticed,
State of the Beacon.
the Beacon was painted white, and from the bleaching
of the weather and the sprays of the sea, the upper parts
were kept clean; but within the range of the tide, the principal beams were
observed to be thickly coated with a green stuff, the conferva of botanists.
Notwithstanding the intrusion of these works, which had formerly banished
the numerous seals that played about the rock, they were now seen in great
numbers, having been in an almost undisturbed state for six months. It had
now also, for the first time, got some inhabitants of the feathered tribe: in
particular the Scarth or Cormorant, and the large Herring-gull, had made the
Beacon a resting-place, from its vicinity to their fishing grounds. About a
dozen of these birds had rested upon the cross beams, which, in some
places, were coated with their dung; and their flight, as the boats
approached, was a very unlooked for indication of life and habitation on the
Bell Rock, conveying the momentary idea of the conversion of this fatal
rock, from being a terror to the mariner, into a residence of man, and a safe-
guard to shipping.
Upon narrowly examining all the parts of the Beacon,
Propriety of
converting it into a
then in the state represented in Plate VIII., and
Barrack. especially the great iron stanchions with which the
beams were fixed to the rock, the writer had the
satisfaction of finding that there was not the least appearance of working or
shifting at any of the joints or places of connection; and excepting the
loosening of the bracing-chains, every thing was found in the same entire
state in which it had been left in the month of October. This, in the
estimation of the writer, was a matter of no small importance to the future
success of the work. He, from that moment, saw the practicability and
propriety of fitting up the beacon, not only as a place of refuge in case of
accident to the boats in landing, but as a residence for the artificers during

Page 229

the working months. With a view to this, he determined on the entire
removal of the bracing-chains, which, in general, were either so relaxed or
loosened by the unlocking of the screws, the stretching of the links, or the
drawing of the chain-bats, from the tremulous motion of the beacon, as to
be comparatively of little use. Measures were therefore taken for procuring
great iron-bars to fix in a horizontal position between each pair of the
principal beams, at the height of about 8 feet from the rock, as the best
means of strengthening them.
Having made these remarks upon the lower parts of the
Bread and water
chest.
beacon, and its connection with the rock, the writer
ascended to the higher parts, where he had also the
satisfaction to find that the fixtures of the cross beams were in the same
good condition. Upon looking into the bread and water-chest fixed on the
top, in case of accident to the boats, or in the event of shipwreck upon the
Bell Rock, the sea-biscuits which had been carefully put into a tin cannister,
were in good order; but, in the compartment of the chest allotted for water,
the fragments of several of the quart bottles in which it was contained were
found, which had probably burst with the freezing of the water, for it can
hardly be supposed to have arisen from the shaking or tremulous motion of
the beacon; be this as it may, only twelve of the eighteen bottles remained
entire.
While upon the top of the beacon, the writer was
Advantages of the
reminded by the Landing-master, that the sea was
Beacon in its present
state. running high, and that it would be necessary to set off
while the rock afforded any thing like shelter to the
boats, which, by this time, had been made fast by a long line to the Beacon,
and rode with much agitation, each requiring two men with boat-hooks to
keep them from striking each other, or from ranging up against the beacon.
But even under these circumstances, the greatest confidence was felt by
every one, from the security afforded by this temporary erection. For,
supposing that the wind had suddenly encreased to a gale, and that it had
been found unadvisable to go into the boats; or, supposing they had drifted
or sprung a leak from striking upon the rocks; in any of these possible and
not at all improbable cases, those who might thus have been left upon the
rock had now something to lay hold of, and, though occupying this dreary
habitation of the sea-gull and cormorant, affording only bread and water,

Page 230

yet life would be preserved, and, under all such circumstances, the mind
would still be supported, by the hope of being ultimately relieved. After,
with some difficulty, getting off the Beacon, a proper time was again
watched, and, by active rowing, the boats soon cleared the Rock in safety,
though not without shipping two or three pretty heavy seas. About 12 noon
the Light-house Yacht bore away, and at 7 in the evening she reached the
Bay of Arbroath, where the writer landed about 8 p. m., and on the following
day returned to Edinburgh.
The Impress Service—that much-to-be-regretted
Impress Service, how
it affected the Bell
system—being in great activity, not only at the larger
Rock operations. ports, but, owing to the pressure of the war with France
and the Northern Powers, orders having likewise been
issued for the establishment of an Impress at Dundee, Arbroath and
Aberdeen, it became necessary to be doubly careful in obtaining protections
for all our seamen. There being now five vessels employed in the service of
the Commissioners of the Northern Light-houses, including the Bell Rock
craft, a requisition was accordingly made to the Admiralty for a protection
for 35 seamen, which was readily granted. In so far as the liberty of the
subject is infringed by the impress service, its existence is much to be
regretted; but, in regard to the works in question, it had the effect of
rendering them popular, instead of their being shunned by seamen, which
might otherwise have been the case.
As the impress officers were extremely rigid in the
Protection Medal.
execution of their duty, it became necessary to have the
seamen carefully identified; and, therefore, besides
being described in the usual manner in the Protection-bills, which,
agreeably to the Admiralty regulations, must always remain on board of the
respective ships for which they are granted, it was found advisable to give
each man a ticket, descriptive of his person, to which was attached a silver
medal emblematical of the Light-house service, as represented in Plate XII.
On the one side of this medal was the figure of the Bell Rock Light-house,
and on the other, the word ‘Medal,’ referring to the Admiralty Protection,
and a description of the person by the Engineer. The following is a copy of
the ticket of one of our best seamen.
“Bell Rock Work-yard, Arbroath, 31st March 1808.
1808, April.

Page 231

“John Pratt, seaman in the service of the Honourable the
Protection Ticket. Commissioners of the Northern Light-houses, aged 35 years, 5 feet 8
inches high, black complexion, and slightly marked with the small-
pox.
“Robert Stevenson,
“Engineer for Northern Light-houses.”
Obverse.
“The bearer John Pratt, is serving on board of the Sir Joseph Banks Tender and Craft,
employed at the erection of the Bell Rock Light-house.
The signature of the Master of the Tender, “David Taylor.
The signature of the bearer, “John Pratt.”

These tickets were found to be indispensably necessary in the Light-house
service, as it was impossible that every man, or even each boat’s crew,
could carry the ship’s protection about with them. But the check afforded by
the several signatures as noted above, was generally respected by the
Impress officers.
Directions having been given in the month of March for
Light-house Yacht
again visits the Rock.
tightening the bracing-chains, and fixing certain ring-
bolts, both at the eastern and western landing places of
the rock, for the conveniency of the boats, the Light-house Yacht again
sailed on the 12th of April, carrying off artificers and all necessaries for the
service. After accomplishing this duty she returned to Arbroath on the 14th,
and in this state things remained till the commencement of the works in the
month of May.
The several implements already alluded to and
Preparatory state of
the Works.
described, were in a state of great forwardness about
the close of the winter, having been prepared in
Edinburgh, under the immediate directions of the writer. At Aberdeen, Mr
Alexander Gildowie, stone-agent, used every exertion to procure an
additional supply of granite from Rubislaw and other quarries. But the
severity of the winter was such as to prevent much progress from being
made. At Mylnefield Quarry, owing to the liability of that stone to board or
split in frosty weather, from its lying in regular strata, by which moisture is
more readily absorbed and acted upon in the laminæ, the operations had
been entirely suspended for several months.
In the month of April, the writer visited the works at Arbroath, which he
found still in a much retarded state, for want of a regular supply of granite.

Page 232

Owing to this, it had not as yet been possible to
Use of Granite complete even one entire course of the building,
restricted to the lower
courses. although the figure and dimensions of the moulds had
been repeatedly altered to accommodate the quarries. It
had already become apparent, that the works would unavoidably be
stopped, if the whole of the outward casing were to consist of granite. In
order, therefore, to avoid a circumstance which might prove hazardous to
the whole operations, the Light-house Board resolved to restrict the use of
this material to the lower courses of the building.
It having thus been found necessary to lessen the
Use of Sandstone
extended.
quantity of granite at the Bell Rock, and proportionally
to encrease the quantity of sandstone, a new
engagement was entered into with the proprietor of Mylnefield, for an
additional supply, at the rate of one shilling and sixpence per cubic foot, put
free on board. On visiting this quarry in the month of April, the writer had
assurance of being largely supplied with stone, if a greater range or variety
in the thickness of the courses were allowed. This, however desirable, was
altogether impossible, in so far as regarded the lower courses; the thickness
of which could only be regulated piecemeal, as the dimensions of the
granite stones could be determined.
Every exertion had already been made on the part of Mr
Mr Skene’s contract
to supply Granite.
Skene of Rubislaw, who had entered into a contract
with the Light-house Board to supply granite, at the rate
of one shilling and threepence per cubic foot, for the use of the Bell Rock,
—having been chiefly induced to enter into this contract, on account of the
celebrity of the work;—but after furnishing a few of the lower courses, he
found that he could not implement his agreement without incurring
considerable loss, and running the risk of retarding the building: he
therefore applied to be relieved of his contract. From the commencement of
the work, Mr Skene had, with much liberality, stated, that in case the
quarries upon his estate should be found defective in producing the
necessary size and quantity of materials, his contract should never be
allowed to form any bar or stoppage to the Commissioners in applying to
others. This had accordingly been acted upon by the Stone-agent; but after
making every exertion for the space of about 12 months, he had been able
to procure only a few additional blocks of the requisite dimensions, even

Page 233

with the range of all the quarries of Aberdeen, besides those of Rubislaw.
The price of suitable blocks had, in the mean time, advanced to three
shillings and threepence, and even to five shillings per cubic foot. At the
commencement of the Bell Rock works, the quarries of Aberdeen were
chiefly worked for paving-stones, and for common house purposes, and
were consequently unprovided with implements or tools suitable either for
working or transporting stones of large dimensions, for which they had
hitherto had no regular demand.
Mr Skene having sustained considerable pecuniary loss,
He is remunerated for
loss.
in opening additional quarries for the Light-house, he
had certain claims upon the Board, which were remitted
to Mr Kennedy, advocate, of Aberdeen, upon whose opinion and report
remuneration was made to the extent of about L. 370.
The Light-house Yacht being employed in the general
The Sir Joseph Banks
service of the Northern Light-houses, she left the Bell
takes the station of the
Light-house Yacht. Rock on the 16th of April, to load stores at Leith. But
the Sir Joseph Banks Tender being now completely
equipped, she sailed to supply her station, for the first time, on the 20th of
May, having on board several sets of moorings for the use of the vessels in
attendance at the Rock. The mushroom-anchors of these moorings weighed
about one ton each, and had about thirty-two fathoms of chain attached to
them, which was made from iron, measuring seven-eighths of an inch in
thickness. These moorings were laid down in fourteen fathoms water, at
about 200 fathoms apart, on a rocky bottom, and at the distance of about a
quarter of a mile on the north-western side of the Rock, as will be seen from
Plate V. After completing this operation, and supplying the Floating-light
with necessaries, the Tender returned to Arbroath previously to the
commencement of the operations at the Rock for the season.
In the month of May, the number of artificers in the
1808, May.
work-yard, consisting of masons, smiths, mill-wrights,
joiners and labourers, amounted to sixty. On the 25th,
Wednesday 25th. the writer embarked at Arbroath, on board of the Sir
Joseph Banks, for the Bell Rock, accompanied by Mr
The writer begins the Logan senior, foreman-builder, with twelve masons,
operations of the
season. and two smiths, together with thirteen seamen,
including the master, mate and steward. The vessel

Page 234

sailed at 3 o’clock p. m., under a salute of three hearty cheers from a great
assemblage of people on the quays; but before getting to the Rock, it was
too late for making fast to the moorings that night; and she kept cruising
about, with the Floating-light in view, which proved a great comfort to the
seamen, in directing them to tack the ship, before she got too near the Rock.
On this occasion, the prospects of the writer were very different from the
state of things upon his sailing to commence the last year’s operations,
when much doubt and uncertainty attended every step. The experience of
last season, together with the facility and confidence afforded by the
erection of the Beacon, which had withstood the storms of a winter,
together with the use of a new Tender, which could now be moored so near
to the Rock as to be perfectly convenient for the boats, and was at the same
time capable of being cast loose from her moorings, to take the people on
board on any emergency;—these circumstances gave a degree of security
and promptitude to the work, which relieved all concerned of much anxiety.
The wind to-day was at south-east, and though the
Thursday 26th.
weather was not very pleasant, yet it was moderate. Mr
James Wilson, now Commander of the Pharos Floating-
light, and Landing-master, in the room of Mr Sinclair, who had left the
service, came into the writer’s cabin this morning at 6 o’clock, and
intimated that there was a good appearance of landing on the rock. The bell
being accordingly rung, the boats were hoisted out, and at half-past 7 the
artificers were seated and arranged by the landing-master in their respective
boats, who, with the foreman-builder, went into the boat on the off-side,
while the writer steered the one on the side of the ship next to the Rock.
Every thing being arranged, both boats proceeded in company, and at 8
a. m. they reached the Rock. The light-house colours were immediately
hoisted upon the flag-staff of the Beacon, a compliment which was duly
returned by the tender and floating-light, when three hearty cheers were
given, and a glass of rum was served out to all hands, to drink success to the
operations of 1808.
When the writer made a landing here, in the month of
State of the Bell Rock
after the storms of
March, he was so entirely occupied in examining all the
winter. parts of the Beacon, that little attention was paid to the
general appearance of the Rock. Its surface was now
found to be covered with a new crop of Fuci, where it had been destroyed

Page 235

and rubbed off in the course of the last season. Even the iron work, and
lower parts of the Beacon, and the site of the foundation of the Light-house,
where it had been dressed and worked with the pick, was now also thickly
coated with a species of Conferva, of a deep green colour, resembling very
fine grass where the water had left it, while in the pools it had the most
beautiful arborescent appearance. The limpets and white bucky were, as
formerly, in considerable numbers, and the barnacle had coated all the
higher parts of the rock, giving it a whitish appearance. On the extreme
points, a few detached clusters of mussels were seen, of a very diminutive
size, varying from a quarter to half an inch in length. The six blocks of
granite, which had been landed as an experiment on the 1st of September
1807, were now scattered about in different directions, covered with the
delicate looking plant above described. The general aspect of the rock
remained otherwise unaltered.
The north-western half of the site of the building being
State of the
Foundation-pit.
higher than the other, it had, in the course of last
season, been wrought down to a regular surface; but the
other half contained depressions or holes, varying in depth from six inches
to no less than three feet. By 8 o’clock the tide had left the higher parts of
the foundation dry, when it appeared from observation, that the water ebbed
at the rate of one inch in two minutes and thirty seconds, and that the
difference of the perpendicular height, between the lowest and highest parts
of the foundation-pit, at the commencement of the works this season, was
still about four feet. After having been an hour and three quarters at work,
the water began to overflow the site of the building, when the boats left the
rock, the landing-master taking the lead; but after getting clear, he waited,
agreeably to usual practice, till the other boat got out of the creek, when
both proceeded for the Tender.
In the evening tide the artificers landed at a quarter past
Landing attended with
considerable
7, though the sea ran pretty high, and the boats shipped
difficulty. a good deal of water. Being rather early in the tide for
working at the site of the building, the time was
occupied in getting the smith’s forge put in order upon the cross-beams of
the Beacon, a step of great importance to the future progress and
advancement of the work. At half-past 7, the higher parts of the foundation
being left dry, a few of the artificers set to work, the others beginning as the

Page 236

water went off. At half-past 9 the tide again overflowed the rock, when the
boats left it, after the artificers had been two hours at work. In coming out at
the eastern creek this evening, the landing-master’s boat was struck by a
heavy sea, and thrown to one side of the creek; but, by his dextrous
management, the boat’s head was fortunately kept seaward, and she got out
in safety, though not without having shipped a good deal of water.
This morning the wind was at east, blowing a fresh
Friday, 27th. gale, the weather being hazy, with a considerable
breach of sea setting in upon the rock. The morning-bell
was therefore rung, in some doubt as to the practicability of making a
landing. After allowing the Rock to get fully up, or to be sufficiently left by
the tide, that the boats might have some shelter from the range of the sea,
they proceeded at 8 a. m., and upon the whole made a pretty good landing;
and after two hours and three quarters’ work returned to the ship in safety.
In the afternoon the wind considerably increased, and
Found necessary still
to excavate to the
as a pretty heavy sea was still running, the Tender rode
depth of fourteen very hard, when Mr Taylor, the commander, found it
inches. necessary to take in the bowsprit, and strike the fore
and main top-masts, that she might ride more easily.
After consulting about the state of the weather, it was resolved to leave the
artificers on board this evening, and carry only the smiths to the Rock, as
the sharpening of the irons was rather behind, from their being so much
broken and blunted, by the hard and tough nature of the rock, which became
much more compact and hard as the depth of excavation was increased.
Besides avoiding the risk of encumbering the boats with a number of men,
who had not yet got the full command of the oar in a breach of sea, the
writer had another motive for leaving them behind. He wanted to examine
the site of the building without interruption, and to take the comparative
levels of the different inequalities of its area; and as it would have been
painful to have seen men standing idle upon the Bell Rock, where all
moved with activity, it was judged better to leave them on board. The boats
landed at half-past 7 p. m., and the landing-master, with the seamen, was
employed during this tide, in cutting the sea-weeds from the several paths
leading to the landing-places, to render walking more safe, for, from the
slippery state of the surface of the rock, many severe tumbles had taken
place. In the mean time the writer took the necessary levels; and having

Page 237

carefully examined the site of the building, and considered all its parts, it
still appeared to be necessary to excavate to the average depth of fourteen
inches, over the whole area of the foundation. Having made these remarks,
we again left the rock, at half-past 9, after having been two hours upon it.
At the entrance of the eastern creek, the sea ran high, and all on board got a
thorough wetting; but so long as the boats were kept from striking upon the
rock, the sprays which came on board were but little regarded.
The wind still continued from the eastward, with a
Saturday 28th. heavy swell; and to-day it was accompanied with foggy
weather, and occasional showers of rain.
Artificers much Notwithstanding this, such was the confidence which
afflicted with sea-
sickness. the erection of the Beacon had inspired, that the boats
landed the artificers on the Rock, under very
unpromising circumstances, at half-past 8, and they continued at work till
half-past 11, being a period of three hours, which was considered a great
tide’s work, in the present low state of the foundation. Three of the masons
on board were so afflicted with sea-sickness, that they had not been able to
take any food for almost three days, and they were literally assisted into the
boats this morning by their companions. It was, however, not a little
surprising, to see how speedily these men revived upon landing on the Rock
and eating a little dulse. Two of them afterwards assisted the sailors in
collecting the chips of stone, and carrying them out of the way of the
pickmen; but the third complained of a pain in his head, and was still unable
to do any thing. Instead of returning to the tender with the boats, these three
men remained on the Beacon all day, and had their victuals sent to them
along with the smiths. From Mr Dove, the foreman-smith, they had much
sympathy, for he preferred remaining on the Beacon at all hazards, to be
himself relieved from the malady of sea-sickness. The wind continuing
high, with a heavy sea, and the tide falling late, it was not judged proper to
land the artificers this evening, but in the twilight the boats were sent to
fetch the people on board who had been left on the Rock.
The wind was from the S. W. to-day, and the signal-bell
Sunday 29th.
rung, as usual, about an hour before the period for
landing on the Rock. The writer was rather surprised,
Misunderstanding however, to hear the landing-master repeatedly call,
among the Artificers
about their wages. “All hands for the Rock;” and, coming on deck, he was

Page 238

disappointed to find the seamen only in the boats. Upon inquiry, it
appeared, that some misunderstanding had taken place about the wages of
the artificers for Sundays. They had preferred wages for seven days
statedly, to the former mode of allowing a day for each tide’s work on
Sunday; as they did not like the appearance of working for double or even
treble wages on Sunday, and would rather have it understood that their work
on that day arose more from the urgency of the case, than with a view to
emolument. This having been judged creditable to their religious feelings,
and readily adjusted to their wish, the boats proceeded to the Rock, and the
work commenced at 9 a. m. The artificers were chiefly employed in
removing the iron-stanchions, or frame-work of the forge, which had last
year been fixed on the rock, and which was now set on a temporary scaffold
erected for it on the Beacon. Having now got two smiths’ hearths above the
reach of the tide, the work of this department made great progress, both in
the sharping of the numerous picks and irons, and in making bats for fixing
the different railway tracks upon the Rock. After getting three and a half
hours’ work, the boats returned to the ship at 12 noon, when the excellent
prayer, composed by the Rev. Dr Brunton, given in a former part of this
work, was read upon the ship’s quarter-deck, in the same manner as had
been done last year.
The sloop Smeaton arrived this afternoon with a quantity of cast-iron rails,
to be laid upon the Rock, for transporting the blocks of stone from the
different landing-places to the site of the building. She had also on board
some Norway logs, intended to be batted on the Rock, for supporting the
railways across the gullies, or inequalities of the surface. The boats of the
Sir Joseph Banks and Floating-light, being employed during the evening
tide in delivering the Smeaton, by landing the cast-iron on the Rock, and
bringing the timber on board of the Tender, the artificers could not be
landed this evening.
The weather to-day was moderate, and there was much
Monday 30th.
less breach in the sea than there had been since the
commencement of the work this season. The wind kept
Fish very abundant at steadily in the south-west, and the barometer had
the rock.
changed its range from 29.40 to 29.90, and the
thermometer from about 40° to 45°. The abundance of fish caught near the
Rock was another proof of the more favourable state of the weather; for the

Page 239

fish never failed to come upon the anchorage-ground during good weather,
while they as regularly disappeared on a change for the worse.
The Tender’s bell rung this morning, as the signal for going to the Rock, at
9 o’clock; and at half-past 9, the water having partially left the foundation-
pit, the work commenced, and continued two and three-fourth hours, or till
a quarter from 1 o’clock p. m., when the tide again overflowed the whole
site of the building. The masons and seamen returned with the boats on
board the Tender, but the mill-wrights and joiners, who had come off with
the Smeaton to fit up the railways, and such of the masons as were apt to be
sick, remained with the smiths on the Beacon throughout the day.
The number of workmen at the Rock was now
General usefulness ofincreased to twenty-eight, including six sailors from the
Sailors as men of all
works. landing-master’s crew, who were constantly employed
in baling water, and keeping the foundation clear of the
chips, struck off by the pick. They also conveyed the irons to the forge, by
hoisting them up to the Beacon by a whip-tackle. The seamen were of the
greatest service in many of the operations, for Jack is a man of all trades;
but as they had their boats to attend, and were always at the landing-
master’s call, they were not taken into account in the enumeration of
artificers.
Mr Francis Watt commenced, at this tide, with five
Mortar Gallery fitted
up.
joiners, to fit up a temporary platform upon the Beacon,
about twenty-five feet above the highest part of the
Rock. This platform was to be used as the site of the smith’s forge, after the
Beacon should be fitted up as a barrack; and here also the mortar was to be
mixed and prepared for the building, and it was accordingly termed the
Mortar Gallery. This platform was supported with joisting, well framed, and
properly fixed to the principal beams; but the flooring or boarding, though
two inches in thickness, was only slightly nailed to the joisting, so that
when the sea rose, and struck it in bad weather, it might lift, without
endangering the general frame of the fabric. At the end of the working
season this floor was lifted, and the joisting only left during the winter
months.
The landing-master’s crew completed the discharging
Smeaton is ballasted
at the Bell Rock.
from the Smeaton of the remainder of her cargo of the

Page 240

cast-iron rails and timber. It must not here be omitted to notice, that the
Smeaton took in ballast from the Bell Rock, consisting of the shivers or
chips of stone, produced by the workmen in preparing the site of the
building, which were now accumulated in great quantities on the Rock.
These the boats loaded, after discharging the iron. The object in carrying off
these chips, besides ballasting the vessel, was to get them permanently out
of the way, as they were apt to shift about from place to place, with every
gale of wind; and it often required a considerable time to clear the
foundation a second time of this rubbish. The circumstance of ballasting a
ship at the Bell Rock afforded great entertainment, especially to the sailors;
and it was perhaps with truth remarked, that the Smeaton was the first
vessel that had ever taken on board ballast at the Bell Rock.
The winds were variable to-day, but chiefly from the
Tuesday, 31st. north, accompanied with fine weather. On landing at a
quarter from 11 a. m., the higher parts of the site of the
building were dry, and the work continued two and a quarter hours, when it
was again stopped by the return of the flood-tide. The joiners and smiths,
together with those who were apt to be sick on board of the Tender,
remained on the Beacon throughout the day, and at a quarter past 1 p. m. the
boats left the Rock with the masons.
There were eighteen seamen from the Smeaton, Sir Joseph Banks, and
Floating-light, employed to-day under the direction of Mr Wilson, the
landing-master, in laying the cast-iron work of the railways in a compact
manner, into the various crevices and holes in the Rock, to prevent its being
tossed about by the sea, until it should be wanted in the course of fixing the
tracks to the Rock.
The Smeaton being finally discharged, and partly
Chips of the rock in
loaded with stone shivers from the Bell Rock, she
great request at Leith.
sailed for Leith, in order to fetch the remainder of the
cast-iron, and some additional logs of timber. Mr Pool, the commander of
this vessel, afterwards acquainted the writer, that when the ballast was
landed upon the quay at Leith, many persons carried away specimens of it,
as part of a cargo from the Bell Rock; when he added, that such was the
interest excited, from the number of specimens carried away, that some of
his friends suggested, that he should have sent the whole to the Cross of
Edinburgh, where each piece might have sold for a penny.

Page 241

In the evening the boats went to the Rock, and brought
Fish caught at the Bell
the joiners and smiths, and their sickly companions, on
Rock.
board of the Tender. They also brought with them two
baskets full of fish, which they had caught at high water, from the Beacon,
reporting, at the same time, to their comrades, that the fish were swimming
in such numbers over the rock at high water, that it was completely hid from
their sight, and nothing seen but the movement of thousands of fish. They
were almost exclusively of the species called the Podlie, or young Coal-
fish. This discovery, made for the first time to-day by the workmen, was
considered fortunate, as an additional circumstance likely to produce an
inclination among the artificers to take up their residence in the Beacon,
when it came to be fitted up as a barrack.
The boats landed to-day at 11 a. m., but the tides being
1808, June.
neap, the water went off very slowly, and it was 12
noon before it left the site of the building. After
Wednesday, 1st. continuing at work one hour and three quarters, the
artificers left the rock with all hands, when the tender
immediately got under weigh, or rather cast off from her moorings, by
simply letting go one end of the mooring hawser, and sailed for Arbroath.
But the wind being N.N.W., it was 8 o’clock p. m. before she got into the
harbour.
This being the birth-day of King George III., who now
Saturday, 4th.
entered into the 70th year of his age, and 50th of his
reign, a considerable effort was made to get the first
First course finished entire course of the building laid upon the platform at
to-day. Its cubical
contents, &c. Arbroath, where it was to be marked and numbered,
and made ready for shipping for the Rock. It may seem
strange, that after continuing the operations of the work-yard for about
twelve months, there should only have been but one course ready to ship for
the Rock. Such also was the difficulty of procuring granite of a large size,
that this course was obliged to be hewn of the thickness of only one foot.
The chief advantage of thick courses in water buildings, besides a saving of
hewing, is that of getting sooner out of the reach of the tide, there being
nearly as much time necessary for laying a thin course as a thick one. The
stones for the first entire course were not quarried particularly for it, but
were taken from the whole materials in the yard. The enumeration of the

Page 242

various kinds and quantity of work in this single course of the Light-house,
may perhaps surprise the reader. Though only one foot in thickness, it
contained 508 feet cubic of granite in outward casing; 876 feet cubic of
Mylnefield stone in the hearting; 104 tons of solid contents; 132 feet
superficial of hewing in the face work; 4519 feet superficial of hewing in
the beds, joints and joggles; 420 feet lineal boring of trenail holes; 378 feet
lineal cutting for wedges; 246 oaken trenails; 378 oaken wedges in pairs.
In the work-yard, about sixty stone cutters were
Certainty of
commencing building
employed in hewing and preparing the various courses
this season. of the solid part of the building. Stones were now got
pretty readily from Mylnefield quarry; and besides the
quarries at Aberdeen, others had been opened near Peterhead, belonging to
Mr John Hutchison, which produced a great many fine blocks. As much of
the Aberthaw limestone had been broken and prepared for burning as would
charge the kiln. A number of casks of the capacity of about 32 gallons, had
also been provided and were ready to be filled, in equal numbers, of clean
sharp sand, lime and pozzolano earth, in the state of fine powder. After
much trouble and correspondence with timber-merchants in Leith, London,
and other parts, a considerable quantity of trenails and wedges of British
oak were procured, which were to be used in connecting the courses of the
solid part of the building, while the works were low, and in danger of being
washed away or injured by the sea. These oaken trenails and wedges were
made up in bundles, containing about 20. In short, every thing was in a state
of readiness in the work-yard, for building the first three courses of the
Light-house. The preparations for its foundation at the Rock were now also
in considerable forwardness, and the works, upon the whole, put on an
appearance which left no doubt as to the commencement of the building
this season.
The writer sailed from Arbroath in the evening of the
Artificers sail for the
Rock.
6th of June in the Tender, with a fine breeze of
northerly wind, having on board 34 artificers,
consisting of masons, smiths, mill-wrights and joiners, besides the landing
master’s crew, consisting of twelve seamen, who worked the ship. There
were also on board Mr Peter Logan, foreman builder; Mr Francis Watt,
foreman mill-wright; Mr James Dove, foreman smith; Mr James Wilson,
landing master; Mr David Taylor, master; Mr William Reid, mate, and Mr

Page 243

John Peters, steward, counting in all fifty-four persons. The weather was
clear, and the vessel had no sooner got out of the harbour, than the lights of
the float were distinctly seen; and before day-break, the Tender was made
fast to her moorings off the Bell Rock.
At 3 o’clock in the morning, the ship’s bell was rung as
Tuesday, 7th.
the signal for landing at the Rock. These artificers, to
which this had been the first trip, found their quarters
Arrangements at rather confined in the ship, and some of them being
landing at an early
hour on the Rock. sickly, were glad of an opportunity of landing, and
came almost immediately upon deck, notwithstanding
the earliness of the hour at which the tide happened. But those who were
more accustomed to the business, calculated their time, knowing that
sufficient warning was always given, especially at hours so early. When the
landing was to be made before breakfast, it was customary to give each of
the artificers and seamen a dram and a biscuit, and coffee was prepared by
the steward for the cabins. Exactly at 4 o’clock, the whole party landed
from three boats, including one of those belonging to the Floating-light,
with a part of that ship’s crew, which always attended the works in
moderate weather. The landing-master’s boat called the Seaman, but more
commonly the Life-boat, took the lead. The next boat called the Mason, was
generally, steered by the writer; while the Floating-light’s boat Pharos, was
under the management of the boatswain of that ship.
Having now so considerable a party of workmen and
How the Artificers are
employed.
sailors on the Rock, it may be proper here to notice how
their labours were directed. Preparations having been
made last month for the erection of a second forge upon the beacon, the
smiths commenced their operations, both upon the lower and higher
platforms, where forges had been erected. They were employed in
sharpening the picks and irons for the masons, and in making bats and other
apparatus of various descriptions, connected with the fitting of the railways.
The landing-master’s crew were occupied in assisting the mill-wrights in
laying the railways to hand. Sailors, of all other descriptions of men, are the
most accommodating in the use of their hands. They worked freely with the
boring irons, and assisted in all the operations of the railways, acting by
turns as boatmen, seamen, and artificers. We had no such character on the
Bell Rock as the common labourer. All the operations of this department

Page 244

were cheerfully undertaken by the seamen, who, both on the rock and on
ship-board, were the inseparable companions of every work connected with
the erection of the Bell Rock Light-house. It will naturally be supposed, that
about twenty-five masons, occupied with their picks in executing and
preparing the foundation of the light-house, in the course of a tide of about
three hours, would make a considerable impression upon an area even of
forty-two feet in diameter. But in proportion as the foundation was
deepened, the rock was found to be much more hard and difficult to work,
while the baling and pumping of water became much more troublesome. A
joiner was kept almost constantly employed in fitting the picks to their
handles, which, as well as the points of the irons, were very frequently
broken. At 8 o’clock, the water overflowed the site of the building, and the
boats left the rock with all hands for breakfast. Several of the artificers
would willingly have remained upon the beacon to avoid the rolling motion
and sickness incident to the ship; yet, being all wetted, and those especially
who were employed in excavating the site of the light-house and railways,
being completely bespattered with the chips and particles elicited from the
Rock, the whole party embarked in the boats; but such as chose were at
liberty to return to the beacon with the smiths after breakfast.
Excepting at the erection of the principal beams of the
Interesting
appearance of the
beacon, the Bell Rock this morning presented by far the
Rock. most busy and active appearance it had exhibited since
the erection of the Beacon. The surface of the Rock was
crowded with men, the two forges flaming, the one above the other, upon
the Beacon, while the anvils thundered with the rebounding noise of their
wooden supports, and formed a curious contrast with the occasional
clamour of the surges. The wind was westerly to-day, and the weather being
extremely agreeable, as soon after breakfast as the tide had sufficiently
overflowed the rock to float the boats over it, the smiths, with a number of
the artificers, returned to the Beacon, carrying their fishing-tackle along
with them, which had all been put in a state of requisition before they left
the shore. In the course of the forenoon, the Beacon exhibited a still more
extraordinary appearance than the Rock had done in the morning. The sea
being smooth, it seemed to be afloat upon the water, with a number of men
supporting themselves in all the variety of attitude and position; while, from
the upper part of this wooden house, the volumes of smoke which ascended
from the forges, gave the whole a very curious and fanciful appearance.

Page 245

The length of the day now afforded two tides with day-
Artificers remain onlight. The boats, therefore, landed the artificers at 5
the rock all day.
o’clock p. m., and after three hours’ work, as in the
morning, all hands again left it at 8 o’clock, and returned on board of the
Tender. Those who had been left upon the beacon, complained of being
very tired, with supporting themselves so long in one position without
motion, or even a sufficient space to rest their feet upon.
From the excellence of the weather, and for the greater conveniency of the
work, the Tender had been made fast to one of the Stone-lighter’s floating
buoys, to be nearer to the Rock than her own moorings, which were placed
at such a distance as might enable her, in casting off, to clear the Rock on
any tack. But, in the course of this tide, it was observed that a heavy swell
was setting in from the eastward; and the appearance of the sky indicated a
change of weather, while the wind was shifting about. The barometer also
had fallen from 30 to 29.60. It was therefore judged prudent to shift the
vessel to the SW. or more distant buoy. Her bowsprit was also soon
afterwards taken in, the top-masts struck, and every thing made snug, as
seamen term it, for a gale. During the course of the night, the wind
increased and shifted to the eastward, when the vessel rolled very hard, and
the sea often broke over her bows with great force.

Page 246

Although the motion of the Tender was much less than
Wednesday, 8th. that of the Floating-light, at least in regard to the rolling
motion; yet, she sended or pitched much. Being also of
Tender bears away for a very handsome build, and what seamen term very
Leith Roads.
clean aft, the sea often struck her counter with such
force, that the writer, who possessed the aftermost cabin, being
unaccustomed to this new vessel, could not divest himself of uneasiness;
for, when her stern fell into the sea, it struck with so much violence, as to be
more like the resistance of a rock than the sea. The water, at the same time,
often rushed with great force up the rudder-case; and forcing up the valve of
the water-closet, the floor of his cabin was at times laid under water. The
gale continued to increase, and the vessel rolled and pitched in such a
manner, that the hawser by which the Tender was made fast to the buoy
snapped, and she went adrift. In the act of swinging round to the wind, she
shipped a very heavy sea, which greatly alarmed the artificers, who
imagined that we had got upon the Rock. But this, from the direction of the
wind, was impossible. The writer, however, sprung upon deck, where he
found the sailors busily employed in rigging out the bowsprit, and in setting
sail. From the easterly direction of the wind, it was considered most
advisable to steer for the Firth of Forth, and there wait a change of weather.
At 2 p. m. we accordingly passed the Isle of May; at 6 anchored in Leith
Roads, and at 8 the writer landed, when he came in upon his friends, who
were not a little surprised at his unexpected appearance, which gave an
instantaneous alarm for the safety of things at the Bell Rock.
The wind still continued to blow very hard at E. by N.,
Wednesday, 9th.
and the Sir Joseph Banks rode heavily, and even drifted
with both anchors ahead, in Leith Roads. The artificers
did not attempt to leave the ship last night; but there being upwards of fifty-
people on board, and the decks greatly lumbered with the two large boats,
they were in a very crowded and impatient state on board. But to-day they
got ashore, and amused themselves by walking about the streets of
Edinburgh, some in very humble apparel, from having only the worst of
their jackets with them, which, though quite suitable for their work, were
hardly fit for public inspection, being not only tattered, but greatly stained
with the red colour of the rock.

Page 247

To-day the wind was at S. E., with light breezes and
Friday, 10th. foggy weather. At 6 a. m. the writer again embarked for
the Bell Rock, when the vessel immediately sailed. At
11 p. m., there being no wind, the kedge-anchor was let go off Anstruther,
one of the numerous towns on the coast of Fife, where we waited the return
of the tide.
Before leaving Leith Roads, the muster-roll was called,
Saturday, 11th. to see that all hands were on board; and we also shipped
an additional seaman. The vessel, therefore, required a
great stock of provisions and water, and, from her very hampered situation,
with the stores and apparatus of various kinds which she had on board, it
became necessary to embrace every opportunity of filling up the stock of
water, as landsmen use a much greater quantity of that indispensable article
for every purpose than seamen. Mr Taylor, who commanded the Tender, and
whose attention in this respect was quite indefatigable, sent the boat ashore
at Anstruther, at a very early hour this morning, for an additional supply.
Throughout these twenty-four hours, the winds were
Work continued on
the Rock till
variable and the weather was hazy. At 6 a. m. the Sir
midnight. Joseph got under weigh, and at 11 was again made fast
to the southern buoy at the Bell Rock. Though it was
now late in the tide, the writer being anxious to ascertain the state of things
after the gale, landed with the artificers, to the number of forty-four. Every
thing was found in an entire state; but, as the tide was nearly gone, only half
an hour’s work had been got when the site of the building was overflowed.
During the period of high-water, the boats were employed in bringing stores
and provisions from on board the Smeaton, which had also returned from
Arbroath, whither she had run for shelter. In the evening the boats again
landed at 9, and, after a good tide’s-work of three hours, with torch-light,
the work was left off at midnight.
To the distant shipping, the appearance of things under
Appearance of the
Rock at night.
night on the Bell Rock, when the work was going
forward, must have been very remarkable, especially to
those who were strangers to the operations. Mr John Reid, principal light-
keeper, who also acted as master of the Floating-light during the working
months at the rock, described the appearance of the numerous lights situate
so low in the water, when seen at the distance of two or three miles, as

Page 248

putting him in mind of Milton’s description of the fiends in the lower
regions; adding, “for it seems greatly to surpass Will-o’-the-Wisp, or any of
those earthly spectres of which we have so often heard.”
The weather was somewhat blowy to-day, and the wind
Sunday, 12th.
veered from E. to S.W. The boats landed at a quarter
past 9 this morning, but not without considerable
difficulty, owing to a heavy swell of sea which accompanied the change of
wind. After continuing at work for three hours and a half at the site of the
building, and the fixtures for the railways, the water came in upon the
artificers, and the boats left the rock with all hands, after having
experienced some difficulty at the entrance of the eastern landing creek, by
the breach of the sea. In this respect, the larger boats of the new Tender
were not found to be so well adapted for pulling through a swell of sea in
these narrow creeks, as the smaller boats of the Floating-light. The breadth
of the former being greater, the oars were more apt to get entangled with the
sea-weed and jutting points of the rock, so that it was with difficulty they
could be equally pulled on each side; and if they did not exactly stem the
sea, but got a preponderance to one side, the waves were apt to throw them
upon the shelving rocks. Smaller boats, under these particular
circumstances, would have been more handy, but of two evils we are often
left to choose the least, and the larger boats were found to be more
generally useful. For the conveniency of accommodating a greater number
of artificers, it was necessary to have the boats of as large dimensions as the
Tender could stow; it being hardly possible in this service to have more than
two upon deck, and one over the stern.
About 1 p.m. the boats returned to the Tender in safety;
Sixty persons on the
quarter-deck at
and prayers were soon afterwards read upon deck, when
prayers to-day. all hands, including the boats crews from the Floating-
light and Smeaton, being present, they counted sixty
individuals. Owing to the difficulty experienced in getting clear of the rock
this morning, and the swell of the sea still continuing, a landing was not
attempted in the evening.
The wind blew fresh from the S.W. this morning, and
Monday, 13th.
the tides were again getting into the state of neap; yet
the ebb was very considerable yesterday, and some
parts of the rock were even dry about half an hour before the calculated

Page 249

time. The boats landed to-day at 11, and left the Rock again at half-past 2
o’clock p. m. The artificers were again landed in the evening, but the tide
did not leave the foundation-pit. All hands, however, were employed on the
higher parts of the rock, in the tracks of the railways, where bat-holes were
to bore and seats for the cast-iron props or supports of the railways to level.
After being employed in this manner for an hour and a half, the boats
returned to the Tender.
From the difficulties attending the landing on the rock,
Artificers appear
backward in landing
owing to the breach of sea which had for days past been
on the Rock to-day. around it, the artificers showed some backwardness at
getting into the boats this morning; but after a little
explanation this was got over. It was always observable, that for some time
after any thing like danger had occurred at the Rock, the workmen became
much more cautious, and on some occasions their timidity was rather
troublesome. It fortunately happened, however, that, along with the writer’s
assistants and the sailors, there were also some of the artificers themselves
who felt no such scruples, and in this way these difficulties were the more
easily surmounted. In matters where life is in danger, it becomes necessary
to treat even unfounded prejudices with tenderness, as an accident, under
certain circumstances, would not only have been particularly painful to
those giving directions, but have proved highly detrimental to the work,
especially in the early stages of its advancement.
The wind was at south this morning, accompanied with
Tuesday, 14th.
very heavy showers of rain; and though the boats
effected a landing at 12 noon; yet, during the whole
Tender sails for tide, there was not less depth than 15 inches of water on
Arbroath.
the highest part of the site of the building, while the sea
was continually ranging into it. The artificers were, therefore, employed on
the higher parts of the eastern railway-track. After an hour and three-
quarters work, the boats returned to the Tender, which had already cast off
from her moorings, and kept plying about till they left the rock with the
artificers, when she immediately sailed for Arbroath, and got into the
harbour at 6 p. m. Here the artificers were employed in the work-yard for six
days, until the return of spring-tides. During this interval ashore, the smiths
were busily employed in giving the picks and other tools a thorough repair.
Every measure was also adopted that could possibly facilitate the fitting up

Page 250

of the railways, without the aid of which the blocks of stone could not
possibly be conveyed along the rugged surface of the rock after they were
landed.
The operations at the rock, both in the preparation of
First entire course
removed from the
the foundation of the building, and in the fitting up of
platform. the railways for landing the materials, became more and
more urgent as the work advanced ashore. The first
course had now been removed from the platform, and the greater part of the
second was laid in its place; and, in the course of three weeks, it was also
expected to be in readiness to ship for the rock, while a number of the
higher courses were in a considerable state of forwardness. Some of the
Aberthaw limestone having been burnt, and reduced to a state of powder, it
was put into casks, while equal quantities of pozzolano and clean sharp
sand were also made up in the same manner, to be used in building up the
inequalities on the south east or lowest part of the margin of the foundation-
pit, that by this means the water might be more speedily pumped out, and a
longer period of the tide obtained for carrying on the work.
It being apparent, from the present state of things, that
Trial of the landing
apparatus.
we should be ready for building in the course of the
next spring-tides, if the weather proved favourable, it
was necessary to have all the apparatus for landing the stones at the rock in
a working state. While at Arbroath, the writer had a trial made of one of the
new praams or stone-lighters, by towing her into the bay of Arbroath, with a
large stone upon deck, where the sloop Smeaton had been previously
anchored with her gaff-boom and tackle rigged. This experiment was made
in pretty rough weather, when the block of stone was lifted with the tackle
in and out of the Smeaton’s hold, and again placed on the praam’s deck, as
was to be done in the operation of landing at the rock. The apparatus is
represented in Plate XI., and the trial was highly satisfactory, the tackle
requiring only some trifling alterations. The Smeaton was then brought into
the harbour and trimmed with ballast, consisting of pieces of granite, neatly
fitted into her hold, over which a platform was laid, which completed her
for the service of taking the stones from Arbroath to the Bell Rock.
Things on shore having been thus arranged, the writer
Monday, 20th.
again embarked on the 20th in the Sir Joseph Banks
Tender, and sailed for the Bell Rock at 1 p. m.,

Page 251

accompanied by the sloop Smeaton, and having on
Tender sails for the
board of both vessels sixty-two artificers and seamen.
Rock.
At 8 the Floating-light was hailed, and at 9 the Tender
and Smeaton were made fast to their respective buoys.
At 3 o’clock this morning, the bell was rung, as a signal
Tuesday, 21st.
for landing at the rock. From the number of artificers, it
required considerable management and exertion on the
Fifty-eight artificers part of the landing-master to get them properly seated
land.
in the four boats belonging to the Tender, the Smeaton,
and Floating-light, which last attended the rock during the morning tides,
and assisted in all the operations of the landing-master’s department. At 4
o’clock fifty-eight persons landed; but the tides being extremely languid,
the water only left the higher parts of the rock, and no work could be done
at the site of the building. A third forge was, however, put in operation,
during a short time, for the greater conveniency of sharpening the picks and
irons, and for purposes connected with the preparations for fixing the
railways on the rock.
The weather towards the evening became thick and
Advantage of a Bell
as a signal at the
foggy, and there was hardly a breath of wind to ruffle
Rock. the surface of the water; had it not therefore been the
noise from the anvils of the smiths who had been left on
the Beacon throughout the day, which afforded a guide for the boats, a
landing could not have been attempted this evening, especially with such a
company of artificers. This circumstance confirmed the writer’s opinion
with regard to the propriety of connecting large bells to be rung with
machinery in the light-house, to be tolled day and night during the
continuance of foggy weather, by which the mariner may be forewarned of
too near an approach to the Rock, while every distant object is obscured in
the mist.
The tides went so little back at the Rock to-day, that no work was done
excepting to the railways; it being impossible to pump the water out of the
foundation-pit, as the tide never left the south-eastern margin of it. After
remaining two hours, all hands returned towards the Tender, where guns
were occasionally fired, horns sounded, and the ship’s bell tolled, as signals
for the boats to find their way from the Rock to the vessels; and, in this
manner, the whole party got safely on board about 8 o’clock p. m.

Page 252

At 6 a. m. the artificers landed, but the foundation could
Wednesday, 22d. only be partially cleared of water, so as to enable a few
hands, standing ankle-deep in water, to work round the
edges where the site of the Light-house was highest. After two and a half
hours’ work, the boats, with the artificers, returned to their respective ships.
This morning several casks of pozzolano, lime and sand
Building materials
landed for the first
were landed, to make mortar, in order to build round the
time this season. lower edges of the foundation-pit. This being something
like an approximation to the long wished-for
commencement of building the Light-house, the artificers thought the
opportunity too good to pass over in silence, and the casks were accordingly
landed under a salute of three hearty cheers. At half past 6 p. m. the boats
again landed upon the rock, but, even when the tide was at the lowest, the
water stood to the depth of 18 inches upon the site of the building, and no
work was done. This was rather a relief to the smiths, who having no irons
to sharp, got rapidly forward with the necessary fixtures for the railways.
The weather continued to be extremely mild, and the
Thursday, 23d.
winds were generally from the eastward and southward,
accompanied with thick and hazy weather, which, in
Small ruble walls communicating with the rock, was not only irksome but
built instead of
cofferdam. even dangerous. At 7 o’clock this morning, the tide
proving more favourable, the artificers began to work.
At 9 the rock was again overflowed, and the boats returned to the Tender
after two hours’ work. Part of the operations of this morning’s tide consisted
in building up the crevices and inequalities of the rock round the margin of
the foundation, with pozzolano mortar, and the chips produced from the
excavation, with a view to dam out the water. These little walls varied from
six inches to eighteen inches in height; a small sluice or aperture being
formed in one of them by which the water, during ebb-tide, was allowed to
drain off.
It formed part of the writer’s original design, as formerly noticed, to erect a
cast-iron coffer-dam of about five feet in height, round the site of the
building; but the surface of the rock was so irregular, that the difficulty of
tightening it, and also of emptying the contained water, so as to get the
benefit of it during ebb-tide, would have been so great, that, taking these
circumstances into account, together, with the loss of time which would

Page 253

attend the erection of such a preparatory work, the idea of a coffer-dam was
laid aside, soon after entering upon the actual execution of the work.
The boats landed this evening, when the artificers had
Inconveniencies of
foggy weather.
again two hours’ work. The weather still continuing
very thick and foggy, more difficulty was experienced
in getting on board of the vessels to-night, than had occurred on any
previous occasion, owing to a light breeze of wind which carried the sound
of the bell, and the other signals, made on board of the vessels, away from
the Rock. Having, fortunately, made out the position of the sloop Smeaton,
at the N.E. buoy,—to which we were much assisted by the barking of the
ship’s dog, we parted with the Smeaton’s boat, when the boats of the Tender
took a fresh departure for that vessel, which lay about half a mile to the
south-westward. Yet such is the very deceiving state of the tides, that
although there was a small binnacle and compass in the landing-master’s
boat, we had, nevertheless, passed the Sir Joseph a good way, when,
fortunately, one of the sailors catched the sound of a blowing-horn. The
only fire-arms on board, were a pair of swivels of one inch caliber; but it is
quite surprising how much the sound is lost in foggy weather, as the report
was heard but at a very short distance. The sound, from the explosion of
gunpowder, is so instantaneous, that the effect of the small guns was not so
good as either the blowing of a horn, or the tolling of a bell, which afforded
a more constant and steady direction for the pilot. It may here be noticed,
that larger guns would have answered better, but these must have induced
the keeping of a greater stock of gunpowder, which, in a service of this
kind, might have been attended with risk. A better signal would have been a
bugle-horn, the tremulous sound of which produces a more powerful effect
in fog, than the less sonorous and more sudden report of ordnance.
The artificers landed to-day, both with the morning and
Friday, 24th.
evening tides. During the first, they had two hours and
three-quarters, and in the latter, two hours and a quarter,
making together five hours work; the weather still continuing thick and
foggy, with the wind at south-east.
The boats landed this morning at a quarter from 8
Saturday, 25th.
o’clock, and the artificers left off work at half-past 10.
During the evening’s tide, the operations were again

Page 254

continued with torch-light, from half-past 7 till 11 o’clock p. m., having to-
day had four hours and three-quarters work upon the rock.
A remarkable fact may here be mentioned as an
Force of the sea upon
the Rock.
evidence of the force of the sea upon the Bell Rock.
The reader may remember, that the mushroom anchor,
with its chain and buoy, which had drifted during the very hard gale of the
6th September 1807, were found upon the Rock after the gale: at that time
the buoy and chain were taken up, but the anchor having got into a pretty
large hole or cavity of the rock, no convenient opportunity occurred for
lifting it last season. No doubt, however, was entertained that a mass of
iron, weighing about a ton, without any timber or buoyant matter attached
to it, would remain in this position undisturbed, till a convenient time
should occur for recovering it. But, at the commencement of the works this
season, to the surprise of every one, the anchor in question could not be
seen. To-day, however, it was discovered at the opposite side of the Rock,
by one of the smiths who was at work upon the highest platform of the
beacon; and the weather being extremely fine, it was weighed or lifted by
the landing-master’s crew. For this purpose, spars were laid across two
boats, between which the anchor was made fast: as the tide rose the boats
floated, and the anchor thus suspended, was conveyed to one of the vessels
in the offing; when a chain and buoy being attached to it, it was again laid
down in a proper birth, as the moorings of one of the praam-boats.
The weather kept still very favourable for the
Sunday, 26th.
operations at the rock, though, from the prevailing fogs,
it was not only inconvenient, but hazardous, to ply even
in the short distance between the rock and the vessels in the offing. The
boats landed this morning at half-past 8, and again returned to the Tender at
12. In the evening, they landed at half-past 8 and continued with torch-light
till half-past 11 p. m., having had five hours work during the two tides.
The weather was still thick and hazy, but the sea kept
Monday, 27th.
smooth, and the tides were very favourable, so that in
the morning, the artificers were at work from half-past
8 till half-past 11 o’clock; and in the evening, from a quarter past 9 till
midnight; or had altogether five hours and three-quarters work to-day.

Page 255

The writer wishing, in such favourable weather, to try the practicability of
bringing the Stone-lighters directly into the landing creeks of the Rock,
with the stones and building materials, by which great facility might
occasionally be given to the work, in landing the stones directly from the
vessels, instead of doing it on all occasions by loading and discharging the
praam-boats; an experiment was accordingly made this evening, and the
sloop Smeaton was towed into the eastern creek, when it was ascertained
that her cargo, in such weather, might have been very speedily landed. But
when the tide left the rock, the vessel heeled to the one side, her sails hung
loose, and she had so much the appearance of a wreck, that the sight cast an
immediate gloom particularly upon the countenances of the seamen, to
whom a vessel, in this state, could not be viewed without some degree of
horror. Whether it was partly from this circumstance, or that the tide and
weather would so seldom answer this nice operation, or that the landing-
master’s crew had become so expert in transporting the praam-boats, the
idea of laying the stone-vessels upon the rock, was, from this night’s
experiment, completely abandoned.
Land in the morning at 9, and continue at work till 1
Tuesday 28th. p. m., and again in the evening, when the work is
continued by torch-light, from half-past 10 till half-past
12, having had five hours’ work to-day.
The wind was at south-east this morning, with gentle
Wednesday, 29th.
breezes and clear weather. The boats landed at 11 a. m.,
and the foundation pit having been speedily cleared of
water, the work was continued till half-past 1. p. m., being three hours. The
evening tides now falling late, and becoming neap, no landing was made
this night.
The boats landed the artificers on the rock at half-past
Monday, 30th.
11 this morning, but the tides being extremely languid,
there was only about an hour’s work got upon the site
Artificers leave the of the building, and about 2½ hours’ at the Railways.
Rock. Progress of the
works. Finding that little more could be got done during the
present set of spring-tides, on returning to the vessel at
3 p. m., she was got under way, and sailed for Arbroath, which she reached
at 7 p. m.; but, being too early in the tide for getting into the harbour, the
author landed with the boat, and felt not a little satisfied with the progress

Page 256

and success of the work. The site of the building had been excavated as low
in some parts as it was necessary or proper to carry it, and there was now a
good prospect of having it completely prepared in the course of the next
spring-tides. About 100 feet of the eastern branch of the Railway had also
been laid, while the best of the season was still to come. The business of the
work-yard was going on with no less vigour ashore. The greater quantity of
the stones wanted from Aberdeen for the courses in hand, had been brought
to Arbroath, and the supply was becoming both more regular and abundant
from the quarry of Mylnefield. The second course, which contained very
weighty stones, being 18 inches in thickness, was now nearly all laid down
upon the platform in the middle of the work-yard, where each stone was
carefully fitted and marked as it was to lie in the building, in the same
manner as had been done with the first course.
It so happened that the artificers employed afloat, or, at
The Artificers’ pay
and premiums this
the Bell Rock, were upon this occasion ashore on the
month. regular pay-day, which took place on the first of every
month. The seamen’s wages were paid once a quarter,
and their premiums at the end of the working season. Such of the artificers
as had been off at the Rock this month, had each a considerable sum to
receive for wages and premiums, say L. 6, the stated wages being L. 1 for
six days; and having no disbursement to make for victuals, the situation of
those afloat became enviable, and the workmen who had not been at the
Rock, now began to make application for what they called their turn afloat.
This change was not a little gratifying, considering the hesitation and
backwardness shewn last season to this part of the service.
At 11 o’clock p. m., the Sir Joseph Banks Tender set sail
1808, July.
from Arbroath for the Bell Rock, to commence the
operations for the ensuing spring tides, having on board
Tuesday, 5th. 38 masons, 6 joiners, 3 smiths, and the landing-master’s
crew, consisting of 12 seamen, in all 59. The winds
Artificers embark for being variable, the vessel only got a short way off the
the Rock.
shore in the course of the night, and did not reach her
moorings till the next day at noon.
Landed on the Rock, with the three boats belonging to
Wednesday, 6th.
the Tender, at 5 p. m., and began immediately to bale the
water out of the foundation-pit, with a number of

Page 257

buckets, while the pumps were also kept in action with
Commence operations relays of artificers and seamen. The work commenced
for the ensuing
Spring-tides. upon the higher parts of the foundation, as the water left
them, but it was now pretty generally reduced to a
level. The pumps were laid in a diagonal position as represented in Plate
XI.; four men wrought at the cross handle and guided the pump-spear, to
which a rope was attached, and in this manner, about 20 men could be
conveniently employed at each pump, and it is quite astonishing in how
short a time so great a body of water could be drawn off. The water in the
foundation-pit at this time, measured about two feet in depth, on an area of
42 feet in diameter; and yet it was drawn off in the course of about half an
hour. After this, the artificers commenced with their picks, and continued at
work for two hours and a half, some of the sailors being at the same time
busily employed in clearing the foundation of chips, and in conveying the
irons to and from the smiths on the beacon where they were sharped. At 8
o’clock, the sea broke in upon us, and overflowed the foundation pit, when
the boats returned to the Tender.
The landing-master’s bell rung this morning about 4
Thursday, 7th.
o’clock, and at 5 the boats landed the artificers, when
the pumps and buckets were set to work to clear the
How employed. foundation-pit of water. The pumps, as formerly
noticed, were left upon the Rock, being fixed between
four bars of iron, batted or wedged into it, upon which plates were fitted
with forelocks, which kept them from shifting. It was common also to drive
a few wedges of iron between the pumps and these fixtures, for greater
security against their being lifted by the pressure of the water, which, in
spring tides, was from 12 to 14 feet in depth. At half-past 5, the foundation
being cleared, the work commenced on the site of the building. But from
the moment of landing, the squad of joiners and mill-wrights was at work
upon the higher parts of the Rock, in laying the railways, while the anvils of
the smiths resounded on the Beacon, and such columns of smoke ascended
from the forges, that they were often mistaken by strangers at a distance, for
a ship on fire. After continuing three hours at work, the foundation of the
building was again overflowed, and the boats returned to the ship at half-
past 8 o’clock. The masons and pickmen had, at this period, a pretty long
day on board of the Tender, but the smiths and joiners were kept constantly
at work upon the Beacon; the stability and great conveniency of which had

Page 258

now been so fully shewn, that no doubt remained as to the propriety of
fitting it up as a barrack. The workmen were accordingly employed, during
the period of high-water, in making preparations for this purpose.
The foundation-pit now assumed the appearance of a
Foundation stone
prepared.
great platform, and the late tides had been so
favourable, that it became apparent that the first course,
consisting of a few irregular and detached stones for making up certain
inequalities in the interior parts of the site of the building, might be laid in
the course of the present spring-tides. Having been enabled to-day to get the
dimensions of the foundation or first stone accurately taken, a mould was
made of its figure, when the writer left the Rock, after the tide’s work of
this morning, in a fast rowing boat, for Arbroath; and upon landing, two
men were immediately set to work upon one of the blocks from Mylnefield
quarry, which was prepared in the course of the following day, as the stone-
cutters relieved each other, and worked both night and day, so that it was
sent off in one of the Stone-lighters without delay.
On returning to the Rock, the writer found that the artificers had been able
to land regularly, both at the morning and evening tides, and that they had
added eight hours to the working period. He was, however, extremely sorry
to find that he had missed the visit of his excellent friend Mr Patrick Neill,
who, in the zeal of his pursuits in botany and natural history, had expressed
a strong desire to examine the fuci and animals upon the Bell Rock, and had
taken the opportunity of a passage with the Smeaton from Leith. But his
engagements did not admit of his remaining till the writer’s return; and he
had left the rock in a boat going to the Redhead, about seven miles east
from Arbroath, where he expected to overtake the writer, but instead of
which, they unluckily passed each other under night.
The weather still continued to be very agreeable, the
Saturday, 9th.
wind being moderate and chiefly from the S.W. At 6
a. m. the signal bell was rung for embarking for the
Rock. At 7 the artificers landed, and began to clear the foundation-pit of
water, and the work continued from a quarter past 7 till half-past 11, having
had three hours’ and a quarter’s work, when the Rock was again
overflowed, and the boats returned to the Tender.

Page 259

The site of the foundation-stone was very difficult to
Foundation stone work, from its depth in the Rock, but being now nearly
landed at high-water.
prepared, it formed a very agreeable kind of pastime, at
high-water, for all hands to land it upon the Rock. The landing-master’s
crew and artificers accordingly entered with great spirit into this operation.
The stone was placed upon the deck of the Hedderwick Praam-boat, which
had just been brought from Leith, and was decorated with colours for the
occasion. Flags were also displayed from the shipping in the offing, and
upon the Beacon. Here the writer took his station with the greater part of the
artificers, who supported themselves in every possible position while the
boats towed the praam from her moorings, and brought her immediately
over the site of the building where her grappling anchors were let go. The
stone was then lifted off the deck by a tackle hooked into a Lewis-bat,
inserted into it; when it was gently lowered into the water, and grounded on
the site of the building, amidst the cheering acclamations of about sixty
persons. The landing of this stone at high-water became necessary, from
there being still a want of a sufficient length of railway for conveying it
along the Rock at low-water to the site of the building. But this method was
rarely resorted to, as it was apt to skirt or break the edges of the stones; and
as a continuation of good weather was not to be calculated upon, it was
observed as a rule never to land more stones in any one tide than could be
built, because the force of the sea was more than sufficient to remove the
heaviest stones, as we have seen in the case of the first six blocks of granite
which were landed by way of experiment, and also of the cast-iron
mushroom anchor, which was drifted about the Rock, although it weighed
upwards of a ton.
The boats landed at half-past 7 this evening, and the artificers immediately
began to bale and pump the water from the foundation-pit, and the work
was afterwards continued by torch-light till a quarter-past 11, having had
three hours’ and a quarter’s work this tide.
The wind to-day was variable, with gentle breezes
Sunday, 10th.
varying from S.E. to N.E.; and every thing being in a
state of preparation for laying the foundation-stone,
Foundation-stone laid which had yesterday been landed with so much eclat,
with masonic
ceremony. the sailors again displayed their flags at all points, and a
cheerful happiness was discernible in every

Page 260

countenance. At half-past 8 the boats landed the artificers, and the weather
being remarkably fine, as many of the crews of the Floating-light, the
Tender and the Smeaton, as could be spared from their respective ships,
landed this morning, to witness the long-wished-for ceremony of laying the
first stone of the Light-house. We had, besides, an acquisition to our
numbers, in a party consisting of about sixteen persons from Dundee, who
came to the Rock, just as preparations were making for laying the stone.
Whether we consider this building as an erection of great difficulty, or, in a
nautical point of view, as adding much to the comfort and protection of the
mariner, and safety of property, upon a range of coast extending almost to
the whole eastern shores of Great Britain, its importance is evident. If it be
proper, therefore, on any occasion, to attach importance to the act of laying
the first stone of a public building, that of the Bell Rock Light-house cannot
be said to yield to any in point of celebrity, either for the peculiarity of its
situation, or the importance of its object. Under these considerations it is
obvious, that but for the perilous and uncertain nature of any arrangement
which could have been made for this ceremony, instead of its having been
performed only in the presence of those immediately connected with the
work, and of a few accidental spectators from the neighbouring shore,
counting in all about eighty persons, many thousands would have attended
upon an occasion which must have called forth the first dignitaries of the
country, in conferring the highest honours of masonry. The writer may,
however, confidently affirm, that, situate as the work was, nothing could
add to the satisfaction felt by all present, in having now got matters in so
advanced a state, as to be able to commence the building operations.
At 11 o’clock, the foundation stone was laid to hand. It was of a square
form, containing about 20 cubic feet, and had the figures or date of 1808
simply cut upon it with a chisel, a derrick or spar of timber having been
erected at the edge of the hole and guyed with ropes. The stone was then
hooked to the tackle and lowered into its place, when the writer, attended by
his assistants Mr Peter Logan, Mr Francis Watt, and Mr James Wilson,
applied the square, the level, and the mallet, and pronounced the following
benediction: “May the Great Architect of the Universe complete and bless
this building,” on which three hearty cheers were given, and success to the
future operations was drunk with the greatest enthusiasm.

Page 261

By 12 o’clock noon, the tide had overflowed the site of
Prayers read after the
the building, and the boats left the Rock after a tide’s
tide’s work.
work of three hours and a half. On returning to the ship,
prayers were read, when every heart perhaps felt more than ordinary
thankfulness. The artificers were again landed in the evening at half-past 8,
and continued at work, with torch-light, till a quarter past 12, having been
three hours and three quarters’ at work, or seven hours in all to-day.
The boats landed at 9 o’clock this morning, and after
Monday, 11th.
three hours’ and a quarter’s work, they left the Rock at
a quarter past 1 p. m. The artificers landed again in the
evening, and work with torch-light from 10 to a quarter past 12, having had
two hours’ and a quarter’s work.
After clearing the foundation-pit of water, by means of
Tuesday, 12th.
the two pumps and a number of buckets, the work
commenced at a quarter past 10, and left off at half-past
12 noon, having had two hours’ and a quarter’s work. In the evening, the
artificers again landed at 9, but it was not till a quarter past 11 that the water
was cleared out, and it began to overflow the site of the building again at
midnight, so that only three quarters of an hour’s work was got upon the
Rock with the evening tide.
Land at a quarter before 10 a. m., and begin to work at
Wednesday, 13th.
half-past 10, and left off at a quarter from 1 p. m.,
having had two hours’ and a half. In the evening at 12
o’clock, the foundation-pit was cleared of water; but at a quarter past 12,
the sea broke into it again, so that no work was done, owing to the state of
the tide.
Land to-day at half-past 12 noon, and had one hour’s
Thursday, 14th.
work. But the tides being now in the state of neap, the
Tender sailed with the artificers and landing-master’s
Tender leaves the crew to Arbroath, to wait the return of spring-tides. The
Rock.
work now put on a very promising appearance. The first
stone had been laid, and the levelling of the site of the building was in such
a state, as to afford every prospect of being able to commence the building
of the first entire course, after a few good tides. The reach of the Railways
from the site of the building, to the eastern landing-place, was also in a state

Page 262

of great forwardness, and the other parts of the apparatus being now in
readiness, there was every prospect of making rapid progress after the
foundation course was laid, and building operations were fairly begun.
In the work-yard, however, things had not so
Price of granite
advanced.
prosperous an appearance, as a number of blocks of
granite were still wanting to complete the first four
courses of the building; and such was the urgency of the demand, lest the
work should be stopped in its progress, that the writer authorised Mr
Gildowie of Aberdeen to advance the price of stone, according to
circumstances, as an additional stimulus to the exertions of the quarriers.
From this state of matters, it was now pretty obvious, that not more than
two or three courses of the light-house could be built this season.
To-day, at 1 o’clock p. m., the Tender left Arbroath for
Friday, 22d.
the Bell Rock, having on board 16 masons, 5 mill-
wrights and joiners, 2 black-smiths, and 13 seamen, in
Artificers sail for the all 35 persons, including the officers of the ship. The
Rock.
wind was at E. N. E., with light breezes and fine
weather; but as it fell calm, the boats left the Tender at 5 p. m. with the
artificers, while yet about 5 or 6 miles from the rock: but owing to the
strength of the ebb-tide, it was found impossible to reach it in time for the
tide, and they returned to the vessel at 9 p. m. without having effected a
landing.
At half-past 5 a. m., the Tender was made fast to the
Saturday, 23d.
south-west buoy, when the artificers landed. The two
pumps were immediately set to work, and at half-past 7
the work commenced, and continued till a quarter past 9, when the site of
the building was again overflowed, and the boats left the Rock after an hour
and three-quarters’ work. In the evening the work commenced at 7, and left
off at half-past 9, after two hours’ and a half’s work.
The wind was at S.S.E., with strong gales, accompanied
Sunday, 24th.
with a heavy breach of sea, so that the boats could not
land, and there was consequently no work done to-day.
A raft of timber goes The ship had also such a rolling motion, that the people
adrift.
could not be collected on deck, as usual, for reading
prayers. The wind was at east, accompanied with a pretty heavy swell of sea

Page 263

to-day, so that it was not without considerable difficulty that the boats
landed, when two hours’ and a quarter’s work were got, having been on the
Rock from three quarters past 7 till 10 a. m. But in this state of the weather
a landing was not attempted in the evening. In the course of this night, a raft
of six Norway logs, intended for laying the railways over certain gullies or
inequalities of the rock, drifted from one of the floating buoys to which it
had been made fast. It was afterwards picked up by some fishermen in the
Firth of Forth, near Anstruther, who were paid L. 2 for their trouble, in
name of salvage and expences.
The weather was more settled to-day, and the sea had
Tuesday, 25th.
become much smoother. At a quarter past 8 a. m. the
work commenced, and left off again at half-past 11,
after an excellent tide’s work of three hours and a quarter. The masons were
chiefly employed at the foundation of the building,—the millwrights and
joiners at the railways,—the blacksmiths were kept busy at both operations,
—while the landing-master’s crew took part in the whole.
The boats landed again in the evening at 8 p. m., and the foundation having
been cleared, the artificers began to the low-water works at a quarter past 9,
and continued till 11. After an hour and three-quarters’ work they left the
rock, but the joiners and blacksmiths had been employed on the beacon
since morning.
The wind being at S.E. this evening, we had a pretty
State of things, at
night, upon
heavy swell of sea upon the rock, and some difficulty
extinguishing the attended our getting off in safety, as the boats got a-
torches. ground in the creek, and were in danger of being upset.
Upon extinguishing the torch-lights, about twelve in
number, the darkness of the night seemed quite horrible; the water being
also much charged with the phosphorescent appearance which is familiar to
every one on ship-board, the waves, as they dashed upon the rock, were in
some degree like so much liquid flame. The scene, upon the whole, was
truly awful.
The work on the rock began this morning at 9 o’clock,
Wednesday, 26th.
and left off at a quarter past 12 noon, when the tide
overflowed the site of the building. The masons then
The first, or went on board of the Tender, but the smiths and joiners,
foundation course is

Page 264

finished to-day. as usual, continued their operations on the beacon. The
weather being moderate, the boats landed again in the
evening, at a quarter past 10, and left off at midnight, having had altogether
four hours’ and three quarters’ of low-water work to-day, when the last of
the eighteen detached pieces of stone, forming the Foundation-course, were
laid. The several holes or cavities in it, varying in depth from six to eighteen
inches, had now been built up with stones, exactly cut and fitted to their
respective places, as represented in Plate XV.; and which brought the whole
surface to a uniform level.
In leaving the Rock this evening, every thing, after the
The force of habit
exemplified in
torches were extinguished, had the same dismal
appearance as last night, but so perfectly acquainted
landing at night on the
Bell Rock. were the landing-master and his crew with the position
of things at the Rock, that comparatively little
inconveniency was experienced on these occasions, when the weather was
moderate: such is the effect of habit, even in the most unpleasant situations.
If, for example, it had been proposed to a person accustomed to a city life,
at once to take up his quarters off a sunken reef, and land upon it in boats at
all hours of the night, the proposition must have appeared quite
impracticable and extravagant; but this practice coming progressively upon
the artificers, it was ultimately undertaken with the greatest alacrity.
Notwithstanding this, however, it must be acknowledged, that it was not till
after much labour and peril, and many an anxious hour, that the writer is
enabled to state, that the site of the Bell Rock Light-house is fully prepared
for the First entire course of the building.
The sloop Smeaton had accordingly loaded the first
Thursday, 28th.
cargo of cut stone at Arbroath for the Light-house,
consisting of twenty blocks of the First entire course,
First cargo of an and had last night come to her moorings; and this
entire course landed.
morning the praam-boats were employed in landing her
cargo upon the Rock. From the want of a complete line of Railway from
any of the landing-places to the site of the building, this operation could
only be effected at high-water, when the stones were let down, one after
another, upon the unincumbered area of the foundation of the Light-house,
by means of a slip-rope passed through the Lewis-bat of each stone. This, as
before noticed, was by no means a very desirable mode of landing the

Page 265

materials, and was indeed, one that could rarely be resorted to, except in the
finest weather. The artificers having landed at 9 a. m., the foundation was
cleared of water by 10, when the masons made preparations for
commencing the building operations. Having had two hours’ and three
quarters’ work, they left the Rock, after laying the blocks of stone which
had been landed, in a compact and regular manner upon the site of the
building.
The wind was at east to-day, with a gentle breeze. At 10
Friday, 29th. a. m. the workmen landed, but the tides becoming neap,
it was two hours and a half before the foundation could
be cleared of water, and at a quarter from 2 p. m. it was again overflowed,
having only had an hour and a quarter’s work with the morning tide, when
the twelve remaining blocks of the Smeaton’s cargo were laid to hand, and
ready for being built with mortar. In the present state of the tides, it was not
judged necessary to land this evening.
The Smeaton having been unloaded yesterday
The Smeaton makes a
forenoon, she was again dispatched to Arbroath for
second trip for a cargo
in 20 hours. another cargo of the First course, which she got on
board that same night by 12 o’clock, and had returned
to her moorings at the Bell Rock this morning; Captain Pool, with his usual
activity, having only been absent from the Rock about twenty hours. In the
mean time, the writer visited the operations of the work-yard, to ascertain
more fully what prospect there was of having a supply of prepared stones
for continuing the works of this season, to the extent of three or four
courses of the Light-house. Some arrangement also was necessary for the
removal of Cranes and other articles of machinery for the use of the
building operations.
The Tender left her moorings at the Rock this morning
Saturday, 30th.
for Arbroath, with such of the artificers as could be
spared. Those left shifted on board of the Smeaton, and
Tender sails for were to be employed at the Beacon, and in laying the
Arbroath.
Railways, now much wanted, for transporting the
stones along the Rock. They also attended to the arrangement of the
materials landed upon the site of the building, where, from the lowness of
its situation, they lay in safety. In the work-yard considerable progress had
now been made with the Second entire course of the building, and after

Page 266

much trouble, the necessary blocks of granite had at length come to hand,
for completing it, but still many stones were wanting for the higher ones.
The Tender sailed this afternoon from Arbroath, having
1808, August.
on board two of the cranes already alluded to, as in
preparation for the work, upon a new construction, as
August, Wednesday, will be seen in Plate XIV. These were intended to be
3d.
erected on the site of the building, for laying the stones
in a more perfect and expeditious manner than had
Returns to the Rock.
hitherto been followed in operations of this kind. She
carried also forty-seven persons, including artificers and seamen; but as the
winds were light, little progress was made during the afternoon, for, as yet,
the utility of the Steam-boat, in cases of this kind, had not been developed.
At 4 o’clock this morning the Tender reached her
Thursday, 4th.
moorings, and was made fast to the south-west buoy, as
laid down upon Plate V. At 5 o’clock, 32 artificers and
Four stones laid. 11 seamen landed upon the Rock, from three boats. The
landing-master’s crew transported one of the cranes
from on board of the Tender, on one of the praams, and landed it at high-
water upon the Rock. Having again landed in the evening, the foundation-
pit was cleared of water by 6 o’clock, when the Crane was set up and
properly guyed with ropes. The center-stone and three others were then laid
with mortar, and trenailed to the Rock. After two hours’ work, the site of the
building was again overflowed, and at 8 o’clock the artificers returned on
board of the Tender.
As the stones were all dove-tailed into one another, they
Advantages of the
new cranes over
required to be laid perpendicularly into their respective
sheer-poles. places, which was also essential to preserving a proper
bed of mortar under them. This could only be effected
in a speedy and dextrous manner by means of a crane; but it will further be
seen, from the angular figure of the stones, that this could not be effected by
one of these machines of the ordinary construction, as has formerly been
noticed. It had been recommended to the writer to use the common sheer-
poles, with which the Edystone Light-house was built, which,
notwithstanding all the improvements in machinery, were still chiefly in use
for laying heavy stones; but sheer-poles, besides being difficult to preserve
on a sunken rock, could neither have laid the materials so well, nor with a

Page 267

tenth part of the expedition, as the crane with the moveable beam delineated
in Plate XIV.
Stones laid at the depth of about 14 feet under high-
Mr Smeaton’s plan of
Trenails and Wedges
water mark, required more than merely laying them on
followed. their respective beds, and trusting to their own gravity.
For this purpose nothing seemed to be so well adapted
as the oaken trenails which Mr Smeaton used in the erection of the
Edystone Light-house. Two jumper-holes, of an inch and a half in diameter,
had accordingly been drilled through each stone, which were continued or
perforated to the depth of six inches into the rock or course immediately
below, which became the most tedious part of the building operation. When
the oaken trenail was inserted into the hole, it had a saw-draught across the
lower end, into which a small wedge was inserted: and when driven home,
it became quite firm. The trenail was then cut flush with the upper bed of
the stone, and split with a chisel, when another wooden wedge was inserted
and driven into the upper end of the trenail, as represented in diagram 10. of
Plate X. Nor was this all, for, in following up Mr Smeaton’s principle, two
pairs of oaken wedges, as represented in Plate X., Fig. 11. were also driven
gently into the perpendicular joints, prior to grouting them with mortar. The
whole stones of a course had thus to be laid with great nicety,
corresponding to a number of checks and marks, previously arranged in the
work-yard, that the wedges might fit without trouble at the Rock, and
preserve the respective positions of the superincumbent courses, and make
band throughout the whole fabric.
The boats landed the artificers this morning at half-past
Friday, 5th.
5 o’clock, and the foundation-pit being cleared of
water, seven stones were laid and secured with trenails
16 Stones laid. by 8 o’clock. The artificers are again landed at 6 p. m.
and in the course of two hours nine additional stones
were laid.
From Saturday the 6th till Wednesday the 10th
Saturday, 6th, till
Wednesday, 10th.
inclusive, the weather and tides were favourable, which
afforded an opportunity of landing both with the
morning and evening tides, and in the course of these
92 Stones laid.
five days twenty-six hours’ work were obtained, and

Page 268

ninety-two stones were laid. The landing-master’s crew also continued their
operations in delivering the Smeaton, and laying her cargoes on the Rock.
The boats landed the artificers to-day at 9 a. m., and in
Thursday, 11th.
about three quarters of an hour the site of the building
was cleared of water, when eleven stones were laid in
11 Stones laid. the course of an hour and three quarters. There being a
considerable swell in the sea to-day from south-east, the
praams could not land any materials upon the Rock at high-water, and
nothing could be done in this way at low-water, as the Railways were not
yet in a working condition.
During the morning-tide, while the work was in
A party of Gentlemen
narrowly escape being
progress, a very serious accident was like to have
drowned. happened to a party of gentlemen from Leith, who
came to see the operations at the Rock. They attempted
to land in a very small boat belonging to their yacht; but, as a considerable
swell of sea set round it in all directions, after several attempts, they found
this to be impracticable. The writer then hailed the gentlemen, and advised
them to return, and remain on board of their vessel, until the state of the tide
would enable him to send a proper boat for them. In the mean time,
however, a boat from the Floating-light, pretty deeply laden, with lime,
cement and sand, approached, when the strangers, with a view to avoid
giving trouble, took their passage in her to the Rock. The accession of three
passengers to a boat, already in a lumbered state, put her completely out of
trim, and, as it unluckily happened, the man who steered her was not in the
habit of attending the Rock, and was not sufficiently aware of the run of the
sea at the entrance of the eastern creek. Instead, therefore, of keeping close
to the small rock called “John Gray,” the situation of which will be seen in
Plate VI., he gave it a wide birth, as the sailors term it; a heavy sea having
struck the boat, drove her to leeward, and the oars getting entangled among
the rocks and sea-weed, she became unmanageable, and was thrown on a
ledge by another heavy swell, which instantly leaving her, she kanted
seaward upon her gunwale, when the people, and part of the cargo, were
thrown into the sea. Before she righted, or any assistance could be rendered
by those on the Rock, another sea came which filled her and scattered the
passengers, eight in number, in all directions. Some clung to the boat, others
to the sea-weed, and two or three having got hold of oars and loose thwarts,

Page 269

which floated about, were carried out of the creek, to a considerable
distance from the spot where the accident happened. By the very prompt
and active assistance of Mr James Wilson, the landing-master, and his crew,
the whole were, however, speedily got out of the water, excepting a Mr
Strachan, one of the strangers, who had clung to the sea-weed upon a small
insulated rock, bearing his name, in Plate VI., to which it was impossible at
this time of tide to approach, without the assistance of a boat. Mr Wilson,
with a dexterity peculiar to himself, made towards this spot, where Mr
Strachan, with great resolution and perseverance, still kept his hold,
although every returning sea laid him completely under water, and even hid
him from the view of the spectators on the Rock. In this situation he must
have remained for ten or twelve minutes. When the boat reached the
insulated rock, the most difficult part was still to perform, as it required the
greatest nicety of management to guide her in a rolling sea, so as to prevent
her from being carried forcibly against Mr Strachan, who was in danger of
being struck with the stem of the boat, to which he lay completely exposed.
Notwithstanding the breach of the sea, however, and the narrowness of the
passage, the boat was conducted at the proper moment close to Mr
Strachan, without either touching him or the insulated rock to which he
clung, till he was lifted into the boat. Mr Strachan was of course much
exhausted, from having been so completely overrun by the sea, and having
had but a very short space for breathing between the returning waves.
The gentlemen thus extricated in safety from the most imminent peril, were
immediately removed on board of their own vessel, no doubt very thankful
for the narrow escape they had made, and with grateful recollections of the
exertions made by Captain Wilson and his crew. With regard to the people
belonging to the Light-house service, none of them were materially injured
beyond the disagreeable ducking which they experienced; but the boat was
almost completely wrecked: her cargo was also injured, and partly lost.
The artificers landed this morning at half-past 10, and
Friday, 12th.
after an hour and a half’s work, eight stones were laid,
which completed the First entire course of the building,
First entire course consisting of 123 blocks, the last of which was laid with
completed.
three hearty cheers. Immediately after this tide the
Tender left the Rock for Arbroath, with all hands on board; and having a

Page 270

fine breeze at south, she got into the harbour at half-past 6 p. m., to wait the
return of the spring-tides.
Those on board felt not a little happy, when the ship,
Artificers are
welcomed into
which, on her passage, had been decorated with
Arbroath Harbour. colours, intimating that the First entire course was laid,
was received with cheering from the workmen ashore,
and the inhabitants of Arbroath. The service of the Bell Rock now became
every trip more desirable with the artificers, who, having been enabled to
work both during the morning and evening tides, with the exception of the
evening of the 11th, the premiums over and above their stated wages
became more and more an object, while the experience acquired in landing
123 blocks of stone, had fully established the practicability of the whole
operation.
On the writer’s arrival at the work-yard this evening, he
One of the Artificers
learned, with much regret, that an unfortunate accident
disabled. He receives
an annuity. had happened to one of the masons, of the name of
Hugh Rose, while employed in raising a block of stone,
of between two and three tons weight, with the carpenter’s jack, represented
in Plate X. The jack had not been set with sufficient care, and slipped from
under the stone, which instantly fell upon his knees. For a considerable time
Rose was thus kept in a sitting posture, with a great part of the weight of
this large stone resting upon his legs, till relieved by the other workmen
who came to his assistance, and again applied the jack to raise the stone.
His legs were, however, sprained in a very painful and distressing manner,
which kept him from work for upwards of a twelvemonth. He was one of
the best workmen in the Yard, and a man of great bodily strength; but
became so much disabled by this accident, that the Light-house Board was
afterwards pleased to settle an annuity of L. 20 per annum upon him.
The work at this moment had much the appearance as if
Friday, 19th.
it would be retarded, as several blocks of stone were
still wanted from the quarries at Aberdeen, to complete
Granite Stones much the Third entire course, the Second being now ready to
wanted.
be removed from the work-yard to the Rock. This
course was 18 inches in thickness, the granite stones of which measured
from 4 to 7 feet in length, varying in breadth from 3 feet to 4 feet 6 inches.
Stones of these dimensions could not be landed with safety at high-water,

Page 271

but the railways on the Rock were nearly completed from the eastern
landing-place to the site of the building, so that every thing was now in
readiness for commencing the landing of the materials with low-water.
Having made all the necessary arrangements for
Wednesday, 24th.
making dispatch with the Third course, the writer sailed
at mid-day on the 24th, with the Tender, for the Bell
10 Stones laid. Rock, having on board forty-three persons in all, and
the wind being favourable, the vessel was made fast to
her buoy at the Rock at 7 p. m. The Smeaton also came to her moorings with
a cargo of the Second course, when the landing-master’s crew brought the
praam-boat along-side, and was loaded with 10 stones, which were landed,
and laid this evening after three hours’ work.
The weather having been extremely favourable, regular
Saturday, 27th.
tides’ work were got both morning and evening, so that
the Second entire course, containing 136 stones in
136 Stones laid in 7 number, and 152 tons weight, was laid in the course of
tides.
seven tides; the sloop Smeaton having been kept
constantly plying between the Bell Rock and Arbroath, where, on her
arrival, she was immediately loaded, whether by night or day. From the
favourable state of the weather, the complete and effective condition of the
landing apparatus, and the dexterity of the landing-master’s crew, a cargo of
stones was discharged from the vessel, and landed on the Rock in as short a
time as the stones could be built, and the holes bored into the course below,
and trenails fixed into them. To facilitate the lifting of the stones off the
waggons, after they were brought on the railways to the site of the building,
and for laying them at once on every part of its area, though measuring 42
feet in diameter, a second crane was erected on the First entire course, as
represented in Plate IX., which thus admitted of the Second course being
built with great facility, without once requiring to shift the cranes
horizontally; as the beams, when extended in opposite directions, reached
from the centre to the extremity of the course.
On completing the laying of the Second entire course,
1808, September.
the Light-house began to assume the appearance and
form of a building; for, although still under a part of the
Second course excavated rock, it was, nevertheless, 4 feet above the
completed.
level of the lower bed of the foundation-stone,—a

Page 272

consideration which was highly gratifying to those immediately connected
with the work. Having successfully completed this course, the writer sailed
with the Smeaton for Arbroath, accompanied by such of the artificers as had
been employed in building, and leaving the Tender at the Rock, with the
mill-wrights, joiners, smiths, and masons, who worked at the Railways, and
in preparing the upper part of the Beacon as a barrack. After landing at
Arbroath, the Smeaton was immediately dispatched for Aberdeen, in quest
of a few blocks of granite, still much wanted for the courses in hand.
Having now got the Third entire course nearly ready for
Friday, 9th.
shipping, the Tender returned to Arbroath for the
artificers, and a supply of water and provisions; and
Artificers go off to the sailed again this morning at two o’clock for the Bell
Rock. 10 Stones laid.
Rock, having forty persons on board. At 9 she was
made fast to the S.W. buoy, when the boats were hoisted out and landed the
artificers, who remained till 12 noon. These two hours were occupied in
adjusting the cranes, and making preparations for commencing the building
operations. A landing is again made in the evening at 9, and at midnight the
artificers returned on board of the Tender, having been three hours on the
Rock, when ten stones of the Third course were laid and trenailed to the
course below.
Land at 9 a. m., and by a quarter past 12 noon, 23 stones
Saturday, 10th.
had been laid. The works being now somewhat elevated
by the lower courses, we got quit of the very serious
Pumping of Water inconvenience of pumping water to clear the
discontinued.
foundation-pit. This gave much facility to the
operations, and was noticed with expressions of as much happiness by the
artificers as the seamen had shewn when relieved of the continual trouble of
carrying the smiths’ bellows off the Rock, prior to the erection of the
Beacon.
While the workmen were laying the closing or last
One of the Artificers
loses a finger.
stone of the former course, John Bonnyman, one of the
most active and expert of the masons, met with an
unlucky accident in the following manner. The moveable beam of the
building-crane having been lowered to a horizontal position, for the purpose
of laying the stone at the circumference of the course, Bonnyman, who was
directing it into its birth with a small pince in his right hand, had

Page 273

inadvertently rested his left hand on the beam, near the sheave or pulley, at
its extremity, when one of the links unfortunately caught his hand, and
before the crane could be stopped, the chain had passed over the middle
joint of the fore-finger, and cut it so nearly off, that he applied to the writer,
who was standing by, to relieve him of the almost detached part. But having
no great inclination for the performance of operations of this kind, the
severed parts were set together and bandaged in as careful a manner as
circumstances would admit, when the patient was sent in a fast-rowing boat
to Arbroath for medical aid. It was nevertheless soon afterwards found
necessary to amputate the finger, and Bonnyman became a successful
candidate for a light-keeper’s birth.
Having landed this morning at 10, the work was
Sunday, 11th.
continued during four hours, when 14 stones were laid;
but its regular progress had now to be stopped for a
Progress of the works time, owing to the want of stones from the work-yard,
stopped for want of
granite. where some blocks of granite were waited for from the
quarries. In the afternoon the Smeaton arrived with a
few hearting or interior stones of the course in hand; but the wind having
been for some days past in the N.E., accompanied with a considerable swell
of sea, it was not found practicable to make a landing, and the praam-boat,
after having been loaded, was made fast to her moorings: consequently no
landing was made on the Rock with the night tide.
The wind being still at N.E., the swell was so great that
Monday, 12th.
the boats landed with much difficulty on the Rock this
morning at half-past 11 o’clock, but could only remain
Building level with for an hour and a half, owing to the heavy sea which
the higher parts of the
Rock. ran upon it. This tide was employed in completing the
boring of the trenail-holes, and in securing the stones
which had been laid. The cranes were also raised from the second to the
third course, which being 18 inches in thickness, the artificers who worked
them now stood nearly on a level with the highest parts of the Rock.
The wind being still at N.E., accompanied with a heavy
Tuesday, 13th.
breach on the Rock, no attempt would have been made
to land to-day, had not the writer felt a more than
Experience great ordinary desire to examine the state of the work, from
difficulty in landing.
the manner in which the sea broke upon the building. In

Page 274

accomplishing this about noon, the boats were frequently put back, but were
at length successful, when it was found that the force of the sea had raised
two of the stones exposed to its immediate wash, which, in the unfinished
state of the course, formed an abrupt face to the waves. These two stones
were lifted perpendicularly off their beds, the one to the height of 6, the
other of 10 inches; but they were fortunately still held by the trenails, and
supported as if on stilts. Had this not been timeously observed, the
probability is, that the operation of another tide might have swept them into
deep water, which would have been attended with much additional hazard,
by delaying the work in its present state, at so advanced a period of the
season.
The trenails of these stones having been drawn or bored
Two Stones loosened
but are again secured.
out, the stones were laid a second time, when every
The vessels slip theirprecaution was taken to secure the mortar, by stuffing
moorings. bagging-cloth round the joints, and loading them with
bars of iron. The guy-ropes of the cranes were also
tightened, and every thing put in as complete a state of security as
circumstances would admit. At 1 p. m. the boats again returned to the
Tender, which now rode so heavily at her moorings that it was found
necessary to get her under way, when she sailed for Arbroath with the
artificers. The Smeaton also slipped her moorings; but instructions were
previously given to Mr Pool, to keep as close as possible to the loaded
praam-boat, still riding at her moorings, that, in the event of her breaking
adrift, he might be at hand to take her in tow. In the evening, however, the
weather moderated considerably, and, after landing the masons at Arbroath,
to remain till the return of spring-tides, the Tender returned to her station at
the Rock, with the workmen employed at the Beacon-house and Railways.
The Light-house Yacht having to-day returned from the
Saturday, 17th.
Northern Light-houses, she transported the builders
from Arbroath to the Rock, and supplied the Floating-
10 Stones are laid. light and Tender with provisions and necessaries. By
The praam-boats ride
out the gale. this means, the latter vessel was enabled to remain at
her moorings during the present neap-tides, by which
the operations on the higher parts of the Beacon made great progress. The
writer also embarked this morning in the Light-house Yacht, and having
hailed the Floating-light at noon, found that she had rode out the late gales

Page 275

with great ease. At 3 o’clock p. m. the Yacht was made fast to a set of
moorings which had been laid down for her early in the season; and at 5,
thirty artificers landed, when 10 stones were laid in two hours and a quarter.
Notwithstanding the heavy seas which had run upon the Rock since the
completion of the Second course, every thing was found in good order. The
stones of the course in hand were all in their respective places, and the
joints were full of mortar. The cranes also stood quite firm, with their guys
and tackling. It was no less satisfactory to find that the loaded praam rode at
her moorings in perfect safety, without having apparently shipped any sea
during the gale.
The artificers landed this morning at 5 o’clock, and
Sunday, 18th.
continued at work till a quarter past 8. The railways
being now in a pretty complete state, and a further
31 Stones laid in 6¼ supply of stones having been brought to the Rock, the
hours.
landing-master got 21 blocks conveyed from the eastern
wharf to the building. In the same manner, with the evening tide, 10 stones
were landed, and the work continued from half-past 5 to half-past 8, having
had six hours’ and a quarter’s work to-day, during which no fewer than 31
stones were laid.
The artificers landed this morning, and continued at
Monday, 19th.
work for three hours, when 7 stones were laid. The
wind being at S.E. there was a very heavy swell of sea
12 Stones are laid. in the eastern creek; and not having as yet been able to
The western track of
Railway much lay the Railway-track to the western creek, the stones
wanted. were obliged to be landed on the eastern side of the
Rock, which was often attended with great
disadvantage to the work. For it was only in the very finest weather that
materials could be dropped or lowered upon the Rock at high-water; an
operation which was further attended with great inconveniency, from the
sparse manner in which it was found necessary to drop them from the
praam, to prevent their being injured. The fear also of a storm overtaking
the work while the stones were in this situation, was none of the least
sources of uneasiness which attended this practice: for, though the sea
might not carry them entirely off the Rock, they might nevertheless be so
damaged, as to render them unfit for the work, and the loss of a single stone

Page 276

could not be replaced without returning to the work-yard, and having
recourse to the mould from which it was cut.
As the landing-master’s crew were in the act of towing
One of the beams
cannot be got out of
one of the praam-boats into the eastern creek this
the eastern creek. morning, an unlucky sea struck her, and carried her
upon the same ledge of the Rock, which, on the 11th of
last month, had almost proved fatal to the Floating-light’s boat. By the
active exertions of the crew, however, the praam on the present occasion
was got off without sustaining much damage, her bottom being only slightly
rubbed; and the cargo, consisting of 7 blocks of stone, with cement, &c.
was landed in safety. The boats returned to the Rock at 6 p. m., and left it
again at 9, after having had three hours’ work, and laid 5 stones, being all
the materials that could be got this tide, owing to the rough state of the
weather; for it was not till after three successive attempts had been made,
that Mr Wilson succeeded in getting the praam into the creek this evening,
the wind being at S.E., and still continuing to blow fresh with a heavy swell
of sea, insomuch, that it was found impracticable to get her out again after
unloading; and she, therefore, remained till the tide had flowed sufficiently
to float her over the lower parts of the Rock to the westward.
The artificers landed this morning at 6 o’clock, and left
Tuesday, 20th.
the Rock again at a quarter past 10, having had four
hours’ and a quarter’s work, when seven stones were
15 Stones are laid. laid. In the evening, the artificers landed at 6, and
The weather
continues to be very continued at work till 10, having had a tide of four
boisterous. hours, in which time eight stones were laid. Owing to
the surf of sea upon the Rock to-day, it was with the
utmost difficulty that the heavy blocks could either be got out of the
Smeaton into the praams, or conveyed in safety to the Rock. It was only by
the experience now acquired, and the activity of the landing-master’s crew,
that any thing was done to the building during the whole of these spring-
tides. Indeed the Smeaton was forced to leave her moorings, and return to
Arbroath, before the whole of her last cargo could be delivered. In this state
of the weather, the workmen could not be regularly employed in building;
but there was so much to do with each course, in boring trenail holes, and
laying railways during the time of low-water, that the artificers were always
fully employed, when it was possible to land. During the period of high-

Page 277

water, the mill-wrights and joiners were occupied in framing the upper part
of the Beacon-house.
To-day the wind was at S.W., blowing a fresh gale, and
Wednesday, 21st. it was not expected that the Smeaton could have
possibly returned from Arbroath, with the remaining
Engineer’s clerk most stones of the course in hand, consisting of 17 blocks,
active in dispatching
the shipping. with which, from the advanced period of the season,
and the boisterous state of the weather, it was proposed
to terminate the building for this year. The Smeaton, however, got to
Arbroath last night, at a late hour; and Mr Lachlan Kennedy, Engineer’s
clerk,—whose department it was to attend to the dispatch of the vessels,—
with that promptitude and zeal in the service which uniformly marked all
his transactions, called the artificers in the work-yard barrack at midnight,
when they commenced, with torch-light, to cart the stones to the quay, and
had loaded the Smeaton, by half-past 2 a. m., so that she saved tide out of
the harbour, and at half-past 6 got to her moorings at the Rock.
Mr Thomas Macurich, mate of the Smeaton, and James
The unfortunate loss
Scott, one of the crew, a young man about 18 years of
of James Scott, one of
the seamen. age, immediately went into their boat to make fast a
hawser to the ring in the top of the floating-buoy of the
moorings, and were forthwith to proceed to land their cargo, so much
wanted at the Rock. The tides at this period were very strong, and the
mooring-chain, when sweeping the ground, had caught hold of a rock or
piece of wreck, by which the chain was so shortened that when the tide
flowed, the buoy got almost under water, and little more than the ring
appeared at the surface. When Macurich and Scott were in the act of
making the hawser fast to the ring, the chain got suddenly disentangled at
the bottom, and this large buoy, measuring about 7 feet in height, and 3 feet
in diameter at the middle, tapering to both ends, being what seamen term a
Nun-buoy, vaulted or sprung up with such force, that it upset the boat,
which instantly filled with water. Mr Macurich, with much exertion,
succeeded in getting hold of the boat’s gunwale, still above the surface of
the water, and by this means was saved; but the young man Scott was
unfortunately drowned. He had, in all probability, been struck about the
head by the ring of the buoy, for although surrounded with the oars and the
thwarts of the boat which floated near him; yet he seemed entirely to want

Page 278

the power of availing himself of such assistance, and appeared to be quite
insensible, while Pool, the master of the Smeaton, called loudly to him: and,
before assistance could be got from the Tender, he was carried away by the
strength of the current, and disappeared! A signal of distress was
immediately hoisted, when one of the boats of the landing-master’s crew
instantly attended to Macurich’s safety, and picked him up in a very
exhausted state, but he happily soon recovered.
The young man Scott was a great favourite in the
His mother gets a
small annuity.
service, having had something uncommonly mild and
complaisant in his manner; and his loss was therefore
universally regretted. The circumstances of his case were also peculiarly
distressing to his mother, as her husband, who was a seaman, had, for three
years past, been confined to a French prison, and the deceased was the chief
support of the family. In order, in some measure, to make up the loss to the
poor woman for the monthly aliment regularly allowed her by her late son,
it was suggested, that a younger boy, a brother of the deceased, might be
taken into the service. This appeared to be rather a delicate proposition, but
it was left to the landing-master to arrange according to circumstances: such
was the resignation, and at the same time the spirit of the poor woman, that
she readily accepted the proposal, and in a few days the younger Scott was
actually afloat in the place of his brother. On representing this distressing
case to the Board, the Commissioners were pleased to grant an annuity of
L. 5 to Scott’s mother.
The Smeaton not having been made fast to the buoy,
17 stones are laid.
The Building
had, with the ebb-tide, drifted to leeward, a
operations completedconsiderable way eastward of the Rock, and could not,
for the season. till the return of the flood-tide, be worked up to her
moorings, so that the present tide was lost,
notwithstanding all exertions which had been made both ashore and afloat
with this cargo. The artificers landed at 6 a. m., but as no materials could be
got upon the Rock this morning, they were employed in boring trenail
holes, and in various other operations, and after four hours’ work they
returned on board the Tender. When the Smeaton got up to her moorings,
the landing-master’s crew immediately began to unload her. There being
too much wind for towing the praams in the usual way, they were warped to
the Rock, in the most laborious manner, by their windlasses, with

Page 279

successive grapplings and hawsers laid out for this purpose. At 6 p. m., the
artificers landed, and continued at work till half-past 10, when the
remaining seventeen stones were laid, which completed the Third entire
course, or Fourth of the Light-house, with which the building operations
were closed for this season.
The building, being now on a level with the highest part
Summary of the
Building operations at
of the margin of the foundation-pit, or about 5 feet 6
the Rock. inches above the lower bed of the foundation-stone, is
computed to contain about 388 tons of stone; consisting
of 400 blocks, connected with 738 oaken trenails, and 1215 pairs of oaken
wedges. The number of hours of low-water work upon the Rock this season,
amounted to about 265, of which number only 80 were employed in
building. It was further highly satisfactory to find, that the apparatus, both
in the work-yard at Arbroath, and also the craft and building apparatus at
the Rock, were found to answer every purpose much beyond expectation.
The operations of this season, therefore, afforded the most flattering
prospects of the practicability of completing the solid part, or first 30 feet of
the building, in the course of another year.
Owing to very heavy gales of wind from a north-eastern
Sunday, 25th.
direction, the Sir Joseph Banks Tender, the Sloop
Smeaton, and Light-house Yacht, were, on the 22d,
Shipping obliged to obliged to slip their moorings, and proceed with all
run for Arbroath.
hands for Arbroath. The Tender and the Smeaton again
returned to their stations at the Bell Rock on the 25th; the former to attend
the mill-wrights, joiners, and smiths, while they completed certain
operations connected with the Railways, and Beacon-house, that everything
might be left in as secure a state as possible for the winter months; the crew
of the Smeaton being at the same time occupied in lifting the several sets of
moorings, building-cranes, and other apparatus connected with the works,
which she carried to Arbroath.
The writer having also sailed on the 25th in the Light-
Appearance of things
at the Rock after the
house Yacht, on his annual inspection of the Northern
late gale. Light-houses, wished, in passing the Bell Rock, to have
landed, but this he found impossible, owing to the
Writer sails for the heavy sea which still ran upon it. The vessel, however,
Northern Light- sailed as near the Rock as possible, that he might, in

Page 280

houses. some measure, learn the state of matters after the late
gales of the 22d and 23d. He could discern that the
Beacon was in good order, but found that the strong Triangular-sheers of
cast-iron, represented in Plate XI., at the Eastern wharf, were thrown down
and broken to pieces; and that the North-west buoy had drifted from its
moorings. The circumstance of the breaking of these sheers greatly
surprised the writer, as they consisted of bars of iron, whose cross section
was about 10 inches; having each four longitudinal ribs, of about an inch
and a half in depth, and thus forming a common circumference of 16
inches.
After sailing by the Orkney Islands, and visiting all the
1808, October.
Light-houses on the coast of Scotland, the writer landed
at Greenock on the 19th of October, and soon
Monday 31st. afterwards returned to the works at Arbroath. At half-
past 11 a. m. on the 31st, he landed on the Bell Rock,
Visits the Rock on his and remained till half-past 3 p. m., examining every
return.
thing minutely, when he had the satisfaction of finding
the stones and joints of the building quite entire. The Railways and Beacon
were also in good order; while the moorings, and all the moveable
apparatus, had been conveyed to Arbroath.
During the months of November and December, the
December.
affairs of the work-yard went forward in the usual busy
manner. A small squad of artificers went off to the Bell
Arrangements for the Rock at each period of spring-tides, when the weather
Writer.
permitted, with tools and implements to repair and refit
any temporary damage which the Beacon or Railways might sustain, and
likewise to examine the state of the several courses of masonry. In the
work-yard the masons were employed in hewing or cutting stones for the
next year’s operations; the joiners, in preparing the upper framing of the
accommodation part of the Beacon-house. The Tender was occupied in
carrying off the workmen who landed at the Rock; in relieving the crew of
the Floating-light in their turns ashore, and supplying that ship with
provisions and necessaries; while the sloop Smeaton made several trips to
the granite quarries of Aberdeen and Peterhead, and the Light-house Yacht
was laid up in ordinary at Leith.

Page 281

In this state of arrangement, the business of the Bell Rock was left during
the winter months; and the writer is now to continue the narrative, by giving
the account of the operations of the year 1809.

Page 282

CHAPTER V.
PROGRESS OF THE WORKS IN THE YEAR 1809.

In the month of January 1809, the winds prevailed
1809, January.
much from the east and north-east, which never fail to
produce a heavy sea on the eastern shores of Great Britain, and particularly
at the Bell Rock, from its exposed position to these points. This state of the
weather, therefore, rendered it extremely difficult to communicate with the
Floating-light, for the purpose of relieving the seamen in their turns ashore,
and supplying the ship with provisions and necessaries.
It was also found impracticable to land upon the Rock
Railways injured, and
Bracing chain-bolts
itself sooner in this month than the 20th, when, after
unlocked. several attempts, Mr Francis Watt and Captain Wilson,
two of the engineer’s assistants, landed with four
seamen, and four artificers with their tools, at 12 noon, and remained till a
quarter past 1 p. m. By this time several of the supports of the iron-railways
on the Rock had got loose, and two of the castings forming the waggon-
track and footpath had broken adrift. One of these was found at a
considerable distance from its place, but the other had entirely disappeared,
and must have been washed off the Rock, although it weighed upwards of
100 lb. In these gales, no fewer than ten of the bracing-chains of the Beacon
were shaken entirely loose, seven of which had unscrewed the tightening-
bolts, and the remaining three lifted the pieces of rock into which the chain-
bats had been fixed. The tightening-bolts were again screwed up, and pieces
of small wire twisted round the points of the screws, to prevent the nuts
from unlocking. The three bolts, with their chains, which had lifted the parts
of the rock, were disengaged from the Beacon altogether, to prevent injury
to the wooden beams, by their motion with the force of the sea; and things
were otherwise left in as serviceable a state as the circumstances of a
limited stay upon the Rock at this season of the year would admit. It was,
upon the whole, highly satisfactory to learn, that the Beacon, this important
auxiliary to the operations, had received no material injury, after such a
continued tract of stormy weather; the great iron stanchions sunk into the
Rock, which kept the main beams in their places, and all the joints and

Page 283

fixtures of the higher parts of the framed work, being quite entire, and
without the smallest appearance of having shifted.
On this trip to the Rock, the Light-house Yacht picked
Proofs of strong
currents in the Sea.
up a floating-buoy belonging to the navigation of the
river Weser. It was marked “Bremen 1808, W. R. No.
2.,” and measured six feet in length, and three feet in diameter over the
head, being of the form known to mariners as a Cann buoy. It appeared to
have drifted, in the course of this winter, from the shores of Germany,
which, in a direct line, is a distance of at least 340 miles. This circumstance,
as the buoy presented, while afloat, but a small surface for the wind to act
upon, being heavily bound with iron, and having about two fathoms of
mooring chain appended to it, affords an extraordinary proof of the effects
of the tides and currents in the ocean. We may likewise here notice, among
other instances corroborative of this curious anomaly of the tides, the
drifting, within the same period, of part of the apparatus belonging to the
works of the Bell Rock; particularly the two buoys, formerly mentioned,
that parted from their moorings, and came ashore, the one, along with a raft
of timber, at Fifeness, and the other at the Island of May, after having been
upwards of two months at sea. But, perhaps, the most remarkable
occurrence of this kind, was that of the Praam-boat, also formerly
mentioned, which broke loose from the Floating-light, and was found at the
Redhead about 13 miles distant, having been at sea for the space of three
months and eight days.
The artificers again landed at the Rock on the morning
Three large drift-
stones found upon the
of the 31st at 7 o’clock, being rather before day-break,
Rock. and left it again at 10, after having been on it about
three hours. Several of the bracing-chains were found
loosened, notwithstanding the precautions hitherto used for preventing the
bolts from unlocking. But the writer had resolved, when the weather would
admit, to remove these chains altogether, and introduce strong bars of
malleable iron, about eight feet above the Rock, as represented in Plate
VIII., to connect the several beams in a horizontal direction. At this landing,
three large masses of rock were found close to the Beacon, which had been
drifted upon the Rock by the force of the sea. They were of various
dimensions, the largest containing no less than about 20 cubic feet, equal
perhaps to a ton and a quarter in weight. After a careful examination, in

Page 284

every direction, of the low-water surface of the rock, it was ascertained that
these stones had formed no part of it, though of the same description of
rock; and it was therefore concluded, they must have been thrown up from
deep water. The refitting of the chains of the Beacon and the cast-iron
Railways, so occupied the time of the artificers, that they could not get the
stones so broken as to be removed, and thereby prevent their being perhaps
thrown, by the force of the sea, against the Beacon and Railways, like so
many battering rams.
During the month of February, the weather continued to
February.
be extremely boisterous, and it was not without
considerable difficulty that the Floating-light could be
visited at the stated periods; while two unsuccessful attempts were made, on
the 1st and 20th, to land at the Bell Rock.
In the work-yard, the preparation of the several courses
Progress of the Works
at Arbroath, and
of the building was going progressively forward. The
exertions made at the Ninth course was now finished, and part of the Tenth
Quarries. laid upon the platform. At Mylnefield Quarry, the
operations were at a stand; for in winter, as formerly
mentioned, no work is done here, owing to the liability of the stones to split
in frosty weather, especially when newly taken from the quarry, the laminæ
of the strata being then charged with moisture. But, as granite imbibes water
very slowly, and is not liable to those changes, every exertion continued to
be made at the quarries of Aberdeenshire, that, if possible, the outside
casing of granite might be carried to the height of 30 feet, or to the top of
the solid part of the building, instead of 16 feet, or to high-water mark, as
had been latterly intended. The stone-agent at Aberdeen, accordingly, had a
person traversing the numerous quarries in that neighbourhood, while one
of the foremen from the work-yard at Arbroath, was similarly employed,
during the winter months, at Peterhead; and whenever a stone was found
answerable to the Light-house moulds, it was immediately purchased, and
laid aside for the use of the Bell Rock.
The sloops Smeaton and Alexander made several trips
1809, February.
to the North, and also to Mylnefield, near Dundee, for
stones which had been quarried in the course of the
Employment of summer months, and were in no danger from the frost;
Shipping.
but owing to the difficult nature of the navigation of the

Page 285

Tay in winter, these voyages were frequently attended with considerable
danger. On the last trip which the Smeaton made to this quarry, she had a
very narrow escape, and lost both her boat and an anchor; but the hazardous
state of the vessel and all on board, will be better understood by the
following very distinct and explicit letter or journal from Mr Thomas
Calder, commander of the Light-house Yacht, who, on this occasion, was
acting master on board of the Smeaton.
“Arbroath, 25th February 1809.
Captain Calder’s
account of a trip to “Mr Stevenson.
the Tay.
“Sir,—At 3 o’clock p. m., on the 21st inst., I got under
way from the South Ferry Roads for Mylnefield quarry, wind at West. At 7
were about a mile from the quarry pierhead. Light airs of wind. Got beset
amongst ice, and brought up with the small bower-anchor. At midnight, all
hands employed hanging fenders over the bows and sides, to save the vessel
from getting cut with the ice.
“At day-light, on the 22d., being high-water, got under way; ice all round,
and had frequently to let go an anchor, to allow it to drift past us. Could not
get up to the quarry, and at 10 put into Dundee. During the remainder of this
day had light breezes, with hard frost.
“On the 23d, at 7 a. m. got again under way, with a westerly wind, but still
could not make up to the quarry. At 10, had drifted down as far as the
Lights of Tay, having little wind, but a heavy sea from E.SE. At 11, the boat
filled, and was turned bottom up; nothing could be done for her safety; cut
her adrift. At noon, had a very heavy sea on our broadside, breaking over
all, with little or no wind. Got into three fathoms water, the sea sweeping
every thing off the deck that was moveable. All hands in the rigging for
safety, except the man at the helm. Endeavour if possible to get back, but all
in vain. Let go our anchor in two fathoms water, the sea breaking over all.
At 9 o’clock p. m., being then high-water, let go the best bower-anchor. At
midnight calm weather, with heavy breaking seas.
“At 9 a. m. of the 24th, got under way again, and took our fate, being in
much peril to ride longer. Could not purchase our anchor, and were
therefore obliged to cut the cable. Had light airs of wind, but still a heavy
sea. Went over the bank in going out of the Tay, and, at 9 in the evening,

Page 286

had the good fortune to get into Arbroath. In the course of this trip we saw
one sloop sink with all hands in the rigging, while close by us, but we could
render them no assistance, and we were still drifting towards the shore.
Another sloop, named the Lady Kinnaird, I believe bound for Leith, God
only knows what her fate was; being thick with snow I lost sight of her
frequently. It was often impossible for a man to stand on deck; and we took
to the rigging for safety. The Smeaton and these two vessels being a long
way a-head of six of the Dundee London smacks, were certainly the means
of saving them. The ship’s company is now employed in rigging the Light-
house Yacht, and fitting her for sea. I am, Sir, your humble servant,
Thos. Calder.”
The month of March set in with some pretty good
1809, March.
weather, and eight artificers landed upon the Rock on
the 5th, at half-past 11 a. m., and remained till half-past
Large Stones 1, when they got the three large stones, formerly
removed. Joisting of
platform lifted by the mentioned as lying near the Beacon, broken, and
sea. reduced to such a size as to admit of their removal.
Several of the fixtures of the Railways had got loose,
and were again secured; and two lengths of the waggon-tracks were broken
to pieces by the movement of the above mentioned stones, which, in their
progress across the rock, had made indelible ruts upon it. The bracing-
chains of the Beacon still required to be screwed up; but the essential parts
of this fabric were in the most entire and perfect state; although all the
joisting of the lower platform, excepting three pieces, had been carried
away. The deals of this floor had been lifted at the end of the working
season, being only about 30 feet above the Rock, but the joisting presented
so little resistance to the waves, that it had been allowed to remain, being
only fixed in a slender manner, that both the floor and the joisting might lift
with the force of the sea, without endangering the safety of the Beacon.
On this occasion, the people of the Floating-light
A vessel in danger of
informed the landing party, that they had just been
being wrecked on the
Bell Rock. spoken to by the crew of a large brig from Gottenburgh,
bound for Liverpool. This vessel having got out of her
reckoning, had been lying-to in the entrance of the Firth for three days, not
knowing the land. But having been directed as to their situation, the
strangers now shaped their course for the Orkneys. Had it not been for these

Page 287

instructions, this vessel, in all probability, might have been wrecked on the
Bell Rock; and, therefore, looking prospectively to the completion of this
work, we may see its extensive and important advantages to shipping.
During the remainder of this month, no opportunity
Fourteenth course laid
on the platform, and
occurred for landing on the Rock, but the other
departments of the service went forward with all
further progress of the
Work. possible dispatch. The Thirteenth course was nearly
completed, and a part of the Fourteenth had been laid
on the platform. The last of the moulds for the granite stones, to the height
of 30 feet, had now been sent to the quarries of Aberdeen and Peterhead,
where the Smeaton, and the hired sloop Alexander, were each loading a
cargo. Mr Peter Logan had now left the quarries at Peterhead, where he had
been for some months; and Alexander Davidson, one of the principal
granite masons, appointed to attend the quarries at Aberdeen, was also soon
to be removed from that station, to perform the same duty at the sandstone
quarry of Mylnefield. Measures had likewise been taken for providing the
necessary castings for the extension of the Railways to the western landing
place at the Rock, which altogether were to include a range of about 800
feet.
The uncertainty attending the fixing of the malleable
Cast-iron Mushroom
iron shank into the large cast-iron head of the
Anchors. Difficulty in
procuring Trenails. mushroom anchor, represented in Plate X. Fig. 4., from
its liability to shake loose, had induced the writer to
make trial of a mushroom anchor, made wholly of cast-iron, which was
finished in a very complete manner by the Shotts Iron Company. At the
same works, castings were also made for a set of new sheers for those
broken in the month of September at the eastern landing creek, which
answered all the purposes of a crane, as represented in Plate XI. The two
new praam-boats building at Arbroath, had advanced considerably in the
course of this month, and were now ready for the laying of the decks. Of all
the materials connected with those which may be termed of a trifling nature,
none was more difficult to be procured than the oaken trenails, for fixing
the stones of the lower or solid part of the building while the work was in
progress. After much correspondence with London and other ports, a
considerable quantity was procured from trenail merchants of Wapping. But
such was the demand for oak timber at this period, owing to the great

Page 288

supply wanted for the Navy, that it was not only at a considerable expence,
from about L. 3 to L. 5 per hundred, but with great difficulty, that trenails of
the dimensions wanted could be collected. It was found by a calculation, at
this time, that 2544 trenails, from 20 to 26 inches in length, and 1¼ inches
in diameter, and 3720 pairs of wedges, from 15 to 19 inches in length, 3
inches in breadth, and 1 inch in thickness at the top, would still be wanted.
Fortunately, however, a great quantity of oak timber, suitable for trenails,
was brought about this time from the Highland districts to Perth, for making
the spokes of carriage-wheels. A supply of these was accordingly got, at a
much cheaper rate than the ordinary trenails of the carpenter, and which
were also considered better for the purposes of the work.
In order that the building operations at the Rock might
Purchase of the Sloop
Patriot.
suffer as little delay as possible, from the difficulty
attending the regular transportation of the stones from
Arbroath, and also to provide against the numerous accidents to which the
vessels in this service were incident, it was judged proper to have another
vessel besides the Smeaton for this department of the service. The writer
consequently corresponded with various ports, with a view to procure a
vessel of about 40 tons burden, or nearly the size of the Smeaton. Two
vessels of this description were offered for sale, at the same price of L. 470;
but one of them, the sloop Patriot of Kirkaldy, was stated to be a new
vessel, which had hardly been at sea, while the other was several years old;
the Kirkaldy vessel was therefore preferred.
On the 5th and 6th April, the boats of the Floating-light
1809, April.
landed the artificers on the Bell Rock at 11 o’clock
a. m., and they remained till 1, having had two hours’
work each tide in refitting the railways, and setting up the bracing-chains of
the Beacon, which were still found in a loose state. Notwithstanding all the
precautions used, one of them had unscrewed its nut to the extent of 3
inches, by the friction arising from the agitation of the sea, but every thing
else was found to be in good order.
From the 6th to the 20th, the weather was particularly
Floating-light
encounters some
boisterous, the winds being chiefly from the eastward,
heavy seas. with occasional showers of snow. On the 16th it was
found necessary to veer out the cable of the Floating-
light from the 30th to the 90th fathom service; and, on the 17th, at 2 o’clock

Page 289

a. m., she had shipped so heavy a sea, that it filled both of the boats amid-
ships, and ran down the companion and hatches in such quantities as to give
great alarm to all on board, who, for a time, concluded that the vessel was
sinking.
About the beginning of this month, the stone-cutters in
Twelfth course
completed by the
the workyard had just completed the hewing of the
Stone-cutters. sandstone or hearting of the Fourteenth course of the
building: but those employed at the granite blocks of
the course were at a stand, both with that and the Thirteenth course, for
want of materials: a supply, however, having timeously arrived from
Aberdeen and Peterhead, these courses were proceeded with, though, as yet,
none higher than the Twelfth was in a finished state. As the sandstone
masons were considerably ahead of those who wrought the granite, the
former were chiefly employed in laying the courses on the platform, and
boring the trenail holes. The necessary implements were also prepared, and
in readiness for shipping for the Rock, with 62 barrels of lime, 78 barrels of
pozzolano, and 60 barrels of sand.
The Light-house Yacht was now fitted out for her
Employment of
Shipping.
voyage with stores for the Northern Light-houses, and
the other general business connected with her
department. The Sir Joseph Banks Tender was ready for sea by the 17th of
April; and the Smeaton and Alexander were still making trips to the
quarries, and occasionally supplying the Floating-light with provisions.
The sloop Patriot, of 45 register tons, formerly
Sloop Patriot
condemned.
mentioned as having been purchased for the work, had
her hatches enlarged, for the conveniency of loading
and delivering stones; and was otherwise fitted up for
Opinion of Mr
Solicitor-General the service at the Rock. On the 20th, she took on board
Boyle. five cast-iron mushroom anchors, with chains and
floating-buoys, together with a quantity of cast-iron
work for extending the Railways. With this cargo she sailed from Leith on
the 21st of April, reached the Bell Rock on the morning of the 22d, and was
discharged with the assistance of the boats of the Tender and Floating-light.
In the course of this trip, the Patriot was observed to make a considerable
quantity of water; and instead, therefore, of proceeding for the quarries for a
cargo of stone, it was found necessary to send her to Arbroath for

Page 290

examination, when James Macdonald, the master, reported that he could not
proceed to sea until the vessel underwent repair. A warrant was accordingly
obtained from the Judge-Admiral for a survey of carpenters, who declared
her “not sea-worthy.” On farther opening the bottom planks, it appeared,
that, upon the starboard-bow, both planks and trenails were in a state of
decay, and the expence of the necessary repairs was estimated at L. 80.
Upon this report of the carpenters being produced, a correspondence was
entered into with the late owner of the vessel, who resisted the charge; and
the matter being submitted by the Light-house Board to Mr Solicitor-
General Boyle, then ex officio one of the Commissioners, (now Lord
Justice-Clerk,) he was of opinion, from the circumstance of the Patriot’s
having been sold as an almost new vessel, that the late owner was liable for
the estimated repairs. Upon this opinion being made known, the sum of
L. 80 was immediately paid, and the vessel was put under repair.
Two of the praam-boats built at Arbroath had been
Two Praams
launched.
launched, by the names of “Fernie,” and “Dickie,” after
the respective builders, and were fitted out with
complete sets of warps and grapplings for landing the stones at the Bell
Rock. Every thing being in readiness for commencing the operations, it was
fully expected that the solid part would be completed in the course of the
ensuing season, and the Light-house thus carried to the height of 30 feet.
The Sir Joseph Banks Tender, having been fitted out for
Thursday, 20th.
sea, sailed on the 20th of April, with the Hedderwick
praam-boat in tow, to attend the works at the Bell Rock.
Tender sails. Floating She had also on board 15 artificers, consisting of mill-
light put under charge
of Mr Reid. wrights, joiners, smiths and masons, to be employed in
extending the Railways, and fitting up the Beacon-
house as a place of residence for the workmen. Having left the harbour of
Arbroath at 5 a. m., the Floating-light was hailed at 8, when her boat came
alongside with Captain Wilson, the landing-master, who was now to leave
his charge on board of the Floating-light for a time, and attend as landing-
master at the Bell Rock, while Mr John Reid, mariner, and principal light-
keeper, took charge as master of the Floating-light, acting in these
capacities with much credit to himself and advantage to the service.
The first attention of the landing-master was to lay down a mushroom-
anchor, weighing 18 cwt. 1 qr. with 32 fathoms of ⅞th inch chain, in 13

Page 291

fathoms water, as the future moorings of the Tender; the
Two sets of MooringsBeacon on the Bell Rock bearing E. by S. distant ¼
laid down.
mile. A set of moorings were also laid down about 300
fathoms to the eastward of this for the praam-boat, with a mushroom-
anchor, weighing 15 cwt. 24 lb., with 25 fathoms of chain, in 11 fathoms
water. The artificers, having left the Tender in two boats, landed on the
Rock at 9 a.m. and returned on board again at half-past 12 noon. But, in the
afternoon, the weather becoming more coarse, with the wind from the NE.,
accompanied with showers of snow, a landing was not attempted in the
evening.
The wind to-day being still from the NE., a heavy sea
Friday, 21st.
set upon the Rock. The artificers, notwithstanding, left
the Tender in two boats, at 10 a. m., but, after various
Tender slips her attempts to land at the western creek, it was found
moorings.
impracticable, and the boats returned to the vessel at
half past 11; when the Tender was found to ride so heavily at her moorings,
that it was judged advisable to slip her hawser; when she set sail, and at 5
p. m. anchored in the bay of Arbroath; but, in the course of the night, she
again returned to her moorings off the Bell Rock.
The wind having come round to the south to-day, the
Saturday, 22d.
weather had moderated; and at 10 a. m. the artificers
landed, their number having been augmented by nine
Other three sets of additional men from Leith, so that they now counted
Moorings laid down.
twenty-five. The latter part of this day was employed in
laying down three sets of moorings with mushroom-anchors, weighing from
15 to 23 cwt., for the use of the Stone-Lighters, and other craft employed at
the work. The positions of these, as nearly as may be, will be seen in Plate
V.
At 6 a. m. the artificers left the vessel, with an intention
Sunday, 23d.
to land on the Beacon at high-water, but there being too
much sea, they returned without effecting their purpose.
Artificers cannot land. At one p. m., being low-water, fifteen of them made a
landing, and remained till 4 o’clock, making
preparations for commencing the operations at the Railways and Beacon-
house. This afternoon the Smeaton supplied the Floating-light and Tender

Page 292

with necessaries, and returned to Arbroath, carrying with her twelve of the
artificers for the work-yard.
At 7 a. m. the artificers left the Tender, and landed on
Monday, 24th.
the Beacon, where they remained all the day. The
masons, who could only be employed on the Rock
during low-water, in boring holes for the bats, and in dressing the Rock for
the supports of the Railways, landed at 1 p. m., and left off work at 3, having
been two hours at work, when the tide overflowed the Rock; but the joiners
and smiths continued on the Beacon till 7 p. m.
During these twenty-four hours the wind was from the
Tuesday, 25th.
westward, with moderate breezes and showers of rain.
At half-past 6 a. m., the smiths and joiners landed on
the Beacon, and continued the whole day. At half-past 3 p. m., the low-water
artificers landed, and the whole returned again on board of the Tender at
half-past 8.
The weather continued to be very unsettled, and there
Wednesday, 26th.
being still great quantities of snow lying on the hills of
Angus, it was an observation made by the sailors, “That
Sailors account for the wind never continued twenty-four hours in one
the unsettled state of
the weather. direction, while there was any whiteness on the Braes
of Angus.” To-day, it was at E.NE., with strong breezes
and hazy weather. At half-past 8 the joiners and smiths left the vessel for the
Rock, but could not make a landing, and returned again at half-past 9, when
she immediately slipped her moorings and sailed for Arbroath, to wait the
return of the spring-tides.
At Arbroath, the several departments of the work went
Progress of the work.
forward with alacrity, and the courses of the building,
as high as the 19th, were now ready for shipment. The
Patriot having undergone a complete repair, was equipped for sea. The
Smeaton was employed chiefly in attending the quarries at Mylnefield, and
the Alexander those of Aberdeenshire. The Tender took on board
provisions, water, and other necessaries for the supply of the Floating-light
and artificers, and also some of the dressed timber for fitting up the cabins
of the higher parts of the Beacon-house.

Page 293

The Tender accordingly left the harbour of Arbroath
Sunday, 30th. this morning, under the command of Mr David Taylor,
and sailed for the Bell Rock with Mr Francis Watt and
Tender sails for the eighteen artificers. At 6 a. m. they spoke the Floating-
Rock.
light, and got Mr James Wilson, the landing-master, on
board. The wind being from the westward with moderate breezes, the
artificers were landed at 7 a. m., and remained on the Rock till 11 p. m.
While the water was low they were employed at refitting and extending the
Railways; and when the Rock was overflowed, they ascended to the
Beacon, and continued their operations. The wind came to blow so fresh
from the N.W., or in the direction of the Tender’s moorings from the Rock,
that it was not judged safe to make her fast; and as soon as the artificers got
on board, she beat to windward and got into St Andrew’s bay for the night.
In the morning the Tender stood again towards the Bell
1809, May.
Rock. In the course of the day the wind shifted from
W.NW. to N.E. The writer reached the Rock this
Monday, 1st. morning, in the Smeaton, at half-past 7, when he landed
with nineteen artificers, and remained till noon, and
then went on board of the Tender, now at her moorings.

Page 294

The several tides’ work which had been got upon the
Writer visits the Rock this season, had enabled the artificers to refit the
Rock.
damage which the railways had sustained during the
winter months, and to make further progress with the great circular track
round the building, which measured fifty-five feet in diameter; but, as yet,
the western reach had made but little advancement. The fitting up of the
temporary residence on the higher part of the Beacon, began to make some
more habitable-like appearance; the joistings for the respective floors were
laid, and a few of the upright spars of the framing had also been set up. This
work continued to create much interest with every one connected with the
operations, as its completion was to relieve those affected with the sea-
sickness, and the whole troop from the continual plague of boating to and
from the Rock by day and night. Having examined the works here, the
writer left the Rock at 11 p. m. with the artificers, who went on board of the
Tender, while he embarked in the Smeaton and sailed for Arbroath.
It blew so fresh, from West to N.W., that no landing
Tuesday, 2d.
could be made to-day, and the Tender was obliged to
slip her moorings, and beat up into St Andrew’s bay, to
pass the night in smooth water.
The wind was still blowing fresh from the same quarter,
Wednesday, 3d.
and, of course, directly upon the Rock from the
moorings of the Tender; it was therefore judged proper,
Some timber is in the present unsettled state of the weather, that she
landed.
should keep under sail, instead of making fast. At 9
a. m. the artificers landed, and returned on board at 1 p. m. In the evening
they again landed and remained till 9. Notwithstanding the state of the
weather, several boat-loads of timber and iron were landed for the use of the
Railways and Beacon.
From the state of the winds at W.NW., instead of
Thursday, 4th.
making fast to her moorings, the Tender kept plying
about the Rock all day, and passed the night reaching
about in St Andrew’s Bay, and returned to the Rock at the proper time of
tide in the morning. At 7 a. m., eighteen artificers landed, and remained at
work till 6 p. m., when they again returned on board.

Page 295

This morning, Captain Taylor embraced the opportunity
Friday, 5th. of the wind having veered to the north, to make the
Tender fast to her moorings, but there was too much
wind and sea for landing on the Rock. The vessel was, therefore, made as
snug as possible, with her top-masts struck, her yards lowered, and boltsprit
run in, to enable her to ride more easily.
The wind was at North to-day, and the weather being
Saturday, 6th.
more moderate, Mr Watt, with eight of the artificers,
landed at 6 a. m., on the Beacon, and at 10, being then
Tender in danger of low-water, the remaining twelve followed. At half-past
drifting upon the
Rock. 3 p. m., the whole returned on board, as the wind blew
very hard. The boltsprit was launched out, and the ship
was got ready for sea, in case of the wind shifting to the N.W., which might
endanger the vessel’s drifting upon the Rock.
The wind remained in the same direction, but the
Sunday, 7th.
weather was much more moderate, and at 7 a. m., eight
artificers left the vessel for the Beacon, where they
were employed at the upper works. At 10 the remaining twelve artificers
landed and continued at work till 4 p. m., when the whole returned on board
of the vessel. At 5, the joiners and smiths again went to the Beacon, and
remained till half-past 8.
At 6 a. m., the artificers employed at the Beacon landed,
Monday, 8th.
and at noon the low-water workmen followed, and
returned on board again at 5 p. m. At 9, the joiners and
smiths also returned to the vessel for the night. The weather was so fine to-
day, that the crew of the Tender were enabled to paint her upper works; for,
although this had been intended all the season, yet the present was the first
favourable opportunity.
The weather still continued moderate, but as the tides
Tuesday, 9th.
became neap, little could now be done to the Railways.
The operations were, therefore, confined, at this time,
Artificers return to chiefly to the upper works of the Beacon. At 6 a. m.,
Arbroath.
eight artificers went to the Beacon, and at half-past 10,
the other twelve landed on the Rock, and remained till half-past 1. At 6

Page 296

p. m., the whole came on board, when the vessel made sail for Arbroath, to
wait the return of spring-tides.
The Sir Joseph Banks having been supplied with
Saturday, 13th.
necessaries for the ensuing spring-tides, left Arbroath at
2 a. m., having in tow the Hedderwick praam-boat; and
Tender sails for the at 2 p. m., both the ship and praam were made fast to
Rock.
their respective moorings, when six joiners and two
smiths were landed on the Beacon. At 5, the remaining eighteen artificers
landed on the Rock, and continued till 9, when the whole returned on board
of the Tender, after a good evening’s work at the Railways and cabins of the
Beacon.
At half-past 6 a. m., twenty-seven artificers landed on
Sunday, 14th.
the rock, and returned again at half-past 9. At half-past
10, the joiners and smiths again went to the Beacon,
Joiners get high and at 6 p. m. the remaining eighteen artificers landed,
premiums. One of
them is hurt. and the whole returned to the ship at half-past 9; the
masons having been six hours and a half on the rock to-
day, while the joiners and smiths were about fourteen hours at work on the
rock and Beacon together, so that their premiums for extra hours’ work,
independently of their stated pay and allowances, were considerable,
averaging about L. 3 per month for the workmen, and double that sum for
the foremen. Unfortunately, one of the joiners was pretty severely hurt, by
the fall of a mason’s pick upon one of his feet, from the smith’s gallery on
the Beacon, which disabled him for some time from working in the water.
The weather continuing moderate, and the tides being
Monday, 15th.
good, the work went on without interruption during
these tides. This morning at half-past 6 o’clock, twenty-
The work makes rapid seven artificers landed on the rock, and continued till a
progress.
quarter past 10. At noon, the joiners and smiths returned
to the Beacon, and commenced their operations, as usual, at the higher parts
of it; and at half-past 6, or at low-water, the remaining eighteen artificers
landed, when the whole were employed at the railways, fixing mooring
rings, and laying down small floating-buoys as guides for the landing-
master, in approaching the rock from the westward with the loaded praams.
In all these operations, the sailors took an active part, and the number of
hands at work to-day, including them, amounted to thirty-eight. In this

Page 297

manner, the work was continued without any material interruption during
five days. The low-water operations, including the night-tides, generally
continued for six hours, and the joiners and smiths, for twelve or fourteen
hours each day.
The wind, which had been easterly during these spring-
Saturday, 20th.
tides, continued moderate till yesterday, when it blew
what sailors term a stiff breeze, which soon set up a
One of the Buoys gets considerable sea upon the Rock, and the tides being
water-logged. Tender
leaves her station. now in the state of neap, no landing was attempted to-
day. One of the mooring buoys having got water-
logged, must soon have disappeared and sunk, had not the Tender been
hauled alongside, when it was taken upon deck. An auger-hole was bored in
it and the water let off, being what the sailors term “bleeding;” when the
hole was closed with a plug, and the buoy was again lowered in the water,
and floated as before. The spring-tides being now considered over, the
Tender sailed for the bay of Arbroath, where she was made fast to a set of
moorings laid down for the conveniency of the work during the summer
months, and at 8 p. m. the artificers came on shore in the boats.
The operations at the Rock, during the last spring-tides,
Sunday, 21st.
had exhausted the stock of timber, of which a great
quantity could not be kept either on board of the
Tender again sails for Tender, or on the Beacon, while much loss and
the Rock.
inconveniency had frequently been experienced by
attempting to keep it afloat in rafts. At 5 o’clock this morning, the boats left
Arbroath with seventeen artificers, and two rafts of timber, which were
taken on board of the Tender, when she immediately sailed for the Bell
Rock. But there being little wind, it was 7 in the evening before she was
made fast to her moorings; and, from the state of the tide, no landing was
made this evening.
The weather was moderate to-day, and, at 9 a. m., Mr
Monday, 22d.
Watt and the artificers left the vessel for the Beacon;
but the wind having been at S.E., it was with great
Great exertions made difficulty that a landing was effected. At half-past 11,
in laying the circular
track of Railway. the masons and other low-water artificers landed, and
proceeded with the operations of the railways; but the
spring-tides being as yet very languid, little work was done, and the boats

Page 298

returned to the Tender in about an hour and a half. The joiners and smiths,
however, continued their operations on the higher parts of the Beacon till 9
p. m. Had it not been a matter of extreme importance to get the circular track
of the Railway completed, so that the waggons might be wheeled round the
site of the building, and the materials brought within reach of the building-
cranes in every direction, as will be understood from Plates VI. and IX., the
artificers, at this period of the tides, would not have remained at the Rock,
but have returned to the work-yard at Arbroath. In this stage of the work,
however, the gaining of a single tide was an object of great moment to its
future progress.
The artificers employed at the Beacon, landed upon it at
Tuesday, 23d.
6 o’clock a.m., being then high-water. At 12 noon, one
of the building cranes was brought to the Rock in a
Attempt made to erect praam, by the landing-master’s crew; but, as the water
one of the cranes.
did not leave the Rock sufficiently for getting hold of
the ring-bats of the guy-tackles, the crane could not be set up: it was
therefore laid upon the building, and made fast to Lewis-bats fixed in the
upper course, and left in that state for the present. The praam-boat was
towed to her moorings at 2 o’clock p. m., but the joiners and smiths
continued at work till 10 o’clock, when they came on board of the Tender.
Things being now in a state of preparation for
Smeaton sails with
commencing the building operations for the season, the
the first stones this
season. sloop Smeaton was loaded with twenty-six blocks of
stone belonging to the Fifth course. She had also on
board a few casks of pozzolano, cement, lime, and sand, with trenails,
wedges, and other materials connected with the building. At 5 p. m., the
writer embarked with Mr Peter Logan the building-foreman, Captain
Wilson the landing-master, and fifteen masons, and sailed for the Bell Rock
with the first cargo of stones for this season’s operations. The wind was
moderate, but being easterly, it was not till 9 o’clock that the vessel reached
the floating-light, when the writer, accompanied by the landing-master,
went on board to examine her moorings after the gales of winter, while the
Smeaton continued her course to the Bell Rock.
The last night was the first that the writer had passed in
Wednesday, 24th.
his old quarters on board of the Floating-light for about
twelve months, when the weather was so fine, and the

Page 299

sea so smooth, that even here he felt but little or no
Floating light’s motion, excepting at the turn of the tide, when the
moorings examined.
vessel gets into what the seamen term the trough of the
sea. At 5 a. m., all hands were called to man the windlass for heaving up the
moorings, consisting of a cast-iron mushroom anchor, weighing 17 cwt.,
and forty fathoms of chain, made from bars of iron one and a half inch
square, and a hempen cable of 120 fathoms, measuring 16 inches in
circumference. At 6, the crew began to lay the part of this cable upon deck
that had been in the hold, and afterwards to heave up that which was in the
water: the whole was found in a serviceable condition, excepting where the
operation of worming and rounding had been used to defend the part which
was most liable to be chafed on the ground. This operation consists in
warping a small rope of about two and a half inches in circumference,
round between the strands or hollows in the cable, so as to give the whole a
more uniform surface. This small rope, however, was found in several
places, to cut yarns of the cable, and appeared to be attended with very bad
consequences. The master and mate therefore concurred in opinion, that the
worming should be discontinued in future, as the small rope stretched more
than the cable, and chafed it. There was also a small rope wound round the
cable in a circular form, which, being laid with parcelling, or strips of
canvas, was a good defence to it.
At 8 a. m., the best bower-anchor and cable were in
Wednesday, 24th.
readiness to be let go, to hold the ship while the
mushroom-anchor was lifted. The crew then began to
State of the Floating- heave up the mooring-chain, which had now been in the
light’s Moorings.
water upwards of two years. The first 10 fathoms of the
chain were distinctly observed to have suffered by the action of the marine
acid. The links had a grooved-like appearance, perhaps, from the softer
parts of the iron being wasted, in the lengthway of the link, and those parts
which were more hard were observed in a raised form like threads; but at
the weldings or joinings of the links, where the iron was more consolidated,
from having received additional beating, it had not suffered oxidation in the
slightest degree. The next 10 fathoms of the chain had also a slight
appearance of waste. It may be remarked, that the half of the chain next to
the hempen cable, was generally suspended between the ship and the
ground, in moderate weather, and was therefore more exposed to waste
from the current of the tides than the half next to the anchor. On heaving up

Page 300

this last part, which lay chiefly on the ground, it was found to be almost as
free of rust, some trifling spots excepted, as when it was first laid down: in
general, the hammer marks, and even somewhat of the bluish appearance
peculiar to the surface of forged iron, were perceptible. The mushroom-
anchor had not sustained the slightest change, and, although the ground was
rather soft, did not appear to have been imbedded in the mud; so that the
ship had rode chiefly by the weight of the chain. On narrowly examining it,
when laid upon deck, two of the links were observed to be insufficient, the
rust having exposed the faulty parts to view. These defective links were
accordingly broken out or removed, and the sound ones connected by
means of shackles, kept on board for this purpose. At noon, after seven
hours of hard labour, the examination of the moorings was completed, and
the writer left the Floating-light, accompanied by the landing-master, to
attend the work on the Rock at low-water.
At 6 a. m. Mr Watt, who conducted the operations of the
State of the works at
the Rock.
Railways and Beacon-house, had landed with nine
artificers. At half-past 1 p. m., Mr Peter Logan had also
landed with fifteen masons, and immediately proceeded to set up the crane,
which still lay lashed to the building. The sheer-crane or apparatus for
lifting the stones out of the praam-boats at the eastern creek had been
already erected, and the Railways now formed about two-thirds of an entire
circle round the building: some progress had likewise been made with the
Reach towards the western landing-place. The external framing of the
cabins of the Beacon was in the state described in the second year’s work,
and partly represented in Plate IX. The floors being also laid, the Beacon
now assumed the appearance of a habitation. The Smeaton was at her
moorings, with the Fernie Praam-boat astern, for which she was laying
down moorings, and the Tender being also at her station, the Bell Rock had
again put on its former busy aspect. At 11 a. m., the Hedderwick praam was
loaded with 11 stones, which were safely landed upon the Rock: and at 2
p. m. the Fernie was loaded with 16 stones, and towed to her moorings, to
wait the proper time of tide for getting to the Rock. The Smeaton being
discharged, she sailed for Arbroath at 5 p. m.
The wind was from the east, with light airs, and there
Plants and Animals on
the building.
was hardly any ruffle or motion on the surface of the
water. The masons were chiefly employed during this

Page 301

tide in clearing the upper course of the building from sea-weed, of which,
since the month of September, it had acquired a thick coating. The weed
consisted chiefly of Fucus digitatus, which, on the new wall, had attained
the length of about 18 inches, with a proportional thickness of stalk and
breadth of frond, during the preceding eight or nine months. The barnacle
was also pretty numerous, and a good many white buckies and small
mussels had attached themselves to several parts of the building. The
masons left the Rock this evening at 6 o’clock, having had four hours and a
half’s work; but the joiners and smiths continued till 10 p. m., and had
therefore been 16 hours on the Rock to-day.
At half-past 2 this morning, the landing-master’s bell
Thursday, 25th.
was rung on board of the Tender; and at a quarter past
3, the writer landed with fifteen masons, nine mill-
wrights and joiners, two blacksmiths, and ten seamen, in all thirty-six, with
their respective foremen. The low-water work continued two hours and a
half, when those employed at the Beacon were left as usual to continue their
operations. In the afternoon, at 3 o’clock, the builders were again landed,
and remained on the Rock till 8, having been five hours at work, when all
hands returned on board of the Tender.
The wind had shifted to the south, with fresh breezes,
Friday, 26th. which set a considerable sea upon the Rock. The boats
landed the artificers at a quarter past 3 this morning,
who continued on the Rock till a quarter past 6, when it was overflowed.
They landed again at a quarter past 3 p. m., and remained till a quarter past
6, when all hands returned on board of the Tender for the night. The
masons, for the two last days, were employed in cutting out the square
joggle-holes in the upper course of last season’s work, represented with
deep shaded lines in Plate XIII., which were not, as usual, cut in the
respective stones before they left the work-yard, that there might be the less
resistance to the waves during the storms of winter. The seamen were
employed this tide in landing wedges and trenails, with cement, lime, sand,
and pozzolano, the necessary materials for mortar: these were stowed on the
mortar gallery or the lower floor of the Beacon-house; which, in a work of
this nature, was found to be of inestimable value for this purpose. The mill-
wrights, joiners, and smiths continued their operations as formerly at the
Railways and upper part of the Beacon.

Page 302

The landing-master’s bell rung this morning at half-past
Saturday, 27th. 4, and at a quarter past 5, the artificers and seamen,
thirty-six in number, commenced work, and continued
Builders commence for 2 hours and a half. The crane having been raised,
and lay 5 stones.
and the necessary preparations made for beginning the
building for the season, five stones of the Fifth course were landed and laid.
In the afternoon, the artificers returned to the Rock at a quarter past 4, and
remained till 9, when other five stones were laid. The seamen landed six
stones with the Hedderwick praam, and sixteen stones with the Fernie,
being her first cargo. The mill-wrights, joiners, and smiths, were employed
at the Railways, and fitting up the cabins of the Beacon-house.
Landed this morning at half-past 5, and continued at
Sunday, 28th.
work till a quarter to 9; and, in the evening tide, the
work commenced at a quarter past 5, and continued till
22 stones laid. 9, when all hands left the Rock. The landing-master’s
crew brought two cargoes of the praam-boats to the
Rock, consisting of 22 stones, which were laid or built. During the first and
middle parts of these twenty-four hours, the wind was from the west,
blowing fresh, but towards the evening it shifted to the N.E., with rain.
The wind having blown fresh all night, and a
Monday, 29th.
considerable sea set up, there was no possibility of
landing on the Rock to-day. In the course of the night it
Tender rides very blew so fresh, that Captain Taylor struck the top-masts
hard.
of the Tender, launched in her boltsprit, hoisted the
boats on board, and had every thing in a state calculated to make her ride at
her moorings as easily as possible. At 2 p. m. the vessel pitched very hard,
and one of the mooring-hawsers having got foul of the cathead or timber,
the ship came with such a jerk, from the run of the sea, as was sufficient to
carry it away. But the Tender still kept her station, in company with the
sloop Smeaton, and the praam-boats Hedderwick and Fernie.
To-day the wind shifted from N.E. to west, but there
Tuesday 30th.
was still too heavy a sea for landing on the Rock. The
writer being on board, looked often and anxiously for
Apparatus on the the safety of the crane and the unfinished course of the
Rock viewed from a
boat. building. At low-water, he accompanied the landing-
master in a boat, and went round the Rock, when he had

Page 303

the satisfaction to find that every thing had the appearance of being in good
order.
The landing-master’s bell, often no very favourite
Wednesday, 31st.
sound, rung at 6 this morning; but on this occasion, it is
believed, it was gladly received by all on board, as the
13 stones laid. welcome signal of the return of better weather. At a
Landing rendered
difficult from snow quarter past 7, the artificers landed, and continued at
showers. work four hours and a half. At 7 p. m. they landed again,
and at 10 all hands, 36 in number, returned to the
Tender. The masons laid 13 stones to-day, which the seamen had landed,
together with other building materials. During these twenty-four hours the
wind was from the south, blowing fresh breezes, accompanied with showers
of snow. In the morning, the snow showers were so thick, that it was with
difficulty the landing-master, who always steered the leading-boat, could
make his way to the Rock through the drift. But at the Bell Rock, neither
snow, nor rain, nor fog, nor wind, retarded the progress of the work, if
unaccompanied by a heavy swell or breach of the sea.
The weather, during the months of April and May, had
1809, June.
been uncommonly boisterous, and so cold that the
thermometer seldom exceeded 40°, while the barometer
Thursday, 1st. was generally about 29.50. We had not only hail and
sleet, but the snow, on the last day of May, lay on the
State of the weather. decks and rigging of the ship to the depth of about three
Zeal of the Writer’s
assistants. inches; and, although now entering upon the month of
June, the length of the day was the chief indication of
summer. Yet such is the effect of habit, and such was the expertness of the
landing-master’s crew, that, even in this description of weather, seldom a
tide’s work was lost. Such was the ardour and zeal of the heads of the
several departments at the Rock, including Mr Peter Logan, foreman
builder, Mr Francis Watt, foreman mill-wright, and Captain Wilson,
landing-master, that it was on no occasion necessary to address them,
excepting in the way of precaution and restraint. Under these
circumstances, however, the writer not unfrequently felt considerable
anxiety, of which this day’s experience will afford an example.
This morning, at a quarter past 8, the artificers were landed as usual, and,
after three hours and three quarters’ work, 5 stones were laid, the greater

Page 304

part of this tide having been taken up in completing the
Eleven of the boring and trenailing of the stones formerly laid. At
artificers left on the
Beacon. noon, the writer, with the seamen and artificers,
proceeded to the Tender, leaving on the Beacon the
joiners, and several of these who were troubled with sea-sickness, among
whom was Mr Logan, who remained with Mr Watt, counting altogether
eleven persons. During the first and middle parts of these twenty-four
hours, the wind was from the east, blowing what seamen term “fresh
breezes;” but, in the afternoon it shifted to E.N.E., accompanied with so
heavy a swell of sea, that the Smeaton and Tender struck their topmasts,
launched in their boltsprits, and “made all snug” for a gale. At 4 p. m. the
Smeaton was obliged to slip her moorings, and passed the Tender, drifting
before the wind, with only the foresail set. In passing, Mr Pool hailed that
he must run for the Firth of Forth, to prevent the vessel from “riding under.”
On board of the Tender the writer’s chief concern was
They encounter a
severe gale.
about the eleven men left upon the Beacon. Directions
were accordingly given that every thing about the
vessel should be put in the best possible state, to present as little resistance
to the wind as possible, that she might have the better chance of riding out
the gale. Among these preparations, the best bower cable was bent, so as to
have a second anchor in readiness, in case the mooring hawser should give
way, that every means might be used for keeping the vessel within sight of
the prisoners on the Beacon, and thereby keep them in as good spirits as
possible. From the same motive the boats were kept afloat, that they might
be less in fear of the vessel leaving her station. The landing-master had,
however, repeatedly expressed his anxiety for the safety of the boats, and
wished much to have them hoisted on board. At 7 p. m., one of the boats, as
he feared, was unluckily filled with sea from a wave breaking into her, and
it was with great difficulty that she could be baled out and got on board,
with the loss of her oars, rudder, and loose thwarts. Such was the motion of
the ship, that in taking this boat on board, her gunwale was stove in, and she
otherwise received considerable damage. Night approached, but it was still
found quite impossible to go near the Rock. Consulting, therefore, the
safety of the second boat, she also was hoisted on board of the Tender.
At this time, the cabins of the Beacon were only partially covered, and had
neither been provided with bedding nor a proper fire-place, while the stock

Page 305

of provisions was but slender. In these uncomfortable
The Tender is also circumstances, the people on the Beacon were left for
very uncomfortable.
the night, nor was the situation of those on board of the
Tender much better. The rolling and pitching motion of the ship was
excessive; and, excepting to those who had been accustomed to a residence
in the Floating-light, it seemed quite intolerable. Nothing was heard but the
hissing of the winds and the creeking of the bulk-heads or partitions of the
ship: the night was therefore spent in the most unpleasant reflections upon
the condition of the people on the Beacon, especially in the prospect of the
Tender being driven from her moorings. But even in such a case, it afforded
some consolation that the stability of the fabric was never doubted, and that
the boats of the Floating-light were at no great distance, and ready to render
the people on the Rock the earliest assistance which the weather would
admit. The writer’s cabin being in the sternmost part of the ship, which had
what sailors term a good entry, or was sharp built, the sea, as before
noticed, struck her counter with so much violence, that the water, with a
rushing noise, continually forced its way up the rudder case, lifted the valve
of the water-closet, and overran the cabin floor. In these circumstances,
daylight was eagerly looked for, and hailed with delight, as well by those
afloat, as by the artificers upon the Rock.
In the course of the night, the writer held repeated
Friday, 2d.
conversations with the officer on watch, who reported
that the weather continued much in the same state, and
The Artificers are that the barometer still indicated 29.20 inches. At 6
relieved.
a. m., the landing-master considered the weather to have
somewhat moderated; and from certain appearances of the sky, he was of
opinion that a change for the better would soon take place. He accordingly
proposed to attempt a landing at low-water, and either get the people off the
Rock, or at least ascertain what state they were in. At 9 a. m., he left the
vessel with a boat well manned, carrying with him a supply of cooked
provisions, and a tea-kettle full of mulled port wine, for the people on the
Beacon, who had not had any regular diet for about 30 hours, while they
were exposed, during that period, in a great measure, both to the winds and
the sprays of the sea. The boat having succeeded in landing, she returned at
11 a. m. with the artificers, who had got off with considerable difficulty; and
who were heartily welcomed by all on board.

Page 306

Upon enquiry, it appeared that three of the stones last
Mr Logan’s account laid upon the building had been partially lifted from
of the state of the
Beacon. their beds by the force of the sea, and were now held
only by the trenails, and that the cast-iron sheer-crane
represented in Plate XI., had again been thrown down and completely
broken. With regard to the Beacon, the sea, at high-water, had lifted part of
the mortar gallery or lowest floor, and washed away all the lime casks and
other moveable articles from it; but the principal parts of this fabric had
sustained no damage. On pressing Messrs Logan and Watt, on the situation
of things in the course of the night, Mr Logan emphatically said: “That the
Beacon had an ill-fared twist when the sea broke upon it at high water, but
that they were not very apprehensive of danger.” On enquiring as to how
they spent the night, it appeared that they had made shift to keep a small
fire burning, and, by means of some old sails, defended themselves pretty
well from the sea sprays.
It was particularly mentioned that, by the exertions of
James Glen’s
exertions.
James Glen, one of the joiners, a number of articles
were saved from being washed off the mortar gallery.
Glen was also very useful in keeping up the spirits of the forlorn party. In
the early part of life, he had undergone many curious adventures at sea,
which he now recounted somewhat after the manner of the Tales of the
Arabian Nights. When one observed that the Beacon was a most
comfortless lodging, Glen would presently introduce some of his exploits
and hardships, in comparison with which, the state of things at the Beacon
bore an aspect of comfort and happiness. Looking to their slender stock of
provisions, and their perilous and uncertain chance of speedy relief, he
would launch out into an account of one of his expeditions in the North Sea,
when the vessel being much disabled in a storm, was driven before the wind
with the loss of almost all their provisions; and the ship being much infested
with rats, the crew hunted these vermin, with great eagerness, to help their
scanty allowance. By such means, Glen had the address to make his
companions, in some measure, satisfied, or at least passive, with regard to
their miserable prospects upon this half-tide rock in the middle of the
Ocean. This incident is noticed, more particularly, to shew the effects of
such a happy turn of mind, even under the most distressing and ill-fated
circumstances.

Page 307

The people from the Beacon had no sooner got safely
State of matters after
on board of the Tender, and were provided for, than the
the gale.
writer went to the Rock with the landing-master,
carrying along with them five artificers, and landed, though not without
considerable difficulty; for, although the wind had shifted to the westward,
yet there was still a very heavy swell of sea. The first object at the Rock
was to relay the three stones which had been lifted about three inches off
their beds. On examining the Beacon narrowly, it appeared to be all in good
order, excepting the mortar gallery, which, as before noticed, had been
lifted, and all the lighter articles that could not be stowed in the upper
apartments, carried into the sea; and two of the four legs of the sheer-crane
were broken in pieces. But the crane upon the building, fortunately still kept
its erect position. After fixing the three stones and making these remarks,
the boat after two hours’ absence returned to the Tender.
The wind was at N.W. to-day, so that the vessel rode
Saturday, 3d.
with her stern towards the Rock; and as it came to blow
excessively hard, there was some danger, in the event of
Tender obliged to any thing giving way, that she might drift upon the
leave her station.
Rock. Accordingly, Mr Taylor, who commanded the
Tender, came into the writer’s cabin between 1 and 2 o’clock this morning,
and, after some consultation, it was thought advisable to slip the hawser,
and to stand with the ship towards the land. It then blew so fresh, that
though the sails were double reefed when the vessel got under way, it was
still found necessary to take in a third reef in the mainsail, and at 6 a. m. she
got into the harbour of Arbroath.
At this time the sea was in such a state of agitation with
Sunday, 4th.
the shifting and violence of the winds, that
apprehensions were entertained about the safety of the
sloop Smeaton, as she was deeply laden when she left her moorings,
especially as her cargo was quite invaluable to the progress of the works of
this season. At 5 o’clock this morning, however, Mr Pool made his
appearance with the vessel, and got safely into the harbour of Arbroath.
In the work-yard, the hewing or cutting of the several
Thursday 8th.
courses went on with great alacrity: the freestone
masons were now at work as high as the Twentieth and
Twenty-first courses, and the granite masons had completed the Sixteenth

Page 308

course, which was now lying on the platform, marked
Progress of the works
and ready for shipment. A great stock of lime, in a
at Arbroath.
pounded state, had been prepared, and a quantity of
clean sharp sand collected, which were put up in separate casks. A large
supply of oaken trenails and wedges was also made up in bundles, each
containing twenty-four trenails, and a like number of pairs of wedges. The
hewing of the stones, and the preparation of the building materials, were
placed under the charge of Mr David Logan, as clerk of works; and the
writing of the books, disbursement of cash, and the dispatch of the vessels
with the materials, provisions and necessaries for the Rock, formed the
department of Mr Lachlan Kennedy, engineer’s clerk.
The Tender and Smeaton having remained in port till
Friday 9th.
last evening, both vessels sailed for the Rock, and
reached their moorings at 5 o’clock a. m. The boats
4 Stones are laid. were immediately hoisted out, when the mill-wrights,
joiners and smiths, ten in number, landed on the
Beacon, with their foreman, and proceeded to the fitting up of the cabins.
Notwithstanding the hazardous situation upon the Beacon in which these
artificers had lately been placed, Mr Watt, with his principal assistant James
Glen, were not to be moved with trifles, and the work, as formerly, was
continued by the joiners’ squad of artificers during the whole day, trusting
to the eventual prospect of their being taken off by the boats at night. At
low-water, or about 3 p. m., Mr Peter Logan landed, with the sixteen
artificers who composed the builders’ squad, and the whole left it again at 8
p. m. The three stones which had been re-laid on the 2d of this month,
having had the pozzolano mortar washed out by the heavy sea, before it had
time to fix, it was found necessary to lift again, and lay them a third time. In
the late gales, the casks of lime and cement left on the Beacon having been
washed off by the sea, an entirely new stock was required. The praams were
accordingly employed in delivering the Smeaton and landing a supply of
these articles, together with four blocks of stone. The operations of the
building-artificers continued only three hours to-day, and no more than four
additional stones were laid.
The Patriot having now undergone a complete repair,
Saturday, 10th.
she was loaded with stones for the first time, and the
writer took a passage in her to the Bell Rock, when he

Page 309

had the pleasure of finding that she wrought or sailed
Patriot obliged to slip
extremely well. She was made fast to her moorings at 6
her moorings.
a. m., but only one praam-load had been discharged
from her to-day, when the wind came suddenly from the N.E., and it was
found necessary to let slip her moorings at 6 p. m., when she made sail for
the Firth of Forth.
Notwithstanding the boisterous state of the weather, the
10 Stones laid.
artificers were enabled to continue their visits to the
Rock, and landed this morning at 5. At this time they
Artificers divided into counted twenty-six, and were, as formerly, divided into
squads.
two squads; the mill-wrights, joiners, and smiths, ten in
number, wrought at the fitting up the Railways while the Rock was
accessible, and when it was covered with the tide, they were employed in
fitting up the Beacon-house. The operations of the builders were as yet
wholly confined to low-water work. Both squads were attended, and
occasionally assisted, by the landing-master’s crew of about twelve sailors,
who were always ready for every sort of work. Including the low-water
periods of morning and evening tides the whole had six hours’ and a
quarter’s work to-day, when ten stones were laid. But those employed at the
Beacon did not leave off till half-past 9 p. m., having been sixteen hours
upon the Rock, when all hands returned to the Tender; and, owing to the
bad state of the weather, the boats were immediately hoisted on board.
The wind was still from the N.E., accompanied with so
Sunday, 11th.
heavy a swell of sea, that it was found impossible to
land this morning. At 12 noon, all hands, forty-two in
No landing on the number, were assembled on deck, when prayers were
Rock to-day.
read as usual. At 5 p. m., the weather being somewhat
more moderate, the boats left the vessel with the artificers. But on a more
narrow inspection of the state of the sea upon the Rock, it was found
impracticable to effect a landing, and they returned to the Tender, after
having been about an hour absent. This evening, the Light-house Yacht
came to the Bell Rock from her first voyage to the Northern Light-houses
for the season, but there was too much sea for making her fast to any of the
moorings. Captain Calder, after ascertaining that all was well, laid the Yacht
to for the night, and kept the Floating-light in view.

Page 310

The wind having fortunately shifted to the S.W., in the
Monday, 12th. course of the night, the weather became more moderate,
and at a quarter past 6 the artificers landed. Including
17 stones laid. both tides, the builders had seven hours’ work to-day,
and laid seventeen stones, those employed at the
Ships belonging to the Beacon continuing at work throughout the day. The
service.
Smeaton having arrived from Arbroath with another
cargo of stones, and the Patriot from Largo Bay, in the Firth of Forth, where
she had run for shelter, the Rock had now a very busy appearance, the
following vessels belonging to the service being at their respective
moorings, viz. the Light-house Yacht; the Sir Joseph Banks Tender; the
Sloops Smeaton and Patriot, besides the Hedderwick and Fernie decked
Praam-boats; and at the distance of about two miles and a half, the Floating-
light was stationed as represented in Plate V.
The artificers landed this morning at the Rock, at a
Tuesday, 13th.
quarter past 6, and had three hours’ and a half’s work;
and in the evening, the builders again returned at 7
12 stones laid. o’clock, and remained three hours and a quarter, when
the whole left the Rock. In the course of this day twelve
stones were laid, which discharged the Patriot, and she returned to Arbroath
for another cargo.
At 7 this morning, the whole of the artificers land, and
Wednesday, 14th.
have four hours and a quarter of low-water work, when
21 stones are laid. In the evening, they land again at
21 stones laid. half-past 6, and have three hours’ and three quarter’s
work in completing the boring and trenailing of the
stones of the course which had already been built. The landing-master’s
crew discharged the Smeaton’s cargo to-day, consisting of twenty-six
blocks, together with four casks of pozzolano, four casks of lime, four casks
of sand, one cask of cement, three bundles of oaken trenails, and six
bundles of wedges; and at 8 o’clock p. m. she sailed for Arbroath. The cargo
of the Smeaton was partly landed upon the Rock; but, calculating upon the
settled appearance of the weather, the greater part of it kept on board of the
praams at their moorings.
At a quarter from 7 o’clock this morning the artificers
Thursday, 15th.
landed, and having had five hours’ and a quarter’s

Page 311

work, eight stones were laid, and the remainder of the
18 stones laid. tide was occupied in boring and trenailing. In the
evening, at half-past 6, they again landed and laid
eighteen stones, having had five hours’ and a half’s work. The Patriot
arrived from Arbroath with another cargo, consisting of thirty-nine blocks
of stone, four casks of pozzolano, four casks of lime, four casks of sand,
four bundles of wedges, and four bundles of trenails. There were thirty-six
blocks of stone landed to-day on the Rock, with the above materials. The
stones, when landed, were laid on the south-west side of the building till
those previously built were trenailed; and the lime, &c. were carried up to
the mortar-gallery on the Beacon. The three remaining stones of this cargo
were left on board of one of the praams at her moorings, and the Patriot
thus discharged, again sailed for Arbroath at 9 p. m. to load another cargo.
This morning, at a quarter past 7, the artificers landed
Friday, 16th.
on the Rock, and had an excellent tide’s work, which
continued for five hours and a quarter, when 24 stones
24 stones laid. of the Patriot’s last cargo were laid. Landing again at
half-past 8 in the evening, they continued at work an
Great exertions used hour and a quarter, when four stones were laid; and at
in supplying
materials. 10 o’clock all hands left the Rock; the joiners, smiths,
and such of the masons as were inclined, having been,
as usual, left all day on the Beacon, had their victuals sent to them from the
Tender. In the present favourable state of the weather, through the exertions
of Mr Lachlan Kennedy, in dispatching the vessels, both by night and day,
and also by the activity of Captains Pool of the Smeaton, and Macdonald of
the Patriot, the work was largely and regularly supplied with building
materials. The Smeaton having returned with a cargo from Arbroath, was
made fast to her moorings at 11 this morning; but, as the wind blew
strongly from the westward, it was found impracticable to land any stones
to-day, without the greatest risk of injuring the materials. About mid-day,
after the landing-master’s crew had taken the artificers on board of the
Tender, they towed the Fernie praam-boat alongside of the Smeaton, and
endeavoured to load her, but it was found impracticable; and, after three
stones had been laid on the praam’s deck, any further attempt was given up.
At 8 a. m., the artificers and sailors, forty-five in
Saturday, 17th.
number, landed on the Rock, and, after four hours’

Page 312

work, seven stones were laid. The remainder of this
7 stones laid. tide, from the threatening appearance of the weather,
was occupied in trenailing, and making all things as
Artificers left all night secure as possible. At 12 noon, the Rock and Building
on the Beacon.
were again overflowed, when the masons and seamen
went on board of the Tender, but Mr Watt, with his squad of ten men,
remained on the Beacon throughout the day. As it blew fresh from the N.W.
in the evening, it was found impracticable either to land the building-
artificers, or to take the artificers off the Beacon, and they were accordingly
left there all night, but in circumstances very different from those of the 1st
of this month. The house being now in a more complete state, was provided
with bedding, and they spent the night pretty well; though they complained
of having been much disturbed at the time of high-water, by the shaking and
tremulous motion of their house, and by the plashing noise of the sea upon
the mortar gallery. Here James Glen’s versatile powers were again at work,
in cheering up those who seemed to be alarmed, and in securing every thing
as far as possible. On this occasion, he had only to recall to the recollections
of some of them the former night which they had spent on the Beacon, the
wind and sea being then much higher, and their habitation in a far less
comfortable state.
The Patriot came to the Rock this morning from
Smeaton and Patriot
slip their moorings.
Arbroath, loaded chiefly with timber and apparatus for
the works of the Beacon. At 5 a. m., Captain Wilson, the
landing-master, and his crew, made a second attempt to deliver the Smeaton
of her cargo, but were only enabled to get out other five stones, with which
the Fernie praam was towed to her moorings, without being able to land
upon the Rock. The wind still continuing to blow fresh from the N.W., at 5
p. m., the writer caused a signal to be made from the Tender for the Smeaton
and Patriot to let slip their moorings, when they ran for Lunan Bay, an
anchorage on the east side of the Redhead. Those on board of the Tender
spent but a very rough night, and, perhaps, slept less soundly than their
companions on the Beacon, especially as the wind was at N.W., which
caused the vessel to ride with her stern towards the Bell Rock; so that, in
the event of any thing giving way, she could hardly have escaped being
stranded upon it.

Page 313

The weather having moderated to-day, the wind shifted
Sunday, 18th. to the westward. At a quarter past 9 a. m., the artificers
landed from the Tender, and had the pleasure to find
16 stones laid. their friends who had been left on the Rock quite
hearty, alleging that the Beacon was the preferable
quarters of the two. The builders laid 16 stones in four hours and a half,
when the whole returned on board of the Tender; and at 3 p. m. all hands,
counting fifty-four, assembled upon deck to prayers. In the evening, at 9,
the artificers again landed, and left off work at a quarter from 12 o’clock at
night, having been employed in boring, trenailing, and wedging the stones
which had been built in the morning.
The wind was at N.E. to-day, with gentle breezes, but
Monday, 19th.
accompanied by the heaviest swell of sea which had yet
been observed at the Bell Rock. It was what seamen
Remarkable breach of term a Ground Swell, and, although the landing-
sea upon the Rock.
master’s crew were employed alongside of the
Smeaton, in loading the praams, the surface of the water being
comparatively smooth, yet the breach upon the Rock was truly surprising. It
is when the sea is in this state,—being the result no doubt of a distant gale
of wind,—that the sprays conducted by a building, rise to such a height as is
represented in the Vignette of Smeaton’s Narrative of the Edystone Light-
house. In the forenoon, the writer, accompanied by the landing-master, in a
well manned boat, went off to observe the effect of the breach of the sea
upon the building and apparatus. The work had now attained the height of
about 8 feet, on which one of the cranes was erected, the top of which was
about 30 feet above the low-water mark. In the course of this tide, the sea,
at the meeting of the waves round the building, was observed to rise in the
most beautiful conical jets, of about 30 or 40 feet in diameter at the base, to
the height of 10 or 15 feet above the crane. Between these seas, but more
particularly at low-water, it was observed with a telescope, that some of the
last laid stones had been partially lifted; but others, which had not been
trenailed, it was feared had been washed off the building.
At 11 a. m., the boats landed, with much difficulty to-
Tuesday, 20th.
day, in order to ascertain the state of the building and
apparatus. On examination it was happily found, that
none of the stones were lost, and that those observed yesterday to have been

Page 314

lifted off their beds, were the three which had not been
3 stones in danger of
trenailed, but which being fortunately confined by two
being washed away.
of the jumpers or boring-irons left in the trenail holes of
the lower course, were thus held in their places. After laying these stones,
the remainder of this tide, which lasted for three hours and a quarter, was
occupied in grouting or filling the perpendicular joints, and plastering them
over with Parker’s Roman cement, to preserve the pozzolano mortar. At this
period, it not only happened to be rough weather, but the building being
now at that height, relatively to the tides, which seamen term “Between
wind and water,” the upper part of the work was exposed to the wash of
every wave towards high-water. It was, therefore, often found necessary to
repeat the grouting of the same joints with mortar several times. As the
evening tide fell wholly under night, the building artificers did not land; but
the squad employed at the Beacon and Railways remained at the Rock
throughout the day, and were, indeed, only restrained from taking up their
quarters also for the night, in consequence of a positive injunction which
the writer thought it prudent to enforce, until the Beacon should be in a
more habitable state.
The artificers employed at the Beacon landed upon it
Wednesday, 21st. this morning at 7 o’clock; and, at a quarter past 11, the
builders landed, and continued at work till 4 p. m.,
22 stones laid. having had five hours’ and a quarter’s work, when 22
stones were laid. The landing-master’s crew, at the
same time, transported 19 blocks to the Rock with the praam-boats, which
completely discharged the Smeaton of her cargo of 32 stones, four casks of
pozzolano, and a similar quantity of cement, lime, and sand, with four
bundles of trenails, and the like number of wedges, when she immediately
left her moorings.
The artificers landed upon the Rock this morning at
Thursday, 22d.
half-past 11, and, from the advanced state of the
building, they were enabled to continue at work for six
Great waste of mortar. hours and a half, being the longest tide’s work which
had yet been got upon the Rock by the building
artificers. During this tide only four stones were laid, but the time was
otherwise occupied in boring, trenailing, wedging, and grouting the joints of
the stones last built. From the great waste of mortar, owing to the wash of

Page 315

the sea, in the present stage of the building, the usual proportions of its
ingredients were not found sufficient for the courses in hand; and having no
conveniency for keeping more than a few casks on the Beacon, while it was
an object to have the lime always fresh, it was found necessary to dispatch a
boat to-day express to Arbroath, for additional supplies of pozzolano, lime
and sand.
The work commenced at 12 noon, and continued six
Friday, 23d.
hours and a quarter; but, owing to the roughness of the
weather, no stones were laid to-day, as, notwithstanding
every precaution in pointing the joints with cement, the mortar was
continually washed away. This tide was, therefore, occupied in the
operation of grouting, and securing the mortar with tow, loaded with pieces
of iron laid horizontally along such of the joints as were accessible to this,
which had the effect of preserving them until the cement dried sufficiently
to defend it against the wash of the sea.
Mr Peter Logan, the foreman builder, and his squad,
Saturday, 24th.
twenty-one in number, landed this morning at 3
o’clock, and continued at work four hours and a quarter,
57 Stones laid. and, after laying 17 stones, returned to the Tender. At 6
a. m., Mr Francis Watt, and his squad of twelve men,
Cooking commenced landed, and proceeded with their respective operations
on the Beacon.
at the Beacon and Railways, and were left on the Rock
during the whole day, without the necessity of having any communication
with the Tender, the kitchen of the Beacon-house being now fitted up. It
was to-day also, that Peter Fortune,—a most obliging and well known
character in the Light-house service,—was removed from the Tender to the
Beacon, as cook and steward, with a stock of provisions as ample as his
limited store-room would admit. At 2 p. m. the building-artificers again
landed, and continued at work till a quarter past 8, when 40 of the stones,
formerly landed, were now laid, making no fewer than 57 blocks which had
been built to-day in the course of both tides. The weather being extremely
fine, with light airs of wind from the S.E., the landing-master’s crew
discharged the Patriot into the praam-boats, which were then towed to their
moorings, as the stones could not at this time be received at the Rock.
When as many stones were built as comprised this day’s work, the demand
for mortar was proportionally encreased, and the task of the mortar-makers

Page 316

on these occasions was both laborious and severe. This
Situation of the operation was chiefly performed by John Watt,—a
Mortar-makers and
smiths. strong active quarrier by profession,—who was a
perfect character in his way, and extremely zealous in
his department. While the operations of the mortar-makers continued, the
forge upon their gallery was not generally in use; but, as the working-hours
of the builders extended with the height of the building, the forge could not
be so long wanted, and then a sad confusion often ensued upon the
circumscribed floor of the mortar-gallery, as the operations of Watt and his
assistants trenched greatly upon those of the smiths. The casks with the
ingredients for the mortar, consisting of pozzolano, lime, and sand, were
laid to hand by the sailors. These materials were lifted in spadefulls, and
thrown into the cast-iron mortar tubs, represented in Plate X. Fig. 12.,
where they were beat with an iron-shod pestle, to a consistency suitable to
the respective purposes of the work. Under these circumstances, the
boundary of the smiths was much circumscribed, and they were personally
annoyed, especially in blowy weather, with the dust of the lime in its
powdered state. The mortar-makers, on the other hand, were often not a
little distressed with the heat of the fire and the sparks elicited on the anvil,
and not unaptly complained that they were placed between the “Devil and
the Deep-sea.”
The work being now about 10 feet in height, admitted
Sunday, 25th.
of a Rope-ladder being distended between the Beacon
and the Building, as represented in Plate IX. By this
27 stones laid. “Jacob’s-Ladder,” as the seamen termed it, a
communication was kept up with the Beacon, while the
Rope-ladder Rock was considerably under water. One end of it being
distended.
furnished with tackle-blocks, was fixed to the beams of
the Beacon, at the level of the mortar-gallery, while the further end was
connected with the Upper-course of the building by means of two Lewis-
bats, which were lifted from course to course as the work advanced. In the
same manner, a rope furnished with a travelling-pulley, was distended, for
the purpose of transporting the mortar-buckets, and other light articles,
between the Beacon and the building, which also proved a great
conveniency to the work. At this period the rope-ladder, and tackle for the
mortar, had a descent from the Beacon to the building; by and by they were
on a level; and, towards the end of the season, when the solid part had

Page 317

attained its full height, the ascent was from the mortar-gallery to the
building; as will be understood by examining the second year’s work, as
shewn in the Plate above alluded to, and when viewed in connection with
the progress of the work. The building-artificers were accordingly enabled
to land this morning at 3 a. m., and to continue at work five hours and a
quarter, when 27 stones were laid of the Seventh course. The praam-boats
were brought from their moorings, where they lay loaded with 43 stones,
besides a supply of pozzolano, lime, sand, cement, trenails, and wedges.
The Smeaton having made a trip ashore for a supply of the castings for the
western Reach of the Railway, she discharged 15 tons of cast-iron work,
and returned to Arbroath for a cargo of stones. At 12 noon, all hands, fifty-
seven in number, being collected upon the deck of the Tender, prayers were
read as usual. At three quarters past 2 o’clock p. m., the building-artificers
again landed, and had five hours’ and three quarters’ work, at boring,
trenailing, wedging, and grouting the stones laid during the two previous
tides, which completed the Seventh course of the building.
The weather still continuing to be very favourable for
Monday, 26th.
the operations, the building-artificers landed on the
Rock at a quarter past 3 a. m., and continued at work
21 stones laid. five hours and a half, when 21 stones were laid. In the
course of this tide, it was discovered that the Patriot had
Builders stopped by a by mistake carried off the trainer or gauge-rule to be
simple mistake.
used for regulating the position of the stones in building
the Eighth course, which, for a time, stopped the progress of building. A fast
rowing boat was dispatched to Arbroath for this useful implement, a
diagram of which will be seen in Plate X. In the mean time, the remainder
of the landing-master’s crew were employed in laying the cast-iron work in
order upon the Rock, so as to be at hand in the course of fitting up the
Railways. In the evening, at a quarter past 4 p. m., the artificers landed, and
had five hours and a half at boring, trenailing, wedging, and grouting the
last laid course of the building.
The Joiners’ squad of artificers, with Mr Fortune, their
Tuesday, 27th.
cook and steward, landed this morning at 5 a. m. for the
day, and the Builders’ squad continued on the Rock till
33 stones laid, and 66 a quarter past 10. They again landed, at half-past 4, and
landed.
returned on board of the Tender with all hands, at 10

Page 318

p. m. The express-boat came from Arbroath with the trainer this forenoon:
33 stones were laid to-day, and the weather being extremely fine the
landing-master’s crew delivered no fewer than 66 blocks at the Rock.
As the work was daily getting higher, the artificers
Wednesday, 28th.
landed on the Beacon, and began this morning at a
quarter before 6 o’clock, having passed along the rope-
32 stones laid. ladder, distended between it and the Building, while the
Rock was yet under water, when the builders got five
Artificers now at hours and a quarter’s work. In the evening, they landed
work while the Rock
is under water. again at 6 o’clock, and remained till 11. In the course of
this day 32 stones were laid, but, owing to the wind
blowing fresh from N.NE., the praams could not approach the eastern creek,
and the western reach of Railway being yet unfinished, no materials were
landed. The Joiners’ squad, as usual, remained all day on the Rock, and
were enabled to make great progress with the lodging part of the Beacon or
“Hurricane-house,” as the seamen termed it.
The wind was still in the N.E., but being more
Thursday, 29th.
moderate, the work, in all its departments, proceeded
with great spirit; 50 blocks of stone were accordingly
25 stones laid, and 50 landed to-day, with the necessary proportions of lime
landed.
and other materials. At half-past 6, the whole of the
artificers landed, and remained till half-past 11, having been five hours on
the Rock. The builders again landed at 6 p. m.; and at midnight, all hands
left the Rock. The builders having to-day been no less than ten hours and a
half at work, had laid 25 stones. The roughness of the weather yesterday
washed a great part of the mortar out of the joints, and this morning’s tide
was chiefly occupied in grouting and pointing the Eighth course, which
being closed, the work was brought to the height of about 11 feet above the
lower bed of the Foundation-stone.
The artificers landed on the Rock this morning at a
Friday, 30th.
quarter past 6, and remained at work five hours. The
cooking apparatus being now in full operation, all
18 stones are laid. hands had breakfast on the Beacon at the usual hour,
and remained there throughout the day. The crane upon
Michael Wishart the building had to be raised to-day from the Eighth to
meets with a serious
the Ninth course, an operation which now required all

Page 319

accident. the strength that could be mustered for working the
guy-tackles; for, as the top of the crane was at this time
about 35 feet above the Rock, it became much more unmanageable. This
will be better understood by examining the apparatus in Plate IX., and
comparing the appearance of the crane-tackle of the second year’s work
with that of the first. In order, to give an additional purchase in tightening
the tackle, one of the blocks of stone was suspended at the end of the
moveable-beam of the crane, which, by adding greatly to the purchase or
weight, tended to slacken the guys in the direction to which the beam with
the stone was pointed, and thereby enabled the artificers more easily to
brace them one after another. While the beam was thus loaded, and in the
act of swinging round from one guy to another, a great strain was suddenly
brought upon the opposite tackle, with the end of which the artificers had
very improperly neglected to take a turn round some stationary object,
which would have given them the complete command of the tackle. Owing
to this simple omission, the crane, with the large stone at the end of the
beam, got a preponderancy to one side, and the tackle alluded to having
rended, the crane fell upon the building with a terrible crash. The
surrounding artificers immediately flew in every direction to get out of its
way; but Michael Wishart, the principal builder, having unluckily stumbled
upon one of the uncut trenails, fell upon his back. His body fortunately got
between the moveable-beam and the upright shaft of the crane, and was
thus saved; but his feet got entangled with the wheels of the crane, and were
severely injured. Wishart being a robust young man, endured his misfortune
with wonderful firmness: he was laid upon one of the narrow framed beds
of the Beacon, and dispatched in a boat to the Tender; where the writer was
when this accident happened, not a little alarmed, on missing the crane from
the top of the building, and at the same time seeing a boat rowing towards
the vessel with great speed. When the boat came alongside with poor
Wishart stretched upon a bed, covered with blankets, a moment of great
anxiety followed, which was, however, much relieved, when, on stepping
into the boat, he was accosted by Wishart, though in a feeble voice, and
with an aspect pale as death, from excessive bleeding. Directions having
been immediately given to the coxwain to apply to Mr Kennedy at the
work-yard, to procure the best surgical aid, the boat was sent off without
delay to Arbroath. The writer then landed at the Rock, when the crane was
in a very short time got into its place, and again put in a working state. The

Page 320

builders commenced work with it at 7 o’clock in the evening, and continued
till midnight, and in the course of this day 18 stones were laid. Robert
Selkirk was appointed by Mr Logan to succeed Wishart, as principal
builder.
The artificers landed this morning at half-past 7, and as
1809, July.
the building was gradually rising out of the reach of the
tide, the work was continued no less than six hours and
Saturday, 1st. a half at this time, being the longest tide’s work which
the builders had hitherto had. They again landed at half-
Artificers have no less past 7 in the evening, and did not leave off till
than ten hours’ work,
and lay 59 stones. midnight, having, to-day, had ten hours and a half’s
work, when no fewer than 59 blocks of stone were
built; 56 of which were landed on the Rock to-day, being the entire cargo of
the Patriot, including six casks of pozzolano, and a similar quantity of lime
and sand; besides twenty parcels containing 200 trenails and 200 pairs of
wedges; together with six sacks of moss (hypnum), two bales of green
woollen-cloth, a bale of red binding tape, with nails, &c. for lining the
cabins of the Beacon-house.
After a trip which he had taken in the Light-house
Sunday, 2d.
Yacht to examine the Carr Rock, with a view to the
erection of a Beacon, as described in the Introduction of
The Writer visits the this work, page 53., the writer landed on the Bell Rock
Carr Rock. Some of
the vessels slip their this evening. He found that the artificers had
moorings. commenced work at a quarter from 8 o’clock a. m., and
continued for seven hours and a quarter, when seven
blocks of stone were laid, with which the Ninth course of the building was
completed. The remainder of this long tide’s-work was occupied in boring
trenail holes, driving trenails and wedges, and in filling the perpendicular
joints of the course with thin mortar, mixed up into that consistency which
is technically termed Grout. Having again landed in the evening, the same
operation was continued from 8 till 11 o’clock p. m.; but the wind having
shifted from south to E.NE., it blew so fresh that the torches could not be
kept burning, being now more exposed, and without the shelter which the
foundation-pit formerly afforded. The work was, therefore, obliged to be
dropt, before the tide had overflowed the Rock. From the state of the
weather, it was also judged necessary to give directions to the landing-

Page 321

master to employ his crew in removing the iron-jumpers and other
implements to the Beacon; and to remove every encumbrance from the
boats, so as to lighten them as much as possible, and fit them the better for
carrying the artificers, thirty-two in number. At midnight, all hands left the
Rock in four boats, two of which belonged to the Tender, one to the Light-
house Yacht, and one to the Smeaton; and, after much difficulty, they
reached their respective vessels. The Yacht and Smeaton then slipped their
moorings, and proceeded for Arbroath, as they rode very hard, but the
Tender kept her position.
The wind still continued to blow so fresh, that no
Monday, 3d.
landing could be made to-day on the Rock. As the
Tender’s stock of provisions was getting low, a
No landing on the considerable effort was made by the Patriot, which had
Rock to-day.
come from Arbroath with supplies, to prevent the
necessity of her leaving her moorings. After several vain attempts however,
the Patriot was obliged to bear away for the Firth of Forth to wait a change
of weather.
The writer having come to Arbroath with the Yacht, had
Michael Wishart is
recovering.
an opportunity of visiting Michael Wishart, the artificer
who had met with so severe an accident at the Rock on
the 30th ult., and had the pleasure to find him in a state of recovery. From
Dr Stevenson’s account, under whose charge he had been placed, hopes
were entertained that amputation would not be necessary, as his patient still
kept free of fever or any appearance of mortification; and Wishart expressed
a hope that he might, at least, be ultimately capable of keeping the light at
the Bell Rock, as it was not now likely that he would assist farther in
building the house.
In the work-yard, the operations were going on as
Progress of the Works
at Arbroath.
usual, under the direction of Mr David Logan, and the
stone-cutters were now working at the Twenty-third
course. The Twentieth course being nearly finished, it was partly laid on the
platform, and ready to be fitted, marked, and numbered for shipping to the
Bell Rock. Dispatch was also making in the joiners’ shop where Mr James
Slight, was preparing the moulds for the succeeding courses, diagrams of
which will be seen in Plate X.

Page 322

The Tender had kept her station at the Rock. Though
Tuesday, 4th. the wind was still at N.E., it had abated a little, and the
artificers landed at 11 a. m., to the number of twenty-
four, and were employed for three hours in completing the trenailing of the
Ninth course. At 3 p. m., the building artificers, fourteen in number, left the
Rock, and went on board of the Tender, but the joiners and smiths remained
upon the Beacon till half-past 9 p. m., when they also returned on board of
the vessel.
The wind having shifted to the east, and the weather
Wednesday, 5th.
being moderate, the artificers landed at half-past 11 this
forenoon, when 19 stones were laid after four hours
19 stones laid. work. At 8 p. m. the boats again left the vessel, and
made an attempt to land on the Rock, but it was found
Joiners left on the impracticable, there being then too much sea. The
Beacon.
joiners’ squad were therefore left on the Beacon all
night.
The building artificers having landed at a quarter past
Thursday 6th.
12 to-day, 16 stones were laid, when they again left the
Rock at a quarter past 4, having been four hours at
16 stones laid. work. The weather having a very unfavourable
appearance, the landing-master expressed a wish to
Joiners resolve to bring all hands with him; but the Joiners’ squad, with
remain on the Beacon.
Mr Fortune their cook, had now resolved to continue
their quarters on the Beacon-house, instead of having “the continual plague
of boating;” and being now better provided with necessaries, they felt much
more at ease. The boats were now less crowded, and this arrangement was a
great relief to the landing-master’s crew. The writer was at Arbroath when
the Beacon was thus taken possession of; and though he felt no uneasiness
as to its permanency in withstanding the effects of the sea, yet he was not
without scruples about the danger of accidental fire, from the chips of wood
which unavoidably encumbered the place while the joiners were at work.
Considering, therefore, the awful circumstances to those inhabiting the
Beacon under such a possible calamity, together with its disastrous
consequences to the work, it became a matter of much solicitude to guard
against such a misfortune.

Page 323

This practical expression of the opinion of the mill-
Favourable to the wrights, joiners and smiths, with regard to the safety of
possession of the
Light-house. the Beacon, was nevertheless highly satisfactory to the
writer, as it shewed a degree of confidence in this
temporary erection, which left no doubt as to its utility in the future
operations. It was also an excellent prelude to the inhabitation of the Light-
house itself when completed, as some were even doubtful if light-keepers
would be found disposed to take up their residence permanently upon a
rock, which, every tide, was sunk under water to the depth of from 10 to 16
feet, of which no instance had hitherto occurred, as the First entire course of
the Edystone Light-house is understood to have been on a level with high-
water mark.
The wind having shifted to the S.E. to-day, with easy
Friday, 7th.
weather, the Patriot returned from Largo Bay to her
moorings, when the praam-boats discharged 19 stones
15 stones laid. of her cargo, and landed them on the Rock. The
artificers landed at 10 a. m. and remained at work no
less than nine hours and a half, when 15 stones of the Tenth course were
laid. The builders then went on board of the Tender, leaving the mill-
wrights, joiners and smiths, in possession of the Beacon-house.
The builders landed to-day at a quarter past 12 noon,
Saturday, 8th.
and remained seven hours and three quarters, when they
laid 11 blocks, while the landing-master’s crew
11 stones laid. transported 46 stones to the Rock. The tide’s work was
now so much lengthened, that time was afforded for
The Tide, for the first boring the trenail holes into the course below, fixing the
time, does not
overflow the trenails and wedges, and grouting up the perpendicular
Building. joints with pozzolano mortar, in a more deliberate
manner than when the work was lower in the water. It
was remarked to-day, with no small demonstration of joy, that the tide—
being neap—did not, for the first time, overflow the building at high-water.
Flags were accordingly hoisted, on the Beacon-house, and crane on the top
of the Building, which were repeated from the Floating-light, Light-house
Yacht, Tender, Smeaton, Patriot, and the two Praams. A salute of three guns
was also fired from the Yacht at high-water, when all the artificers being
collected on the top of the building, three cheers were given, in testimony of

Page 324

this important circumstance. A glass of rum was then served out to all hands
on the Rock, and on board of the respective ships.
Having thus got the Light-house above the sea-level in
Number of Joiners
reduced. Balance
ordinary neap-tides, and the Beacon into a habitable
Crane begun. state, while the Railway operations were confined to the
western reach, it was now found expedient to diminish
the number of mill-wrights and joiners at the Rock. At this period, the
writer went to Edinburgh to attend a general meeting of the Commissioners
of the Northern Light-houses, and to report the advanced state of the works,
—news which was received with the greatest satisfaction by the Board. He
also visited the Shotts Iron-works, and took measures for the immediate
construction of a Crane, upon a new principle. This had occupied his
attention, along with the general scheme of the work. But, since the
unfortunate accident which happened to Wishart, by the fall of the
Moveable-beam-crane, it had became more apparently necessary, as the
increasing height of this machine rendered the guy-tackles too taunt, to use
a sailor’s expression for any thing that is high, or when the ropes, which
support a spar or mast, form too small an angle at the top. Instead of these
unmanageable tackles, the upright shaft of the new crane was to be kept in
an erect position by a balance-weight acting upon the opposite end of the
loaded working-beam, which was thus to be kept in a state of equilibrium.
As Mr Watt, foreman of the Beacon and Railway works, could now be
spared from the Rock for a time, he was sent to Shotts to get the patterns
made for this machine, and other implements connected with the progress
of the higher parts of the building; from whence the castings were sent to
Edinburgh to be fitted up.
On the writer’s return to the Bell Rock to-day, it
Sunday, 9th.
appeared from the notes of the foreman builder, and
log-book of the landing-master, that the work had made
Tenth course very good progress, of which the building itself bore
completed.
testimony, being now about 13 feet in height. The wind
was at N.E. this morning, and blowed so fresh that a landing could not be
made till a quarter past 4 o’clock p. m., when the closing-stone of the Tenth
course was laid, after three hours and a quarter’s work; but the landing-
master’s crew could not approach the Rock with the praam-boats.

Page 325

Twenty of the artificers landed this morning at half-past
Monday, 10th. 5, and continued at work till half-past 7. Again, in the
evening, the work was resumed at 6, and continued till
a quarter from 9. The artificers were employed to-day in dressing off and
completing the last laid course. Still the wind being from the N.E.,
accompanied with a heavy sea, the praams could not approach the Rock,
and consequently no materials were landed.
The wind having shifted to the westward, the sea was
Tuesday, 11th.
greatly run down; and the landing-master’s crew being
early at work this morning, transported no fewer than
31 stones laid, and 65 blocks to the Rock in the course of the day. At 6
numerous articles
landed. a. m. the artificers landed, when 19 stones of the
Eleventh course were laid. They again landed at 4 p. m.
and laid 22, making altogether nine hours and a quarter upon the Rock to-
day, when 31 stones were built. The Patriot had left Arbroath last night, and
got to the Rock this morning with 43 pieces of stone, twelve bundles
containing 396 wedges, five bundles containing 165 trenails, three casks of
cement, six casks of pozzolano, six casks of lime, six casks of sand, besides
provisions for the use of the Beacon-house and Tender, viz. five hogsheads
of water, five bags of coals, three casks of beef, five bags of biscuit, one
cask of oatmeal, one firkin of butter, one cask of flour, one cask of pot
barley, with salt and vegetables.
At a quarter past 5 this morning, the artificers, 21 in
Wednesday, 12th.
number, landed, and remained eight hours on the Rock,
when 21 stones were laid. They landed again in the
37 stones laid. afternoon at half-past 3, and remained till 9 p. m., when
16 stones were laid. The landing-master’s crew
transported three stones to the Rock to-day, which completed the Eleventh
course. The Smeaton arrived from Leith this forenoon, with 53 casks of
pozzolano earth, 39 of which were stowed on board of the Tender to be at
hand: the Smeaton then proceeded with the remainder to Arbroath, where
she loaded stones for the Rock.
The weather still continuing favourable, the artificers
Thursday, 13th.
landed this morning at half-past 6 and remained till
half-past 11, when 15 stones were laid. They landed
29 stones laid. again at 5 and remained till 11 p. m., when 14 stones

Page 326

were laid. 29 stones were transported to the Rock to-day in the praam-boats.
The artificers landed this morning at a quarter from 7,
Friday, 14th.
and remained six hours and a quarter on the Rock,
when 18 stones were laid. They landed again in the
27 stones laid. evening and remained four hours and a quarter, when 9
stones were laid, which completed the Twelfth course;
the praam-boats having landed 27 stones.
The wind was southerly, with occasional showers of
Saturday, 15th.
rain to-day, but the sea was smooth. The artificers
landed at a quarter past 7 this morning, and as the water
52 Stones landed and did not overflow the building, they continued on the
laid.
Rock till midnight, being 16 hours and a half, and laid
no fewer than 52 stones, which, in the early part of the day, had also been
transported to the Rock by the landing-master’s crew. This was the most
successful day’s work which had hitherto been made. The Twelfth course
was thus completed, which brought the building to the height of 15 feet
above the lower bed of the foundation-stone.
Hitherto no order had been given for loading the Bell
Sunday, 16th.
Rock vessels with stones on Sundays, but Mr Kennedy,
to whose department this belonged, had, with his usual
32 Stones laid. unwearied attention, commenced on Sunday night, at
12 o’clock, which enabled the Patriot to sail at 5, and
reach the Rock at 10 a. m., with a cargo of stones. The artificers landed at
half-past 7, and laid 21 stones in the course of seven hours and a half; and
having again landed in the evening at 7, they laid 11 stones in four hours,
all of which had been landed on the Rock to-day from the praams. Besides
laying, boring, trenailing, wedging, and grouting these stones, several other
operations were proceeded with on the Rock, at low-water, when some of
the artificers were employed at the Railways, and at high-water at the
Beacon-house. The seamen having prepared a quantity of tarpaulin, or cloth
laid over with successive coats of hot tar, the joiners had just completed the
covering of the roof with it. This sort of covering was lighter and more
easily managed than sheet-lead in such a situation. As a farther defence
against the weather, the whole exterior of this temporary residence was
painted with three coats of white-lead paint. Between the timber-framing of
the habitable part of the Beacon, the interstices were to be stuffed with

Page 327

moss, as a light substance that would resist dampness, and check sifting
winds: the whole interior was then to be lined with green baize-cloth, so
that both without and within the cabins were to have a very comfortable
appearance.
The artificers landed this morning at half-past 7, and
Monday, 17th.
remained at work five hours and a half, when 9 stones
were laid; but the wind having shifted to the N.E.,
9 Stones laid. which increased to a hard gale, in the course of this
afternoon, both the Smeaton and Patriot were obliged to
slip their moorings, when they proceeded in company to Leith Roads for
shelter. The Tender, however, being in a more light trim, and better adapted
for riding, continued at her station.
While some of the masons were employed to-day in
One of the Artificers
is accidentally killed
raising a large stone in the work-yard at Arbroath, the
in the work-yard. purchase unfortunately slipped, and the stone fell upon
William Walker, one of the labourers, who was putting
a prop under it, to preserve its position till a better purchase could be taken.
By this accident, Walker’s thigh-bone was unfortunately broken, and,
though medical assistance was procured without delay, the poor man died in
the course of a few hours, leaving a wife and two young children. The
Commissioners of the Light-houses, in consideration of the circumstances
of this case, settled an annuity of L. 5 upon his widow.
The wind still continued to blow fresh from the N.E.,
Tuesday 18th.
but the artificers were enabled to land on the Rock at a
quarter from 11, where they remained two hours and
One of the workmen three quarters, employed in shifting the crane on the
remains in the Beacon
alone. building, and making other preparations for laying the
Thirteenth course. Although the building-artificers
generally remained on the Rock throughout the day, and the mill-wrights,
joiners, and smiths, while their number was considerable, remained also
during the night, yet the Tender had hitherto been considered as their night-
quarters. But the wind having, in the course of the day, shifted to the N.W.,
and as the passage to the Tender, in the boats, was likely to be attended with
difficulty, the whole of the artificers, with Mr Logan, the foreman, preferred
remaining all night on the Beacon, which had, of late, become the solitary
abode of George Forsyth, a jobbing-upholsterer, who had been employed in

Page 328

lining the Beacon-house with cloth, and in fitting up the bedding. Forsyth
was a tall, thin, and rather loose-made man, who had an utter aversion at
climbing upon the trap-ladders of the Beacon, but especially at the process
of boating, and the motion of the ship, which he said, “was death itself.”
He, therefore, pertinaciously insisted with the landing-master in being left
upon the Beacon, with a small black dog as his only companion. The writer,
however, felt some delicacy in leaving a single individual upon the Rock,
who must have been so very helpless, in case of accident. This fabric had,
from the beginning, been rather intended by the writer to guard against
accident from the loss or damage of a boat, and as a place for making
mortar, a smith’s shop, and a store for tools, during the working months,
than as permanent quarters: nor was it at all meant to be possessed until the
joiner-work were completely finished, and his own cabin, and that for the
foremen, in readiness, when it was still to be left to the choice of the
artificers to occupy the Tender or the Beacon. He, however, considered
Forsyth’s partiality and confidence in the latter, as rather a fortunate
occurrence.
The whole of the artificers, 23 in number, now
Wednesday, 19th.
removed, of their own accord, from the Tender, to lodge
in the Beacon, together with Peter Fortune, a person
Artificers remove singularly adapted for a residence of this kind, both
with Peter Fortune to
the Beacon. from the urbanity of his manners, and the versatility of
his talents. Fortune, in his person, was of small stature,
and rather corpulent. Besides being a good Scotch cook, he had acted both
as groom and house-servant; he had been a soldier, a suttler, a writer’s
clerk, and an apothecary, from which he possessed the art of writing and
suggesting recipes, and had hence, also, perhaps acquired a turn for making
collections in natural history; but in his practice in surgery, on the Bell
Rock, for which he received an annual fee of three guineas, he is supposed
to have been rather partial to the use of the lancet. In short, Peter was the
fac-totum of the Beacon-house, where he ostensibly acted in the several
capacities of cook, steward, surgeon, and barber, and kept a statement of the
rations or expenditure of the provisions, with the strictest integrity.
The wind was at the S.E. to-day, accompanied with a
Thursday, 20th.
considerable swell of sea; and, although the Smeaton
and Patriot had returned from Leith Roads, and the

Page 329

praams had been loaded, and were riding at their
Praam-boats cannot moorings, yet they could not approach the Rock. The
approach the Rock.
building artificers, however, found employment in
boring, trenailing, wedging, and grouting the last laid course. The smiths
and mill-wrights worked at the western Railway, and the joiners at sundry
jobs about the Beacon-house.
The weather having improved, the Smeaton was
Friday, 21st.
entirely discharged to-day of her cargo of 69 stones,
which were also landed on the Rock, with a due
18 Stones laid and 69 proportion of other building materials, as pozzolano,
landed.
lime, and sand, &c.; and 18 stones of the Thirteenth
course were laid to-day.
In the present important state of the building, when it
Saturday, 22d.
had just attained the height of 16 feet, and the upper
courses, and especially the imperfect one, were in the
An embargo is laid on wash of the heaviest seas, an express-boat arrived at the
Shipping.
Rock, with a letter from Mr Kennedy of the work-yard,
stating, that, in consequence of the intended Expedition to Walcheren, an
embargo had been laid on shipping at all the ports of Great Britain; that
both the Smeaton and Patriot were detained at Arbroath, and that, but for
the proper view which Mr Ramsay, the port-officer, had taken of his orders,
neither the express-boat, nor one which had been sent with provisions and
necessaries for the Floating-light, would have been permitted to leave the
harbour. The writer set off without delay for Arbroath, and, on landing, used
every possible means with the official people; but their orders were deemed
so peremptory, that even boats were not permitted to sail from any port
upon the coast. In the mean time, the collector of the Customs at Montrose
applied to the Board at Edinburgh, but could, of himself, grant no relief to
the Bell Rock shipping.
At this critical period, Mr Adam Duff, then Sheriff of
Mr Sheriff Duff
Forfarshire, now of the county of Edinburgh, and ex
corresponds with the
Board of Customs. officio one of the Commissioners of the Northern Light-
houses, happened to be at Arbroath. Mr Duff took an
immediate interest in representing the circumstances of the case to the
Board of Customs at Edinburgh. But such were the doubts entertained on
the subject, that, on having previously received the appeal from the

Page 330

Collector at Montrose, the case had been submitted to the consideration of
the Lords of the Treasury, whose decision was now waited for.
In this state of things, the writer felt particularly
Operations at the
Rock while the
desirous to get the Thirteenth course finished, that the
vessels were under building might be in a more secure state, in the event of
embargo. bad weather. An opportunity was therefore embraced on
the 25th, in sailing with provisions for the Floating-
light, to carry the necessary stones to the Rock for this purpose, which were
landed and built on the 26th and 27th. But so closely was the watch kept up,
that a Customhouse-officer was always placed on board of the Smeaton and
Patriot while they were afloat, till the embargo was specially removed from
the Light-house vessels. The artificers at the Bell Rock had been reduced to
fifteen, who were regularly supplied with provisions, along with the crew of
the Floating-light, mainly through the port-officer’s liberal interpretation of
his orders. After completing the Thirteenth course, they were employed in
erecting a kind of stool or prop of masonry on the western side of the
building, for which the stones had fortunately been landed previous to the
embargo. This prop, as will be understood by examining the second year’s
work of Plate IX., consisted of large blocks of stone, measuring 5 feet in
length, 2 feet 6 inches in breadth, and 15 inches in thickness, and, when
completed, it was 6 feet in height, and 6 feet square at the top, so that the
men in working the crane had a sufficient space for standing. By this
means, the foot of the lower crane was elevated 6 feet above the Rock,
which, added to the length of the working-beam, made a height of about 18
feet, and, in the present state of the building, the stones were thus raised to
the level of the last built course. The crane on the top of the building, with
which the stones were laid, was, therefore, now only employed to take them
from the lower crane, instead of lifting them at once from the waggons on
the Railway. During this period, also, the Beacon-house and Railways were
completely overhauled, and matters of minor importance attended to, which
were obliged to be left behind when the works were going on briskly.
The Lords of the Treasury had no sooner received the
1809, August. appeal from the Board of Customs at Edinburgh, than
an order was issued for all vessels and boats belonging
The embargo is taken to the service of the Commissioners of the Northern
off the Light-house
vessels. Light-houses, to be released and permitted to sail upon

Page 331

their respective voyages. But before this order could be made effective, ten
days of the finest weather of the season had elapsed. Every one connected
with the work had now become impatient to be again at work, when the
writer had the happiness to receive a letter from Mr Charles Cuningham,
Secretary to the Commissioners of the Northern Light-houses, stating that
an order might be expected to reach the Collector of the Customs at
Montrose on the 30th. Mr Kennedy was consequently sent to Montrose to
wait the arrival of the post, which happened at midnight, when Mr Paton the
Collector, with much attention, gave immediate orders for the liberation of
the Bell Rock vessels; and as both the Smeaton and Patriot were loaded and
ready for sea, they sailed from Arbroath on Sunday the 30th, with the wind
at E.S.E., and arrived at their moorings at the Rock early on the 31st.
On the subject of this embargo, as applicable to the
The necessity of
stopping the Bell
boats and vessels in the Bell Rock service, it would be
Rock shipping difficult, and perhaps improper, to give any opinion
doubted, under any regarding the discretion or prudence exercised by the
circumstances.
Officers of the Customs, especially as the Board itself
found it necessary to appeal to the Treasury for
instructions. If, however, the Superior Officers at Montrose, aware of all the
circumstances of this peculiar case, had allowed the work at the Bell Rock
to proceed, till special orders could have been received on this peculiar
point, there is reason to believe it would not have been called in question by
the Board of Customs at Edinburgh. But when the vessels were
peremptorily stopped, and the matter brought formally under its notice, an
appeal to the Treasury was considered indispensable.
There being a considerable swell and breach of sea
Tuesday, 1st.
upon the Rock yesterday, the stones could not be got
landed till the day following, when the wind shifted to
78 stones landed, and the southward, and the weather improved. But to-day
40 laid.
no less than 78 blocks of stone were landed, of which
40 were built, which completed the Fourteenth, and part
24 artificers inhabit
the Beacon. of the Fifteenth courses. The number of workmen now
resident in the Beacon-house were augmented to 24;
including the landing-master’s crew from the Tender, and the boat’s crew
from the Floating-light, who assisted at landing the stones. Those daily at
work upon the Rock at this period amounted to 46. A cabin had been laid

Page 332

out for the writer on the Beacon, as will be seen from Plate VIII. but his
apartment had been the last which was finished, and he had not yet taken
possession of it; for though he generally spent the greater part of the day, at
this time, upon the Rock, yet he always slept on board of the Tender.
To-day the wind was from the S.E., accompanied with a
Wednesday, 2d.
pretty heavy swell of sea, which, in the early part of the
season, would perhaps have been sufficient to deter the
Mr Sheriff Duff visits attempt of landing building materials; but such was the
the works at the Rock.
dexterity of the landing-master and his crew, that 23
stones were transported to the western creek, and afterwards, by great
exertions, got along the Rock, though the Railways were still in an
incomplete state. With these, the builders were enabled to finish the
Sixteenth course, consisting of 53 stones. The work was visited to-day by
Mr Sheriff Duff, who, with his accompanying friends, were much gratified
in landing on the Bell Rock, and viewing the advanced state of the works.
The wind being from south-east, a heavy swell of sea
Thursday, 3d.
ran upon the Rock, so that no stones were landed to-
day. The building being now about 19 feet in height, it
23 stones laid. was found to produce a smoothness on the lee-side, and
as the north-east wind produced the heaviest seas, the
lower crane, erected on the prop, being placed on the south-west side, was
somewhat sheltered from that quarter, and admitted of a considerable
quantity of materials being occasionally laid around it; and, therefore,
although none were landed to-day, yet 23 blocks of the Seventeenth course
were built.
The weather proved very fine, and the seamen were
Friday, 4th.
employed on board of the Floating-light in shifting her
winter cable, and inspecting her chain-moorings, as she
2 stones laid. had just undergone such repair in her upper-works, as
could be conveniently given her while afloat. The
artificers on the Rock laid two stones to-day, and were otherwise employed
in trenailing and grouting the Seventeenth course.
The weather still continued favourable, and the landing-
Saturday, 5th.
master’s crew discharged the Patriot of her cargo, of
which 40 stones were landed on the Rock, and the

Page 333

remaining 12 were kept on board of one of the Praam-
8 stones laid. boats at her moorings. The artificers built 8 stones to-
day, so that 32 of the 40 which had been landed, were
either laid without mortar, upon the building, or ranged round the stool of
the lower crane, in readiness for next tide.
In the course of the last night, however, the wind had
Sunday, 6th. shifted to the N.E., accompanied by a heavy swell of
sea, and it was impossible for the landing-master’s
boats to approach the Rock. But the artificers being now stationary upon the
Beacon, they could pass from it to the building at all times of tide, by means
of the rope-ladder, formerly noticed, as will be understood by examining the
second year’s work, represented in Plate IX. They accordingly laid 25
stones to-day, and completed the Seventeenth course, consisting of 60
blocks. The Praam-boat, with the remaining 12 stones of the Patriot’s cargo
on board, rode at her moorings with great ease, and although the swell was
very considerable, yet she had very little motion; and even when deeply
loaded, these decked boats shipped no water. So easily did they ride at
anchor, that the sickly artificers, while on board of the Tender, though much
easier than the Floating-light, were often heard to express a wish that their
births could be shifted to a Praam-boat.
At day-break, this morning, a large schooner, the Fly of
Narrow escape from
ship-wreck.
Bridport, Green, master, bound from London to
Dundee, was observed standing right upon the Bell
Rock, when she was suddenly taken aback on seeing the Beacon and works
on the Rock. The crew of this vessel being entire strangers, had hoisted a
signal, when the landing-master immediately went on board, and after some
consultation, Pool, the master of the Smeaton, was sent to conduct the Fly
into the Firth of Tay.
The wind had shifted to the S.W. to-day, but still a
Monday, 7th.
heavy swell of the sea prevented the landing of
materials, and the artificers were accordingly employed
in shifting the crane on the building, and at low-water they were all engaged
in fixing and extending the Railways towards the western creek.
The sea having fallen considerably, the loaded Praam-
Tuesday, 8th.
boat got to the Rock, and the artificers laid the 12

Page 334

stones which had now been on board of her since the
12 stones laid. 5th. The works at the Rock were visited to-day by Mr
Robert Hamilton, Sheriff of Lanark, and ex officio one
Mr Sheriff Hamilton of the Commissioners of the Northern Light-houses,
visits the works.
who expressed much satisfaction at the progress of the
operations.
The number of artificers were augmented from 24 to
Wednesday, 9th.
26, and measures were taken for leveling the necessary
sites on the Rock for some additional supports for the
36 stones laid. legs or principal beams of the Beacon. These supports
had been prepared in the course of the winter, but had
Additional supports not yet been applied, from the pressing nature of the
for the Beacon landed
to-day. building operations. They consisted both of iron and of
timber, the former to connect the principal beams
horizontally, and the latter diagonally, in order that, by every possible
means, this essential part of the establishment might be preserved through
the winter, and divested of the twist so expressively felt and complained of
by Mr Logan, on the 30th of May. To-day 36 stones were landed and built,
which finished the Nineteenth course, and brought the building to the height
of about 23 feet.
To-day 26 stones of the Twentieth course were landed
Thursday, 10th.
and laid.
The wind was at S.E. on the 11th, and there was so very
Friday, 11th.
heavy a swell of sea upon the Rock, that no boat could
approach it. Such indeed was the force of its breach,
Sheer-crane broken that one of the legs of the cast-iron Sheer-crane at the
by the force of the
sea. eastern creek, represented in Plate XI., was again
broken. It is not a little remarkable, that these bars,
which contained about 16 square inches of section, should nevertheless
have been snapped, by the force of the sea, on three different occasions. It
must, however, be remarked, that these sheers, in their operation, had
necessarily a certain action laterally, in effecting the laying of a stone upon
the waggon; in heavy seas, therefore, the apparatus was subject to a jerking
motion, which proved sufficient to break it; so essential is it, that every
thing within the range of the sea should be Dead-fast, as workmen
emphatically express it, or as firm and steady as possible.

Page 335

The gale still continuing from the S.E., the sea broke
Saturday, 12th. with great violence both upon the Building and the
Beacon. The former being 23 feet in height, the upper
Some of the Artificers part of the crane erected on it having been lifted from
become alarmed and
leave the Beacon. course to course as the building advanced, was now
about 36 feet above the Rock. From observations made
on the rise of the sea by this crane, the artificers were enabled to estimate its
height to be about 50 feet above the Rock, while the sprays fell with a most
alarming noise upon their cabins. At low-water, in the evening, a signal was
made from the Beacon, at the earnest desire of some of the artificers, for the
boats to come to the Rock; and although this could not be effected without
considerable hazard, it was however accomplished, when twelve of their
number, being much afraid, applied to the foreman to be relieved, and went
on board of the Tender. But the remaining fourteen continued on the Rock,
with Mr Peter Logan, the foreman builder. Although this rule of allowing an
option to every man either to remain on the Rock or return to the Tender,
was strictly adhered to; yet, as it would have been extremely inconvenient
to have had the men parcelled out in this manner, it became necessary to
embrace the first opportunity of sending those who had left the Beacon to
the workyard, with as little appearance of intention as possible, lest it
should hurt their feelings, or prevent others from acting according to their
wishes, either in landing on the Rock or remaining on the Beacon.
All hands were employed at low-water to-day, in
Sunday, 13th.
refitting the sheer-crane at the eastern landing-place,
and in adjusting other things about the Beacon and
Effects of the late Rock, which had been scattered and deranged during
gale.
the late gale. In particular, the guy-ropes of the cranes
required to be tightened; for, although they were of patent-cordage, and had
often been well tried, yet, upon this occasion, they were stretched and much
relaxed with the excessive motion of the sea. The whole appurtenances of
the mortar-gallery had been sent adrift; even the blacksmith’s anvil was
upset! and found lying at the foot of the Beacon, while his bellows, and the
greater part of the deals with which the floor was laid, were forced up and
carried away, with all the lime and cement casks.
The wind still continued from the S.E., and though
Monday, 14th.
blowing with less force, yet the sea rolled over the

Page 336

Rock too heavily for approaching it with building materials. But, in the
course of the day, efforts were made for getting the landing-apparatus again
into a working state.
The wind had fortunately shifted to the S.W. this
Tuesday, 15th.
morning, and though a considerable breach was still
upon the Rock, yet the landing-master’s crew were
5 stones laid. enabled to get one Praam-boat, lightly loaded with five
stones, brought in safety to the western creek: these
The Writer takes stones were immediately laid by the artificers, who
possession of his
cabin in the Beacon. gladly embraced the return of good weather to proceed
with their operations. The writer had this day taken
possession of his cabin in the Beacon-house. It was small, but commodious,
and was found particularly convenient in coarse and blowing weather,
instead of being obliged to make a passage to the Tender in an open boat, at
all times, both during the day and the night, which was often attended with
much difficulty and danger.
The sea was much run down to-day, but the wind from
Wednesday, 16th. the west, prevented the landing of stones on the western
side of the Rock, and the repairs of the sheer-crane
52 stones landed and were still incomplete. Captain Wilson undertook,
18 built.
however, to land two Praam-boats of stones on the top
of the building at high-water. He accordingly laid the Hedderwick and
Fernie in succession, alongside of the building, and in this manner 30 stones
were landed; the repairs of the sheer-crane were completed, and during the
evening tide, other two praam-loads were landed at low-water at the eastern
creek, making in all 52 stones, of which 18 of the Twentieth course were
built.
The wind had shifted from W. to N.E. to-day, but the
Thursday, 17th.
weather being fine, 29 stones were landed, and 25 built.
The weather is rather boisterous to-day, accompanied
Friday, 18th.
with rain, and a considerable swell of sea. The two
praam-boats, however, were got to the Rock, when 16
stones were landed, which, with those already at hand, finished the
Twentieth and commenced the Twenty-first course.

Page 337

For some days past, the weather had been occasionally
Saturday, 19th. so thick and foggy, that no small difficulty was
experienced in going even between the Rock and the
Floating-light boat Tender, though quite at hand. But the Floating-light’s
loses her way.
boat lost her way so far in returning on board that the
first land she made, after rowing all night, was Fifeness, a distance of about
14 miles, as will be seen from Plate IV. The weather having cleared in the
morning, the crew stood off again for the Floating-light, and got on board in
a half famished and much exhausted state, having been constantly rowing
for about 16 hours.
The wind shifted this morning from E. to S.W. with
29 stones built.
much rain. The sloop Patriot returned from the Firth of
Forth this forenoon, to which she had been driven by
the late gales. The weather being more favourable to-day, 31 stones were
landed on the Rock, and 29 stones were built, with which the Twenty-first
course was finished, which brings the building to the height of 25 feet. The
crane was also shifted, and every preparation made for commencing with
the next course.
The weather being very favourable to-day, 53 stones
Sunday, 20th.
were landed, and the builders were not a little gratified
in having built the Twenty-second course, consisting of
An entire course laid 51 stones, being the first course which had been
to-day. Prayers read
on the Rock. completed in one day. This, as a matter of course,
produced three hearty cheers. At 12 noon, prayers were
read for the first time on the Bell Rock: those present, counting thirty, were
crowded into the upper apartment of the Beacon, where the writer took a
central position, while two of the artificers joining hands supported the
Bible.
The wind was from the S.W. this morning, blowing
Monday, 21st.
fresh, with rain. The Praam-boats, however, landed
thirty-two stones, which were also built. At 6 p. m. the
Smeaton arrives with Smeaton arrived from Arbroath, having on board the
the last course of the
solid. last cargo of the solid part of the building. She was, of
course, decorated with all her colours; and, in
compliment to the advanced state of the work, there was a display of flags

Page 338

from the Floating-light and the other vessels on the station, and also from
the Beacon-house and the Building itself.
During last night it blew excessively hard, and the
Tuesday, 22d.
operations to-day were much interrupted by the
breaking loose of the Floating-light. At 5 o’clock this
Floating-light breaks morning an alarm was given throughout the Beacon-
adrift.
house of this circumstance, when a signal was instantly
made for the Tender to get under way; at the same time one of her boats
came to the Rock, and the writer left the Beacon, and sailed with the Tender
to the assistance of the Floating-light. It was some time before the watch on
the deck had observed, by their greater distance from the buoy upon the
spare moorings, that the vessel had actually got adrift. Mr John Reid, acting
master, was immediately called, when the best bower anchor was let go
with a sufficient scope of cable, about a mile from her original station. Here
she was obliged to be left till the weather should become moderate enough
to admit of her being towed to her former station.
From the untoward circumstance of the Floating-light’s
Wednesday, 23d.
breaking adrift, the landing-master and his crew were
fully employed with the Tender in this service, so that
no materials could be got landed on the Bell Rock, either yesterday or to-
day.
The wind was still from the westward, but had now
Thursday, 24th.
moderated considerably, when 28 stones of the
Smeaton’s cargo were landed on the Rock, and 14
blocks were laid, with which the Twenty-third course was completed.
To-day, the remainder of the Smeaton’s cargo was
Friday, 25th.
landed, and the artificers laid 45 stones, which
completed the Twenty-fourth course, reckoning above
Building operations the first entire one, and the twenty-sixth above the
concluded for the
season. Rock. This finished the solid part of the building, and
terminated the height of the outward casing of granite,
which is 31 feet 6 inches above the Rock or site of the foundation-stone,
and about 17 feet above high-water of spring-tides. Being a particular crisis
in the progress of the Light-house, the landing and laying of the last stone
for the season was observed with the usual ceremonies.

Page 339

From observations often made by the writer, in so far as
Probable height of such can be ascertained, it appears that no wave in the
waves in free space.
open seas, in an unbroken state, rises more than from 7
to 9 feet above the general surface of the ocean. The
Inducements for
stopping the building Bell Rock Light-house may therefore now be
operations. considered as from 8 to 10 feet above the weight of the
waves; and, although the sprays and heavy seas have
often been observed, in the present state of the building, to rise to the height
of 50 feet, and fall with a tremendous noise on the Beacon-house, yet such
seas were not likely to make any impression on a mass of solid masonry,
containing about 1400 tons: its form being at the same time circular, and
diminishing in diameter from the base to the top, as represented in the
second year’s work, Plate IX. It had for some time been a matter of doubt
with the writer, whether he might not attempt to carry the building to the
top of the stone stair-case, or 13 feet above the solid, the wall being here of
the medium thickness of 6 feet. Several considerations, however, induced
him to stop for the season with the completion of the solid, especially as it
left the work in a more entire and defensible condition than if the door and
part of the void had been built. One of the chief objections to continuing the
operations, was the dread of encountering the gales experienced in former
years early in the month of September. Another special obstacle was the
difficulty and danger attending the guying or fixing of the present crane on
the top of the building, which had now got to too great a height for its
stability, as the guy-ropes which supported it were of the unmanageable
length of about 80 feet. Even in the month of July, as before noticed, this
state of things had become so obvious, that it was then determined to make
the crane upon a new construction, which was to be kept in equilibrium by
means of a balance-weight, and thus do away with the guy-ropes altogether.
This crane had accordingly been prepared, but, like most machines upon a
new construction, it was not found to operate in so satisfactory a manner as
to warrant its immediate removal to the Bell Rock. It was therefore resolved
rather to perfect the Balance-crane in the course of the winter months, and
begin with a better prospect of success in the spring. The building
operations were therefore brought to a conclusion; and the writer now took
his leave of the Bell Rock till the ensuing season, excepting in so far as an
occasional visit might occur.

Page 340

The Floating-light had been made fast to the spare
Tuesday, 29th. moorings to-day, but those which had given way were
again fished up, when she was towed back to her
former station for the winter. It appeared that one of the shackles had got
loose when she went adrift.
From the 25th till the 30th, the seamen and artificers
Wednesday, 30th.
were busily employed, at the proper time of tide, in
removing every thing from the Rock that was not
Tender to continue farther wanted for the season, and in securing such
her station, and
Beacon to be things as were to be left. It was still necessary, however,
occupied for a time. to keep the Tender on the station, and also to occupy the
Beacon-house, and to retain the floor of the open
gallery for the smiths, as an additional strut or support was to be erected on
the inside of each of the six principal beams of the Beacon. There were also
36 strong tie-bars of malleable-iron to be bolted to these beams, in a
horizontal direction, as represented in Plate VIII., in lieu of the bracing-
chains, which were not found to answer, for connecting the whole together.
These operations being arranged with Mr Francis Watt,
Congratulations on
the Artificers
as foreman, the whole of the artificers left the Rock at
mid-day, when the Tender made sail for Arbroath,
returning ashore after
several months’ which she reached about 6 p. m. The vessel being
absence.
decorated with colours, and having fired a salute of
three guns on approaching the harbour, the work-yard
artificers, with a multitude of people, assembled at the harbour, when
mutual cheering and congratulations took place between those afloat and
those on the quays. The Tender had now, with little exception, been six
months on the station at the Bell Rock, and, during the last four months,
few of the squad of builders had been ashore. In particular, Mr Peter Logan,
the foreman, and Mr Robert Selkirk, principal builder, had never once left
the Rock. The artificers having made good wages during their stay, like
seamen upon a return-voyage, were extremely happy, and spent the evening
with much innocent mirth and jollity.
In reflecting upon the state of matters at the Bell Rock,
1809, September.
during the working months, when the writer was much
with the artificers, nothing can equal the happy manner

Page 341

in which these excellent workmen spent their time.
Reflections on the They always went from Arbroath to their arduous task
very proper conduct
of the Artificers. cheering, and they generally returned in the same hearty
state. While at the Rock, between the tides, they
amused themselves in reading, fishing, music, playing cards, drafts, &c. or
in sporting with one another. In the work-yard at Arbroath, the young men
were almost, without exception, employed in the evening at school, in
writing and arithmetic, and not a few were learning architectural drawing,
for which they had every convenience and facility, and were, in a very
obliging manner, assisted in their studies by Mr David Logan, Clerk of
Works. It therefore affords the most pleasing reflections, to look back upon
the pursuits of about 60 individuals, who, for years, conducted themselves,
on all occasions, in a sober and rational manner.
The operations at the Bell Rock for the remainder of the
Tuesday, 5th.
season being confined to the lower parts of the Beacon
and Railways, were chiefly low-water works. The
Tender again returns Tender had again been fitted out for her station, with a
to her station at the
Rock. supply of provisions and necessaries for ten seamen and
nineteen artificers, carrying with her supplies for the
Floating-light and Beacon-house. At 11 a. m. she left Arbroath on this
service; but the wind being S.E., it was not till Thursday the 7th, at 8
o’clock p. m. that she was made fast to her moorings.
At 6 o’clock this morning, Mr Watt, with eighteen
Friday, 8th.
artificers, landed on the Rock, commenced the work,
and remained on the Beacon till Thursday, the 14th,
Experiences very bad when the vessel returned to Arbroath, having had
weather.
extremely boisterous weather, and been twice obliged
during that period to slip and leave her moorings. The prevailing winds
were S.E., and the barometer oscillated between 29.5 and 29.60.
Looking forward with confidence to the completion of
Monday, 17th.
the Bell Rock Light-house in the course of the next
year, the writer, with much expectation, began to
Writer makes a trip to prepare every part of the establishment. He had early
Flamborough-head
Light-house. anticipated the necessity of fixing upon the description
of light which would be necessary for characterising
and distinguishing its range or compartment of the coast. With this in view,

Page 342

he had already made a train of experiments with shades of different
coloured glass at Inchkeith Light-house, the result of which tended to shew
that light passing through Red-coloured shades, alternating with periodic
intervals of Darkness, and light of the Natural appearance, were the most
effectual and suitable means for answering this purpose. Notwithstanding
that his opinion on this subject was quite decided, he was still desirous of
seeing the effect produced by the light of Flamborough-head, on the coast
of Yorkshire, which was the first erection of this description on the British
coast, and had, indeed, been only lately exhibited. That his observations
might therefore be the more certain and complete, he embarked in the sloop
Smeaton, on the 16th of this month, reached the Yorkshire coast on the
18th, and in the course of that night had the light in view, at various
distances, both in clear and foggy weather, which extended the range of his
remarks.
In the course of this night, the wind blew fresh from the
Experiences a sudden
gale of wind.
S.W., and an immense number of large vessels, chiefly
in the Coal-trade, passed our small ship, which obliged
the crew to keep a sharp look-out, to avoid the imminent danger of being
run down, especially after the weather became thick. As our course lay
close to Flamborough-head, we had several hairbreadth escapes; for the
vessel had no sooner put about to avoid the land, than she was in danger of
being run foul of by the passing vessels. In this situation things remained
from about 1 o’clock on the morning of the 19th till 5, when, all of a
sudden, the wind shifted, in the most surprising manner, from W.SW. to
N.W., when the weather immediately clearing, was succeeded by a heavy
gale, which forced our ship into Burlington-Bay, where she was safely
anchored.
As this was one of the most extraordinary tornadoes
Storm described.
that the writer ever witnessed, he will endeavour to give
some account of it. On the morning of the 18th, the day
Great want of a Public preceding the storm, when off Scarborough, he had
Harbour on this coast.
requested to be called early, that he might see the coast,
and enjoy the sight of the rising sun. The weather was then extremely fine,
but the sun had a most piercingly brilliant appearance as it came into view
upon the horizon; and he was assured by Captain Pool, that the general
aspect of the heavens indicated a change of weather for the worse. In the

Page 343

course of the 18th the sky became cloudy, and the wind shifted from point
to point, but prevailed chiefly from the S.W. At midnight, the weather was
foggy, and the wind blew so fresh that the second reef was taken into the
Smeaton’s mainsail, and her topmast was struck. During the whole of the
night, a fleet of vessels passed to the northward with a fair wind: these were
understood to be colliers, in ballast, on their return voyage from London to
Sunderland and Newcastle. At 5 a. m., however, while the Smeaton was
lying-to, and waiting for day light, the wind shifted so suddenly to N.W.,
that it appeared to those below as if she had been upset, or had run upon a
rock. In an instant all was bustle and confusion, till the vessel was got
before the wind. The writer being in bed, immediately sprung up, and, on
inquiring into the matter, the answer was, “It blows mere fire.” The man at
the helm, at the same time, pointed out a vessel in a disabled state, having
been dismasted with the sudden change of the wind. Our small bark was
fortunately in the opening of Burlington Bay, where she got to an anchor
about 6 o’clock a. m. In the course of the day, not fewer than 160 vessels
took shelter in the same place, many of them in a mutilated and dismantled
state, having, to use a sea phrase, had their sails “split in ribbons;” and two
were towed into the Bay, one of which, a large brig, already alluded to, was
totally dismasted. Such a scene, arising from what may be termed a
“Summer’s Gale,” had rarely been seen on this coast. Three vessels were
also driven ashore and wrecked in Robin Hood Bay, a few miles north of
Flamborough-head, and several others, as the writer afterwards learned, had
been stranded on various parts of the coast, between Yarmouth Roads and
the Shetland Islands. The want of some place of refuge for the extensive
shipping of this coast in disastrous circumstances like the present, is very
apparent. Had there been a harbour at Bridlington of sufficient capacity for
large ships, perhaps not fewer than 100 sail would have refitted there, which
were obliged to go to sea in a very crippled condition. Probably a Northern
Ramsgate could not be better set down than here or somewhere upon the
Norfolk coast.
The writer is the more particular in noticing the
Progress of the gale
along the coast.
anomalous state of the weather on this occasion,
because the progress of this gale seems to have been
comparatively slow. It appeared upon inquiry, from the date of various
shipwrecks, to have visited Shetland on the evening of the 17th, Peterhead
on the 18th, and Yarmouth at noon of that day. Now, as the distance

Page 344

between Sumburgh-head in Shetland and Yarmouth is about 430 miles, and
if we allow 42 hours, as nearly as could be ascertained, for the progress of
the wind between these points, it thus appears that the N.W. gale had not
made its way against the S.W. wind, at a greater rate than about 10 miles
per hour, though, from a train of experiments made in the neighbourhood of
Leith, by Mr Andrew Waddell, F. R. S. E., and obligingly communicated to
the writer, he has often observed the velocity of the wind to be about 60
miles per hour. But here we cannot enough regret the want of an efficient
Anemometer, or instrument for measuring the force of the wind. Indeed, we
hardly know any desideratum of more universal interest, for,
notwithstanding the labours of Lind and others on this subject, from the
want of a proper scale, we are still groping in the dark with the use of such
indefinite terms, as “Light airs, inclining to calm,”—“Fresh
breezes,”—“Fresh gales,”—“Hard gales,”—and “Very hard gales;” for it
rarely happens that the sailor will admit the term “Storm” into his
nomenclature.
Having landed at Bridlington on the 20th, the writer
Monday, 25th.
had the pleasure of meeting with Mr Benjamin Mills,
Collector of the Customs there, and agent for
Mr B. Mills suggests Flamborough-head Light-house. This gentleman
distinguishing-lights
with colours. accompanied the writer to the Light-house, about six
miles distant. He was also at pains to explain the mode
in which he had originally proposed the erection of a Distinguishing-light,
from oil, with reflectors, for this station; as a Coal-light, formerly here, had
long since been actually extinguished, on account of its being often
mistaken for other lights on the coast. Mr Mills, observing the consequent
disasters to shipping on these shores, proposed to construct a Revolving-
light, distinguishable by means of colours, the machinery to be kept in
motion by the agency of a neighbouring rill of water. Though the apparatus
described to the writer seemed, upon the whole, not very applicable in
practice, yet it is believed that Mr Mills was the first who suggested the idea
of a distinguishing light, by means of coloured shades of glass. Some useful
remarks having been made on the effects of Flamborough-head light, the
writer sailed for the Firth of Forth, and reached Edinburgh on Monday the
25th.

Page 345

Soon afterwards, he embarked at Greenock in the
Voyage to the Light-house Yacht, on his annual voyage for the
Northern Lights.
inspection of the Northern Light-houses, proceeding
down the Clyde by the Mull of Kintyre, through the sounds of the Western
Islands to Cape Wrath and the Orkneys, and from thence, along the eastern
coast to the Firth of Forth, which he reached in the beginning of November;
when he found the Bell Rock works about to be concluded.
The complement of artificers which had been employed
1809, November.
at the Rock, and lodged in the Beacon-house, from the
period of completing the building operations in the
State of the works month of August, till November, was twenty-four, who,
when concluded for
the season. as before noticed, were chiefly employed in fixing
additional supports to the Beacon, and in extending and
completing the Railways leading to the western creek. The works therefore,
were only continued during the period of spring-tides; and in neap-tides the
artificers returned to the work-yard. The plate-iron-forge, anvil, and other
weighty articles, had been removed from the Beacon, and set up in a
centrical position on the top of the building, where the smiths had been for
some time at work: the rope-ladder of communication, which had been
found so useful this season, was taken down, and every thing arranged in
the most compact and orderly manner for the winter. In the course of these
latter operations, the Tender had been twice obliged to slip her moorings,
and leave the artificers upon the Beacon. At one of these times, she
proceeded for Leith Roads, when Mr Watt stated that very bad weather had
been experienced on the Beacon, and that, on several occasions,
considerable alarm was felt, more particularly when the Tender was driven
off her station, the artificers conceiving themselves in a more forlorn and
helpless situation while she was out of view. Having made the necessary
arrangements for the Rock being visited during the winter months, the
writer left the works on the 8th November.
The Tender sailed to-day at 2 p. m., and next morning at
Wednesday, 22d.
8, Mr Watt and five artificers were landed from two
boats, and remained on the Rock till 11, when they had
The prop of the crane great difficulty in returning to the vessel, as the wind
is demolished.
blew fresh from the N.E. The boats were no sooner
hoisted on board, than, instead of sailing for Arbroath, the Tender was

Page 346

obliged to steer for Leith Roads, where she lay till the 29th: she then again
made sail for Arbroath; but, from the severity of the weather, was put past
her port, and went into Montrose. When the artificers landed, at this time,
they found that the prop of the lower building-crane had been demolished
during the late gales, and that the stones were scattered about the Rock in
every direction, having done considerable damage to the contiguous
Railways.
The Tender sailed early in the morning of the 14th
1809, December.
December for the Rock, having on board six artificers
and twelve seamen, with a supply of provisions for the
Thursday, 14th. Floating-light. The artificers landed in the evening, and
though the tide did not leave the Railways, every thing
Artificers again visit appeared to be in the same state as at their former visit.
the Rock. A large
buoy has drifted. Two of the large stones which had formed the prop of
the crane, had been thrown forcibly against the Beacon;
but it was impossible, under the present circumstances, to effect their
removal. The large buoy placed upon the spare moorings of the Floating-
light, had drifted between the night of the 9th and the morning of the 10th
December, the wind then blowing hard at S.SW.; and the two spar-beacons,
attached to small mushroom anchors, used as a direction to the western
creek, had also been washed away during the same gale. But, on the whole,
no material damage had been sustained either at the Rock or on board of the
Floating-light.
At 3 o’clock this morning, the Tender sailed for the
Saturday, 8th.
Rock, and carried off a mushroom-anchor and chain,
which were laid down as spare-moorings for the
Artificers visit the Floating-light, to be in readiness in case of her
Rock. Floating-light
has had bad weather. accidentally drifting, as the season would not admit of
the old moorings being grappled for. On landing the
artificers, they found every thing much in the same state as at their former
visit, excepting two additional lengths of the Railways, extending to about
eight feet, which had been broken by the loose stones of the prop of the
crane. The crew of the Floating-light had also experienced some very bad
weather, and on several occasions the ship is represented as having laboured
much. In particular, on the 15th, with the wind at S.E., when in the act of
swinging round to the tide, she was boarded by a heavy sea which

Page 347

unshipped the boats; and found its way below, in such quantity, that it
extinguished the fires, and created considerable alarm; but the vessel, being
strongly built, and well found in all her materials, sustained no damage.
Having now gone through the journal of the Bell Rock operations for the
year 1809, we shall proceed with a narrative of the works for the year 1810,
in the course of which the Bell Rock Light-house was completed.

Page 348

CHAPTER VI.
PROGRESS AND COMPLETION OF THE WORKS IN THE YEAR 1810.

The shipping establishment connected with the Bell
1810, January.
Rock service during the winter of 1809 and 1810,
consisted only of the Pharos Floating-light and Sir Joseph Banks Tender;
the other vessels being laid up in ordinary. The latter vessel was appointed
to carry artificers to the Rock at spring-tides, for the inspection of the
works, and to repair any small damage that might occur at the Beacon-
house and Railways. She also supplied the Floating-light with provisions
and necessaries, and changed the crew in their respective turns of leave on
shore. The landing-master, Captain Wilson, was the appointed commander
of this vessel; but as he and part of his crew were occupied constantly at the
Rock during the building-season, they were occasionally relieved from the
unpleasant duty of the Pharos, by such of the officers and seamen belonging
to the other ships in the Light-house service, as were kept in pay during the
winter months.
Five artificers from the work-yard at Arbroath were
Friday 5th.
allotted for visiting the Bell Rock, with Mr Francis
Watt, the foreman mill-wright. They accordingly sailed
The Tender visits the on one of their trips on the 5th of January at 12 noon;
Floating-light and
Bell Rock. but the Tender did not reach the Floating-light till next
morning at 1 o’clock. The weather being moderate, a
supply of fuel, water, and provisions, was immediately sent on board, when
Captain Taylor, with Mr William Reid his mate, and four seamen, shifted to
the Tender, and Captain Calder of the Light-house Yacht, with John
Blackwood his mate, and four seamen, took their station in the Floating-
light. The Tender then stood towards the Rock, when the artificers landed
with the boats at 9, and remained till 12 noon, and in the afternoon, the
vessel returned and got into the harbour of Arbroath; Mr Watt reporting that
every thing was in good order.
In the same manner, and with similar success, the
Saturday 20th.
Floating-light and Bell Rock were visited on the 20th of
this month.

Page 349

The Tender was in a state of readiness for the spring-
February. tides, on the 5th of February, but the winds, though
westerly, were so stormy, that she could not go to sea.
Sunday, 11th. The weather having moderated on the 11th, though then
the period of neap-tides, she went off to change the
Artificers cannot land crew of the Floating-light, and supply that ship with
on the Rock.
necessaries; and afterwards stood towards the Rock; but
as it did not appear above water, a landing could not be effected, though,
from the general aspect of things, the Beacon and Building were concluded
to be in good order, and the vessel returned to Arbroath on the afternoon of
Monday the 12th.
The Tender sailed this morning at 5 o’clock, with a fine
Wednesday, 21st.
breeze at west, having on board the usual complement
of artificers, a change of crew, and a supply of
Still prevented from provisions for the Floating-light. At 9 she got off to the
landing.
Rock, but the wind, by this time, blew so fresh, that it
was found impracticable to land; every thing, however, about the Building
and Beacon appeared to be in good order. At 11, the Tender stood towards
the Floating-light, and, after considerable difficulty, the provisions were got
on board, and a transfer made of the crews; when the Tender sailed for
Arbroath, and got into the harbour at 4 p. m., having been only about eleven
hours in making this trip.
At 4 o’clock this morning, the Tender sailed for the
1810, March.
Rock with the wind at N. by E., when the artificers
made a landing at half-past 10, and remained till 1 a. m.,
Sunday, 11th. having found every thing in good order, excepting some
parts of the Railways, which had received damage from
A landing is effected. the movement of a large drift-stone or traveller,
Large stones drifted
upon the Rock. estimated to contain upwards of one ton of rock, which
was broken and removed, to prevent its doing more
damage. The building, as high as the daily rise of the tide, was now covered
with a strong growth of sea-weed. On the course, however, immediately
above the Rock, the fuci had been prevented from taking root from the
chips of stone which continually washed about the building. Some holes in
the Rock, near the Beacon, which, in the year 1807, had been filled with
ruble-building, a species of work rather unexpectedly found to withstand

Page 350

the force of the sea, had in the late gales been shaken loose, and laid open.
—In the course of the gales of the 25th, 26th, and 27th of March, as is
supposed, two large drift-stones or travellers had done considerable injury
to the Railways. It also appeared, from certain marks upon the beams of the
Beacon, at the height of about five feet above the Rock, that these stones,
containing from seven to ten cubic feet each, or upwards of half a ton, had
actually been lifted by the sea and driven with force against the Beacon. In
the course of these gales, also, the large cask-buoy, used as the moorings of
the Tender, had broken adrift. During these gales, the Floating-light rolled
very heavily, and had shipped several great seas, but nothing of any
consequence happened in the way of damage to the vessel or her
appurtenances.
As the finishing of the Light-house, in the course of
Beacon now rendered
very secure.
next season, depended wholly upon the stability of the
Beacon, every possible attention was paid to its safety;
and it was most satisfactory to learn, by Mr Watt’s report, that every thing
about it continued in good order. On almost every visit during the two
former winters, some of the bracing-chains were found in a broken state;
but since the months of September and October last, when they were
removed, and replaced with thirty-six great bars of iron bolted to the
principal beams, as shown in Plate VIII., every thing had remained in a state
of connected firmness.
The hewing or cutting of the several courses, forming
Progress of the works
at Arbroath.
the void of the Light-house, was also in great
forwardness in the work-yard at Arbroath; and by the
latter end of the month of April, the Forty-fourth course, forming part of the
store-room, shewn in the section of Plate XVI., was laid on the platform,
and ready for shipping to the Rock. The burning and pounding of the
Aberthaw lime, and the preparation of other materials, were also going on.
The season, though now advanced to the month of
1810, April.
April, was still boisterous. The day, however, was
getting long, and the influence of the sun began to be
Landing on the Rock felt in checking the frosts, which often stopped both the
precarious in Winter.
quarrying operations and the stone-cutters. The
lengthening of the day, as well as moderate weather, was a great regulating
circumstance in the Bell Rock works; for, during the winter months, only

Page 351

one low-water tide occurred with day-light; and, indeed, in the depth of
winter, there may be said to be no very favourable opportunity of landing
on the Rock, as low-water at new and full moon happens here about 8
o’clock, which renders the chance of landing extremely uncertain and
precarious.
Previously to entering upon the operations of the season
Retrospective view of
the works. Mylnefield
1810, it may be proper, in this place, to take a
Quarry. retrospective view of the various departments of the
work. The granite courses of the Bell Rock Light-house
having been completed, for a considerable time, it was only the sandstone
quarries that were to be attended to. As formerly noticed, the stone of
Mylnefield, like that of most quarries which lie in strata or alternate beds, is
liable to split and become useless, from the effects of frost, owing to the
natural sap or moisture which they contain. Water, being unlike other bodies
which follow the general law of contracting in volume with a reduction of
temperature, is found, on the contrary, to encrease in bulk at the moment of
congelation, producing the most surprising effects in rending rocks, even
with an explosive force. In sandstone quarries, therefore, the work is
usually suspended during the months of December, January, February and
March, when the frost happens to be intense, as was the case in the winter
of 1809–1810, when the thermometer occasionally fell so low as the 17th
degree of Fahrenheit. Notwithstanding every precaution in the work-yard at
Arbroath, by covering the quarried materials with straw and brushwood,
many excellent and valuable stones were lost by the intenseness of the frost.
Such, however, was the desire of getting early forward with the work, in
order to insure the completion of the building operations in the favourable
part of the season, that the writer took the earliest measures for getting an
additional supply of stones from Mylnefield; and, by the beginning of the
month of April, the Smeaton and Patriot, together with the hired sloop
Alexander, were loaded and sent to Arbroath.
From this description of the nature of the stone of
Craigleith Quarry.
Mylnefield, it became necessary, for the furtherance of
the upper parts of the Light-house during the winter
months, that they should be prepared of stone which would admit of being
worked without much risk of injury during frosty weather. For the cornice
of the building, and the parapet of the light-room, the writer, therefore,

Page 352

made choice of the Liver-rock of the Craigleith Quarry, well known for its
durability and beauty, and for its property of not being liable to be affected
by frost. By this means also, the iron-work or frame of the Light-room
might be fitted to the masonry on the spot where it was to be prepared,
which would thereby lessen the actual work upon the Rock. Another
advantage attending this arrangement, was the opportunity it afforded of
making practical trial of the Balance-crane, with which the masonry of the
ensuing season was to be built, as it had been found necessary to make
several alterations on its construction.
The use of a piece of vacant ground was accordingly
State of the Works at
Edinburgh.
got at Greenside, contiguous to the author’s house, in
Edinburgh, where a number of masons were employed,
at the sight of Mr Peter Logan, foreman builder. A very considerable
difficulty was, however, experienced in procuring so many principal stones
of the liver-rock, of the description and dimensions necessary for the
cornice and balcony; the stones of which also formed the Light-room floor
in one length, as will be understood by examining Plates XIII. and XVI.
But, as these works commenced at Edinburgh in the latter end of October
1809, they were completed early in the month of March 1810, and the
whole of this critical and difficult part of the building was then ready for
shipping to the Bell Rock. The several compartments of the Light-room
were now also in progress. The sheets of silver-plated copper for the
reflectors having been ordered from Messrs Boulton and Watt,—the glass
from the British Plate-Glass Company,—the cast-iron sash-frames from Mr
John Patterson of the Edinburgh Foundery,—while the construction of the
reflectors and reflecting-apparatus, together with the framing of the whole
Light-room and its appurtenances, were executed under the immediate
directions of Mr Thomas Smith, the writer’s predecessor, who had now
retired from the more active duties of engineer to the Light-house Board.
Having, in the course of the two last seasons, landed
Practical conclusions
and built upwards of 1400 tons of stone upon the Bell
about the period of
completing the Rock, while the work was low in the water, and before
Works, and mode ofthe Beacon was habitable, and finding that it did not
distinguishing the
Light.
now require more than about 700 tons to complete the
masonry, the writer concluded, that, barring accidents
of a very untoward nature, there was every prospect of the Light-house

Page 353

being finished in the course of the ensuing season. A question, of much
importance, however, still remained in some measure undetermined,
regarding the characteristic description of the light most suitable for the
Bell Rock, so as to render it easily distinguishable from all others upon the
coast. There being Stationary-lights already in the Firth of Forth; this mode
could not be adopted for the Bell Rock. Revolving-lights had also lately
been erected upon the Fearn Islands, the most contiguous Light-house-
station to the southward, as will be seen from the General Chart of the coast
in Plate III. Considering, therefore, the liability of the mariner to mistake
the appearance of lights in stormy weather, or from an error in his course in
returning from a distant voyage, it was of the last importance that the Bell
Rock Light-house should be easily distinguishable. The most suitable
means for accomplishing this seemed to be by the exhibition of different
colours from the same Light-room. The only colour which had yet been
found to answer, was produced by interposing shades of red glass before the
reflectors. But this was the colour used for distinguishing the Light of
Flamborough-head, on the Yorkshire coast, and, though about 169 miles to
the southward, it would still have been desirable to have avoided the same
colour. A train of experiments was therefore made from Inchkeith Light-
house, with plates of glass, coloured red, green, orange, yellow, blue, and
purple, procured from Birmingham and London. These were fitted to the
reflectors at Inchkeith, within view of the writer’s windows in Edinburgh.
The Tender was likewise appointed to cruise, that more distant observations
might be made, for ascertaining the effect of these coloured shades. But
after the most full and satisfactory trials, the red colour was found to be the
only one applicable to this purpose. In tolerably clear weather, the light of
one reflector tinged red, alternating with a light of the natural appearance,
with intervals of darkness, was easily distinguishable at the distance of
eight or nine miles; while the other colours rendered the light opaque, being
hardly distinguishable to the naked eye at more than two or three miles.
After various trials and observations made in this manner, both on land and
at sea, the writer at length resolved on recommending the use of red, as the
only colour suitable for this purpose; and, in order to vary the light as much
as possible from that of Flamborough-head, a square Reflector-frame was
adopted at the Bell Rock, with two of its faces or sides having red coloured
shades, and the other two exhibiting lights of the natural appearance. At
Flamborough-head, the Reflector-frame is triangular, and on one side it is

Page 354

furnished with red coloured shades, while the other two sides exhibit lights
of the natural appearance. The design at the Bell Rock, on the contrary, was
to exhibit a light tinged red, alternating with one of the natural appearance;
and, upon this principle, the apparatus was put in a state of preparation.
In the work-yard at Arbroath things were going forward
1810, March.
very prosperously, at the sight of Mr David Logan,
clerk of works. The hewing or preparation of the stones
State of the Works at for the Light-house was now advanced to within about
Arbroath.
eight courses of the cornice, which, with the parapet, as
already observed, was all set up at Edinburgh, and ready for being shipped
when wanted at the Rock. A kiln of the Aberthaw limestone having already
been calcined, was partly reduced to the state of powder, and put up into
casks, as formerly. The operation of pounding the lime was very tedious and
unpleasant, being performed by labourers upon a stone-bench in the lime-
house, where it was reduced chiefly by means of friction, between the
bench and stones, managed by hand. Due proportions of pozzolano-earth
and clean sharp sand were made up in casks, and the oaken trenails and
wedges in bundles; but the supply wanted of these materials was, in future,
to be comparatively trifling. The building being now considerably above the
rise of the tide, the use of mortar was less, while the system of trenailing
and wedging was to be discontinued, after the building had reached the top
of the stone staircase, or to the height of 13 feet above the solid. The several
implements connected with the building operations being also laid to hand,
nothing was now required but good weather and favourable tides, to
proceed with the works at the Rock.
Among the preparations at Arbroath for the furtherance
Gangway or Bridge
for the Rock.
of the work at the Bell Rock, was the construction of a
gangway or bridge of timber between the Beacon and
the Building, instead of the Rope-ladder employed with
1810, April.
so much effect last season, as will be understood by
examining the second and third years’ work, represented in Plate IX. This
more stable and commodious way of communicating with the works, was
also to be useful as a stage for raising the building materials, instead of the
lower crane, the stool or prop of which had become too low, and, as before
noticed, had been washed away by the sea in the course of last month. This
bridge consisted of two principal beams of Memel timber, measuring 44

Page 355

feet in length, 6 inches in thickness, and 13 inches in depth. At one end
these beams were to abut against the principal beams of the Beacon, and to
be strongly bolted to them; at the opposite end, one was to be rested on the
sole or instep of the door, while the other was to be let 6 inches into a hole
cut into the upper granite course of the Light-house. They were placed 7
feet apart, and formed a roadway of 6 feet in breadth between the rails,
which was strongly bound in a lateral direction with cross framing mortised
into the principal beams, and otherwise fixed with screw-bolts. The bridge
was further to be supported by four diagonal spur-beams, which met in
pairs on each side, at the middle of the roadway, and there formed king-
posts, to steady and support it. A crab or winch-machine was to be placed
upon it, for raising the stones at once from the rock to the level of the top of
the solid part of the building.
After making the experiments relative to the
Wednesday, 18th.
distinguishing of the light, the Tender sailed from Leith
Roads on the morning of Tuesday, the 3d of April, and
Operations commence got into Arbroath on the 6th, where she lay. Being fitted
for the season.
Wooden Bridge is out for the Rock, with a sufficient stock of water and
erected. provisions, and having also on board the beams and
apparatus for the wooden bridge, she sailed at 1 o’clock
this morning, with eleven masons, three joiners, and two blacksmiths,
together with Mr Francis Watt, foreman, in all seventeen artificers, who
were to be employed during the ensuing spring-tides, in erecting the bridge
between the Beacon and Building. At 3 p. m. she was made fast to the new
moorings, which had been laid down for her in lieu of those which had
drifted on the 26th of March; but the weather was then so boisterous, that
no landing could be made on the Rock till the following morning, at 6
o’clock, when they commenced the operations of the season by laying the
deals of the mortar-gallery, or lowest floor of the Beacon. Although the
weather continued to be extremely boisterous till the 23d, the Tender’s
marine barometer oscillating between 29.05 and 29.60, yet the wind being
westerly, the artificers were enabled to pursue their operations by landing
daily; for, upon this occasion, the Beacon was not taken possession of, and
they returned at night to the Tender. On the 24th the weather became very
fine; the barometer remaining for several days at about 30.10. The work
now proceeded with so much alacrity and dispatch, that by the 28th the

Page 356

fixing of the bridge was completed, and the Tender returned with all hands
to Arbroath.
While the Tender waited the operations of the artificers
Monday, 23d.
at the Rock, the Smeaton made two trips to it, and laid
down six sets of moorings with their floating-buoys, so
Charles Gray gets one that every thing was now in a state of readiness for the
of his fingers severely
bruised. commencement of the works. When unloading these
moorings, Charles Gray, a seaman, unfortunately got
one of his fingers so bruised between the hatchway of the ship and a
mushroom-anchor, that it was found necessary to amputate part of it.
The Smeaton having come to Leith for the Balance-
1810, May.
crane, the writer sailed this afternoon with her for the
Bell Rock, to commence the building operations for the
Tuesday, 1st. season. The weather, for the last eight days, had been
extremely stormy, and, though still unfavourable, yet,
The Writer proceeds being moderate, hopes were entertained that she would
for the Rock, to begin
building for the soon make her way down the Firth of Forth. After
season. beating to windward for a day and a night, however, she
was obliged to bear away for Burntisland Roads, where
he left the vessel, to pursue his journey by land to Arbroath, accompanied
by Mr James Dove, foreman-smith, to whom particularly the change in the
mode of travelling was a great relief, as, notwithstanding his having had
considerable practice at sea, he was still a great martyr to sickness, and even
felt a dislike for every thing connected with a ship, which was strongly
marked by the following trifling occurrence. On leaving the Smeaton,
Captain Pool, presenting the bread-basket to Mr Dove, observed, that,
although he could not eat on board, he might perhaps be thankful of a
biscuit when he got on shore; on which Mr Dove gravely replied, that “it
would be long to the day before he would be thankful for a sea-biscuit.”
The object of his journey at this time was to fit up the Balance-crane on the
top of the building, and to superintend its operation for a time on the Rock.
This useful implement had been constructed in the course of last season, but
was not then found to be in a sufficiently serviceable state. It was
accordingly new-modelled, and, though an opportunity had been afforded
of making trial of it at Edinburgh, in raising the weighty stones of the

Page 357

cornice and balcony of the Light-house, yet the writer wished Mr Dove also
to fit it at the Bell Rock. They reached Arbroath on the evening of the 3d.
The Smeaton arrived at Arbroath to-day with the
Saturday, 5th.
Balance-crane, which was immediately put on board of
the Tender, now ready to proceed for the Rock with the
The Tender is ready first good weather. The Smeaton then took on board the
for sea.
stone ballast, and platform, laid in her hold for the
greater conveniency of stowing and discharging the prepared stones of the
building. The wind had now changed to the S.W., and hopes were
entertained of a return of good weather. But this being the period of neap-
tides, and considering that it might be three or four months before some of
the artificers again returned to the shore, as the Beacon was now habitable,
it was intimated to them on Saturday, that the Tender would not sail till
Monday. They accordingly attended church to-day, with their wonted
decency of deportment.
The artificers having been warned to take their quarters
Monday, 7th.
on board of the Tender last night, the writer sailed this
morning from Arbroath at half-past 2, accompanied by
Writer sails with the Mr Peter Logan, foreman builder, Mr Francis Watt,
Artificers for the
Rock. foreman mill-wright, and Mr James Dove, foreman
smith, together with sixteen artificers, and the regular
crew of the vessel, in all counting thirty-two persons; but the Tender having
the Hedderwick praam-boat in tow, went slowly off. At 12 noon the
Floating-light was hailed, when Captain Wilson, the landing-master, came
on board, to take his station for the season, and at 1 p. m. the Tender was
made fast to her moorings at the Bell Rock. The praam-boat was
immediately hauled alongside, and the apparatus of the Balance-crane laid
upon her deck, when she was towed to her moorings, there being too much
sea at this time, for attempting to land upon the Rock. As the barometer
stood at 30.04, hopes were entertained that the weather would soon
improve.
The wind was at east to-day, and the sea still broke so
Tuesday, 8th.
heavily upon the Rock, that no landing could be made.
At high-water, the spray was observed to fly
Landing considerably above the building, perhaps not less than
impracticable.
20 feet, in all about 50 feet above the Rock, while the

Page 358

seas were raging and breaking among the beams of the Beacon with much
violence.
The same boisterous state of the weather still continued,
Wednesday, 9th.
and the sea-swell was nothing abated to-day, so that no
landing could yet be made upon the Rock. The landing-
The Praam-boats ride master, however, went in a boat, and examined the
easily.
Praam-boat at her moorings, where every thing was
found in good order. It is here worthy of remark, that while the Tender and
Floating-light rolled much, and occasionally shipped pretty heavy seas, the
praam, with a cargo of about three tons on board, was perfectly dry upon
deck, and to use the seamen’s expression, “rode as easily as an old shoe.”
The wind had shifted to-day to W.NW., when the writer,
Thursday, 10th.
with considerable difficulty, was enabled to land upon
the Rock, for the first time this season, at 10 a. m. Upon
State of the Building. examining the state of the Building, and Apparatus in
general, he had the satisfaction to find every thing in
good order. The mortar in all the joints was perfectly entire. The building,
now 30 feet in height, was thickly coated with fuci to the height of about 15
feet, calculating from the Rock: on the eastern side, indeed, the growth of
sea-weed was observable to the full height of 30 feet, and even on the top or
upper bed of the last laid course, especially towards the eastern side, it had
germinated, so as to render walking upon it somewhat difficult. The smith’s
forge, which had been removed from the mortar-gallery to the top of the
Building, in the month of September last, to give more accommodation to
the works of the joiners, was left there for the season,—the bellows
excepted, which were kept under cover in the Beacon throughout the
winter; and, it is not a little remarkable, that, although the sea had risen to a
considerable height, and fallen in great quantities upon the top of the
building; yet such was the centrical position of the forge, that it remained
quite entire: even the spar of timber, and the small cords which had been
stretched for steadying it, and forming an awning of about 8 feet in
diameter, for sheltering the smith, were also still in their places. This was a
proof that no very heavy seas had broken so high as the top of the solid,
otherwise the forge and the apparatus for supporting the awning, must have
long since been swept away by the breach of the sea.

Page 359

The Beacon-house was in a perfectly sound state, and
State of the Beacon. apparently just as it had been left in the month of
November. But the tides being neap, the lower parts,
particularly where the beams rested on the Rock, could not now be seen.
The great iron-bars, however, which measure 3 inches square, and from 7 to
9 feet in length, stretching between the principal beams, in place of the
bracing chains, which were found constantly liable to break and unscrew,
were in view, and in good order. The whole frame of this fabric was now in
a firm and secure state. The floor of the mortar-gallery having been already
laid down by Mr Watt and his men on a former visit, was merely soaked
with the sprays; but the joisting-beams which supported it had, in the course
of the winter, been covered with a fine downy conferva, produced by the
range of the sea. They were also a good deal whitened with the mute of the
cormorant and other sea-fowls, which had roosted upon the Beacon in
winter. Upon ascending to the apartments, it was found that the motion of
the sea had thrown open the door of the cook-house: this was only shut with
a simple latch, that, in case of shipwreck at the Bell Rock, the mariner
might find ready access to the shelter of this forlorn habitation, where a
supply of provisions was kept; and being within two miles and a half of the
Floating-light, a signal could readily be observed, when a boat might be
sent to his relief as soon as the weather permitted. An arrangement for this
purpose formed one of the Instructions on board of the Floating-light, but
happily no instance occurred for putting it in practice. The hearth or fire-
place of the cook-house was built of brick, in as secure a manner as
possible, to prevent accident from fire; but some of the plaster work had
shaken loose, from its damp state, and the tremulous motion of the Beacon
in stormy weather. The writer next ascended to the floor which was
occupied by the cabins of himself, and his assistants, which were in
tolerably good order, having only a damp and musty smell. The barrack for
the artificers over all, was next visited: it had now a very dreary and
deserted appearance, when its former thronged state was recollected. In
some parts, the water had come through the boarding, and had discoloured
the lining of green cloth, but it was, nevertheless, in a good habitable
condition. While the seamen were employed in landing a stock of
provisions, a few of the artificers set to work, with great eagerness, to
sweep and clean the several apartments. The exterior of the Beacon was, in
the mean time, examined, and found in perfect order. The painting, though

Page 360

it had a somewhat blanched appearance, adhered firmly both on the sides
and roof, and only two or three panes of glass were broken in the cupola,
which had either been blown out by the force of the wind, or perhaps
broken by sea-fowl.
Having, on this occasion, continued upon the building
Thursday, 10th.
and beacon a considerable time, after the tide had
begun to flow, the artificers were occupied in removing
State of the Timber the forge from the top of the building, to which the
Bridge.
gangway or wooden bridge gave great facility; and,
although it stretched or had a span of 42 feet, its construction was extremely
simple, while the roadway was perfectly firm and steady. In returning from
this visit to the Rock, every one was pretty well soused in spray, before
reaching the Tender at 2 o’clock p. m., where things awaited the landing
party in as comfortable a way as such a situation would admit.
The wind was still easterly, accompanied with rather a
Friday, 11th.
heavy swell of sea, for the operations in hand. A
landing was, however, made this morning, when the
Balance-crane landed. artificers were immediately employed in scraping the
Position of the
Entrance-door. sea-weed off the upper course of the building, in order
to apply the moulds of the first course of the staircase,
that the joggle-holes might be marked off in the upper course of the solid,
which, as formerly, had not been done to the finishing course of the season.
This was also necessary previously to the writer’s fixing the position of the
entrance-door, which was regulated chiefly by the appearance of the growth
of the sea-weed on the building, indicating the direction of the heaviest
seas, on the opposite side of which the door was placed. The landing-
master’s crew succeeded in towing into the creek on the western side of the
Rock, the praam-boat, with the balance-crane, which had now been on
board of the praam for five days. The several pieces of this machine having
been conveyed along the Railways upon the waggons, to a position
immediately under the bridge, were elevated to its level, or thirty feet above
the Rock, in the following manner. A chain-tackle was suspended over a
pulley from the cross-beam, connecting the tops of the king-posts of the
bridge, which was worked by a winch-machine, with wheel, pinion and
barrel, round which last the chain was wound. This apparatus was placed on
the Beacon-side of the bridge, at the distance of about twelve feet from the

Page 361

cross beam and pulley in the middle of the bridge. Immediately under the
cross-beam a hatch was formed in the roadway of the bridge, measuring 7
feet in length and 5 feet in breadth, made to shut with folding boards like a
double-door, through which stones and other articles were raised; the
folding-doors were then let down, and the stone or load was gently lowered
upon a waggon which was wheeled on railway tracks towards the Light-
house. In this manner, the several castings of the balance-crane were got up
to the top of the solid of the building.
The several apartments of the Beacon-house having
Artificers take
possession of the
been cleaned out and supplied with bedding, a
Beacon. sufficient stock of provisions was put into the store,
when Peter Fortune, formerly noticed, lighted his fire in
the Beacon, for the first time this season. Sixteen artificers, at the same
time, mounted to their barrack-room, and the foremen of the works also
took possession of their cabin, all heartily rejoiced at getting rid of the
trouble of boating, and the sickly motion of the Tender. The boats had
landed on the Rock this morning at 9, and the writer left it again with the
landing-master and his crew at 3 p. m., and went on board of the Tender for
the night, after having seen some progress made in setting up the balance-
crane.
The Smeaton having been loaded at Arbroath with the
Smeaton arrives with
the first cargo.
first cargo of stones, consisting of thirty-eight blocks of
the Twenty-seventh course, got to her moorings at the
Bell Rock this morning, and was made fast, though not without
considerable difficulty. But, nothing could be done towards delivering her
until the balance-crane was got into a working state.
The wind was at E.NE., blowing so fresh, and
Saturday, 12th.
accompanied with so much sea, that no stones could be
landed to-day. The people on the Rock, however, were
No communication busily employed in screwing together the balance-
with the Rock.
crane, cutting out the joggle-holes in the upper course,
and preparing all things for commencing the building operations.
The weather still continues boisterous, although the
Sunday, 13th.
barometer has all the while stood at about 30 inches.
Towards evening, the wind blew so fresh at E. by S.,

Page 362

that the boats both of the Smeaton and Tender were
Balance-crane ready obliged to be hoisted in, and it was feared that the
for use.
Smeaton would have to slip her moorings. The people
on the Rock were seen busily employed, and had the balance-crane
apparently ready for use, but no communication could be had with them to-
day.
The wind had now prevailed long from the eastward,
Theory of the land
and sea breeze
and it was remarked on board of the Tender, that, in
exemplified. moderate weather, it generally inclined from the
northward in the mornings, and from the eastward and
southward, as the sun advanced to the meridian; in this respect, resembling
the land and sea breezes, familiar to those acquainted with tropical climates.
This phenomenon is accounted for, by considering the state of the inland
country, where the Grampian-hills lie about 20 miles northward from the
coast, thickly covered with snow. The winds, therefore, in the early part of
the day, generally came from these colder regions, towards the milder and
somewhat more rare atmosphere of the sea. But in the after part of the day,
the heat of the sun, acting more powerfully upon the arable lands and
objects in the fore-ground of this mountainous range, rarified the air more
highly upon the shores than on the sea, which produced a tendency in the
winds to blow towards the land. Extending this view of the subject to the
great tracts of snow-covered mountains, in the north-eastern districts of
Europe, it is natural to suppose that the current of the winds will be from
these colder regions towards the expanse of the Atlantic Ocean. Hence the
prevailing winds in the spring of the year are from the eastward, in their
passage across Great Britain to the Atlantic.
The wind continued to blow so fresh, and the Smeaton
Monday, 14th.
rode so heavily with her cargo, that at noon a signal was
made for her getting under way, when she stood
Smeaton slips her towards Arbroath; and, on board of the Tender, we are
moorings.
still without any communication with the people on the
Rock; where the sea was seen breaking over the top of the building in great
sprays, and ranging with much agitation among the beams of the Beacon.
The Smeaton did not go into Arbroath last night, as the
Tuesday 15th.
appearance of a northerly or land breeze induced the
active spirit of Captain Pool to stand off again for the

Page 363

Bell Rock; but he had no sooner reached his moorings
Returns to the Rock.at 5 o’clock this morning, than the wind again shifted to
the S.E., and he could not get hold of the ring of the
Floating-buoy of his moorings, and was, therefore, obliged to return again
towards Arbroath. There was still no communication between the Tender
and the Rock, as the sea continued to run very heavily upon it.
The wind had shifted to the N.E. this morning, and
Wednesday, 16th.
hopes were entertained that it might take a more
northerly direction, but it continued without change,
Is driven to Leith and for two or three days past the Barometer had been
Roads.
falling, and was now at 29.50. It was, therefore, still
impossible to land upon the Rock. The appearance of the weather brought
the Smeaton out of the harbour, Captain Pool having become very impatient
to get his first cargo landed; but, on his arrival, instead of being able to
make fast to his moorings, the writer found it necessary to direct him to
proceed for Leith Roads, as the proper place for the vessel in the present
state of the weather.
The Smeaton had no sooner reached the Firth last night,
Thursday 17th.
and anchored in Leith Roads, than the wind came round
to the north, and Pool, without delay, once more
Patriot sent to the weighed anchor and sailed for the Bell Rock, which he
quarry for the last
cargo of stones. reached this morning. The Patriot, at the same time,
came off from Arbroath with water, fuel, and provisions
People at the Rock for the supply of the Floating-light, the Tender, and
experience boisterous Beacon-house, and after discharging these, she
weather. proceeded for Mylnefield Quarry, for the last cargo of
stones wanted for the Bell Rock Light-house. On this
trip the writer had great pleasure in dispatching her, as this state of things
greatly narrowed the operations. The wind, in the course of the day, had
shifted from north to west; the sea being also considerably less, a boat
landed on the Rock at 6 p. m., for the first time since the 11th, with the
provisions and water brought off by the Patriot. The inhabitants of the
Beacon were all well, but tired above measure for want of employment, as
the balance-crane and apparatus was all in readiness. Under these
circumstances, they felt no less desirous of the return of good weather than
those afloat, who were continually tossed with the agitation of the sea. The

Page 364

writer, in particular, felt himself almost as much fatigued and worn out as
he had been at any period since the commencement of the work. The very
backward state of the weather at so advanced a period of the season,
unavoidably created some alarm, lest he should be overtaken with bad
weather, at a late period of the season, with the building operations in an
unfinished state. These apprehensions were, no doubt, rather increased by
the inconveniences of his situation afloat, as the Tender rolled and pitched
excessively at times. This being also his first off-set for the season, every
bone of his body felt sore, with preserving a sitting posture, while he
endeavoured to pass away the time in reading; as for writing it was wholly
impracticable. He had several times entertained thoughts of leaving the
station for a few days, and going into Arbroath with the Tender till the
weather should improve; but, as the artificers had been landed on the Rock,
he was averse to this at the commencement of the season, knowing also that
he would be equally uneasy in every situation, till the first cargo was
landed; and he, therefore, resolved to continue at his post until this should
be effected.
At low-water to-day, an opportunity was afforded of
State of lower parts of
examining the lower parts of the Beacon-house. The
the Beacon. Effects of
marine vermes. kneed Bats, or great iron stanchions, employed for
fixing the principal beams to the Rock, which will be
seen by examining Plate VIII., were found in good order, without the least
appearance of movement or decay. The same observation is also applicable
to the exterior of the principal beams of the Beacon, wherever the charring
of the timber and successive coats of boiling pitch had been applied; but at
the foot or sole of the respective beams, where they rested upon a site cut
for them upon the rock, where the pitch could not be applied, the òniscus or
vermis so destructive to timber exposed to the wash of the sea, had made a
considerable impression, and the beams were found to be hollowed out. In
several instances, they even stood clear of the Rock, depending only upon
the stanchions and bolts for their support. The circumstance of these vermes
attacking the sole of the beams, had not been anticipated, otherwise
preventive means might have been adopted, by sheathing them with copper,
especially where they rested on the Rock.
The company of artificers, lodged on the Beacon,
Friday, 18th.
having been increased from sixteen to twenty-two, their

Page 365

time hang very heavily on their hands, till the stones
23 blocks of stone were landed on the Rock. The wind being now N.W.,
landed and raised
with the new tackle. the sea was considerably run down, and this morning at
5 o’clock, the landing-master’s crew, thirteen in
number, left the Tender; and having now no detention with the landing of
artificers, they proceeded to unmoor the Hedderwick Praam-boat, and
towed her alongside of the Smeaton; and in the course of the day, twenty-
three blocks of stone, three casks of pozzolano, three of sand, three of lime,
and one of Roman cement, together with three bundles of trenails, and three
of wedges, were all landed on the Rock and raised to the top of the building,
by means of the tackle suspended from the cross-beam on the middle of the
bridge. The stones were then moved along the bridge on the waggon to the
building, within reach of the balance-crane, with which they were laid in
their respective places on the building. The masons immediately thereafter
proceeded to bore the trenail holes into the course below, and otherwise to
complete the one in hand. When the first stone was to be suspended by the
balance-crane, the bell on the Beacon was rung, and all the artificers and
seamen were collected on the building. Three hearty cheers were given
while it was lowered into its place, and the steward served round a glass of
rum, when success was drank to the further progress of the building.
Having thus had the satisfaction of finding that the
One of the stones in
danger from the
bridge and its apparatus answered every purpose for
breaking of a bolt. raising the materials; that the balance-crane was no less
suitable for building the stones, which, from their dove-
tailed form, as before noticed, required that they should be slipped or laid
perpendicularly into their sites; and the artificers being now comfortably
lodged in the Beacon-house, there hardly remained a doubt that the Bell
Rock Light-house would be completed in the course of the current year. It
often happens, however, that accidents occur on the first trial of machinery;
and, accordingly, in shifting the wheel and pinion work of the winch-
machine upon the bridge, from the single to the double-purchase, in order to
raise a pretty heavy stone, the bolt of the bush gave way, just as the stone
had attained its full height, and was about to be lowered on the bridge-
waggon, to be moved within the sphere of the balance-crane. The fall of the
stone, though only from a height of 8 or 9 inches, communicated a sudden
shock throughout the Beacon-house, and produced an alarm among the
workmen for the moment. Had this accident occurred before the waggon

Page 366

was wheeled under the stone, in all probability it would have killed some of
those who were at work below upon the Rock; besides breaking the stone
and the railway, which must have stopped the work for a considerable time,
until another stone could have been prepared and sent from the work-yard
at Arbroath.
The Smeaton having been completely discharged last
Saturday, 19th. night, sailed at 10 p. m. for Arbroath, to load a second
cargo for the Bell Rock. The Patriot had towed off the
15 stones landed. Dickie Praam-boat to-day, being of a somewhat smaller
size, and more handy than the Fernie, which now lay in
ordinary, at Arbroath, in case of accident to the Hedderwick or Dickie. The
wind, however, being rather unsteady, it was feared that no materials would
have been landed; but Captain Wilson, with his usual dexterity and skill,
succeeded in transporting fifteen stones, which were raised to the top of the
building, by means of the tackle on the bridge, and built by the balance-
crane with wonderful facility.
This morning at 1 o’clock, the Smeaton got into
Smeaton makes rapid
trips.
Arbroath, when Mr Kennedy, engineer’s clerk, had the
artificers immediately called, who loaded her with the
Twenty-eighth course of the building, consisting of thirty-three pieces of
stone, besides six casks of pozzolano, six casks of lime, six casks of sand,
four bundles of trenails, four bundles of wedges, and eight stone joggles,
together with four logs of timber, one Railway-waggon, and a supply of
water, beer, fuel and provisions for the Beacon-house. At 2 p. m. she sailed
again for the Bell Rock, and reached it at 5, to the surprise of every one,
Captain Pool being no less active in his trips than Mr Kennedy was zealous
in the dispatch given at the work-yard.
The wind was southerly to-day, but there was much less
Sunday, 20th.
sea than yesterday, and the landing-master’s crew were
enabled to discharge and land twenty-three pieces of
Prayers first read on stone, and other articles for the work. The artificers had
the Light-house.
completed the laying of the Twenty-seventh or First
course of the staircase this morning, and in the evening, they finished the
boring, trenailing, wedging, and grouting with it mortar. At 12 o’clock
noon, the Beacon-house bell was rung, and all hands were collected on the
top of the building, where prayers were read, for the first time, on the Light-

Page 367

house, which forcibly struck every one, and had, upon the whole, a very
impressive effect. The artificers then went to their barrack to dinner, and the
landing-master’s crew went off to the Tender. In the afternoon, the
remainder of the Smeaton’s cargo was discharged, and she sailed for
Arbroath at 11 p. m.
The Patriot had arrived at Arbroath with the last cargo
Monday, 21st.
of stones from Mylnefield Quarry for the Light-house,
on the 19th, and was fully discharged to-day, and was
Active exertions of now fitting with her ballast and platform for carrying
the landing-master’s
crew. off the worked materials to the Rock. The wind being at
south, caused a considerable swell on the Rock, and it
was with great difficulty that the landing-master got the remaining ten
stones of the Smeaton’s last cargo landed from the Hedderwick. His crew
were not only completely drenched, but were much exhausted with the
fatigue of pulling the loaded praam-boat against the swell of the sea; and on
reaching the Rock, it required their utmost exertions to prevent her from
driving to leeward upon the rugged ledges which encumbered the eastern
creek.
The dispatch made by the Smeaton in performing her
Tuesday, 22d.
trips between Arbroath and the Bell Rock, was quite
surprising, being seldom more than one day absent. On
Thirty-first course the last trip, for example, she had only left the Rock on
completed.
Sunday night at 11, and this morning at 8 o’clock, she
returned to her moorings with thirty-five pieces of stone. Of these,
seventeen were landed to-day, with which the Thirty-first course of the
building was completed, and the remainder of the day was occupied in
boring the trenail holes in the lower course, fixing the trenails and wedges,
and grouting the whole carefully with mortar.
The Patriot arrived at the Rock this morning, with her
Wednesday, 23d.
first cargo of building materials for the season,
consisting of 42 stones, together with a supply of
pozzolano, lime, sand, wedges, trenails, and 8 stone joggles. The Smeaton
was completely discharged of her cargo, and sailed again at 2 p. m., when
the writer took his passage with her to Arbroath.

Page 368

The weather continued moderate at the Rock, with the
Thursday, 24th. wind at west, and 18 stones of the Patriot’s cargo were
landed and built to-day. The Accounts connected with
Arrangements for the Light-house service were collected at this period,
conduct of the work,
and safety of the being paid at the terms of Whitsunday and Martinmas.
Beacon. The writer at the same time arranged some matters
more fully in the work-yard, connected with the loading
of the materials at Arbroath. In particular, Mr David Logan, clerk of works,
was held responsible for providing every thing contained in the Requisition
of the foreman-builder; while Mr Kennedy, engineer’s clerk, was
answerable for the other parts of the respective Requisitions from the
Tender and Beacon, and for the dispatch given in the loading and sailing of
the vessels. The masters of the stone-vessels were accordingly directed, on
their arrival by night or day, to deliver all letters at the office. In the same
manner, before leaving the Rock, Regulations for the proper conduct of the
works there, were also instituted; where his assistants were also held
responsible for the duties of their several departments; Mr Peter Logan, for
the execution of the masonry; Mr Francis Watt, for the good condition of
the Beacon-house, Railways, and Machinery; Captain Wilson, for the state
of the Praams and other boats employed in the landing of materials, and for
the safety of the stones and building-materials in transporting them from the
ship’s hold till they were placed upon the waggons on the Rock. The
steward, Mr John Peters, was answerable for making the necessary
Requisitions for a sufficient stock of provisions, water and fuel; while
Captain Taylor, master of the Tender, was to see a proper stock of these
articles landed and kept in store upon the Rock. From the hazardous
situation of the Beacon-house with regard to fire, being composed wholly
of timber, there was no small risk from accident; and on this account, one of
the most steady of the artificers was appointed to see that the fire of the
cooking-house, and the lights in general, were carefully extinguished at
stated hours.
The weather continued to be extremely fine, with the
Friday, 25th.
wind at west, and the barometer standing about 30
inches. The landing operations proceeded briskly, so
that the building was to-day ready for the Door-lintel.

Page 369

The door-lintel being of large dimensions, equal to
Saturday, 26th. about a ton and a half in weight, and considerably
heavier than any of the other stones of this course, in
Balance-crane shaft is raising it with the balance-crane, sufficient attention
broken.
had not been paid to increase the balance-weight
proportionally, and an unequal strain being then brought upon the opposite
arms of the crane, the upright shaft yielded, and broke at one of the joints;
fortunately no person was hurt, though a stop was put to the work for the
present. This unlucky accident happened about 4 in the afternoon, when the
Patriot, then at her moorings, discharging a cargo of stones, was
immediately dispatched to Arbroath with the broken shaft, where she
arrived about 2 o’clock on Sunday morning. The writer was at this early
hour rather alarmed, by Captain Macdonald knocking at his bed-room door,
and calling out in a hollow tone, “that the Balance-crane had given way.”
An express was immediately sent for Mr James Dove, who, only two days
prior to the accident, had left the Bell Rock, and was in the neighbourhood
of Arbroath, and when the messenger reached him, he was preparing to go
with his friends to the church of his native parish.
The shaft of this crane consisted of four hollow pipes of
The Writer is cast iron, in lengths, the lower one of 8 feet, and the
welcomed in at the
door of the Light- three upper ones of 6 feet, fitted to each other with a
house. flush or square joint, so that the body of the crane might
traverse upon them without interruption, as will be
understood by examining Plate XVII. There was, unavoidably, a degree of
weakness at these joints, which required considerable precaution in shifting
or adjusting the balance-weight, according to the strain occasioned by a
heavy stone. This accident, though speedily repaired, produced a delay of
no less than three days to the building operations, which, together with the
time occupied in making provision for a new method of inserting the door-
hinges into the building, made this part of the masonry, upon the whole,
appear extremely tedious. Having got the door-lintel laid, the writer was not
a little gratified on being welcomed, with acclamation, in at the Door of the
Bell Rock Light-house. Limited as the height of the building still was, the
formation of the door stamped a new character upon it, and the lintel gave it
an additional appearance of strength.

Page 370

The fixtures of the hinges of the door and shutters of
Fixtures of the hinges
the windows are of a peculiar construction, as will be
of the door and
window-shutters. seen in the different diagrams of Plate XIX. They
consisted of boxes or cases made of brass, of a
dovetailed form, measuring 16 inches in length, and 1 inch in depth in the
void; one of these cases was inserted into a cavity cut in the upper bed of
one of the rybat-stones on each side of the door or window, and run up with
melted lead. Into this case the dovetail-end of the hinge was afterwards
introduced, and fixed in its place by driving a middle-piece, after the
manner of a Lewis-bat. The advantage of this method is, that, in the event
of its being found necessary, at any future period, to renew or repair a
hinge, all that becomes necessary is to draw the middle-piece and extract
the Lewis from the box, without requiring to cut or mangle the building, as
would be found necessary by the usual method of inserting hinges into
walls. The hinges and cases were made of fine brass; those for the door
weighing 50 lb., and those for the window-shutters being smaller, weighed
about half as much.
The weather, during the last week of the month of May,
1810, June.
was very favourable for the operations; and the
barometer stood to-day at no less than 30 inches and 42
Friday, 1st. hundred parts. The wind was S.E., and the atmosphere
somewhat foggy, but not such as to prevent the landing
operations from going forward. The Patriot was now at her moorings
discharging; and the landing-master’s crew transported one of the praam-
boats to the Rock with 14 stones, which enabled the builders to complete
the Thirty-third course, being the one immediately above the door-lintel,
consisting of 32 stones.
The weather still continuing to be extremely fine, the
Saturday, 2d.
landing-master and his crew left the Tender at 4 a. m.,
and proceeded to deliver the remainder of the Patriot’s
Shipping makes great cargo, consisting of 14 stones, with a proportion of
dispatch.
pozzolano, lime, sand, and Roman cement, together
with six bundles of trenails and wedges. She then made sail for Arbroath,
and the Smeaton at the same time arrived with the Thirty-fourth course,
consisting also of 32 stones. She had previously put a new cable on board of
the Floating-light, this being the period at which her winter-tackle was

Page 371

annually shifted. The Smeaton got to her moorings at 11 a. m., when
Captain Wilson and his crew immediately proceeded to deliver her, and by
4 in the afternoon she was cleared, and had sailed again for Arbroath to
load, having thus been discharged in five hours, being the shortest period in
which any cargo had hitherto been delivered at the Bell Rock. This formed
a striking contrast with the delivery of the first cargo of the season, which
had been on board from the 18th till the 29th of May, or eleven days, in the
course of which the Smeaton was put thrice into Arbroath, and once up to
Leith Roads, shewing how very dependent these works are upon the state of
the weather. To-day there were no fewer than 56 pieces of stones
transported to the Rock, being the greatest number hitherto landed in one
day.
The dispatch given in the loading department at
Sunday, 3d.
Arbroath was nothing short of that of the landing at the
Rock. The Patriot only got to the Light-house loading-
Patriot makes a trip in birth last night at 11 p. m., when Mr Kennedy
33 hours.
commenced loading her at midnight, with 34 pieces of
stone, 9 stone joggles, two casks of pozzolano, two casks of lime, two casks
of sand, and three bundles of trenails and wedges: she sailed again at 4
a. m., and got fast to her moorings at 5 in the afternoon, having been absent
from the Rock only 33 hours. The landing-master’s crew towed the
Hedderwick praam-boat alongside, and loaded her with 18 pieces of stone,
which were safely landed on the Rock. At 11 p. m. the boats returned to the
Tender, having been at work since 4 o’clock this morning. The weather was
so inviting at this time, that, contrary to usual practice, a quantity of the
stones was laid upon the Rock round the western side of the building, which
were afterwards raised by the purchase-tackle on the bridge: the building
was thus continued for a longer period than the tide permitted the landing-
master’s crew to proceed with their operations. Some risk, however,
attended this arrangement, as part of the stones were necessarily left on the
Rock, exposed to the wash of the sea, from one tide to another. But the
workmen being now permanently on the Rock, this could scarcely happen
to a great extent, as the sea generally takes a tide or two to get into so rough
a state as to be dangerous in cases of this kind. The Thirty-fifth course was
laid to-day, consisting of 32 pieces of stone; but it required the work to be
continued from 5 in the morning till 8 in the evening, before the trenailing,

Page 372

wedging, and grouting with mortar, were completed; the artificers having of
course pay for their extra hours.
To-day there was a strong breeze of wind from the east,
Monday, 4th.
with hazy weather, but, as the mercury still maintained
the high state of 30.32, every confidence was felt in the
Thirty-sixth course landing operations. The Patriot was accordingly
laid.
discharged of the remainder of her cargo, and 16 stones,
with other building materials, were landed on the Rock, though not without
considerable difficulty, from the heavy swell of sea which was running
upon it. The artificers also succeeded in building all the stones which were
on the Rock, and finished the Thirty-sixth course, consisting of 24 blocks.
This being the Birth-day of our much revered
The King’s birth-day
observed.
Sovereign King George III., now in the Fiftieth year of
his reign, the shipping of the Light-house service were
this morning decorated with colours according to the taste of their
respective captains. Flags were also hoisted upon the Beacon-house and
Balance-crane on the top of the Building. At 12 noon, a salute was fired
from the Tender, when the King’s health was drunk, with all the honours,
both on the Rock, and on board of the shipping.
The weather still continuing very favourable for the
Tuesday, 5th.
operations, the work proceeded with much regularity
and dispatch. Twenty stones were landed to-day from
Stair-case completed. the Smeaton, and the artificers completed the Thirty-
eighth or finishing course of the staircase, which
Rate of Wages. brought the building to the height of 45 feet. As the
walls were here reduced from 5 feet 9 inches to 3 feet 2
inches in thickness, the scarsement at the level of this course formed a kind
of floor or bench 2 feet 7 inches in breadth, at the top of the staircase,
intended for keeping the water-cisterns, fuel, and provisions. The laying of
this course being attended with a good deal of additional trouble, the
artificers were occupied with it from 5 o’clock in the morning till 8 in the
evening, when all hands being collected on the building, three hearty cheers
were given, and a dram served out, at the completion of the first floor.
During this season, nine hours were counted a day’s work at the Bell Rock,
instead of three hours of tide-work, as in the early stages of the business.
The artificers having, therefore, had six extra hours to-day, at the rate of 6d.

Page 373

per hour, each had 3s. per day to receive, in addition to his stated wages of
3s. 4d.; and, as the work was continued on Sundays, they were now making
upwards of two guineas per week, free of incumbrance, while the foremen
were in the receipt of about double that sum. The inhabitants of the Beacon
were consequently in great spirits, both at the satisfactory progress of the
work, and at the amount of their extra wages.
While the work thus proceeded at the Bell Rock, it was
Progress of the Works
at Edinburgh.
making also good progress at Arbroath, as the whole of
the courses, excepting three, were now ready for
shipping to the Rock. Advice was also received from Edinburgh, that the
Light-room Reflecting-apparatus and Revolving-machinery were getting
regularly forward, so that every prospect was afforded of the work being
brought to a conclusion in the course of the season.
As the Light-house advanced in height, the cubical
Artificers liable to
accident. Small Boat
contents of the stones were less, but they had to be
and Life-buoy raised to a greater height; and the walls being thinner
provided. were less commodious for the necessary machinery, and
the artificers employed, which considerably retarded
the work. Inconvenience was also occasionally experienced from the men
dropping their coats, hats, mallets, and other tools, at high-water, which
were carried away by the tide; and the danger to the people themselves was
now greatly increased. Had any of them fallen from the Beacon or Building
at high-water, while the landing-master’s crew were generally engaged with
the craft at a distance, it must have rendered the accident doubly painful to
those on the Rock, who at this time had no boat, and consequently no
means of rendering immediate and prompt assistance. In such cases, it
would have been too late to have got a boat by signal from the Tender. A
small boat, which could be lowered at pleasure, was therefore suspended by
a pair of davits projected from the cook-house, the keel being about 30 feet
from the Rock, as will be seen from Plate VIII. This boat, with its tackle,
was put under the charge of James Glen, of whose exertions on the Beacon
mention has already been made, and who having in early life been a
seaman, was also very expert in the management of a boat. A life-buoy was
likewise suspended from the bridge, to which a coil of line 200 fathoms in
length was attached, which could be let out to a person falling into the

Page 374

water, or to the people in the boat, should they not be able to work her with
the oars.
The landing-master succeeded to-day in transporting 44
Wednesday, 6th.
stones to the Rock, and the artificers laid the Thirty-
eighth course, which consisted of 16 blocks. The
Trenailing the Stones trenailing and wedging of the stones being now
discontinued.
discontinued, as the building was above the ordinary
range of the sea, a great relief was instantly felt, as will be understood from
examining the several courses in Plate XIII.; and as the work was thereby
much simplified, it was now expected that two courses might be laid per
day.
To-day 12 stones were landed on the Rock, being the
Thursday, 7th.
remainder of the Patriot’s cargo; and the artificers built
the Thirty-ninth course, consisting of 14 stones. The
Number of people on Bell Rock works had now a very busy appearance, as
the Beacon. Fitting of
window-hinges the Light-house was daily getting more into form.
troublesome. Besides the artificers and their cook, the writer and his
servant were also lodged on the Beacon, counting in all
twenty-nine; and at low-water the landing-master’s crew, consisting of from
twelve to fifteen seamen, were employed in transporting the building
materials, working the landing apparatus on the Rock, and dragging the
stone-waggons along the railways, of which an idea will be formed by
examining Plate XVIII. There were 27 stones discharged to-day from the
Smeaton; and the artificers laid the Fortieth course of the building, in which
the windows of the water, fuel, and provision store-room occur. The fitting
of the hinge-boxes for the window storm-shutters, occupied a considerable
portion of time, as has already been described in allusion to the entrance-
door.
In the course of this day the weather varied much. In
Friday, 8th.
the morning it was calm; in the middle part of the day
there were light airs of wind from the south, and in the
The comfort of good evening fresh breezes from the east. The barometer in
weather on the Rock.
the writer’s cabin in the Beacon-house oscillated from
30 inches to 30.42, and the weather was extremely pleasant. This, in any
situation, forms one of the chief comforts of life, but, as may easily be

Page 375

conceived, it was doubly so to people stuck as it were upon a pinnacle in
the middle of the ocean.
The weather continued to be very agreeable, and ships
Saturday, 9th. every where seen upon the sea. At the Bell Rock we
had only the Tender and the Floating-light, the Smeaton
Balance-crane shifted and Patriot being at Arbroath. The Dickie praam-boat
to-day.
was brought from her moorings this morning, when 9
stones were landed. The artificers were chiefly occupied to-day, in shifting
the balance-crane from the top of the solid, to the top of the staircase, across
which it was supported on strong beams, while struts were projected under
the body of the crane, and butting against the interior of the walls of the
building, as will be understood by examining the third year’s work of Plate
IX. The balance-crane was, however, so constructed, that its foot might
have been allowed to rest upon the solid of the building throughout the
whole operation, and the shaft lengthened as the building rose, by adding
additional pieces, till the whole of the masonry was completed, which
would have formed a length of shaft extending to 50 feet. It was, however,
found, upon the whole, to be more convenient and economical to lift the
crane from floor to floor as the work advanced.
Although stones had hitherto been occasionally landed
Sunday, 10th.
on the western, as well as the eastern side of the Bell
Rock, according to the state of the weather; yet, as the
Crane erected at railways and apparatus of the eastern creek were much
western Wharf.
sooner in a working condition than those of the other,
and being only 90 feet from the Light-house, while the western Railway
extended to 290 feet in length, as will be seen from Plates VI. and XVIII.,
the eastern creek was generally used in all directions of the wind, when the
weather was moderate. To-day, however, the wharf at the western creek had
been completed to its full extent, and one of the moveable-beam cranes was
erected at it, upon a piece of frame-work constructed of Norway logs,
forming also a platform employed in landing the stones.
In the course of last night, the wind had blown pretty
Two stones upset by
the Sea.
strongly from the S.E., and towards morning it shifted
to the S.W., which created a considerable swell of sea.
Owing to the time unavoidably occupied in the shifting the balance-crane,
and fitting the brass cases for the Lewis-bat hinges of the window-shutters

Page 376

of the provision-store, together with the eagerness, and even impatience of
Captain Wilson, the landing-master, on all occasions, to get his part of the
business accomplished by the speedy delivery of the stone-vessels, he had
landed both the Thirty-first and Thirty-second courses, which were thus
piled in rather too great a number at the western side of the building. During
the night, though the range of the sea was considered trifling, yet it had
upset two of the stones, which, when the tide left the Rock, were found
lying at some distance with the Lewis-bats turned downwards. These two
courses, being too much at the mercy of the waves, were raised to their
places on the building, and, though not laid with mortar for the present,
were, nevertheless, out of the reach of heavy seas, and more at the
command of the artificers.
Although the praam-boats, from their built, and the
A Praam boat is sent
from the Rock with
construction of their moorings, rode easily with a cargo
her cargo. on deck, as formerly noticed, yet a certain risk also
attended this state of things, and the writer rather
wished the Smeaton and Patriot to remain at their station, with the stones on
board, until an opportunity was afforded of landing and getting them at
once laid in their places upon the building. One of the praam-boats had,
however, been brought to the Rock with 11 stones, notwithstanding the
perplexity which attended the getting of those formerly landed taken up to
the building. Mr Peter Logan, the foreman builder, interposed, and
prevented this cargo from being delivered, but the landing-master’s crew
were exceedingly averse to this arrangement, from an idea that “ill luck”
would in future attend the Praam, her cargo, and those who navigated her,
from thus reversing her voyage. It may be noticed, that this was the first
instance of a Praam-boat having been sent from the Bell Rock with any part
of her cargo on board, and was considered so uncommon an occurrence,
that it became a topic of conversation among the seamen and artificers.
At 1 p. m. the bell rung for prayers, which were read by the writer in the
Beacon; after which the artificers went to dinner, and the work again
commenced and was continued till 9.
The first operation of the building-artificers this
Monday, 11th.
morning, was to lift the two courses laid on the top of
the walls last night, and build them with mortar; some
of the stones of the upper course, in the mean time, being stowed round the

Page 377

foot of the balance-crane. These two courses consisted each of 16 stones,
besides the dove-tail joggles for connecting the perpendicular joints, as
shewn in diagrams of Plate XIII. The landing-master’s crew proceeded this
morning to discharge the Patriot, and having loaded the Hedderwick Praam-
boat, she was towed to her moorings to remain until the stones could be
received at the Rock. In the afternoon the Patriot sailed; and in the evening
the Smeaton arrived from Arbroath with another cargo, bringing also letters,
papers, provisions, water, and fuel for the Beacon.
To-day the stones formerly sent from the Rock were
Tuesday, 12th.
safely landed, notwithstanding the augury of the
seamen, in consequence of their being sent away two
Stones sent from the days before. These, together with 14 dove-tail joggles,
Rock are safely
landed. were immediately taken up to the top of the building,
and laid, for the present, without mortar, on the top of
the Thirty-fourth course.
The artificers were employed with the Forty-sixth
Wednesday, 13th.
course to-day, and in making preparations for laying the
Forty-seventh, being the floor for the Light-room
Floor of the Light- stores. In the afternoon and evening, the joiners were
room flat laid.
employed in fitting up a piece of frame-work, as a
centre for supporting the interior ends of the stones composing the Floor
course, which projected from the outward face of the building towards the
centre of the apartment, as will be understood from Plates XIII. and XVI.
The Floating-light having got her winter cable on
Mr John Reid has got
leave ashore, after
board, and being otherwise in good order, Mr John
being three months Reid, principal Light-keeper, and acting master, while
afloat. Captain Wilson was employed at the Bell Rock, having
been upwards of three months afloat, it was thought
proper that he should now have liberty for a time on shore, that, in his turn,
he might relieve Mr Wilson. Mr Taylor, commander of the Tender,
accordingly went on board of the Floating-light, leaving the landing-master
in charge of the Tender, along with his other duties at the Rock.
To-day 27 stones and 11 joggle-pieces were landed, part
Thursday, 14th.
of which consisted of the Forty-seventh course, forming
the store-room floor. The builders were at work this

Page 378

morning by 4 o’clock, in the hopes of being able to accomplish the laying
of the 18 stones of this course. But at 8 o’clock in the evening they had still
two to lay, and as the stones of this course were very unwieldy, being 6 feet
in length, they required much precaution and care both in lifting and laying
them. It was, however, only on the writer’s suggestion to Mr Logan, that the
artificers were induced to leave off, as they had intended to complete this
floor before going to bed. The two remaining stones were, however, laid in
their places without mortar, when the bell on the Beacon was rung, and all
hands being collected on the top of the building, three hearty cheers were
given on covering the first apartment. The steward then served out a dram
to each, when the whole retired to their barrack much fatigued, but with the
anticipation of the most perfect repose even in the “hurricane-house,”
amidst the dashing seas on the Bell Rock.
While the workmen were at breakfast and dinner, it was
First letter written
the writer’s usual practice to spend his time on the walls
from the Light-house.
of the building, which, notwithstanding the narrowness
of the track, nevertheless formed his principal walk, when the Rock was
under water. But this afternoon he had his writing-desk set upon the store-
room floor, when he wrote to Mrs Stevenson, certainly the first letter dated
from the Bell Rock Light-house, giving a detail of the fortunate progress of
the work, with an assurance that the Light-house would soon be completed
at the rate at which it now proceeded; and the Patriot having sailed for
Arbroath in the evening, he felt no small degree of pleasure in dispatching
this communication to his family.
The floor-courses of the Bell Rock Light-house lay
Friday, 15th.
horizontally upon the walls, as will be seen from the
sections in Plates VII. and XVI. They consisted in all of
Floors of the Bell 18 blocks, but only 16 were laid in the first instance, as
Rock and Edystone
Light-houses. the centre-stone were necessarily left out, to allow the
shaft of the balance-crane to pass through the several
apartments of the building. In the same manner also, the stone which
formed the interior side of the man-hole, was not laid till after the centre
stone was in its place, and the masonry of the walls completed. The number
of stones above alluded to are independently of the sixteen joggle pieces
with which the principal blocks of the floors were connected, as shewn in
the diagrams of Plates VII. and XIII. The floors of the Edystone Light-

Page 379

house, on the contrary, were constructed of an arch-form, and the haunches
of the arches bound with chains, to prevent their pressing outward, to the
injury of the walls. In this, Mr Smeaton followed the construction of the
Dome of St Paul’s; and this mode might also be found necessary at the
Edystone, from the want of stones in one length, to form the outward wall
and floor, in the then state of the granite quarries of Cornwall. At
Mylnefield Quarry, however, there was no difficulty in procuring stones of
the requisite dimensions; and the writer foresaw many advantages that
would arise, from having the stones of the floors to form part of the outward
walls without introducing the system of arching: in particular, the pressure
of the floors upon the walls would thus be perpendicular; for, as the stones
were prepared in the sides, with groove-and-feather, after the manner of the
common house-floor, they would, by this means, form so many girths,
binding the exterior walls together, as will be understood by examining the
diagrams and section of Plate VII., with its letter-press description;
agreeably to which he had modelled the floors in his original designs for the
Bell Rock, which were laid before the Light-house Board in the year 1800.
The weather still continuing favourable for the
31 Persons lodged in
the Beacon-house.
operations at the Rock, the work proceeded with much
energy, through the exertions both of the seamen and
artificers. For the more speedy and effectual working of
Pay and Premiums at
the Rock. the several tackles, in raising the materials as the
building advanced in height, and there being a great
extent of Railway to attend to, which, required constant repairs, two
additional mill-wrights were added to the complement on the Rock, which,
including the writer, now counted thirty-one in all. So crowded was the
men’s barrack, that the beds were ranged five tier in height, allowing only
about 1 foot 8 inches for each bed, while the greatest extent of floor-room
measured only about 8 feet 6 inches across, between the beds on opposite
sides, as will be seen in the sections and diagrams of Plate VIII. The
artificers commenced this morning at 5 o’clock, and, in the course of the
day, they laid the Forty-eighth and Forty-ninth courses, consisting each of
16 blocks. From the favourable state of the weather, and the regular manner
in which the work now proceeded, the artificers had generally from four to
seven extra hours’ work, which, including their stated wages of 3s. 4d.,
yielded them from 5s. 4d. to about 6s. 10d. per day, besides their board;
even the postage of their letters was paid while they were at the Bell Rock.

Page 380

In these advantages, the foremen also shared, having about double the pay
and amount of premiums of the artificers. The seamen being less out of
their element in the Bell Rock operations than the landsmen, their
premiums consisted in a slump sum, payable at the end of the season, which
extended from three to ten guineas.
As the laying of the floors was somewhat tedious, the
Seamen find one of
the lost sets of
landing-master and his crew had got considerably
moorings. beforehand with the building artificers in bringing
materials faster to the Rock than they could be built.
The seamen having, therefore, some spare time, were occasionally
employed, during fine weather, in dredging or grappling for the several
mushroom-anchors and mooring-chains, which had been lost in the vicinity
of the Bell Rock, during the progress of the work, by the breaking loose and
drifting of the floating-buoys. To encourage their exertions in this search,
Five Guineas were offered as a premium for each set they should find; and
after much patient application, they succeeded to-day in hooking one of
these lost anchors with its chain.
It was a general remark at the Bell Rock, as before
Experiment of
collecting Gas from
noticed, that fish were never plenty in its
Fishes. neighbourhood, excepting in good weather. Indeed, the
seamen used to speculate about the state of the weather
from their success in fishing. When the fish disappeared at the Rock, it was
considered a sure indication that a gale was not far off, as the fish seemed to
seek shelter in deeper water, from the roughness of the sea, during these
changes of the weather. At this time, the Rock, at high-water, was
completely covered with podlies, or the fry of the coalfish, about six or
eight inches in length. The artificers sometimes occupied half an hour after
breakfast and dinner in catching these little fishes, but were more frequently
supplied from the boats of the Tender. This evening the landing-master’s
crew brought to the Rock a quantity of newly caught codfish, measuring
from 15 to 24 inches in length. The membrane called the sound, which is
attached to the back-bone of fishes, being understood to contain, at different
times, greater portions of azote and of oxygen than common air, the present
favourable opportunity was embraced for collecting a quantity of this gas in
a drinking-glass, inverted into a pail of salt-water. The fish being held under
this glass as a receiver, their bladders were punctured, and a considerable

Page 381

quantity of gas was thus collected. A lighted match was afterwards carefully
introduced into the glass, when the gas exhibited in a considerable degree
the bright and luminous flame which an excess of oxygen is known to
produce.
The weather was hazy, and the wind had shifted to-day
Saturday, 16th.
from west to east, accompanied with a heavy ground-
swell in the sea. At the Bell Rock, this was sometimes
Cause of ground observed to be the precursor of a gale, while, on other
swells.
occasions, the swell did not make its appearance till the
force of the wind had ceased. Many speculations have been made by
naturalists upon the probable cause of ground-swells, so often observed by
seamen, and which sometimes appear even without the accompaniment of
wind, either before or after. To account for this, it may be noticed, that the
waters of the German Ocean or North Sea, from their connection with the
Atlantic Ocean, are often affected by gales of westerly winds, which never
reach our shores, though they have the effect of forcing an undue portion of
the waters of the Atlantic into the British seas, which tend to overfill all the
friths and bays, producing the phenomenon of a ground-swell;—a condition
of things which may also be supposed to follow from the account given of
the gale experienced by the writer off Flamborough-head, on the 19th
September 1809, described at page 320.; which might as readily have been
checked in its progress, by the contrary wind, before it reached the northern
shores, as off the coast of England. This subject is further illustrated by the
writer in a paper read before the Wernerian Society, on the bed of the
German Ocean, and given in the Appendix, No. V.
The landing-master having this day discharged the
Landing-master’s
Smeaton, and loaded the Hedderwick and Dickie
dress, and activity of
his crew. praam-boats with 19 stones, they were towed to their
respective moorings; when Captain Wilson, in
consequence of the heavy swell of sea, came in his boat to the Beacon-
house, to consult with the writer as to the propriety of venturing the loaded
praam-boats with their cargoes to the Rock, while so much sea was running.
After some dubiety expressed on the subject, in which the ardent mind of
the landing-master suggested many arguments in favour of his being able to
convey the praams in perfect safety, it was acceded to. In bad weather, and
especially on occasions of difficulty like the present, Mr Wilson, who was

Page 382

an extremely active seaman, measuring about 5 feet 3 inches in height, of a
robust habit, generally dressed himself in what he called a Monkey Jacket,
made of thick duffle-cloth, with a pair of Dutchman’s petticoat-trowsers,
reaching only to his knees, where they were met with a pair of long water-
tight boots; with this dress, his glazed hat, and his small brass speaking-
trumpet in his hand, he bade defiance to the weather. When he made his
appearance in this most suitable attire for the service, his crew seemed to
possess additional life, never failing to use their utmost exertions when the
captain put on his “storm-rigging.” They had this morning commenced
loading the praam-boats at 4 o’clock, and proceeded to tow them into the
eastern landing-place, which was accomplished with much dexterity,
though not without the risk of being thrown, by the force of the sea, on
certain projecting ledges of the rock. In such a case, the loss even of a
single stone would have greatly retarded the work. For the greater safety in
entering this creek, it was necessary to put out several warps and guy-ropes,
to guide the boats into its narrow and intricate entrance; and it frequently
happened that the sea made a clean breach over the praams, which not only
washed their decks, but completely drenched the crew in water.
On this, as on many other occasions, the want of the
Want of the western
wharf.
western wharf was particularly felt; for, although it had
long been used with great advantage in the ordinary
traffic of the Rock, and was now carried to its full extent, it was still not fit
for all the purposes of landing weighty materials, otherwise the landing
operations would have been accomplished with much more ease and facility
to-day. So much, however, had been to do in boring the rock, inserting iron-
bats and other operations, accessible only at the lowest tides, that, although
Mr Watt and his squad of artificers had embraced every opportunity, by day
and night,—for this work to the last was carried on by torch light,—yet the
wharf of the western railway was not entirely completed.
The building-artificers were employed to-day in raising
Operation of shifting
the Balance-crane to the light-room-store, where it was
the Balance-crane. Its
properties. supported upon two beams of oaken timber, which were
made to rest upon the outward extremity of the floor, or
close to the wall of the house. The removal of the crane from one storey to
another was attended with considerable trouble. The body of the crane, as
will be understood by examining Plates IX. and XVII., was raised upon the

Page 383

shaft at every two or three courses which were added to the height of the
building. This mode might have been continued throughout, without once
raising the foot of the crane, by simply adding to the length of the shaft.
But, all things taken into view, it was considered preferable to lift the whole
machine from floor to floor. This was accomplished in the following
manner: Two beams of fir-timber were laid across the walls of the house, on
which the body of the crane was rested. This new position did not prevent
the purchase-tackle of the crane from being worked, and it was therefore
applied to lift the foot and the four lengths of the shaft, which were laid
aside till successively wanted in the course of building. The foot, with two
lengths of the shaft, being placed upon the oaken beams above alluded to; a
cutter or spear-bolt was passed through one of the numerous holes in the
shaft; when the beams on which the body of the crane rested on the walls
being removed, the crane was again in a complete working condition. The
Balance-crane had therefore the property of being applicable to raising
itself, from stage to stage, as well as of laying the stones, and preserving its
equilibrium when loaded. In case, through inattention or accident, an undue
proportion of weight had been brought upon one end of the beam of the
crane, as was the case when the door-lintel was laid, four spurs or diagonal
supports of oak, were attached to the shaft, the lower ends of which rested
upon the floor and butted against the wall, while the upper ends fitted into a
collar or circular piece of cast-iron, which embraced the shaft immediately
under the body of the crane. These preparatory operations occupied a great
part of this day, after which there was no further delay occasioned by the
Balance-crane, till it was again to be raised to the next floor, except the
occasional lifting of the body, and applying additional lengths to the shaft,
as the building rose, things which were accomplished without retarding the
work.
It was fortunate, in the present state of the weather, that
Sunday, 17th.
the Fiftieth course was in a sheltered spot, within the
reach of the tackle of the winch-machine upon the
Western wharf bridge; a few stones were stowed upon the bridge itself,
finished to-day.
and the remainder upon the building, which kept the
artificers at work. The stowing of the materials upon the Rock, was the
department of Alexander Brebner, mason, who spared no pains in attending
to the safety of the stones, and who, in the present state of the work, when
the stones were landed faster than could be built, generally worked till the

Page 384

water rose to his middle. At 1 o’clock to-day the bell rung for prayers, and
all hands were collected into the upper barrack-room of the Beacon-house,
when the usual service was performed.
At low-water this afternoon all hands were employed in completing the
western wharf,—a work which had now been in progress for a
twelvemonth. One of the moveable-beam cranes was elevated on it, under a
salute of three hearty cheers. This wharf was formed of timber, consisting
of successive layers of Norway logs, like the Eastern Wharf, as represented
in Plate XI., which were raised to the level of the Railways, or about 6 feet
in height, and fixed down with bat-bars of iron, measuring 7 feet in length,
having been sunk about 12 inches into the Rock.
The wind blew very hard in the course of last night
Remarkable state of
the sea at the Bell
from N.E., and to-day the sea ran so high that no boat
Rock to-day. could approach the Rock. During the dinner-hour, when
the writer was going to the top of the building as usual,
but just as he had entered the door, and was about to ascend the ladder, a
great noise was heard over-head, and in an instant he was soused in water,
from a sea which had most unexpectedly come over the walls, though now
about 58 feet in height. On making his retreat, he found himself completely
whitened by the lime which had mixed with the water, while dashing down
through the different floors; and, as nearly as he could guess, a quantity
equal to about a hogshead had come over the walls, and now streamed out
at the door. After having shifted himself, he again sat down in his cabin, the
sea continuing to run so high that the builders did not resume their
operations on the walls this afternoon. The incident just noticed, did not
create more surprise in the mind of the writer, than the sublime appearance
of the waves, as they rolled majestically over the Rock. This scene he
greatly enjoyed while sitting at his cabin window: each wave approached
the Beacon like a vast scroll unfolding; and, in passing, discharged a
quantity of air, which he not only distinctly felt, but was even sufficient to
lift the leaves of a book which lay before him. These waves might be 10 or
12 feet in height, and about 250 feet in length. Their smaller end being
towards the north, where the water was deep, and they were opened or cut
through by the interposition of the Building and Beacon. The gradual
manner in which the sea, upon these occasions, is observed to become calm
or to subside, is a very remarkable feature of this phenomenon. For

Page 385

example, when a gale is succeeded by a calm, every third or fourth wave
forms one of these great seas, which occur in spaces, of from 3 to 5
minutes, as noted by the writer’s watch; but, in the course of the next tide,
they become less frequent, and take off, so as to occur only in 10 or 15
minutes; and, singular enough, at the third tide after such gales, the writer
has remarked, that only one or two of these great waves appear in the
course of the whole tide.
From Monday 18th till this date, the work went forward
Thursday, 21st.
in the usual routine, and the building was now in
readiness for the floor of the kitchen or third apartment.
Landing-master’s In the present state of things, the two stone-vessels
crew have now more
leisure. Smeaton and Patriot, could not be fully employed, as,
owing to the greater height of the building, every
operation required much more time, in proportion to the tonnage which the
vessels brought off to the Rock. Indeed, the original intention of providing
two vessels for this department was chiefly to guard against accident, as, in
this service, they were much exposed to danger, in the event of which,
without a second vessel, the work must have been arrested in its progress.
Having now also the full use of the western creek, the process of landing
was seldom delayed, excepting from want of demand on the part of the
builders; it was still, nevertheless, necessary to keep up the establishment of
shipping, for the reason above stated.
The 19th was a very unpleasant and disagreeable day,
Disagreeable state of
the weather.
both for the seamen and artificers, as it rained
throughout with little intermission from 4 a. m. till 11
p. m., accompanied with thunder and lightning, during which period the
work nevertheless continued unremittingly; and the builders laid the Fifty-
first and Fifty-second courses. This state of weather was no less severe
upon the mortar-makers, who required to temper or prepare the mortar of a
thicker or thinner consistency, in some measure, according to the state of
the weather. From the elevated position of the building, the mortar-gallery
on the Beacon was now much lower, and the lime buckets were made to
traverse upon a rope distended between it and the building, as will be seen
from Plate IX. On occasions like the present, however, there was often a
difference of opinion between the builders and the mortar-makers. John
Watt, who had the principal charge of the mortar, was a most active worker,

Page 386

but being somewhat of an irascible temper, the builders occasionally
amused themselves at his expence. For, while he was eagerly at work with
his large iron-shod pestle in the mortar-tub, they often sent down
contradictory orders, some crying, “Make it a little stiffer, or thicker, John,”
while others called out to make it “thinner;” to which he generally returned
very speedy and sharp replies; so that these conversations at times were
rather amusing. The brass cases of the upper-hinges of the window of this
apartment, occurring in the Fifty-second course, occasioned a good deal of
detention, on the 20th, in laying it, when the artificers were employed from
4 in the morning till 9 in the evening.
During wet weather, the situation of the artificers on the
Extra pay.
top of the building was extremely disagreeable; for,
although their work did not require great exertion, yet,
Responsible situation as each man had his particular part to perform, either in
of the principal
workmen. working the crane, or in laying the stones, it required
the closest application and attention, not only on the
part of Mr Peter Logan, the foreman, who was constantly on the walls, but
also of the chief workmen. Robert Selkirk, the principal builder, for
example, had every stone to lay in its place. David Cumming, a mason, had
the charge of working the tackle of the balance-weight, and James Scott,
also a mason, took charge of the purchase with which the stones were laid;
while the pointing the joints of the walls with cement, was entrusted to
William Reid and William Kennedy, who stood upon a scaffold suspended
over the walls in rather a frightful manner. The least act of carelessness or
inattention on the part of any of these men might have been fatal, not only
to themselves, but also to the surrounding workmen, especially if any
accident had happened to the crane itself, while the material damage or loss
of a single stone would have put an entire stop to the operations, until
another could have been brought from Arbroath. The artificers having
wrought seven and a half hours of extra time to-day, had 3s. 9d. of extra
pay, while the foremen had 7s. 6d. over and above their stated pay and
board. Although, therefore, the work was both hazardous and fatiguing, yet
the encouragement being considerable, they were alwise very cheerful, and
perfectly reconciled to the confinement, and other disadvantages of the
place.

Page 387

During fine weather, and while the nights were short,
Carpenter of the the duty on board of the Floating-light was literally
Floating-light leaves
the service. nothing but a waiting on, and therefore one of her
boats, with a crew of five men, daily attended the Rock,
but always returned to the vessel at night. The carpenter, however, was one
of those who was left on board of the ship, as he also acted in the capacity
of assistant light-keeper; being, besides, a person who was apt to feel
discontent, and to be averse to changing his quarters, especially to work
with the mill-wrights and joiners at the Rock, who often, for hours together,
wrought knee-deep, and not unfrequently up to the middle in water. Mr
Watt having, about this time, made a requisition for another hand, the
carpenter was ordered to attend the Rock in the Floating-light’s boat. This
he did with great reluctance, and found so much fault, that he soon got into
discredit with his messmates. On this occasion, he left the Light-house
service, and went as a sailor in a vessel bound for America,—a step which,
it is believed, he soon regretted, as, in the course of things, he would, in all
probability, have accompanied Mr John Reid, the principal Light-keeper of
the Floating-light, to the Bell Rock Light-house, as his principal Assistant.
The writer had a wish to be of service to this man, as he was one of those
who came off to the Floating-light in the month of September 1807, while
she was riding at single anchor, after the severe gale of the 7th, at a time
when it was hardly possible to make up this vessel’s crew; but the crossness
of his manner prevented his reaping the benefit of such intentions.
The trips of the stone-vessels became more and more
Patriot makes a trip to
Arbroath and back to
remarkable for dispatch. The Patriot having only sailed
for Arbroath yesterday morning at 8 o’clock, returned
the Rock, in 24 hours.
this evening at the same hour with a cargo; when the
landing-master immediately got his praam-boats alongside, and came to the
Rock with 16 stones, 8 joggles, 8 casks of pozzolano, and the same quantity
of lime and sand, with seven logs of timber for the Railways, which were
immediately taken up to the Beacon, till they were wanted on the Rock.
Such, therefore, was the dispatch given to the loading of the materials at
Arbroath, together with the persevering activity of Mr Spink,—who had
succeeded Mr Macdonald in the command of the Patriot,—and his mate Mr
Peter Soutar, that, although she did not reach Arbroath till the morning of
the 21st, at 1 o’clock, yet being instantly loaded, she was made fast to her
moorings again at the Rock, after an absence of only 24 hours.

Page 388

The weather was extremely fine to-day, and the
An attempt made to artificers laid the Fifty-sixth course, or kitchen-floor,
land stones at high-
water, with the forming, like the other floors of the building, a part also
bridge-apparatus. of the outward wall. For supporting the inward
extremity of these long stones, until a sufficient weight
was built upon the exterior wall, the joiners had erected a piece of frame-
work on the floor below on which they rested. This morning at 4 o’clock,
the landing-master’s crew had commenced their operations, and by 12 noon
34 stones were landed, together with the several articles mentioned above,
which discharged the Patriot, and she again sailed for Arbroath. An attempt
was made to-day to land materials at high-water with the bridge-apparatus;
but, although the water was smooth, yet there was a certain lift in the sea,
which occasionally brought a sudden strain on the frame of the bridge, and
made the whole shake and jerk in such a manner as to communicate a
considerable degree of tremor to the whole fabric of the Beacon-house,
shewing that this mode of landing weighty stones could hardly be ventured
upon, even in the very finest weather.

Page 389

The building operations had for some time proceeded
Progress of landing more slowly, from the higher parts of the Light-house
the stones. The
Seamen become requiring much longer time than an equal tonnage of
discontented. the lower courses. The duty of the landing-master’s
crew had, upon the whole, been easy of late; for, though
the work was occasionally irregular, yet the stones being lighter, they were
more speedily lifted from the hold of the stone-vessel to the deck of the
praam-boat, and again to the waggons on the railway, after which they came
properly under the charge of the foreman-builder; the artificers working the
several purchase-tackles in raising the stones through the successive stages,
from the railways to the bridge, and from thence to the top of the building,
as represented in Plates IX. and XVIII. It is, however, a strange, though not
an uncommon feature in the human character, that when people have least
to complain of, they are most apt to become dissatisfied, as was now the
case with the seamen employed in the Bell Rock service, about their rations
of beer. Indeed, ever since the carpenter of the Floating-light, formerly
noticed, had been brought to the Rock, expressions of discontent had been
manifested upon various occasions. This being represented to the writer, he
sent for Captain Wilson, the landing-master, and Mr Taylor, commander of
the Tender, with whom he talked over the subject. They stated, that they
considered the daily allowance of the seamen in every respect ample, and
that the work being now much lighter than formerly, they had no just
ground for complaint; Mr Taylor adding, that if those who now complained
“were even to be fed upon soft bread and turkeys, they would not think
themselves right.” At 12 noon, as before noticed, the work of the landing-
master’s crew was completed for the day. But at 4 o’clock, while the Rock
was under water, those on the Beacon were surprised by the arrival of a boat
from the Tender, without any signal having been made from the Beacon. It,
however, brought the following note to the writer from the landing-master’s
crew.
Sir Joseph Banks, Tender.
“Sir,
“We are informed by our masters, that our allowance is to be as before, and it is not
sufficient to serve us, for we have been at work since 4 o’clock this morning, and we have
come on board to dinner, and there is no beer for us before to-morrow morning, to which a
sufficient answer is required before we go from the Beacon; and we are, Sir, your most
obedient servants.”

Page 390

On reading this, the writer returned a verbal message, intimating, that an
answer would be sent on board of the Tender, at the same time ordering the
boat instantly to quit the Beacon. He then addressed the following note to
the landing-master.
“Beacon-house, 22d June 1810,
Correspondence with 5 o’clock, p. m.
the Landing-master. “Sir,
“I have just now received a letter purporting to be from the landing-master’s crew and
seamen on board of the Sir Joseph Banks, though without either date or signature; in
answer to which, I inclose a statement of the daily allowance of provisions for the seamen
in this service, which you will post up in the ship’s-galley, and at 7 o’clock this evening I
will come on board to enquire into this unexpected and most unnecessary demand for an
additional allowance of beer. In the inclosed, you will not find any alteration from the
original statement, fixed in the galley at the beginning of the season. I have, however,
judged this mode of giving your people an answer, preferable to that of conversing with
them on the Beacon. I am, Sir, your most obedient servant,
“To Captain Wilson.
Robert Stevenson.”
“Beacon-house, 22d June 1810.—Schedule of the daily Allowance of Provisions to be
served out on board of the Sir Joseph Banks Tender.”—“1½ lb. beef; 1 lb. bread; 8 oz.
oatmeal; 2 oz. barley; 2 oz. butter; 3 quarts beer; vegetables and salt no stated allowance.
When the seamen are employed in unloading the Smeaton and Patriot, a draught of beer is,
as formerly, to be allowed from the stock of these vessels. Further, in wet and stormy
weather, or when the work commences very early in the morning, or continues till a late
hour at night, a glass of spirits will also be served out to the crew as heretofore, on the
requisition of the Landing-master.”
“Robert Stevenson.”

On writing this letter and schedule, a signal was made
Writer goes on board
of the Tender. on the Beacon for the landing-master’s boat, which
immediately came to the Rock, and the schedule was
afterwards stuck up in the Tender’s galley. When sufficient time had been
allowed to the crew to consider of their conduct, a second signal was made
for a boat, and at 7 o’clock the writer left the Bell Rock, after a residence of
four successive weeks in the Beacon-house. The first thing which occupied
his attention on board of the Tender, was to look round upon the Light-
house, which he saw with some degree of emotion and surprise, now vieing
in height with the Beacon-house; for, although he had often viewed it from
the extremity of the western Railway on the Rock, yet the scene, upon the
whole, seemed far more interesting from the Tender’s moorings, at the
distance of about half a mile.

Page 391

The Smeaton having just arrived at her moorings with a
Two of the Seamen cargo, a signal was made for Captain Pool to come on
are dismissed the
service. board of the Tender, that he might be at hand to remove
from the service any of those who might persist in their
discontented conduct. One of the two principal leaders in this affair, being
the master of one of the praam-boats, and who had also steered the boat
which brought the letter to the Beacon, was first called upon deck, and
asked if he had read the statement fixed up in the galley this afternoon, and
whether he was satisfied with it. He replied that he had read the paper, but
was not satisfied, as it held out no alteration on the allowance; on which he
was immediately ordered into the Smeaton’s boat. The next man called had
but lately entered the service, and being also interrogated as to his
resolution, he declared himself to be of the same mind with the Praam-
master, and was also forthwith ordered into the boat. The writer, without
calling any more of the seamen, went forward to the gangway, where they
were collected, and listening to what was passing upon deck: he addressed
them at the hatchway, and stated that two of their companions had just been
dismissed the service, and sent on board of the Smeaton, to be conveyed to
Arbroath. He therefore wished each man to consider for himself, how far it
would be proper, by any unreasonableness of conduct, to place themselves
in a similar situation, especially as they were aware that it was optional in
him either to dismiss them, or send them on board a Man-of-war. It might
appear that much inconveniency would be felt at the Rock by a change of
hands at this critical period, by checking for a time the progress of a
building so intimately connected with the best interests of navigation; yet
this would be but of a temporary nature, while the injury to themselves
might be irreparable. It was now, therefore, required of any man who, in
this disgraceful manner, chose to leave the service, that he should instantly
make his appearance upon deck, while the Smeaton’s boat was alongside.
But those below having expressed themselves satisfied with their situation,
viz. William Brown, George Gibb, Alexander Scott, John Dick, Robert
Couper, Alexander Shephard, James Grieve, David Carey, William Pearson,
Stuart Eaton, Alexander Lawrence, and John Spink, were accordingly
considered as having returned to their duty. This disposition to mutiny,
which had so strongly manifested itself, being now happily suppressed,
Captain Pool got orders to proceed for Arbroath Bay, and land the two men

Page 392

he had on board, and to deliver the following letter at the office of the work-
yard.
“On Board of the Tender off the Bell Rock,
22d June 1810. 8 o’clock p. m.
“Dear Sir,
“A discontented and mutinous spirit having manifested itself of late, among the Landing-
master’s crew, they struck work to-day, and demanded an additional allowance of beer, and
I have found it necessary to dismiss D——d and M——e, who are now sent on shore with
the Smeaton. You will, therefore, be so good as to pay them their wages, including this day
only. Nothing can be more unreasonable than the conduct of the seamen on this occasion,
as the landing-master’s crew not only had their own allowance on board of the Tender, but,
in the course of this day, they had drawn no fewer than 24 quart pots of beer from the stock
of the Patriot, while unloading her.
“I remain, yours truly,
“Robert Stevenson.”
“To Mr Lachlan Kennedy, Bell-Rock Office, Arbroath.”

On dispatching this letter to Mr Kennedy, the writer returned to the Beacon
about 9 o’clock, where this afternoon’s business had produced many
conjectures, especially when the Smeaton got under way, instead of
proceeding to land her cargo. The bell on the Beacon being rung, the
artificers were assembled on the bridge, when the affair was explained to
them. He, at the same time, congratulated them upon the first appearance of
mutiny being happily set at rest by the dismissal of its two principal
abettors.
The Smeaton having landed the disaffected men and
Saturday, 23d.
delivered the letter, returned to the Bell Rock last
evening at 8 o’clock, when the landing-master and his
Progress of the Works crew immediately proceeded to discharge her, leaving
at Arbroath.
the loaded praams at their moorings for the night. By
letters from the work-yard from Mr David Logan, clerk of works, the writer
learned, that, when the two courses which the stone-cutters had now in hand
were completed, there would only be one more to prepare, and that already
several of the masons were about to be paid off.
At the Rock, the landing of the materials, and the
Sunday, 24th.
building operations of the light-room-store, went on
successfully, and in a way similar to those of the
The Works are visited provision-store. To-day it blew fresh breezes; but the
by Mr Murdoch of
seamen nevertheless landed 28 stones, and the artificers

Page 393

Soho. built the Fifty-eighth and Fifty-ninth courses. The
works were visited by Mr Murdoch junior, from Messrs
Boulton and Watt’s works of Soho. He landed just as the bell rung for
prayers; after which the writer enjoyed much pleasure from his very
intelligent conversation: and having been almost the only stranger he had
seen for some weeks, he parted with him, after a short interview, with much
regret.
There were 46 pieces of stone landed to-day, 16 of
Wednesday, 27th.
which were built, being the Sixty-second course, in
which the upper brass cases for the hinges of the storm-
Sixty-second course shutters occurred, each of which weighed about 25 lb.,
laid.
or 100 lb. for the four cases with their hinges. The sole
or foot of the balance-crane was also shifted, an operation which became
necessary at the height of about every 16 feet of the Light-house; and it was
now raised from the store-room to the kitchen-floor. The shaft of the crane
consisted of one piece of 8 feet, and three of 6 feet, making its whole length
26 feet, of which, about 7 feet were occupied with the body and foot of the
crane. The operations of laying the courses in which the hinge-cases of the
storm-shutters of the different windows occurred, like those of the entrance-
door, being very tedious, the Beacon-bell was rung this morning at the very
early hour of 3 o’clock, and as the work continued till half-past 9 at night,
the artificers had 8 hours and a half’s extra work, which yielded them 4s.
3d. of extra pay.
The Sixty-third and Sixty-fourth courses were laid to-
Thursday, 28th.
day, consisting of 16 stones each. Last night the wind
had shifted to north-east, and blowing fresh, was
Workmen wetted by accompanied with a heavy surf upon the Rock. Towards
the sea on the top of
the walls. high water it had a very grand and wonderful
appearance. Waves of considerable magnitude rose as
high as the solid or level of the entrance-door, which, being open to the
south-west, was fortunately to the leeward; but on the windward side, the
sprays flew like lightning up the sloping sides of the building; and although
the walls were now elevated 64 feet above the Rock, and about 52 feet from
high-water mark, yet the artificers were nevertheless wetted, and
occasionally interrupted in their operations on the top of the walls. These
appearances were in a great measure new at the Bell Rock, there having till

Page 394

of late been no building to conduct the seas, or object to compare them
with. Although, from the description of the Edystone Light-house, the mind
was prepared for such effects, yet they were not expected to the present
extent, in the summer season; the sea being most awful to-day, whether
observed from the Beacon or the Building. To windward, the sprays fell
from the height above noticed, in the most wonderful cascades, and
streamed down the walls of the building in froth as white as snow. To
leeward of the Light-house, the collision or meeting of the waves produced
a pure white kind of drift, which is attempted to be represented in the
Frontispiece to this work: it rose about 30 feet in height, like a fine downy
mist, which, in its fall, felt upon the face and hands more like a dry powder
than a liquid substance. The effects of these seas, as they ranged among the
beams, and dashed upon the higher parts of the Beacon, produced a
temporary tremulous motion throughout the whole fabric, which to a
stranger must have been frightful.
The artificers laid the Sixty-fifth course to-day, forming
Saturday, 30th.
the fourth or bed-room floor. They had, however, no
extra hours’ work, a circumstance which had not
Mr John Reid’s occurred for several weeks before. Although, from the
Report on the
Floating-light. rapid progress which was now making with the
Building, there was every prospect that it would be
finished in the course of this year; yet, as the Light-room and its apparatus
were very critical parts of the operation, which would necessarily fall to be
transported to the Rock at a late period of the season, and were,
consequently, liable to many casualties, it was proper to make provision for
continuing the Floating-light for another winter, in case the light should not
be exhibited from the Light-house. This vessel had now been on her station
for three years; and as she lay at anchor in 19 fathoms water, it had,
consequently, been impossible thoroughly to examine her bottom. What
rendered her state more uncertain, was the condition of the logs of timber
employed for supporting the temporary Railways on the Rock for nearly a
similar period. These logs were of the common Norway-fir, and when laid
down measured about ten inches upon each side; but after lying about three
years on the Rock, they were so much wasted by the small insect formerly
mentioned, that they would not now square to more than 7 inches, without
leaving traces of the ravages of this animal, having thereby lost at the rate
of about one-half inch on each side of sound timber per annum. Directions

Page 395

had been given to Mr John Reid, who, during the summer months, had the
command of the Floating-light, and who was also professionally a ship-
carpenter, to take a convenient opportunity of trimming the vessel, in such a
manner as to give her a list first to one side and then to the other, so as to
get her bottom as fully examined as possible. This having been done, Mr
Reid intimated that he considered her in a sound state. The writer
accordingly left the Beacon-house to-day, accompanied by the landing-
master, to see some of the side-planks which had been dubbed or dressed
with a carpenter’s adze, and, on examination, he had the satisfaction to find
that they appeared perfectly fresh. This was a matter of some consequence
to the work, as it must have been attended with great inconvenience, to have
removed such a vessel as the Floating-light, and put another in her place,
even for a short period. After this inspection, the writer returned to the
Rock, having previously requested of Mr Reid to make a report in writing,
which he did in the following terms:
“Pharos Floating-Light, off the Bell Rock,
30th June 1810.
“Sir,
“According to your orders, I have, on several occasions, during this month, careened the
Float, and inspected her bottom as much as possible while the vessel is at anchor; but I can
see no appearance of the wood-worm in any part of it. There is indeed plenty of sea-weed,
mussels, and red-worms (creatures with many feet), but it is not this kind of worm that
perforates the planks of shipping; and as this destructive animal generally makes its
appearance between wind and water, I am apt to believe that the Pharos’ bottom is
perfectly sound and healthy. With regard to the beam and knee observed to be working a
little, I will send a note of the scantling of the timber that will be necessary for securing it,
to Mr Dickie, the carpenter, at Arbroath. I, for one, have no objections to another winter on
board, without further repairs; for though she rolls heavily in the trough of the sea, yet she
has, upon the whole, been a very kindly ship to me.—I am, Sir, your most obedient servant,
“To Mr Stevenson.
John Reid, Carpenter.”

While William Kennedy, one of the masons, was
1810, July.
stepping off the bridge into the entrance-door of the
Light-house, one of the cast-iron slips of the balance-
Narrow escape of one
of the Masons.
weight of the crane, weighing about 70 lb., fell from the
top of the building and grazed his left shoulder, but,
fortunately, in so gentle a manner, that it hardly ruffled the skin; a few
inches nearer, it would have carried away his arm or killed him on the spot.

Page 396

The artificers laid 12 stones to-day, and the seamen
Sunday, 1st. landed no fewer than 34 blocks.—The writer had now
been at the Bell Rock since the latter end of May, or
Writer describes his about six weeks, during four of which he had been a
Cabin.
constant inhabitant of the Beacon, without having been
once off the Rock. After witnessing the laying of the Sixty-seventh or
second Course of the bed-room apartment, he left the Rock with the Tender,
and went ashore, as some arrangements were to make for the future conduct
of the works at Arbroath, which were soon to be brought to a close; the
landing-master’s crew having, in the mean time, shifted on board of the
Patriot. In leaving the Rock, the writer kept his eyes fixed upon the Light-
house, which had recently got into the form of a house, having several tiers
or storeys of windows. Nor was he unmindful of his habitation in the
Beacon, now far overtoped by the masonry; where he had spent several
weeks in a kind of active retirement, making practical experiment of the
fewness of the positive wants of man. His cabin measured not more than 4
feet 3 inches in breadth on the floor; and though, from the oblique direction
of the beams of the Beacon, it widened towards the top, yet it did not admit
of the full extension of his arms when he stood on the floor; while its length
was little more than sufficient for suspending a cot-bed during the night,
calculated for being triced up to the roof through the day, which left free
room for the admission of occasional visitants. His folding-table was
attached with hinges, immediately under the small window of the
apartment, and his books, barometer, thermometer, portmanteau, and two or
three camp-stools, formed the bulk of his moveables. His diet being plain,
the paraphernalia of the table were proportionally simple; though every
thing had the appearance of comfort, and even of neatness, the walls being
covered with green cloth, formed into pannels with red tape, and his bed
festooned with curtains of yellow cotton-stuff. If, in speculating upon the
abstract wants of man in such a state of exclusion, one were reduced to a
single book, the Sacred Volume, whether considered for the striking
diversity of its story,—the morality of its doctrine,—or the important truths
of its Gospel, would have proved by far the greatest treasure.
In walking over the work-yard at Arbroath this
Monday, 2d.
morning, the writer found that the stones of the course
immediately under the cornice were all in hand, and
that a week’s work would now finish the whole; while the intermediate

Page 397

courses lay ready numbered and marked for shipping to
Case of George Dall, the Rock. Among other subjects which had occupied his
an impressed seaman.
attention to-day, was a visit from some of the relations
of George Dall, a young man who had been impressed near Dundee in the
month of February last: A dispute had arisen between the Magistrates of
that borough and the Regulating Officer as to his right of impressing Dall,
who was bona fide one of the protected seamen in the Bell Rock service. In
the mean time, the poor lad was detained, and ultimately committed to the
prison of Dundee, to remain until the question should be tried before the
Court of Session. His friends were naturally very desirous to have him
relieved upon bail. But as this was only to be done by the judgment of the
Court, all that could be said was, that his pay and allowances should be
continued in the same manner as if he had been upon the sick-list. The
circumstances of Dall’s case, were briefly these. He had gone to see some
of his friends in the neighbourhood of Dundee, in winter, while the works
were suspended, having got leave of absence from Mr Taylor, who
commanded the Bell Rock Tender, and had in his possession one of the
Protection Medals, represented in Plate XII., and alluded to at page 209.
Unfortunately, however, for Dall, the Regulating-Officer thought proper to
disregard these documents, as, according to the strict and literal
interpretation of the Admiralty regulations, a seaman does not stand
protected unless he is actually on board of his ship, or in a boat belonging to
her, or has the Admiralty-protection in his possession. This order of the
Board, however, cannot be rigidly followed in practice; and therefore, when
the matter is satisfactorily stated to the Regulating-Officer, the impressed
man is generally liberated. But in Dall’s case this was peremptorily refused,
and he was retained at the instance of the Magistrates. The writer having
brought the matter under the consideration of the Commissioners of the
Northern Light-houses, they authorised it to be tried on the part of the
Light-house Board, as one of extreme hardship. The Court, upon the first
hearing, ordered Dall to be liberated from prison; and the proceedings never
went further.
During the three years in which the operations of the
Tuesday, 3rd.
Bell Rock Light-house had been in progress, the
Magistrates of the Royal Burgh of Arbroath, where the
Magistrates of work-yard was established, had shewn the utmost
Arbroath visit the Bell
attention in forwarding the works, by every means in

Page 398

Rock. their power. In particular, a free or peculiar birth had
been given to the vessels of the Light-house service,
where a crane was permitted to be erected; and the building materials were
allowed to be reshipped for the Light-house, without any additional charge
for shore-dues. Indeed, the whole community of this town seemed to view
the work, and those concerned with the operations, in a very favourable
manner. The writer was therefore happy, at this time, in having an
opportunity of giving effect to an arrangement long talked of, with the
Magistrates and some of their friends, of taking a sail to the Bell Rock, to
see the progress of the works. This having been accordingly intimated to
Provost Airth, he gladly embarked in the Tender, along with two of the
former Chief-Magistrates, Balfour and Milne, and Bailies Duncan, Fleming,
Anson, Wightman, and Kid, together with Mr John Colville, Town-Clerk,
Messrs Bruce, Bell, Balfour, Johnston, Christie and Lindsay, &c. in all
sixteen. The vessel sailed from Arbroath at an early hour, but the weather
became thick and foggy, with the wind at S.E., and it was 2 o’clock p. m.,
before she reached her moorings at the Rock, which being then covered
with water, the party had to wait till about 6 before a landing could be
made. During these four hours, the vessel had a very unpleasant rolling
motion: the party cast many a weary look towards the Rock for its
appearance; and, on landing, much satisfaction was expressed at getting a
firm footing upon the railways. The party soon began to clamber up to the
Beacon, and, after examining all its parts, crossed the bridge, but only a few
ventured to the top of Light-house, from the narrowness of the passages,
and difficult position of the ladders. After spending fully three hours upon
the Rock, the water began to rise upon the Railways, when the gentlemen
again embarked, and were greeted with cheers from the workmen. The wind
being fair, and the weather pleasant, the Tender soon reached Arbroath,
when the party landed, much delighted with their trip, while the writer was
not a little pleased at having thus had an opportunity of gratifying so many
of his friends.
The artificers had yesterday laid the Sixty-eighth course
Wednesday, 3d.
of the building, consisting of 16 stones, of which 10
had also been landed. The Tender having returned from
Number of Artificers Arbroath this afternoon, the landing-master’s crew left
on the Rock reduced
to 22. the Patriot, and took up their quarters again on board of
the Tender. The artificers lodged in the Beacon had of

Page 399

late varied from twenty-six to thirty-one in number; but the Railways being
finished, the work now admitted of their being reduced to twenty-two.
During the time that the Rock was covered with water, and materials could
not be landed, the masons were employed in dressing off and repolishing
any inequalities which appeared on the interior walls of the different
apartments. The raising of stones from the waggons on the Rock to the top
of the building, now about 80 feet in height, had become rather a tedious
operation. The lift with the balance-crane in particular being upwards of 45
feet, it required some precaution and trouble in coiling such a length of
chain upon the barrel. It therefore became necessary to lessen this
operation, by placing a winch-machine on the store-room floor, and
projecting a beam from the western window, to form a stage in taking up
the stones, as will be understood by examining the third year’s work of
Plate IX., and the general view of the operations at the Rock represented in
Plate XVIII.
Being now within twelve courses of being ready for
Narrow escape of the
Smeaton at the Bell
building the cornice, measures were taken for getting
Rock. Advantage of the stones of it and the parapet-wall of the Light-room
Alarm-bells. brought from Edinburgh, where, as before noticed, they
had been prepared, and were in readiness for shipping.
The honour of conveying the upper part of the Light-house, and of landing
the last stone of the building on the Rock, was considered to belong to
Captain Pool of the Smeaton, who had been longer in the service than the
master of the Patriot. The Smeaton was therefore now partly loaded with
old iron, consisting of broken railways and other lumber, which had been
lying about the Rock. After landing these at Arbroath, she took on board
James Craw, with his horse and cart, which could now be spared at the
work-yard, to be employed in carting the stones from Edinburgh to Leith.
Alexander Davidson and William Kennedy, two careful masons, were also
sent to take charge of the loading of the stones at Greenside, and stowing
them on board of the vessel at Leith. The writer also went on board, with a
view to call at the Bell Rock, and to take his passage up the Firth of Forth.
The wind, however, coming to blow very fresh from the eastward, with
thick and foggy weather, it became necessary to reef the mainsail, and set
the second-jib. When in the act of making a tack towards the Tender, the
sailors who worked the head sheets were all of a sudden alarmed with the
sound of the smith’s hammer and anvil on the Beacon, and had just time to

Page 400

put the ship about to save her from running ashore on the north western
point of the Rock, marked “James Craw’s horse,” in Plate VI. On looking
towards the direction from whence the sound came, the Building and
Beacon-house were seen, with consternation, while the ship was hailed by
those on the Rock, who were no less confounded at seeing the near
approach of the Smeaton, and, just as the vessel cleared the danger, the
smith and those in the mortar-galley made signs in token of their happiness
at our fortunate escape. From this occurrence the writer had an
experimental proof of the utility of the large Bells which were in
preparation to be rung by the machinery of the Revolving-light; for, had it
not been the sound of the smith’s anvil, the Smeaton, in all probability,
would have been wrecked upon the Rock. In case the vessel had struck,
those on board might have been safe, having now the Beacon-house as a
place of refuge; but the vessel, which was going at a great velocity, must
have suffered severely, and it was more than probable that the horse would
have been drowned, there being no means of getting him out of the vessel.
Of this valuable animal and his master, both delineated in Plate X., we shall
take an opportunity of saying more in another part of the work.
The weather cleared up in the course of the night, but
The Artificers on the
Beacon greatly
the wind shifted to the N.E., and blew very fresh: and it
alarmed. was with difficulty that a communication could be
made with the Tender, after which the Smeaton bore
away for Leith about 7 a. m. At 9 she was abreast of Fifeness, and at half-
past 1 p. m. got safely into Leith harbour, after a passage of about six hours,
which was fully the quickest which the writer had made from the Bell Rock
to Leith, a distance of about 88 miles. From the force of the wind, being
now the period of spring-tides, a very heavy swell was experienced at the
Rock: at 2 o’clock on the following morning, the people on the Beacon
were in a state of great alarm about their safety, as the sea had broke up part
of the floor of the mortar-gallery, which was thus cleared of the lime-casks,
and other buoyant articles; and the alarm-bell being rung, all hands were
called to render what assistance was in their power for the safety of
themselves and the materials. At this time, some would willingly have left
the Beacon and gone into the Building: the sea, however, ran so high, that
there was no passage along the bridge of communication; and when the
interior of the Light-house came to be examined in the morning, it appeared
that great quantities of water had come over the walls, now 80 feet in

Page 401

height, and had run down through the several apartments, and out at the
entrance-door. From this state of things the work was stopped for two days,
in the course of which the joiners got the mortar-gallery refitted, and the
landing-master’s crew supplied it with a fresh stock of materials for making
mortar. Notwithstanding this state of the sea upon the Rock, the Tender and
Patriot still kept at their moorings. Such, indeed, was the practice of the
seamen, in this kind of life, that, unless when the wind blew from N.W., or
in such a direction as made the vessels ride with their sterns towards the
Rock, they never thought of moving from their moorings, unless the vessels
were deeply loaded.
On reaching Edinburgh, the writer found the Light-
Progress of the Light-
room works.
room and Reflecting-apparatus in considerable
forwardness at the Greenside Company’s works. He
had also received advice from Prescot, that the plate-glass for the windows
would soon be in a state of readiness; and Messrs Meirs and Son of London
intimated, that they would cast the Bells at any time, on receiving a week or
ten days notice. The only article connected with the light-room, regarding
which there was a doubt, was the coloured glass for distinguishing the light,
which had long since been commissioned from Mr Okey of London, who,
though a very ingenious artist, was rather an irregular correspondent.
The upper course of the Light-house at the work-yard
Works at Arbroath
completed.
of Arbroath, was completed on the 6th, and the whole
of the stones were therefore now ready for being
shipped to the Rock. The operations of the hewers or stone-cutters were
thus brought very nearly to a close: only the 23 steps of the stone staircase
of the Light-house remained to be dressed; and this piece of work was
reserved for some of the principal masons, on their return from the Rock, as
the steps could not be conveniently built until the balance-crane and other
bulky apparatus were removed from the building. From the present state of
the works, it was impossible that the two squads of artificers at Arbroath
and the Bell Rock could meet together at this period; and as, in public
works of this kind, which had continued for a series of years, it is not
customary to allow the men to separate without what is termed a
“Finishing-pint,” five guineas were for this purpose placed at the disposal
of Mr David Logan, clerk of works. With this sum the stone-cutters at
Arbroath had a merry-meeting in their barrack, collected their sweethearts

Page 402

and friends, and concluded their labours with a dance. It was remarked,
however, that their happiness on this occasion was not without alloy. The
consideration of parting, and leaving a steady and regular employment, to
go in quest of work, and mix with other society, after having been
harmoniously lodged for years together in one large “Guildhall or Barrack,”
was rather painful. The completion of this part of the work at Arbroath was
felt as an era in the Light-house affairs, by admitting of the discharge of so
considerable a number of the artificers. Mr David Logan, by this means
also, got off to the Bell Rock, having been hitherto chiefly confined to the
operations ashore.
While the writer was at Edinburgh, he was fortunate
Mr Smeaton’s
daughter visits the
enough to meet with Mrs Dickson, only daughter of the
Light-house works atlate celebrated Mr Smeaton, whose works at the
Edinburgh. Edystone Light-house had been of such essential
consequence to the operations at the Bell Rock. Even
her own elegant accomplishments are identified with her father’s work, she
having herself made the drawing of the vignette on the title-page of the
Narrative of the Edystone Light-house. Every admirer of the works of that
singularly eminent man, must also feel an obligation to her for the very
comprehensive and distinct account given of his life, which is attached to
his Reports, published in three volumes quarto, by the Society of Civil
Engineers. Mrs Dickson being, at this time, returning from a tour to the
Hebrides and Western Highlands of Scotland, had heard of the Bell Rock
works, and from their similarity to those of the Edystone, was strongly
impressed with the desire of visiting the spot. But, on inquiring for the
writer at Edinburgh, and finding from him that the upper part of the Light-
house, consisting of nine courses, might be seen in the immediate vicinity,
and also, that one of the vessels which, in compliment to her father’s
memory, had been named “The Smeaton,” might also now be seen in Leith,
—she considered herself extremely fortunate; and having first visited the
works at Greenside, she afterwards went to Leith to see “The Smeaton,”
then loading for the Bell Rock. On stepping on board, Mrs Dickson seemed
to be quite overcome with so many concurrent circumstances, tending in a
peculiar manner to revive and enliven the memory of her departed father;
and, on leaving the vessel, she would not be restrained from presenting the
crew with a piece of money. “The Smeaton” had been named
spontaneously, from a sense of the obligation which a public work of the

Page 403

description of the Bell Rock owed to the labours and the abilities of Mr
Smeaton. The writer certainly never could have anticipated the satisfaction
which he this day felt, in witnessing the pleasure it afforded to the only
representative of this great man’s family. Mrs Dickson’s stay in Edinburgh
was short, as, in seeing so much of the Bell Rock works, she had
accomplished the chief object which brought her to this side of the country.
On her return to the neighbourhood of Kendal, the place of her residence,
she had the kindness to send the writer a portrait of her father, together with
the vignette of the Edystone Light-house.
At the Bell Rock, Mr Peter Logan, foreman builder,
Mr David Logan joins
the Works at the
was reinforced by the able and active exertions of his
Rock. son Mr David Logan, who was now relieved from
attendance at the work-yard of Arbroath, where the
stone-cutters had just completed their operations. In the mean time, the
walls of the Light-house were progressively rising, and, on Friday the 6th,
the artificers laid the Seventy-first course, consisting of 16 stones, and
shifted the foot of the Balance-crane from the kitchen to the bed-room,
about 42 feet above the bridge. A considerable time was, therefore,
occupied in raising a stone from thence to the top of the building. To
remedy this, as formerly alluded to, a beam was projected from the western
window of the light-room store, where a winch-machine and apparatus were
placed, with which the stones were raised from the bridge to the level of the
window-sill. The chain of the balance-crane was then lowered, and hooked
into the Lewis-bat of the stone, which was thus hoisted up, and laid in its
place on the building, as will be fully understood by examining the progress
of the work in Plate IX. This additional tackle from the store-room window
gave a wonderful facility to the operation of raising the stones; for, though
the time of working upon the walls of the building was now extended to the
whole day, yet the period of landing the materials upon the Rock was still
unavoidably confined to the few hours during which it was left by the tide
at low-water.
The landing-master’s crew commenced at 4 o’clock this
Saturday, 7th.
morning, and transported 24 blocks of stone and 8
dove-tailed joggles to the Rock in the course of the day,
The Patriot is seven which cleared the Patriot of her cargo, when she sailed
days in being cleared
of a cargo. for Arbroath, having now been no less than 7 days on

Page 404

the birth. This was, therefore, the most tedious trip since the first cargo of
this season, which, as before noticed, had been on board of the Smeaton for
11 days. The stones landed to-day could not be raised to the top of the
building, as the joiners had possession of the upper apartment, where they
were fixing the framing used for supporting the floor-stones, while building.
The stones were, in the mean time, left chiefly on the Rock, though a few
were laid upon the bridge.
To-day the Seventy-second course was laid. The mill-
Saturday, 8th.
wrights, in the mean time, made preparations for fitting
up another winch-apparatus on the bed-room floor,
Progress of raising the similar to that already described for the store-room, by
Stones.
projecting a beam from its western window, which was
to form another stage for lifting the materials. When, therefore, a stone was
landed on the Rock, and conveyed along the Railways, within reach of the
winch-apparatus upon the bridge, and raised to its level, it was next hooked
by the chain of the winch on the store-room floor: having attained that
height, it was laid hold of by the chain of the machinery on the bed-room
floor; and last of all, it was hooked to the chain of the balance-crane, by
which it was raised to the top of the walls and laid in its place. The series of
machinery now in motion on the Bell Rock, was very complete, and gave
great facility to the landing of the materials. A set of tackle was at work at
the landing-cranes on the eastern and western side of the Rock, for lifting
the stones from on board of the Praam-boats, and laying them on the
waggons: from thence they were wheeled along the Railways to the bridge;
from which they were successively lifted, as has been described, by the
machinery upon it; then by that in the store-room; next by that in the bed-
room, and last of all by the balance-crane,—as will be more particularly
seen in the third year’s work of Plate IX., and in the General View of the
Works, Plate XVIII.
At Arbroath, the Patriot had now loaded the last cargo
Monday, 9th. of building materials from that port, consisting of 65
pieces of stone, 4 dove-tailed joggles, 18 casks of
Last cargo of stone pozzolano, lime, sand, and cement, with three cart-
shipped at Arbroath.
loads of timber, and the necessary supplies of
provisions for the Tender and Beacon-house. From the interest which the
inhabitants of Arbroath took in all that concerned the Bell Rock Light-

Page 405

house, it soon became generally known that the last cargo from the work-
yard was loading. Upon this occasion, the ships in the harbour hoisted their
colours, in compliment to the approaching termination of the works; and, at
7 p. m., a great concourse of people collected on the quays, who united in
giving three hearty cheers, as the Patriot sailed from the harbour. At the Bell
Rock, the building-artificers were at a stand to-day for want of materials,
and were employed in dressing off and polishing the interior of the
building, while the landing-master’s crew were removing lumber from the
Rock, which, for the present, was put on board of the Tender. The joiners
and mill-wrights were occupied in framing a centre for building the dome-
roof of the library.
The Patriot reached her moorings this morning, but it
Tuesday, 10th.
was then blowing a fresh gale from W.S.W., and the
Tender’s boat had much difficulty in getting her hawser
reeved through the eye-bolt of the floating-buoy. No materials could be
landed on the Rock to-day.
The weather being moderate, with the wind at S.E., the
Wednesday, 11th.
landing-master’s crew proceeded this morning to
discharge the Patriot at the early hour of 3 o’clock; and
in the course of the day, 30 blocks and 2 dove-tailed joggles of stone, and 7
casks of pozzolano, lime, and sand, were landed, besides some timber,
which occupied them till 8 o’clock p. m., with little intermission. During this
time also, the artificers laid the Seventy-third course, consisting of 16
stones.
The building-artificers laid the Seventy-fourth course
Thursday, 12th.
to-day, being the floor of the library or strangers’ room,
which, like the others, consisted altogether of 18 stones;
Library Floor laid. but of the floor courses, as before noticed, only sixteen
stones were laid in the first instance, the centre and the
stone connected with the man-hole being left for the conveniency of
moving the machinery as the building advanced in height. The seamen
landed 25 blocks of stone, and the remaining 2 dove-tailed joggles which
discharged the Patriot; and at 2 p. m. she sailed for Leith, to load a cargo of
the upper courses of the Light-house, which had been worked at Edinburgh.
The artificers on the Rock were now reduced to 22, there having been 6 of
their number sent ashore at this time. The Smeaton having loaded 48 stones

Page 406

at Leith, with sundry other materials, arrived to-day at the Bell Rock; but
the praams were still at their moorings, loaded with part of the former
cargo, which the builders could not yet receive.
To-day the building-artificers laid the Seventy-fifth and
Friday, 13th.
Seventy-sixth courses, consisting each of 12 stones, and
the seamen landed 11 stones, being the remainder of the
Patriot’s cargo.
The Seventy-seventh and Seventy-eighth courses were
Saturday, 14th.
laid to-day: the landing-master’s crew discharged 26
blocks of stone, and 20 dove-tailed joggles from the
Smeaton, and landed them on the Rock. As it blew very fresh from the
S.W., it was a hard day’s work for the seamen, who commenced this
morning as early as 2 o’clock to load the praam-boats, and it was between 7
and 8 in the evening before the boats returned on board of the Tender for
the night.
The artificers laid the Seventy-ninth and Eightieth
Sunday, 15th.
courses to-day, consisting of 12 stones each, and had no
less than seven and a half hours of extra time, having
been at work from 4 o’clock this morning till 9 in the evening, owing to
some difficulty which occurred in laying the course, in which the upper
storm-hinge cases occurred.
The artificers laid the Eighty-first course, consisting of
Monday, 16th.
12 stones from Craigleith Quarry, being one of these
worked at Edinburgh, in which a groove, for an iron-
Ring-bar course laid. ring, was cut, as an additional security for the
superincumbent weight of the cornice. In the First
Floors described. course of the Dome of St Paul’s of London, a
continuous chain had been sunk into a groove, in order
to bind the haunches of the arch more firmly together. Mr Smeaton,
alluding to this in his Narrative, also inserted a chain into each of his floor-
courses at the Edystone Light-house. Being of an arched form, these chains
inserted into grooves, cut in the haunch-courses of arches, have a tendency
to counteract their pressure outwards. At the Bell Rock, the writer, however,
designed the floors in such a manner that each projected from the outward
wall of the building towards the centre, and the whole being grooved in a

Page 407

lateral direction, in the joints, like the deals of a common floor, became as
one stone, having a perpendicular pressure upon the walls. Even in the
dome-roof of the library, though it has a spherical appearance within, yet
the stones are all laid upon horizontal beds, the dome being formed by
hollowing the under beds, and making them overlap or project inward
beyond each other, the pressure being still perpendicular upon the walls,
instead of thrusting outwards, as in the case of an arch.
Instead of a continuous chain, as at the Edystone
Description of the
Ring-bar.
arches, the writer here introduced a flat-bar of the best
Swedish iron into the Eighty-first course, having been
previously connected in three pieces with scarf-joints and screwed bolts,
with nuts. This bar was set on edge in the building: it measured 3 inches in
depth, 1 inch in thickness, and was in weight about 400 lb. avoirdupois.
This bar was fitted into a groove 3 inches in width, and 4 inches in depth,
cut in the upper bed of the course. The bar having been heated as nearly as
might be to the temperature of about 150 or 160 degrees of Fahrenheit, it
was floated or run up flush with lead, in a very careful and complete
manner by Mr John Gibson, plumber of Leith, who entered so much into
the spirit of this work, that he attended the operation himself: no pains was,
therefore, spared in having this body of melted lead properly connected
with the circular bar of iron. By this means the iron was preserved from the
accession of moisture, and, being much stronger than copper, it was
preferred to that more ductile metal. The stones of this course were soon
laid, but the artificers were occupied so long with the application of the
ring-bar, that they had been at work from 4 in the morning till 8 in the
evening. The Smeaton being discharged, sailed again for Leith, to take on
board the last cargo of stones for the Light-house. The artificers could only
receive 7 blocks of stone and 7 joggles to-day: the Hedderwick Praam-boat
was accordingly left at her moorings with the remainder of the Smeaton’s
cargo still on board.
The seamen landed 2 casks of pozzolano and lime, 4
Tuesday, 17th.
joggles and 6 blocks of stone, which discharged the
praam-boats. The artificers laid 8 stones of the Eighty-
The Dome course second course, forming part of the dome-roof of the
occupies much time
in laying. library. This course consisted of 16 stones, which were
attended with much more difficulty than those of the

Page 408

ordinary courses: from their projecting into the apartment, and being also
more easily injured, they required more precaution in laying and in the
fitting of the joggles. The artificers were therefore at work to-day from 4 in
the morning till half-past 8 in the evening, in laying one-half of this course.
From the prevalence of S. W. winds, the Patriot only reached Leith at one
p. m. yesterday, and commenced loading this morning, when she took on
board 32 pieces of stone. The Smeaton having also arrived at Leith this
afternoon, both vessels were now off the station, and it was found necessary
to dispatch one of the Floating-light’s boats to Arbroath, for a supply of
pozzolano, lime, and sand, and also for provisions for the people at the
Rock.
The building-artificers laid the remaining 8 stones of
Wednesday, 18th.
the Eighty-second course to-day, and had three and a
half hours of extra time. The landing-master’s crew
Landing-master’s having no materials to land upon the Rock, were
crew reduced in
number. employed to-day in collecting a variety of articles, and
clearing the Building and Beacon of implements not
now wanted, which were carried on board of the Tender. The Floating-
light’s boat returned this afternoon from Arbroath, and immediately landed
her cargo. The landing-master’s crew had for some time past been reduced
to nine men, being little more than was necessary for working the Tender
when she got under way; but at the Rock they had the daily assistance of a
boat and five men from the Floating-light.
The Patriot arrived at the Bell Rock this evening at 9
Thursday, 19th.
o’clock, with a cargo of the cornice-stones; but, as it
blew a fresh gale from the N.E., the Tender’s boat could
Patriot driven from not make fast her hawser to the moorings, and she was
the Rock.
obliged to stand in for the Bay of Arbroath. There
being, of course, no building materials on the Rock, the artificers were
employed in dressing off and polishing some of the joints in the interior of
the Light-house. At high-water to-day, it being now the time of spring-tides,
there was a great deal of sea upon the Rock: considerable sprays rushed up
to the smith’s gallery on the Beacon, and the water occasionally rose in jets
to the height of 40 feet upon the building.
The gale from the N.E. still continued so strong,
Friday, 20th.
accompanied with a heavy sea, that the Patriot could

Page 409

not approach her moorings; and, although the Tender
Ceremony observed at still kept her station, no landing was made to-day at the
loading the last stone
at Leith. Rock. At high-water, it was remarked, that the spray
rose to the height of about 60 feet upon the building.
The Smeaton now lay in Leith loaded; but the wind and weather being so
unfavourable for her getting down the Firth , she did not sail till this
afternoon. It may here be proper to notice, that the loading of the centre of
the Light-room floor, or last principal stone of the building, did not fail,
when put on board, to excite an interest among those connected with the
work. When the stone was laid upon the cart, to be conveyed to Leith, the
seamen fixed an ensign-staff and flag into the circular hole in the centre of
the stone, and decorated their own hats, and that of James Craw’s, the Bell
Rock carter, with ribbons; even his faithful and trusty horse Bassey, was
ornamented with beaus and streamers of various colours. The masons also
provided themselves with new aprons; and, in this manner the cart was
attended in its progress to the ship. When the cart came opposite the Trinity-
House of Leith, the officer of that Corporation made his appearance,
dressed in his uniforms, with his staff of office; and when it reached the
harbour, the shipping in the different tiers where the Smeaton lay, hoisted
their colours, manifesting, by these trifling ceremonies, the interest with
which the progress of this work was regarded by the public, as ultimately
tending to afford safety and protection to the mariner. The wind had
fortunately shifted to the S.W.; and about 5 o’clock this afternoon the
Smeaton reached the Bell Rock. The writer had also the satisfaction soon
afterwards to see the Patriot made fast to her moorings; but there was still
too much sea to admit of landing upon the Rock.
The present interesting state of the Light-house, which
Monday, 23d.
had now attained the height of 90 feet, induced a great
many strangers to visit the Bell Rock, while the
Many Strangers visit machinery was in operation, and the Light-house and
the present interesting
state of the Works. Beacon were connected with the wooden-bridge; and
beams were projected from the windows of the store-
room and bed-room, for the suspension of the tackle with which the stones
were raised. The Stone-lighters and Tender also lay in the offing at this
time, while the Praam-boats were occasionally at the landing creeks on the
eastern and western sides of the Rock, delivering the stones, which were
afterwards wheeled along the railways. The whole, as shewn in Plate

Page 410

XVIII., afforded great pleasure, and excited the surprise of many visitants,
who often endured much hardship in open boats, on a passage of from 12 to
20 miles, from the shore. Two parties, under these circumstances, landed to-
day, among whom were Messrs Gellatly and Macpherson, accountants,
from the Greenside works at Edinburgh. This being the fifth day of the gale,
much relief was felt at the Rock on the arrival of the boats.
At 6 o’clock this morning, Captain Wilson and his
Tuesday, 24th.
people left the Tender to load the praam-boats with
stones from the Patriot, so as to be ready at tide time for
Difficulty of landing landing them on the Rock. In the course of this day, the
and raising the stones
of the Cornice. whole of the Eighty-third, and 2 stones of the Eighty-
fourth courses were landed in safety, which greatly
relieved the writer’s mind as to the practicability of landing the stones of
the Eighty-fifth course, forming the balcony-walk and light-room floor, as
shewn in Plates XIII. and XVI. The stones of this course measured 7½ feet
in length, and weighed upwards of one ton each. For the safety of these
unwieldy and more delicately formed stones, Captain Wilson had made
some very judicious arrangements. In particular, he had procured pieces of
matting, and the seamen of the Tender and Floating-light had been at work
for some time, preparing additional defenders, made of old ropes. By a
proper application of these, the stones went safely through the progressive
stages of being taken from the hold of the Smeaton, and laid on the decks of
the praam-boats, after which they were delivered by the landing-apparatus
on the Bell Rock, laid on the stone-waggons, conveyed along the railway to
a centrical position under the bridge, and raised by four different sets of
tackles to the top of the building, as will be understood by examining Plates
IX. and XVIII. These several movements were fortunately accomplished
with all the stones, without even a trifling injury being done to any of them.
The writer, in the course of this day’s work, remarked, that, from the time
that one of these large blocks was laid upon the waggon at the landing-
apparatus, till it reached the top of the building, then about 95 feet in height,
it required, on an average of eight observations, at the rate of 14 minutes for
each. Though the number of stones landed to-day was only 18, yet there
being still some remains of sea from the former gale, much care and
attention became necessary in the management of these unhandy materials.
The landing-master’s crew, who were frequently working up to the middle
in water, were occupied till 10 o’clock at night before they returned to the

Page 411

Tender. The building-artificers were no less constantly employed, though
they only laid 8 stones of the Eighty-fourth course to-day, after continuing
their operations till 9 o’clock p. m.
The landing-master’s crew commenced their operations
Wednesday, 25th.
again this morning at 6, and, in the course of the day,
they landed 10 stones of the Eighty-fifth, being the
Eighty-fourth course course immediately under that of the balcony; together
completed.
with 14 dove-tailed joggles for the joints, as will be
understood by examining the diagrams of Plate XIII. The building-artificers
laid the remaining 8 stones of the Eighty-fourth course. The Patriot having
been cleared this evening of her cargo, sailed to Arbroath for a supply of
water and provisions for the people on the Rock, as the stock at this time
was getting low, from the vessels having of late been much off the station,
while employed in bringing the stones from the work-yard at Edinburgh.
The building-artificers having now 8 blocks of the
Eight stones of the
Balcony course laid.
Eighty-fifth or Balcony course at hand, which, in one
length, formed the balcony-path and Light-room-floor,
excepting the centre-stone, as will be seen from the diagrams in Plate XIII.,
above alluded to, they commenced work at 4 o’clock this morning; but such
was the difficulty attending the laying and fitting the joggled joints of these
long stones, that it was 10 p. m. before they were laid: they had, therefore,
no fewer than eight extra hours to-day, which yielded the high rate of 7s.
6d. to the workmen, and 15s. to the foremen, besides their stated wages and
provisions. The landing-master’s crew transported the remaining 8 blocks
of the balcony to the Rock; and, when the last stone was raised in safety
through its various stages to the top of the building, three cheers were given
by all hands.
The winds were still moderate, but it rained very
Thursday, 26th.
heavily at times, and the artificers were very
uncomfortably situate on the top of the walls. They,
Balcony course however, persevered in completing the laying of the
completed.
balcony-course under every disadvantage. The Patriot
returned to the Rock this afternoon, with a supply of provisions and
necessaries; when she was dispatched to Mylnefield Quarry, for the first
cargo of stones for the establishment of houses at Arbroath, about to be

Page 412

erected for the use of the families of the Bell Rock Light-keepers, it being
only intended to lodge the keepers themselves at the Rock.
The artificers had finished the laying of the Balcony-
Friday, 27th.
course, excepting the centre stone of the light-room
floor, which, like the centres of the other floors, could
Eighty-sixth course not be laid in its place till after the removal of the foot
built.
and shaft of the balance-crane. This stone was
accordingly left on board of the Smeaton, to be landed with the last cargo.
The Eighty-sixth course, consisting of 8 stones, being the first of the
Parapet-wall of the light-room, was landed and built. During the dinner
hour, when the men were off work, the writer generally took some exercise
by walking round the walls, when the Rock was under water. But to-day his
boundary was greatly enlarged, for, instead of the narrow wall as a path, he
felt no small degree of pleasure in walking round the balcony, and passing
out and in at the space allotted for the light-room door. In the labours of this
day, both the artificers and seamen felt their work to be extremely easy,
compared with what it had been for some days past.
The building-artificers laid the Eighty-seventh and
Sunday, 29th.
Eighty-eighth courses, consisting each of 8 stones; and
having made another long day’s work, they had eight
extra hours pay. The landing-master’s crew transported 2 casks of
pozzolano, 2 of lime, and 2 of sand, with 23 blocks of stone, to the Rock,
which completed the landing of the masonry of the exterior walls of the
Light-house. Immediately before dinner the bell was rung, and all hands
being assembled, prayers were read as usual in the artificers’ barrack-room.
Captain Wilson and his crew had made preparations for
Ceremony observed at
landing the last stone, and, as may well be supposed,
landing the last stone.
this was a day of great interest at the Bell Rock. “That it
might lose none of its honours,” as he expressed himself, the Hedderwick
praam-boat, with which the first stone of the building had been landed, was
appointed also to carry the last. At 7 o’clock this evening, the seamen
hoisted three flags upon the Hedderwick, when the colours of the Dickie
Praam-boat, Tender, Smeaton, Floating-light, Beacon-house, and Light-
house, were also displayed, and the weather being remarkably fine, the
whole presented a very gay appearance, and, in connection with the
associations excited, the effect was very pleasing. The praam which carried

Page 413

the stone was towed by the seamen in gallant style to the Rock, and, on its
arrival, cheers were given as a finale to the landing department.
The Ninetieth or last course of the building having been
Monday, 30th.
laid to-day, which brought the masonry to the height of
102 feet 6 inches, the Lintel of the light-room door,
Ceremony at laying being the finishing-stone of the exterior walls, was laid
the last stone of the
walls. with due formality by the writer, who, at the same time,
pronounced the following benediction: “May the Great
Architect of the Universe, under whose blessing this perilous work has
prospered, preserve it as a guide to the Mariner.”
The artificers were employed to-day in taking down the
Tuesday, 31st.
tackle and machinery from the store-room and kitchen-
floors, which were put on board one of the praam-boats,
Machinery partly and conveyed to the Tender. The joiners were assisted
dismantled.
at low-water by some of the seamen, in preparing the
lower parts of the beams of the Beacon-house, for receiving a coat of hot
pitch and tar, as usual, before winter, to defend them against the ravages of
the insect which, as before noticed, had made a considerable impression on
the soles of the beams, where they rested upon the Rock. The Patriot had
sailed for Mylnefield Quarry; and the Smeaton, being now discharged, left
the Rock for Lord Elgin’s works at Charlestown, to load limestone for the
light-keepers’ houses, to be built at Arbroath. The Tender continued at her
moorings, and took on board from time to time such implements and
apparatus as were no longer wanted at the Rock. The Floating-light, from
the uncertainty attending the period of finishing the light-room and its
apparatus, and consequent exhibition of the light from the building, had,
perhaps, a long time yet to remain at her station; but one of her boats was to
be regularly sent with five seamen, to assist at the operations on the Rock as
formerly.
The artificers and seamen were employed to-day, as
1810, August.
yesterday, in clearing the building of lumber, and in
coating the beams of the Beacon with a mixture of tar
Wednesday, 1st. and pitch. The body of the Balance-crane was also
supported with beams on the walls of the light-room, in
Foot and shaft of such a manner that its machinery could be applied to
Balance-crane taken
lowering its foot and shaft down through the apertures

Page 414

down. left for this purpose in the floors of the several
apartments. The machinery of this useful implement
thus supported, was yet to be used in laying centre-stones in the floors of
the store-room, kitchen, bed-room, library and light-room; and also in
taking up the cast-iron sash-frames and other weighty apparatus of the light-
room.
The several apartments of the building being now
Thursday, 2d.
entirely cleared of the tackle and apparatus connected
with raising the materials, the artificers were in
readiness for laying the centre-stones of the several floors.
This morning, between 7 and 8 o’clock, the works of
Friday, 3d.
the Bell Rock were visited by the Earl of Kellie, the
Honourable Mr Methven Erskine, Mr David
Lord Kellie with a Monypenny, Sheriff of Fifeshire and one of the
party visits the Bell
Rock. Commissioners of the Northern Light-houses (now
Lord Pitmilly), and his Lordship’s brother, Mr
Alexander Monypenny. The party had left Cambo-house, upon the coast of
Fife, at an early hour; but the wind being from the south-west, and blowing
fresh, had rendered their passage very uncomfortable. When the boat
reached the Tender, the party came on board, as it was too early in the tide
for landing on the Rock, which was still under water; but when the railways
made their appearance, the party proceeded to the western-wharf, and Lord
Pitmilly having been the first of the Light-house Commissioners who had
landed here, it was named Pitmilly Wharf. After viewing the Rock, which
was now partially dry, they ascended to the Beacon-house, and passed along
the bridge, with all its difficult steps, to the Light-house, where the servants
had contrived to cover a table, made up with detached planks, on which the
first breakfast was laid out in the Bell Rock Light-house. After having gone
over the whole of the works, they left the Rock about mid-day.
At 3 p. m., the necessary preparations having been
Centre-stone of the
made, the artificers commenced the completing of the
Light-room floor laid
by the writer. floors of the several apartments, and at 7 o’clock the
centre-stone of the light-room floor was laid, which
may be held as finishing the masonry of this important National Edifice.
After going through the usual ceremonies observed by the Brotherhood on
occasions of this kind, the writer, addressing himself to the artificers and

Page 415

seamen who were present, briefly alluded to the utility of the undertaking,
as a monument of the wealth of British Commerce, erected through the
spirited measures of the Commissioners of the Northern Light-houses, by
means of the able assistance of those who now surrounded him. He then
took an opportunity of stating, that toward those connected with this
arduous work, he would ever retain the most heartfelt regard in all their
interests.
When the bell was rung, as usual, on the Beacon this
Saturday, 4th.
morning, every one seemed as if he were at a loss what
to make of himself. There was, however, upon the
Artificers leave the whole, still much to do to the Light-house, which is
Rock.
only yet to be considered in the state of a house with its
outward wall built; but, before being useful or habitable, it must be roofed
over, internally finished, and provided with the necessary furniture and
utensils. At this period, the artificers at the Rock consisted of 18 masons, 2
joiners, 1 mill-wright, 1 smith, and 1 mortar-maker, besides Messrs Peter
Logan and Francis Watt, foremen, counting in all 25; and matters were
arranged for proceeding to Arbroath this afternoon with all hands, as it now
became necessary to new-model the works there. The Sir Joseph Banks
Tender had by this time been afloat, with little intermission, for six months,
during the greater part of which the artificers had been almost constantly off
at the Rock, and were now much in want of necessaries of almost every
description. Not a few had lost different articles of their clothing, which had
dropped into the sea from the Beacon and Building; some wanted jackets,
others, from want of hats, wore night-caps; each was, in fact, more or less
curtailed in his wardrobe, and, it must be confessed, that at best, the party
were but in a very tattered condition. This morning was occupied in
removing the artificers and their bedding on board of the Tender; and
although their personal luggage was easily shifted, the boats had,
nevertheless, many articles to remove from the Beacon-house, and were
consequently employed in this service till 11 a. m. All hands being collected
and just ready to embark, as the water had nearly overflowed the Rock, the
writer, in taking leave, after alluding to the harmony which had ever marked
the conduct of those employed on the Bell Rock, took occasion to
compliment the great zeal, attention and abilities of Mr Peter Logan and Mr
Francis Watt, foremen, Captain James Wilson, landing-master, and Captain
David Taylor, commander of the Tender, who, in their several departments,

Page 416

had so faithfully discharged the duties assigned to them, often under
circumstances the most difficult and trying. The health of these gentlemen
was drunk with much warmth of feeling by the artificers and seamen, who
severally expressed the satisfaction they had experienced in acting under
them; after which, the whole party left the Rock.
In sailing past the Floating-light, mutual compliments
The writer meets with
were made by a display of flags between that vessel and
his assistants ashore.
the Tender; and at 5 p. m. the latter vessel entered the
harbour of Arbroath, where the party were heartily welcomed by a
numerous company of spectators, who had collected to see the artificers
arrive, after so long an absence from the port. In the evening, the writer
invited the foremen and captains of the service, together with Mr David
Logan, clerk of works at Arbroath, and Mr Lachlan Kennedy, engineer’s
clerk and book-keeper, and some of their friends, to the principal Inn, where
the evening was spent very happily; and after “His Majesty’s health,” and
“The Commissioners of the Northern Light-houses,” had been given,
“Stability to the Bell Rock Light-house” was hailed as a standing toast in
the Light-house service.
The author has formerly noticed the uniformly decent
Sunday, 5th.
and orderly deportment of the artificers who were
employed at the Bell Rock Light-house, and to-day, it is
believed, they very generally attended church, no doubt, with grateful hearts
for the many narrow escapes from personal danger which all of them had
more or less experienced during their residence at the Rock.
Hitherto the account of these works has been given in
Monday, 6th.
the form of a Diary; but now that the chief difficulties
of the undertaking are over, it is proposed to quote only
Plans arranged for particular dates in reference to their progress. At the
building Light-
keepers’ houses at meeting of the Commissioners of the Northern Light-
Arbroath. houses, held at Edinburgh in the month of July 1810, it
had been resolved to purchase a piece of ground
contiguous to the harbour of Arbroath, which presented an unobstructed
view of the Bell Rock Light-house, on which a suite of buildings was to be
erected, for the accommodation of the families of the light-keepers and
seamen of the Tender, and also for the necessary store-houses. Mr Charles
Cunningham, Secretary to the Light-house Board, accordingly

Page 417

corresponded with Mr John Nicol, writer in Arbroath, who purchased the
ground for the site of these buildings, together with a small court-yard and
bleaching-green, as arranged and laid out in Plate XII. In constructing these
buildings, and enclosing an extensive piece of garden-ground for the use of
this establishment, the artificers, who had just returned from the Rock, were
now to be employed.
The Patriot had returned from Mylnefield Quarry to
Duty on stone
charged for these
Arbroath with the first cargo of stones, for the use of
buildings. these operations, which were about to be landed duty-
free, when the Custom-house officers interposed,
demanding the duty of 33 per cent. on stone carried coast-ways, as the
buildings at Arbroath were not considered as coming within the exemption
granted for the Bell Rock Light-house. After representing the circumstances
of the case to the Board of Customs at Edinburgh, it was found that another
petition would have been required to the Lords of the Treasury, before the
present exemption could be granted; but the extent of the duty in question
being trifling, the Light-house Board declined making any further
application, and the duty was therefore regularly paid for the stones of this
compartment of the work.
The writer finding that the Bell Rock work-yard at
Three years of the
lease of the Work-
Arbroath, which had been taken upon a lease of seven
yard given up. years, could be dispensed with after the term of
Martinmas, thereby leaving three unexpired years of the
tack still to run, the lease was cancelled by the landlord, on his being paid
one year’s rent in name of damages. This afforded a satisfactory proof of
the termination of the works, at least three years sooner than the period
calculated upon at its commencement. The great circular platform in the
work-yard, shown in Plate XII., which measured 42 feet in diameter, and
was sunk 2 feet 6 inches under the level of the surrounding ground, used for
laying and marking the courses of the Light-house, before they were
shipped for the Rock, contained a great quantity of stones suitable for the
interior walls of the light-keepers’ houses. The first operation of the
builders, therefore, was to remove the stones of this platform to the site of
the new buildings.
The writer, with a view to making a survey of the coast
Friday, 9th.
contiguous to the Bell Rock, or from Fifeness to the

Page 418

Redhead, embraced the present as a convenient time for
Base-line measured measuring a base-line. For this purpose, the Sands of
on the Sands of Barry.
Barry, about 9 miles westward from Arbroath, were
selected; and he provided himself with the following apparatus: a strong
iron-chain of the length of 100 feet, carefully graduated; 5 wooden coffers,
each 20 feet in length, 5 inches in width, and 3 inches in depth, on which
the chain was to be stretched; 10 oaken stakes, 4 feet in length, and 4 inches
square at the top, for marking off distances of 1000 feet; 10 picket-rods of
fir timber, measuring 8 feet in length, with cross boards at the top; 2 spars
of 20 feet in length, with small red flags for marking the termination at each
end of the Line; and one of Messrs Miller and Adie’s best Theodolites. With
these, he left the harbour of Arbroath at 5 on the morning of the 9th of
August, in one of the Bell Rock boats, manned with six seamen, and
accompanied by one of his assistants. At 8 o’clock they reached the small
village called the Feus; and after walking about two miles and a half along
the Sands of Barry, flag-staffs were erected at the extremities of the line
intended to be measured, which, in relation to each other, were situate by
compass S.W. ½ S., and N.E. ½ N. The next operation was to mark off the
first 1000 feet of the line in a general way, with the picket-rods, into spaces
of 100 feet. The wooden coffers, or troughs, for levelling and directing the
chain, were then laid on the sands, which being naturally very flat, required
only that certain places of the track should be partially cleared with the
spade. The chain was then stretched by two of the seamen, to a degree of
tension which they were directed to give it, by as regular and uniform a
strain as possible; and the links being all previously examined, the distances
were carefully marked with an iron pricker. In this manner, the whole length
of a line, extending to 10,866 feet and 9½ inches was measured. This was
altogether a most laborious operation, occupying 14 hours, including the
short time the party were at their meals, which were taken on the field. The
line having been thus gone over from North-east to South-west, the
operation was reversed as a check, from South-west to North-east; the result
of which was not a little satisfactory, as the second measurement only
varied one inch from the first, though the line extended upwards of two
miles. The weather was very favourable; the wind being westerly, and
blowing gentle breezes, while the barometer remained steadily at about
29.78.; the temperature was marked three times a day, and averaged 54°.
The angles and bearings of the Bell Rock and other objects having been

Page 419

taken from this base-line, were ultimately referred to in constructing the
map of the coast delineated on Plate IV.
For a more complete and perfect mode of making such
Trigonometrical
Survey of Great
measurements, the reader may consult Colonel Mudge’s
Britain. Account of the Trigonometrical Survey of England and
Wales, in two volumes quarto; a work which shows the
astonishing accuracy with which that great National Survey is conducted;
and also, the correctness to which mathematical instruments have been
brought; and strongly illustrates the difficulties which assail man, when he
aims at absolute precision, even in the most simple of the arts.
The Smeaton having, in the course of the last ten days,
Tuesday, 14th.
lifted such of the moorings as could now be dispensed
with, took the Dickie praam-boat in tow, and sailed for
Artificers return to the Leith, to load the cast-iron sash-frames of the Light-
Bell Rock.
room. On her return to Arbroath, she took on board the
stone-steps for the Light-house, 23 in number, to be erected between the
passage of the entrance-door and the provision store, as will be seen from
the section of Plate XVI. With these she sailed to-day at 1 p. m., having on
board 16 artificers, with Mr Peter Logan, together with a supply of
provisions and necessaries; who left the harbour, pleased and happy to find
themselves once more afloat in the Bell Rock service. At 7 o’clock, the
Tender was made fast to her moorings, when the artificers landed on the
Rock, and took possession of their old quarters in the Beacon-house, with
feelings very different from those of 1807, when the works commenced.
The barometer, for some days past, had been falling
The Smeaton is in
from 29.90, and to-day it was 29.50, with the wind at
danger, and obliged to
leave her Station. N.E., which, in the course of this day, encreased to a
strong gale, accompanied with a sea which broke with
great violence upon the Rock. At 12 noon, the Tender rode very heavily at
her moorings, when her chain broke at about 10 fathoms from the ship’s
bows. The kedge-anchor was immediately let go, to hold her till the
floating-buoy and broken chain should be got on board; but while this was
in operation, the hawser of the kedge was chaffed through on the rocky
bottom, and parted, when the vessel was again adrift. Most fortunately,
however, she cast off with her head from the Rock, and narrowly cleared it;
when she sailed up the Firth of Forth, to wait the return of better weather.

Page 420

The artificers were thus left upon the Rock with so heavy a sea running, that
it was ascertained to have risen to the height of 80 feet on the building.
Under such perilous circumstances, it would be difficult to describe the
feelings of those who, at this time, were cooped up in the Beacon, in so
forlorn a situation, with the sea not only raging under them, but
occasionally falling from a great height upon the roof of their temporary
lodging, without even the attending vessel in view, to afford the least gleam
of hope in the event of any accident. It is true that they had now the
masonry of the Light-house to resort to, which, no doubt, lessened the
actual danger of their situation. But the building was still without a roof,
and the dead-lights, or storm shutters, not being yet fitted, the windows of
the lower storey were stove in and broken, and, at high-water, the sea ran in
considerable quantities out at the entrance-door. In the course of this
afternoon, the spring-tides being now at the highest, the bridge or gangway
was also for a time rendered completely impassable, from the quantity of
sea that constantly washed over it. The smith’s gallery, at the same time,
was also partially broken up, and several bags of coal, a barrel of small
beer, and a few casks, containing pozzolano, lime and sand, were all swept
off the Beacon. When the sea left the Rock, it was likewise found that two
of the cast-iron legs of the sheer-crane were broken, and that some pieces of
the Railways had been torn up.
The gale continues with unabated violence to-day, and
Thursday, 16th.
the sprays rise to a still greater height, having been
carried over the masonry of the building, or about 90
Mortar-gallery feet above the level of the sea. At 4 o’clock this
completely broken up.
morning, it was breaking into the cook’s birth, when he
rung the alarm-bell, and all hands turned out to attend to their personal
safety. The floor of the smith’s or mortar-gallery was now completely burst
up by the force of the sea, when the whole of the deals and the remaining
articles upon the floor were swept away, such as the cast-iron mortar-tubs,
the iron hearth of the forge, the smith’s bellows, and even his anvil, were
thrown down upon the Rock. The boarding of the cook-house, or storey
above the smith’s gallery, was also partly carried away, and the brick and
plaster-work of the fire-place shaken and loosened. At low-water, it was
found that the chain of the moveable beam-crane, at the western wharf, had
been broken, which set the beam at liberty, and greatly endangered the guy-
ropes by its motion. It was observed, during this gale, that the Beacon-

Page 421

house had a good deal of tremor; but none of that “twisting motion”
occasionally felt and complained of before the additional wooden struts
were set up for the security of the principal beams; but this effect had more
especially disappeared ever since the attachment of the great horizontal
iron-bars in connection with these supports, instead of the chain-braces,
shewn in Plate VIII. Before the tide rose to its full height to-day, some of
the artificers passed along the bridge into the Light-house, to observe the
effects of the sea upon it, and they reported that they had felt a slight
tremulous motion in the building, when great seas struck it in a certain
direction, about high-water mark. On this occasion, the sprays were again
observed to wet the balcony, and even to come over the parapet-wall into
the interior of the light-room. In this state of the weather, Captain Wilson
and the crew of the Floating-light were much alarmed for the safety of the
artificers upon the Rock, especially when they observed, with a telescope,
that the floor of the smith’s gallery had been carried away, and that the
triangular cast-iron sheer-crane was broken down. It was quite impossible,
however, to do any thing for their relief, until the gale should take off.
The weather moderated in the course of the last night,
Friday, 17th.
and the wind shifted to S.W., when the Tender, which
had been for the last two days in the Firth of Forth,
Tender returns to the stood towards the Rock, and reached it at 7 p. m., but
Rock.
could not come within speech of the inhabitants of the
Beacon, though, from signals mutually exchanged, it appeared that all was
pretty well. Captain Taylor next spoke the Floating-light, and found no
complaint on board. They had, indeed, shipped several heavy seas, yet no
damage had been sustained; and during the gale they rode with 60 fathoms
of cable veered out. After making these enquiries, he stood towards
Arbroath to get the Tender’s rigging refitted, and her moorings repaired,
which had suffered in the gale. Knowing also that a new floor, and other
articles, were wanting at the Beacon, he meant also to supply some of these;
but on approaching Arbroath, there was still too much sea upon the bar of
the harbour, and he was obliged to stand off again to sea.
The wind shifted to the westward to-day, and the
Saturday, 18th.
Tender got into Arbroath. In the mean time, Captain
Wilson visited the Bell Rock with a well manned boat
Smith’s Anvil, from the Floating-light, when he had the happiness to
Bellows, &c. washed

Page 422

off the Beacon. find Mr Peter Logan and his people in perfect health,
though, in the course of the gale, they had at times been
considerably alarmed, while the sea was making inroads upon their
habitation. In searching about the Rock in quest of some of the articles
which had been washed from the smith’s gallery, it is not a little
remarkable, that so ponderous an article as the anvil, weighing 170 lb.,
should have been found in a hole at the distance of 60 feet from the Beacon,
and that the iron pan or hearth of the forge, weighing about 100 lb., was
found at the distance of 200 feet from it. Near to this lay one of the cast-iron
mortar-tubs; but the smith’s bellows, and many other articles amissing, were
never found. Captain Wilson foreseeing that there might be a want of fuel
on the Rock from the late disaster, had very properly carried two bags of
coal from the Floating-light; and, after landing these, he returned to his ship
at 2 p. m.
Both the Tender and the Smeaton having been forced
Thursday, 23d.
into Arbroath, were detained there with strong gales of
westerly wind, till Monday the 20th, when they sailed
Light-room sashes for the Rock; the Smeaton, with the sash-frames of the
landed. Captain
Wilson is hurt by one Light-room on board, and the Tender, with a supply of
of them. provisions and necessaries for the Floating-light and
Beacon-house. The wind being at W.S.W. and the
weather more moderate, both vessels got to their moorings on the 23d,
when all hands were employed in transporting the sash-frames from on
board of the Smeaton to the Rock. In the act of setting up one of these
frames upon the bridge, it was unguardedly suffered to lose its balance, and,
in saving it from damage, Captain Wilson met with a severe bruise in the
groin, on the seat of a gunshot wound received in the early part of his life.
This accident laid him aside for several days.
The Smeaton being now discharged, sailed again for
Friday, 24th.
other articles still wanted from Edinburgh, belonging to
the Light-room frame. The masons at the Rock were
busily employed in setting up the stair, and in dressing off and polishing the
joints of the interior walls of the Light-house: For, although the stones had
all been polished to a smooth surface in the work-yard, in order to give the
apartments a cleanly and comfortable appearance, as plastering would have
been quite unsuitable for such a situation, yet the walls in many parts

Page 423

required to be retouched, when they came to be examined in a more
finished state. James Glen, of whom mention has already been frequently
made, was assisted by the smith in refitting the gallery, and the other injured
parts of the Beacon-house.
The sash-frames of the Light-room, 8 in number, and
Monday, 27th.
weighing each 254 lb., having been got safely up to the
top of the building, were ranged on the balcony, in the
Balance-crane order in which they were numbered, for their places on
removed from the top
of the Building. the top of the parapet-wall; and the balance-crane, that
useful machine, having now lifted all the heavier
articles, was unscrewed and lowered, to use the landing-master’s phrase, “in
mournful silence.”
The works were visited at this time by Mr Rae, Sheriff
Wednesday, 29th.
of Edinburgh, now Sir William Rae, Bart., Lord
Advocate of Scotland, and Mr Adam Duff, Sheriff of
Sir William Rae and Forfar, now of Edinburgh, ex officio Commissioners of
Party visit the Rock.
the Northern Light-houses, who, as Members of the
Bell Rock Committee, had individually taken much interest in the Light-
house affairs. The party further consisted of General Brown, Captain Harry
Stuart of the Royal Navy, Mr James Dickson of Leith, and Mr Charles
Cuningham, Secretary and Cashier to the Light-house Board. The writer
had the pleasure of embarking with these gentlemen at Leith on the 28th, in
the Bell Rock Tender, and, after calling at the Light-houses of Inchkeith and
Isle of May, the vessel, in the course of the night, got towards the Rock, and
next morning the party landed, and minutely examined every thing
connected with the operations of the Light-house and Beacon. On this
occasion, one of the principal landing-places was named Rae’s Wharf, and
another Duff’s Wharf, as marked on Plate VI. After breakfasting in the
Light-house, Sir William proposed, that the foremen, landing-master,
artificers and seamen, should be collected on the Beacon, when he
expressed the satisfaction which he and his brother Commissioner felt at
seeing the present advanced state of the Light-house; and, after alluding to
the utility which might result from the publication of the whole proceedings
of this work, concluded an address of much tenderness of feeling, by
wishing all of us every prosperity and happiness. The party having been
highly amused and gratified upon the Rock, again embarked; and at 10 a. m.

Page 424

the Tender sailed for Leith Roads, where she arrived, at 6 o’clock p. m.,
having made the trip from thence in the short space of about 28 hours.
The writer having accompanied the party to Leith,
1810, September.
immediately returned to the Bell Rock, where he was to
make arrangements for bringing the operations to a
Sunday, 2d. conclusion. The steps of the stair being landed, and all
the weightier articles of the Light-room got up to the
Wooden-bridge balcony, the wooden-bridge was now to be removed, as
removed from the
Rock. it had a very powerful effect upon the Beacon, when a
heavy sea struck it; and could not possibly have
withstood the storms of a winter. Every thing having been cleared from the
bridge, and nothing left but the two principal beams, with their horizontal
braces, James Glen, at high-water, proceeded with a saw to cut through the
beams at the end next the Beacon, which likewise disengaged their opposite
extremity, inserted a few inches into the building. The frame was then
gently lowered into the water, and floated off to the Smeaton, to be towed to
Arbroath, to be applied as part of the materials in the erection of the light-
keepers’ houses. After the removal of the bridge, the aspect of things at the
Rock was much altered. The Beacon-house and Building had both a naked
look, to those accustomed to their former appearance; a curious optical
deception was also remarked, by which the Light-house seemed to incline
from the perpendicular towards the Beacon. The horizontal rope-ladder
before noticed was again stretched, to preserve the communication; and the
artificers were once more obliged to practise the awkward and stradling
manner of their passage between them during 1809, as will be understood
by examining the second year’s work of Plate IX.
At 12 noon, the bell rung for prayers, after which the
Last Stone of the
Light-house laid.
artificers went to dinner, when the writer passed along
the rope-ladder to the Light-house, and went through
the several apartments, which were now cleared of lumber. In the afternoon,
all hands were summoned to the interior of the house, when he had the
satisfaction of laying the upper step of the stair, or last stone of the
Building. This ceremony concluded with three cheers, the sound of which
had a very loud and strange effect within the walls of the Light-house. At 6
o’clock Mr Peter Logan, and eleven of the artificers, embarked with the
writer for Arbroath, leaving Mr James Glen with the special charge of the

Page 425

Beacon and Railways, Mr Robert Selkirk with the Building, with a few
artificers to fit the temporary windows, to render the house habitable.
At Arbroath, the building operations for the keepers’
1810, October.
houses were left under charge of Mr Peter Logan and
Mr Lachlan Kennedy, when the writer proceeded for
Tuesday, 4th. Greenock, to sail on his annual voyage to the Northern
Light-houses. In passing the Floating-light this
Tender sails for Leith, morning, he went on board, and examined that ship
to be sold.
with Captain Wilson, and had the satisfaction to find
every thing in the most orderly and cleanly condition. The sailors, with
those feelings which usually accompany taking permanent leave of a vessel,
hoisted an ensign flag on board of the Floating-light, as the Tender was now
on her way to Leith to be dismantled and sold. The writer must also confess,
that, on finally leaving the Sir Joseph Banks Tender, it was not without
feelings of regret, as he had spent a considerable portion of the two last
summers in this beautifully moulded ship.
On the afternoon of the 5th, a signal was observed
A Praam-boat drifts
from the Rock.
flying from the main-mast-head of the Floating-light,
which created considerable alarm at Arbroath, when the
Smeaton sailed to inquire into the cause. Upon hailing the Floating-light,
Captain Wilson informed Mr Pool that the Hedderwick praam-boat had
broke adrift from her moorings, and gave his opinion as to the course to be
steered, in order to fall in with her. At 8 o’clock next morning she was
observed a few leagues to the eastward, and taken in tow by the Smeaton, to
be carried to Leith; but the wind being westerly, after getting above the Isle
of May, she was obliged to anchor in Canty Bay, to the eastward of
Tantallan Castle; and at noon on the 12th, she got safely into the harbour of
Leith, after a very cross passage of six days.
The arrival of the Smeaton had for some days been
Artificers for the
anxiously watched, as the remaining parts of the Light-
erection of the Light-
room landed. room were ready to ship for the Bell Rock. No time was
therefore lost in getting her loaded; and, on Thursday
the 13th, she again sailed with Mr Dove, and the artificers, who were to fit
up the light-room; and on the following day the whole were landed at the
Rock. The first operation was to put up a temporary rail round the balcony,
with a few iron stanchions, and some ropes, for the safety of the workmen.

Page 426

Captain Wilson and his crew also erected a pair of sheers and a suitable
tackle for lifting the cast-iron sash-frames from the balcony to the top of the
parapet-wall.
This being the train in which the Bell Rock matters
Saturday, 15th.
were left, the writer embarked to-day at Greenock, in
the Light-house Yacht, along with his friends, Dr John
Dr Barclay and party Barclay, Mr Charles Oliphant, and Mr Patrick Neill,
sail with the writer to
the Light-houses. who were to accompany him on a tour to the Northern
Light-houses. Notwithstanding the boisterous state of
the weather during the early part of the month of September, it now became
uncommonly fine; the barometer being found to oscillate within a few parts
of 30 inches, and the range of the thermometer, taken daily at 9 a. m.,
indicated from 43 to 50 degrees. The winds were also chiefly from the west,
which being favourable for the ship’s course, the trip was not only
remarkable for its quickness, but was, upon the whole, the most pleasant
which the writer had ever experienced; as will readily be imagined by those
who have the happiness to know the excellent qualities of his fellow-
travellers, whether considered on account of their manner, intelligence, or
scientific acquirements. This opportunity is therefore gladly embraced by
the writer of recording their mutual friendships.
On returning from this voyage, the writer landed at the
Progress of the Light-
room works.
Bell Rock on Sunday the 14th of October, and had the
pleasure to find, from the very favourable state of the
weather, that the artificers had been enabled to make great progress with the
fitting up of the Light-room. From the 14th of September till the 22d, they
were occupied in fitting the sole-plate and trimming-path, forming the
basement of the window-sash-frames. From the 22d till the 23d, the work
executed got two successive coats of oil-paint; and, as it had also been
carefully laid over with linseed-oil at the foundry, while in a hot state, it
was nearly impervious to the effects of the atmosphere, and was likely to be
kept free from oxidation. Between the 28th September and 2d October, the
sash-frames were raised to their places and screwed together, along with the
top-plate or cornice. From the 2d till the 15th, the copper-smiths were
employed in erecting the cupola or roof of the Light-room, the several parts
of which will be more readily understood by examining Plate XX., with its
letter-press description. Besides finding the works in this forward state, the

Page 427

writer had the happiness of seeing the plate-glass for the Light-room safely
landed on the Rock. Each of these plates, measuring 32½ inches by 26¼
inches, and one quarter of an inch in thickness, could not have been soon or
easily replaced; and their safe arrival was therefore considered a very
fortunate circumstance; which having witnessed, the writer set sail for
Leith, where he landed on the following morning.
The light-room work had proceeded, as usual, to-day,
Friday, 10th.
under the direction of Mr Dove, assisted in the
plumber-work by Mr John Gibson, and in the brazier-
Loss of Charles work by Mr Joseph Fraser; while Mr James Slight, with
Henderson.
the joiners, were fitting up the storm-shutters of the
windows. In these several departments, the artificers were at work till 7
o’clock p. m., and it being then dark, Mr Dove gave orders to drop work in
the light-room; and all hands proceeded from thence to the Beacon-house,
when Charles Henderson, smith, and Henry Dickson brazier, left the work
together. Being both young men, who had been for several weeks upon the
Rock, they had become familiar, and even playful on the most difficult parts
about the Beacon and Building. This evening they were trying to outrun
each other, in descending from the light-room, when Henderson led the
way; but they were in conversation with each other, till they came to the
rope-ladder, distended between the entrance-door of the Light-house and
the Beacon. Dickson, on reaching the cook-room, was surprised at not
seeing his companion, and inquired hastily for Henderson. Upon which the
cook replied, “Was he before you upon the rope-ladder?” Dickson answered
“Yes; and I thought I heard something fall.” Upon this the alarm was given,
and links were immediately lighted, with which the artificers descended on
the legs of the Beacon, as near the surface of the water as possible, it being
then about full tide, and the sea breaking to a considerable height upon the
building, with the wind at S.S.E. But after watching till low-water, and
searching in every direction upon the Rock, it appeared that poor
Henderson must have unfortunately fallen through the rope-ladder, and
been washed into the deep water.
The deceased had passed along this rope-ladder many hundred times, both
by day and night, and the operations in which he was employed being
nearly finished, he was about to leave the Rock when this melancholy
catastrophe took place. The unfortunate loss of Henderson cast a deep

Page 428

gloom upon the minds of all who were at the Rock, and it required some
management on the part of those who had charge, to induce the people to
remain patiently at their work: as the weather now became more boisterous,
and the nights long, they found their habitation extremely cheerless, while
the winds were howling about their ears, and the waves lashing with fury
against the beams of their insulated habitation.
It has already been noticed, that the plate-glass for the
Difficulty attending
the procuring of Red-
sash-frames of the light-room was safely landed on the
coloured-Glass. Rock, and the writer had also the satisfaction of
learning to-day that the red-coloured glass for
distinguishing the light was in readiness to ship at London. After having
corresponded with all parts of the kingdom, in endeavouring to procure red
glass of the finest quality, by having it coloured in the furnace, it was
mortifying to find that its manufacture was wholly impracticable, excepting
in the production of small pieces, containing not more than three or four
square inches, similar to those in the compartments of cathedral-windows:
which, in the process of shading a reflector, must have induced a number of
minute divisions, and necessarily obstructed much of the light. The writer at
length resolved on confining his attention to plates of Crown-glass, stained
by repeated applications of the litharge of gold, laid on after the manner of
gum or paint, which was afterwards subjected to a strong heat in a muffle or
furnace, of a peculiar construction, forming altogether a very nice and
difficult process. In looking through this stained glass, the eye is not
sensible of any effect but that of a fine rich red colour, when the pigment is
properly applied; but, on examining a cross section of the glass, the green
colour of the Crown-glass is distinctly seen in the centre, while a thin film
of red is perceptible on the edges. Although the effect produced in this way
cannot be so perfect as if the glass were uniformly coloured in the pot; yet,
when applied to the purposes of a distinguishing light, its effects are highly
characteristic and beautiful. As the works were now drawing near a
completion, and all the essential parts of the light-room apparatus must
soon be upon the spot, the writer, after repeated disappointments from Mr
James Okey, glass-stainer of London, found it necessary to send Mr John
Forrest, superintendant of light-keepers’ duty, with instructions to remain
there until he got the plates into his possession. He accordingly arrived in
London on the 15th of September, and immediately waited upon Okey; but,
notwithstanding the numerous letters and pressing calls which had been

Page 429

made upon that artist, explanatory of the necessity of the case; yet, as the
plates wanted were to be 25 inches in diameter, and, consequently, about 5
inches more than any he had hitherto been required to make, his furnace
was still to rebuild, and his apparatus otherwise to conform to these
enlarged dimensions, before he could begin to the Bell Rock plates. In order
to insure attention and dispatch, Mr Forrest took lodgings at Clerkenwell, in
Mr Okey’s immediate neighbourhood, and paid frequent visits to his
workshop. Numerous glass-workers in various parts of the country had
previously been applied to for this article, but none of them ever produced a
single plate.
The whole apparatus and workmen necessary for
Monday, 22d.
completing the exterior of the Light-house being now
on the Rock, the writer was desirous of seeing the ball
Mr Robert Hamilton placed upon the top of the cupola, and accordingly
visits the Bell Rock.
embarked at Leith in the Yacht for that purpose. Mr
Hamilton, who, as one of the Commissioners, had always taken a most
lively interest in the affairs of the Bell Rock, took this opportunity to pay it
another visit. The wind was at W.S.W., blowing pretty fresh with the
barometer at 29.50; but, in the course of the night, the Yacht got down to the
Floating-light, and was kept plying about, within view of it, till morning.
The wind had shifted, in the night, to N.W., and blew a
Tuesday, 23d.
fresh gale, while the sea broke with violence upon the
Rock. It was found impossible to land, but the writer,
The ventilator-ball is from the boat, hailed Mr Dove, and directed the ball to
set upon the cupola.
be immediately fixed. The necessary preparations were
accordingly made, while the vessel made short tacks on the southern side of
the Rock, in comparatively smooth water. At noon, Mr Dove, assisted by
Mr James Slight, Mr Robert Selkirk, Mr James Glen, and Mr John Gibson,
plumber, with considerable difficulty, from the boisterous state of the
weather, got the gilded-ball screwed on, measuring 2 feet in diameter, and
forming the principal ventilator at the upper extremity of the cupola of the
Light-room, as will be seen from the section in Plate XX. At Mr Hamilton’s
desire, a salute of 7 guns was fired on this occasion, and all hands being
called to the quarter-deck, “Stability to the Bell Rock Light-house” was not
forgotten.

Page 430

The glazing of the sash-frames of the light-room having
Thursday, 25th. been completed on Wednesday the 24th, the boats of
the Smeaton and Floating-light landed on the morning
The Light-room is of the 25th, when the plumbers and glaziers left the
glazed.
Rock; from whom the writer learned the progress which
had been made with the work. Among other preparations for the glazing, it
was stated, that besides the sheeting provided as a screen, all hands had
engaged to give part of their bedding for the better defence of the glass, in
case it should come to blow so hard as to endanger the stopping of the
work; but although the weather had rather a threatening aspect at the
commencement of this critical operation, yet it was got through in a manner
much beyond expectation, and in one day and a half the light-room was
completely closed; though not without being under the necessity of lighting
torches at night, which were, however, screened from the view of shipping.
After the house was glazed, and in a manner externally
Saturday, 27th.
finished, the writer sailed from Leith for the Rock, on
the 27th of October; but, as it came to blow very fresh
The Yacht returns to from W.S.W., a landing could not be effected, and the
the Rock, but loses
one of her boats. Yacht was put into Arbroath till the 29th, when the wind
became more moderate, and she again stood off. While
in the act of putting about, with the sea still running high, one of the two
boats astern got entangled and filled with water, when the stem of one of
them unfortunately parted, and she immediately sunk. It was indeed with
great difficulty that the other was saved, by two of the crew jumping into
her, at the risk of their lives; and having baled out the water with buckets,
she was got safely on board.
This accident obliged the vessel to be anchored all night
Tuesday, 30th.
in the Bay of Arbroath, and having got another boat she
sailed this morning at 5 o’clock. On reaching the Rock,
Great dexterity of the it was found that a very heavy sea still ran upon it; but
Landing-master and
his crew. the writer having been disappointed on the two former
occasions, and, as the erection of the house might now
be considered complete, there being nothing wanted externally, excepting
some of the storm-shutters for the defence of the windows, he was the more
anxious at this time to inspect it. Two well manned boats were therefore
ordered to be in attendance; and, after some difficulty, the wind being at

Page 431

N.N.E., they got safely into the western creek, though not without
encountering plentiful sprays. It would have been impossible to have
attempted a landing to-day, under any other circumstances than with boats
perfectly adapted to the purpose, and with seamen who knew every ledge of
the Rock, and even the length of the sea-weeds at each particular spot, so as
to dip their oars into the water accordingly, and thereby prevent them from
getting entangled. But what was of no less consequence to the safety of the
party, Captain Wilson, who always steered the leading boat, had a perfect
knowledge of the set of the different waves, while the crew never shifted
their eyes from observing his motions, and the strictest silence was
preserved by every individual except himself. Under such regulations,
which were observed on all occasions of difficulty, the landings at the Rock
proceeded with the greatest regularity, and by this means, safety, and even
comfort, were enjoyed, where, under different circumstances, there would
have been much peril. The second or attending boat was steered by James
Shepherd the experienced coxwain of the Floating-light, whose directions
were to keep about two oars’ length astern. This boat was generally kept
light, and as free of incumbrance as possible, that she might be ready to
assist in any case of emergency. The writer is the more particular upon this
subject, as he conceives that much of the success of the Bell Rock
operations depended on the safety which attended the many thousands of
landings made in all sorts of weather.
On landing at the Rock this morning, the writer found
State of the Railways.
the Railways much broken up on the eastern-reach and
the circular track round the building; while the western-
reach, extending to upwards of 290 feet, had also materially suffered. In
several places it had got an inclination to one side, by the force of the N.E.
seas, which came sweeping round the Rock, and it was evident it could not
withstand the gales of winter. The Norway logs, on which these railways
were supported, had not only been much reduced in strength, by the ravages
of the insect formerly noticed, but, from this cause also, the rails had got a
tremulous motion in heavy seas, which had shaken loose several of the
bolts. It was, however, so far well that they had already answered the
immediate purpose intended by them.
The Beacon-house was found, upon examination, to be in general in a good
state of repair, though the lower parts, where the beams rested upon the

Page 432

Rock, had suffered from the insect. Several of them, as
State of the beams ofbefore noticed, had been so much hollowed, where they
the Beacon.
at first rested on the Rock, that the hand could be
introduced into the heart of the log, while the exterior of the timber, for an
inch or two in thickness, remained quite entire; the charring of the surface,
and the hot-pitch, wherever it could be applied, having completely
preserved it. Several of the beams, however, now rested chiefly upon the
bolts, which passed through the great iron-stanchions sunk into the Rock, as
represented in Plate VIII. But this fabric had nearly served its purpose, and
there was a prospect of its being taken down next summer. It has before
been noticed that these effects, at the parts where the beams rested, or were
in contact with the Rock, had not been anticipated. But, in the event of a
similar erection on any part of the British coast, it would be proper to
provide against this by sinking the foot of the principal beams 8 inches into
the Rock, and shoeing them with sheet lead or copper; though the action of
the latter metal with the iron-work might be somewhat objectionable, and
might render a coating with tin advisable.
Having examined the Beacon-house, he next passed to
State of the Light-
house.
the Light-house, by the horizontal rope-ladder
represented in Plate IX. The lower part of the building,
as high as the perpendicular range of the tide, was coated all over with
marine plants; toward the north-east, this appearance had indeed reached
about 50 feet in height. On entering the house, he had the pleasure to find it
in a somewhat habitable condition, the lower apartments being closed in
with temporary windows, and fitted with proper storm-shutters. It may here
be remarked as a strong instance of the very fortunate position of the
Entrance-door, that although the sea had risen to the height of upwards of
80 feet, on the eastern side of the Light-house, it had not, as yet, been found
necessary to have it hung, although Mr Slight was now setting about this
operation, by the insertion of the Lewis-bats or tails of the hinges, into their
respective brass-boxes, previously built into the walls. There being, as yet,
no inner-door for the passage, temporary-hatches were also still wanting for
the man-holes of the several floors, to check the sifting air, which, in
westerly winds, made the house very cold, and carried along with it
particles of dust, which might have become injurious to the reflecting-
apparatus.

Page 433

The lowest apartment at the head of the stair-case was
Condition of the occupied with water, fuel, and provisions, put up in a
several apartments.
temporary way, until the house could be furnished with
proper utensils. The second or light-room store was, at present, much
encumbered with various tools and apparatus for the use of the workmen.
The kitchen immediately over this had, as yet, been supplied only with a
common ship’s coboose, and plate-iron funnel, while the necessary cooking
utensils had been taken from the Beacon. The bed-room was, for the
present, used as the joiners’ workshop, and the strangers’ room,
immediately under the light-room, was occupied by the artificers, the beds
being ranged in tiers, as was done in the barrack of the Beacon. The light-
room, though unprovided with its machinery, being now covered over with
the cupola, glazed and painted, had a very complete and cleanly
appearance. The balcony was only as yet fitted with a temporary rail,
consisting of a few iron stanchions, connected with ropes; and in this state it
was necessary to leave it during the winter.
Having gone over the whole of the low-water works on
Light-house put underthe Rock, the Beacon and Light-house, and being
charge of Mr John
Reid. satisfied that only the most untoward accident in the
landing of the machinery could prevent the exhibition
of the light, in the course of the winter; Mr John Reid, formerly of the
Floating-light, was now put in charge of the light-house as principal keeper;
Mr James Slight had charge of the operations of the artificers; while Mr
James Dove and the smiths having finished the frame of the light-room, left
the Rock for the present. With these arrangements the writer bade adieu to
the works for the season. At 11 a. m. the tide was far advanced; and there
being now little or no shelter for the boats at the Rock, they had to be pulled
through the breach of sea, which came on board in great quantities, and it
was with extreme difficulty that they could be kept in the proper direction
of the landing-creek.—On this occasion, he may be permitted to look back
with gratitude on the many escapes made in the course of this arduous
undertaking, now brought so near to a successful conclusion.
The wind having, on Saturday the 3d of November,
November.
shifted to the N. E., with showers of snow,
accompanied by a very heavy swell of sea, it was
Saturday, 3d. stated, in the monthly return from the Rock, that the

Page 434

water had come in considerable quantities into the
The Boat is washed threshold of the entrance-door, which, on this occasion,
off the Beacon.
had to be shut. During this gale, it was thought that the
Beacon would certainly have been carried away by the force of the
tremendous seas which fell upon it, and often washed over it at high-water.
The small boat suspended from projected davits at the height of 30 feet
above the Rock, as shown in Plate VIII., got full of water by the accidental
stopping of the eyelet-hole, while the friction occasioned by the tremulous
motion of the Beacon, and beating of the waves, chaffed one of the bow-
tackle ropes: she then hung suspended from the stem-tackle, and every sea
which came rolling along gave her a new impulse: this soon wore out the
remaining tackle, and she was at length swept away, after having kept her
position since mid-summer.
On one occasion, while the inmates of the Light-house
Sprays rise 104 feet
on the Light-house.
were standing on the balcony, looking with attention at
the wonderful state of the sea, the sprays conducted by
the walls, came full in their faces, and, passing partly over their heads,
struck upon the second tier of the glass-panes of the light-room, which is
104 feet from the Rock! During this gale, a thrilling motion was sensibly
felt throughout the building, upon leaning against the walls at particular
periods, when the seas struck the base of the house. The rise of the spray to
the height above mentioned rather surprised the writer, as he had not
himself at any time seen it higher than about 70 feet. He had, however, felt
the tremulous effect alluded to; and it has already been remarked, that it is
not while the gale continues that the sea strikes so hard, or rises to so great a
height; but after the abatement of the storm, when the waves begin to break
in the manner represented in the frontispiece.
This gale was also much felt on board of the Floating-
Sprays fly over the
Floating-light.
light. Captain Wilson states, in his account of the
weather, that he had to veer out the long-service, or
about 90 fathoms of cable, and often to freshen hawse, or to shift that part
of the cable which was immediately in the hawsehole of the ship. The seas
also which struck the bows of the vessel were generally carried as far aft as
the quarter-deck, and were not unfrequently thrown over the stern. This gale
was, therefore, considered to have been as severe as that of September
1807, already described. The Light-house Yacht, now acting as Tender at

Page 435

the Rock, having been driven from her station, had taken shelter in
Burntisland Roads, ready on the first change of weather to return to the
Rock. The Smeaton and Patriot were fortunately in Arbroath, discharging
their cargoes of stones from Milnfield, for the establishment on shore.
On Monday the 5th, the Yacht again visited the Rock;
Mr Reid and Mr
Fortune left in the
when Mr Slight and the artificers returned with her to
Light-house. the work-yard, where a number of things were still to
prepare connected with the temporary fitting up of the
accommodation for the light-keepers. Mr John Reid and Peter Fortune were
now the only inmates of the house. This was the smallest number of persons
hitherto left in the Light-house. As four light-keepers were to be the
complement, it was intended that three should always be at the Rock. Its
present inmates, however, could hardly have been better selected for such a
situation; Mr Reid being a person possessed of the strictest notions of duty,
and habits of regularity, from long service on board of a man-of-war, while
Mr Fortune had one of the most happy and contented dispositions
imaginable.
From Saturday the 10th till Tuesday the 13th, the wind
Tuesday, 13th.
had been from N.E., blowing a heavy gale; but to-day,
the weather having greatly moderated, Captain Taylor,
Experience a heavy who now commanded the Smeaton, sailed at 2 o’clock
gale.
a. m. for the Bell Rock. At 5 the Floating-light was
hailed, and found to be all well. Being a fine moon-light morning, the
seamen were changed from the one ship to the other. At 8, the Smeaton
being off the Rock, the boats were manned, and taking a supply of water,
fuel, and other necessaries, landed at the western side, when Mr Reid and
Mr Fortune were found in good health and spirits. They reported, that the
sea had run very heavily, and rose at times nearly to the balcony of the
Light-house, when it fell with great weight and violence on the Beacon-
house; that, on Sunday the 11th, the wooden-frame of the western wharf
was carried away; and that the railways to the eastward were also much
shattered and broken by large detached masses of rock, brought from deep
water by the impulse of the sea, some of which left on the Rock were
apparently of the cubical contents of several tons. Though none of these
stones have yet been traced as belonging to any particular part of the Rock,
yet they are all of the same red sandstone. It was intended at this time, that a

Page 436

large stock of coals and water should have been got into the Light-house,
before the Smeaton went to Leith, to load the remainder of the apparatus;
but this, from the state of the weather, was found impracticable, and she
therefore returned to Arbroath, to wait a change of weather.
It having been intimated at the work-yard, that a log of
1810, November.
timber had come ashore at West-Haven, about six miles
from Arbroath, James Glen, who knew every piece of
Saturday, 1st. timber upon the Bell Rock, was dispatched, to ascertain
if it had drifted from thence; and, on his return, reported
Their description of that the log had belonged to the Western Wharf. Mr
the effects of the Sea
upon the Light- Slight having got his apparatus prepared, went again off
House. to the Rock with the workmen, when a large additional
supply of water, fuel, and provisions, was also landed.
It was now ascertained, that the whole of the western wharf, and part of its
connecting railway, had been carried away, and that the circular-track and
eastern-reach of the railways were much damaged. Mr Reid farther stated,
that, during the late gales, particularly on Friday the 30th, the wind veering
from S.E. to N.E., both he and Mr Fortune sensibly felt the house tremble,
when particular seas struck, about the time of high-water; the former
observing that it was a tremor of that sort which rather tended to convince
him that every thing about the building was sound, and reminded him of the
effect produced, when a good log of timber is struck sharply with a mallet;
but, with every confidence in the stability of the building, he nevertheless
confessed, that, in so forlorn a situation, they were not insensible to those
emotions which, he emphatically observed, “made a man look back upon
his former life.”

Page 437

The Smeaton was now much wanted at Leith, where Mr
1810, December. Forrest had arrived from London on the 1st, with the
plates of red-coloured glass; but the weather continued
Thursday, 6th. boisterous, and she was detained in the harbour of
Arbroath with a gale at S.W. To-day the writer got notice
The Red-coloured from Mr Andrew Roger, merchant in St Monance, that
glass arrives at Leith.
some fishermen belonging to that village had picked up a
raft of timber, strongly bolted together. This turned out to be part of the timber
of the Western Wharf, which had drifted from the Rock on the 11th, and had
been ever since floating about the Firth of Forth. It was picked up on the coast
of Fife, about nine miles to the westward of the Isle of May.
The wind having shifted last night, the Smeaton sailed
Saturday, 8th.
from Arbroath at 10 p. m., for Leith, to take on board the
whole of the remaining appurtenances necessary for the
The Reflecting exhibition of the Light. She got into Leith harbour on the
apparatus sent from
Leith. 9th, about mid-day, when the apparatus was immediately
put on board; but the weather was unfavourable for going
down the Firth of Forth. To-day, however, the wind being west, with a better
appearance, the following persons sailed for the Rock, viz. Mr James Dove,
smith, who was to screw together the frame for the Reflecting-apparatus; Mr
James Clark, clock-maker, who had constructed, and was now to regulate, the
Revolving-machinery for the lights; and Mr John Forrest, who had the general
superintendance of the keepers’ duty of the Northern Light-houses, and being
also foreman for Light-room repairs in the service, was to adjust the reflectors
and lamps, and remain at the Bell Rock until every thing was found to proceed
in a satisfactory manner.
At day-light this morning, however, the Smeaton was still
Friday, 14th.
eight or nine miles from the Light-house, with hardly any
wind. In the prospect of effecting a landing, Captain
An attempt is made to Taylor manned the boat when about two miles distant
land at the Rock.
from the Rock, intending to leave the above persons, and
afterwards to take the earliest opportunity of landing the apparatus, the tide
being now too far spent for attempting the latter operation. The only articles
taken in the boat, besides their personal luggage, were the two boxes of red-
glass, which having already cost so much trouble, and requiring so much care,
Mr Forrest, with his usual caution, had determined not to lose sight of. The
party thus proceeded, but, on reaching the Rock, they had the mortification to

Page 438

find it nearly under water, with such a breach of sea that no boat could
approach it. They were, therefore, obliged to return to the ship, perishing with
cold, and chagrined with disappointment.
The wind still continued from N.W., but, most fortunately
Saturday, 15th.
for the business of the day, the weather was moderate.
Having last night called at the Floating-light, it was
Reflecting-apparatus arranged with Captain Wilson, that he should attend by
safely landed.
day-light at the Rock, with one of his boats, to assist in
landing the Smeaton’s cargo. The passengers went off first, carrying in their
boat the two cases of coloured-glass, and a few other articles, while the
Floating-light’s boat followed with the machinery; and by noon the whole of
the Reflecting-apparatus was got safely into the Light-house. Mr Forrest
having thus been enabled to give advice, which reached the writer on the 17th,
that all the articles had been safely landed; and foreseeing that every thing
would be in readiness in the course of about four weeks, a specification of the
appearance of the light was prepared, to the following effect, for public
advertisement.
“Navigation of the North Seas.—A Light-house having been erected
Monday, 17th. upon the Inch Cape, or Bell Rock, situate at the entrance of the Friths of
Forth and Tay, in north Lat. 56° 29´, and west Long. 2° 22´,—The
Commissioners of the Northern Light-houses hereby give notice, That
The Light is the Light will be from oil, with reflectors, placed at the height of about
advertised to the 108 feet above the medium level of the sea. The light will be exhibited
Public. on the night of Friday, the 1st day of February 1811, and each night
thereafter, from the going away of day-light in the evening until the
return of day-light in the morning. To distinguish this light from others on the coast, it is made
to revolve horizontally, and to exhibit a bright light of the natural appearance, and a red-
coloured light, alternately, both respectively attaining their greatest strength or most luminous
effect in the space of every four minutes; during that period, the bright light will, to a distant
observer, appear like a star of the first magnitude, which, after attaining its full strength, is
gradually eclipsed to total darkness; and is succeeded by the red-coloured light, which in like
manner increases to full strength, and again diminishes and disappears. The coloured-light,
however, being less powerful, may not be seen for a time after the bright light is first
observed. During the continuance of foggy weather, and showers of snow, a Bell will be
tolled, by machinery, night and day, at intervals of half a minute. Notice is hereby also given,
That the Floating-light, moored two and a half miles N.W. ½ N. from the Bell Rock, will,
from and after the 1st day of February 1811, be discontinued, and, as soon thereafter as the
weather permits, the vessel will be removed from her station.”

To give this Notice publicity, it was advertised in the
List of Newspapers.
following Newspapers:
Scotch.

Page 439

Edinburgh Weekly Chronicle.
---- Courant.
---- Correspondent.
---- Mercury.
---- Advertiser.
---- Star.
---- Journal.
Leith Telegraph.
Dundee Advertiser.
---- Mercury.
Perth Courier.
Montrose Review.
Aberdeen Journal.
---- Chronicle.
Inverness Journal.
Glasgow Journal.
---- Courier.
---- Western Star.
---- Sentinel.
---- Packet.
---- Herald.
Greenock Advertiser.

English.

London Gazette.
---- Globe.
---- Morning Post.
London Courier.
---- Chronicle.
Plymouth Telegraph.
---- Chronicle.
Bristol Gazette.
---- Journal.
---- Mirror.
---- Mercury.
Liverpool Courier.
---- Advertiser.

Page 440

---- General Advertiser.
---- Saturday Advertiser.
Cumberland Packet.
Newcastle Courant.
---- Chronicle.
---- Advertiser.
---- Tyne Mercury.
Hull and Rockingham Packet.
Hull and Rockingham Advertiser.
York Courant.
---- Herald.
---- Chronicle.
Norwich Mercury.
Hampshire Telegraph.

Irish.

Dublin Evening Post.
---- Patriot.

The Tender having got a landing made on the 27th
Thursday, 27th. December, every thing at the Light-house was found in a
prosperous state. Mr Dove and Mr Clark had finished
The Light-keepers are their work about two hours before the Smeaton came in
left in possession of
the House. sight; and Mr Slight had also completed all that was
proposed to be done to the interior finishing of the
apartments this winter; so that Mr Forrest, with Messrs Reid, Bonyman,
Leask, and Fortune, the keepers, were now left in possession of the Light-
house.

Page 441

CHAPTER VII.
ACCOUNT OF THE BELL ROCK LIGHT-HOUSE, FROM ITS COMPLETION IN 1810
TILL THE YEAR 1823, INCLUDING A STATEMENT OF THE EXPENCE OF THE
WORK.

When the artificers left the Bell Rock, on the 27th of
1811, January.
December 1810, Mr Forrest’s first object was to take
down the rope-ladder, distended in a horizontal position between the entrance-
door of the Light-house and the mortar-gallery of the Beacon, as it prevented
the door from being conveniently shut, and thereby occasioned a draught of
air through the several apartments, rendering the house uncomfortable, and
proving injurious to the lustre of the reflectors. In lieu of this, another rope-
ladder, fitted with wooden steps, was suspended from a Lewis-bat, inserted
into the sill of the door. This ladder, when hauled up, was stowed in the
passage, and thus admitted of the door being shut.
During the last fortnight of the month of January 1811, the
Fresh Provisions fall
short at the Light-
weather had been very unsteady, with gales of wind
house. chiefly from the eastward; which prevented the Light-
house Yacht, now acting as Tender, from sailing for the
Rock till Thursday the 17th. Mr Forrest and the light-keepers were found in
good health, and busily employed in their respective operations, now nearly
brought to a close. No communication having been had with the shore for the
last three weeks, their stock of fresh meat and vegetables was expended; and,
looking forward to the possibility of a continuation of similar weather, they
had begun to economise the fuel and water before this day’s supply came to
hand.
The next trip which the Yacht made to the Rock was on
A supply is received.
Tuesday the 29th. A letter from Mr Forrest stated, that he
had received a very full supply of every thing, both for the
light-room and provision-store, and added, “Let the weather be how it will, we
shall not be in want even of the most trifling article, for a month to come.”
The day long wished for, on which the mariner was to see
February.
a light exhibited on the Bell Rock, at length arrived.
Captain Wilson, as usual, hoisted the Float’s lanterns to
Friday, 1st. the topmast on the evening of the 1st of February; but the

Page 442

moment that the light appeared on the Rock, the crew,
The Light is giving three cheers, lowered them, and finally
exhibited.
extinguished the lights. The Yacht had sailed on the 31st
of January, for the purpose of taking this ship in tow for Leith, as being no
longer necessary here; but in the course of that night, it came to blow so
excessively hard from E.SE., that she was obliged to bear away for the Firth
of Forth, leaving the Floating-light at her moorings.
On the 9th, the Yacht returned, and, although a very heavy
Friday, 8th.
sea then ran upon the Rock, a landing was effected with a
boat-load of coals, water, and fresh provisions. Mr Forrest
A Storm occurs when states in his letter at this time, that every thing on the 1st
the House is lighted.
of February, had been found to answer to his entire
satisfaction. He, however, mentions, that the wind blew excessively hard
during the three first days after the house was lighted, and that the sprays had
risen to the height of 80 feet upon the building. He adds, that, in the course of
this gale, all hands had kept watch without intermission for twenty-four hours,
with the storm-window-frames at hand, in case of accident, as the plates of
glass on the windward side of the light-room had shaken loose, and, by the
continued violence of the wind, the putty had been “wrought quite thin, and
was softened like mortar.” These plates of glass, measuring each 32½ inches
by 26¼ inches, were so fitted with brass-guards that they could not possibly
be blown out, in an entire state, but were in some danger of being broken, by
pressing upon the window-sashes while the putty was thus softened. Mr
Taylor, who upon this occasion commanded the Yacht, had considerable
difficulty in approaching the Light-house, and observes, “There being now no
attending-boat to accompany our landings at the Rock, I find we must not run
such risks as formerly, as, in the event of an accident happening to us singly,
no assistance can be got. To-day, one of those heavy rolling seas struck the
boat, and pitched her upon one of the ledges, but she was got afloat again
before the next breach of the sea reached her, and was afterwards carried like
a shot out of the creek.”
The wind having shifted to the west, with moderate
Tuesday, 12th. weather, the Yacht sailed from Arbroath to-day, to take
charge of the Floating-light. Having accordingly received
Floating-light puts a hawser on board, she cast off the chain-cable moorings,
into Anstruther.
on which a buoy was placed, it being impossible, at this
time, to lift the mushroom-anchor. The wind was then at N.NE., and the crew

Page 443

were all extremely happy in the prospect of soon finishing their task, declaring
that they had been more tired of the Floating-light during the last twelve days,
than all the time they had been on board of her. At 10 p. m., the wind suddenly
shifted to W.NW., and when abreast of the Island of May they wore-ship, for
the Floating-light was so unmanageable that she could not be stayed or tacked
in the usual manner. They then stood to the north shore, and anchored off
Crail during the night, in seven fathoms water. On the 14th, the wind being
still down the Firth , it occupied the whole period of the flood-tide to get
about six miles to windward, and night coming on, Captains Wilson and
Taylor concluded that it would be most prudent for them to put into Anstruther
harbour, and there wait for a fair wind. While the Floating-light lay here, the
Yacht made a trip to the Bell Rock, and relieved the Light-keepers, when all
was found well.
At Anstruther a great deal of interest was felt, and people
Some of her Crew get
married.
even flocked from a considerable distance, to see a vessel
which had been moored, for nearly four years, off the Bell
Rock. The singularity and simplicity of her rigging attracted the attention
particularly of nautical men, while the thick bed of sea-weed and shell-fish on
her bottom, was matter of surprise to every one. The crew had also become so
well acquainted in this port, and the neighbouring fishing-towns, that some of
them had got married, and if the vessel had remained another week or two in
port, the probability is that she would not have had an unmarried man on
board.
The Floating-light at length arrived at Leith, on the 8th of
State of the Floating-
light’s bottom.
March, after a passage of no less than three weeks from
her station. The account given of the marine productions
on the ship’s bottom, had excited the curiosity of several
1811, March.
of the writer’s friends; and, on her arrival, he was
accompanied by the Reverend Dr Fleming of Flisk, Dr Leach of the British
Museum, and Mr Patrick Neill, Secretary to the Wernerian Society, who
examined, with great attention, the numerous crustaceous, testaceous and
molluscous animals, and zoophytes, which still adhered in great numbers to
her bottom. Mussels of the species called Mytilus pellucidus, were abundant:
they were of a large size, the striæ on the shells measuring 3½ inches in
length, by 1¼ inch in breadth. Some of the common acorn-shell, Balanus
communis, were so large as 1½ inch in diameter. The sea-weeds were chiefly
Fucus digitatus and esculentus, and were in general 4 or 5 feet in length.

Page 444

During the time the Floating-light had rode off the Bell Rock, the crew had
made a regular practice of picking off considerable quantities of the mussels
for fishing-bait for the several vessels in the Light-house service, and also for
the artificers at the Rock. It was therefore chiefly in the runs and lower parts
of the bottom, where they had never been disturbed, that the animals were in
the greatest numbers; and here also the fuci were longest. Next to the keel, the
writer measured a compact bed of these mussels and vermes, of the depth of
from six to eight inches; and Captain Wilson, upon first seeing her bottom at
Anstruther, described it in his letter to be a “complete mussel-scalp.” The
timber of the ship, however, was quite sound.
The Light-house Yacht had no sooner got her troublesome
Sunday, 24th.
charge safely into port, to be dismantled and sold, than
she returned to the Rock, to supply the Light-house and
The Light-keepers get shift the keepers; but such was the boisterous state of the
their turns of liberty
ashore. weather, that no landing could be made till the 22d, when
Mr John Reid relieved Mr John Bonyman, who went
ashore in his turn. The Yacht then steered for Leith, when the command of that
vessel was given to Captain Wilson, while Captain Taylor took charge of the
Bell Rock Tender,—situations for which their services had respectively
qualified them.
The Yacht, when last at the Rock, brought a letter from
Letter from the
Superintendant Light-
Mr Forrest, in answer to a number of queries, on points to
keeper. which his attention had been directed, during his
residence in the Light-house. He replied with so much
intelligence and correctness of observation, that it may be proper here to give
his letter verbatim.
Bell Rock Light-house, 14th March 1811.
“SIR,
“I received your letter of the 7th of January, desiring me to give you an account of every
particular occurrence at the Bell Rock during the winter, including the effects of the sea on the
building, the comfortableness of the Light-house as a dwelling, and the ability of the light-
keepers for their duty. In answer, I will now endeavour to give you the information wanted,
which I shall do in the order of the particulars which you sent me, having, in consequence of
your instructions, noticed every thing about the place.
“Nothing extraordinary happened from the time I came here, on the
Effects of the sea on 15th day of December, till the 1st day of February, when the house
the building. was lighted to the public. On that night, it appeared as if nature, on
the first lighting of the house, were making trial of the sufficiency
of the building. During all that night and the following day, there was nothing to be seen but
the sea covered with foam as far as the eye could reach. The only damage we sustained, was

Page 445

the loosening of a number of the panes of glass, which I noticed to you in a former letter.
During the gale, the sprays did not rise higher than the bed-room windows, or about 70 feet
above the level of the sea. I paid particular attention to your directions, as to whether I could
feel the house shake; but I was not then very sensible of this effect, the tides being neap,
though, at the time of high-water, there was a kind of vibration felt when the sea did not break
till it reached the building. The most sensible feeling, however, of this kind which we have, is
when there is a very heavy ground-swell after a gale at N.E. On these occasions, the sea rises
at intervals on the building, till the sprays are stopped in their course upwards by the cornice;
but this only happens when the heavy swell occurs with spring-tides. On the 15th of February,
we felt the vibration very sensibly, which had not so much the effect of shaking, as that of the
tremor produced by the striking of the alarm bells, on the balcony of the Light-house, in foggy
weather, when the storm-shutters, windows, and hatches are shut. During some gales from the
S.E., especially when the wind continues two or three days from that quarter, the seas rise to a
great height. At high-water, on these occasions, I have observed the Beacon-house, for
perhaps a second or two, completely covered with waves and sprays. But every thing about
that fabric remains quite entire, without the least damage that I can discover.
“I have done all in my power, with the assistance of the light-
State of the Wagon- keepers, to preserve the waggon-ways, and we have frequently
ways. forgot ourselves in working at them, till the tide was too far
advanced; and, in stormy weather, have been obliged to make a
precipitate retreat up the rope-ladder, after a complete wetting. Some of the reaches are
notwithstanding much broken up, and it will be a great pity if the remainder do not stand till
the summer months, when they can be properly secured; for, at times, in the course of this
winter, the Tender’s boat has brought us supplies, when, but for the waggon-ways, it would
have been just the same as going to destruction, to have attempted a landing.
“I often take pleasure in looking at the seas breaking upon the
Remarkable effects of Light-house, and it is awfully grand, at the time of high-water, to
the sea in lifting a observe the sprays rising to such a height on the building, and even
piece of lead. to be on the Rock at low-water, when the waves are about to break.
Being in a manner only a few yards distant, they approach as if
they were about to overwhelm us altogether. But now that we are accustomed to such scenes,
we think little of it. You will perhaps form a better idea of the force of the sea, during these
gales, when I relate to you, that, on the 15th of February, the large piece of lead that was used
as the back weight of the balance-crane, weighing 4 cwt. 3 qrs. 17 lb., or nearly a quarter of a
ton, was fairly lifted by the sea, and carried to the distance of six feet from the hole, in which
it had lain since the month of August. It was now found turned with the ring-bolt downwards,
and it was with great difficulty that four of us could muster strength enough to return it to its
former shelf in the Rock.
“All the observations which I have made regarding the effects of
Direction of the seas the seas and weather on the Light-house, while I have been here,
which have most lead me to conclude, that when the wind is from the S., S.W., W.,
effect upon the Light- N.W., and even N., the sea has little effect on the building; but,
house. from south to north-easterly, the force of the waves is considerable,
especially when it comes to blow hard. During the gale of the 22d
February, I remarked, that even the heaviest seas, if they broke before they came to the foot of
the building, slipped past without giving the least shock to the house; and it is only a very few
of the waves that reach the building, in the course of a tide, which cause the vibration alluded
to; but we fear those seas only which come from the NE., as they break close upon the house.
I may say, in general, that the higher or stronger the wind is, the less power the sea has on the
Light-house; the heaviest seas being accompanied with little wind, or occurring after the gale
has abated.

Page 446

“With regard to the comfort of this building as a dwelling, I had no
Comfortable state of other expectation but that, on account of the sea-air, and newness
the building. of the walls, the house would have, in the first instance, been
damp. It is, however, the very reverse of this, and I may
confidently say, that it is as dry round the inside walls, and on the floors, as any house in
Edinburgh. This may be chiefly occasioned by the smoke-tube which passes from the kitchen
through the upper floors to the cupola of the Light-room, which contributes greatly to the dry
state of the building; but we even find the store-rooms and stair-case, which, as yet, have not
the benefit of a fire, also comparatively free of dampness. As a proof of this, it may be
noticed, that the lower parts of the house dry pretty readily when the floors are washed,
excepting, indeed, when a heavy sea runs, and some water comes in at the checks of the
windows, and partially wets the lower apartments. It is, however, impossible entirely to keep
out wetness at windows, which, for conveniency, must be made to open, especially when so
great a body of water occasionally presses upon them. As to the warmth of the house, ever
since we got The Jacob’s ladder taken down, and the Entrance-door shut, we have been very
comfortable. I never heard the least complaint on this head from any of the Light-keepers, and
it is a general remark that we are warmer here than ashore.
“With regard to your inquiries about the Light-keepers, I may
Qualifications of the remark, that Mr John Reid, the principal keeper, appears to like his
Light-keepers. situation very well, though, at first, when the sea struck hard upon
the building, he seemed rather sad, and was perhaps not so
confident about it. When he was in that mood, I used to cheer him by telling him it was only a
fancy; and as he is a very sensible man, and originally bred a seaman and carpenter, his mind
readily complies with a belief in our safety. Mr John Bonyman, the principal assistant,
appears to take well with his situation; and having been personally employed as a mason from
first to last in the erection, and more fully understanding its nature, he always keeps himself
very easy upon this point. Mr Henry Leask, though formerly a shipmaster, yet having for
several years been a light-keeper, has been much at home with his family, and his attention is
naturally drawn more towards them; however, he appears quite satisfied, though he does not
speak very confidently about our habitation, but shrugs up his shoulders, and looks strange
when he feels the tremor of the house. As to their qualifications as light-keepers, I have not
the least hesitation in stating, that Mr Reid and his assistants are now fully competent for their
duty. We proceed agreeably to our written instructions, though there are some parts of them
which I shall take the liberty of submitting to you for alteration.
“I will now let you know how we come on with what I may call
1811, April. our domestic life. When the duty of the house is over for the day,
we generally take a walk on the waggon-ways, and search about
the crevices of the rock for small fishes, when the state of the tides
Manner in which they and weather permit; but when that is not the case, we content
spend their time. ourselves without it, and find amusement in reading a small library,
consisting of about a dozen of volumes of one kind or other,
collected among us; and you know we have the progressive numbers of the Scots Magazine
and the Weekly Chronicle, which we receive as regularly as the situation of the place will
admit. I may further notice, that it gives the Light-keepers much pleasure to learn that Mr
Slight has received orders, in fitting up the strangers’ room, to provide it with a book-case,
which we understand the Commissioners are to supply with books. On Sunday, we attend to
the general rule of the service, doing no more work in the Light-room than is necessary,
cleaning only the reflectors, lamp-glasses and windows, operations which are usually over at
this season about 12 o’clock, after which we meet for prayers, and read two or three chapters
of the Bible.

Page 447

“I have perhaps tired you with this long letter, but I could not give you the description you
wanted in fewer words. I shall only further add, that we all remain in good health, and that
every thing connected with the Light-room apparatus is in good order.—I am, &c. &c.
“John Forrest”
“To Mr Robert Stevenson,
“Engineer for Northern Light-houses.”

Friday, 2d. From this very satisfactory communication, it was evident
that the Light-house might now be left under the charge of
They are left in full Mr Reid and his assistants. The Tender accordingly sailed
possession of the this morning, carrying off Mr Bonyman, who had been at
house. Arbroath on leave; when Mr Forrest, who had been
upwards of three months at the Rock, came on shore,
leaving Mr Reid to instruct his third assistant, Michael Wishart, the mason
who had been so severely hurt on the 30th June 1809, by the fall of the
moveable beam-crane.
The houses erecting at Arbroath for the families of the
Progress of the
ulterior works.
Light-keepers, were roofed over in the month of May; at
which period, the signal-tower for communicating with
1811, May.
the Light-house, represented in Plate XII., had attained to
half its height, or about 30 feet. The shipping at this
station consisted only of the Smeaton as Bell Rock Tender, the other vessels
which had been employed in carrying on the work, having been disposed of
by public sale. As soon as the weather permitted, the artificers went off to the
Rock to put the Railways in a state of repair after the gales of winter; for this
purpose, the Beacon-house was still extremely useful as a smith’s shop, while
it also served as a store for the implements and bulky articles connected with
the fitting up of the interior of the Light-house.
On the 24th of July, Lord Justice-Clerk Hope, Lord Boyle,
The Lord Justice-
Clerk Hope, and a
Dr Hope, Mr Hamilton, and Mr James Spreull, besides
party embark for the Lady Charlotte Hope and Mrs Hamilton, embarked at
Bell Rock. Leith in the Light-house Yacht, to visit the Bell Rock. The
wind being at SW., and blowing hard, the vessel had to
put into Arbroath till the 26th, which prevented the Lord Justice-Clerk and his
Lady from visiting the Light-house; but the rest of the party having remained,
they had a most convenient landing on the Rock; were highly gratified with
their visit, and returned in the Yacht to Leith on the 28th.

Page 448

In the course of his annual voyage to the Northern Light-
1811, September. houses, the writer, on the 27th September, touched at
Arbroath, and had the satisfaction to find that the Light-
State of things at the keepers’ houses were nearly in a habitable state, while the
Rock.
Signal-tower was ready for the plaster-work. Having
landed on the following day at the Bell Rock, with Mr James Haldane, who
had accompanied him thither on his first visit in the year 1800, they did not
fail to express their mutual congratulations on the successful result of those
operations which, on the former occasion, had been contemplated at a very
distant view. On examining the Light-house, every thing was found to be in
good order, and Mr Reid, and his assistants, quite satisfied with their
habitation. Mr Dove had completed the copper flag-staff, and also the iron-
grating on the outside of the Light-room, for the greater conveniency of
cleaning the windows: Mr Slight had made great progress in fitting up the oak
partitions, beds, and interior finishing of the house; and had dismantled the
upper parts of the Beacon-house, which was now reduced to its state in 1809,
as represented in Plate VIII. At low-water, all hands were engaged at the
Railways to fortify them also for withstanding the storms of winter; and it was
chiefly for this purpose that the principal beams of the Beacon-house were
preserved on the Rock. It had been originally intended to erect a stone-slip for
the conveniency of landing, till, from experience, it was found that the iron
Railways were more suitable to the circumstances of the place than solid
masonry; the waves acting with much more force on the solid wall, than on
the open railways.
On the 12th of this month, the Smeaton having been, for
Tender goes adrift. several days, at the Rock, landing stores and articles for
the artificers, unluckily broke adrift by the failure of the
mooring-chain. As it came to blow fresh from W. NW., she narrowly escaped
shipwreck; and having been driven eastward as far as Dunnottar Castle, it was
not till Tuesday the 15th that she returned. This shewed the uncertainty of
making the Tender fast to moorings at the Rock, excepting in fine weather,
and pointed out the propriety of keeping her under-way, during her future
casual attendance for the supply of the Light-house. This arrangement,
however, required that the mate and one seaman should be left on board, while
the master and other two were at work in the boat.
It may here be noticed, that a boat, in order to be at once
Boats suitable for the
Bell Rock.
safe and convenient for landing at the Bell Rock, should

Page 449

measure not more than from 14 to 16 feet in length of
“Bruce’s boat.” keel. A boat, therefore, of a proper size for parties visiting
the Light-house from the shore, will be found too large for
landing at the Rock; because, when she has still a depth of water to float her
into the several creeks, the tide has not sufficiently ebbed to afford shelter
from the breach of the sea, even when there is but a slight swell on the Rock.
In like manner, she requires to lie too long in floating off again, and is
consequently more apt to be damaged than a smaller boat. A decked vessel,
with a float-boat of the dimensions mentioned above, is the safest; or, if a
large open boat is used to go from the shore, it should not be less than 20 feet
in length of keel, carrying a small boat, upon the plan of “Bruce’s Two-half
boat.” This description of craft may be conveniently stowed into the fore-peak
of a large boat, and, when put to use, the two-halves are screwed together with
great facility, and used with perfect safety as one boat. For this ingenious
contrivance, the public are indebted to the late Mr James Bruce, of the Naval
Yard establishment, Leith.
Owing to inattention on the part of the Light-keepers, the
Light-house Stove
takes fire.
chimney of the temporary stove, which, for the present,
was fitted up in the kitchen, had been allowed, on the 20th
of this month, to take fire; and though the surrounding apparatus was proof
against burning, yet the heat of the tube, which passes through the Light-
room, so cracked and damaged six of the squares of plate-glass, that it was
judged proper to replace them with others from the stock on hand.
The month of November set in with S.E. winds, and the
1811, November. tides and sea upon the shores of the Firth of Forth, rose
higher than had been observed for the last thirty years.
Sprays rise to the During this gale, while Mr Leask, one of the keepers, was
height of the Light-
room. standing upon the balcony, a considerable quantity of
sprays broke over the cornice, so as to wet all his clothes,
and to strike against the glass of the Light-room so forcibly, as to alarm those
who were within. This was the first instance observed of the sea rising to the
height of about 108 feet above the surface of the Rock. The Light-keepers also
stated, that when the tide was at the highest, they expected every minute that
the Beacon would have been swept away, as it was frequently wholly under
water when the sea broke around the Light-house; nor were they altogether at
ease as to their own situation. Several large masses of stone were, upon this
occasion, thrown upon the Rock; a mass of about two tons, completely

Page 450

blocked up one of the landing-places until it was broken and removed. The
Railways also suffered severely, having been dislocated in several places.
In the course of the month of December, the Light-house
Advantage of double
windows.
had been visited with very severe gales, but the keepers
were now gaining more confidence in the stability of their
habitation. Captain Taylor, who commanded the Tender, on questioning them
when he landed on the Rock, how they had stood out the bad weather, they, to
his surprise, replied, “There has been nothing remarkable in the weather.”
They further stated, “that, when the doors and storm-shutters were made fast,
and the double windows shut, all was quiet in the several apartments: it was
only when they went to the Balcony that they heard the wind: and that the
house had little or no motion by the sea striking it, excepting in storms from
the north-east, east, or south-east, but especially from the north-east.”
The light had now been exhibited for twelve months; and
1812.
it was highly gratifying to the Board to find, from almost
every quarter of the coast, by the testimony of those who
The Light-house had seen it at sea, that this important edifice gave
excites much interest.
universal satisfaction, appearing in all respects to answer
the fullest expectations of the mariner. It appeared also from the Album, or
book kept at the Light-house, for inserting names, that nearly 500 strangers
had landed to see it, in the course of the summer season.
On the 21st of August, Sir William Rae, Baronet, the Lord
1812, August.
Chief-Baron Dundas, General Francis Dundas, Mr Jardine
of the Exchequer, and Mr Russell, accountant to the
Sir William Rae and Board, visited the Light-house, when the Chief-Baron
Mr Duff visit the
Rock with parties. expressed his entire approbation of the work and
establishment in general. About the same period, Mr Duff
landed, accompanied by Mr Foulerton, one of the Elder Brethren of the
Trinity-House, Mr Menzies of Pitfoddels, and the late Mr Taylor of
Kirktonhill, who were in like manner much pleased. It was, upon this
occasion, gratifying to hear Captain Foulerton’s remarks of approbation, as his
official connection with the English Light-house Board, more especially
qualified him for judging of the Bell Rock works.
On Friday the 4th September, at 5 a. m., the writer landed
The Beacon is
removed from the
at the Rock with Mr James Slight, clerk of works, who,
Rock. with eight artificers, was to commence taking down the

Page 451

frame or principal beams of the Beacon-house. This useful fabric might have
remained for an indefinite period, but for the ravages of the insect already
described, which had now affected the beams so much where they rested upon
the Rock, as to render its removal advisable. In this operation the artificers
were only employed for about three weeks, although it had occupied nearly
the whole of two working seasons to erect it. The Tender made occasional
trips ashore with the timber, the great iron stanchions, bracing-bars, and
numerous bolts, which were to be employed in the erection of the buildings at
Arbroath, and in the works of the Carr Rock Beacon.
The only remark which the writer has to make, regarding
Mode of securing
timber against the
the erection of such a building as the Beacon-house is,
insect. that due precaution should be used in protecting the soles
or feet of the beams, where they rest upon the Rock, and
are inaccessible to the application of pitch or other preventives. Sheathing
with copper might, perhaps, be found the best protection; but, in such
situations, the copper should be coated with tin, to prevent any action between
it and the iron-work.
On the 1st of October, Mr Slight, accompanied by several
Light-house assailed
by a gale.
artificers, went again off to the Light-house with the
remaining apparatus for finishing the interior of the house,
having still the bed-room to fit up, the brass-plates for the safety of the sill and
lintel of the entrance-door, and a variety of other small works to complete.
The railways were also in want of some additional stays, to fit them for
withstanding the storms of winter. These operations, however, were conducted
much more slowly since the removal of the Beacon; and it now became
necessary to erect the smith’s forge upon the balcony of the Light-house, for
sharpening tools, and other little operations.
On Saturday the 14th of November, a very severe storm
1812, November.
took place, accompanied with a heavy sea from the S.E. A
letter from the Light-house stated, that, “at high-water in
Remarkable shock of the evening, a tremendous sea struck the house, the effect
the sea.
of which was the most alarming that had been
experienced perhaps since it was erected. The locks upon the doors were
heard to rattle; and what makes this the more singular is, that not another sea
of consequence struck the house during the whole tide.” Upon further inquiry
into this matter, the writer found that the artificers, and two of the light-
keepers were then in the kitchen; upon the shock taking place, the whole

Page 452

sprung up to the balcony, imagining for the moment that some vessel must
have got upon the Rock, and that the report heard was the discharge of a gun,
so sudden and sharp was the sensation which it occasioned. But they soon
found that their alarm was occasioned by the sea alone.
The writer has often thought of this surprising effect of
Professor Robison’s
opinion on this
the force of the sea; and he finds it difficult to assign a
subject. cause for the motion of the doors in so low a position of
the building as the kitchen; otherwise than by supposing a
disturbance in the equilibrium of the air, by the sudden displacement of the
column of water, which, upon these occasions, rises upon the building. The
tremor felt in leaning against the walls in the upper apartments, when it blows
fresh, or when the house is struck by a sea, or by a boat coming suddenly
against it, may be compared to that which is perceptible in a common house,
upon the slamming of particular doors, or when a carriage makes a rattling
noise in passing along the streets; but it is attended with no real danger. In
confirmation of this, it may be mentioned, that when the late Professor
Robison of Edinburgh visited the Edystone Light-house, something having
forcibly struck the building, he was sensible of a vibratory motion in one of
the rooms in which he was then sitting. But, instead of producing any alarm in
the mind of the Professor, he assured his friends, that it was to him the
strongest proof of the unity and connection of the fabric in all its parts. This
anecdote the writer is desirous of preserving, as it was communicated to him
by this eminent person.
The writer being in Forfarshire at this time, was desirous
View of the Sea, from
which the
of seeing the effects of the sea upon the Light-house, after
Frontispiece is the Beacon had been removed. He accordingly embraced
delineated. the opportunity of sailing from Arbroath with the Tender,
in a pretty hard gale from north-east, at 4 o’clock in the
1812, December. morning of the 9th of December, and, at 7, got close to the
Rock. The Light-house now appeared in one of its most
interesting aspects, standing proudly among the waves, while the sea around it
was in the wildest state of agitation. The Light-keepers did not seem to be in
motion; but the scene was by no means still, as the noise and dashing of the
waves were unceasing. The seas rose in the most surprising manner to the
height of the kitchen windows, or about 70 feet above the Rock; and after
expending their force in a perpendicular direction, successively fell in great
quantities round the base of the Light-house, while considerable portions of

Page 453

the spray were seen adhering as it were to the building, and guttering down its
sides in the state of froth as white as snow. Some of the great waves burst, and
were expended upon the Rock before they reached the building; while others
struck the base, and, embracing the walls, met on the western side of the
house, where they dashed together, and produced a most surprising quantity of
foam. Upon this view of the breaking of the seas at the Light-house, the
frontispiece for this work has been delineated.
Though there was no possibility of effecting a landing to-
The Sea overruns the
Rock at low-water.
day, yet the vessel lay off-and-on till low-water, that the
writer might also then see the state of the waves upon the
Railways. He found that they still continued to make a constant run over
them; and that no one could have stood upon any part of the rock, even for the
space of one minute, without having been thrown down and carried away by
their force. After lying-to till 10 o’clock, the Tender bore away for the Firth of
Forth, leaving the inhabitants of the Rock surrounded, and even enveloped by
the sea in its utmost fury, yet in a state of comparative comfort, and enjoying
feelings of the most perfect security.
The regulations observed in attending the Bell Rock are
Mode in which the
Light-house is
these. The vessel stationed at Arbroath goes off every
attended. fortnight, or in the course of each set of spring-tides, to
relieve the Light-keepers, and to supply the house with
necessaries; but when the weather does not admit of this, the master’s
instructions direct him to embrace the first favourable opportunity thereafter.
Of the four keepers belonging to this establishment, three are always at the
Light-house, while one is ashore on liberty. The regular term ashore is a
fortnight, and the duty at the Rock is six weeks. During the rotations,
however, in the course of the winter and spring, some of the keepers were
detained upwards of three months upon the Rock, while others were four or
five weeks ashore. The Tender had made several unsuccessful attempts to
effect a landing during this period, and had been twice forced to Leith Roads,
and once to the northward as far as Aberdeen. The light-keepers, however,
seemed, upon the whole, pleased with their situation; and talked in a feeling
manner of the hardships of mariners, whom they often saw tossed about
during the storms of winter.
In the course of the year 1813, the Light-keepers’ houses,
1813.
at Arbroath, signal-tower, and sea-wall connected with
them, were completed; and a garden of upwards of an acre

Page 454

was enclosed, and laid out for the use of the families of
Establishment for thethe light-keepers, and for supplying the Light-house and
Light-keepers at
Arbroath completed. Tender with vegetables. These buildings formed no part of
the original design; but the Commissioners were resolved
that this establishment should be complete. Had houses been hired in the town
of Arbroath, for the light-keepers, much inconvenience would have arisen to
the service, especially when the attending vessel was going off to the Rock
under night. Besides the principal building occupied by the light-keepers,
there are store-houses, and accommodation for the master and crew of the
attending vessels, in an adjoining building, where each family has two or three
rooms. The top of the signal-tower is formed into a small observatory,
furnished with a 5 feet achromatic telescope, a flag-staff, and copper signal-
ball measuring 18 inches in diameter.
By means of this, and a corresponding ball at the Light-
Signals observed at
the Rock.
house, certain signals are daily kept up between Arbroath
and the Rock. The chief of which consists in hoisting the
ball at the latter place to the top of the flag-staff, where it is kept, when all is
well, every morning, between the hours of 9 and 10. But in case the weather
should prove so foggy or cloudy at this hour, that the signals cannot be seen,
the watch is again set at 1 p. m., and should it then become clear, the ball is
again elevated, and allowed to remain till 2 o’clock. This signal is watched by
the light-keeper who, in his turn, happens to be ashore on liberty, and who
immediately answers it by hoisting the ball at Arbroath. Should the ball at the
Rock, however, be allowed to remain down, as is the case when any thing is
particularly wanted, or in the event of sickness, the Tender immediately puts
to sea.
The mechanical operations at the Bell Rock, during the
1814. year 1814, consisted principally in fitting up a thunder-rod
or electrical conductor, on the exterior and western side of
Thunder-rod. the building, as may be observed on the elevation of the
Light-house in Plate XVI. This rod is continuous from the
top to the foundation of the building, being connected with the sash-frames of
the light-room, and the Railways upon the Rock. The best construction and
application of rods for conducting the electric fluid, is a problem upon which
scientific men are not altogether agreed; some being of opinion, that the
conducting-surface should be large; while the slender bell-wires in dwelling-
houses are found capable of conveying it in a body sufficient to destroy the

Page 455

premises. The fixing of a plate of any considerable breadth upon the exterior
of the Light-house would have been attended with much difficulty; and the
writer having consulted Professors Playfair and Leslie, and Dr Brewster, a rod
was prepared by Mr Adie, optician, 2¼ inches in breadth, and, where thickest,
1 inch, the external side being slightly rounded, to suit the circle of the wall,
and thus presenting the least possible resistance to the sea. The composition of
this rod was one ounce and a half of tin to a pound of pure copper; and with
its bats, screws, and connecting pieces, it weighed 556 pounds, or about one-
quarter of a ton.
In order to fix it to the building, a groove was cut in the
Method of fixing it.
exterior wall, as high as the solid part, about half an inch
in depth, which was sufficient to receive the edge or
thinnest part of the rod. On the higher parts of the building the wall was not
cut, the flat side of the rod being simply applied to it; and in its track, brass-
bats, previously perforated and screwed, were sunk in the wall to the depth of
three inches, and run up with melted lead, at about two feet apart. The rod
being cast in lengths of seven feet, the pieces were successively applied to the
building, when the precise positions of the holes in the brass-bats were
ascertained, marked on the rod, and bored on the spot for screw-nails of ⅝ths
of an inch in diameter; the several lengths of the rod being half checked at
each end, and the nail-heads counter-sunk, as shewn in Plate XIX. Fig. 10.
The cutting of this groove and the bat-holes in the masonry, was done in a
very masterly manner by the late Thomas Selkirk, of whom notice is here
more particularly taken, as this was the last piece of work which he executed,
as well as from his having been acknowledged by his companions to have
been one of the best stone-cutters in Scotland.
On the 30th of July this year, Mr Hamilton, Mr Erskine,
1814. and Mr Duff, Commissioners, along with Mr (now Sir)
Walter Scott, and the writer, visited the Light-house; the
A party of the Commissioners being then on one of their voyages of
Commissioners and
Sir Walter Scott visit Inspection, noticed in the Introduction. They breakfasted
the Light-house. in the library, when Sir Walter, at the entreaty of the party,
upon inscribing his name in the album, added the
interesting lines, of which the reader will find a fac-simile on the second title-
page.
Though the temporary railways originally fitted up for the
1815.
building operations had been thoroughly repaired, they

Page 456

were often found much in disorder, and required a still
Permanent Railways stronger mode of construction. In the course of this
began to be fitted.
summer, therefore, part of the western-reach of the new or
permanent Railway was fitted up, which was named
Lord President Hope
lands at the Rock. Hope’s Wharf; Lord President Hope having landed upon it
in the month of August, from the Latona Frigate.
The sloop Smeaton having been originally constructed as
1816.
a stone-lighter, was not well adapted for sailing, or doing
the duty of a Tender. A vessel, of 51 tons register, properly
Pharos Tender built. fitted for this service, was therefore built at Leith by Mr
Morton, and launched in the summer of 1816, under the
appropriate name of The Pharos. Besides her stern-boat, this vessel carries
another upon deck, measuring 15 feet in length of keel; she is also sheathed
with copper, and laid out with a fore and after cabin.
Owing to the sprays of the sea, the colour of the upper
The Light-house is
Painted.
part of the Light-house had become much changed, and
had acquired a dark olive hue, while, on the western side,
the granite courses below were of a whitish-grey; so that the building had now
a party-coloured appearance. To remedy this, and especially to prevent the
sandstone from imbibing moisture, it was, in the summer of 1816, painted in
oil colour, of a greyish tint. The whole of the interior of the house being of
polished masonry, was at the same time painted white; while the walls and
roof of the library were decorated with pannelled work, in a very tasteful
manner. Mr Macdonald of Arbroath the painter, having remained a
considerable period in the Light-house, had several opportunities of observing
the effects of the sea upon the Rock, and made some striking sketches of its
appearance upon the building in storms, which have afforded useful hints to
the artist who furnished the draught from which the frontispiece to this work
is taken.
On visiting the Light-house in the summer of 1818, the
1818.
writer was struck with the naked appearance of the Rock,
the fuci having in a great measure disappeared. On
Fuci disappear from examination he found that they had been cut off by vast
the Rock.
numbers of a species of limpet, curiously striated with
blue lines, (the Patella pellucida of naturalists). Among various other changes
incidental to the plants and animals on the Rock, the barnacle was found to be
fully more prevalent than formerly, and covered all the higher parts, like a

Page 457

greyish coloured scurf. One good effect connected with the disappearance of
the sea-weed, was a more complete exposure of several large holes or
inequalities in the Rock. Some of those, on the north-eastern side of the Light-
house, being of a large size, varying from two to four feet in depth, the writer
considered necessary to have filled with ruble-building, which, in an
imbedded state, when executed with pozzolano-mortar, had been found to
withstand the utmost force of the sea.
In the course of the summer of 1819, Mr James Slight,
1819.
and his brother Alexander (who had assisted throughout
the works in making moulds for the stone-cutters, and in
Permanent Railways other operations requiring neat and ingenious
completed.
workmanship), together with Messrs George Dove,
Robert Selkirk, James Glen, James Scott, Alexander Brebner, and John
Mitchell, completed the remaining parts of the western and southern-reaches
of the railways, by the addition of a number of large cast-iron stays or braces,
as represented in Figs. 13, 14, and 15, of Plate X. The bats of these new
railways were wedged with timber and iron in the usual manner, and the feet
of the supports, with their bats and spear-bolts, were plastered over with
Roman-cement, with a view to secure them against the effects of oxidation.
By taking the stores from the railways to the entrance of
Improvement on the
the Light-house up the sloping exterior wall, the joints of
entrance to the Light-
house by a ladder of the courses at that part had been somewhat injured. The
brass. access also to the door had hitherto been only by a rope-
ladder, or, to strangers, by a suspended chair, which was
hoisted up by the crane fixed to the building. Both of these were liable to
accidents and decay, from the wearing of the ropes by frequent use. In order,
therefore, to prevent injury to the building, and to remove these defects, two
strong bars of brass, of the same composition as the thunder-rod, were fixed
on the building, from the door down to the rock, to answer the purpose of
skids; and steps of the same metal, being attached to these bars by screw-bolts,
a substantial and convenient ladder, or rather flight of steps, was thus
constructed; and, as this apparatus became a fixture, ready entrance to the
Light-house was provided for, and could on all occasions of emergency be
safely obtained. A connection being also formed between this metallic-stair
and the kitchen-chimney, a thunder-rod was thus obtained for the interior as
well as the exterior of the house; the whole including the stair, weighing about
3133 pounds, or about 1 ton 8 cwt. of brass.

Page 458

In the course of the three last winters, the weather had
Sprays rise 105 feet.been so uncommonly mild, that the sea, as appears from
the Light-house Returns, had rarely risen upon the
building higher than from 30 to 50 feet. But, in October 1819, there were
some very severe gales, accompanied with heavy seas, the sprays of which, on
the 24th, rose to the height of 105 feet above the Rock. The water had struck
the light-room with such force at this time, that one of the assistants, then on
watch, started from his seat, imagining that some serious accident had
occurred. The writer having landed on the 20th November following,
examined into the precise state of matters upon that occasion, when it was
stated, that it appeared as if a bucket or two of water had been thrown with
violence against the Light-room windows. Mr Reid, principal Light-keeper,
and Mr Taylor, commander of the Tender, also confidently observed, that this
was the most severe gale which they had experienced since they were
connected with the service. It may, perhaps, therefore, be concluded, that the
maximum force of the sea at the Bell Rock is to raise the sprays to the height
of about 105 feet above the surface of the Rock.
These storms had proved so severe, that the Rock actually
A piece of the highest
part of the Rock
lost about 18 inches of its height, a fragment of that
carried away. thickness having been carried away from the highest part.
This spot the workmen had significantly termed “The
Last-hope,” as marked on Plate VI., in allusion to the imminent hazard which
the party on the Rock had incurred in the year 1807. The removal of this
highest stratum is the more particularly noticed, as forming a link in the chain
of probabilities, leading to the conclusion of the Bell Rock having once been
of much greater extent.
Though the Light-house might be considered as long
1820.
since finished, various improvements have still at
different times been made on it. In the course of the year
Improvements on the 1820, an inner entrance-door was hung in the passage,
Light-house, Brass-
door, &c. chiefly to prevent the necessity of shutting the outer-door
so frequently during the continuance of westerly winds.
To save room, and cutting the walls, this door was constructed of brass-
pannelled work, and the upper part glazed with plate-glass, to preserve the
light. In the original fitting up of the interior of the house, the machinery-
weight had been carried through the centre of the several apartments; but this
having been found incommodious, the rope was now conducted close to the

Page 459

wall, in a small case; and, by introducing a double-pulley, the weight does not
require to be brought higher than the floor of the Light-room-store, from
which it descends into the drop-hole formed in the solid part of the building,
as shewn in Plate XVI. The store-room for water, fuel, and provisions, was
also fitted up this year in a more commodious manner, with cast-iron cisterns,
an enlarged magazine for fuel, and a complete set of lockers. The water, which
hitherto had been carried from the store to the kitchen in buckets, was now
raised by a pump, fitted up after the manner of the beer-pumps in general use
in London.
The weather during 1821 was comparatively mild, and no
1821.
storm of any consequence occurred at the Rock. The only
work deserving notice that year, was the removal of the
A new machine for small crane from the entrance-door, to the provision-store;
taking up the stores.
where a machine, upon a new principle, was constructed,
the barrel or drum of which moves vertically upon its axis, instead of
horizontally, while it winds up the chain. By means of this machine, the stores
are now taken up to the entrance-door more conveniently; while both the door
and passage are entirely relieved of the encumbrance of the crane-apparatus;
as will be understood by examining Plate XIV. Fig. 7. and Plate XVI.
In the course of this year, Mr John Reid, the principal
Mr Reid retires from
the Light-house
light-keeper, on account of the state of his health, resigned
service. his situation, and was succeeded by Mr Thomson Milne,
reflector-maker. In consideration of Mr Reid’s faithful
services, the Board put him on the half-pay list, at the rate of 30 guineas per
annum.
In the year 1822, the several large holes in the Rock,
1822.
formerly alluded to, were filled up, and that important
work completed. The writer may here mention, that he is
Light-house works possessed of a complete model of the Bell Rock Light-
and model completed.
Design for Wolf house as executed, and of the chief implements mentioned
Rock. in this work, which he will take measures for preserving
to the Public; from a recollection of the interest he should
have felt in examining any model of the Edystone Light-house, before he had
an opportunity of seeing that work itself. He also, for similar reasons, gives a
design, in Plate XXIII., founded on experience, as applicable to the erection of
Light-houses on sunken rocks, which more particularly occurred to him after
his first visit to the Wolf Rock situate between the Land’s End and the Scilly

Page 460

Islands, in the year 1813, under the auspices of the Admiralty, in the Orestes
sloop of war, commanded by Captain Smith.
The year 1823 set in with perhaps as severe a storm as has
1823.
occurred on this coast since the Light-house was erected.
The Pharos, in the course of her attendance on the Rock,
Severe storm. Carrier- was driven first into the Firth of Tay, and thereafter into
pigeon sent from the
Rock. the Forth, where she was forced to anchor above
Queensferry, about 70 miles from her station; and in the
course of the winter, it was fully two months before she could effect a landing
at the Light-house. The only accident, however, which happened during that
period, was the breaking of the ratchet-wheel spring, which keeps the
reflector-frame in motion, while the machinery is winding up. Though only of
a trivial nature, and unconnected with the stormy effects of the sea, it
nevertheless created considerable alarm among the families of the Light-
keepers ashore, as the signal-ball was very properly kept down upon this
occasion. Their anxiety, however, was relieved in the course of the day, by the
arrival of a carrier-pigeon, with a billet from the principal light-keeper,
intimating what had happened. A pair of these curious birds had originally
been presented to the establishment by Captain Samuel Brown of the Royal
Navy. They have now multiplied considerably; and two or more are generally
conveyed to the Rock at every trip of the Tender, and let off occasionally for
amusement. Their flight between the Light-house and the Signal-tower at
Arbroath, upwards of 11 miles, has been ascertained to have been at the rate
of about one mile per minute.
In concluding these details, it may be proper to state, from
Expence and cubic
the Abstract Accounts of the expence, quantity of
contents of the Work.
materials, and description of workmanship, given in
Appendix, No. VI., that the expence of this important national work amounted
to L. 61,331:9:2; and that the cubical contents of the materials used in its
erection were about 28,530 feet, and would weigh about 2078 tons.

Page 461

General View of the Bell Rock Works.
Drawn by G. C. Scott from a Painting by A. Carse.

Engraved by Willm. Miller.

PLATE XVIII.

Page 462

APPENDIX.

No. I.
CONTAINING A NOTICE OF ADDITIONAL LIGHT-HOUSE STATIONS, LIGHT-
KEEPERS’ INSTRUCTIONS, FORMS OF MONTHLY AND SHIPWRECK RETURNS.

ADDITIONAL LIGHT-HOUSE STATIONS.

In noticing the different points alluded to, at page 60., as
Additional Light- the most prominent stations for additional Light-houses
houses.
on the coast of Scotland, we shall follow a course from
east to west, including the Orkney and Shetland Islands.
On the eastern coast two light-houses seem particularly to
Eastern Coast.
be required, in addition to the present Light on Kinnaird-
Head. One of these, at Buchan-Ness, near Peterhead,
which becomes a turning-point in the navigation of that coast, as will be seen
from Plate III., would be an excellent guide to the southward, for shipping on
the long flat shores of Aberdeenshire, and not less useful as a direction for the
foul ground or sunken rocks called Rattray Briggs to the northward of
Buchan-Ness. Some are also of opinion, that Girdle-Ness, at the entrance of
Aberdeen harbour, would be a proper station for a sea or public Light. The
next station in the order of position on the eastern coast, is Tarbetness, a
centrical point of land extending into the Moray Firth , which leads to
Cromarty Roads, a great rendezvous for shipping in stormy weather. A Light
upon this projecting point would also be extremely useful as a direction to the
numerous small ports of this district, and would prevent the losses which
occasionally happen on Culloden Rock, and Halliman’s Scars, and by the
Firth of Tain being mistaken for a continuation of the Moray Firth . It would
also serve as a guide to the narrow passage of Fort George, leading to the
eastern entrance of the Caledonian Canal.

Page 463

Several Light-houses are still wanted for the protection of
Northern Coast. shipping on the Northern Coast. In particular we notice,
that although the eastern entrance of the Pentland Firth is
already well marked by the Light-house on the Skerries; yet the western
approach to this dangerous, but important channel, requires a light upon
Dunnet-head in Caithness, which would prevent vessels from mistaking
Murkle Bay for the Pentland Firth , and, at the same time, form an excellent
guide for the south-western coast of Orkney. Cape Wrath in Sutherland is the
north-western point of the Mainland of Scotland, as will be seen from Plate
III. A Light-house upon that promontory would be of great importance to the
navigation of the dreary coast of Caithness and Sutherland, and as a direction
for the sunken rock called the Nun, surveyed by Captain Ramage, in H. M. S.
Cherokee in the year 1814; and by him found to lie 15 miles in a north-eastern
direction from that shore. A light upon Cape Wrath would likewise serve as an
excellent guide to the northern entrance of the Great and Little Minish, or
Friths of Lewis and Uist, a central track in the navigation of the Hebrides,
now much frequented by shipping since the erection of the Light-house upon
Glass, one of the Harris Isles.
Perhaps the only additional light still wanted in Orkney, to
Orkney and Shetland
Islands.
which it is here necessary to allude, is one upon
Nouphead of Westra, to direct shipping on the north-
western side of these Islands. In addition to Sumburgh-head Light-house in
Shetland, one upon the Out-skerries of Whalsey, on the east, another upon the
Scaw of Unst, in the north; and a third on the Skerries of Ve, on the western
side, would seem to render these Islands complete in regard to Light-houses.
The opening of the sheltered passage through the Friths of
Western Coast.
Lewis and Uist, by the Light-house on Glass, has, in a
great measure, superseded the use of the outward course
of shipping by St Kilda, which is now seldom taken by coasting vessels,
though a Light upon that island would be extremely useful to ships making the
land from the Western Ocean. The next Light-house that seems wanting in
connection with the navigation of the Minish is one upon the Island of Bara,
as a direction to its western entrance by the Firth of Uist. It will only further
be necessary, on this coast, to direct our attention to the position of the Rocks
of Skerryvore, in order to perceive the importance of a light upon that
dangerous reef, which lies about 12 miles south-west from the Island of Tiree.
The principal rock here is a circular mass of granite, about 60 feet in diameter,

Page 464

and elevated about 20 feet above the highest tides. The rocks of Skerryvore
prove not only a great bar to ships making the coast from foreign voyages,
but, it is feared, have been fatal to many vessels sailing along these western
shores.
The Rhins, a promontory forming the south-western extremity of the Island of
Islay, is another position of importance for pointing out the northern side of
the passage from the Atlantic to the Clyde and Irish Sea, between Islay and
Bengore Head in Ireland. The Commissioners, at their meeting in the month
of January 1823, having ordered a Light-house to be built at this station, it is
accordingly in progress. The navigation of the sounds and tracks among the
Western Isles would also be greatly facilitated by the erection of four Light-
houses, of the smallest class of sea-lights, on stations connected with the inner
Sounds of Skye and Mull. One of these lights, erected at the south entrance of
the Sound of Mull, would not only be important to that passage, but to the
various tracks leading to the Sounds of Islay, and by those of Linnehe and
Loing, to the western entrances of the Caledonian and Crinan Canals. The
Island Devaar, at the entrance of the much frequented anchorage of
Campbeltown Loch, is another station for a small Light, to which the attention
of the Board has been directed by the Shipping Interest of the Western Coast.
Although the lights upon the Point of Corsewall and Isle
Southern Coast.
of Man, form a good direction for the southern coast of
Scotland, yet a light upon the Mull of Galloway would
still be of much utility in preventing northern-bound ships from mistaking
Glenluce Bay for the Irish Channel; and in leading them along the Scotch
side, between the Firth of Clyde and the Irish Sea. Application has also been
made for the erection of a small Light upon the Little-Ross Island, at the
entrance of Kirkcudbright-anchorage.

Page 465

INSTRUCTIONS for the BELL ROCK LIGHT-KEEPERS.

I.—The Keepers of the Bell Rock Light-house are hereby
Instructions to Light-
Keepers.
instructed and directed to keep the lamps of the reflecting-
apparatus burning bright and clear, from the going away
of day-light in the evening till the return of day-light in the morning. The
better to obtain this purpose, the period of night is to be divided into Watches,
and each keeper in rotation will mount guard for three hours. The fountains of
the lamps being daily supplied with oil, the wicks must be frequently trimmed
in the course of the night, but more particularly at the end of each watch.
II.—The motion of the machinery of the reflector-frame must be so regulated,
that one of the lights of the natural appearance, and one of those coloured red,
shall be exhibited to the mariner in their most brilliant effect, in the course of
every four minutes; or the reflector-frame must make one entire revolution in
the space of eight minutes.
III.—The keeper on watch will look out for the occurrence of foggy or snowy
weather, and during the continuance of either, the bells must be kept tolling
both day and night.
IV.—At the end of each watch, the keeper respectively on duty must ring the
house or bed-room bell, as the case may be, and thereafter remain at his post
until he is relieved by the keeper in person whose turn it is to mount guard.
V.—In the event of any thing getting out of order about the machinery of the
reflector-frame, so as to prevent its operation, the Lights, and also the Bell-
hammers, if required, must be moved by hand, as nearly to the periodic time
as possible, until the repair of the machine can be accomplished.
VI.—Should the stock of Oil in the Light-house by any means be reduced to
150 gallons, between the 1st day of October and the last day of February; or to
50 gallons between the 1st day of March and the 30th day of September, the
number of lights on each side of the reflector-frame shall be reduced to three;
but in the event of the stock of Oil being respectively lessened to one-half of
the above quantities, or that any of the other stores essential to the support of
the Light, are getting so low as to endanger its total failure, only one burner
shall be lighted on each side of the reflector-frame, or four burners in all.

Page 466

VII.—Unless, under these circumstances, a supply comes to hand, recourse
must ultimately be had to the use of the Wax Candles in store.
VIII.—During any period that the stores or provisions appear to the acting
Principal Light-keeper to be in danger of falling short, or in the event of
sickness, or under any other circumstances considered of a calamitous and
hazardous nature, the signal of distress shall be observed, by ceasing to hoist
the Signal-ball at the stated periods, until the arrival of the Attending-vessel.
IX.—In all cases of difficulty, especially such as are referred to by the tenor of
the Articles VI. VII. and VIII. of these Instructions, the acting Principal Light-
keeper shall use his discretion and judgment in lessening the daily allowance
of provisions, water, and fuel, according to his view of the circumstances of
the case.
X.—No lights of any kind are to be left in such a situation as to endanger
accident by fire. If at any time it should be found necessary to enter the store-
room under night, the light must be carried in a lantern.
XI.—The better to ensure regularity and good order in the Light-house-duty, it
shall be performed in three distinct departments. The keepers to shift in
rotation weekly, from the performance of one department to another. These
changes are to take place every Saturday-night.
XII.—The light-keeper performing the duty of the first department, shall, in
the course of the day, supply the lamp-fountains with oil, and the burners with
cotton; he shall clean the reflecting-apparatus, and all the utensils connected
with the trimming of the lights. He shall also take his turn in mounting guard
both day and night.
XIII.—The day-work of the second department includes the cleaning of the
machinery-case, windows, walls, floors, and apparatus connected with the
light-room, not already specified as coming under the first department; he
shall likewise clean the balcony and library; the books of which must be
dusted or cleaned on the first Saturday of every month. The keeper in this
department will also take his turn at day and night watches.
XIV.—The third department includes the cleaning of the bed-room, kitchen,
and provision store-room; together with the passages, stairs, and whole
utensils connected with these apartments. He shall likewise cook the
provisions, and take charge of them from the time of their being served out,

Page 467

until they are set upon the table in a prepared state. The keeper acting in this
department shall only be subject to the performance of night-watches.
XV.—The acting Principal Light-keeper will mount guard in his turn by day
and night, and do the duty of the first and second departments, but he is
hereby exempted from personally performing the duty of the third department;
he will, however, serve out the stores, and keep the light-room store in a
cleanly and orderly state.
XVI.—The chimney or smoke-tube of the kitchen-range, and the windows of
the several apartments, are to be cleaned on the last Saturday of every month,
or as soon thereafter as the weather will permit: The performance of which is
to be entered into the Monthly Return.
XVII.—The wharfs or cast-iron railways, rope-ladder (now brazen stair),
shall, in like manner, be overhauled and examined during the period of spring-
tides, on the full and change days of the moon. The condition of these works
to be also regularly entered into the Monthly Returns.
XVIII.—The light-keeper on guard is to give immediate notice to the acting
Principal-Keeper of the appearance of the Tender, or of any other vessel or
boat, which is seemingly approaching the Rock; when the proper signals will
be made as to the practicability and safety of landing, and the necessary
attendance given; according to the instructions of the Signal-Book.
XIX.—The Keeper on watch between the hours of 9 and 10 in the morning,
shall hoist the signal-ball to the flag-staff-head (if the weather will permit),
and, in this position, allow it remain during that hour, when all is well; but in
the event of foggy or stormy weather, such as shall obstruct the view with the
telescope between the Light-house and the Signal-tower at Arbroath, the ball
shall be hoisted between the hours of 1 and 2 in the afternoon, should the
weather have then improved. These circumstances are to be stated in the
Monthly Returns.
XX.—The keepers, in rotation, shall have leave, and be carried ashore in the
Attending-vessel, at such periods as may best suit the service. When this
occurs in regular succession, each of the four keepers will remain six weeks at
the Light-house, and two weeks at Arbroath with their families.
XXI.—The keeper who for the time being is on leave at the establishment at
Arbroath, will there attend the duty of the signal-room, from 9 to 10 every
morning, and likewise from 1 to 2 in the afternoon, when, from the state of the

Page 468

weather, the signals at the Bell Rock cannot be seen and repeated at the
appointed hour in the morning, agreeably to Article XIX.
XXII.—The rotation for leave on shore must be so regulated, that the turns of
the Principal and Principal-assistant Light-keepers do not immediately or
successively follow each other.
XXIII.—When at the Light-house, the keepers will have Rations of provisions
and other allowances, as stated in the annexed Schedule, but while they are on
shore they provide for themselves.
XXIV.—In case the Rations served out should not at any time be used, the
same must be returned to the store, as no provisions of any kind are permitted
to be taken away from the Light-house.
XXV.—The Principal Light-keeper, and, in his absence, the Acting Principal-
keeper, is held responsible for the due performance of the duty of the other
keepers; for the correctness of the Requisitions made for stores; for the
Monthly Returns written by the Assistant or Expectant Light-keepers; for all
Entries made in the store and journal books; for the regular and properly
serving out of the daily allowance of light-room stores and provisions; for the
regular use and cleanly state of the bed and table linen; for the good order of
the Light-house furniture, apparatus and appurtenances; that none of the stores
be wasted or embezzled, but that the strictest economy and careful
management be observed, yet so as to preserve a good and sufficient light.
XXVI.—The light-keepers are hereby prohibited from receiving, bringing, or
allowing to be brought to the Light-house, any spiritous liquors, as private
stores. The Acting Principal Light-keeper is held responsible for the conduct
of his assistants; and the Master of the Tender for the conduct of his men in
this respect.
XXVII.—The Bell Rock being the chief station at which Light-keepers are
instructed in their duty for the service of the Northern Lights, the Principal, or,
in his absence, the Acting-principal Keeper, is directed to superintend this
department, and they are respectively held responsible for the certificate they
may ultimately give as to the qualifications of Expectant-keepers. Upon
production of the certificate to the Engineer, the light-keepers will be found
entitled to the premium stated in the annexed Schedule of Allowances.
XXVIII.—Each Expectant-light-keeper is to be resident for at least six weeks
at the Bell Rock. In the course of this period he is to practise the whole duty

Page 469

performed in the light-room; to write the Monthly Returns; and carefully to
peruse these Instructions. If, at the end of this period, he is found qualified, he
will receive a certificate to the following effect: “Bell Rock Light-house,”
(here insert the date.) “These certify, That” (here insert the name,) “has
resided” (here insert the number of) “days at this Light-house; and having
been duly instructed in the whole practice of the Keeper’s duty in the Light-
room, he is considered qualified to act as an Assistant Light-keeper,” or is
found deficient in certain points, (here state the case as it may be.) “Witness
my hand,” (Signature of Principal, or, in his absence, of the Principal
Assistant Light-keeper.)
XXIX.—The Inventory of the Light-house apparatus, books, furniture, and
utensils, is to be compared with the Inventory-book upon the first Friday of
the months of May and November half-yearly, or as soon thereafter as the
Principal and Principal Assistant Light-keepers are both upon the Rock. Any
deficiency in the articles of the Inventory-Book is to be stated in the
respective Returns for these months.
XXX.—It being a rule in the Service of the Commissioners of the Northern
Light-houses, that access to their establishments shall be free and open to the
Public, the keepers are enjoined to pay attention to Strangers, shewing them
every civility in their power; and, particularly, to afford their aid and
assistance, in cases of Ship-wreck; yet so as not to neglect any thing
incumbent upon them, in the proper discharge of their duty as light-keepers.
XXXI.—It is recommended to the light-keepers to be cleanly in their persons
and linens, and proper in their apparel in general.
XXXII.—The Light-keepers are enjoined to assemble in the Library, for the
purpose of reading the Scriptures, and for Prayers, every Sunday, at 12
o’clock noon, in their Uniform-dress. This service is to be performed by the
Acting Principal Light-keeper, or Principal Officer of the Board present. The
table is to be covered during this service with a flag; and, when the weather is
moderate, the Light-house flag is, at the same time, to be hoisted to the mast-
head, and allowed to remain till sunset.
XXXIII.—Should any difference of opinion arise among the Light-keepers
about the meaning of these Instructions, the duty shall in such cases be
performed agreeably to the explanation and orders of the Acting Principal
Light-keeper. In the same manner, in all matters to which these Instructions

Page 470

may not seem fully to apply, the orders of the Acting Principal Light-keeper
are hereby declared to be binding upon the respective Light-keepers.
XXXIV.—In case of neglect of duty on the part of any of the Assistant-
keepers, the Principal shall, according to the nature of the offence,
communicate the circumstances to the Superintendant Light-keeper, on his
first visit, or immediately by letter to the Engineer, that the offending party
may be reprimanded, put under stoppages, or ultimately dismissed from the
service, as the case may require.
XXXV.—These Instructions, with such additional orders as may be issued
from time to time, are to be read by the officiating Officer, immediately before
reading Prayers, on the first Sunday of the months of May and November.
Edinburgh, 1st August 1823.
ROBERT STEVENSON,
Engineer to the Commissioners of the Northern Light-houses.

SCHEDULE referred to in the XXIII. and XXVII. Articles of the
INSTRUCTIONS.
Daily Allowance per Man, 1 lb. Beef; 1 lb. Bread; 2 oz. Oatmeal; 2 oz. Barley; 2 oz. Butter; 3
quarts Beer; Vegetables and Salt no stated allowance; For Tea and other necessaries 4d. per
day; For instructing each Expectant-Light-keeper L. 2, distributed as follows, viz. Principal
Light-keeper 15s., Principal-Assistant 10s., each of the two Ordinary Assistants 7s. 6d.

Page 471

MONTHLY RETURN from the BELL ROCK LIGHT-HOUSE, for
November 1812.

Key:
Monthly Return.
A Spermaceti Oil, in Gallons.
B Wicks in Dozens
C Lamp glasses
D Beef, in Lib.
E Bread, in Lib.
F Oatmeal in Lib.
G Barley, in Lib.
H Butter, in Lib.
I Beer, in Qrts.
J Water, in Gallons
K Coals in Cwts
L Vegetables in Dozens
M Number of People victualled

Light-House Stores received. Provisions, Water, and Fuel, received.
Nov. 1812. A B C D E F G H I J K L M
Stock on hand, 313 593 360 263 243 72 32 2 200 615 60 11
Sunday, 1. 8
Monday, 2. 8
Tuesday, 3. 200 60 112 160 200 12 6 9
Wednesd. 4. 9
Thursday, 5. 9
Friday, 6. 8
Saturday, 7. 8
Sunday, 8. 8
Monday, 9. 8
Tuesday, 10. 8
Wednesd. 11. 8
Thursday, 12. 8
Friday, 13. 8
Saturday, 14. 8
Sunday, 15. 8
Monday, 16. 8

Page 472

Tuesday, 17. 8
Wednesd. 18. 8
Thursday, 19. 8
Friday, 20. 100 37 80 4 3 3
Saturday, 21. 3
Sunday, 22. 3
Monday, 23. 3
Tuesday, 24. 3
Wednesd. 25. 3
Thursday, 26. 3
Friday, 27. 3
Saturday, 28. 3
Sunday, 29. 3
Monday, 30. 3
Received, 613 593 360 360 355 72 32 25 440 815 76 20 188
Expended, 111¼ 12 36 188 188 23½ 23½ 23½ 376 260 19 13½
Remainder in Store, 501¾ 581 324 172 167 48½ 8½ 1½ 64 555 57 6¼ —

Key:
AB Spermaceti Oil. Galls.
AC „ Qs.
AD „ Pts.
BB Wicks in Dozens
CC Lamp Glasses
DD Number of Lamps in Light-Room.
EE Beef in Lib.
FF Bread, in Lib.
GG Oatmeal in Lib.
HH Barley, in Lib.
II Butter, in Lib.
JJ Beer, in Qts.
KK Water, in Gallons
LL Coals in Cwts
MM Vegetables used.

Light-House Stores Provisions, Water, and Fuel, served
served out. out.
Nov. AB AC AD BB CC DD EE FF GG HH II JJ KK LL MM
1812.

Page 473

Stock on
hand,
Sunday, 1. 3 2 24 8 8 10 1 0 1 0 16 6
Monday, 2. 3 2 24 8 8 10 1 0 1 0 16 6
Tuesday, 3. 13 2 6 24 9 9 12 1 2 1 2 18 30 6
Wednesd. 4. 3 2 24 9 9 12 1 2 1 2 18 2 6
Thursday, 5. 3 2 24 9 9 12 1 2 1 2 18 1 6
Friday, 6. 3 2 24 8 8 10 1 0 1 0 16 6
Saturday, 7. 3 2 6 24 8 8 10 1 0 1 0 16 2 6
Sunday, 8. 3 2 6 24 8 8 10 1 0 1 0 16 6
Monday, 9. 3 3 24 8 8 10 1 0 1 0 16 40 6
Tuesday, 10. 3 2 24 8 8 10 1 0 1 0 16 2 6
Wednesd. 11. 4 0 24 8 8 10 1 0 1 0 16 6
Thursday, 12. 4 0 24 8 8 10 1 0 1 0 16 2 6
Friday, 13. 3 2 24 8 8 10 1 0 1 0 16 6
Saturday, 14. 3 2 6 24 8 8 10 1 0 1 0 16 6
Sunday, 15. 3 3 24 8 8 10 1 0 1 0 16 2 6
Monday, 16. 3 3 24 8 8 10 1 0 1 0 16 150 6
Tuesday, 17. 3 3 24 8 8 10 1 0 1 0 16 6
Wednesd. 18. 3 3 24 8 8 10 1 0 1 0 16 2 6
Thursday, 19. 3 3 24 8 8 10 1 0 1 0 16 6
Friday, 20. 3 3 6 24 3 3 06 06 06 6 4
Saturday, 21. 3 3 24 3 3 06 06 06 6 2 4
Sunday, 22. 3 2 24 3 3 06 06 06 6 4
Monday, 23. 4 0 24 3 3 06 06 06 6 4
Tuesday, 24. 4 0 24 3 3 06 06 06 6 4
Wednesd. 25. 3 3 6 24 3 3 06 06 06 6 2 4
Thursday, 26. 4 0 24 3 3 06 06 06 6 4
Friday, 27. 3 3 24 3 3 06 0 6 0 6 6 40 4
Saturday, 28. 4 0 24 3 3 06 06 06 6 4
Sunday, 29. 3 3 24 3 3 06 06 06 6 4
Monday, 30. 4 0 6 6 24 3 3 06 06 06 6 2 4
23 23
111 1 12 36 188 188 23 376 260 19 13
0½ 0
Carried to return for next month.

Written by M. Wishart, Assist.
Principal or Principal Assistant Light-Keeper’s Signature, John
Reid, Prinl.

Page 474

JOURNAL relative to the Duty of the Light-Keepers, and the State of the
Weather, &c. at the Bell Rock, for November 1812.

Nov. 1812. Time of Time of Night- Keepe Keepe Tolling Tolling
Extinguishing, Lighting, Watch r on r of of
A.M. P.M. Set, First absent Bells Bells
P.M. Watch. on begun. ceased.
Leave.
Sunday, 1. 6.50 4.55 5 J. Reid Wishart
J.
Monday, 2. 6.20 4.55 -
Bonyman
Tuesday, 3. 6.30 4.55 - H. Leask
Wednesday, 4. 6.25 5. - Reid Bonyman
Thursday, 5. 6.25 4.45 - Leask
M.
Friday, 6. 6.40 4.45 - 8 A.M. 10 A.M.
Wishart
Saturday, 7. 6.45 4.40 - Reid
Sunday, 8. 6.50 4.40 - Leask
Monday, 9. 6.40 4.45 - Wishart
Tuesday, 10. 6.45 4.35 - Reid
Wednesd. 11. 6.30 4.35 - Leask
Thursday, 12. 7. 4.30 - Wishart
Friday, 13. 6.55 4.30 - Reid
Saturday, 14. 6.30 4.30 - Leask
Sunday, 15. 7. 4.20 - Wishart
Monday, 16. 6.55 4.20 - Reid
Tuesday, 17. 7. 4.20 - Leask
Wednesd. 18. 7.5 4.20 - Wishart
Thursday, 19. 7. 4.15 - Reid
Friday, 20. 7.15 4.10 - Leask
Saturday, 21. 7.15 4.10 - Wishart
Sunday, 22. 7. 4.10 - Reid
Monday, 23. 7. 4.10 - Leask
Tuesday, 24. 7.10 4.10 - Wishart
Wednesd. 25. 7.10 4.15 - Reid
Thursday, 26. 7.20 4.10 - Leask
Friday, 27. 7.15 4.5 - Wishart
Saturday, 28. 7.20 4.15 - Reid

Page 475

Sunday, 29. 7.10 4.10 - Leask 12 noon 10 P.M.
Monday, 30. 7.10 4.10 - Wishart

Prevailing State of the
Weather.
Nov. 1812. Foggy, Hazy, Wind Barom. in Therm. in
Snowy. H. Calm, Inches at 8 A.M. Degrees at 8
Rain, R. C. A.M.
Clear,
C.
Sunday, 1. R.H. S.W. 29.40 46
Monday, 2. C. W.S.W. 29.50 42
Tuesday, 3. C. West. 29.68 42
Wednesday, 4. C. N.N.W. 29.69 43
Thursday, 5. C. North. 29.70 45
Friday, 6. Foggy, C. North. 29.50 45
Saturday, 7. C. N.N.E. 29.60 50
Sunday, 8. H. Variable. 29.88 50
Monday, 9. C. S.E. 30.10 49
Tuesday, 10. C. Variable. 30.12 48
Wednesd. 11. C. N.E. 30.30 48
Thursday, 12. H.R. N.E. 29.90 45
Friday, 13. H.R. S.E. 29.52 42
Saturday, 14. H.R. S.S.E. 29.60 43
Sunday, 15. H.R. N.E. 29.65 41
Monday, 16. H.R. N.E. 29.92 41
Tuesday, 17. H. East. 29.41 44
Wednesd. 18. H. N.E. 29.70 43
Thursday, 19. C. N.N.E. 29.22 45
Friday, 20. C. Variable. 29.50 45
Saturday, 21. H. N.W. 29.47 50
Sunday, 22. H. W.S.W. 29.58 49
Monday, 23. H. W.S.W 29.60 46
Tuesday, 24. H.R. Variable. 29.50 45
Wednesd. 25. R.H. N.E. 29.86 45
Thursday, 26. R.H. E.N. 29.66 49
Friday, 27. C. S.S.E. 29.97 48
Saturday, 28. H. S. by E. 30.23 47
Sunday, 29. Foggy, H. Variable. 30.34 43
Monday, 30. C. S.W. 30.15 43
30) 892.25 1356

Page 476

Average, 29.742 45.2

Supposed rise at Tender’s Boat Sick, and Number of
High Water on unable Strangers on
the Building of for Duty. the Rock.
Nov. 1812. Tide. Spray. Arrives. Departs.
Sunday, 1. 8 40 5 Artificers.
Monday, 2. 9 40
Tuesday, 3. 10 40 8 A.M. 10 A.M. 2 Surveyors.
Wednesday, 4. 11 40 8 A.M. 9.30 A.M. 2 depart.
Thursday, 5. 11 50 10 A.M. 10.15 A.M.
Friday, 6. 11 70
Saturday, 7. 10 40
Sunday, 8. 9 40
Monday, 9. 9 40
Tuesday, 10. 8 40
Wednesd. 11. 8 50
Thursday, 12. 7 50
Friday, 13. 7 40
Saturday, 14. 8 60
Sunday, 15. 8 96
Monday, 16. 9 60
Tuesday, 17. 9 70
Wednesd. 18. 10 60
Thursday, 19. 11 50 7 A.M. 10 A.M. 5 depart.
Friday, 20. 11 50
Saturday, 21. 10 40
Sunday, 22. 10 50
Monday, 23. 9 40
Tuesday, 24. 9 50
Wednesd. 25. 8 90
Thursday, 26. 8 40
Friday, 27. 8 40
Saturday, 28. 8 40
Sunday, 29. 9 30
Monday, 30. 9 30

Written by M. Wishart, Assist.
Principal or Principal Assistant Light-Keeper’s Signature, John
Reid, Prinl.

Page 477

REMARKS regarding any Accident or Particular which occurred
connected with the Bell Rock Light-house during the Month of November
1812.

1812.
Nov. 1. The first part of these twenty-four hours strong gales, with much rain, middle and
latter parts moderate and changeable.
... 3. Blowing fresh breezes to-day, with fine clear weather. At 8 a. m. the Light-house Yacht’s
boat landed twenty ankers of spermaceti oil. Mr John Steedman, and Mr William
Lorimer, from Mr Stevenson’s office, also came to the Rock to do business at the
House. Returned by the boat one anker of dregs of oil, with a box of broken lamp-
glasses, together with 20 empty casks. One mason went ashore.
... 4. At 8 a. m. the Yacht’s boat landed, and made two trips with a variety of articles and
materials for the joiners, and provisions for the use of the house. Returned some
extra bolts. Mr Steedman and his assistant employed with their instruments
measuring the Rock at low-water.
... 5. These twenty-four hours, strong breezes with clear weather. At 10 a. m. the Yacht’s boat
landed, and took off Mr Steedman and Mr Lorimer.
... 15. A constant gale, with much rain until the 19th, when it fell moderate. The signal-ball
was not hoisted to-day, as an intimation ashore that the artificers were ready to
leave the Rock.
... 20. Variable weather to-day, with flying showers. At 7 a. m. the Tender’s boat landed at
three trips, with water, fuel, and provisions, for the use of the House, and ten ankers
of oil for the use of the Light-room. At 10 o’clock the boat departed, when Mr
Slight, James Glen, Robert Selkirk, and two others, left the Rock to proceed to the
shore for the season.
... 23. All these twenty-four hours it blew strong gales, with very hazy weather. Signal-ball not
hoisted, owing to the state of the weather.
... 25. Blowing a gale with much rain. Signal-ball not hoisted.
... 26. Do. weather with much sea.
... 29. First and middle parts of these twenty-four hours hazy and variable. Middle parts foggy
and calm, with frost. Bells tolling. Signal-balls not hoisted.
... 30. Fine clear weather. Cleaned the chimney to-day.

Written by, M. Wishart, Assist.
Principal or Principal Assistant Light-keeper’s Signature. John Reid,
Prinl.
To Robert Stevenson, Esq.
Engineer for Northern Light-houses,
Edinburgh.

Page 478

Note.—Similar Monthly Returns are also sent from the other Light-house
Stations, independently of which, the Light-keepers are directed to correspond
with the Engineer as often as the circumstances of the Service require.

Page 479

SHIPWRECK RETURN from Pladda Light-House.

DESCRIPTION of Vessels or Boats Wrecked within Fifty Miles of any
Shipwreck Return. of the Northern Light-House Stations, to be immediately communicated
to the Engineer, in so far as the circumstances can be ascertained by the
observation or diligent inquiries of the respective Light-Keepers; who are also instructed to
render every assistance in their power to Shipwrecked Mariners; without however neglecting
the proper duties of their charge.

Date. Ship, Brig, Belonging to Name of Name of the
Schooner, or what Port. the Vessel. Commander.
Sloop, &c.
Tuesday, 18th
Sloop, Greenock, Atlas, Alexander Duncan.
February 1823.

Where At what In what No. of the No. of the Whence Where
Wrecked. Hour kind of Crew or Crew or from. Bound.
Wrecked, Weather. Passengers Passengers
A. M. or Saved. Lost.
P. M.
Stormy,
Island of
Hazy
Pladda, to the
At 5 A. M. Weather. 5 none. Sydney. Greenock.
S. W. of the
Wind S. S.
Light-house.
E.

Cargo. Tonnage. Supposed Value of the Supposed Value of the
Vessel. Cargo.
British Oak
75 £ 400 0 0 £ 200 0 0
Timber.

Principal or Assistant’s Signature, William Soutar, Prinl.
Note.—It fortunately happens that no instance of Shipwreck has occurred at
the Bell Rock since its erection; and therefore a Return from one of the other
Light-house Stations is given.

Page 480

LETTER accompanying the foregoing Shipwreck Return.

Pladda Light-House, 18th February 1823.
SIR,
I beg leave to inform you, that this vessel was observed by the keeper on
watch in the Light-room to be ashore at 5.30 A.M., who gave the alarm to all
the inmates of the Light-house; but no assistance could be given to the crew
by us till 8.30 A.M., when the tide ebbed so far that they could heave us a
rope; then we assisted them in getting their clothes, and themselves, and some
other articles, ashore. It is thought by the Captain and crew that the vessel will
not be got off. As it happened to be about high-water when she came ashore,
she is very far up on the shore, and ebbs almost dry at low-water, although it
be neap-tides.
The report given us by the Captain and crew is, that they thought to have
weathered this island, as they had the light three points on their weather-bow;
but having so little sail set at the time, they observed they were so near the
shore they thought the vessel would not stay. Their jib and top-sail was all the
sail they could carry to the storm. They say they were in the act of setting a
small bit of the peak of their mainsail when the vessel struck, to enable them
to keep more to windward of the island.
Wednesday, 19th. At low-water, the Captain and crew, with other assistance,
stripped the vessel of her sails and materials, which were carefully laid aside,
and partly got into the store-house. Nothing more particular about the wreck at
this date; but we shall be as serviceable to the unfortunate men as we can.
I remain,
SIR,
Your most obedient humble Servant,
WILLIAM SOUTAR.
To Robert Stevenson, Esq.
Engineer for Northern Light-Houses, Edinburgh.

Page 481

No. II.
INCHCAPE ROCK.

Extracted, by Mr Southey’s permission, from his Minor Poems, Vol. III. p.
148.
An old writer mentions a curious Tradition, which may be worth
Inchcape Ballad. quoting. “By east of the Isle of May,” says he, “twelve miles from all
land in the German Seas, lyes a great hidden rock, called Inchcape, very
dangerous for navigators, because it is overflowed every tide. It is reported in old times, upon
the saide rocke there was a bell, fixed upon a tree or timber, which rang continually, being
moved by the sea, giving notice to the saylers of the danger. This bell or clocke was put there
and maintained by the Abbot of Aberbrothok, and being taken down by a sea pirate, a yeare
thereafter he perished upon the same rocke, with ship and goodes, in the righteous judgment
of God.”
Stoddart’s Remarks on Scotland.

No stir in the air, no stir in the sea,
The Ship was still as she could be;
Her sails from heaven received no motion,
Her keel was steady in the ocean.

Without either sign or sound of their shock,
The waves flow’d over the Inchcape Rock;
So little they rose, so little they fell,
They did not move the Inchcape Bell.

The Abbot of Aberbrothok
Had placed that bell on the Inchcape Rock;
On a buoy in the storm it floated and swung,
And over the waves its warning rung.

When the Rock was hid by the surge’s swell,
The Mariners heard the warning Bell;
And then they knew the perilous Rock,
And blest the Abbot of Aberbrothok.

The Sun in heaven was shining gay,
All things were joyful on that day;

Page 482

The sea-birds scream’d as they wheel’d round,
And there was joyaunce in their sound.

The buoy of the Inchcape Bell was seen
A darker speck on the ocean green;
Sir Ralph the Rover walk’d his deck,
And he fix’d his eye on the darker speck.

He felt the cheering power of spring,
It made him whistle, it made him sing;
His heart was mirthful to excess,
But the Rover’s mirth was wickedness.

His eye was on the Inchcape Float;
Quoth he, “My men, put out the boat,
And row me to the Inchcape Rock,
And I’ll plague the Abbot of Aberbrothok.”

The boat is lower’d, the boatmen row,
And to the Inchcape Rock they go;
Sir Ralph bent over from the boat,
And he cut the Bell from the Inchcape Float.

Down sunk the Bell with a gurgling sound.
The bubbles rose and burst around;
Quoth Sir Ralph, “The next who comes to the Rock
Won’t bless the Abbot of Aberbrothok.”

Sir Ralph the Rover sail’d away,
He scour’d the seas for many a day;
And now grown rich with plunder’d store,
He steers his course for Scotland’s shore.

So thick a haze o’erspreads the sky
They cannot see the sun on high;
The wind hath blown a gale all day,
At evening it hath died away.

On the deck the Rover takes his stand,

Page 483

So dark it is they see no land.
Quoth Sir Ralph, “It will be lighter soon,
For there is the dawn of the rising Moon.”

“Canst hear,” said one, “the breakers roar?
For methinks we should be near the shore.”
“Now, where we are I cannot tell,
But I wish we could hear the Inchcape Bell.”

They hear no sound, the swell is strong;
Though the wind hath fallen they drift along,
Till the vessel strikes with a shivering shock,
“Oh Christ! it is the Inchcape Rock!”

Sir Ralph the Rover tore his hair;
He curst himself in his despair;
The waves rush in on every side,
The ship is sinking beneath the tide.

But even in his dying fear
One dreadful sound could the Rover hear,
A sound as if with the Inchcape Bell,
The Devil below was ringing his knell.

1820.

Page 484

No. III.

Page 485

ABSTRACT ACCOUNT of LIGHT-HOUSE DUTIES, furnished to the Committee of the
Light-house Duties. House of Commons, in reference to the Bell Rock Act.
“ABSTRACT STATE of ADDITIONAL DUTIES that will arise from the District to be included in the Collection
by the Erection of a Light-House on the Cape or Bell Rock; calculated from the Custom-House Returns, 13th May
1806, at the rate of 1½d. per ton, whether Outwards or Inwards.

Inwards, 93,782
Foreign,
Outwards, 67,633
‘ 1804.
Inwards, 239,037
Coastways,
Outwards, 170,174 Tons.
———— 570,626 L. 3566 8 3
Inwards, 81,123
Foreign,
Outwards, 73,289
‘ 1805.
Inwards, 259,997
Coastways,
Outwards, 203,564
———— 617,973 3862 6 7½
Inwards, 97,205
Foreign,
Outwards, 86,739
‘ 1806.
Inwards, 270,737
Coastways,
Outwards, 215,637
———— 670,318 4,189 9 9
Total of three years, 1,858,917 L. 11,618 4 7½

“The tonnage of the ports of the Firth of Forth, already pay ½d. per ton for Inchkeith light, so that the additional duty
payable by them, will be only one penny per ton, the total tonnage thus paying ½d. is, for the whole three years, 971,482.
Deduct, therefore, ½d. per ton for this amount, L. 2023 18 5
Deduct also expences of collection, and the charges of management, say 15 per cent. 1742 14 9
3766 13 2
“Nett total for three years, L. 7851 11 5½
“Nett yearly total L. 2617 3 9½
(Signed) “C. Cuningham,
Secretary to the Commissioners of the Northern Light-houses.”
Note.—The District of coast referred to in the above Abstract, lies between Peterhead, in Aberdeenshire, towards the north, and Berwick-
upon-Tweed, to the south, both inclusive.

Page 486

No. IV.
Containing REPORTS relative to the Bell Rock Light-House, addressed to the Commissioners of the Northern Light-
Relative Reports. houses, by John Rennie and Robert Stevenson, Civil Engineers.

Page 487

REPORT by Mr Stevenson.

Edinburgh, 23d December 1800.
During the reign of his present Majesty (George III.), a spirit for discovery and improvement, in maritime affairs,
has been pursued with the greatest energy, and crowned with a success, which can only be equalled by the happy
effects that have followed to commerce. In proportion, therefore, as the pursuits of the navigator are considered
essential to the wealth of the community, every effort to Assist him, in his course through the pathless ocean, must
be regarded both as the call of interest and humanity. The most prominent causes of the perfection to which
coasting-navigation has been brought, may be ascribed to the accuracy of our charts, and an increase of land-
marks, by which the mariner, after braving the dangers of the seas, is enabled to guide his ship with safety into her
intended port. It is well known, that before the Maritime Survey of the Orkneys and Hebrides, by Mackenzie; and
until an act of Parliament was passed, appointing Commissioners for erecting Light-houses upon the coast of
Scotland, mariners were left to grope their way from the Firth of Forth to the Firth of Clyde, without the assistance
either of proper charts or land-marks. Under these circumstances, they passed the Pentland Firth , and generally
held a course to the northward of the Orkney islands; then steering westward, they sailed on the outward side of
the Lewis Isles into the Atlantic Ocean, exposed to many dangers, and unable to avail themselves of the
advantages of the sheltered sounds and harbours of the Friths of Lewis and Uist. Hence the difficulty of navigating
this district, was long a great bar to the improvement of the Highlands, and to the extension of the British fisheries.
It was, likewise, a material drawback to the present flourishing trade, carried on through these sounds to the Baltic
and other parts of the northern Continent of Europe.
From the earliest accounts which tradition gives of the navigation of the Firth of Forth, a Light-house upon the
Bell Rock appears to have been looked forward to as an essential pre-requisite to the advancement of its
commerce: And in proportion to the extent of the one, the call for the other has become more and more urgent, and
is now regarded as a matter of the greatest importance.
Since the publication of Adair’s Charts, there has been no want of a survey of the Firth of Forth; but this important
estuary still remains extremely deficient with regard to land-marks, and the reporter will venture to say, that there
is not any where a more dangerous reef in the kingdom, or one that calls more loudly for something to be done,
than the Cape or Bell Rock. When, therefore, the extensive benefits derived from those powers, which have
enabled the Commissioners of the Northern Light-houses to erect and maintain six Light-houses upon the coast,
are considered, it is much to be wished that some measure were adopted for enabling that Board to add to the
number of these land-marks, by the erection of one upon this most destructive rock. From the numerous losses by
shipwreck, which have happened upon the Bell Rock, it is presumed, that some account of its position and extent,
from actual survey,—a few remarks upon the description of building best suited to the situation of the rock,—
together with an attempt to point out the extensive use of such a light,—and the ports which appear to be within
the limits of any duty to be levied for its support, will not be deemed unnecessary at a time when the public look
forward, with anxious expectation, to this Board, in a matter of so much importance, not only to the navigation of
the Firth of Forth, but in general, to the eastern coast of Great Britain.
Having finished a design and model of a pillar-formed light-house for the Bell Rock, immediately after the very
fatal storm which occurred in the month of December 1799, the next object of the Reporter, was to survey the rock
itself, that he might judge more fully of its fitness for the situation. Accordingly, in the month of April following,
he set off for the rock, and had reached Fifeness, when, from the state of the weather, he was obliged to return,
after an absence of ten days, without accomplishing his purpose. Soon after his return from his annual voyage to
the Northern Light-houses, Mr Gray, secretary for the Commissioners, requested of the Board of Customs to grant
the use of one of its yachts, to make another attempt. An order having been accordingly obtained for the
Osnaburgh cutter, Captain Campbell, then lying at the Elie, the reporter, accompanied by his friend Mr James
Haldane, architect, set off for that place. But the Osnaburgh being then under repair, and the period of spring-tides
being at hand, it was found advisable to proceed along the coast to West-haven, on the northern side of the Firth of
Tay; and upon Sunday the 5th of October 1800, a landing was effected upon the Rock, and an ample opportunity
afforded of gaining all necessary information.
The Bell Rock, as appears by the best charts of the coast, is situated at the mouth of the Firth of Forth, in west
longitude 2° 22´, and north latitude 56° 29´. It lies nearly fifteen miles from the Island of May, in a north-eastern
direction per compass, and twelve miles south-west from the Red-head in Angusshire, which it resembles, being a

Page 488

free-stone of a reddish colour, though of a much harder body, and closer grit. Besides its natural asperities, the
surface in general is thickly coated with sea-weed, and, on the higher parts, the barnacle, white buckie or whelk,
and limpets, abound, and altogether it presents a very rugged appearance, owing to the sloping of the strata from
south, where highest, to north, at an angle of about 30 degrees. The material part of the rock, which lies north-east
and south-west, measures, on an average, about 300 feet in length, and 240 feet in breadth. The highest part above
the surface of the sea, does not exceed seven feet at low-water of spring-tides; which part, at high-water of same
tides, is from nine to ten feet under water. The reporter also found, that the medium height of the foundation of any
building erected upon it, will not exceed two or three feet above the surface of the sea at low-water of spring-tides.
The above dimensions may be termed the material part of the rock; but, south-west of this, there runs a reef or
shoal, of considerable extent, which is only visible in very low tides.
The short time which the Bell Rock is seen above water, and the irregularity of the soundings in its vicinity, are the
cause of many wrecks upon it. Indeed, after the water has flowed, in ordinary tides, but a very short time, the most
skilful mariner cannot point out its place, without its proper meaths or land-marks in sight, which lie from twelve
to twenty miles distant. Under these circumstances, the Bell Rock will be found more dangerous to vessels coming
near it, than perhaps any of those reefs upon which Light-houses have as yet been erected.
The Edystone Rock, for example, is about eleven miles from land, situate at the entrance of Plymouth Sound.
Before the rock was reduced for the foundation of the Light-house, it was about three feet above high-water of
spring-tides. The Longships Rock, situate three miles off the Lands-End, is about forty feet above high-water
mark, though barely large enough for the foundation of the Light-house. The Smalls lie fourteen miles off St
David’s Head; and the rock on which the light-house is built, is about five feet above high-water of spring-tides.
The South Rock, lying three miles off the land, between Loch Strangford and Donaghadee, is about four feet under
the surface at high-water of spring-tides. The Tour de Corduan, upon the coast of France, is built upon a sunken
rock at the entrance of the Garonne, and is said to be about eight feet under the surface of the sea at high-water of
spring-tides. And, lastly, the Bell Rock, the subject of this report, lying upwards of eleven miles from land, is from
nine to ten feet under water, as before stated.
Ever since the reporter had an opportunity to know the danger and inconvenience that must attend the navigation
of the Firth of Forth, while the Bell Rock remains without some signal upon it, to forewarn seamen, he has been
much employed in considering what kind of building would be most applicable to its situation; and he has,
therefore, endeavoured to obtain as much information as possible about works of this kind. The first light-house
erected upon an insulated rock on the coast of Great Britain or Ireland, appears to have been that of the Edystone,
which was begun in 1696, and was scarcely finished, when a dreadful storm carried it completely away. This
erection was constructed of timber, and was designed and executed by Mr William Winstanly, who, with his
artificers and the light-keepers, unfortunately perished in its ruins. The next light-house that was built upon the
Edystone Rocks, consisting partly of stone and partly of wood, it was finished in 1709, and was the work of Mr
John Rudyard, who, carefully avoiding the errors of his predecessor, lopped off all superfluous ornaments, and
produced a plain building; which, after withstanding the fury of the waves for forty-nine years, had the misfortune
to be destroyed by fire. The present Edystone Light-house was begun in 1756, and finished in 1759. It has now
stood forty-four years, a memorial of the ingenuity and indefatigable labours of Mr John Smeaton, who, guarding
against the defects of the two former buildings, constructed the whole of stone; the blocks of the solid part are
curiously dove-tailed into each other; and every thing unnecessarily tending to give resistance to the water is
carefully avoided, while the whole is completely fire-proof. The next light-house erected upon a situation of this
kind, was the Smalls, which is placed upon eight beams of oak, arranged round a centre one. The latest light-house
built on an insulated situation, is that upon the South Rock on the coast of Ireland. The reporter made three
successive journeys to this light-house, during its progress: First in 1796, when it was only 12 feet in height; again
in 1797, when it was nearly finished; and a third time in the month of August 1800. This light-house is built of
granite, quarried in the mountains of Morne. The method of dove-tailing or joggling the stones, and attaching the
courses to each other, is different from that of the Edystone; throughout the solid part of the masonry, and eighteen
inches within the circumference of the building, six great bars of malleable iron are carried up, each four inches
square; and upon the top of every alternate course, a circular plate of iron is let into the stone, and fixed by spear-
bolts to the upright bars. The building is of a conical figure, and was built in the course of three years from a
design by Mr John Rodgers of Dublin.
Before being properly certified as to the possibility of getting a foundation for a building of any kind upon the Bell
Rock, the reporter thought of a Floating-light, like those moored off the Dudgeon-shoal, and other sand-banks on
the coast of England. But the foulness of the ground about the Bell Rock, the great depth of water near it, together

Page 489

with the unsteadiness of a light of this description,—and above all, the perplexing uncertainty which must ever
attend such a light in a storm, cannot fail to unhinge the confidence of the mariner, and thereby prevent him from
making free with his course; and when, from an error in it, or in the distance run, he is disappointed in seeing the
light, wrong conclusions are apt to be formed: he supposes that the Floating-light has drifted, and by changing his
course, perhaps turns upon the very point of danger. These were considerations from which much relief was felt,
upon learning that the rock was large enough to form the foundation of a permanent building; but, till the moment
he landed upon it, he was uncertain if a building of stone was applicable; and foreseeing the difficulties which
would be avoided, if, instead of carrying up the lower part solid, it could be formed of pillars, after the manner of
the Smalls Light-house; reflecting also upon that elegant and useful application lately made of cast-iron, in the
construction of bridges, choice was made of this metal, in his first model for the Bell Rock, as being more
substantial than timber, and also less liable to corrosion from the action of the atmosphere than malleable-iron.
This light-house (see Plate VII.), was to consist of six hollow tubes or pillars, built each to the height of ninety
feet, measuring two feet in diameter at the base, and diminishing to six inches at the top, ranged round a common
centre so as to form a diameter of thirty-five feet at the base, and eight feet at the top, immediately under the light-
room. The pillars were to be cast in lengths or pieces of ten feet each; and at every joint horizontal bars were made
to grasp the pillars, and the whole was also connected diagonally with various cross braces. Under the light-room,
the building was to be laid out into four heights of apartments for the light-keepers and stores, formed within the
range of the pillars, which occupying 45 feet of their height, the part below being of similar height, was left free
for the passage of the sea, thus presenting the least possible resistance to the waves. These apartments were to be
formed and covered in with strong copper, which, to prevent its acting upon the iron, was to be coated with tin.
The lower part, or floor nearest to the sea, was to form an inverted cone, presenting a surface calculated to disperse
the seas which might strike against it. In order still more to increase the common base, and strengthen this fabric,
Professor Robison advised that a diagonal bar should be attached to the exterior side of each of the pillars.
In this first design, provision was made chiefly against the impulse of the sea, without taking into account the
possibility of a vessel or wreck getting near it; but he found, after landing upon the rock, that it was possible for a
vessel at high-water to come, without interruption, against the pillars. To guard against misfortune from this
quarter, the reporter first thought of defending the pillars in various ways, particularly by throwing a kind of
Chevaux de Frise round them, with beams of oak. He, however, found it difficult to suppose any set of pillars of
adequate strength to resist the force of a loaded vessel, violently agitated in a winter storm, which must render the
pillar-formed construction very uncertain, even after every precaution should be taken to guard against such
accidents. Nor ought the danger to which such a mass of metal, constantly exposed to the effects of the marine-
acid, to be wholly overlooked, in giving a preference to a circular building of stone, which being a compact figure
of solid matter, would resist any force that might be brought against it. The reporter has estimated the Pillar-formed
Light-house at L. 15,000; and, although that for the Tower of masonry amounts to L. 42,636, 8s., yet, as it is
treading a beaten path, which leads to certainty, it is surely to be preferred in a work of this kind: the foundation-
course of stone must be more tedious than that of so many pillars, yet, in this there is nothing impracticable; and
when the difficulties of the first courses are surmounted, the superiority of a fabric of stone over one of iron will
readily be admitted.
In the model for a building of stone, made since the reporter first landed upon the Bell Rock, he has retained nearly
the same elevation as that of the Edystone Light-house, which presents less resistance, and preserves a greater base
than perhaps any other figure that could have been thought of. In this design he has also followed Mr Smeaton in
the use of oak-trenails to keep the stones in their places, while the work is in progress; but has differed in the mode
of diminishing the interior-walls, as the building rises in height. Instead, also, of Mr Smeaton’s plan of dove-tailing
the stones, and connecting the floors, various other modes are resorted to, for effecting this perpendicularly as well
as laterally, with the view of introducing larger materials, and keeping the stones in a more entire state. One of
these is by an iron-bat, which is inserted into the joints of the lower courses, while the void or upper courses are to
be indented, or let perpendicularly into one another. Upon inspection of the models and drawings of this design, it
will perhaps be found to render the construction more simple, to divide the strength of the walls more equally, and,
upon the whole, to give that stability which the situation of the Bell Rock seems so peculiarly to require. (See Plate
VII.)
Upon comparing the pillar-formed Light-house, with the circular tower of masonry, it is matter of surprise that
ever the Smalls Light-house should have been erected upon that plan, unless it were to avoid the additional
expence of a stone building. There is, however, one circumstance which materially favours the pillar-formed
construction at the Smalls, the want of which becomes a principal objection to its application at the Bell Rock;
namely, that the Smalls Rock being five feet above high-water of spring-tides, the pillars are more obviously

Page 490

defended from injury in the event of a vessel or wreck coming against them, and also from the violence of the sea,
whereas the Bell Rock, at certain periods of the tide, is from nine to ten feet under water.
When Mr John Rennie, civil engineer, obligingly favoured the reporter by examining his models, he gave a
decided preference to the structure of stone, as did Professors Robison and Playfair. And Captain Huddart also,
upon seeing the pillar-formed model, mentioned that the Trinity-House did not approve of iron pillars which, in the
instance of the Smalls, were considered not so proper as beams of oak. The chief motives which induced the
reporter to model a light-house upon the plan of the Smalls, were the uncertainty of procuring a foundation for a
stone building; the small resistance which the pillars present to the force of the waves, and the first cost being very
considerably less. But although this is true, with regard to the resistance, it must also be remembered, that the
pillars come prodigiously short of the weight of a tower of masonry, of the dimensions of the one modelled,
containing upwards of 2000 tons; whereas the iron pillars, even in their most improved state, do not exceed 200
tons. When, therefore, the stone light-house is compared with the iron one, all idea of the greater resistance of the
former is lost in its solid contents, and in the uniformity of its figure.
In alluding to the great utility of an erection on the Bell Rock, it may, in general, be observed, that it is in the same
degree of latitude with the Town of Holstebro in Denmark, and that the Naze of Norway, or entrance to the Baltic,
lies north of Holstebro 1° 30´. It therefore follows, that all vessels bound to the Baltic, from, any port south of the
River Tweed, must cross the latitude of the Bell Rock, while the degree of east or west longitude, in which such
vessels pass, must depend upon the direction of the winds and other circumstances. In order to avoid the enemy in
the time of war, it is common for shipping in this track, first to make the land about Buchanness in Aberdeenshire,
and from thence take their departure either over seas, or along shore to their respective ports. With regard to ships
bound for Archangel and Greenland, they, at all times, make the Islands of Shetland, and from thence take their
departure. If, therefore, lines be drawn from Buchanness and Girdleness in Aberdeenshire, to Flamborough Head
in Yorkshire, and the mouth of the Tyne in Northumberland, the Bell Rock will only be found to lie from six to ten
leagues distant from these courses or lines. So that vessels crossing the mouth of the Firth of Forth, from
Buchanness to the Humber and Thames, &c., may not only come in sight of a light upon this rock, but be
materially benefited by it, according to the state of the weather, while those upon the course of the nearest line
bound for Newcastle and Sunderland, &c. must, in every voyage which carries them north of the Tweed, be
essentially served by a light upon the Bell Rock.
It further deserves notice in this place, that the principal estuaries on the eastern coast of Great Britain, are those of
the Friths of Moray and Forth, and the Rivers Humber, and Thames. The most material general purpose which
would be answered by a Light upon the Bell Rock, is the opening of the Firth of Forth as a place of safety, in
storms from south-east, east, and north-east. When mariners at sea are overtaken with a gale under such
circumstances, they make for the most contiguous of these four inlets; but are often known to avoid the Forth, on
account of this Rock, which, like another Cerberus, guards its entrance. Of this, a melancholy example occurred
(which will long be remembered with that regret which never fails to accompany the forlorn case of the widow and
fatherless), in that heavy gale at south-east, which happened in the winter of 1799, and drove many vessels from
their moorings in Yarmouth Roads, put them past the Humber, and the crews being afraid to make free with the
Firth of Forth, even though the wind was fair, were, with others, driven ashore between the Redhead in Forfarshire,
and Kinnaird Head in Aberdeenshire, to the number of about thirty sail. Nor were they all saved that weathered
Kinnaird Head; several were wrecked in Orkney and Shetland; and the whole loss occasioned by this gale has been
stated as high as seventy sail, with many of their crews! amongst which are reckoned two that were known to have
been lost upon the Bell Rock. This fatal catastrophe, of which the history of our coast affords few examples, is the
more to be lamented, when it is considered that a light upon the Bell Rock, by opening the way to a place of safety,
would infallibly have been the means of preventing much calamity, to those who sought safety, with various
fortune, in more northern latitudes. In conclusion, it may be observed, that until this improvement of the coast
comes from the Commissioners of the Northern Light-houses, it is much to be feared that the cause continuing, the
sad effects will not cease.
(Signed) Robert Stevenson.
To the Honourable the Commissioners of the Northern Light-houses.

Page 491

REPORT by Mr Rennie.

London, 30th December 1805.
Gentlemen,
In consequence of your directions, I set out in a vessel called the Pharos, from Leith, on the 15th of August last,
early in the morning, in company with Robert Hamilton, Esq. one of your Commissioners, and Mr Stevenson,
your Engineer, to view the Bell or Cape Rock, for the purpose of considering the practicability of building a Light-
house thereon. But, owing to the want of wind, we did not get near the Rock till dusk, i. e. about half-past seven,
which was near half ebb; but although we were not above a mile distant, we could discover but little of the rock
itself. Its situation, however, was sufficiently apparent, by the breakers upon it, which, although the sea was very
little agitated where we were, yet the waves were very high on the Rock itself, breaking over it with considerable
violence. We approached within less than half a mile of it, and took soundings; but it becoming dark, we judged it
advisable to sail further off, and anchored about a mile from the Rock all the night, in expectation we should be
able to land on it next morning, which, from the serene appearance of the sky, we doubted not we should be able to
effect. We had not dropped the anchor long, when the little wind there was during the day ceased, and it became a
dead calm, but, notwithstanding this, there was a heavy swell, and the vessel rolled much. Frequently, during the
night, I viewed the place where the Rock lies, and saw the heavy breakers which played about it, till near three
quarters flood, when they nearly ceased, and no appearance of such a place was to be observed. They commenced
again about quarter ebb, and continued increasing for some time; but, by nine in the morning, the sea became more
smooth, and about half-past nine, the rock appearing several feet above water, we left the Pharos in a small boat,
and had the satisfaction of landing on it about half-past ten, a little before low water. The spring-tides, however,
were rather past their height, being five days after the full moon. We landed on the north-east side of the Rock, in a
little bay or inlet, through some breakers, but these were just on the verge of the Rock, for when we got in, the
water was quite smooth.
The Rock lies in a direction nearly south-west and north-east, magnetic bearing. That part which was dry, saving
some small inlets, I found to be about 280 feet long, and 220 feet wide. Its general surface was about 4 feet above
the level of low water, though some places were about 6 feet high. The Rock, however, extends for some distance
all round that part which was dry, and dips downward. It extends under the surface for about 400 feet on the south-
west side, about 100 feet on the north-east side, and about 50 on the south-east and north-west sides; and on those
parts the water is shallow. At about 300 feet south-west, I found about 13 feet water, but, on account of the
breakers, could not sound on the low parts of the Rock, or either of the other sides. At the extremities of the main
Rock above mentioned, the dip is sudden; the bottom, however, is rocky for a considerable extent round its bed,
but the water is deep.
The Rock itself is a hard red freestone, in beds dipping to the south-east, about one in five; these beds are various
in their thickness, some being much greater than others; but, generally, well connected together. Such parts as are
not immediately exposed to the violent wash of the waves, are coated with a hard crust, and covered with limpets;
and, indeed, when it is exposed to the full fury of the sea, there seems to be little appearance of decay, so that I
have no doubt, were a Light-house constructed here, no fears need be entertained for the durability of the Rock, as
it seems to me well calculated to resist the effects of the waves.
We remained on the Rock for about an hour and a half, when the tide began to flow rather quickly, and having got
all the necessary measurements as to height and size, we left it, and returned to our vessel, having been much
gratified with the ample view we had of it, and soon after our getting on board the vessel, we weighed anchor at
one, and the wind suiting, we arrived at Arbroath about four o’clock.
The Inch Cape, or Bell Rock, lies in West longitude 2° 22´; North latitude 56° 29´, as stated by Mr Stevenson. It is
about eleven miles distant from the harbour of Arbroath, about ten miles from the Bluff Point of the Sands of
Barry, at the northern side of the entrance to the River Tay, and about eleven miles from the Red Head, which lies
between Arbroath and Montrose; so that in fact it is about the same distance from the shore as the Edystone Rock,
on which Mr Smeaton completed a stone light-house in the year 1759. The soundings on the south-west side, and
near to this Rock, as taken at low water, were about 7 fathoms, within half a mile of it; and, in the same direction,
about 15 fathoms, bottom rock. About three-fourths of a mile, 19 to 20 fathoms, bottom gravel. At the north-east
side, and near to the Rock, the soundings were 6 fathoms. About three-fourths of a mile north-west of the Rock 15

Page 492

fathoms, and about a mile and a quarter in the same direction 18 fathoms. We did not take the soundings on any
other side of the Rock, or at a greater distance; but I was informed they were full as much as those we had taken.
Such being the situation of the Cape or Bell Rock, lying nearly in the direction which vessels generally take in
sailing into the Firth of Forth, from northerly directions, or out of it, in sailing to the north or east, it is no wonder
that many accidents should arise in hazy weather or dark nights, there being no means of discovering its situation
correctly, unless when the land-marks are to be seen, for the deep water lying so close all round the Rock, nothing
can be ascertained from soundings, until too near to enable vessels to get out of the way. Breakers, no doubt,
frequently point out its situation, but these, in dark nights, and hazy weather, often are not sufficient, and at high-
water, even in good nights, are not always discernible; for want of other means, many vessels have been wrecked
thereon, and numberless valuable lives and much property lost.
Vessels trading from the Humber, and northwards to the Baltic, to Norway, Greenland, &c. are often, by stress of
weather, driven towards the coast, and even those from more southerly ports often share the unfortunate fate of
coasting vessels. It is therefore of the utmost importance that something should be done to mark out the situation
of this dangerous and frightful Rock.
A Beacon has been proposed, but this would but ill answer the purpose. Nothing, in my opinion, would do it
effectually, except a Light-house; and the question is, whether a Light-house could be built on this Rock, and, if so,
of what materials it should be composed, and which, in point of strength and durability, are most likely to become
a lasting work, without which the mariner can never make free with his course.
Of all the works which could be erected here, perhaps a wooden Light-house would be the cheapest. But were a
wooden Light-house to be constructed, I apprehend a solid base of stone must first be constructed, similar to that
built on the Edystone by Mr Rudyard; but wood is liable to decay; it would require constant repairs, and would
also be liable to be destroyed by fire, as that of Mr Rudyard’s was. A Light-house of cast-iron might also be
constructed here, and I will allow that it might have a coating of lead, or other metallic substance, so as for a long
time at least to resist the effects of the marine acid. But to make a Light-house that would last of such materials,
would be nearly, if not wholly, as expensive as one of stone, which I believe, I need scarcely say, no human
ingenuity could render as durable; and as the durability of such a work as this is of the utmost consequence, I
apprehend a moderate sum of extra expence ought not to be looked on as an object of material consideration, when
put in competition with the advantages of durability. But, besides these objections to a work constructed of wood
or iron, vessels being apt to be driven against it at high-water, there being at spring-tides from nine to ten feet deep
on the top of the Rock, and should the vessel be a large one, and acted on by a heavy sea, it would not be difficult
to foretell the consequences.
The durability and efficacy of a stone Light-house has been proved in the most satisfactory manner at the Tour de
Corduan, near the mouth of the River Garonne, on the coast of France; at the Edystone, off the mouth of Plymouth
Harbour, and in other situations. Why, therefore, with such incontestible proofs before our eyes, should recourse be
had to a material new in itself for such purposes, and untried? a material which, if fitted and joined together as it
ought to be, would consume nearly as much time in getting the lower part laid, as the laying of three or four
courses at the bottom of a stone Light-house, and when the stone-work is got to the height of five or six feet above
the Rock, the greatest part of the difficulty may be said to be over; and besides, such a solid mass of materials
would resist any violent shock of a vessel which might be brought against it by the sea. I have, therefore, no
hesitation in giving a decided opinion in favour of a stone Light-house.
As to the practicability of erecting such a work on the Bell Rock, I think no doubt can be entertained, with such
examples before us as the Tour de Corduan and Edystone before mentioned.—In the 4th volume of the
Architecture Hydraulique of Belider, an account is given of the Tour de Corduan. It is built on a low rocky island,
dry at low water, and whose surface is nearly level; it is covered at high-water, as near as I can ascertain from his
draughts and description, about 8 or 9 feet. It is exposed to a very heavy swell of the sea, lying quite open to the
Bay of Biscay, from whence it is well known very heavy swells come, and beat against it with great fury; yet this
Light-house has resisted the fury of the waves for above 250 years.
The Edystone Light-house is built even in a more exposed situation than that of the Tour de Corduan, and upon a
rock whose surface is little larger than the base of the Light-house itself. The top of this rock is shelving, and was
seldom covered by ordinary spring-tides before Mr Smeaton began his foundation; the lower part, however, was
always covered over at the top of neap-tides. At the lowest place, when he began his work, the rock was dry about
six hours each tide, although there the Edystone Rock is less in size than the Cape Rock, yet the advantage of

Page 493

being so long dry, is greatly in favour of building a Light-house; the most difficult and tedious part of the work
being the establishment of the four or five lower courses of the foundation.
The higher parts of the Cape Rock, as I have before stated, are little more than six feet above the low water of an
ordinary spring-tide. But I apprehend, when a place sufficiently large for the foundation is levelled, its surface will
be little more than three and a half feet above the low water of an ordinary spring-tide. I do not think that above
three hours’ time for work can be expected, which is about half of what was got at the Edystone. The depth of the
water all round it, and its exposure to the German Ocean, renders it as difficult a situation to construct a durable
work upon as that of the Edystone, if not more so. I doubt, therefore, more time will be required for the work; but
this depends so much on the state of the weather, that no certain calculation can be made. It is better, therefore, to
reckon on a sufficient time, and this I would beg leave to state at four years; and if it can be done in less time so
much the better. The Rock upon which the Edystone Light-house stands is certainly harder than the Cape Rock,
and of course required more time to work; but, on the other hand, the Cape Rock lying in a more northerly latitude,
and where the weather is more variable, it is likely that greater interruption will be given to the proceedings than in
the other; so that, all circumstances considered, the time I have mentioned, I doubt, will be little enough.
Mr Stevenson, to whose merit I am happy to bear ample testimony, has been indefatigable in obtaining
information respecting this Rock, and he has made a model of a stone Light-house, nearly resembling that of the
Edystone, in which he has proposed various ingenious methods of constructing the work, by way of facilitating the
operations. I own, however, after considering these in the fullest manner I have been able, and comparing them
with the construction of Mr Smeaton’s, I mean in the building, and also that there is undoubted proofs of the
stability of the Edystone, I am inclined to give it the preference. No doubt some methods different from the
Edystone will require to be put in practice for the foundation; but its general construction, in my opinion, renders it
as strong as can well be conceived,—in fact, it may be looked upon as a solid mass of rock. Viewing the matter,
therefore, in this light, it will be unnecessary for me to accompany this Report with the design of a Light-house. It
will be time enough to make such a design, when the Commissioners shall be in a situation to give orders for the
erection, and then I have no doubt Mr Stevenson will furnish much valuable matter towards the perfecting of it.
The total height of the Edystone Light-house, from the lower course of stones on the rock to the top of the platform
or balcony-floor, is about 70 feet; from thence to the bottom of the iron-frame of the lantern about 6 feet 9 inches;
and the lantern itself is about 8 feet 3 inches; so that the total height to the eve of the cupola is about 84 feet 6
inches. Now, as the Bell Rock lies so much lower than that of the Edystone, I think the height of the shaft or tower
of the Light-house should not be less than 80 feet, or, perhaps, a little more, say 85 feet; so that the cupola will, in
this case, be about 100 feet above the surface of the rock. With such a height of Light-house as is here proposed, I
would advise that the diameter of the base should be greater, and as it is less surrounded by such an extent of rock,
it will give facility to the gradual diminution of the effects of the waves breaking upon it; will render the fabric
more steady, and, as it will diminish quickly, no great additional surface will be presented to the sea.
The floor of the lower room, i. e. the height of the solid part of the Light-house, I would propose to be about 50
feet, and from thence to the top of the platform 35 feet, making a total height, from the rock to the platform or
gallery, of 85 feet. As to the lantern itself, I need say little on that head, as lanterns for light-houses have, of late
years, been greatly improved, as well as the lights. The substitution of lamps with reflectors, in place of coal or
candle lights, has been found of the greatest advantage to the mariner; and it is not unlikely, from what I have been
lately made acquainted with, that the substitution of the hydrogen gas in place of lamps, will not only prove a
much cheaper, but a better light than even lamps. I am told that it will not cost above one-eighth of the price of oil.
The kind of light to be used is also a matter of consideration, for unless lights are so constructed as to enable the
mariner to distinguish between one and another, he may be apt to mistake his situation; but that also can be easily
arranged, when this part of the subject comes to require consideration. The new light on the Skerries in Orkney is a
revolving one; perhaps a similar one may also be judged advisable here, as, if the Light-house on the Island of
May was to be fitted up with reflectors in the usual manner, it would not always be easy to distinguish this from
the Cape Rock, unless one of them was to be made a revolving, or the lights to be placed in different situations of
the house.
A Light-house has, of late years, been built on the South Rock, near the mouth of Loch Strangford, on the coast of
Ireland. This Light-house was begun on the 11th of June 1795, and completed the 25th March 1797. It is 30 feet
diameter at the base, and about 15½ feet just below the balcony floor. It is 56 feet high from the rock to the
platform or balcony floor, and its shape is the frustum of a cone. It is built of granite from the Mountains of Morne;
and the lantern, from the platform to the cupola, is about 12 feet high, and 10 feet wide. The light is a revolving

Page 494

one, and lighted by 10 lamps with reflectors, 3 in the upper course, 3 in the lower course, and 4 in the middle, and
makes a revolution in five minutes. This distinguishes it from the Copland lights.
The rock on which this Light-house stands is about 400 yards long, and about 100 wide, and is covered about 18
inches deep at high-water, ordinary spring-tides. The rock is composed of beds of schistus, intermixed with beds of
a kind of indurated clay, which are wearing fast away by the washing of the sea; and, unless some speedy and
effectual means are taken to secure it, this Light-house will not be of long duration. It has cost about L. 22,000,
and it is said that L. 7000 more will be required to secure the rock from washing away. I will not take upon me to
say that this sum will be sufficient for the purpose; but it seems to me that it will not be a very difficult matter to
secure the rock, if proper means are taken. The channel is here narrow, and the seas cannot be very heavy; indeed
Macculloch the Light-house keeper informed me, that they seldom rise above the first landing, which is only
about 27 feet from the top of the rock.
In the construction of a Light-house at the Cape Rock, great care will be necessary in choosing stone of the most
durable quality, fit to resist the effects of the waves. For this purpose, I examined the rocks lying along the shore
nearest adjoining the Inch Cape Rock, but found none of a very durable quality; most of it is a red freestone, softer
than the rock itself, which has been much worn away by the wash of the sea, and therefore by no means fit for the
exterior work of such a building; and there does not appear to be any fit for that purpose nearer than Kingoodie,
about three or four miles from Dundee. This stone is a hard millstone-grit, of an excellent quality; very hard to
work, but can be raised in blocks of any size and thickness required. It therefore appears to me to be most fit for
the exterior work of a Light-house to be built on the Cape Rock; but as the price the proprietor asks for it is very
high, it becomes a question whether the solid part of the building may not be done with the stone from near
Arbroath, which, although not fit for exterior work, is yet of a pretty strong quality, and might be used in the solid
part of the building, not exposed to the weather or wash of the sea: Or, it may be a question, whether the saving
that would arise from using the stone near Arbroath, is a consideration, when put in competition with the superior
strength and specific gravity of the Kingoodie stone.
Granite is also a stone that will resist the waves without wearing, and it is therefore a matter of consideration,
whether granite stone might not be had from Peterhead or Aberdeen for this purpose. Granite, it is true, cannot
conveniently be had in such large blocks as the Kingoodie stone, but it may be had in blocks sufficiently large to
answer the purpose, and, if well dove-tailed, and properly cemented together, the whole may be made to act as one
solid body of rock.
As to the expence of a Light-house in such a situation, it is not a very easy matter to form any thing like a correct
calculation. So much depends on weather, on the untoward circumstances that may probably happen while the
work is in hand, that they baffle even the most experienced artist to make the proper allowances. The price and
quantity of materials is by no means difficult to ascertain; but the expence of putting them together must be more a
matter of guess than of correct and well founded calculation. I have, however, computed the expence that such a
work ought to cost, and have made every allowance for contingencies, from my own experience of works in the
sea, and from what I have been able to collect from the experience of others, in which, I think, I have made a very
full allowance for contingencies, and the cost amounts, by my estimate, to L. 41,844, but I will say L. 42,000, and,
I trust, if ever the work is executed, and done with judgment, it will not exceed that sum.
I have gone on the supposition, that the outside is to be made of Kingoodie stone, and the hearting of stone from
near Arbroath. I am, Gentlemen, your most humble servant,
(Signed) John Rennie.
To the Honourable the Commissioners of the Northern Light-houses.

Page 495

REPORT by Mr Stevenson.

Edinburgh, 15th November 1806.
In the year 1800, when the Reporter laid before the Commissioners various models of a Light-house for the Bell
Rock, the prospect of the undertaking was so distant, that it then appeared unnecessary to trouble the Board with
any scheme for carrying the work into execution; but since the passing of the act of Parliament for this purpose, the
case is materially altered. In preparing any method for carrying on a work, the most difficult in its nature, and one
to which the common tests of experience can hardly be applied, he is aware, that it is impossible, by any previous
arrangement, to determine what will answer in all respects. In so far as the operations on shore are considered, the
ordinary rules of practice apply, but, in forming plans for the Rock itself, matters must be adjusted to the situation
and circumstances of the case.
Certain measures, of a preliminary nature, are, however, indispensably necessary, while others may be of doubtful
application; among the former, it appears to be essentially necessary to provide a vessel to be moored at the
distance of from three quarters to one mile north-west of the Rock. She must, of course, be fitted up as a store-ship,
with accommodation for the artificers, and ground-tackle for riding in from 17 to 20 fathoms water, on rather a
hard bottom. This vessel, besides answering as a store-ship for water and provisions, may occasionally take on
board lime, cement, and other materials from the small craft at the Rock, when lying at anchor with them on board
may be found inconvenient. There is also another and most important service, which this vessel will fall to perform
in terms of the act of Parliament, which is the carrying of a Light upon her mast, for the benefit of shipping, and to
enable a duty to be collected, even before the commencement of the work, agreeably to the suggestion of Mr
Cuningham.
The Reporter, in order to inform himself more fully regarding the construction of such a vessel, while attending the
progress of the Bill in London, visited the Floating-light ship at the Nore, under the command of Mr Bennet, who
very politely described every particular connected with the business. He had also frequent communications with
Captain Huddart of the Trinity House, who takes a particular charge of the Floating-lights under the management
of that Board, since which he has also corresponded with him upon the subject, who has obligingly stated his ideas
relative to a vessel and moorings fitted for the Bell Rock. Upon the whole, the Reporter is of opinion, that a
dogger, or Dutch-built vessel, is best calculated for this service. Such a vessel would require to be from 80 to 100
tons burden, moored with a mushroom-anchor, weighty iron mooring-irons, having likewise on board a hempen
cable of 16 inches in circumference. The mushroom-anchor, which is but a late invention, is now in use at all the
Floating-lights on the coast, and even in some of his Majesty’s store-ships. Its great property consists in its being
hardly possible for a vessel to foul her anchor with it; and the construction is such, that it may be made in part, or
wholly, of cast-iron, agreeably to the accompanying model, from which an idea may more easily be formed of its
application. (See Plate X.). This vessel must be furnished with such a light as to be readily distinguishable from the
Coal-light on the Island of May; and although the Dudgeon Floating-light, off the Norfolk coast, which carries two
lanterns, is at a great distance, yet, as it is the nearest Floating-light to the Bell Rock, it may be advisable to
distinguish it from that also. As a vessel cannot be dispensed with for the accommodation of the artificers, it will
be found to be a great saving to employ her as a store-ship. As this vessel is only meant to answer a temporary
purpose, by purchasing one of the Dutch or Prussian prize-ships, now for sale in Leith, she might perhaps be fitted
up for about L. 2000.
Although it would be perfectly impossible to do any thing with much effect at the Bell Rock, without a vessel
stationed in the offing; yet as she must necessarily be moored at the distance of about a mile from it, to give a
sufficient birth for swinging, according to the wind, and also to give sea-room to clear the Rock, in the event of her
breaking adrift, the inconveniency and difficulty of the frequent passage between the Floating-light and the Rock
must be very considerable. It therefore occurs to the Reporter, that the greatest advantages would arise from the
erection of a temporary residence for the artificers upon the Rock during the working-months of summer, and also
to answer as a store for some of the materials. The greatest difficulties which Mr Smeaton had to struggle with at
the Edystone, arose from the smallness of the rock, which at once precluded any attempt of this kind from being
undertaken, and subjected the work to all the disadvantages and trouble so particularly described as experienced in
communicating on all occasions with the store-ship. But, from the extent of the Bell Rock, an opportunity may be
had for erecting a temporary residence, for facilitating the work. It was under the conviction that such an
accommodation might be constructed, that the clause was introduced into the act for allowing the collection of

Page 496

half-duties upon the erection of a Beacon. But, independently of these advantages, the Reporter conceives some
erection of this kind necessary, to give confidence to the artificers, in the event of accident to the boats, of which
they might lay hold, until assistance could be procured from the store-vessel. This temporary residence is provided
for in his estimate for the Light-house, and having modelled it, he proposes that it should consist of beams of
timber, not less than 50 feet in length, and of proportional strength; the beams are coupled together at the top,
where they form a cabin for the workmen, and, at the same time, answer all the purposes of a Beacon.
The next material object to be considered, is a method which may prolong or extend the working hours at the
Rock, especially in the first instance, to low water of neap, as well as spring tides. In this respect we also find, that
Mr Smeaton had no alternative, having had barely extent for the foundation of the Light-house; but, in this respect,
he had less occasion for such an apparatus, as the top of the Edystone Rock was rather above high-water, although,
from its shelving form, the level of the ground-course was not more than nine feet above low water of spring-tides.
The ground-course of the Bell Rock, however, will not be more than about two feet above low-water of such tides.
It therefore becomes an object of great importance, to construct a water-tight fence round the site of the building,
which might be the means of saving a whole season with the work, and securing the proper execution of the lower
courses, by enabling the workmen to go on in a more deliberate manner with their operations. The Reporter has
had several methods in view for raising a coffer-dam for this purpose to the height of about six feet or thereby,
which would allow the work to proceed regularly in moderate weather at low water of neap as well as spring-tides.
He has, accordingly, modelled a coffer-dam with this view, which he proposes to be three feet more in diameter
than the base of the building, and, from its exposed situation, the greatest attention must be paid to the strength and
fitness of the materials. At first he intended this to be of timber, but at length fixed upon cast-iron, strongly
connected with iron-bolts, passing through flanges raised upon the joints, which are to be provided with a groove,
for the conveniency of tightening them. The whole of this apparatus is estimated to weigh about 40 tons, and is so
constructed, that when all the pieces are landed on the rock, and laid in their places, the foundation for them being
prepared, they may be set up, and temporarily fixed, in the course of a good spring-tide.
There is no part of this critical work which will be attended with so much difficulty as the landing of heavy
materials, nor is there any part of the business that has occupied so much of the Reporter’s attention. Mr Smeaton
appears to have had a great deal of trouble upon this head; and in conversing with one of those having charge at the
South Rock Light-house, on the coast of Downshire in Ireland, while it was building, it was stated, that there was
more time lost in getting a regular supply of materials, and more vexation attending this department, than any other
part of the operations, although this rock is exposed and dry at every tide, and only 3 miles from the shore, with a
beach where vessels were laid to discharge their cargoes; whereas the Bell Rock is about 11 miles from land,
forming neither a steep-face, like that of the Edystone, nor a sloping beach, like that of the South Rock, while it is
so low in the water, that it can afford little or no shelter to vessels, if brought alongside of it. Under all these
adverse circumstances, the landing of the materials becomes a consideration of the most perplexing nature. He has
sometimes thought that the depth of water upon the rock might be turned to advantage in landing the stones at
high-water; yet this mode has its disadvantages, and could not always be depended upon; others must, therefore, be
resorted to, more certain in their application. Vessels of an easy draught of water, and not exceeding 20 tons
burden, might in very moderate weather be brought close into some of the small creeks of the rock. Some of these
will admit of improvement, where cranes might be fixed for unloading them. This may, perhaps, turn out to be the
surest mode upon trial; but it may also be necessary to resort to others, such as having buoys moored in different
directions, at a convenient distance from the rock; by making fast a hawser to the buoy best suited to the direction
of the wind; the hawser may be veered out till the vessel with the materials gets so close to the Rock as to
discharge. Some have even supposed, that the materials may be transported to the Rock under these circumstances
by a float of cork or timber, and when the vessel is thus cleared of her cargo, she may be hauled off again, and so
make sail. The stones, when landed, if not immediately built, may be stowed into the cast-iron coffer-dam, which,
for this purpose, will be found of the greatest use, while the lower courses of the building are in progress; and as
the work advances, other plans will present themselves.

In the Report dated 23d December 1800, on the subject of the Bell Rock, the Reporter explained his reasons for
laying aside the plan of a cast-iron Light-house, and, after what has since been stated in Mr Rennie’s report 30th
December 1805, it is unnecessary for him to enter again upon that subject, especially as it has been fixed that the
building is to be of stone. The matter which he, therefore, now submits to the consideration of the Board, is, the

Page 497

quarry or quarries from which these materials should be taken. It is to be regretted, that the extensive quarries in
the neighbourhood of Arbroath are not of so durable a nature as to render them fit for outside work. On his way
from Fraserburgh lately, he passed through Aberdeen, Arbroath, and Dundee, and, in addition to former inquiries,
brought with him a note of prices, and specimens of the stone of the quarries of these places. Upon the whole,
there seems to be objection to the use of best Arbroath or Red Head stone, for the hearting or inside-work, which
may be had for 9s. 4d. per ton. The Mylnefield or Dundee stone at 25s., but for the granite, of the sizes wanted, no
price could be quoted. Stone is the principal material that requires consideration. As for lime, we have an extensive
choice in this country, and nothing can perhaps answer the purpose better for securing the outside joints than
Parker’s cement. The Reporter has a specimen of Aberthaw lime, which Mr Smeaton used with so much
advantage; it would be no difficult matter to get a cargo of it, which would be sufficient for the whole building.

With regard to the Lantern, and other parts of the building which require to be of metal, without entering into
particulars, they will no doubt fall to be made of copper, at least such parts as are more particularly exposed to the
action of the air or water. As to the nature of the Light itself, there may be some improvements and alterations
upon the present system, before the building is completed; but, after erecting such a fabric as will be necessary at
the Bell Rock, no pains will of course be spared upon so essential a part as the quality or description of Light to be
exhibited.

Supposing the work to commence in the Spring of the year 1807, it is already time that the store-vessel were in
preparation, and the necessary arrangements made for fitting her up as a Floating-light, that the collection of the
duties may commence; and, when got to her moorings, the workmen may begin to the temporary residence or
beacon, and prepare the rock for the building, which would form the primary operations, and occupy the first
Summer. If the beams are found to withstand the storms of winter, the upper part can then be covered in as a
residence for the artificers in 1808; and, at all events, be habitable for the Summer of 1809. While these measures
are carrying forward, and the site of the building is in progress, the lower course of stones will be in preparation on
shore. The place which the Reporter would propose for carrying on these works is Arbroath, as the port most
contiguous to the Rock, being situate at the northern side of that range of coast which forms St Andrew’s Bay, in
which the Bell Rock holds a centrical situation. A passage may be made from Arbroath to the Rock with much
more regularity than from the Tay. On the southern side of this great Bay, there is no convenient harbour between
the Tay and Fifeness. The stones, being transported from Mylnefield and Aberdeen, would be hewn at Arbroath,
and after being laid and marked upon a platform, course by course, would then be shipped for the Rock.

It is unnecessary at this time to enter further into particulars. When the dimensions of the building are finally
arranged, it will then be proper to enter into contracts for the materials, and shipping for conveying them, and to
provide implements and artificers for the work.
(Signed) Robert Stevenson.
To the Honourable the Commissioners of the Northern Light-houses.

Page 498

JOINT REPORT by John Rennie and Robert Stevenson.

Edinburgh, 26th December 1806.
Gentlemen,
You having at your meeting on the 10th instant resolved that the Light-house to be erected on the Bell Rock shall
be of stone, we, according to your request, went to Aberdeen and Mylnefield, for the purpose of examining into the
quality and price at which stone for the erection of the Light-house could be delivered at Arbroath, the place where
it is proposed the materials shall be prepared for the work.
At Aberdeen, we found that many additional quarries had lately been opened, some of them of an excellent quality,
and capable of producing larger blocks of stone than granite quarries usually do; but still it is doubtful, as has been
formerly mentioned, whether any one quarry will be found to produce a sufficiency of large blocks in any
reasonable time; but by purchasing from different quarries, a regular supply may be procured for all the purposes
wanted, in case you shall determine upon using the granite in preference to stones from Kingoodie. The Aberdeen
granite is of so very strong and durable a nature, and has been used in works where the sea has acted upon it for
time immemorial, that no doubt can possibly be entertained respecting its adaptation to a work of this kind. There
is also every reason to believe, that the Kingoodie stone resists the sea and weather equally well, but we have not
been able to collect such positive proofs of this as of the other; for, although a good deal of that stone has been
used in the piers of the harbour of Dundee, yet, as this has been mixed with other sorts of the same appearance, and
nearly of the same composition of those of Kingoodie, it prevents the possibility of our saying whether some of the
stones that have wasted may not be Kingoodie, although we have great reason to believe that they are not.
However, where facts cannot be positively ascertained, doubts exist; and we think, that a Light-house upon the
Bell Rock is too important a work to suffer even a doubt to exist; and we have no hesitation, therefore, in
recommending, that the under part of the building, at least as high as the first apartment, should be of Aberdeen
granite; and as this is the great bulk of the work, it may be as well, perhaps, to complete the outer course of granite
to the top.
As to the extra price this will incur, we cannot at present correctly say. We have had two offers for granite from the
Rubislaw and Dancing-Cairn Quarries. The former by Robert Spalding, is at 10d. per cubic foot, delivered on the
quay at Aberdeen, but, as the expence of shipping and shore-dues are not included, this may be fairly reckoned at
2d. per cubic foot more. The other is from Snell, Ranie and Thom, at 1s. 4d. per cubic foot, delivered free on board
a vessel at the quay. Now, as the freight from Aberdeen to Arbroath will be about 7d. per cubic foot, and as an
agent must be employed to examine and see the stone delivered by the different quarry-men, we suppose that 1d.
per foot may be added for commission; so that, exclusive of Government duties, the offer for Aberdeen stones will
stand nearly as follows: Spalding’s offer, with charges, will amount to 1s. 8d. per cubic foot, and Snell and
Company’s at 2s. The expence of working the Aberdeen stone will come high, we doubt, for such a work as this.
Where dove-tails, and other devices for the security of the building will be necessary, it cannot cost less than 2s.
6d. per cubic foot. Now, taking the price of stone at the average of the above offers, it will amount, with
workmanship and freights, to 4s. 4d. per cubic foot, so that the casing or outside course of granite will amount to
about L. 7266. Mr Mylne offers to supply blocks of Dundee or Kingoodie stone, put free on ship-board, at 1s. per
cubic foot; the freight from thence to Arbroath will be about 4d. per cubic foot, so that the stone will cost at
Arbroath 1s. 4d. The working of this stone will cost about 1s. 6d. per foot, making the cost of the Kingoodie stone
2s. 10d.; therefore a casing of Dundee stone would amount to L. 4760, making a difference in favour of Kingoodie
stone of L. 2506.
The next question that arises here is, what kind of stone should be used for the hearting of the building, where
nothing can affect the stone, of whatever quality it may be; and here the Arbroath or Redhead quarries may come
into competition. There are arguments in favour of both; the Kingoodie will be more expensive, but its specific
gravity is greater, and it is of a much stronger nature than the Arbroath stone. If Kingoodie stone is used for the
hearting, the cost of the stone, with freight and cutting, will be about L. 2124. The Arbroath stone will cost,
delivered at the work, about 9s. per ton of 16 cubic feet, and cutting about 1s. per cubic foot, so that the total cost
will be about L. 1172, a difference in favour of the Arbroath stone, besides duty, of about L. 952. Now, whether
you may agree to pay this extra price we will not venture to anticipate, but we have no hesitation in saying that the
Kingoodie stone is the best.

Page 499

Another object which occupied our attention, was the procuring of a piece of ground at Arbroath, with proper
sheds and warehouses, near the harbour, for the purpose of dressing the stones, laying the courses as they are to be
in the Light-house, keeping stores, &c. &c. For this purpose we applied to Messrs Duncan and Cargill, who have a
ship-builder’s yard adjoining the harbour, and who some time since intimated their intention of disposing of it; but
we found that the place was not of the dimensions necessary for the work, that the warehouses on the ground did
not belong to the ship-yard, and that the people had not finally determined upon disposing of this place. We
therefore inquired further, and found a piece of ground much larger than the carpenter’s yard, and nearly as well
situated, but there are no buildings upon it; and indeed, there is no other spot at all convenient, or near the harbour,
that can be had. We therefore saw the proprietor John Taylor, and he has offered to let the whole for seven years, at
the rent of Twenty Guineas per annum. The rent is high, but the situation is such as to render it more suitable than
any other, and therefore we advise Mr Taylor’s proposal to be accepted.
Having now stated the result of the several objects for which our journey northward was undertaken, it may be
proper to mention what occurs to us as the best mode of proceeding respecting the measures to be taken for the
erection of the Light-house, with the construction that appears best suited to the stability of the work. The first
object that naturally presents itself is the establishment of the Floating-Light, now in preparation, respecting which
some correspondence has taken place between Mr Stevenson and Captain Huddert of the Trinity Board of London,
which is now before you. Their information is very satisfactory, and from the measures taken in advising with the
Trinity-House of Leith, it is hoped that every thing relative to the fitting out of the Prussian-dogger, purchased for
this service, will be the most complete of the kind, and the sooner she can be got to her moorings the better, that
the operations at the Rock may be commenced, and that the duties may be collected for paying the Treasury loan,
and otherwise adding to the general fund.
The second object that comes under consideration is the inclosing the piece of ground at Arbroath for a work-yard.
This may either be done by a ruble wall or a wooden fence, but the former is preferable, because several buildings
must be made for stores, and for floors, to mark out the different courses with the dove-tails as they form the
building, so that the ruble wall may form part of these buildings. Sheds must also be erected for the masons to
work in.
Thirdly, Two vessels, of about 30 tons each, for conveying stones from Arbroath to the Rock, should, without
delay, be contracted for. These vessels must be built strong, and of good materials, and calculated to work well at
sea, that no opportunity of going to the Rock may be lost.
Fourthly, A crane for unloading the vessels should be established at Arbroath, and another at the Rock, for landing
the materials, as also the necessary tools and triangles, with tackle for setting the stones in the work-yard, and at
the Rock likewise, stone-carriages, jacks, &c.
Fifthly, Mooring-chains, anchors, buoys, with ropes, &c., to assist in landing the materials, and for enabling the
men to leave the Rock when the tide prevents them from working.
Sixthly, A coffer-dam will be wanted, to the height of 4 or 5 feet, so as to enable the workmen to continue so much
longer on the Rock than they could do, were the tide allowed to flow over the foundation when it rises above the
level of the Rock.
Seventhly, Although we do not pretend to say that a stage, for the accommodation of the workmen, can with
certainty be constructed on the Rock, yet it might be worth while to attempt the establishment of such a work, as, if
it did answer, great facility in carrying forward the work would be obtained; and, should the project fail, the timber
and iron can be applied to other uses, and the expence of the experiment cannot be great.
Eighthly, A variety of small tools, for cutting the foundation of the Rock, for dove-tailing the stones, and sundry
other uses too tedious to mention, will also be wanted.
Ninthly, A quantity of Aberthaw lime should be procured, as well as other lime of the best quality which the
country affords, and a small lime-kiln for burning it erected, and no more burned at once than can be used in a
short time, that it may be always had as fresh as possible, as the less it is exposed to the air after being burned the
better will it cement. Pozzolano or tarras should be got, if possible, to mix with the lime, these making the best
cement that has yet been discovered; but, if it cannot be had, manganese, or even burnt ironstone, will form a good
substitute. A quantity of Parker and Company’s Roman cement will be wanted, to keep the sea from washing out
the other cement before it has time to harden in the joints.

Page 500

Tenthly, Oak trenails will be required for fixing down the stones, while the building is in operation, and the several
courses liable to be washed by the waves. Lead for running bolts into the Rock, &c. will also be necessary.
As to the construction of the Light-house itself, we are of opinion, that it is much better to follow what has been
found to answer at the Edystone, a situation nearly similar to the present, than, in a work so important, to look for
other methods that have not stood the test of trial. It must, however, be observed, that some alteration, suited to the
difference of local circumstances, ought to be adopted. The Rock at the Edystone differs both in form and quality
from the Bell Rock; it lies in a slanting direction, and the higher part was never covered by the tide. It is of a
harder quality, and but small in size; nothing, therefore, was to be found in this case in regard to the wearing or
wasting of the Rock; and from its limited size, there was no more space than what merely enabled the engineer to
make the erection upon it.
The case at the Bell Rock is very different, the Rock being, on an average, not more than four feet higher than low-
water of spring-tides. It is of a softer quality, but the dimensions are large. It therefore becomes necessary that the
base should be more extended and flat where it is connected with the Rock, so that when the waves break upon it,
they may spend their fury on the base of the Light-house, instead of the Rock itself, and thereby prevent it from
wearing away. The tower should also be higher, as the tide rises more upon it than on the Edystone. These, and a
few other alterations, will adapt the Edystone plan to the Bell Rock, unless in so far as the light itself is connected;
but this need not now be a subject of inquiry. A Plan of the Light-house, nearly similar to what is proposed, is
handed herewith, but no plan of the dove-tailing has been made, nor can it well be done at present, as the dove-
tails must be suited to the different courses of stone as they come from the quarry; but, as the principle is similar to
that of the Edystone, the design may be easily judged of.
It is of much importance, that, in so hazardous a work as the present, recourse should speedily be had to advice
when occasion requires; and, as a Quorum at all times cannot be got, it might be advisable to appoint a Sub-
Committee of your number, to be called together when necessity may require.
(Signed) John Rennie.
Robert Stevenson.
To the Honourable the Commissioners of the Northern Light-houses.

Page 501

REPORT by Mr Rennie.

Edinburgh, October 29. 1807.
Gentlemen,
I went to the Bell Rock on the 5th instant, when I found Mr Stevenson with his workmen engaged in preparing the
Rock to receive the foundation of the Light-house; also in erecting a Beacon on it, for the double purpose of
pointing out to mariners the situation of the Rock more correctly than can be done by the Floating-Light, and as an
asylum to the men employed on the Rock, in case they should be overtaken by the tide before the boats had time to
take them to the vessel. Mr Stevenson had been constantly engaged in the different operations for about two
months, during which time he had never been ashore; and it was fortunate he had taken the resolution of remaining
constantly on board, for, without this, there is every reason to believe that the workmen could not have been
prevailed on to continue at the work, they having previously shewn a disposition to leave it; but by perseverance,
and by allowing them their provisions while on board the vessel and working at the Rock, they have not only been
prevailed on to remain at the work, but they now seem to be better satisfied when at the Rock than on shore; and as
no accident has happened, although the weather has several times been very stormy, there is great reason to believe
that the workmen, being now accustomed to the work, and having gained entire confidence by the success of the
past year, will return with redoubled vigour next season, and that the work will proceed with much spirit and
regularity.
The work performed in the course of the present season, consists first of preparing the Rock for the foundation of
the Light-house to a certain extent; but owing to that part of the Rock where the Light-house is to stand being very
uneven in the surface, and some of it within 2½ feet of the level of the sea at low-water of spring-tides, the time at
which the men can work is of course very limited; and as there would be great danger of shivering the Rock, if
blasting or any other violent measure were resorted to for expediting the work, it has been thought better to
proceed in the more secure mode of cutting the stone by picks and chisels, which, as the Rock is hard, and so
consumes much time, considerable progress has been made towards this; and I hope, by the end of next June, the
whole of the Rock will be completely ready to receive the foundation-course of the Light-house: perhaps it may
even be ready sooner; but so much depends on weather, I do not venture to state particularly the time when this
most essential object will be completed; but I have great confidence in the zeal Mr Stevenson has shewn in the past
season, to prognosticate that he will do all that can be done in the next to expedite the work.
A large beacon, consisting of six main beams of timber, about 13 inches square, and 44 feet long, has been erected
on the Rock; it forms a pyramid of about 42 feet high, and a base of the same extent. This is well secured to the
Rock with dove-tail cramps, and with chains and braces. Near the top are cross-bars to stiffen the upper part of it,
which have been found of great use, as the smith’s forge for sharping tools was erected there, and for the last
fortnight the tools were sharped, and various other works done, which tended greatly to facilitate the operations at
the Rock. The workmen continued there during the time the Rock was covered with the tide, which enabled them
to begin working the moment the part was uncovered where they were employed, and it likewise enabled them to
work till the last moment, when the tide began to cover the work. Had no such asylum been provided, the
workmen would not only have lost much time in getting from the vessel to the Rock, but also in getting from it.
This beacon is not yet entirely finished: a few good tides would enable the workmen to complete it, and when
done, I have great hopes it will be found to resist the storms; indeed it has resisted several even in the unfinished
state it is, and therefore is a favourable prognostication that it would be stable when completed.
There is, besides, a provision-chest intended to be placed on its top, and above this a ball and flag-staff, so that I
hope it will be a very useful additional mark for mariners to avoid this dangerous Rock, and should be advertised
as well as the Floating-Light.
The advanced state of the year renders it necessary that the operations at the Rock should stand until the spring of
the year. This is proposed to be done whenever the beacon is completed; but during the winter every requisite
measure should be taken to proceed with the work for the Rock as expeditiously as possible. For this purpose I
must beg leave to recommend to the Commissioners that the remainder of the articles mentioned in our Report of
the 26th December last, should be provided with as little delay as possible.
The ground taken on lease from John Taylor, at Arbroath, for a wood-yard, has been covered in part with the
necessary buildings and workshops, but sheds for the masons to work in during the winter season are not yet done.

Page 502

These may be got of the most temporary kind; if they just keep off the rain it will be enough, and no delay should
take place in procuring them.
Several cargoes of Aberdeen and Dundee stones have been laid down and landed at the yard, part of which are
worked, and the masons are engaged in working the remainder. I am sorry, however, to say, that neither the supply
from Aberdeen nor Kingoodie has been so abundant as could be wished. Unless exertions far greater than has
hitherto appeared be made, it will be impossible to proceed with the building on the Rock next season. I
accompanied Mr Stevenson both to Aberdeen and Kingoodie. In viewing the former, it appears, that unless stones
are purchased from such quarries near Aberdeen, as may turn them out, it is scarcely probable a sufficient quantity
of large stones for the lower courses of the Light-House can be had in due time from the Rubieslaw quarries alone.
It therefore will be advisable, that Mr Skene empower his agent to purchase from the other quarries whenever
blocks of the requisite size can be found. As to the Kingoodie quarry, it only wants a little exertion on the part of
Colonel Mylne’s agents, as the quantity wanted would be easily got in a few weeks, if exertion such as has been
promised be made.
The Floating-Light was completed and moored within the distance of one mile from the Rock on the 9th July, and
for some time the people employed at the Rock lodged in her; but the situation in which she was moored has been
found not to answer, as, after the gale of the 6th September last, which she rode out with perfect safety, it was
found that her cable had been cut by a piece of rock or wreck. She went adrift next day, luckily without receiving
any injury, but it has been found that there is no clear ground, (at least that has yet been discovered), less than the
distance of about two miles and a half from the Rock, which will render her of no use as a place to accommodate
the workmen; another vessel of some sort must therefore be provided. The Yacht has been used since the Float was
removed to such a distance, but as neither the manner she was rigged, nor her accommodation, is suitable, nor
indeed can she well be spared from attending the other light-houses, she cannot be counted upon in future. In my
opinion a proper vessel should be purchased, and fitted up for this purpose, and she will sell at little discount after
the work is completed.
One vessel of the description mentioned in the second article of the Report of 26th December 1806, has been built
and fitted out. She has been engaged in carrying materials to the Rock; in carrying stones to the yard; and sundry
other matters. A second vessel of the like description should be got ready against the spring, to carry the stones and
materials to the Rock, &c. Two cranes have been purchased for loading and unloading stones; one has been erected
at Aberdeen, and the other at Arbroath; and they both answer the purpose very well. Triangles, and other necessary
apparatus are preparing for the work on the Rock, and will be ready against the time they are wanted. Mooring-
chains and buoys for the vessels employed about the Rock have also been prepared and laid down.
It was proposed, in the Report of December last, to have a coffer-dam on the Rock, for keeping out the water
during a part of the time the tide is flowing; but it rises so quickly here, after having turned, that I do not think a
coffer-dam will produce advantages adequate to the expence. It is therefore proposed to do the work without any
coffer-dam at all: there has been sufficient trial already made, to satisfy us respecting its practicability without a
coffer-dam. The beacon already erected, and which there is reason to believe will stand, renders a stage of the
description formerly mentioned unnecessary. It is intended, should this beacon stand over the winter, to erect
places for the accommodation of the workmen employed at the Rock on its top. This will greatly facilitate the
operations, as before stated.
Most of the small tools mentioned in article 9th of Report of December last, have been procured. Some are still
wanting; but these are few. No Aberthaw lime has been procured, nor any pozzolano. Mr Stevenson intends to send
the Yacht for a cargo of Aberthaw limestone, as soon as she can be spared from the service of the Light-houses;
and, if a vessel is purchased for the accommodation of the workmen at the Rock, she may also be sent for a cargo
of Aberthaw lime. I have not been able to procure any pozzolano, although many trials have been made. I have
some hopes that a small quantity may still be procured; but I cannot speak with certainty: if not, tarras, or burnt
ironstone, must be used. No oak trenails for the stones have yet been got. Mr Stevenson, however, is about to order
some from Southampton; and I hope they will be in time for the work. Lead is, at this time, very cheap. I submit it
to the wisdom of the Commissioners, whether it might not be advisable to purchase now what may be wanted for
the work.
As to the construction of the Light-house, I submitted a plan to your consideration in the month of February last,
(see Plate VII.) According to this plan, the works are proceeding; plans of each course of stone have been made;
the whole is dove-tailed, but somewhat different from the mode pursued at the Edystone; they are less in length on
the outside, but deeper in the direction of the radius of the Light-house, which will render the structure, on the

Page 503

whole, stronger than the Edystone plan. The extension of the base of the building is also much greater; and the
base is considerably different. By this means, not only the impulse of the waves on the building will be less, but
their action on the part of the rock adjoining the foundation will be much easier. The Rock is softer than that on
which the Edystone is built, but it is harder than I imagined when last here. On the whole, I feel confident, that this
work will be brought to a successful termination, within a reasonable period. The knowledge which has been
acquired by the operations of the last season, impresses me with additional confidence in the practicability of the
work, although confident, from the commencement, that, with proper care and attention, such a work might, with
certainty, be completed.
The necessity of Mr Stevenson’s remaining much at the Rock while the operations are going forward, render it
necessary that some person, by way of agent, should be appointed to pay money at Arbroath, and to credit and
settle accounts. As to this the Commissioners will order as they think right. I am, honourable gentlemen, your most
obedient servant,
(Signed) JOHN RENNIE.
To the Honourable the Commissioners of the Northern Light-houses.

Page 504

REPORT by Mr RENNIE.

Edinburgh, 12th December 1808.
Gentlemen,
I visited the Bell Rock on the 25th ult. The weather was favourable, but the tide did not ebb so low as to allow me
to examine the foundation of the masonry so completely as I could have wished; but as there was little swell, I was
enabled to form a tolerable judgment concerning the perfection with which it is executed, and this, I have the
pleasure to say, is very favourable.
The Rock was nearly all cut last season, but several parts in the interior was hollow, and others appearing unsound,
they could not be cut out without a serious expence in money, as well as a great loss of time. It was therefore
judged preferable to make up these places with stone, and, accordingly, 17 stones have been let into different parts
of the foundation, which brought the whole on which the Tower stands to a level; on which level, the first course
of 12 inches was laid in August, and the outer-edge margin of this course, was nicely fitted all round to the rock,
which, in every place except one, as I have been told by Mr Stevenson, projects higher than the upper part of it, by
which, the base may be said to be completely indented into the Rock. Above this 12 inch course, two others, of 18
inches, have been laid, and it gives me great satisfaction to inform you, that they are done in a very complete
manner, and the mortar, in all the outside joints, has not been at all affected by the sea beating upon it. A very small
quantity was out of some of the inside joints, which, I am told, had arisen from the sea catching it (the weather
being unfavourable) while the course was laying; this has been directed to be made up, and covered with Roman
cement, which will render it as perfect as if no such thing had happened.
It is here proper to remark, that although the pozzolano mortar forms the best of all cements I have seen, yet it does
not acquire a sufficient degree of induration to resist the effect of heavy waves for several weeks after it is used.
The Roman, or Parker’s cement, acquires almost an immediate induration, capable of resisting the heavy waves;
but it never acquires so great a degree of induration, nor does it bind the stones so well together as the pozzolano
mortar ultimately does. Its use, therefore, is to guard or preserve the pozzolano mortar until it has time to harden,
which it does most effectually, and therefore every joint should be plastered over with this cement as soon as laid.
The place where the lower or 12 inch course is above the Rock, should be made up with stone of the same quality
as the Rock itself. These stones should be dove-tailed into the rock, and laid with pozzolano mortar, secured by the
Roman cement, the same as the other; for if done with harder stone (should the rock waste at all) it would resist the
waves better than the soft, and occasion a more speedy waste of the other parts of the Rock than the Tower. All the
protuberances of the Rock round the base of the Tower, should likewise be cut off, and smoothed, so as to form a
regular curve at the base of the Tower, by this means there will be no place for the waves to catch, and their action
will be regular on the whole, and I have no doubt, when so done, there will be little or no wasting in the rock itself.
The operations in the work-yard seem to be proceeding with much regularity, and there is a good stock of materials
now there. Two courses are nearly completed on the platform, and as the diameter of the Tower diminishes fast, I
have little doubt that there will be several other courses ready by the season that the work can with safety be
resumed on the Rock; so that if the next season is at all favourable, I would fain hope the whole solid part of the
Tower may be completed; every course of stone will raise it so much above the rock, and, of course, prolong the
time of working a tide, until it is above the top of the springs, and then, if materials can be landed at the rock in
sufficient quantity, the laying of them on the Tower will proceed with little or no interruption.
To secure a regular supply, another Praam or Stone-lighter should be got ready by the end of April next. Mr
Stevenson has already received proposals for the building of one, and the sooner it is set about the better. It will
also be necessary to build or hire another vessel, to assist the Smeaton in carrying out the stones from the work-
yard; I apprehend it will be best to hire a vessel for that purpose, as the services required of her will be of short
duration. About 10 tons more of pozzolano will probably be wanted, and this I have been able to procure through
the friendship of the Hull Dock Company; it is already ground, and now lying there to be shipped. A small
additional quantity of Aberthaw limestone is likewise to be procured, by the kelp-vessels that trade to Bristol, as a
return freight.
It happens, rather unfortunately, that some of the granite quarries about Aberdeen have veins of a soft sort, which I
have reason to believe decomposes with the sea and weather. Some of these stones have, unluckily, been sent to

Page 505

the work-yard. My decided opinion is, that all of this kind should be laid aside for the out-side work, and others of
a good quality procured in their place. They can be substituted for the Dundee stone, and, therefore, although some
loss will by this means be sustained, it will, on the whole, be trivial. I am, Gentlemen, your most humble servant,
(Signed) JOHN RENNIE.
To the Honourable the Commissioners of the Northern Light-houses.

Page 506

No. V.
REMARKS relative to the Ground-swells of the Sea.

In the Memoirs of the Wernerian Natural History Society, Vol. III. p. 814., and in the
Wasting Effects of the
Ocean.
Edinburgh Philosophical Journal, Vol. III. p. 42., the subject of the Wasting Effects of the Sea
upon the firm ground, is variously treated by the writer; and is here alluded to, in reference to
the production of the appearance termed a Ground-swell, so often observed on our shores. In these papers it has
been assumed, that the German Ocean, or North Sea, bounded partly by the coasts of Great Britain, Norway,
Denmark, Germany, Holland, and France, as will be seen from Plate III., is almost every where wasting and
extending its margin, upon the principle of its forming the great receptacle for all the debris of the surrounding
countries above mentioned, which have a direct tendency to lessen its capacity for containing the waters which
flow into it from the Atlantic, by the apertures between the shores of Scotland and Norway, towards the north, and
between Dover and Calais, to the south. These passages may respectively be conceived as admitting a constant
quantity, while this great basin is continually receiving the debris of the extensive tracts of country which surround
it, through the medium of the innumerable rivers and streams that fall into it.
Upon similar principles, the extensive lakes of interior countries become so many receptacles
Wasting Effects of the
Ocean.
for the debris of their respective districts; and must in the lapse of time, contain less water, in
proportion to the cubical contents of solid matters carried into them. So it is upon the great
scale with the basin of the North Sea, from the extensive banks deposited therein, which lessen its capacity, and
thereby give a tendency to the water which flows into it to overflow and waste its margin, producing, under
various modifications, those heavy swells in the Sea to which we now allude. With this state of things in view, we
may now inquire into the effects of the storms which agitate the waters of the Atlantic, and reach our shores only
in the form of what has been significantly termed a Ground-swell; which may partly be illustrated from the storm
described in page 312. of this work. We accordingly find the waters of the North Sea often in an agitated state,
without any apparent cause, though no doubt proceeding from distant storms at sea. Hence, a continued gale from
the westward, passing along the Atlantic Ocean, overcharges all the seas and inlets communicating immediately
with it. Under these circumstances, although the surface of the North Sea be comparatively smooth, yet having
acquired motion to a considerable depth from the distant storm, it continues to produce the effect of a Ground-
swell for a considerable period. A swell of this description is almost constantly observable in the Bay of Biscay,
owing to its exposure to the Atlantic, and from the configuration of the bounding land between Cape Finesterre in
Spain, Ushant in France, and the relative position of the British Isles. Here the Ground-swells, proceeding from the
same cause as those of the North Sea, are either the precursors of a gale of wind, or the effects of one which does
not reach us.
Similar, though less evident effects, are produced by gales of wind which may be conceived to be confined to the
boundary of the North Sea itself. Hence the heavy waves which often break upon the eastern shores of Great
Britain, without any apparent cause at the time, are afterwards found to arise from storms at sea. But the heaviest
Ground-swells of the North Sea are produced by gales from the north-east, which proceed in a progressive manner
along the inclined plane of its bed, until the waves, by impinging upon the bottom and sides of the firm ground, are
so disturbed that they ultimately cease, after wasting the whole extent of the shores, and sometimes causing the
most destructive effects upon the coast of Holland, forming the southern extremity of this great basin.

Page 507

No. VI.

SCHEDULE, containing an Enumeration of the MATERIALS used in the Erection of the Bell
Materials.
Rock Light-House.

Course. Granite Sandstone Granite Sandstone Tons of Sandstone Oak Oak Pozzolano Lime in San
in in Pieces. in in cubic Sandstone Joggles. Trenails. Wedges in Barrels. Barr
Pieces. cubic feet. and in Barrels.
feet. Granite. pairs.
1 4 14 6 146 10.891 1.5 2.2
2 52 71 508 876 101.648 13 246 378 13.6 19.9
3 52 84 808 1269 152.797 13 246 437 16.9 24.8
4 52 71 696 1009 125.609 13 246 400 14.5 21.2
5 53 54 593 849 106.258 13 212 336 12.5 18.3
6 26 71 492 790 94.275 13 194 270 11.8 17.2
7 26 58 238 767 73.094 13 168 242 8.3 12.3
8 26 45 196 547 54.148 13 142 268 7.4 11.0
9 26 45 264 426 50.737 13 142 229 6.3 9.3
10 26 45 292 606 65.748 13 142 229 7.6 11.0
11 26 45 339 363 52.006 13 142 229 6.3 9.3
12 16 37 160 462 45.308 8 108 184 5.7 8.4
13 16 37 194 347 39.709 8 108 184 5.0 7.4
14 16 37 168 329 36.423 8 108 184 4.8 7.0
15 16 37 188 301 35.962 8 108 184 4.6 6.8
16 16 37 153 321 34.698 8 108 184 4.7 6.9
17 16 37 182 308 36.000 8 103 184 4.7 6.9
18 16 37 153 297 32.983 8 108 184 4.4 6.4
19 16 37 180 304 35.560 8 108 184 4.5 6.6
20 16 29 196 308 37.077 8 108 152 4.3 6.3
21 16 29 211 264 35.088 8 92 152 4.2 6.1
22 16 29 100 311 29.906 8 92 152 3.9 5.7
23 16 29 177 238 30.615 8 92 152 3.9 5.7
24 16 29 147 303 32.951 8 92 152 3.9 5.6
25 16 29 149 235 28.248 8 92 152 3.5 5.2
26 6 39 142 250 28.780 8 92 152 3.5 5.2
27 38 315 22.500 8 79 67 3.0 4.4
28 33 259 18.500 8 66 58 2.8 4.1
29 26 236 16.857 8 54 61 2.9 4.2
30 26 249 17.786 8 52 54 2.4 3.4
31 25 238 17.000 8 50 68 2.2 3.3
32 26 274 19.571 8 52 69 2.3 3.3
33 28 302 21.571 8 56 78 2.6 3.8
34 30 296 21.143 8 60 80 2.7 4.0
35 32 271 19.357 8 64 80 3.0 4.5
36 32 266 19.000 8 64 80 2.5 3.7
37 32 279 19.929 8 64 80 2.3 3.5
38 24 275 19.643 1.5 2.2
39 16 138 9.857 1.2 1.8
40 16 136 9.714 1.2 1.7
41 14 133 9.500 1.1 1.6
42 14 142 10.143 1.1 1.6
Over, 599 1524 6932 16035 1678.590 338 4065 6329 207.1 303.8

Course. Granite Sandstone Granite Sandstone Tons of Sandstone Oak Oak Pozzolano Lime in San
in in Pieces. in in cubic Sandstone Joggles. Trenails. Wedges in Barrels. Barr
Pieces. cubic feet. and in Barrels.
feet. Granite. pairs.

Page 508

Over, 599 1524 6932 16035 1678.590 338 4065 6329 207.1 303.8
43 16 140 10.000 1.1 1.6
44 16 139 9.929 1.2 1.8
45 16 135 9.643 1.1 1.7
46 16 132 9.429 1.1 1.6
47 18 261 18.643 16 64 2.0 3.0
48 16 118 8.429 1.0 1.5
49 16 115 8.214 1.0 1.5
50 14 114 8.143 1.0 1.5
51 14 123 8.786 0.9 1.4
52 16 122 8.714 0.9 1.4
53 16 115 8.214 1.0 1.5
54 16 113 8.072 1.0 1.5
55 16 102 7.286 0.9 1.4
56 18 258 18.428 16 64 2.0 3.1
57 16 97 6.929 0.9 1.4
58 16 104 7.429 0.9 1.4
59 14 96 6.857 0.9 1.4
60 14 102 7.286 0.7 1.1
61 16 100 7.143 0.8 1.2
62 16 97 6.929 0.8 1.3
63 16 90 6.429 0.7 1.1
64 16 86 6.143 2.0 3.1
65 18 228 16.288 16 64 0.6 0.9
66 16 83 5.929 0.7 1.0
67 16 82 5.859 0.6 0.9
68 16 88 6.286 0.4 0.7
69 12 76 5.429 0.6 0.9
70 16 74 5.286 0.6 0.9
71 16 95 6.786 1.0 1.5
72 16 77 5.500 2.0 3.1
73 16 75 5.357 2.5 3.7
74 18 225 16.071 16 64 2.0 3.1
75 16 73 5.216 0.6 0.8
76 16 73 5.216 0.7 1.1
77 16 82 5.859 0.6 0.7
78 12 62 4.429 0.5 0.7
79 12 62 4.429 0.6 0.9
80 12 75 5.357 0.6 0.9
81 16 70 5.000 1.0 1.5
82 16 181 12.929 1.0 1.5
83 16 190 13.571 16 2.0 3.1
84 16 257 18.357 16 2.0 3.1
85 16 298 21.286 16 2.5 3.7
86 8 62 4.429 0.4 0.7
87 8 60 4.286 0.4 0.6
88 8 56 4.000 0.3 0.6
89 8 52 3.716 0.3 0.5
90 8 48 3.429 0.2 0.5
Total 90 599 2236 6932 21598 2075.945 450 4065 6585 255.0 377.9

Masonry, 2075.945
Lantern, and its Apparatus, 7.500
Total in Tons, 2083.445
In this Table, 13 cubic feet are allowed to a ton of Granite, and 14 cubic feet to a ton of Sandstone.
SCHEDULE, shewing the Extent and Description of WORK executed on the Sandstone and Granite employed in the
Workmanship. Erection of the Bell Rock Light-house.

Page 509

Course. Granite Sandstone Granite Sandstone Sandstone Granite Sandstone Granite Sandstone Granite
Beds and Beds and face-work face- polish- boring boring in wedge wedge Lewis
Joints in Joints in in work. work. in lineal feet. grooves grooves in holes.
superficial sup. feet. superficial lineal in lin. lin. feet.
feet. feet. feet. feet.
1 500
2 1165 3354 132 156 264 208 170 52
3 2472 3141 275 208 325 260 421 52
4 1832 2980 265 208 325 300 300 52
5 1735 2406 220 208 251 300 204 52
6 1120 2788 196 104 316 156 349 26
7 679 2100 159 69 267 138 185 26
8 613 1858 110 78 184 104 164 26
9 750 1359 113 82 166 113 125 26
10 626 1887 111 87 173 112 145 26
11 898 1216 114 91 181 130 156 26
12 519 1394 90 51 125 69 120 16
13 522 1157 87 51 125 69 120 16
14 443 1148 86 51 125 69 120 16
15 539 997 84 51 125 69 120 16
16 448 1123 82 51 125 69 120 16
17 484 1093 80 51 125 69 120 16
18 430 1036 79 51 125 69 120 16
19 467 1023 84 56 134 74 129 16
20 484 952 89 56 110 80 114 16
21 513 872 87 56 110 80 114 16
22 319 981 82 53 113 76 118 16
23 464 829 78 53 113 76 118 16
24 361 926 88 59 107 83 111 16
25 388 802 77 56 110 80 114 16
26 370 818 76 56 110 80 114 6
27 1017 70 36 130 78
28 943 62 31 99 58
29 956 61 31 81 61
30 785 61 30 78 54
31 754 60 30 75 68
32 762 70 35 87 80
33 868 73 47 98 97
34 908 68 23 100 93
35 1022 68 23 106 93
36 854 64 21 106 86
37 782 71 25 112 100
38 502 70 111 24
39 421 56 37 16
40 417 56 37 16
41 391 55 37 14
42 372 60 44 14
Over, 18641 50494 2944 1025 598 2093 5306 2933 4859 594

Page 510

Course. Granite Sandstone Granite Sandstone Sandstone Granite Sandstone Granite Sandstone Granite
Beds and Beds and face-work face- polish- boring boring in wedge wedge Lewis
Joints in Joints in in work. work. in lineal feet. grooves grooves in holes.
superficial sup. feet. superficial lineal in lin. lin. feet.
feet. feet. feet. feet.
Over, 18641 50494 2944 1025 598 2093 5306 2933 4859 594
43 383 60 44
44 409 59 40
45 395 59 40
46 388 58 40
47 685 67 231 80
48 361 54 38
49 352 54 38
50 335 54 52
51 322 64 44
52 315 64 44
53 335 58 49
54 339 58 41
55 318 54 38
56 672 65 231 80
57 320 51 38
58 318 51 38
59 301 51 48
60 250 60 41
61 273 60 41
62 298 55 49
63 294 51 41
64 294 51 41
65 645 55 231 80
66 277 49 38
67 274 49 38
68 250 53 57
69 192 43 61
70 198 43 61
71 282 57 44
72 259 49 38
73 254 49 38
74 645 51 247 80
75 209 45 45
76 247 53 41
77 226 57 52
78 165 54 61
79 221 54 61
80 225 52 49
81 368 49 38
82 679 115
83 846 160
84 671 148
85 165 399
86 157 92
87 147 91
88 138 90
89 129 89
90 120 88
Total 90 18641 66440 2944 3145 4377 2093 5306 2933 5179 594

Page 511

No. VII.
ABSTRACT-ACCOUNT of the EXPENCE of ERECTING the BELL-ROCK LIGHT-HOUSE, and of executing the ULTERIOR
WORKS connected with that ESTABLISHMENT.

Wages and Premiums.

Wages of artificers while off at the Bell Rock, and in the work-yards at Arbroath and Edinburgh,
L. 11,980 15 8
where the stones were cut and prepared in regular courses,
Premiums to artificers for Sundays’ work and extra hours upon the Rock, and in the Work-yard at
998 14 9
Arbroath,
Premiums to seamen, including Sundays’ work at the Bell Rock, 473 5 6
Note.—Masons and smiths were paid at the rate of 3s. 4d.,—mill-wrights 3s. 6d.,—joiners 3s., and
labourers at from 2s. 2d. to 2s. 8d. per day; besides lodgings ashore, and victuals while afloat.—The
premiums paid to artificers were at the rate of 6d. per hour for extra time; eight hours constituting a
day’s work at the Rock.—The seamen were paid at the same rate on Sundays as on week days.
Amount for wages and premiums to artificers, and including premiums to seamen, L. 13,452 15 11

Building Materials.

35,952 cubic feet of Sandstone from Mylnefield quarry, dressed to the quarry-moulds, and put on
L. 3,412 18 5
ship-board,
Extra dressing in reducing the courses to regular thicknesses at Mylnfield, 667 2 8
1700 cubic feet of sandstone from Craigleith Quarry for the cornice and parapet wall of the Light-
200 0 10
room,
13,964 cubic feet of granite from Rubieslaw and other quarries at Aberdeen, and from Cairngall near
1,979 1 4
Peterhead,
Extra dressing in reducing the granite stones to the quarry-moulds, and to regular thicknesses, to suit
1,291 7 2½
the respective courses, including cartage and charges of shipping,
40 Tons of Pozzolano-earth in casks, 398 3 4
60 Tons of Aberthaw-limestone, including freight from South Wales, 78 14 2
100 Bushels Parker’s or Roman cement, including casks and shipping charges, 43 12 0
6 Tons of Tarras, including casks and shipping charges, 52 19 10
Casks for carrying lime and sand from the workyard to the Bell Rock, 38 3 3
4824 oaken trenails, from 21 to 24 inches and 6195 oaken wedges, from 12 to 18 inches in length, 216 1 6
Note.—The quarry price of Sandstone varied from 1s. to 2s. 9d., and Granite from 1s. 3d. to 5s. per
cubic foot. Pozzolano from L. 6 to L. 14 per ton. Tarras from L. 6, 10s. to L. 11 per ton. Limestone
was 1s. per ton. Cement varied from 5s. to 6s. 6d. per bushel; oaken trenails from L. 1 to L. 5 per
hundred, and wedges were L. 1: 6: 6 per hundred.
Amount for Building Materials, 8,378 4 1½

Implements and Machinery for the Works, including Beacon-house, Cast-iron Railways, &c. &c. (See
Plates VIII., IX., X., XIV., XVII., and XVIII.)

Page 512

4662 cubic feet of Memel and Swedish timber, and 480 Petersburgh deals for the use of the Beacon-
house, cast-iron Railways and wharfs upon the Bell Rock, and for making moulds for the stone- L. 1,436 19 7
cutters,
69 tons 9 cwt. of cast-iron for Railways, 812 15 11
25,893 lb. malleable iron in stanchions, bats, knees, stays, bracing-chains, screw and spear bolts,
1,244 3 7
including other apparatus for the use of the Beacon-house and Railways,
19 Tons 13 cwt. 2 qrs. 3 lb. cast-iron, 14,002 lb. malleable iron, and 505 lb. of brass for cranes,
1,191 14 7½
winch-machines, and other apparatus,
Cordage for cranes, &c. 409 1 0
Two large Sling or Woolwich-carts, for conveying large blocks of stone, fitted up with wheel and
150 3 6
pinion-work for slinging or lifting the stones off the ground,
15,446 lb. quarry and stone-cutters’ tools; 11,934 lb. malleable iron, and 771 lb. steel, used in the
work-yard; exclusively of tools, nails, and other furnishings connected with joiners’ and smiths’ 1,567 10 1½
shops; but including stone-jacks and common carts used in work-yard, &c. &c.,
Note.—The price of fir-timber varied from 3s. to 5s. 6d. per cubic foot; cast-iron from L. 10, 10s. to
L. 23:6:8 per ton; chains and axles, &c. 6½d. to 1s. per lb.; quarry and stone-cutters tools from 6d. to
10d. per lb.; Swedish and British bar-iron from L. 21 to L. 29 per ton. Steel was 7d. per lb., and brass
1s. 10d. per lb.
Amount for Machinery, &c. 6,812 8 4

Shipping.

Price of the hull of a Prussian fishing-dogger, L. 250 0 2
Carpenter-work, altering and fitting up the dogger as the Pharos Floating-light, 1,397 12 8
Two sets of chains, with mushroom anchors, spare shackles and swivels, &c., for mooring her off the
462 9 4
Bell Rock, the whole weighing about 13,083 lb. of malleable, and 3200 lb. of cast-iron,
Outfit in hempen cables, sails and rigging, including 11 tons cast-iron, ballast, ship-hearth, cabin-
1,664 2 3
stoves, alarm-bell, &c.,
Three large copper lanterns, glazed with plate glass, (so constructed, that the ship’s masts passed
through them), fitted with brass chandeliers for 60 agitable-lamps, each having a small silvered- 397 1 2½
copper reflector,
Freight of a vessel, and expence of laying down the moorings for the Floating-light, 81 5 6
Wear and tear of the Floating-light riding off the Bell Rock, from July 1807 till February 1811, 1,059 11 5½
Advertising the mooring and exhibition of the Floating-light, generally, in the Newspapers of the
227 18 9
United Kingdom,
Victualling the crew of the Floating-light, including occasional subsisting money and board-wages
1,149 18 7
while ashore,
Pay of the master, mate, principal and assistant light-keepers, and seven seamen, from 1807 to March
1,632 12 8
1811,
8,322 12 5
First Cost and Outfit of the Sir Joseph Banks Tender of 84 tons register, the Sloop Smeaton of 42
tons, the Sloop Patriot of 46 tons, and of four Stone Lighters of about 15 tons each, including wear L. 5,436 9 7½
and tear during the progress of the works,
Bedding for seamen and artificers during the progress of the works, 349 7 2
Victualling seamen and artificers afloat, including occasional subsisting money for seamen while
2,930 12 7½
ashore,
Pay of the masters, mates, and seamen of the respective vessels, 2,434 2 2
Freight of hired vessels bringing stone from Mylnefield, Aberdeen, and Peterhead quarries, and
930 17 11
timber and cast-iron from Leith and other ports to Arbroath,
Port charges and sailing disbursements of the several vessels, 358 8 4½
Insurance of Shipping, effected only for a limited period, 647 12 6
14 Mushroom Anchors, weighing 13 tons 7 cwts. 0 qrs. 10 lb. of cast-iron, 235 15 8
28,456 lb. malleable iron, in mooring-chains, shanks of mushroom-anchors, spare swivels and
891 11 2
shackles,
16 Large mooring buoys of coopers’ work, and one of carpenters’ work, 456 19 2
Note.—Pay of the masters of the respective vessels in the service was from L. 5 to L. 6, 6s., mates
from L. 4 to L. 5, 5s., principal light-keeper L. 5, 5s., assistant light-keeper L. 3, 15s., seamen from
L. 2, 10s. to L. 3, 15s. per month. Officers’ occasional subsisting money 2s., and seamens’ 1s. 8d. per
day.
The price of the hulls of the vessels were from L. 9, 15s. to L. 10 per ton, and cordage from L. 77 to
L. 130 per ton; cordage subject to a discount of 7½ per cent.; other articles generally to 5 per cent.
Amount for shipping, 14,671 16 4½

Light-room, &c. (See Plates XVI. and XX.)

Page 513

Lantern or Light-room with tinned copper roof, 8 cast-iron sashes, 8 feet in height, glazed with 48
squares of plate-glass, measuring 13½ by 26¾ inches. Malleable iron stays, copper rings, flag-staff, L. 1,135 1 11
and signal-ball, &c.
24 Reflectors raised to the parabolic-curve, made from copper plated, in the proportion of 6 oz. of
silver to each lb. of copper; arranged upon a malleable iron chandelier, furnished with brass
1,287 17 2
fountains, and argand burners, including a train of Revolving-machinery, and two alarm-bells, set
upon tripods on the balcony, &c.
Balcony-railing of cast-iron, with brass supports and top-rail; and a conductor or thunder-rod
extending, from the Light-room to the Rock, 216 0 3
Amount of Light-room, &c. 2,638 19 4

Ulterior Works, &c. (See Plate XII.)

Finishing and Completing the interior of the Light-house, with wainscot partitions,—doors,—trap-
ladders,—furniture of oaken-timber for the several apartments,—kitchen range with cast-iron
L. 1,489 16 6
chimney,—tinned-copper oil cisterns—brass and copper bolts and hinges for doors,—window-
shutters,—brasslocks,—brass hand-rails for inside stairs,—water-cisterns, and coal magazines, &c.
Erecting permanent Railways upon the Bell Rock, improving the wharfs or landing places, and
1,338 16 6
removing the Beacon-house,
Houses erected for the families of the light-keepers and seamen of the Tender, signal-tower, store-
4,500 8 3
houses, and sea-wall, at Arbroath,
The price of about 1½ acre of ground for a garden, trenching, and enclosing it for the use of the light-
1,158 18 10
keepers, and seamen, and their families,
The price of a pew of 14 sittings in the parish-church of Arbroath, for the use of the Light-keepers
52 10 0
and their families,
Note.—Wainscot 7s. 6d. per foot, brass 1s. 8d. to 2s. per lb.
Amount for Ulterior Works, 8,540 10 1

Incidents.

Page 514

Expence of Act of Parliament, L. 548 8 0
Travelling charges connected with the work, 312 14 7
Incidental charges for stamps and postages, including letters for artificers afloat, salary for
882 5 1
Engineer’s clerk, &c.
Advertising the exhibition of the Light upon the Bell Rock, and the discontinuance of the Floating-
219 10 3
light, on the 1st of February 1811,
The cost-price of the artificers barracks, platform of aisler-masonry for fitting the courses before
shipping them to the Rock,—engineer’s office,—smith and joiner’s shops,—store-house and stable, 1,255 5 6
estimated at
Rent of the work-yard, and compensation to the landlord for taking it off the hands of the
174 19 6
Commissioners before the expiry of the lease,
Price, hire, and keep of work-horses, 593 5 11½
481 tons coals, used in the artificers’ barracks, smith’s-shop, lime-kiln in the work-yard, and at the
347 4 2
beacon-house, &c.
Shore-dues upon materials for the Light-house, and other articles during the progress of the works, 270 9 6
57½ dozen of flambeaux, for night-work at the Bell Rock, 32 9 6
Stationery and books for Engineer’s office, and shipping, 134 10 8½
One five feet Achromatic-telescope with brass-stand, steadying-rods, two eye-tubes, a mahogany-
35 1 0
stand with night-glass for signal-room,
Pension, and Sick lists for wages of artificers and seamen when off work, medical attendance, &c. 925 12 2
Superintendence of engineers, and plans, including L. 300 to Captain Brodie, 4,858 13 5
Interest upon L. 25,000 of Government loan, up to March 1810, 3,446 11 5
Treasury fees for Exchequer bonds, &c. 235 10 4
Note.—Price of coal 13s. 4d. to 19s. per ton. Oats from 20s. to 23s. per boll. Hay from 10½d. to 1s.
3d. per stone of 22 lb.
Amount for Incidents 14,272 11 1
Amount of gross expenditure in erecting the Light-house, including Ulterior Works, L. 77,089 17 8

Gross Expenditure.

Deductions.

DEDUCTIONS.

For workmens’ barracks, implements, machinery, shipping and old
materials, disposed of by public sale, or transferred to the Northern Light-
houses for the general service of the Board, at the conclusion of the works.
By the price of the workmens’ barracks, storehouses and offices in the
L. 700 0 0
work-yard at Arbroath,
By old gable-walls, lime-house, and sundries in workyard, and engineer’s
52 8 2
office,
By the price of three work horses and carts sold at different times, 86 0 0
By fulzie of stable and work-yard, 21 17 0
By stone-shivers sold by public sale at different times, including 232 cart
48 4 6
loads for the use of the Roads in the vicinity of Arbroath,
By artificers’ time three weeks at Mylnefield, deducted from Quarry
42 0 0
Account,
By two large Woolwich-carts, 55 0 0
By sundries, sold in the work-yard, by public sale, at the conclusion of the
121 16 5
work,
By the price of two cast-iron cranes, in use upon the quays at Aberdeen and
273 3 0
Arbroath, and a small boring-machine used in the work-yard,
By broken cast-iron railways, 97 19 0
By the price of drift timber recovered, 6 10 0
By a stone-waggon and quarry-tools, sold at Aberdeen, 15 13 0
By old brass and bell-metal, 12 16 9
By scrap-iron from the smith’s shop, 6 10 8
By sale of old timber, and the soil taken off the site of the light-keepers
15 3 11
houses at Arbroath,
By the price of the Sir Joseph Banks Tender, 1,510 0 0
By the price of the Patriot, 400 0 0
By the price of an old boat and mast belonging to the Patriot, 12 0 0
By cash, in name of damages, in consequence of sap-wood in the Patriot’s
80 0 0
hull,

Page 515

By the amount of sales of sundry stores, 406 0 0
By the price of three praam-boats or stone-lighters, 193 0 0
By the price of the wreck of an old stone-lighter and boat, 10 10 0
By retaining-money paid during the winter months, to one of the seamen
1 11 6
who left the service,
By interest upon the engineer’s deposit-account with the Dundee Banking
Company at Arbroath, from the commencement till the conclusion of the 26 5 7
works,
By return-freight of the sloop Smeaton, from Aberdeen to Arbroath, 18 18 0
By shipping, boats, machinery, implements, stores, and moorings,
3,222 8 7
transferred to the general service of the Northern Light-houses,
By the nett cost and maintenance of the Floating-light deducted, as
L. 7,901 10 7
belonging to the general service of the Northern Light-houses,
By the price of the vessel and her stores when sold, 421 1 10
8,322 12 5
15,758 8 6
Nett cost of the Bell Rock Light-house, and Ulterior Works connected with that establishment, L. 61,331 9 2

Extracted by
Nett Cost. Lachlan Kennedy, Engineer’s Clerk.

Average Price of
Provisions.

Average Price of Provisions during the Period of the Bell Rock Works.

Beef 6d. per lb. of 17½ oz. avoirdupois.
Ship-biscuit L. 1, 9s. per cwt.
Quartern Loaf 13½d. per loaf, of 4 lb. 5½ oz.
Oat-meal L. 1, 11s. per boll, of 140 lb.
Barley 2½d. per lb. of 17½ oz.
Butter 1s. 8d. per lb. of 24 oz.
Salt 10s. per bushel, of 56 lb.
Whisky 11s. per gallon.
Small Beer 1s. 10d. per Scots gallon, of 8 Scots points.

Page 516

DESCRIPTION OF PLATES.

Page 517

DESCRIPTION of the PLATES, as they are mentioned in the Work.

Plate I.
INCHKEITH LIGHT-HOUSE.

INCH KEITH LIGHT HOUSE.
Drawn by W. Lorimer

PLATE I.
The Light-house of Inchkeith, delineated on Plate I. was erected while Mr Thomas Smith, the writer’s predecessor,
held the situation of Engineer for the Northern Light-houses. A plan of it is given, as having been the first of these
establishments erected upon the new principle; the Reflectors being illuminated with Argand-burners; the Light-
room rendered completely fire-proof; and the Dwelling-house fitted for the accommodation of two keepers. But as
this establishment is described in the introductory chapter, at page 24, and the names of the several apartments are
marked upon the Plate, it seems unnecessary here to enter into detail.

Page 518

Plate II.
CARR ROCK BEACON.

CARR ROCK BEACON as designed in the year 1810.

Page 519

CARR ROCK BEACON as executed in the year 1821.
Drawn by J. Slight

Engd. by E. Mitchell

PLATE II.
Pl. II. The Carr Rock Beacon is represented in Plate II. and referred to in the introduction at page 53.
The diagram marked Figure 1. is an outline of the rock, shewing the position of the beacon,
and plan of the first course of the building, made to a radius of nine feet, cut in a dove-tailed form, after the
manner of the courses of the Edystone and Bell Rock Light-houses.
Figure 2. is a section of the rock on the line A, B, Fig. 1. with a perpendicular section also of a tower of masonry
and apparatus, for tolling an alarm-bell, which was originally intended for this situation. In Fig. 2. letter a
represents an aperture measuring 3 inches in diameter, which was perforated with much labour and care through a
block of granite 7 feet in length, previously to its being laid. This canal was intended to admit the tidal-waters into
the interior chamber of the building marked b, in which the flood-tide was to act upon an air-tight copper-tank,
marked c, and its rod of connection formed into a rack with teeth, by which motion was to be given to a train of
machinery, represented at d in the void of the building. The machine was to act on the vertical shaft e, connected
with a series of hammers f, placed under the great bell g, which was to have measured 5 feet in diameter, and
become the cupola or roof of the building. In this manner the bell was to be tolled to forewarn the mariner of his
approach to the dangers of the Carr, and the other extensive ledges of sunken rocks in its neighbourhood. By the
rise of the flood-tide, and consequent admission of the waters into the canal a, the tank c, with its connecting rod,
not only lifted the bell-hammers f, and, at the same time, also elevated the weight marked h, which, in its descent

Page 520

during ebb-tide, was to have continued the motion of the machinery; and thus, by the alternate operation of the
tides, the continual tolling of the Bell was to have been preserved.
It will further be seen from the section of this building, that the masonry of the solid is connected perpendicularly
by means of stone-joggles inserted half into the one course and half into the other. But in the void or upper part,
instead of the joggles, the bed-joints of the stones were let or sunk about an inch in depth, into each other, as at the
Bell Rock, forming so many bands or girths to the work. This will be observed by narrowly examining the section
at letter i, with its accompanying diagram Fig. 3., which represents a plan of one of the courses of the void,
shewing how the stones were connected horizontally by a system of dove-tailing, as is further represented in Fig.
4., being a plan of a course at the level a, k, in which the perforation is delineated for the admission of the tidal-
waters.
The ascent to this building was to have been by means of a ladder of cast-iron or flight of steps, marked a, i, l,
fixed on the outward wall by means of screw-bolts fixed into brass-bats, sunk into the masonry, and run up with
lead. The entrance-door of this building was formed in the cast-iron frame or pedestal on which the great bell was
to have been supported, the access to the interior being by the balcony, round which a cast-iron rail was intended,
not only for the safety of the keepers or occasional attendants, but also, in some measure, to defend the bell from
the sprays of the sea.
Figure 5. represents the Pillar-formed Beacon, as finished at the Carr Rock in the year 1821. The lower part of this
diagram is a perpendicular section of the rock on the line A B, Fig. 1. The masonry is also shewn with two of the
six great malleable iron-bats or stancheons marked a in Fig. 5., which passing through the several courses, are
sunk about 30 inches into the Rock. The upper part of this diagram represents a frame of cast-iron work, of great
strength, fashioned somewhat after the manner of what seamen term a spar or spur beacon, from being made
generally of timber, set up in the form of struts or spur-beams. The connection of this frame will be understood
from the detached diagram Fig. 6., taken upon the line or level marked b in Fig. 5. From Figs. 5. and 6. it will be
observed, that the beacon consists of 6 pipes or hollow tubes, marked letter A, which are inserted into the sockets
c, in the sill-plate of Fig. 6, into which these hollow tubes are strongly wedged and keyed with culter or spear
bolts, which pass through each of the sockets and base of the hollow tubes at c. Besides the main hollow tubes
marked A, other six marked B, are set up as spurs or diagonals, which radiate from sockets cast in the centre of the
sill-plate marked e. These diagonals are so situated, and connected by dove-tail or hook-joints, that they butt
against the main tubes, and support them at f. The main tubes are further connected by means of horizontal bars of
malleable iron, marked g in Fig. 5, laid into grooves formed in the arms of the cast-iron collars F, k, which clasp
around the main tubes at these points, immediately above and below their connection with the diagonal tubes.
These collars are also keyed with the main tubes by means of spear-bolts. At the point of junction d d, towards the
top, the main tubes form segments of a common circle, and rest upon the centre block h, into which they are keyed
and wedged. As a further security, a strong cast-iron tubular formed case, marked i i, is made to clasp around the
whole upper parts of the main tubes at their point of junction d d, so as to form a girth to them. This tubular case or
cap i i, is 8 feet in length, and terminates with a cast-iron ball marked m m, which is 3½ feet in diameter, formed
into ribs, connected with the cap i i, by means of a socket, through which a spear-bolt passes, and binds it to the
top of the tubular-case at the point l.
Fig. 6. represents the Ballast-plate, which forms the sill or basement of the superstructure. It contains about 8 tons
of cast-iron, and is so constructed as to become a cap or girth to the upper course of the masonry which it is
calculated to secure, by means of a flange of 6 inches in depth at the outward extremity, marked b b in Fig. 5,
where it is let into the stone. This plate is cast in six pieces, connected together at the points m m m m m m, by
means of screw-bolts of one and a half inch in diameter (with nuts), passing through flanges raised at the joints of
its several compartments. At the points n n n n n n, there were six socket-holes, for the reception of the great
stancheons or bolts, marked a a, Fig. 5, which, passing through the masonry, are sunk 30 inches into the Rock,
where they are fixed at the lower ends with iron-wedges, driven home by means of a long iron-driver. The ballast-
plate is connected with the upper ends of these great stancheons, by means of a shackle and bolt, in such a manner
that the more exposed parts may be renewed. The whole is imbedded and run up with pozzolano-mortar, so as to
preserve the several parts as much as possible from the effects of oxidation.
Fig. 7. represents a horizontal section of this beacon, on the line F F, shewing the connection of the horizontal
malleable iron-bars or braces g g g g, which fit into the grooves of the arms of the collars, embracing the hollow
tubes or pillars A A A A, and connecting them by means of spear-bolts at k k k k. The grooves in these arms are so
formed as to command the braces, and to contain a quantity of Parker’s or Roman cement, by which the bolts are
preserved from the effects of oxidation. These collars and arms, with their connecting malleable iron-bars, form a

Page 521

girth immediately above the diagonal struts or braces B B B, Fig. 5. A similar chain of connection is in like manner
formed below the junction of these diagonal struts, with the main tubes, which, like those described above, has the
effect of binding the whole fabric horizontally.
Fig. 8. is a horizontal section upon the line d d, delineated upon a scale of double the size of the other parts of the
beacon, shewing the connection of the hollow tubes A A A A A A, at the top, where they change their cylindrical
form into segments of a circle at the point of contact, so as to embrace the centre-block h h. The top of these tubes
thus formed into a compact figure, is cased or covered with the cylindrical cap i i, through which the spear-bolts
immediately above and below the points d d, in Fig. 5, are made to pass and bind the whole firmly together.

Page 522

Plate III.
GENERAL CHART, SHEWING THE RELATIVE POSITION OF THE BELL ROCK.

CHART
shewing the relative situation
of the
BELL ROCK LIGHT HOUSE.
Drawn by J. Steedman

Engd. by W. H. Lizars

Plate III.
This Plate is reduced from a manuscript-map in the possession of the writer, which is drawn
Pl. III.
upon a large scale, originally intended for exhibiting the depths of the German Ocean or North
Sea, and the situations of the numerous Light-houses on the coasts of the United Kingdom, and
opposite Continent, but is here given with the view of shewing the relative position of the Bell Rock.
The chief peculiarity of this map is the sectional lines, exhibiting at one view the relative depths of the ocean, in
connection with a theory which the writer has advanced, regarding the wasting of the firm ground by the effects of
the sea, as alluded to in Appendix V. These sectional lines, of a deeper shade, are drawn across the German Ocean,
from shore to shore. As, for example, between Shetland and Norway, the greatest depth is ascertained to be about
140 fathoms, and so of other examples, extending southward as far as the Straits of Dover. The soundings are all
marked in fathoms, and, in so far as regards the east coast of Scotland, have been very generally made from on
board of the vessels belonging to the service of the Northern Lights. The forms given to the principal sand-banks,
and the soundings in the central and eastern parts of this great basin, have been taken from the best maritime
surveys, and nautical authorities. The numerous Light-houses on the respective coasts are coloured; those of
Scotland being blue, England red, Ireland green, and the foreign Lights yellow.

Page 523

Plate IV. CHART, SHEWING THE PARTICULAR POSITION OF THE BELL ROCK.

CHART
Shewing the Position
of the
BELL ROCK LIGHTHOUSE
relatively to the Coasts of
FIFE and FORFAR SHIRES.
Drawn by A. Stevenson

Engd. by W. H. Lizars

PLATE IV.
This chart is intended to shew the position of the Rock in reference to the opposite shores of
Pl. IV.
Fife and Forfar, and to the entrances to the Friths of Forth and Tay. The most contiguous point
of land, being in the immediate neighbourhood of Aberbrothwick, is distant about 11¾ miles.
This chart also exhibits the depths of water, and the nature of the bottom, in the vicinity of the Rock.

Page 524

Plate V.
CHART OF THE BELL ROCK, SHEWING ITS POSITION RELATIVELY TO THE
SHIPPING EMPLOYED AT THE WORK.

BELL ROCK
Shewing the relative position
of the
SHIPPING EMPLOYED
at the
WORKS
Drawn by J. Steedman

Engd. by W. H. Lizars

PLATE V.
This Plate represents the Rock at low-water of spring-tides, when that part of it which extends
Pl. V.
about 1000 feet in a south-western direction from the Light-house, may be traced by the
appearance of some detached portions of rock, but chiefly from the sea-weeds which float at
the surface of the water. Its greatest extent, in a north-eastern and south-western direction, is about 1400 feet, and
in a south-eastern and a north-western direction about 240 feet.
King George III.—This is an insulated rock which lies towards the south-eastern extremity of the Main or House
Rock, and has been named in reference to the reign in which the Light-house was erected.
King James V.—is also a detached rock, forming the south-western extremity of the reef, which extends from the
House-rock, and is named in reference to that Monarch’s memorable voyage round his dominions, about the year
1540, as alluded to in the Introduction, at page 4.
On the north-western side of the Rock, as nearly as may be, the figures of the respective vessels employed at the
work are delineated, and the positions of their moorings laid down; with the exception of those of the Pharos
Floating-light, whose bearing or direction is only to be understood, as the full distance at which she was ultimately
moored would fall beyond the limits of the Plate. The house-part of the Rock is left bare at low-water of ordinary
spring-tides, and at high-water of these tides it is from 10 to 12 feet under water; but during the storms of winter,
the sea generally breaks over the whole surface of the rock, so as to render walking upon it impracticable, even in
the lowest ebbs; while at high water, the sprays fly over the building, or rise to a height of upwards of 100 feet.
The reef, which extends in a south-western direction from the House-rock, contains many Travellers or large
boulder-stones; affording a proof that the Bell Rock has at one time been of greater dimensions than at present, and

Page 525

these detached stones may be regarded as part of the debris, which have been separated in the lapse of ages from
the main Rock.

Page 526

Plate VI.
PLAN OF THE NORTH EASTERN PARTS OF THE BELL ROCK, SHEWING THE
POSITION OF THE LIGHT-HOUSE, RAILWAYS, AND WHARFS, &c.

NORTH EASTERN parts of the BELL ROCK shewing the position of the
LIGHT HOUSE, railways, wharfs, &c.
Drawn by G. C. Scott

Engd. by E. Mitchell

PLATE VI.
The description of this Plate, representing the higher parts of the Rock as seen at low-water of
Pl. VI.
spring-tides, affords the writer an opportunity of mentioning many distinguished names
connected either officially, or in a friendly manner, with the erection of the Light-house. In
corresponding about the state of the Rock, he has often found the advantage of this particular nomenclature of its
different parts, as affording a reference to all its localities.
Site of the Light-House, and Railway-Tracks.—The site of the Light-house, which will be seen from the Plate,
was fixed by the writer in a central position of what may be termed the House-Rock. From this, as a centre, the
Railways ramify in various directions. Upon these the materials for the erection of the house were conveyed, and
they are still partly preserved, as convenient foot-paths and wharfs, in landing stores for the Light-house. The
portions of the Railway-tracks marked with light dotted lines, were only used during the continuation of the works;
while those of a deeper shade represent the permanent railways.
Site of Captain Brodie’s Beacon.—The late Captain Joseph Brodie, of the Royal Navy, was perhaps not less
known to the public as the fortunate bearer of Lord Duncan’s dispatches announcing the victory obtained by the
British fleet off Camperdown, than for his unwearied exertions in keeping up the interest of the public, relative to
the important results to navigation which would attend the erection of a Light-house upon the Bell Rock, of which
notice is taken at page 88.
Site of Mr Stevenson’s Beacon.—The position of the Beacon or temporary erection delineated in Plate VIII., was
fixed upon the southern side of the site of the Light-house, with the ultimate view of obtaining shelter from the
breach of the north-east seas. It was farther important, for the conveniency it afforded of a communication during
the progress of the works, by means of a wooden bridge, which will be understood by examining Plate XVIII.
Haldane’s Ledge—is situate on the south-eastern side of the Rock, where the writer made his first landing with his
friend Mr James Haldane, architect, as noticed at page 91.
Gray’s Rock.—Toward the eastern side of the Rock, there is a small outlier, or reef, important as a low-water-
mark, which is named Gray’s Rock, in compliment to the late Mr John Gray, Writer to the Signet, and the first

Page 527

Secretary to the Light-house Board, as noticed in the Introduction, page 5.
Smith’s Rock,—situate on the eastern side of the Light-house, derives its name from the late Mr Thomas Smith,
who introduced Reflecting-Lights upon the coast of Scotland; and was the first Engineer to the Board, as noticed at
page 7.
Cuningham’s Ledge.—This ledge of rock has its name from Mr Charles Cuningham, Writer to the Signet, and
successor to Mr Gray, as Secretary and Cashier to the Light-house Board.
Port Hamilton.—This creek is situate at the south-eastern extremity of the House-rock, and derives its name from
Mr Robert Hamilton, Sheriff of Lanarkshire, and ex officio one of the Commissioners of the Northern Light-
houses; who first landed here in the year 1805, accompanied by Mr Rennie and the writer, with a view further to
ascertain the practicability of erecting the proposed Light-house, as noticed at page 95. Mr Hamilton has been a
zealous member of the Bell Rock Committee since the period of its institution in the year 1807, and, from his
literary habits, he has taken much interest in the pages of this work.
Port Rennie—is situate in the north-eastern part of the House-rock, and derives its name from the late Mr John
Rennie, the celebrity and extent of whose works as a Civil Engineer are well known to the public. Mr Rennie was
consulted by the Light-house Board relative to this work. His reports will be found in Appendix, No. IV.; and his
plan in Plate VII.
Port Stevenson—enters from the north-eastern side of the Rock, and forms the principal landing-place in that
direction; it was named for the writer by Mr Hamilton, at the landing above alluded to, in the year 1805.
The Abbot’s Ledge—forms the north-western extremity of the House-rock, and derives its name from a tradition
(for we can find no authentic record) of one of the Abbots of Aberbrothwick having erected an Alarm-bell, to
forewarn mariners of their danger in approaching the Bell Rock.
Sir Ralph the Rover’s Ledge—forms the south-western extremity of the House-rock, and takes the name of Sir
Ralph the Rover from a noted pirate who is said to have landed upon it, and carried away the Alarm-bell. This
traditionary story is beautifully alluded to in a ballad by Mr Southey in his Minor Poems, which, with his
permission, is included in Appendix, No. II. page 438.
Dunnichen Ledge,—on the north-western side of the Rock, is named in compliment to Mr Dempster of
Dunnichen, who is mentioned in the Introduction, page 5.
Dunskey Ledge,—which is contiguous to the former, is named in compliment to Sir James Hunter Blair of
Dunskey, first Preses of the Commissioners of the Northern Light-houses, as mentioned at page 6.
Arniston Ledge.—Named in compliment to the late Lord Chief-Baron Dundas of Arniston, who, while Solicitor-
General and Lord Advocate of Scotland, took an active part in Light-house affairs; and visited the Bell Rock in the
year 1812, as noticed at page 413.
Rattray Ledge.—In compliment to Mr Baron Clerk Rattray, who, while Sheriff of the Shire of Edinburgh, as
noticed at page 98, was ex officio one of the Commissioners of the Northern Light-houses, and, as one of the Bell
Rock Committee, took much interest in the work.
Hope’s Wharf—forms the termination of the permanent railway toward the west. It was named for the Right
Honourable Charles Hope, Lord President of the Court of Session, who landed here in the year 1815. While Lord
Advocate of Scotland, he took a warm interest in the affairs of the Northern Light-houses, and in 1803 brought the
first bill into Parliament for the erection of the Bell Rock Light-house, as noticed at page 93.
Pulteney Ledge.—So named in compliment to Sir William Pulteney, who, as a Member of Parliament, took a
lively interest in the bill brought forward for the Bell Rock Light-house in the year 1803, as alluded to at page 92.
Banks Ledge.—Named in compliment to Sir Joseph Banks, who was Vice-President of the Board of Trade in the
year 1806, when the Bill for the Light-house was in Parliament, and who took much interest in it, as noticed at
page 101.
Cochrane’s Ledge—is named in compliment to Admiral Sir Alexander Cochrane, who first called the attention of
the Light-house Board to an erection upon the Bell Rock, as mentioned at page 85.
Port Erskine—forms the principal landing-place on the western side of the Rock, and derives its name from the
Honourable Henry Erskine, who, when Lord Advocate of Scotland, and ex officio one of the Commissioners of the

Page 528

Northern Light-houses, brought the second Bill for the Bell Rock Light-house into Parliament, which passed in the
year 1806, as stated at page 100.
Ulbster Ledge.—Named in compliment to the Right Honourable Sir John Sinclair, Baronet, of Ulbster, Chairman
of the Committee of the House of Commons, and who brought up its report relative to the Bell Rock bill, as stated
at page 103.
Kellie Ledge.—Named in compliment to the Earl of Kellie, who visited the works at the Bell Rock in the year
1810, as noticed at page 378.
Pitmilly Wharf—formed the western extremity of the landing-wharf in use during the Light-house operations, and
was named in compliment to Mr Monypenny, now Lord Pitmilly, who, while in the commission both as Sheriff of
Fife and Solicitor-General of Scotland, was a member of the Bell Rock Committee, and visited the works in the
year 1810, as stated at page 378.
Kinedder Ledge—is named in compliment to the late Mr William Erskine, Sheriff of Orkney and Shetland, and a
member of the Bell Rock Committee. From Mr Erskine’s literary pursuits, he took a lively interest in this work,
before he left the Light-house Board, and also after he was raised to the Bench, where he took his seat as Lord
Kinedder.
The Abbotsford.—This spot, where the waters of the two principal and opposite landing-places meet, is named in
compliment to Sir Walter Scott, Baronet, of Abbotsford, who landed here in the year 1814, as noticed at page 419,
when he wrote the beautiful and expressive lines inserted in a fac-simile of his handwriting in the 2d Title-page.
Rae’s Wharf—forms the extremity of the southern reach of the permanent railway, and derives its name from Sir
William Rae, Baronet, who, in the several capacities of Sheriff-Depute and Lord Advocate of Scotland, has long
been a member of the Light-house Board and Bell Rock Committee. His Lordship visited the Rock in 1810, as
noticed at page 387.
Duff’s Wharf—derives its name from Mr Adam Duff, Sheriff of the shire of Edinburgh, and a member of the Bell
Rock Committee, who repeatedly visited the works at the Bell Rock while in progress, particularly in the year
1810, as noticed at page 387.
Port Boyle—takes its name from the Right Honourable David Boyle, Lord Justice-Clerk, who, while Solicitor-
General of Scotland, was a member of the Bell Rock Committee, and visited the Light-house in the year 1811, as
noticed at page 411.
The Crown Lawyers.—This name is given to two detached rocks, which lie on the south-eastern side of the
House-rock, in allusion to the Lord Advocate and Solicitor-General of Scotland, who are ex officio Commissioners
of the Northern Light-houses, as noticed at page 6.
The Maritime Sheriffs.—This name comprehends a range of rocks, also on the south-eastern side of the main
Rock, in reference to the Sheriffs of maritime counties, who are ex officio Commissioners of the Northern Light-
houses, as noticed at page 6.
The Royal Burghs,—A group of rocks lying on the south-western side of the House-rock, so named from certain
of the Chief Magistrates of the Royal Burghs of Scotland who are ex officio Commissioners of the Northern Light-
houses, as noticed at page 6.
Telford’s Ledge—is named in compliment to Mr Thomas Telford, Civil Engineer, who was requested by Sir
William Pulteney to visit the Bell Rock professionally in the year 1803, as noticed at page 92.
Downie’s Ledge—derives its name from the late Mr Murdoch Downie, a Marine Surveyor of considerable
eminence, who suggested a plan for erecting a Light-house on the Bell Rock, as noticed at page 93.
Neill’s Pool—derives its name from Mr Patrick Neill, a particular friend of the writer’s, who first visited the Bell
Rock in 1808, as noticed at page 235. The surface of this pool measures about three fathoms across, and a fathom
and a half in depth, when the tide leaves the Rock. The bottom is generally covered with boulder-stones, which are
whirled about with much force when the sea is in a state of agitation.
Stuart’s Track—is on the south-western side of the Rock, derives its name from the late Captain Harry Stuart of
the Royal Navy, who visited the Bell Rock in the year 1810, as alluded to at page 387. Captain Stuart took an early
interest in the plans for the Light-house, both by Captain Brodie and the writer.

Page 529

Bruce’s Ledge—was named in compliment to the memory of the late Mr James Bruce of the Naval Yard, Leith,
who frequently visited the Bell Rock, and to whose ingenuity the Light-house service is indebted for the improved
construction of a boat, delineated in Plate XI. and noticed at page 412.
Russell’s Ledge—is named in compliment to Mr Claud Russell, Accountant to the Light-house Board, who visited
the Rock in the year 1812, as mentioned in page 414.
Scoresby’s Point,—the most northern part of the Rock, named in compliment to the writer’s friend Captain
Scoresby junior, who has so much extended our information regarding the Polar Regions.
Trinity Rock.—This rock is named in compliment to a Committee of the Trinity House of Leith, consisting of
Messrs Thomas Grindlay, John Hay, and Thomas Ritchie, who gave their advice and assistance in the fitting out
and mooring the Floating-light in the year 1807, as alluded to at page 110.
Balfour’s Ledge—is named in compliment to the late Provost Balfour of Arbroath, who felt the most lively
interest in the Light-house affairs. In his hospitable mansion the writer occasionally resided while the works were
in progress.
Leitch’s Ledge—is named in compliment to the writer’s friend Mr Quintin Leitch, who visited the Rock in the
year 1818. Mr Leitch is further noticed at page 43.
Pillans’s Ledge—is named in compliment to the writer’s friend Mr James Pillans of Leith, who took an early
interest in the erection of the Light-house, and who signs the Report of the Merchants of Leith regarding it, as
noticed at page 96.
The Last Hope.—This name was given by the writer to the highest part of the rock, in allusion to the narrow
escape which he and the artificers made in the year 1807, by the timeous arrival of James Spink, the Bell Rock
pilot at Arbroath, as noticed at page 149. Spink is a remarkably strong man, whose tout ensemble is highly
characteristic of a North-country fisherman. He usually dresses in a pé-jacket, cut after a particular fashion, and
wears a large flat blue bonnet. A striking likeness of Spink, in his pilot-dress, with the badge or insignia on his left
arm, which is characteristic of the boatmen in the service of the Northern Lights has been taken by Howe, and is in
the writer’s possession.
Forrest’s Passage.—This gully or opening on the eastern side of the Rock, is sometimes taken as a track by boats
in certain states of the sea and tide. It derives its name from the late Mr John Forrest, Superintendant of
Lightkeepers’ duty in the service of the Northern Lights, who is particularly noticed at page 406.
Logans’ Reach.—This reach or compartment of the Railway, on the eastern side of the Light-house, is named in
compliment to the late Mr Peter Logan, foreman-builder at the Bell Rock, and his son Mr David Logan, clerk-of-
works, whose active and faithful services, in their respective departments, have been too often noticed in this work
to admit of reference to particular pages.
Watt’s Reach—has its name in compliment to Mr Francis Watt, foreman-mill-wright, whose services have also
already been often particularised in the course of this work, and whose exertions in erecting the beacon and
temporary-railways did much credit to his zeal and intrepidity. The writer also often profited by his ingenuity, in
reference to the various pieces of machinery employed at the works.
Kennedy’s Reach—derives its name from Mr Lachlan Kennedy, who, as Accountant and Cashier in the Engineer’s
Office, discharged the various duties of his situation in a manner equally creditable to himself and satisfactory to
his employers. An Abstract-Account of the expence of the work, as drawn up by him, appears in the Appendix, No.
VII. page 475.
Slights’ Reach,—named in compliment to Mr James Slight, and his brother Alexander, who were chiefly
employed in drawing the courses of the building at large, and in making the various and nicely formed moulds for
fashioning the stones. They also fitted up the interior of the house, and the permanent railways on the rock; and
made a complete model of the Light-house.
The Smiths’ Forge and Ledge—named in compliment to Mr James Dove, foreman-smith, and his assistants, who
have been frequently alluded to in these pages. It was here that the forge was erected at the commencement of the
works on the Rock; and on the connecting ledge the first or experimental cargo of stones was landed.
Reid’s Ledge—is named in compliment to Mr John Reid, the first principal Lightkeeper at the Bell Rock, who
retired from the service in the year 1821, as noticed at page 422.

Page 530

Selkirks’ Ledge,—named for Mr Robert Selkirk, principal builder, and his brother Thomas, who was the principal
stone-cutter at the work.
Wishart’s Ledge—is named for Mr Michael Wishart, some time principal builder at the Rock, as noticed at page
291.
Glen’s Ledge.—This ledge has its name from Mr James Glen, millwright and joiner, particularly noticed at page
279.
John Watt.—A detached rock on the western side of the main rock, named for John Watt, principal mortar-maker
at the Bell Rock.
Peter Fortune.—A detached reef on the western side of the Rock, named for a well known character in the Light-
house service, as noticed at page 299.
Gloag’s Track—leads into Port Hamilton, and is named for Mr Robert Gloag, who commanded the Light-house
Yacht in the year 1807, and who has otherwise had a good deal of connection with the Light-house service.
Macurich’s Track—on the western side of the Rock, is named in compliment to Mr Thomas Macurich, mate of
the sloop Smeaton, and afterwards commander of the Bell Rock Tender, who had a very narrow escape in a boat
off the Rock, as noticed at page 253.
Webb’s Rock—is named in compliment to Mr Joseph Webb, one of the King’s pilots at Yarmouth, who
superintended the fitting out and mooring of the Floating-light, as noticed at page 108.
Sinclair’s Track—is named in compliment to Mr George Sinclair, who, in 1807, commanded the Floating-light,
and acted as landing-master.
Wilson’s Track—named for Mr James Wilson, landing-master, whose active and enterprising conduct is often
noticed in the course of this work. In the year 1815, Mr Wilson left the Light-house service, when he was
appointed one of the Harbour-masters of Leith. The speaking-trumpet which he used at the Bell Rock was
presented to him, with the sanction of the Light-house Board, when a suitable inscription was engraved on a plate
of silver attached to it.
Taylor’s Track—leads into Port Erskine, and derives its name from Mr David Taylor, who commanded the Sir
Joseph Banks Tender during the progress of the works, and afterwards became Light-house Storekeeper at Leith.
Calder’s Track—situate on the north-western side of the Rock, derives its name from Mr Thomas Calder, who
commanded the Light-house Yacht, and other craft, connected with the works, as noticed at page 260.
Soutar’s Track—derives its name from Mr Peter Soutar, who was one of the Praam-masters while the works were
in progress. In 1815 he succeeded Mr James Wilson in the command of the Light-house Yacht.
Pool’s Track—is named for Mr Robert Pool, commander of the Smeaton stone-lighter, a very active and
persevering seaman.
The Engineers’ Ledge,—situate on the eastern side of the Rock, is named in compliment to certain of the
Engineer’s assistants, who, though belonging more especially to his general or private business, have nevertheless
been occasionally employed in the department of the Bell Rock, particularly Mr John Steedman, Mr John Thin, Mr
William Lorimer, Mr G. C. Scott, and Mr Robert Shortreed, some of whose names are attached to several of the
Plates.
The Artificers.—A name given to a parcel of detached rocks, lying on the north-western side of the main Rock, in
allusion to the numerous artificers employed at the works, many of whom are now moving in spheres of more
extended usefulness, and, did our limits admit, would be deserving of particular notice, as may be learned from
page 379.
The Mariners.—This is also a group of detached rocks on the north-eastern side of the Rock, which in like manner
is named in compliment to the exertions of the Seamen, who, as men-of-all-works, gave a helping hand to every
operation; and many of whom deserve the warmest acknowledgments of the writer.
Strachan’s Ledge,—situate on the north-eastern side of the Rock, was named for Mr Robert Strachan of Leith,
who fitted out the Floating-light, and narrowly escaped being lost upon the Rock, when approaching it in a boat
which was upset in the year 1808, as noticed at page 244.

Page 531

Craw’s Horse.—Another detached rock, deriving its name from a narrow escape which the sloop Smeaton made
in foggy weather, as noticed at page 364, while James Craw, who had charge of the stable, and was principal carter
at the work-yard of Arbroath, was on board, with his favourite horse, on his way to Leith, to convey the upper part
of the Light-house, from Edinburgh, to be shipped for the Bell Rock. The horse alluded to was a remarkably strong
and powerful animal, measuring about 16 hands in height, and having, in the language of jockies, a great deal of
bone. It is not a little remarkable, that while the work was in progress, this animal must actually have drawn the
materials of the Light-house, extending to upwards of 2000 tons in its finished state, perhaps three or four times, in
removing the blocks of stone from the ship to the work-yard, again to the platform, and from the work-yard, when
they were to be shipped for the Rock, besides occasional movements to and from the hands of the stone-cutters. A
sketch of this animal, and of his master James Craw, will be found at Fig. 21. Plate X. The horse having failed
from age, towards the close of the work he was removed to the Island of Inchkeith, to go at large, where he died in
the year 1813. The fame of this animal’s labours, together with his strength and excellent proportion as a draught-
horse, having attracted the notice of Dr John Barclay, that eminent anatomist procured the bones, and set them up
in his Museum. This valuable collection, it is understood, is to be bequeathed to the College of Surgeons of
Edinburgh; so that the bones of the Bell Rock-horse, to use the Doctor’s own language, “will be seen and admired
as a useful skeleton, and a source of instruction, when those of his employers lie mingled with the dust.”

Page 532

Plate VII.
ORIGINAL DESIGNS FOR THE BELL ROCK LIGHT-HOUSE.

DESIGNS for the BELL ROCK LIGHT HOUSE by Mr. STEVENSON.

Page 533

DESIGN for the BELL ROCK LIGHT HOUSE by Mr.
RENNIE.
Drawn by J. Slight
Engraved by R. Scott

PLATE VII.
Fig. 1. shews the sites of the principal and diagonal supports of cast-iron of the Pillar-formed
Pl. VII.
Light-house, modelled by the writer prior to his landing on the Rock in the year 1800, as
alluded to in his report, included in the Appendix, No. IV. at page 440. This Figure is a Plan in
which letters a a a a a a a a point out the feet of the eight principal columns; e the central shoe or socket, intended
to receive the feet of the diagonal supports or braces, which correspond in number with those of the main columns.
This fabric, at the base, was to form a common diameter of about 35 feet, diminishing to 12 feet at the top, or
immediately under the Light-room.
Fig. 2. The great columns in this design, which are sunk into the Rock, and the diagonal braces d d d d, which butt
against, or step into the shoe c, are also strongly connected by the braces b b b b b b b b, and cross ties marked c c
c c c c. The habitable part of this building is formed by two concentric rings of copper, marked a f, a f, the one
upon the outside, and the other upon the inside, of the main columns. The space between these rings was to be
filled with plaster-of-Paris, or some light substance, to render the apartments air-tight. Letter g is the position of
the entrance-door, and the space below the first floor, marked h, is a coal magazine. The better to throw off the
sprays of the sea, the lower part, as will be seen from the diagram, is of a conical form inverted.

Page 534

Fig. 3. Shews the mode of fixing the principal columns, to the Rock, and of building or connecting them together,
being an enlarged section of the foot of one of the main columns. The hollow cylindrical tube marked b b, is sunk
24 inches, and acts as a steady pin or joggle to the column which is wedged into the Rock, as shewn at c c c c, by
driving oaken and iron wedges alternately, instead of running them up with melted lead. The next length of the
column, marked a a a a, is slipped over this tube, and has a seat cut in the rock at right angles to the oblique
direction of the column, to which it is connected by the cutter or spear-bolts marked d d d, whose directions
respectively cross each other, as shewn in the section.
Fig. 4. represents one of the joints of the main columns, which occur at every 7 feet of their length, from the rock
to the habitable part of the Light-house. This description of joint is what is technically termed spigot and faucet; a
a is the upper half, b b b the lower, c c the joint, d d d d the collar-piece clasping the joint, and connecting it with
the horizontal arms or braces e e, which, in Fig. 2, are marked b, and in connection with the cross ties c, and
diagonal-supports d, bind the whole firmly together.
Fig. 5. represents the lower floor of the five apartments, in which a a a a a a a a, as in the foregoing Figs. 1, 2, and
3. shew the main columns passing between the outer covering and inner lining of copper. Letter c marks the
entrance door, shewn at g, in Fig. 2., in which d is the plat at the top of the ladder, formed on one of the columns,
which may also be conceived as passing up through the habitable part of the building; the floors of which are
formed with plates of cast-iron.
Fig. 6. represents a Light-house of masonry, modelled by the writer immediately after his first landing upon the
Rock. The better to illustrate this design, the solid or lower part is given in elevation, and the upper or habitable
part in section. Compared with the Edystone Light-house, upon the principles of which it was designed, the chief
differences consist in the exterior spiral-formed stair, intended to afford permanent access to the Light-house, and
also to serve as a landing quay or wharf at high-water. The steps of this stair were to be 3 feet in length, forming a
kind of scarsement upon the outer-wall, there being nothing to obstruct the force of the sea under the stair; as it
formed part of the main-wall, it may be conceived calculated to have become a kind of spiral buttress to the
building. In the upper or habitable part, the interior walls diminish gradually, instead of forming abrupt
scarsements, and the floors were laid horizontally, instead of being arched.
Fig. 7. Shews one of the floors, each stone of which forms part of the outward walls, extending inwards to a centre
stone, independently of which they were to be connected, by means of copper-batts, with a view to preserve their
square form at the extremity, instead of dove-tailing. These stones were also modelled with joggles sidewise, upon
the principles of the common-floor, termed Feathering in carpentry; and also with dove-tailed joggles across the
joints, where they formed part of the outward wall, as shewn in this figure.
Fig. 8. is a plan of one of the courses of the void or habitable part of this design, shewing both the joggles of the
end joint and the girth, raised upon the upper beds of the courses, and sunk into the groove cut in the lower beds of
the respective covering courses.
Figs. 9. and 10. exhibit different modes of connecting the stones and courses of the solid of the building, both
perpendicularly and horizontally, by means of dove-tailing. But as a certain degree of weakness is unavoidably
incident to every system of dove-tailing, and, as the method of forming the bed-joints of the void above alluded to
is equally effective, in its application to the solid or lower part of the building, as represented in Plate XXIII., this
is considered preferable to the dove-tailing system.
Fig. 11. is part of a course, shewing a simple mode of connecting the stones in water-buildings, so as to avoid
dove-tailing, and preserve, as much as possible, the entire figure of the stones. This is effected by inserting square
joggles into the joints, and allowing these joggles to project 6 inches into the course immediately above, thereby
forming a connection horizontally between the stones of a course, and vertically with the several courses.
Fig. 12. is also a course of masonry, in which the square or entire form of the materials is preserved, while the
stones are bound both horizontally and vertically, by means of metallic-batts and plates, as represented in the
enlarged diagram described in the following Figure.
Fig. 13., a is the dove-tailed cross-head or plate; b is a section both of the batt and plate, in their places, shewing
their connection with two courses of the building marked A B; c shews the mode in which the batt is fixed into the
lower course, by means of wedges; d the upper end of the batt and plate, which is also wedged, and appears, when
in its place, as in Fig. 11., marked also a a a. But these several modes of connecting the materials of masonry are
considered more or less objectionable, when compared with the girths delineated in the design represented in Plate
XXIII.

Page 535

Figs. 14. and 15. are a reduced plan and elevation of the Bell Rock Light-house by Mr Rennie, in the year 1807.
They will be found so obvious upon inspection, as not to require explanation, and are here preserved as the only
plans or drawings furnished for this work by that eminent engineer.

Page 536

Plate VIII.
BEACON-HOUSE.

Page 537

BELL ROCK BEACON
Drawn by W. Lorimer

Engd. by W. H. Lizars

PLATE VIII.
Fig. 1. represents the Beacon-house, which was used as a barrack for the artificers during the
Pl. VIII.
working seasons of 1809 and 1810. Letter A A A is the surface of the Rock. The principal legs
or beams, with their diagonal supports, radiating from the centre of the plan, are marked a a a
a a a, and the bracing chains b b b, as completed in the year 1807. In 1808 the bracing-chains were removed, and
the malleable iron-bars marked c c c were substituted. The dotted lines d d d d d, are intended to show the form of
the upper or habitable part of the Beacon as it was ultimately finished, with its lantern, for ventilating the barrack-
room. One of the figures characterised as sailors, and used for illustrating this elevation, is represented as standing
upon the Rock, and laying hold of one of the bracing-chains. The next figure is ascending the trap-ladder, formed
with cleats of timber nailed upon one of the principal beams; he is on a level with the mortar-gallery, marked letter
e e e. The third figure is standing upon the cross or collar-beams, nearly on a level with the floor of the cook-room,
marked f f. The fourth, or highest figure, is standing upon one of the principal beams, with his feet on a level with
the top of the windows in the floor of the cabins of the engineer and his assistants marked g g; the head of this
figure being within the artificers’ barrack, marked h h. With one hand he is supposed to be touching the provision-
chest, marked i, and with the other he is laying hold of the rope for hoisting the copper signal-ball k upon the flag-
staff.

Page 538

Fig. 2. represents the gallery where the mortar-makers and smiths latterly worked. a a a a a a represent the
principal beams of the Beacon cut across; b b b the position of the mortar tubs and lime-casks; c the smith’s anvil;
d his bellows; e the hearth or fire-place.
Fig. 3. represents the floor of the cook-room, in which a a a a a a shew the principal beams cut across; b the platt
or landing at the entrance-door; c c the coboose or cooking-hearth; d the chimney or smoke funnel; e e e e the
provision casks; f the trap stair leading to the floor above; g g the small life-boat, suspended by davits from the
principal beams of the beacon; i i i i i i the six angular upright posts cut across, marked d in Fig. 1., which form the
framing of the hexagonal apartments or floors marked III. and IV. Letter k represents the position of the privy, and
stair leading to it.
Fig. 4. is the floor of the cabins of the engineer and his assistants. Letters a a a a a a mark the position of the six
principal beams of the beacon, now approaching closely together from their diagonal direction: b b b b b b the
angular upright posts, which, together with those marked i i i i i i, as referable to Fig. 3., form the upper apartments
into twelve sides; c is the trap-ladder, corresponding with letter f in Fig. 3., which communicates with the cook-
room floor below; d is another ladder, leading to the artificers’ barrack above.
Fig. 5. represents the upper floor, or that of the artificers’ barrack-room, on a level with the top of the principal
beams, marked a in Figs. 1, 2, and 3. In this diagram a a a a a represent the ground-tier of beds, which were
ranged in five heights, excepting at the space over the man-hole, leading up to this apartment, where there was
only three heights of beds; c represents the trap ladder answerable to letter d of Fig. 4.
Fig. 6. represents what may be termed a bird’s-eye view of the Beacon, as completed in 1807, and before it was
converted into a barrack. In reference to Fig. 1., letter a represents the six principal beams, forming a common
base measuring about 35 feet across, including the bracing-chains, which are marked b b b b b b. These beams
meet in a point at the top, where they rest upon a block of beechwood, to which the upper ends of the beams were
fitted, the whole being girded with strong malleable iron rings or hoops, keyed with spear-bolts. Here the
provision-chest i, and signal-ball k, are represented as resting upon the top of the principal beams.
Fig. 7. is an enlarged view of two of the bracing-chains, marked a a, with their tightening shakle marked b b,
meeting in the ring c c. Letter d represents one of the batts, which were sunk into the rock A A about 20 inches, and
wedged with timber and iron, as shewn at e e.
Fig. 8. represents a side view of one of the beams of the beacon, marked a a a a, cut across immediately above the
great stancheons b b b b, with its bolts, which were fitted upon each side of the beam; c c represent the clasp-
plates, which embraced each foot of the beacon, with its two stancheons. These clasp-plates were fixed with spear-
bolts, as shewn at d d. Letters e e represent the wedging with timber and iron, referred to in Fig. 7.
Fig. 9. represents a front view of a like portion of one of the principal beams, as in Fig. 8.; a a a a shew the
stancheons on each side of the beam, and b b the lower extremity of the stancheons sunk into the Rock A; c c one
of the clasp-plates; d d d d the spear-bolts.
Fig. 10. is one of the principal beams, a cut across at the clasp-plate c c c c. Letters b b are the great iron-
stancheons; and d d d shew the spear-bolts.

Page 539

Plate IX.
SHEWING THE PROGRESS OF THE WORKS DURING THE SECOND, THIRD, AND
FOURTH YEARS’ OPERATIONS.

Page 540

Progress of the Bell Rock Works.
Drawn by J. Slight.

Engd. by W. Miller.

PLATE IX.
Fig. 1. shews the state of the works about the close of the second season, or year 1808, with
Pl. IX.
two of the moveable beam-cranes, with their guy tackles and working gear, which will be
more particularly described under Plate XIV. These are placed upon the top or fourth course of
the building. In the fore-ground, part of the unfinished railways are seen, with waggons and artificers at work; and
on the right the beacon is partly traced in faint lines.
Fig. 2. represents the state of the works in the month of August 1809, at the close of the third season’s work, when
only one of the cranes was set upon the building; the other, as the work increased in height, and became less in
diameter, was placed upon a temporary stool or prop of masonry, marked a a a a. This prop was found extremely
useful, as, by elevating one of the cranes upon the top of it, the lift of the materials was divided, and brought more
conveniently within reach of the higher crane, which at this period was about 30 feet above the Rock. In the fore-
ground of this diagram, part of the circular track of railway round the building is seen. On the right, a part of the
Beacon-house appears with the rope-ladder of communication, extending from the top of the solid of the Light-
house to the mortar-gallery. On the rope-ladder a figure is represented walking from the Beacon to the Light-
house, and a tackle, with its travelling pulley, is also stretched, for conveying the mortar-bucket, to the builders.

Page 541

Fig. 3. represents a section of the void or habitable part of the Light-house as it appeared in the month of August
1810, when the masonry was nearly completed. On the right is an elevation of part of the Beacon-house, but
instead of the rope-ladder of communication, a bridge of timber is constructed. Letters a a represent the top of the
solid, or level of the entrance-door of the building, from which the stair-case ascends to the several apartments.
Resting on the sill of the door at b, is seen one of the beams for supporting the road-way of the bridge, and below
this, at the point c, is the step of one of the diagonal braces of the bridge, where it is inserted about 6 inches into
one of the courses of the solid masonry. Regarding the frame-work of the bridge, it may only further be noticed,
that the road-way was chiefly suspended from the king-posts d d.
Letter e represents a block of stone, in the act of being raised from the rail-way on the Rock, to the level of the
bridge, by means of the crab or winch-machine marked f, with wheel and pinion apparatus; the pully of the
working chain is suspended from the cross beam g, which rests or is supported upon the top of the king-posts. One
of the figures on the bridge at h, is in the act of pushing forward a truck cart or waggon i, to receive the stone e;
when raised through the aperture in the road-way, it is then lowered upon this waggon, and removed towards the
building within the sphere of the several purchases or machines, by which it is transported to the hands of the
builders.
Letter k refers to a life-buoy, and a coil of rope, kept in readiness upon the bridge, in case of accident by the fall of
any of the people from the building or beacon while the Rock was covered by the tide. l l represent two of the fire-
buckets, which were hung round the beacon, under the projection immediately above the cook-room. The stone
marked e, in the second stage of its progress towards the top of the building, is now seen immediately above the
lintel of the entrance-door, the purchase chain, by which it is suspended, passes over a pulley at m, attached to the
beam n n, which is projected from one of the windows of the Light-room store, where it is supported upon a block
of timber, so as to admit of the chain passing under it. The further end of this beam, being within the Light-house,
was bolted to an upright post marked o o, and the whole apparatus was worked by means of the crab or winch-
machine at p, similar to that upon the bridge marked f f. The stone e is next supposed to have gained the height of
the floor of the bed-room, where another apparatus, similar to those at f and p, is placed. Here a figure is
represented at q, with a rod in his hand, in the act of hooking the chain of the balance-crane into the Lewis-batt,
fixed in the stone e, still in its progress to the top of the building. r r r represent the strong oaken beams placed on
the floor of the library, on which the foot of the cast-iron balance-crane is supported. s s two of the four diagonal
braces of oak timber, bolted into a collar-piece of cast-iron, clasping the upright shaft of the crane at t t, and butting
against the upright stretchers at u u; intended as a security to the walls, in case the balance-crane should at any
time get out of equilibrium. The two figures marked v v, are represented as working the balance-crane, and are
supposed to be standing upon a moveable platform x x, suspended from the body of the crane by rods of iron y y.
This platform or stage, with the artificers upon it, being moveable with the body of the crane, gave great facility
and conveniency to those who wrought it. z is the balance-weight, moveable by the machinery along the balance-
beam of the crane, to keep the whole in a state of equilibrium, according to the varied load suspended from the
working or opposite beam; accented á represents the moveable block or cross-head of malleable iron, with two
eyes, into which the chains of the crane were hooked, when the body (comprehending the machinery and beams)
was to be elevated upon the shaft in the progress of building. But the cross-head, together with the other apparatus
of this machine, will be better understood by examining Plate XVII., with its letter-press description. b´ b´ b´
represent the form and position of the Light-room in dotted lines; c´ the mortar-bucket made to traverse upon the
guide-rope d´ d´, stretched between the building and the mortar-gallery of the Beacon; the end of the rope attached
to the building being fixed to the stanchion é, inserted into one of the Lewis batt-holes, on the balcony of the
Light-room.

Page 542

Plate X.
VARIOUS IMPLEMENTS AND APPARATUS CONNECTED WITH THE WORKS.

Page 543

CERTAIN IMPLEMENTS connected with the BELL ROCK WORKS
Drawn by G. C. Scott

Engd. by E. Mitchell

PLATE X.
Fig. 1.—is an elevation of one of the three large copper Lanterns carried by the Pharos
Pl. X.
Floating-Light, which was moored off the Bell Rock while the Light-house was erecting. In
order to relieve this vessel of the cumbrous yards with which Floating-lights were in use to be
fitted, these lanterns were so constructed as to clasp round the masts, and traverse upon them. This was effected by
constructing them with a tube of copper in the centre, capable of receiving the mast, and through which it passed.
The lanterns were first completely formed, and fitted with brass flanges; they were then cut longitudinally asunder,
which conveniently admitted of their being screwed together on the masts, after the vessel was fully equipped and
moored in her station. Letters a a a a shew part of one of the masts, b one of the tackle-hooks for raising and
lowering the lanterns at pleasure, c c c c c c c c c c the brass flanges, with their screw-bolts, by which the body or
case of the lantern was ultimately put together; d d d shew the position of certain holes in the bottom for the
admission of air, f f f f the holes at the top, connected with the ventilation, to which the collar-pieces e e and g g
form guards against the immediate effects of the weather. The detached diagram, upon an enlarged scale, shows
the air-hole, which is marked m. The letters h h h h shew the part of the lantern which was glazed with plate-glass;
i is one of the glass shutters, by which the lamps were trimmed; the lower half being raised, slides into a groove
made for its reception; k k shew the range of ten agitable burners or lamps, out of which the oil cannot be spilt by
the rolling motion of the ship. Each lamp having a silvered-copper speculum or reflector l l placed behind the
flame, was found greatly to increase the brilliancy of the light.

Page 544

Fig. 2.—is a cross section of the bottom of the lantern, shewing the mast a cut across, b b is the sole or bottom of
the lantern, c c the flanges at the junction of the body, in reference to the same letter in Fig. 1.; d d d d the small
holes for the admission of air, e e e the brass zone or chandelier, with its ten arms and sockets marked f f, &c. in
which the stalks of the burners are inserted. The chandelier is made to traverse horizontally into a corresponding
groove fixed upon the interior cylinder or case, through which the mast passes, and upon which the whole moves
up and down. When, therefore, the lamps require to be trimmed or taken out of the lantern, the chandelier is turned
until they are respectively brought opposite to the shutter marked i.
Fig. 3. is an enlarged view of one of the agitable burners a, with its reflector b, which last measures four inches
over the lips, and is raised to the parabolic curve of three inches focus; c the socket, d the section of the moveable
chandelier in its groove, answerable to letters k and l, Fig. 1., and f and e Fig. 2. In reference to Fig. 3., e e is a
section of part of the central cylinder of the lantern and mast of the ship.
Fig. 4. represents one of the Mushroom-Anchors, constructed wholly of cast-iron, used for mooring the Floating-
Light and other craft off the Bell Rock, to which part of the mooring-chain is attached. This diagram seems so
obvious as to require no particular description. Towards the head a a the shank is strengthened by means of four
feathers or brackets raised upon it, somewhat resembling the connecting gills of the vegetable mushroom. These
anchors weighed from 14 to 21 cwt.
Figs. 5. to 9.—Quarry Tools.—Fig. 5. is a common stone-pick, weighing from 8 to 10 lb., shown with and
without the handle, which measured about 2 feet in length, but is here shortened. Fig. 6. is the Aberdeen or granite
pick, weighing from 6 to 16 lb. Fig. 7. is a quarry hammer, weighing from 6 to 8 lb. used for jumping or boring
batt-holes in the Rock, and the trenail-holes in the courses of the building. Fig. 8. represents the boring-irons for
the trenail-holes, measuring 1¾ inches in breadth at the cutting end, and varying in length according to the depth
of the respective holes. Fig. 9. is the scraper used for cleaning the holes; the perforated end being applied with a
piece of rag for drying up the moisture.
Fig. 10. represents one of the oaken trenails used for keeping the stones in their places while the building was
within the ordinary range of the sea. The positions of these trenails may be traced in the small circular holes of the
courses, in Plate XIII. Their lower ends were cut with a saw-draught as at letter a, into which a small wedge
marked b was inserted, and the trenail having been driven home, the small wedge had the effect of tightening or
fixing it. The upper end c was then cut off flush with the upper bed of the stone, when it was split, and another
small wedge, marked d, driven into the chisel-mark, which completed the operation of fixing the trenails into their
places.
Fig. 11. represents a pair of the oaken wedges inserted into corresponding grooves cut into the perpendicular joints
of the stones in each course of the solid or lower part of the Light-house, as may be traced in the small oblong
holes, marked in the joints of the courses in Plate XIII. These wedges were chiefly intended for bringing the dove-
tailed parts of the stones to a general bearing. The thick end of the wedge marked a being dropped into its groove,
the smaller end of the corresponding wedge b was then inserted, and driven home till some degree of tension or
firmness was obtained. This operation of trenailing and wedging was followed from Mr Smeaton’s practice at the
Edystone Light-house.
Fig. 12. is a section of one of the cast-iron mortar-tubs, with its pestle, shod or loaded with a piece of malleable
iron.
Figs. 13. to 15.—Cast-Iron Plate-railway.—Fig. 13. is a longitudinal view of one length of the cast-iron railways
erected upon the Rock; a a a a represent the stools or upright supports, b b are the tracks of the roadway, c c one of
the side stays or braces. Fig. 14. is a cross section on the line A B of Fig. 15, in which a a is the support with its
cross-brace f, bolted at g g g g; b b are the railway tracks, c c c c the stays, with their connecting bolts on each side,
d d the sleeper or horizontal brace connecting the top of the stools, and forming a chair or seat for the rails and
grated roadway; e e e e represent the batts and spear-bolts, with which the whole was connected to the Rock, by
the process of wedging with timber and iron. Fig. 15. is a plan of the finished railway; a a a a are the feet of the
stools, b b the side rails or waggon-tracks, c c the stays or side braces, d d the sleepers, and h h the grated footpath.
The weight of a yard in length of the railways complete, of the height of four feet, as represented in these
diagrams, may be estimated about 5 cwt.
Fig. 16. represents a plan of one of the railway waggons; a is the iron handle made to hook upon either end of the
waggon, so as to prevent the necessity of turning it; b b is the body of the waggon, consisting of two pieces of oak
timber, bolted upon the upper part of the double frame intended for accommodating the wheels to the circular track

Page 545

of the railway round the building. The upper and under frames are connected with the bolt c c, so as to admit of the
movement above alluded to. For the same reason, a joint was formed in the perch or middle of the frame at d. The
trucks or wheels e e e e were of cast-iron, measuring 15 inches in diameter. These waggons were always left upon
the Rock, being simply turned upside down, or off their wheels, in a particular part, and were seldom moved by the
sea, as they weighed about 2 cwt. each.
Fig. 17. The ten diagrams, marked a, b, c, d, e, f, g, h, i, and k, are a set of moulds for one course of the solid part
of the building, by which the stones were cut and prepared in the work-yard previous to their being shipped for the
Rock. The application and connection of these diagrams will be better understood by examining the courses of the
building in Plate XIII.
Fig. 18. a Trainer or Rule, framed of timber, applied by the builders, for ascertaining the exact position of the
stones of the respective courses. a is the eye or socket on which it was fitted to a steady-pin placed exactly in the
centre. This rule was used chiefly for ascertaining the radiating direction of the stones, from the centre towards the
circumference, being laid agreeably to corresponding notches and lines marked upon their upper-beds, so as to
preserve band throughout the work, and prevent difficulty with the closing or finishing stones.
Fig. 19. is a perpendicular section of the carpenter’s jack, used with much advantage for shifting and turning the
stones in the work-yard. The case of this machine was made of elm, and strongly bound at the ends with iron. It
measured 4 feet in height, its greatest breadth 12 inches, and its thickness 6 inches. a a is the stock or case, b b the
rack, fashioned at the lower end somewhat like the claws of a carpenter’s hammer. The upper end is of a forked
form, both ends being conveniently applicable to the varied positions of the stones; c and d are the wheel and
pinion work; e the handle by which the machinery is worked, affording a purchase or mechanical advantage in the
ratio of about 64 to 1.
Fig. 20. is a plan of the useful machine called The Woolwich Sling-Cart, applicable to transporting large blocks of
stone suspended between the wheels by means of a Lewis-batt. When a stone was of considerable length, it
became necessary to employ a chain to steady it at the farther end, the application of which will be seen in this and
the following figure. a a a a represent the shafts and body of the cart, b b b b the wheels, c c the handles passing
between the spokes of the wheels, by which the machinery is worked for lifting the stone. The dotted line d d d d
represents a plan of a stone in its state of suspension, e e e the wheel and pinion work, f the barrel or cylinder on
which the chain turns as the stone is raised; g g is the tail-beam with its chain h h, and steady-pin i.
Fig. 21. represents the sling-cart in its working state, with letters corresponding to Fig. 20. Here the Bell Rock
carter, and his horse, are shown, already noticed in the description of Plate VI., page 498.

Page 546

Plate XI.
THE SHEER-CRANE, LEWIS-BATT, PRAAM-BOAT WITH CARGO, SLOOP SMEATON
DISCHARGING, AND BRUCE’s TWO-HALF ATTENDING-BOAT.

Page 547

Apparatus connected with the Bell Rock Works.
Drawn by G. C. Scott

Engd. by W. Miller.

PLATE XI.
Fig. 1.—The Sheer-Crane at Duff’s Wharf. a a a are the working-sheers, to the upper
Pl. XI.
extremity of which the purchase-chain a, e, g, is attached; from the hook marked i, the stone k
is suspended by the sling-chain i, k, which was lengthened or shortened according to the state
of the tide. b b are the upright-sheers; c c the diagonal or supporting sheers. Those last, though acting as braces,
had also a motion upon the connecting block d at the top, from which the pulley e is suspended, and over which
the purchase-chain passes. This motion had the effect of giving the stone a kant inwards, when the working-sheers
came to the perpendicular, so as to lay it upon the waggon f, to be wheeled along the railways, as will be
understood by examining Plate XVIII. The crab or winch machine g g, fixed upon the Rock at one side of the
railway, with batts and spear-bolts, was worked with a less or greater purchase, according to the weight of the
stone to be lifted. The large wheel measuring 3 feet 3 inches in diameter, formed the single purchase, and the
smaller wheel of 2 feet 6 inches, with its pinion of 6 inches, when connected with the former by an intermediate
pinion, formed the greater purchase, exerting a power in the one case in the ratio of about 20 to 1, and in the other
of 98 to 1.
Fig. 2. is a front view of the machine described above, with corresponding letters. At letters h h, will be seen more
distinctly the cast-iron bed, with the snugs or flanges for the reception of the lower ends of the sheers a a a and b b

Page 548

b b, with their journal-bolts. This apparatus, along with the other parts of the works, have been modelled for
preservation.
Fig. 3. represents one of the malleable iron Lewis-batts, with which the stones were lifted from stage to stage, after
leaving the hands of the stone-cutter. This useful implement consists of six members, viz. the palm, which is in
three pieces, marked a, b, c; the palm-bolt d d; the shackle e. The spear-bolt f, for preventing the palm-bolt from
drawing, was seldom used in practice.
Fig. 4. is a section of one of the praam-boats, shewing her cargo on deck, and more particularly the form and
application of the mushroom-anchor and chain-moorings of the Bell Rock craft. a a is the cargo upon deck; b b is
the hold or compartment under deck, calculated to contain a sufficient number of empty casks, for floating her, in
the event of receiving injury at the rock. c c mark the fore and after peaks, for containing warps, kedge-anchors,
grapplings, defenders, and other tackle; d marks the position of the bits and cross-tree to which a hook at e was
fixed, for attaching the end of the mooring-chain; f is the slit in the stem, answerable to a hawse-hole, through
which the mooring-chain passed almost on a level with the deep water-line, and was ultimately fixed by the ring g,
to the lower swivel of the floating buoy h, and also with the mushroom-anchor i at the bottom, connected with a
length of chain extending to about twice the depth of the water.
The detached diagram towards the stern of the praam-boat, consisting of a mushroom-anchor, a larger and smaller
floating buoy, with their respective chains, represent the state of the moorings while the praam-boats were
employed at the Rock. The small buoy k, with its chain l, was connected at the ring accented l´ to the hawser-chain
of the praam. When she was unmoored, this small buoy prevented the end of the chain from sinking. In this
manner the praams were conveniently disengaged, or attached to the large buoy h. When at their moorings, the
small buoy k was unhooked and stowed below, the strong mooring-chain being now drawn through the hawse, or
slit at f, and the ring at l´ being simply laid into the hook at e.
Fig. 5. is a perspective view of the sloop Smeaton at her moorings, delivering a cargo of stones, with one of the
praam-boats along-side. In the back ground, the Light-house is seen partly built, together with the Beacon-house.
Two of the three figures shewn on the deck, near the mast, are working the winch-machine of the ship in raising a
stone from the hold, while the figure, in a lying posture, is holding-on the end of the tackle-fall, as described at
page 144. A stone is seen in the main hatch of the ship, suspended from the end of a short boom nearly at right
angles to the mast. The figure near the companion or cabin-stair is working one of the guy-tackles. On the praam’s
deck, part of a cargo may be seen, and the figure towards her stern is laying hold of the stone, suspended in the
tackle, to guide it to its birth, while the other contiguous figure is working an opposite guy-tackle. To avoid
confusion, only five figures are here introduced. The praam-boat is understood to be lashed head and stern to the
ship, having three or four large wooden defenders slung between them, to prevent the vessels from injuring each
other with the undulating motion of the sea. The Smeaton’s sails are handed, and the main and gaff-booms braced
to one side, to give room upon deck, in bringing the stones out of the hold. The only peculiarities about the fitting
of the Smeaton, were her large main hatch, for the conveniency of loading and discharging; her winch-machine
was pretty powerful, exerting a force in the ratio of about 20 to 1, independently of the purchase-tackle; her cargo
was also carried upon a temporary platform laid in the hold.
Fig. 6. is a perspective view of the smith’s forge, which was partly fixed with batts upon the Rock; and also of the
Foundation-pit, with a number of figures pumping water from the excavated site of the Light-house. The pumps
for this purpose were laid in an inclined direction, made of a square form, and very simple in their construction;
the pump-spear with its leathern valve, being worked by the artificers, who laid hold of a rope attached to the end
of it. In the back ground of this diagram, the Floating-light is seen as if through the haze of the atmosphere.
Fig. 7. represents an Attending-boat, occasionally used during the summer months for visiting the Rock, and
relieving the light-keepers. a a is a section of the principal boat, measuring 22 feet in length of keel, and equipped
in her rigging after the manner technically termed Lateen-sails, which were originally introduced into use on the
Firth of Forth by Mr Thomas Bruce of Grangemuir. These sails are considered more safe than the common lug-
sail, from their greatest breadth being carried very low on the mast. But the chief peculiarity of this boat is the
launch or “two-half boat” of Mr James Bruce, which she carries, for more conveniently communicating with the
Rock, as alluded to at page 412, and further described in Thomson’s Annals of Philosophy, vol. viii. p. 58. In this
diagram b is the two-half boat, stowed the one-half within the other, between the main and fore masts, c c the two
halves about to be joined and used as one boat, d d the stern view of these boats in a separated state, e e the chatter
and catch-bolt for connecting the boats together, after the manner of a ship’s rudder, f f f f the bolt holes, by which
the upper parts of the boats are connected and held together.

Page 549

Plate XII.
WORK-YARD, LIGHT-KEEPER’s HOUSES, SEA-WALL AT ARBROATH, AND SEAMEN’s
PROTECTION-MEDAL.

PLAN of the HARBOUR and part of the TOWN of ABERBROTHOCK
PLANS & ELEVATION of the LIGHT KEEPERS HOUSES & SIGNAL
TOWER
Drawn by D. Logan

Engd. by W. H. Lizars

PLATE XII.

Page 550

Work-Yard.—The left-hand side of this Plate is
Pl. XII. occupied with a plan of the harbour of Arbroath,
shewing the relative positions of the Bell Rock work-
yard and light-keepers’ houses.
Light-Keepers’ Houses.—The other side of the Plate is occupied with a
plan and elevation of the light-keepers’ houses; but as the apartments are
respectively marked, it seems unnecessary to enter farther into particulars,
than to notice that each family has three rooms, with other conveniencies.
Connected with this establishment, there is also a signal-room at the top of
the tower, represented in the elevation, where a five-feet achromatic
telescope is placed upon a stand. On the roof a flag-staff is erected, and here
the signals made by the light-keepers at the Rock are watched and repeated.
On the opposite side of the small court formed by these buildings, there is a
range of houses for stores, and accommodation for the seamen belonging to
the Bell Rock Tender. The whole occupies a piece of ground extending to
about one-third of an acre. While the works were in progress, the large
telescope was placed at one of the attic-room windows of Provost Balfour’s
house, which commands a view of the Rock, as may be observed from the
Plate.
Sea-Wall.—The diagram laid down on the left of the light-keeper’s
houses, represents a section of the wall erected for the protection of the
property against the encroachment of the sea. It extends to about 100 feet,
and consists of a face-wall of stone from Mylnefield quarry, backed with
Arbroath stone, and a granite pavement along its seaward base.
Protection Medal.—The diagram in the central part of this Plate represents
the obverse and reverse of the seamen’s protection medal, described at page
209.

Page 551

Plate XIII.
PLANS OF THE SEVERAL COURSES OF THE MASONRY
OF THE LIGHT-HOUSE.

Page 552

Page 553

PLANS of the COURSES of the MASONRY of the BELL ROCK
LIGHT HOUSE

Page 554

Drawn by D. Logan.

Engd. by W. H. Lizars

PLATE XIII.
Pl. XIII. As the ground or imperfect course of the building could
not be ascertained till towards the second year’s work,
when the site of the Light-house was excavated, this course is represented
in Plate XV.
Fig. 1. Plate XIII., is the first entire course, which measures 42 feet in
diameter. The dove-tailed method of connecting the solid part of the Light-
house here delineated, extends to the height of the entrance-door, as will be
further understood by examining the section in Plate XVI. The outward
stones of this course are of a lighter shade, being intended to represent the
granite blocks, while the central part of a darker shade, represents the
sandstone. The thirteen small square or cubical stones in the Plan of this
course, shew the upper sides of the joggles, sunk half into the one course,
and penetrating half into the superincumbent one, acting as so many steady-
pins, calculated to guard against any force tending to affect the fabric
horizontally. By tracing the bounding-lines of the stones, from the centre to
the circumference, it will be observed, that the whole are connected by
means of a system of attachments technically termed Dove-tailing, by
which the stones may be said to hook laterally into one another, forming a
vertical bond of connection; but it is on the gravity of the materials that the
chief dependence is placed for the stability of the fabric. The small circular
dots, of which there are four in the centre-stone, and two in each of the
others, shew the position of the oaken trenails, measuring 1¾ inch in
diameter, and varying in length from 16 to 26 inches, so as to pass through
the upper or last laid course, and penetrate 6 inches into the course
immediately below. Besides these circular holes, others of an oblong form
were cut in the joints, as will also be observed from the Figure. These last
were for the reception of wooden wedges, driven in pairs perpendicularly
into the joints of the stones, with a view to bring the dove-tailed parts to a
uniform bearing, before the joints were grouted with mortar; the bond
throughout the building being carefully preserved, by placing the
perpendicular joints over the middle of the stones immediately below, being
what is technically termed “Breaking-band,”—a system universally
attended to in good masonry.

Page 555

Fig. 2. represents the upper side of the 27th course, or first of the Stair-case,
which measures 6 feet 4 inches in diameter within walls, and 19 feet 8
inches over walls. This course is elevated 32 feet 8 inches above the Rock
at the foundation of the first stone, as will be seen in the section of Plate
XVI. Here the granite casing is discontinued, and sandstone only is in
future used. It will be observed, that the same system of dove-tailing is
attended to in the stair-case as in the solid: this unavoidably occasioned the
working of the stones into very awkward forms, and required the utmost
precaution in landing them on the Rock with safety.
The parts of this course which are not shaded, shew the plan of the
entrance-door, passage, and circular void of the stair, crossed by the
radiating lines of the steps, as also the form of some of the stones of the top
of the solid. a a represent the base of a column of cast-iron, which renders
the drop-hole for the machinery continuous from the floor of the oil-store
down to the level of the passage, and so through the centre of the solid, as
shewn in the section Plate XVI.; b is a small stove placed in the stair-case; c
is the position of the Inner door, of brass, as shewn in Fig. 2. Plate XIX., the
upper part of which is glazed with plate-glass, to preserve the light of the
stair-case; d is the position of the entrance-door, which is fashioned
agreeably to the circular form of the building, and is strongly bound with
the brass-hinges, as also shewn in Figs. 1. and 2. of Plate XIX.
Fig. 3. is the 39th course of the building, and first of the provision-store,
and is 45 feet 11 inches above the foundation. This apartment measures 11
feet 9 inches in diameter within walls, and 18 feet over walls. From the
floor to the roof the height is 8 feet 7 inches. Here the dove-tailed system,
excepting at the end joints, and in the centre stones of the floors, was laid
aside. At this level another system of connecting the courses was adopted,
by means of a zone or belt, which was raised or worked upon the upper bed
of the stones, and fitted to a corresponding groove in the course laid
immediately above, as may be seen by tracing the diagrams representing the
habitable parts of the house. This zone or belt, together with the horizontal
plan of the floors, form the chief distinctive differences between the
Designs of the Edystone and Bell Rock.
Fig. 3. The parts in this Figure which are not shaded represent the two
windows of this apartment with the landing at the top of the stone stair-case.
a a represent the storm-shutters, which will be more fully seen in Plate

Page 556

XIX. b b are the outer glazed windows; c c the inner glazed windows; d the
open trap-ladder, with its brass hand-rail, leading to the light-room-store; e
e the cast-iron coal magazine; f f f f the water-cisterns, of cast-iron, lined
with a mixture of pitch and sand, and containing each 150 gallons; g g g g
the four cast-iron magazines, for containing the provision casks, and
various implements; h h the machinery, placed on a level with the top of the
water-cisterns, for raising the stores from the entrance-door of the building
to the Light-house; i i is the hole perforated through the wall for the passage
of the chain for lifting the stores, the operation of which will be better
understood by examining Plate XVI.; k the cast-iron stage upon which the
light-keepers stand when they work the machinery for taking up the stores; l
l the cast-iron steps leading to the stage k.
Fig. 4. is a plan of the floor of the light-room store, being the 48th course,
which is 55 feet 10 inches above the foundation. This apartment, within
walls, measures 11 feet 10 inches, over walls 16 feet 10 inches, and its
height is 8 feet 7 inches. The shaded part of the floor marked a a a a a a a,
represents the copper oil-cisterns, coated with tin, calculated to contain one
whole year’s stock of oil, or about 1100 gallons. This apartment being
chiefly occupied with these cisterns, there is only one window in it; b is the
trap-ladder, and shews also the manhole, measuring 3 feet in its greatest
length and 2 feet in breadth; c the store-room door; d d the position of the
oaken pannelled partitions, which separate and inclose the store-room from
the stair.
Fig. 5. being the kitchen floor, forms the 57th course, which is elevated 65
feet 8 inches above the foundation. This apartment measures 11 feet 11
inches in diameter, over all 16 feet, and its walls are 8 feet 9 inches in
height. This room, in the position of its windows, manhole, and trap-ladder,
is similar to what has already been described in reference to Figs. 3. and 4.
In Fig. 5, a is the door leading to the apartment below; b the door leading to
the trap-ladder of the apartment above; c c the oaken partitions, formed into
lockers, which shut off the stair from the apartment; d is the cast-iron
kitchen range or fire-place, which stands free and unconnected with the
walls, forming a connected piece of pannelled work, extending from the
floor to the ceiling; e is a strong cast-iron fender, and also a receptacle for
the ashes; f f copper coal-boxes, formed into seats, on each side of the fire-
place; g the cook’s table and locker; h the handle of the pump, by which

Page 557

water is raised from the provision-store or the second floor below; i i other
lockers, also formed into seats.
Fig. 6. is the bed-room floor, or 66th course of the building, and is elevated
75 feet 8 inches above the foundation; it measures 11 feet 11½ inches in
diameter, and over all 15 feet 6 inches; the walls are 9 feet in height. The
windows, manhole, trap-ladder, doors, and oaken partition are similar to
what have already been described in the floors below; a shews the position
of the aperture for the cast-iron funnel leading from the kitchen-chimney
through the several apartments to the cupola of the Light-house; b b the
bed-frames, forming two bed-places in breadth, which are three tiers in
height, reaching from the floor to the roof, and capable of accommodating
six persons; c c lockers on each side of the beds, for the use of the four
light-keepers.
Fig. 7. the next in order is the floor of the Strangers’-room or Library, being
the 75th course of the building, which is 85 feet 11 inches above the
foundation. The diameter of this floor is 12 feet, it measures 15 feet over
walls, and the height of the roof, at the centre, is 11 feet 1 inch. The walls,
windows, and other particulars of this apartment are nearly similar to those
formerly described; a is the cast-iron funnel leading from the kitchen-
chimney; b b the oaken framed book-case; c the tube through which the
machinery-rope is conducted by the side of the walls of the several
apartments, to the ceiling of the Provision-store.
Fig. 8. is the Light-room floor, or 86th course of the building, which is
elevated 97 feet 9 inches above the foundation; within walls the floor
measures 11 feet in diameter, over walls 13 feet 6 inches. The stones of the
floor of this apartment, as will be observed, extend from the centre stone to
the circumference of the balcony, varying from 7 feet to 7 feet 6 inches in
length. The parapet-wall of the light-room, as will be seen from the Plate,
has its outward face of an octagon form, but is worked circular within. In
the several courses of the parapet, the principle of the zone or belt in the
beds of the stones is still continued, and also the dove-tail of the end joints.
The Light-room measures from the floor to the top of the stone work, or
sole of the glazed sash-frames, 6 feet. a is the circular aperture for the cast-
iron smoke-tube leading from the kitchen-chimney; b b is the manhole of
this floor, having its landing towards the centre of the apartment, instead of
being close to the wall, as in the several floors below. To have formed the

Page 558

length-way of the man-hole of this floor along the wall, would have
occasioned the cutting of the stones in the dome-roof of the Library, in a
manner hurtful to the strength of the building, which was conveniently
avoided by introducing a platt in the ladder, instead of ascending more
directly as by the trap-ladders of the floors below; c c is the case of the
revolving-machinery, which gives motion to the Lights; d d is the drum or
barrel, with its connecting wheels, on which the rope is coiled, from which
the weight is suspended; e the position of the upright shaft for supporting
the chandelier on which the reflectors are ranged, which is put in motion by
its connecting train of machinery. The dotted lines marked f f shew the
direction of the grooves cut in the floor for the horizontal shafts, which
derive their motion from the machinery, and work the hammers of the two
alarm-bells placed on the balcony; g g the bell-hammers with their cases; h
h the bells, weighing each 5 cwt., which are tolled during the continuance
of foggy or snowy weather; i i, &c. are the screwed batts of brass, forming
the fixtures of the balcony-rail; k the Light-room door communicating with
the balcony, which measures in the clear 5 feet in height, and 1 foot 10
inches in breadth.
Fig. 9. is a plan of the Lantern, showing the position of the trimming-path,
and reflector-frame. The height from the foundation to the sill of the sash-
frame is 102 feet 6 inches, and from thence to the lining of the cupola 13
feet four inches. a is the smoke-tube leading from the kitchen to the cupola;
b b b b the cast-iron grated trimming-path, on which the light-keepers stand
when they trim the lamps; c c the reflector-frame or chandelier, on which
three tiers of reflectors are ranged; d the upright shaft; f f, &c. the position
of the fountains for the reflector-burners, g g the position of the shades of
red-coloured glass, by which the light is distinguished; h the iron trap-
ladder communicating with the trimming-path.

Page 559

Plate XIV.
MOVEABLE BEAM CRANE.

MOVEABLE BEAM CRANE &c.
Drawn by A. Slight

Page 560

Engd. by A. Wilson

PLATE XIV.
Pl. XIV. Fig. 1. is an Elevation of the Crane. In cranes of the
common construction, the beam is a fixture, and is
placed at right angles to the upright-shaft; but in the machine represented in
this Plate, its attachment is at the lower extremity of the crane, where it is
moveable up and down upon a journal or bolt. This crane is therefore
termed a Moveable-beam-crane. The moveable property of the beam, in so
far as the writer knows, is new, and possesses the advantage of laying any
stone within its range perpendicularly on its site. This, from the dove-tailed
form of the stones at the Bell Rock, rendered it essentially useful to this
work, to which a crane of the ordinary construction could hardly be said to
be applicable. At the Edystone Light-house this operation was performed by
means of Triangular-sheers; but, from the greater extent of the Bell Rock
works, and their greater depth in the water, such means must have rendered
the process of building extremely tedious.
In reference to this Figure, a a a is the upright shaft of the crane; b b the
cast-iron foot into which the lower journal of the shaft was stepped; c the
cap into which the upper journal works, and into which two of the hooks d
d of the four guy-ropes x x x x were entered, for commanding the top of the
upright-shaft. From the immersed state of these cranes, while the building
was low in the water, a guard-plate was introduced, and bolted to the cap,
which laid hold of a collar raised round the journal, to prevent the cap from
being unshipped by the waves; e e is the moveable beam, formed and built
of two strong pieces of oak timber, connected in the centre by a serpentine
row of bolts. This beam was mounted at the upper and lower extremities
with strong cast-iron plates; f marks the cast-iron sheers or cheeks, fixed to
the bottom of the upright shaft, into which the moveable beam works upon
the journal or bolt g.
In order to direct the strain of the main purchase-chain h h h h h h passing
over the cheek pulley i fixed upon the shaft, and to prevent its effect from
bringing home the moveable beam e e to the upright shaft, a martingale or
tail-block l is introduced and made fast to the shaft at m. When the
purchase-chain is not in action, the block l is suspended from the small
chain at n, which prevents it from falling too low, and thereby deranging the

Page 561

position of the purchase-chain. That the beam may be made applicable to
laying the stone marked k, at the foot of the crane, or at the utmost reach of
the beam, a chain or purchase marked o o o, is introduced, which also
passes over a cheek-pulley i on the opposite side of the shaft. By this
additional apparatus the beam is capable of being elevated or depressed at
pleasure. The handle marked p p, with its pinion and connecting wheel q q,
and larger wheel r r, together with its intermediate pinion, form the main
purchase, and exert a force calculated at the rate of about 98 to 1. When a
smaller weight was to be lifted, and greater speed wanted, the handle was
transferred to the axle s, whose pinion being always in gear with the wheel r
r, produced an accelerated motion, with a power in the ratio of 20 to 1; at
the same time, the handle t t, with its pinion in action with the wheel u u,
worked the beam e e, so as to lay a stone perpendicularly with the greatest
facility within any part of its range.
Fig. 2. is the cast-iron tripod, used as a prop to the moveable beam, when
applied as a lever, for lifting the crane; a a a mark the foot, b the cross head,
having a stud which works into a circular hole perforated in the top of the
tripod. By this simple apparatus, the crane could be moved and shifted
either perpendicularly or horizontally, with a facility which added greatly to
the conveniency of the operations. When the tripod was applied to use, it
was placed under the heel-plate of the moveable beam marked v, and when
rested upon it, the beam became a lever of great power.
Fig. 3. is an Elevation of the Working-gear of the Moveable Beam-Crane. a
a a is the upright-shaft, as in Fig. 2.; b b the cast-iron foot; c the cap with its
guard-plate; d d guy-hooks for commanding the top of the shaft; f f the
edges of the sheers or cheeks, for the heel of the moveable beam; g the bolt
or journal on which the beam is moveable; h h the purchase-chain; i i the
cheek pulleys; o o the moveable beam-chain; p p the two main purchase-
handles; q q the smaller wheel of the main purchase; r the greater wheel,
with the intermediate pinion w, connected with the axle s of the wheel q q.
The handles and pinion t t are connected with the wheel u u, for working
the moveable beam-purchase; x is the drum or barrel for the main purchase-
chain; y the barrel of the purchase-chain of the moveable beam.
Fig. 4. is a Section, shewing the connection of the purchases for working
the beam, and lifting the weight: the axle s, of the lesser wheel q, with its
intermediate pinion x of the main-purchase, work through the eye or centre

Page 562

of the wheel u u, and barrel y of the beam-purchase. x and r refer to the
corresponding letters in Fig. 3.
Fig. 5. is an Elevation of the Winch-machine. The machines, used for the
various purposes of landing the materials and raising them to the top of the
building, were framed or made of cast and malleable iron. a a a a are the
cheek plates or frames in which the axles of the machinery work. Those
employed upon the Rock were fixed down by means of spear-bolts, to four
bats, as shewn at b b; but in other situations they were fixed by straps of
iron to beams of timber. The cheeks a a a a were connected by means of
three strong bolts passing through hollow tubes, which butted against the
inner sides of the cheeks and kept them in their places. The large wheel
marked c c measures 3 feet 3 inches in diameter, and the smaller wheel d d
is 2 feet 6 inches: these, with their respective pinions, of 6 inches in
diameter, exerted powers respectively of 20 to 1, and 98 to 1, being of a size
similar to the cranes; as one set of wheel and pinion patterns were made to
answer the several machines employed at the work. Letter e is one of the
handles connected with its axle and pinions, which, at pleasure, is made to
work with a double or single purchase, by simply slipping the axle out and
into gear with the larger and smaller wheels.
Fig. 6. is a Plan of the Winch-machine. a a a a is the sole of the frame,
shewing the bat-holes for fixing it down; c is the large, and d the small
wheel, with its axle; e e the handles, with their axle and pinions f f f; letter g
is the barrel attached to the axle of the large wheel, with part of the
purchase-chain; h h is the axle of the small wheel and intermediate pinion;
and i i one of the hollow pipes through which the bolts pass for connecting
the two cheeks or frame of the machine together.
Fig. 7. refers to a machine fixed to the walls of the Provision-store, for
raising the stores from the railways to the entrance-door, as pointed out in
Plate XVI. a a a a a section of part of the walls of the Provision-store, in
which a hole x x is perforated, and lined with a copper tube, for the passage
of the purchase-chain; b is the pulley, with its case, over which it works; c c
c is the frame of the machine; and d the handle, with its bevelled pinion.
The distinctive feature of this apparatus is the vertical motion of the barrel,
by which it receives and discharges the chain always at the same point; the
direction also of the chain may thus be altered almost close to the barrel,
which in this case was the chief desideratum. To effect this purpose, the

Page 563

barrel is made to move vertically upon the axle f, by means of a screw y,
upon its lower end, which works into a corresponding screw-rack g; in its
operation, the wheel h h is worked by the cylindrical upright-pinion of
brass, marked i. The two pairs of bevelled wheels, supported upon the small
intermediate frame l, are introduced, for applying a double or single
purchase, according to the load to be raised.

Page 564

Plate XV.
FOUNDATION-PIT, OR EXCAVATED SITE OF THE
LIGHT-HOUSE.

Page 565

FOUNDATION PIT OF THE LIGHTHOUSE.

Page 566

Drawn by J. Slight.

Engd. by W. H. Lizars

PLATE XV.
Pl. XV. Fig. 1. is a Plan of the site of the Light-house, and of
the ground or imperfect course, in readiness for
receiving the first entire course of the building, represented in Plate XIII.
Fig. 1. The dark shaded figures delineated upon the Plan in Plate XV.
represent the stones of the ground-course, consisting of 18 detached pieces,
which vary in their forms according to certain irregular holes in the Rock.
From the same cause, the stones of this imperfect course vary in thickness
from 6 to 18 inches. The situation of the Foundation-stone will be seen from
its having the year of our Lord 1808 cut upon it, as noticed at page 237. The
four exterior stones, which are cut somewhat of a dove-tail form, are of a
lighter shade being granite, while the 14 interior pieces, being of sandstone,
are of a darker shade. The dark shading on the northern side of the Plan
represents merely the shadow of the higher parts of the Rock round the
excavated site of the Light-house.
Fig. 2. is a Section of the Foundation-pit, upon the line A B, varying in
depth from 18 inches to 5 feet, representing also the dip or inclination of the
strata; while the dotted lines above show the form of the lower part of the
Light-house.

Page 567

Plate XVI.
ELEVATION AND SECTION OF THE LIGHT-HOUSE.

Page 568

ELEVATION and SECTION of the BELL ROCK LIGHT HOUSE.

Page 569

Drawn by D. Logan

Engd. by W. H. Lizars

PLATE XVI.
Plate XVI. Fig. 1. is an Elevation of the Light-house, with the
brazen-ladder leading up to the entrance-door. Part of
the Rock and railways are seen, on which several figures are at work,
landing stones from a boat, as at low-water of spring-tides. The small
aperture bored through the outward wall between the door and the window
of the Light-room-store, is for the passage of the chain for raising the stores,
as described in Fig. 7. Plate XIV. The two leaves of the entrance-door are
shewn folded back upon the walls. The first window above the door seen in
this view of the building, is that of the Light-room store; the second is one
of the bed-room windows; and the third is in the Library; immediately over
this are the cornice and balcony-rail, through which last is seen the Light-
room door, with the alarm bells on each side. Through the glazed sashes,
the reflectors are seen arranged upon the chandelier, connected with the
revolving apparatus. On a level with the lower part of the cupola is the
signal-ball. On the ensign-staff a flag is hoisted, with a light-house in the
field, used as a complimentary signal in the service of the Northern Light-
houses.
Fig. 2. is a Section of the Light-house, shewing parts of the Rock and
ground-course. a a show part of the railways; b the brazen ladder leading to
the entrance-door, which is marked c. In the central part of the solid of the
building is shewn the cylindrical drop-hole d d, which passes through the
centre-stones of each course, and forms part of the range of the machinery-
weight. On each side of the drop-hole, throughout the solid, and walls of the
stair-case, are seen the stone-joggles e e, &c. as they occur in the several
courses, and were noticed in the description of Plate XIII. Figs. 1. and 2. At
the entrance-door a figure is represented receiving stores into the house.
Immediately behind him, one of the leaves of the inner door, of brass,
appears folded back into its recess in the wall, the upper part being glazed
with plate-glass, for the admission of light to the stair-case. In continuation
of the range of the machinery-weight above alluded to, and extending
between the solid and the ceiling of the provision-store, a column of cast-
iron, marked x x, passes up through the well-hole of the stair. The provision
store, with which the stone stair communicates, is formed by a scarsement

Page 570

of the walls at the level of letter f, on which the water-cisterns, lockers for
provisions, and coal magazine, are ranged. Over these a stage or platform of
cast iron is erected, on which a figure is seen at work at the machinery for
raising the stores from the railways to the entrance-door of the house. The
purchase-chain of this machine passes over the pully at g, as described in
Plate XIV. Fig. 7.
The next apartment in ascending the oaken trap-ladders leading through the
several apartment, is the Light-room-store, marked h, occupied chiefly with
7 copper oil-cisterns, which are strengthened with polished brass bars
forming the front into pannels. This, and the several apartments above are
partitioned off from the stair with a pannelled framing of oak. The kitchen i,
over the store-room, is chiefly occupied with the fire-place, (though not
seen in this section), which, with its cast-iron pipe or chimney ascending
through the different rooms to the cupola, stand free, or are not embedded
in the walls of the house. On the right-hand side of the kitchen a figure is
seen at the cook’s table and lockers; and on the left are seen the oaken trap-
ladder set close to the wall, and the lockers, by which it is partitioned off
from the apartments. A similar arrangement takes place in the bed-room
marked h, occupied chiefly with the oaken bed frames, described in Fig. 6.
Plate XIII. The apartment marked l is the Strangers’-room or Library, which
contains a small collection of books. The furniture is of oak timber,
executed in Mr Trotter of Edinburgh’s best style. The walls were painted by
Mr Macdonald of Arbroath, in handsomely decorated pannel-work; and
from the dome an antique bronze lamp is suspended. The upper apartment
m forms the Light-room and Lantern, rendered fire-proof, as every thing is
of stone or metal, excepting a small oaken table and chair for the use of the
light-keeper on watch; accented m´ is the copper-ball, shown as hoisted for
the signal “All is Well.” The reflecting apparatus and revolving machinery
with which the Light-room is occupied, will fall to be described under Plate
XX.

Page 571

Plate XVII.
BALANCE-CRANE.

Page 572

BALANCE-CRANE.
Drawn by J. Slight
Engd. by A. Wilson

PLATE XVII.
Pl. XVII. Fig. 1. is an elevation of the Balance-Crane, constructed
for building the upper part of the Bell Rock Light-
house, when the guy-ropes of the Moveable Beam-crane, became “too
taunt,” as sailors express it, or were too near the perpendicular, thereby
rendering the machine unstable. To remedy this, the crane alluded to was
kept in equilibrium by a back-weight of cast-iron, so adapted as to
counteract the varying load upon the working arm or beam. The elevation
here represented is the same in principle with that used at the Bell Rock, but
differs somewhat in form, agreeably to more recent improvements made in
order to adapt it to the erection of the Carr Rock Beacon. a a is the cast-iron
foot or socket, into which the upright central column b b is stepped, being a
tube of cast-iron put together in convenient lengths, with flush joints, after
the manner of spiggot and faucet, fitted by turning and boring. The centre
column of this machine might have been carried to any suitable or
convenient height, by adding length to length, as the building advanced,
without once moving the foot; but at the Bell Rock, not more than three
lengths of from 6 to 9 feet were generally in use. c c represent a malleable
iron cross-head, which was stepped into the void of the central shaft or
column, when the body of the crane was to be elevated. This operation was
accomplished simply by hooking the main-purchase and traveller-chains
into the eyes c c, when the machinery of the crane was employed with great
facility as a locomotive power for lifting itself; d is a stone supposed to be
suspended in the purchase-chain; and e is the back-weight or counterpoise,
which, at pleasure, was moved horizontally along the balance-beam marked
f, consisting of two plates or bars of malleable iron; g is the working-beam,
of similar construction; h-h, h-h, h, h, are four of the eight main and
secondary suspending ties of malleable iron, applied from above, in order to
leave the lower part of the crane unobstructed. This afforded great
conveniencey particularly at the Carr Rock, and also at the erection of the
Melville Monument of Edinburgh, where the space for the workmen was
extremely circumscribed, the shaft of the column not being more than 10
feet 6 inches in diameter towards the top. The main ties h-h, h-h, at the

Page 573

lower extremity, were made fast by the same bolt which passes through the
pulleys f and g, while the upper ends were bolted into a collar, which is seen
clasping the central column at i i. This collar is fitted with four friction-
rollers, one of which is seen at k. l l shew two of the four principal rods or
bars of malleable iron for connecting the Crane, and answering the purpose
of a king-post to the ties h-h, h-h, of the frame-work; m m mark two of the
four braces forming a connection between the main ties and arms or beams
of the crane. The cheeks n n n, which contain the train or series of wheels of
the crane, are of cast-iron. In the formation of these cheeks they present as
little obstruction to the workmen as possible, while, at the same time, they
embrace the various journals or axles of the machinery. The upper part is
connected by a square framed collar of malleable iron, seen at Fig. 5. fitted
with friction rollers, and, like the collar above alluded to, works round the
central column. This lower collar is connected with the cheeks of the crane
by studs passing through them, and fixed by means of screw-nuts. The
lower part of the frame is in like manner connected with the upright shaft,
by a collar, which is moveable upon friction-balls of cast-iron, contained in
a circular race or chamber o o, a plan of which, shewing the balls, is given
at Fig. 3. The whole machine thus fitted, is supported upon the central shaft
by means of the cutter or spear-bolt p. The winch handle marked q, is that
with which the main-purchase chain r, passing over the pulley s, is worked,
from which the stone d is suspended. Connected with the main-purchase, a
wheel, marked w, of 30 inches diameter, is worked by a pinion of 5 inches,
mounted upon the axle of the handle q, producing a power or force in the
ratio of 18 to 1; this power may at pleasure be increased by throwing
another pinion on the same axle into gear with the wheel marked n´, of 16
inches diameter.
The handle u u is connected with the main-traveller s, balance-chain v v v,
and their traveller x, to which the back-weight e is appended. The main-
traveller wheel y measuring 36 inches in diameter, with its pinion of 5
inches marked u, exerting a power in the ratio of 21 to 1, serves to work the
main-traveller. On the same axle with the pinion u, is another pinion,
working two wheels, as seen in Fig. 4, which gives motion to the balance-
traveller. These two combinations of wheels are so arranged, that, by
working the small levers m and z, they can with facility be thrown in and
out of gear, so as to work the traveller either together or separately. The
whole weight of the Balance-crane, here represented as resting upon the

Page 574

oaken beams A A B, on one of the floors, weighed about three tons; but the
balance and working beams having latterly been made of malleable iron,
and the other parts of the machine considerably lightened, it did not exceed
more than two tons in weight when used at the Carr Rock.
Fig. 2. The cast-iron foot of the Crane is necessarily very ponderous, and
weighs about half a ton. The toes a a a a extend about 5 feet; b b b b are the
bat-holes for fixing it down, in case of its at any time getting off the
balance, but, in practice, these bats were seldom applied. When the crane
was supported over the void or central holes left in the floors during the
progress of the work, the toes were clasped to the oaken beams A A B,
formerly noticed, represented as resting on one of the upper floors of the
building, B, in Fig. 1., being a cross section of the lower beam, with its
levelling-block; c, the socket for the central column, or upright shaft, is 10
inches in diameter at the upper side, and diminishes to 9 inches, that the
column may become fixed into it by the pressure of the machine.
Fig. 3. o o, in reference to Fig. 1., represents the collar-chamber, filled with
cast iron friction-balls, upon which the body of the machine rested, and
traversed horizontally with the greatest facility.
Fig. 4. is a perpendicular section taken across the cheeks and wheels with a
view to shew the train of the machine more fully. a a is the foot; b b two
lengths of the central column, or hollow cylinder, with their spiggot and
faucet joint in the middle, shewing also that the metal is about an inch and a
quarter in thickness; c c the cross-head, referred to in Fig. 1.; i i the upper
collar, shewing its connection l l with the king-posts or main rods; n n the
cast-iron cheeks, with the lower collar, and the chamber for the friction-
balls; o the cutter or spear-bolt, which supports the whole machine; u u the
traveller handles, the main-purchase handles not being embraced in this
section; y y the wheels and pinion of the main traveller; accented y´ y´ the
wheel and pinion of the balance-traveller x x. In the central part of this
figure, the barrel or drum x of the traveller-chains is seen, and also the
middle collar x, with its friction rollers.
Fig. 5. is a plan of the body of the Crane, in reference to Fig. 1. b is a cross
section of the central column, seen in connection with the upper collar d d;
with a stone suspended from the end of the main-beam; e e the back weight
suspended from the balance-beam: f and g the extremities of these two

Page 575

beams; h´ h´ h´ h´ four horizontal braces, extending from the cast-iron
cheeks to the middle of the beam. Letters n n n n the cast-iron cheeks of the
body; q q the main purchase-handles; r the main-purchase chain; s its
traveller; t t the traveller-chain; u u the traveller handles; v the balance
traveller-chain; x its traveller; w w the main-purchase wheels; y y the
traveller wheels; z the lever, for stopping the main traveller-wheel.
Fig. 6. is a plan of the frame work of this machine: b is the upright column,
with the upper malleable iron-collar, shewing its connection with the king-
posts l l of Fig. 1.; f and g are the extremities of the main-purchase and
balance-beams; m´ m´ the horizontal rods connecting with the main-ties; h
h, &c. the main ties; h´ h´, &c. the horizontal braces; n n n n the cheeks or
frame of the wheels and machinery, with the two great bolts marked n´ n´,
by which the frame was principally connected; these bolts being passed also
through the interior ends of the balance and working beams.

Page 576

Plate XVIII.
GENERAL VIEW OF THE WORKS.

This Plate gives a Perspective view of the Works at the
Pl. XVIII.
Bell Rock, taken by Carse, at low-water of spring-tide,
from on board the Light-house Yacht, in the month of
July 1810, at the distance of about half a mile in a southern direction from
the Rock, and is here reduced from a picture in the possession of the writer.
In the fore-ground a boat is introduced, approaching the Rock with a party
of strangers, and another is leaving it, supposed to be receiving orders from
a figure on the Rock, who is pointing towards her. In the back-ground, the
shipping belonging to the work is introduced, viz. the Tender, a Schooner,
and the stone-vessels Smeaton and Patriot, with the Floating-light. In the
distance, the hills of Fife and Forfar are seen, but the entrance to the Firth of
Tay is intercepted by the beams of the Beacon-house. Between the Light-
house and Beacon, or in the direction of the chain and stone suspended
from the Wooden-bridge, the ruins of the Abbey of Aberbrothwick are seen.
The operation of landing the stones with the sheer-crane at Duff’s Wharf,
toward the right, is seen; and also one of the moveable beam-cranes, in a
working position, at Pitmilly Wharf, on the left.
The principal lines of the railways, with waggons, and a variety of
operations which are in progress, form a very busy scene upon the Rock.
On the praam-boat’s deck, toward the left of the picture, Captain Wilson,
the landing-master, is represented with a speaking-trumpet in his hand; and
at the foot of the Beacon-house, Mr Francis Watt, foreman mill-wright, is
supposed to be giving directions about some operations. On a level with the
entrance-door of the Light-house, the bridge of communication is situate,
and four blocks of stone are seen, in progress of being raised from the
railways to the top of the building, viz. one is suspended from the winch-
machine upon the bridge, another from the beam projecting out of the
window of the Light-room store, a third from the bed-room, and a fourth
from the Balance-crane, which last is about to be laid upon the parapet-wall
of the Light-room. Here the operations are going forward under the
direction of Mr Peter Logan, foreman builder. In the open gallery of the

Page 577

Beacon-house, Mr Dove, the foreman smith, is seen at work, with the
smoke of the respective fires of the forge and cook-room. The tackle,
distended in a diagonal direction, from the balcony of the Light-house, to
the mortar-gallery of the Beacon, shews the mode of raising the mortar-
buckets. The figure on the small scaffold suspended from the balcony,
shews the method of pointing the walls with Roman cement.

Page 578

Plate XIX.
ENTRANCE-DOOR, WINDOWS, HINGES, AND
THUNDER-ROD.

Page 579

Page 580

ENTRANCE DOOR, WINDOWS, HINGES and THUNDER ROD.
Drawn by J. Slight
Engraved by R. Scott

Page 581

PLATE XIX.
Pl. XIX. Fig. 1. represents part of the outward wall A A A A, and
entrance-door, one leaf or half of which is open, and the
other shut; a, one of the handles for opening and shutting it, connected with
a thumb-latch; b b the bolts for securing the door when shut; c c c c the
hinges; d d d d the brass guard-plates at top and bottom of the door, for
defending the timber. The door is framed of fir-wood, and measures 6 feet 4
inches in height in the clear, besides the brass-checks upon which it shuts at
top and bottom, which are of 2 inches in depth, as shewn at e in Fig. 1., and
also by an end view in Fig. 2. The two leaves form a common breadth of 2
feet 10 inches in the clear. A cornice of brass is formed on the lintel of the
door answerable to an eaves-drop, in which a friction roller h is placed, for
the chain of the crane, with which the stores are raised. The door, when
shut, finishes flush with the building, and is therefore of a circular form,
framed and double lined, the whole being put together with white-lead
paint: each leaf measures 5 inches in thickness at the hinge side, and
diminishes to 2½ inches at the meeting edges, as will be understood by
examining the section in Fig 3. When the leaves of the door are thrown
open, they are kept in their places by catch-hooks of brass, to prevent gusts
of wind from shutting them suddenly; f shews a moveable handle or piece
of brass rail, within the passage, for laying hold of in stepping off the
brazen ladder to enter the house; g shews the upper extremity or highest
step of the ladder, which terminates at the sill of the door.
Fig. 2. shews the relative position of the outer and inner entrance-doors, in
which a a a is an end view of the former; b b b b a front view of one of the
leaves of the inner brass door; e e the outer door check, faced with plates of
brass; f the moveable handle or rail, for the greater conveniency of entering
the threshold; g the termination and upper step of the brazen-ladder,
attached to the building, for communicating with the Rock. h, section of the
cornice and friction-roller. The passage being only 2 feet 10 inches in
breadth, the rails or moveable handles f, on each side, are made to slide into
brass sockets i i, sunk into the walls, and, like the inner door, are flush with
the wall when not at use. k k the sockets for the centre-pin hinge of the
inner-door.
Fig. 3. is a cross section of one of the leaves of the entrance-door, shewing
the position of the brass-case of the hinge-bat, as it lies in the building. A A

Page 582

part of the walls, B B part of the side-walls of passage, C C part of the
surface of the outward wall. a a a a is the brass-case, containing the Lewis-
bat-tails or palm of the hinge, (described in Plate XI. Fig. 3.); b b b b the
working-tails; c c the outside lining; d d the inside lining; e e e the frame-
work of the door, with the bolts and nails connecting the hinges; f the joint
of the hinge, shewing the journal pin-hole; g the half-check joint of the
door.
Fig. 4. represents a front view of the door-hinges, lettered in reference to
Fig. 3. a a a a is the brass box or case, which is built into the wall for
containing the palm-end of the Lewis-hinge; b b is the exterior or working
tail, with its screw bolt and nail holes; f f f the double-joint and slip-pin.
Fig. 5. is a cross section of the Lewis-box on the line A B of Fig. 4. with its
dove-tail feathers; a a a a shew the parts of the Lewis-bat b c d, as it lies in
the box, which is built into the wall.
Fig. 6. represents a longitudinal section of the box and palm of the hinge,
shewing its position, in reference to the cross section in Fig. 5. a a a a is the
brass box; b and d are the dove-tailed compartments of the palm; c is the
tongue or locking-piece; e the pin hole, perforated in the locking-piece, for
drawing the parts of the palm in the event of the joint wearing and requiring
to be renewed; f f is the slip pin-hole in the other two parts of the palm of
the Lewis. The weight of one of the entire hinges of the door, with its
Lewis-tail and brass-box was 56 lb., and consequently the four sets for the
door weighed about 2 cwt.
Fig. 7. shews the elevation of one of the windows of the Light-house, with
part of the exterior wall marked A A A A; one-half of one of the storm-
shutters, marked a a, is closed, and the other marked c c, is open; b is a bar
of brass, which folds across the window when the shutters are closed, and is
used as a stretcher, for preserving them in their places when opened. It will
be observed by comparing the close shutter a a with the open one c c, that
they are double or cross boarded; they are also fastened with hammered
copper nails; d is the clasp used as a handle, which also locks the shutter; e
e e e the ends of the dove-tailed hinges as they appear projecting through
the walls; f f f f the working-tails of the hinge, forming at the same time the
guard-plate of the shutters, as described in Fig. 1. Letter g, upon the open
shutter, shews one of the brackets connected with the stretching-bar b, for

Page 583

keeping them open, as will be better understood by examining the following
Figure.
Fig. 8. is a plan of one of the window-sills, and a section of one of the
storm-shutters, with part of the walls A A, shewing the position of the
Lewis-bat cases; a and c, the storm-shutters in an open state; b the
stretching-bar in its place, when the shutters are open; e e the exterior ends
of the Lewis-bats, with their cases é é é é, which are built into the wall, and,
together with the other parts of the hinge, weigh about 28 lb., or 1 cwt. for
each set, being one-half of the weight of the door-hinges; g g the brackets
connected with the stretching-bar; h h the check in the wall for receiving the
shutters; i i the stiles or framing of the outer-window, which opens in two
leaves; k k k the framing and case of the inner window, which slides up and
down in one sash; l l the balance-weight of the inner-window.
Fig. 9. is a perpendicular section of one of the windows, shewing the triple
mode of shutting them during stormy weather. A A a section of a part of the
walls. a a, the storm-shutter; h h the check in the building for its reception; i
i the frame of the outer-window; k k the inner-window; l the case into which
the inner-window drops when not in use.
Fig. 10. A A is a section of part of the thunder-rod and outward wall. a a
shew part of the zones or bond-belts, noticed in Plate VII. Fig. 7., and Plate
XVI. Fig. 2.; b b the brass-bats let into the wall, for attaching the thunder-
rod with the screws c c, which vary from 2 to 3½ feet apart; d d the thunder-
rod, made of the best gun-metal, and weighing at the rate of 7 lb. per lineal
foot in the range of the sea, or from the Rock to the entrance-door, and from
thence to the Light-room, at the rate of about 4 lb. per lineal foot; e is the
joint technically termed Half-checking, by which the pieces, of about 7 feet
in length, are connected by two screws at each joint, as shewn in the
section. This rod, which extends from the Light-room to the Railways,
forms an exterior Conductor, while another, which is not seen here, is
connected with the chimney, brazen ladder and railways, and completes the
interior conducting process.

Page 584

Plate XX.
BALCONY AND LIGHT-ROOM.

Page 585

Page 586

LIGHT-ROOM AND BALCONY.

Page 587

Drawn by W. Lorimer

Engd. by J. Moffat Edinr.

PLATE XX.
Pl. XX. Fig. 1. a a represent the Balcony or walk round the
exterior of the Light-room; b b, &c. the brass bats,
made in the form of the paw of an animal, are used for supporting the
balcony-rail; c c the two Alarm-Bells; d d the hammers by which they are
tolled, during the continuance of foggy or stormy weather; e e the case for
defending the levers which work the hammers; f f f the stone parapet-wall of
the Light-room, of an octagon form on the outside, and circular within; g g
g the cast-iron sill of the lantern; h h, &c. the angular cast-iron pillars or
mullions, formed by the junction of the contiguous parts of two of the sash-
frames; i i, &c. the smaller upright bars, forming the astragals or principal
divisions of the sash-frames; k k, &c. the grated cast-iron trimming-path; l
the smoke-tube, leading from the kitchen through the cupola or roof; m the
trap-ladder leading from the light-room-floor to the trimming-path; n n the
reflector frame or chandelier, on which are seen 8 of the reflectors marked o
o, &c. with their oil-fountains p p, &c. the whole being framed or built
upon the moveable upright-shaft q.
Fig. 2. is a section of the dome-roof of the library, the parapet-walls of the
light-room, the lantern and its cupola. a a is the balcony, shewing the
position of the Alarm-Bells, and cast-iron rail; which last is made in the
form of meshes, with a massive coping of brass; f f the parapet-wall of the
light-room; g g the cast-iron sill of the lantern; h h, &c. the angular pillars
or mullions; i i, &c. the astragals; k k the grated trimming-path; l l the
smoke-tube passing through the cupola; n n, &c. the reflector frame, on
which 20 reflectors, marked o o, &c. with their fountains p p, &c. are
ranged; q q the upright shaft upon which the reflector-frame is built, and
which is connected with the revolving-machinery; r r, &c. the copper
smoke-tubes from the respective reflectors; s s the cross-bars supporting the
upright shaft at t t; and u u a copper receiver for any accidental drop from
the upper or central ventilator marked v´ v´ v´, while the letters v v v v mark
the exterior line of the cupola; w w the external cornice of the lantern, used
as a gutter or eaves-drop, from which the rain-water is conducted off the
roof in small pipes to the parapet-wall of the Light-room; x x the handles
which the light-keepers lay hold of; and y y the exterior grated path on

Page 588

which they stand when cleaning the outside of the windows; z z z the steps
fixed to the parapet of the Light-room and lantern, by which they ascend to
the cupola; á á the copper-tube, used as a flag-staff; b´ the signal-ball,
hoisted daily at the Light-house, between the hours of 9 and 10 o’clock in
the morning, when “All is Well:” The ropes for raising this ball pass over
two pulleys fixed in the top of the flag-staff, and are let down through the
interior of it: c´ c´ part of the cornice of the building, shewing the mode of
connecting the horizontal and perpendicular joints of the Library-roof; d´ d
´, &c. shew the zone or bond-belt worked in the beds of the courses, as
mentioned in the description of Plate VII. Fig. 7., Plate XVI. Fig. 2., and
Plate XIX. Fig. 10.; e´ e´, &c. from the enlargement of the scale, shews
more distinctly than any of the other diagrams, the mode in which the
horizontal joggling of the joints of the Light-room and other floors of the
building is accomplished; f´ the door leading from the Light-room to the
balcony; g´ g´ g´ the case and machinery for causing the Reflecting-
apparatus to revolve, so as to distinguish this Light from others upon the
coast; h´ h´, &c. the connection-rods, with their various wheels of
communication, for changing the direction, and giving motion to the Bell-
hammers; i´ i´, &c. the brass tubes for supplying fresh air to the Light-
room; k´ the Time-piece, set upon brackets fixed in the wall, for regulating
the Revolving-machinery, and for the direction of the light-keepers in
changing the day and night watches; l´ a bracket of cast-iron attached to the
machinery-case, for supporting the foot on which the upright shaft works; m
´ the bevelled wheels connected with the interior machinery and upright
shaft, which can be thrown out and into gear at pleasure.
In describing the Reflecting-apparatus delineated in Fig. 3., we may notice,
that, agreeably to the laws of optics, almost inconceivable effects are
produced by the use of these specula, by which portions of a sphere are
illuminated, whose radii seem to be proportionate to the elevation of the
radiant point, and the particular state of the atmosphere. Taking these
conditions into view, the Revolving-light at the Bell Rock has been seen,
from an elevated position on the land, at the distance of about 35 miles.
According also to observations which have been made upon Sumburgh-
Head Light, in Shetland, which is elevated about 300 feet above the
medium level of the sea, it has been seen from a ship’s deck at the distance
of about 27 miles. Similar effects are also expected to be produced with
light refracted through glass-lenses. These, it is believed, are about to be

Page 589

made trial of in the Tour de Corduan, at the entrance of the Garonne, with
what are termed Polygonal Lenses, being one large lens, built or composed
of a number of small lenses, as suggested by Dr Brewster, in the Edinburgh
Encyclopædia, in the year 1811, under the article “Burning Glass.”
Fig. 3. a a a represents one of the reflectors, measuring 25 inches over the
lips, in a finished state, as now in use at the Bell Rock and Northern Light-
houses in general. They consist of a circular sheet of copper, measuring,
when flat, 26¼ inches in diameter; weighing 11½ lb. on an average; and
plated with silver in the proportion of 6 oz. to each pound avoirdupois of
copper. These plates are formed into the Parabolic curve by a very nice
process of hammering, and afterwards set into a bezil or ring of brass; b is
the lamp, being an Argand-burner, with a circular wick, of about three-
fourths of an inch in diameter. If the parabolic figure of the reflector could
be constructed and its form preserved with perfect accuracy, the magnitude
of the flame of the lamp employed for its illumination would be of less
importance. From certain experiments now in progress, the writer is in
expectation that considerable improvements may be introduced, in the
construction of reflectors, and that additional modes of distinguishing the
Light-houses on the coast will be obtained. c is a cylindrical fountain of
brass, which contains 24 oz. of oil, suitable for the consumpt of the lamp for
about 18 hours, or equal to its expenditure during the longest night in
Shetland. A great improvement upon the Burner-apparatus has lately been
introduced into the Northern Lights, by affording the light-keeper an
opportunity of cleaning the reflector without the obstruction of the burner:
the oil-pipe and fountain of the burner is connected with the rectangular
frame d, and moveable in a perpendicular direction upon the guide-rods e
and f, by which it can be let down and taken out of the reflector, by simply
turning the handle g, as will be more fully understood by examining Fig. 5.
In this way, the necessity of lifting the reflector, or deranging its focus, is
avoided. Although a properly trimmed lamp, especially upon the Argand
principle, does not emit smoke, yet the heat and effluvia arising from it, are
sufficient to oxydise or sully the upper part of the reflector: an aperture of
an elliptical form, measuring about 2 inches by 3 inches, is therefore cut in
the upper part of the reflector, to which the copper-tube h is attached. Letter
i, immediately behind the reflector, refers to a cross section of the main-bar
of the chandelier or frame on which the reflectors are ranged, each being

Page 590

made to rest upon three knobs of brass, one of which, as seen at k k, is
soldered upon the brass band l, that clasps the exterior of the reflector.
To distinguish the Bell Rock Light from others on the coast, as noticed at
page 401, it is made to revolve, and to exhibit periodically a bright light of
the natural appearance, alternating with a red coloured light. This last effect
is produced by means of shades of red glass, one of which, represented at m
m, is also set in a brass bezil, and made to slide horizontally upon two rods
marked n n, into corresponding sockets, fixed upon the reflector-frame at o,
so as to enable the light-keeper to trim the lamp without entirely removing
the red coloured shade. In the present aspect of the shade, the rods are
drawn out to their full extent; but when set for use, the shade is pushed in
till its bezil and that of the reflector are within half an inch of each other.
Fig. 4. is a section of the reflector a a, shewing the position of the burner b,
with the glass chimney accented b´ b´, and oil cup b, or receiver for any
drop that may fall from the lamp. The letters c, d, f, and g, in reference to
the corresponding letters in Fig. 3., shew the oil-fountain in its place when
the burner is in use.
Fig. 5. has reference to the apparatus for moving the burner up and down,
so as to admit freely of the reflector being cleaned. In the present position,
c, the fountain, is moved partly down; d d, &c. shows the rectangular frame
on which the burner is mounted; e e the elongated socket-guides; f the
rectangular guide-rod, connected with the sockets on which the perforated
check-handle g slides; accented c´ is a cross section of the oil-pipe, where it
joins the valve of the fountain.
Figs. 6, 7, and 8. These three diagrams represent a different mode of
withdrawing the burner from the reflector, for the conveniency of cleaning
it. In Figs. 3, 4, and 5., this is supposed to be done by a perpendicular
motion of the burner; but in Figs. 6, 7, and 8. it slides horizontally. Fig. 8. is
a horizontal section of the reflector a a a, and its apparatus, the letters in
which correspond with those of Figs. 3, 4, and 5. The advantages attending
this mode, are the rendering of the apparatus more steady, by its having two
points of support upon the bars i i and k k; while its motion is more direct.
The part of the reflector cut out for the admission of the burner in this case,
being that which is partly intercepted by it, little of the reflecting surface is

Page 591

thus lost; and this mode may therefore be considered an improvement upon
the perpendicular manner of lifting and lowering the burner.

Page 592

FRONTISPIECE.

This scene, which is intended to represent the Bell
Pl. XXI.
Rock after a storm at north-east, will hardly admit of
any adequate description, from the evanescence of the
form of the waves upon these occasions. It is, however, founded upon
observations made at the Light-house, between the years 1810 and 1822, or
during twelve successive winters. The great rise of the sea during a gale, as
delineated in the Vignette to the Narrative of the Edystone Light-house,
being so surprising, the writer was at much pains to ascertain the effect also
at the Bell Rock; and the maximum height of the sprays hitherto observed
has been about 105 feet, or as high as the central part of the Light-room
windows.
Mr Andrew Masson, an artist who in early life had been at sea, having
expressed a desire to reside in the Light-house for some time during winter,
that he might observe the waves in a storm, was readily furnished with an
opportunity. He went there in the month of December 1816, and remained
for six weeks and four days, when he produced various sketches of the
appearances which he witnessed; and Mr Macdonald, noticed at page 519,
made several outlines from actual observation, in the winter of 1820. All of
these were put into the hands of Mr Turner, Royal Academician; who gave
the very spirited drawing from which Mr Horsburgh, an artist of much
promise, has succeeded in producing the striking representation in the
Frontispiece. The writer has also the pleasure of acknowledging the
obligations he owes to Mr Williams, author of Views in Greece, for his
friendly advice and assistance.
It may here be remarked, as not a little surprising, that while the sea is
running nearly to the height represented in the Frontispiece, the entrance-
door of the Light-house, or at least one of its leaves, may nevertheless be
left open; and the portion of water which on these occasions makes its way
into the passage, is found to be very trifling. This is owing to the fortunate
position of the door; for, while the sprays on the eastern side fly with the
quickness of lightning to the top of the house, the waves separate below,
and are sent round the building with such force, that their collision upon the

Page 593

lee-side produces the wonderful appearance in the picture; where a downy
spray, white as snow, rises at some distance from the house, to the height of
20 or 30 feet above the medium surface of the sea, and comes in minute
particles upon those within the entrance-door, producing a sensation as if
dust were falling upon them.

Page 594

VIGNETTE OF SECOND TITLE-PAGE.

The night scene of the Bell Rock Light-house, in the
Pl. XXII.
Vignette of the Second Title-page, was drawn by Miss
Stevenson, from a sketch by the masterly hand of Mr
Skene of Rubislaw. To Miss Stevenson, also, as an amanuensis, the writer
takes this opportunity, with parental affection, of acknowledging his
obligation for almost the entire manuscript written to his diction. The reader
will be gratified to find, in connection with this Vignette, inserted at page
64., a fac-simile of the handwriting of Sir Walter Scott, Bart. in the
expressive and beautiful lines which he wrote in the Album kept at the
Light-house, as noticed at page 419.

Page 595

Plate XXIII.
DESIGN FOR A LIGHT-HOUSE, SUGGESTED UPON
VISITING THE WOLF ROCK SITUATE EIGHT MILES S. S.
W. FROM THE LAND’S-END.

Page 596

SKETCHES of a NEW DESIGN for a LIGHT HOUSE.
Drawn by G. C. Scott

Engd. by J. Moffat Edinr.

PLATE XXIII.

Page 597

In the range of aquatic buildings applicable to the
Pl. XXIII. purposes of a Light-house, which the writer has
examined, he was forcibly struck with the magnitude of
the Tour de Corduan, on the French coast. This magnificent edifice
measures about 145 feet in diameter at the base, and 150 feet in height. Its
cubical contents may perhaps be stated at the immense quantity of 339,432
feet; of which the basement alone forms about 200,000 feet. This building
has undergone considerable alterations since its completion in the year
1609, as appears from Belidor’s Architecture Hydraulique, tom. ii. At the
time of its alteration from a coal fire to an oil light with reflectors, the upper
parts in particular seem to have been greatly simplified, by the removal of
several of its exterior ornamental appendages.
The Edystone Light-house, owing to the smallness of the rock, as appears
from Mr Smeaton’s Narrative of this celebrated building, measures only 26
feet in diameter, at the level of the first entire course; but if there had been
space on the Rock for extending it equally on all sides, the ground-course,
according to the curve of the outward walls, and the position of the
foundation-stone, would have measured 32 feet in diameter. The height of
the cupola of the Edystone Light-house is 90 feet, and the cubical contents
of the masonry is about 13,147 feet. The Bell Rock Light-house, measures
42 feet in diameter at the base; its height, from the foundation to the cupola,
is 118 feet; and the cubical contents of the masonry, as appears from the
Table in Appendix, No. VI. is 28,530 feet.
Though the design represented in Plate XXIII., is more or less applicable to
several situations upon the coast, yet the writer, in making this Sketch, had
special reference to the Wolf Rock, which, as noticed at page 423, he visited
in the Orestes sloop of war, commanded by Captain Smith. The extreme
dimensions of the upper surface of this rock are about 115 feet, by 90 feet.
It is not liable to be covered by the ordinary rise of the tide, though little of
it appears above water in spring-tides. The Rock consists of grey porphyry,
and is extremely hard. Its outline is somewhat uniform, and the depth of
water in its vicinity is from 20 to 40 fathoms. The dangerous position of this
reef, in reference to the navigation of the British Channel, led to the
proposition of having a Light-house upon it many years since. The erection,
however, was ultimately made upon the Long-Ships Rocks, lying about one
mile off the Land’s-End.

Page 598

With the construction and dimensions, therefore, of the Light-houses above
alluded to in view, the design delineated in this Plate is given, as the result
of the writer’s knowledge and experience on subjects of this kind. Without,
however, entering into particulars as to the mode in which such an operation
should be conducted, he merely notices, in reference to the various curves
delineated in Figs. 1, 2, 3, and 4. as applicable to Light-houses upon sunken
rocks, that he prefers the curve of the diagram represented in Fig. 3., as the
outline of a building for a situation like the Wolf Rock.
Fig. 1. is formed by the supposed revolution of the cycloidal curve round
the axis of a building, whose base is 50 feet, and which, at the entrance-
door or top of the solid, measures 25 feet in diameter; the lines produced
beyond these dimensions, which would form the habitable part of the Light-
house, being tangents to the curves below. Between the base a b, and its
parallel c d, this Figure contains 29,635 cubic feet.
Fig. 2. is in like manner formed by the revolution of the logarithmic curve
round the axis of a building of similar dimensions at the base and top of the
solid with Fig. 1., and contains 31,867 cubic feet.
Fig. 3. is obtained by the revolution of a parabola round the axis of the
supposed building. The contents of the solid part, ascertained as in the two
former Figures, is 34,006 cubic feet, being 4,371 cubic feet more than that
of the cycloidal curve, and 2,139 cubic feet more than in the logarithmic
curve.
Fig. 4. is formed by the revolution of the hyperbola between the two
parallels a b, and c d, and contains 39,655 cubic feet, or 5,649 cubic feet
more than the parabola. But, from the divergent nature of this curve, it is
not applicable to the purposes of a Light-house tower, in its pure or simple
form.
Fig. 5. is the section of a design formed by the revolution of the parabola
round the axis of a building, as its asymptote, whose base a b, measures 56
feet in diameter, and parallel c d, at the top of the solid, is 36 feet; and
height to the entrance-door, 35 feet. The contents of this Figure between
these parallels is calculated at 45,000 cubic feet; but the whole of the
masonry of the design is estimated at 70,624 cubit feet. Its general features
may be stated as similar to those of the Edystone and Bell Rock Light-
houses, the parts being only enlarged and the parabolic instead of the

Page 599

logarithmic curve, adopted for its outline. In this design, the parabolic curve
is continued from the basement to the cope-stone of the Light-room,
exclusively of the projection for the cornice and balcony. The masonry is
intended to be 120 feet in height, estimating from the medium level of the
sea, of which the solid, or from the foundation to the entrance-door, forms
35 feet, the stair-case 25 feet; and the remaining 60 feet of its height is
occupied with six apartments, and the walls of the Light-room. In the stair-
case a recess is formed for containing the machinery, for raising the stores
to the height of the entrance-door; here a small hole, marked g g, is
perforated through the building, for the admission of the purchase-chain.
The thickness of the walls immediately above the solid, marked c c, is 12
feet; at the top of the stone staircase or level e f, they are 8 feet, and where
the walls are thinnest, as at h i, immediately under the cornice, they
measure 2 feet. k k represents a drop-hole formed in the courses of the stair-
case and solid, for the range of the weight of the machinery of a revolving
Light. The ascent to this building, as at the Bell Rock, is intended to be by
an exterior stair or ladder of brass, and the interior communication between
the several apartments by means of flights of circular oaken-steps.
Fig. 6. represents the first entire course of this design, drawn to a scale
double the size of the former Figure, and shows the manner in which the
courses are proposed to be built or connected with each other. In every
building of this kind, it is proper that two or more of the lower courses,
according to the situation and circumstances of the rock, should be sunk or
imbedded in it. Since the erection of the present Light-house on the
Edystone, the practice of dove-tailing and trenailing stones in water-
buildings has been occasionally followed; and there can be no doubt that in
some instances it is attended with advantage. But it is also true, that,
independently of the extra quantity of rock and workmanship required, the
stones are thereby greatly weakened, and rendered much more difficult to
be landed in safety in such situations, and that there is often more apparent
than real utility in cutting them agreeably to this system of building, as the
great bond of the fabric still resolves itself into the gravity of the materials.
It may likewise be noticed, that, unless in very peculiar circumstances, the
process of trenailing stones newly laid in mortar ought to be avoided, as it
becomes necessary to bore holes into the course immediately below, which
is apt to break the bond of the mortar by the tremulous motion of the jumper
or chisel and hammer.

Page 600

To avoid these disadvantages, and more effectually to preserve the square or
simplest form of the stones, it is proposed, in this new design, to adopt the
same mode throughout, that was followed with the courses of the void or
habitable part of the building at the Bell Rock, viz. to have zones or joggle-
belts worked on the upper beds, and corresponding grooves cut into the
under beds, of all the stones. In the plan represented in this Figure these
zones are intended to be 1 foot in breadth, and 1½ inch in depth or
thickness, forming the concentric rings, marked c c c c c c, which become
so many girths to the course, superseding the necessity both of the dove-
tailing system, and of the cubic joggles described in Plate XVI.
In tracing the general aspect of Fig. 6., it may be observed that the outer
circle of stones is more lightly shaded, being intended for granite, while the
hearting or interior part is of a darker shade, as descriptive of sandstone.
The whole course of the building here represented, is uniformly simple, and
when laid in its place, no mode of attachment can be conceived more
effectually to add to the strength and connection of the fabric than these
circular belts. Letter d refers to the recess worked in the outward wall of the
solid, measuring 2 feet in breadth and 1 foot in depth, for the reception of a
flight of brazen-steps for ascending to the entrance-door, instead of the
greater projection of the spiral-formed stair delineated in Plate VII., Fig. 6.,
or the uncertain means of communication by a rope-ladder. The recess
alluded to on the outward wall is worked with a small projection, which
gradually falls into the circle of the building, without presenting any abrupt
face to the waves. A stair of this description, upon a sloping wall, is
ascended with great ease.
Fig. 7. is a section of part of the solid of the building, of which a b is the
foundation course, and, in reference to Fig 6., letters c c, &c. correspond
with the zones or joggle-belts; d d, shew a section of part of the brazen-
ladder, answerable to the purposes of a stair, and a pair of skids, for
preventing the joints of the building from being injured in taking up stores
to the Light-house. This ladder may also be applied as a part of the thunder-
rod, as is the case at the Bell Rock.
Fig. 8. is a plan of an entire course of the void or habitable part of the Light-
house, showing one of the joggle-belts of the bed-joints. The form of joggle
for the end-joints here shewn is also simple, and suited for preserving the
strength of the materials more entire than the method of dove-tailing.

Page 601

Fig. 9. is a section of three courses of the void of the building, showing the
connection of the bed-joints.

FINIS.

P. Neill, Printer.

Page 602

DIRECTIONS TO THE BINDER.
The View of the Light-house in a Storm, to be placed as a Frontispiece, opposite the
General Title-page.
The Engraved Title-page, with the Vignette representing the Light-house during Night, to
be placed immediately after p. 64.
The General View of the Works, or Plate XVIII, to be placed immediately after p. 424.

Page 603

Transcriber's Note
The following printed corrigenda have been incorporated into the text:
CORRIGENDA.

Page 90, line 10. after matter insert rested
---- 414, marginal note, for April read August
---- 516, line 38. — one of the —— the two

The following further apparent errors have been corrected:

p. vi "Inchkeith Light-hoouse" changed to "Inchkeith Light-house"
p. vi "Corsewall Light-houuse" changed to "Corsewall Light-house"
p. vii "92–74" changed to "72–74"
p. vii "93–81" changed to "75–81"
p. viii "is passed" changed to "is passed."
p. ix "137–130" changed to "127–130"
p. x "a Life-boats" changed to "a Life-boat"
p. xii "hree" changed to "three"
p. xii "562–277" changed to "272–277"
p. xiv "Tinber" changed to "Timber"
p. xvii "Mr Forest" changed to "Mr Forrest"
p. xix "Instructions" changed to "Instructions."
p. xix "VI Schedules" changed to "VI. Schedules"
p. xix "wth Sections" changed to "with Sections"
p. 5 (sidenote) "1736" changed to "1786"
p. 10 "E," changed to "E.,"
p. 10 "SE," changed to "SE.,"
p. 20 (sidenote) "Sanday." changed to "Sanday"
p. 26 "From the" changed to "“From the"
p. 28 "uinformity" changed to "uniformity"
p. 29 "nonoticed" changed to "noticed"
p. 44 "Turnberry Point." changed to "Turnberry Point,"
p. 50 "Langnees" changed to "Langness"
p. 53 "Masters’ Names" changed to "Masters’ Names."
p. 55 "Plate II,;" changed to "Plate II.;"
p. 56 "Puzzolano" changed to "Pozzolano"
p. 67 "sea-cost" changed to "sea-coast"
p. 74 "them," changed to "then,"
p. 79 "Bell Rock;" changed to "Bell Rock,"
p. 79 (sidenote) "Dee." changed to "Dee"
p. 81 "southernside" changed to "southern side"
p. 100 (sidenote) "Loan" changed to "Loan."

Page 604

p. 105 (sidenote) "reading" changed to "reading."
p. 116 (sidenote) "7th August" changed to "7th August."
p. 133 "duty," changed to "duty."
p. 142 (sidenote) "Monday, 31st" changed to "Monday, 31st."
p. 159 "artifieers" changed to "artificers"
p. 172 "Plate XII" changed to "Plate VIII"
p. 194 "Plate XIII" changed to "Plate XIII."
p. 196 "Plate XII." changed to "Plate IX."
p. 206 "Bell Rock," changed to "Bell Rock."
p. 213 "the a species" changed to "a species"
p. 225 (sidenote) "12th" changed to "12th."
p. 238 (sidenote) "13th" changed to "13th."
p. 238 (sidenote) "the Rock" changed to "the Rock."
p. 239 "circumtances" changed to "circumstances"
p. 247 "applyed" changed to "applied"
p. 250 (sidenote) "pram boats" changed to "praam-boats"
p. 254 (sidenote) "a a small" changed to "a small"
p. 259 (sidenote) "February," changed to "February."
p. 267 "lowt hey" changed to "low they"
p. 272 "windlas" changed to "windlass"
p. 282 "obliged slip" changed to "obliged to slip"
p. 282 (sidenote) "to day" changed to "to-day"
p. 288 (sidenote) "Mortar makers" changed to "Mortar-makers"
p. 292 "hyp num" changed to "hypnum"
p. 293 "opportuty" changed to "opportunity"
p. 296 "tthe Rock" changed to "the Rock"
p. 303 (sidenote) "5th" changed to "5th."
p. 305 (sidenote) "Beacon" changed to "Beacon."
p. 308 "with rain," changed to "with rain."
p. 311 "a. m" changed to "a. m."
p. 329 (sidenote) "Beacon" changed to "Beacon."
p. 329 "bridge, which which" changed to "bridge, which"
p. 331 "measuer" changed to "measure"
p. 334 "cr e" changed to "crew"
p. 334 "ballass" changed to "ballast"
p. 335 (sidenote) "Thirty-fifth" changed to "Thirty-first"
p. 335 (sidenote) "Beacon" changed to "Beacon."
p. 340 "provided" changed to "provided."
p. 343 "Thirtieth" changed to "Fortieth"
p. 343 "balance-crane" changed to "balance-crane."
p. 348 "petticoat-trowers" changed to "petticoat-trowsers"
p. 363 "3rd" changed to "3rd."
p. 364 "respresented" changed to "represented"
p. 373 (sidenote) "20th." changed to "19th."
p. 373 (sidenote) "21st." changed to "20th."
p. 374 (sidenote) "3d." changed to "23d."
p. 374 (sidenote) "2d." changed to "24th."
p. 376 (sidenote) "27th." changed to "26th."
p. 376 (sidenote) "26th." changed to "27th."
p. 383 (sidenote) "Station" changed to "Station."

Page 605

p. 383 "29.90." changed to "29.90"
p. 386 "&c" changed to "&c."
p. 389 (sidenote) "landed" changed to "landed."
p. 410 (sidenote) "house" changed to "house."
p. 411 (sidenote) "Rock" changed to "Rock."
p. 412 "propritey" changed to "propriety"
p. 418 "premisses" changed to "premises"
p. 422 "seeiug" changed to "seeing"
p. 428 "prosions" changed to "provisions"
p. 433 "eef, Bin Llb." changed to "Beef, in Lib."
p. 433 "Galls" changed to "Galls."
p. 433 "Butter in Lib." changed to "Butter, in Lib."
p. 433 ",Beer in Qts." changed to "Beer, in Qts."
p. 434 "Articers" changed to "Artificers"
p. 434 "89.225" changed to "892.25"
p. 435 "Syevenson" changed to "Stevenson"
p. 440 "Cssist" changed to "Assist"
p. 443 "of a a" changed to "of a"
p. 449 "foretel" changed to "foretell"
p. 459 "cubit" changed to "cubic"
p. 471 "7 4" changed to "7.4"
p. 496 "Forest’s Passage." changed to "Forrest’s Passage."
p. 501 "Plate XXIII" changed to "Plate XXIII."
p. 503 "faint lines" changed to "faint lines."
p. 505 "Plate XVII" changed to "Plate XVII."
p. 523 "Fig.1." changed to "Fig. 1."
p. 523 "in this way" changed to "In this way"
p. 527 "lense" changed to "lens"
p. 533 "Plate VII" changed to "Plate VII."
(plate) "PLATE II" changed to "PLATE II."
(plate) "PLATE XII" changed to "PLATE XII."
(plate) "PLATE XVI" changed to "PLATE XVI."
(plate) "PLATE XXI." changed to "PLATE XXIII."

The following additional changes have been made from the printed text:

Plates I to XXI have been moved next to their descriptions.
Duplicate sidenotes have been removed.
Totals carried forward at the end of each page of the Account of Expence have
been removed.
Large tables have been split and reformatted with keys and altered punctuation, in
order to fit smaller displays.
Spacing of sums of money has been regularised in the form L. 61,331:9:2.

The text contains many Scottish and archaic words and spellings, as well as inconsistent
capitalisation and punctuation, which have otherwise been retained. Apostrophes are not
consistently used in possessive plurals.
Compass directions are inconsistently presented in the forms SW. and S.W.; S. SW. and
S.SW.
References to diagrams are given in the forms á and a´.

Page 606

The colours mentioned in the description of plate III. on p. 490 are not apparent.
The following possible errors have been left as printed:

p. 239 "35 persons"
p. 334 "with it mortar"
p. 339 "Thirty-eighth"
p. 346 "slump sum"
p. 353 "alwise"
p. 457 "begin to the"
p. 500 "plat"
p. 519 "several apartment"

The name of the engraver of Plate I was not intact in the copy of text transcribed.
In addition to variant spellings in quotations, the following are used inconsistently in the
text:

adrift and a-drift
ahead and a-head
aisler and aislar
alongside and along-side
Belider and Belidor
blacksmith and black-smith
brushwood and brush-wood
bucky and buckie
Burlington Bay and Burlington-Bay
cast iron and cast-iron
coalfish and coal-fish
coboose and co-boose
cofferdam and coffer-dam
conveniencey and conveniency
Copinsha and Copinsay
coxswain and coxwain
creeking and creaking
daylight and day-light
dovetail and dove-tail
forepeak and fore-peak
freestone and free-stone
halfpenny and half-penny
hawsehole and hawse-hole
Island Glass and Island-Glass
Kinghornness and Kinghorn-ness
Kinnaird Head and Kinnaird-Head
landmark and land-mark
lengthway and length-way
Lewis bat, Lewis batt, Lewis-bat and Lewis-batt
lighthouse and light-house
lightkeeper and light-keeper
lightroom and light-room
manhole and man-hole
millwright and mill-wright

Page 607

Milnfield and Mylnefield
Mull of Kantire and Mull of Kintyre
oatmeal and oat-meal
overboard and over-board
praam boat, praam-boat and Praam-boat
railway and rail-way
Redhead and Red-head
relaid and re-laid
roadway and road-way
Rubislaw, Rubieslaw and Rubeslaw
Scottish and Scotish
shackle and shakle
shipboard and ship-board
shipmaster and ship-master
shipowner and ship-owner
shipwreck and ship-wreck
skylight and sky-light
staircase and stair-case
Start Point and Start-Point
storehouse and store-house
tie chain and tie-chain
torchlight and torch-light
topmast and top-mast
torchlight and torch-light
Traill and Trail
United Kingdom, United kingdom, and united kingdom
vice versa and vice versâ
workshop and work-shop
workyard and work-yard

Page 608

*** END OF THE PROJECT GUTENBERG EBOOK AN ACCOUNT OF
THE BELL ROCK LIGHT-HOUSE ***

Updated editions will replace the previous one—the old editions will
be renamed.

Creating the works from print editions not protected by U.S. copyright
law means that no one owns a United States copyright in these works,
so the Foundation (and you!) can copy and distribute it in the United
States without permission and without paying copyright royalties.
Special rules, set forth in the General Terms of Use part of this license,
apply to copying and distributing Project Gutenberg™ electronic
works to protect the PROJECT GUTENBERG™ concept and
trademark. Project Gutenberg is a registered trademark, and may not
be used if you charge for an eBook, except by following the terms of
the trademark license, including paying royalties for use of the Project
Gutenberg trademark. If you do not charge anything for copies of this
eBook, complying with the trademark license is very easy. You may
use this eBook for nearly any purpose such as creation of derivative
works, reports, performances and research. Project Gutenberg eBooks
may be modified and printed and given away—you may do practically
ANYTHING in the United States with eBooks not protected by U.S.
copyright law. Redistribution is subject to the trademark license,
especially commercial redistribution.

START: FULL LICENSE

Page 609

THE FULL PROJECT GUTENBERG™ LICENSE
PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg™ mission of promoting the free
distribution of electronic works, by using or distributing this work (or
any other work associated in any way with the phrase “Project
Gutenberg”), you agree to comply with all the terms of the Full Project
Gutenberg License available with this file or online at
www.gutenberg.org/license.

Section 1. General Terms of Use and Redistributing
Project Gutenberg electronic works

1.A. By reading or using any part of this Project Gutenberg electronic
work, you indicate that you have read, understand, agree to and accept
all the terms of this license and intellectual property
(trademark/copyright) agreement. If you do not agree to abide by all
the terms of this agreement, you must cease using and return or destroy
all copies of Project Gutenberg electronic works in your possession. If
you paid a fee for obtaining a copy of or access to a Project Gutenberg
electronic work and you do not agree to be bound by the terms of this
agreement, you may obtain a refund from the person or entity to whom
you paid the fee as set forth in paragraph 1.E.8.

1.B. “Project Gutenberg” is a registered trademark. It may only be
used on or associated in any way with an electronic work by people
who agree to be bound by the terms of this agreement. There are a few
things that you can do with most Project Gutenberg electronic works
even without complying with the full terms of this agreement. See
paragraph 1.C below. There are a lot of things you can do with Project
Gutenberg electronic works if you follow the terms of this agreement
and help preserve free future access to Project Gutenberg electronic
works. See paragraph 1.E below.

1.C. The Project Gutenberg Literary Archive Foundation (“the
Foundation” or PGLAF), owns a compilation copyright in the

Page 610

collection of Project Gutenberg electronic works. Nearly all the
individual works in the collection are in the public domain in the
United States. If an individual work is unprotected by copyright law in
the United States and you are located in the United States, we do not
claim a right to prevent you from copying, distributing, performing,
displaying or creating derivative works based on the work as long as
all references to Project Gutenberg are removed. Of course, we hope
that you will support the Project Gutenberg mission of promoting free
access to electronic works by freely sharing Project Gutenberg works
in compliance with the terms of this agreement for keeping the Project
Gutenberg name associated with the work. You can easily comply with
the terms of this agreement by keeping this work in the same format
with its attached full Project Gutenberg License when you share it
without charge with others.

1.D. The copyright laws of the place where you are located also govern
what you can do with this work. Copyright laws in most countries are
in a constant state of change. If you are outside the United States,
check the laws of your country in addition to the terms of this
agreement before downloading, copying, displaying, performing,
distributing or creating derivative works based on this work or any
other Project Gutenberg work. The Foundation makes no
representations concerning the copyright status of any work in any
country other than the United States.

1.E. Unless you have removed all references to Project Gutenberg:

1.E.1. The following sentence, with active links to, or other immediate
access to, the full Project Gutenberg License must appear prominently
whenever any copy of a Project Gutenberg work (any work on which
the phrase “Project Gutenberg” appears, or with which the phrase
“Project Gutenberg” is associated) is accessed, displayed, performed,
viewed, copied or distributed:

This eBook is for the use of anyone anywhere in the United States
and most other parts of the world at no cost and with almost no
restrictions whatsoever. You may copy it, give it away or re-use it
under the terms of the Project Gutenberg™ License included with

Page 611

this eBook or online at www.gutenberg.org. If you are not located
in the United States, you will have to check the laws of the
country where you are located before using this eBook.

1.E.2. If an individual Project Gutenberg electronic work is derived
from texts not protected by U.S. copyright law (does not contain a
notice indicating that it is posted with permission of the copyright
holder), the work can be copied and distributed to anyone in the United
States without paying any fees or charges. If you are redistributing or
providing access to a work with the phrase “Project Gutenberg”
associated with or appearing on the work, you must comply either with
the requirements of paragraphs 1.E.1 through 1.E.7 or obtain
permission for the use of the work and the Project Gutenberg
trademark as set forth in paragraphs 1.E.8 or 1.E.9.

1.E.3. If an individual Project Gutenberg electronic work is posted
with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any
additional terms imposed by the copyright holder. Additional terms
will be linked to the Project Gutenberg License for all works posted
with the permission of the copyright holder found at the beginning of
this work.

1.E.4. Do not unlink or detach or remove the full Project Gutenberg
License terms from this work, or any files containing a part of this
work or any other work associated with Project Gutenberg.

1.E.5. Do not copy, display, perform, distribute or redistribute this
electronic work, or any part of this electronic work, without
prominently displaying the sentence set forth in paragraph 1.E.1 with
active links or immediate access to the full terms of the Project
Gutenberg License.

1.E.6. You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form, including
any word processing or hypertext form. However, if you provide
access to or distribute copies of a Project Gutenberg work in a format
other than “Plain Vanilla ASCII” or other format used in the official

Page 612

version posted on the official Project Gutenberg website
(www.gutenberg.org), you must, at no additional cost, fee or expense
to the user, provide a copy, a means of exporting a copy, or a means of
obtaining a copy upon request, of the work in its original “Plain
Vanilla ASCII” or other form. Any alternate format must include the
full Project Gutenberg License as specified in paragraph 1.E.1.

1.E.7. Do not charge a fee for access to, viewing, displaying,
performing, copying or distributing any Project Gutenberg works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8. You may charge a reasonable fee for copies of or providing
access to or distributing Project Gutenberg electronic works provided
that:

• You pay a royalty fee of 20% of the gross profits you derive from the
use of Project Gutenberg works calculated using the method you
already use to calculate your applicable taxes. The fee is owed to the
owner of the Project Gutenberg trademark, but he has agreed to donate
royalties under this paragraph to the Project Gutenberg Literary
Archive Foundation. Royalty payments must be paid within 60 days
following each date on which you prepare (or are legally required to
prepare) your periodic tax returns. Royalty payments should be clearly
marked as such and sent to the Project Gutenberg Literary Archive
Foundation at the address specified in Section 4, “Information about
donations to the Project Gutenberg Literary Archive Foundation.”

• You provide a full refund of any money paid by a user who notifies
you in writing (or by e-mail) within 30 days of receipt that s/he does
not agree to the terms of the full Project Gutenberg™ License. You
must require such a user to return or destroy all copies of the works
possessed in a physical medium and discontinue all use of and all
access to other copies of Project Gutenberg™ works.

• You provide, in accordance with paragraph 1.F.3, a full refund of any
money paid for a work or a replacement copy, if a defect in the
electronic work is discovered and reported to you within 90 days of
receipt of the work.

Page 613

• You comply with all other terms of this agreement for free distribution
of Project Gutenberg™ works.

1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™
electronic work or group of works on different terms than are set forth
in this agreement, you must obtain permission in writing from the
Project Gutenberg Literary Archive Foundation, the manager of the
Project Gutenberg™ trademark. Contact the Foundation as set forth in
Section 3 below.

1.F.

1.F.1. Project Gutenberg volunteers and employees expend
considerable effort to identify, do copyright research on, transcribe and
proofread works not protected by U.S. copyright law in creating the
Project Gutenberg™ collection. Despite these efforts, Project
Gutenberg™ electronic works, and the medium on which they may be
stored, may contain “Defects,” such as, but not limited to, incomplete,
inaccurate or corrupt data, transcription errors, a copyright or other
intellectual property infringement, a defective or damaged disk or
other medium, a computer virus, or computer codes that damage or
cannot be read by your equipment.

1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES -
Except for the “Right of Replacement or Refund” described in
paragraph 1.F.3, the Project Gutenberg Literary Archive Foundation,
the owner of the Project Gutenberg™ trademark, and any other party
distributing a Project Gutenberg™ electronic work under this
agreement, disclaim all liability to you for damages, costs and
expenses, including legal fees. YOU AGREE THAT YOU HAVE NO
REMEDIES FOR NEGLIGENCE, STRICT LIABILITY, BREACH
OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE
FOUNDATION, THE TRADEMARK OWNER, AND ANY
DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES

Page 614

EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
DAMAGE.

1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you
discover a defect in this electronic work within 90 days of receiving it,
you can receive a refund of the money (if any) you paid for it by
sending a written explanation to the person you received the work
from. If you received the work on a physical medium, you must return
the medium with your written explanation. The person or entity that
provided you with the defective work may elect to provide a
replacement copy in lieu of a refund. If you received the work
electronically, the person or entity providing it to you may choose to
give you a second opportunity to receive the work electronically in lieu
of a refund. If the second copy is also defective, you may demand a
refund in writing without further opportunities to fix the problem.

1.F.4. Except for the limited right of replacement or refund set forth in
paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO
OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.

1.F.5. Some states do not allow disclaimers of certain implied
warranties or the exclusion or limitation of certain types of damages. If
any disclaimer or limitation set forth in this agreement violates the law
of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted by
the applicable state law. The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6. INDEMNITY - You agree to indemnify and hold the
Foundation, the trademark owner, any agent or employee of the
Foundation, anyone providing copies of Project Gutenberg™
electronic works in accordance with this agreement, and any
volunteers associated with the production, promotion and distribution
of Project Gutenberg™ electronic works, harmless from all liability,
costs and expenses, including legal fees, that arise directly or indirectly
from any of the following which you do or cause to occur: (a)

Page 615

distribution of this or any Project Gutenberg work, (b) alteration,
modification, or additions or deletions to any Project Gutenberg work,
and (c) any Defect you cause.

Section 2. Information about the Mission of Project
Gutenberg

Project Gutenberg is synonymous with the free distribution of
electronic works in formats readable by the widest variety of
computers including obsolete, old, middle-aged and new computers. It
exists because of the efforts of hundreds of volunteers and donations
from people in all walks of life.

Volunteers and financial support to provide volunteers with the
assistance they need are critical to reaching Project Gutenberg’s goals
and ensuring that the Project Gutenberg collection will remain freely
available for generations to come. In 2001, the Project Gutenberg
Literary Archive Foundation was created to provide a secure and
permanent future for Project Gutenberg and future generations. To
learn more about the Project Gutenberg Literary Archive Foundation
and how your efforts and donations can help, see Sections 3 and 4 and
the Foundation information page at www.gutenberg.org.

Section 3. Information about the Project Gutenberg
Literary Archive Foundation

The Project Gutenberg Literary Archive Foundation is a non-profit
501(c)(3) educational corporation organized under the laws of the state
of Mississippi and granted tax exempt status by the Internal Revenue
Service. The Foundation’s EIN or federal tax identification number is
64-6221541. Contributions to the Project Gutenberg Literary Archive
Foundation are tax deductible to the full extent permitted by U.S.
federal laws and your state’s laws.

The Foundation’s business office is located at 41 Watchung Plaza
#516, Montclair NJ 07042, USA, +1 (862) 621-9288. Email contact

Page 616

links and up to date contact information can be found at the
Foundation’s website and official page at www.gutenberg.org/contact

Section 4. Information about Donations to the Project
Gutenberg Literary Archive Foundation

Project Gutenberg™ depends upon and cannot survive without
widespread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can be
freely distributed in machine-readable form accessible by the widest
array of equipment including outdated equipment. Many small
donations ($1 to $5,000) are particularly important to maintaining tax
exempt status with the IRS.

The Foundation is committed to complying with the laws regulating
charities and charitable donations in all 50 states of the United States.
Compliance requirements are not uniform and it takes a considerable
effort, much paperwork and many fees to meet and keep up with these
requirements. We do not solicit donations in locations where we have
not received written confirmation of compliance. To SEND
DONATIONS or determine the status of compliance for any particular
state visit www.gutenberg.org/donate.

While we cannot and do not solicit contributions from states where we
have not met the solicitation requirements, we know of no prohibition
against accepting unsolicited donations from donors in such states who
approach us with offers to donate.

International donations are gratefully accepted, but we cannot make
any statements concerning tax treatment of donations received from
outside the United States. U.S. laws alone swamp our small staff.

Please check the Project Gutenberg web pages for current donation
methods and addresses. Donations are accepted in a number of other
ways including checks, online payments and credit card donations. To
donate, please visit: www.gutenberg.org/donate.

Page 617

Section 5. General Information About Project Gutenberg
electronic works

Professor Michael S. Hart was the originator of the Project Gutenberg
concept of a library of electronic works that could be freely shared
with anyone. For forty years, he produced and distributed Project
Gutenberg eBooks with only a loose network of volunteer support.

Project Gutenberg eBooks are often created from several printed
editions, all of which are confirmed as not protected by copyright in
the U.S. unless a copyright notice is included. Thus, we do not
necessarily keep eBooks in compliance with any particular paper
edition.

Most people start at our website which has the main PG search facility:
www.gutenberg.org.

This website includes information about Project Gutenberg, including
how to make donations to the Project Gutenberg Literary Archive
Foundation, how to help produce our new eBooks, and how to
subscribe to our email newsletter to hear about new eBooks.

Page 618

back

Page 619

back

Page 620

back

Page 621

back

Page 622

back

Page 623

back

Page 624

back

Page 625

back

Page 626

back

Page 627

back

Page 628

back

Page 629

Page 630

back

Page 631

back

Page 632

back

Page 633

back

Page 634

back

Page 635

back

Page 636

back

Page 637

back

Page 638

back

Page 639

back

Page 640

Page 641

back

Page 642

Page 643

back

Page 644

back

Page 645

Page 646

back

Page 647

back

Page 648

Page 649

back

Page 650

back

Page 651

back

Page 652

back

Page 653

Page 654

back

Page 655

Page 656

back

Page 657

back

Page 658

PDF language

简体中文 https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=zh Translating…
Español https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=es Translating…
Français https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=fr Translating…
Deutsch https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=de Translating…
日本語 https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=ja Translating…
한국어 https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=ko Translating…
Português https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=pt Translating…
Русский https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=ru Translating…
العربية https://pdftoflip.com/view.php?t=d12483b9e97cb9701cd77d4f383eb5b1&bl=ar Translating…