Steam-ships _ The story of their development to the present day R. A. Fletcher 2414 downloads.pdf

469 pages · Make another flipbook

Page 1

Page 2

Page 3

The Project Gutenberg eBook of Steam-ships
This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online at
www.gutenberg.org. If you are not located in the United States, you
will have to check the laws of the country where you are located
before using this eBook.

Title: Steam-ships
The story of their development to the present day

Author: R. A. Fletcher

Illustrator: Charles Dixon

Release date: January 31, 2024 [eBook #72847]

Language: English

Original publication: United Kingdom: Sidgwick & Jackson, Ltd.,
1910

Other information and formats: www.gutenberg.org/ebooks/72847

Credits: Peter Becker, Harry Lamé and the Online Distributed
Proofreading Team at https://www.pgdp.net (This file was
produced from images generously made available by The
Internet Archive)

*** START OF THE PROJECT GUTENBERG EBOOK STEAM-SHIPS
***

Page 4

Please see the Transcriber’s Notes at the
end of this text.

STEAM-SHIPS

UNIFORM WITH THIS VOLUME

AILING SHIPS:
THE S T O RY OF THEIR
DEVELOPMENT FROM THE
EARLIEST TIMES TO THE
P R E S E N T D AY
BY
E. KEBLE CHATTERTON

With a Coloured Frontispiece by
CHARLES DIXON
and over 130 Illustrations from Original Sources,
Photographs, Models, &c.

Page 5

Extra Royal 8vo, 384 pages, in Designed Cover,
Cloth Gilt, 16s. net

The “William Fawcett,” the First P. & O. Steam-ship, 209 Tons, Built
1829.
On the Left is a Bomb Ketch, a Type On the Right is H. M. S. “St.
withdrawn from the Navy about this Vincent,” 101 Guns.
Date.
From a Painting by Charles Dixon
By kind permission of the Peninsular & Oriental Steam Navigation Co.

Page 6

STEAM-SHIPS
THE STORY OF THEIR DEVELOPMENT
TO THE PRESENT DAY

BY

R. A. FLETCHER

WITH A HUNDRED AND
FIFTY ILLUSTRATIONS

LONDON
SIDGWICK & JACKSON, LTD.
3 ADAM STREET, ADELPHI, W.C.
1910

All rights reserved

Page 7

PREFACE
The story of the Steam-ship, and of its development up to the present
time, covers little more than a hundred years. In the companion volume,[1]
the evolution of the sailing ship necessitated a comprehensive survey of
some eight centuries; but that we need vessels, not only faster than the
sailing ship, but also more independent of the weather conditions, is shown
by the fact that in the world’s shipping tonnage of to-day (omitting small

Page 8

vessels) the proportion of steam to sail is as nine to one. The “seven seas”
must be crossed with speed and safety, in the interest of all nations that have
a mile of sea coast; but the Anglo-Saxon race, as it has contributed—from
either side of the Atlantic—most largely to the mechanical and structural
development of the steam-ship, now depends most vitally upon the
organisation of its naval and transportation systems. Napoleon said that the
strength of an army lay in its feet; no less true is it that the strength of our
Empire lies in her ships.
[1] “Sailing Ships and their Story,” by E. Keble Chatterton, 1909.

A hundred years ago it was impossible to forecast with any accuracy how
long a journey might take to accomplish, and the traveller by land or sea
was liable to “moving accidents by flood and field”; but side by side with
the growth of the steam-ship, and the accompanying increase of certainty in
the times of departure and arrival, came the introduction of the railway
system inland. Between the two, however, there is the fundamental
difference that the sea is a highway open to all, while the land must be
bought or hired of its owners; and the result of this was that inland
transportation, implying a huge initial outlay on railroad construction,
became the business of wealthy companies, whereas any man was free to
build a steamboat and ply it where he would. The shipowner, moreover, has
a further advantage in his freedom to choose his route, because he is at
liberty to “follow trade”; but if, as has happened before now, the traffic of a
town decreases, owing to a change in, or the disappearance of, its
manufactures, the railway that serves it becomes proportionately useless.
In another essential, the development of steam-transport on land and sea
provides a more striking contrast. The main features of George
Stephenson’s “Rocket” showed in 1830, in however crude a form as regards
detail and design, the leading principles of the modern locomotive engine
and boiler; but the history of the marine engine, as of the steam-ship which
it propels, has been one of radical change.
The earliest attempts were made, naturally enough, in the face of great
opposition. Every one will remember Stephenson’s famous retort, when it
was suggested to him that it would be awkward for his engine if a cow got
across the rails, that “it would be very awkward—for the cow”;—and at sea
it was the rule for a long while to regard steam merely as auxiliary to sails,
to be used in calms. While ships were still built of wood, and while the

Page 9

early engines consumed a great deal of fuel in proportion to the distance
covered, it was impossible to carry enough coal for long voyages, and a
large sail-area had still to be provided. Progress was thus retarded until, in
1843, the great engineer Brunel proved by the Great Britain that the day of
the wooden ship had passed; and the next ten years were marked by the
substitution of iron for wood in shipbuilding.
Thenceforward the story of the steam-ship progressed decade by decade.
Between 1855 and 1865 paddle-wheels gave place to screw propellers, and
the need for engines of a higher speed, which the adoption of the screw
brought about, distinguished the following decade as that in which the
“compound engine” was evolved. Put shortly, “compounding” means the
using of the waste steam from one cylinder to do further work in a second
cylinder. The extension of this system to “triple expansion,” whereby the
exhaust steam is utilised in a third cylinder, the introduction of twin screws,
and the substitution of steel for iron in hull-construction, were the chief
innovations between 1875 and 1885. The last fifteen years of the century
saw the tonnage of the world’s shipping doubled, and the main features of
mechanical progress during that period were another step to “quadruple
expansion” and the application of “forced draught,” which gives a greater
steam-pressure without a corresponding increase in the size of the boilers.
The first decade of the present century has been already devoted to the
development of the “turbine” engine.
I have to thank the Institute of Marine Engineers at Stratford, E., for
much valuable assistance and for placing its Transactions at my disposal; if
I have not acknowledged every item derived therefrom I trust that this
general acknowledgment will suffice. To Mr. J. Kennedy, author of “The
History of Steam Navigation”; Mr. A. J. Maginnis, author of “The Atlantic
Ferry”; and Captain James Williamson, author of “The Clyde Passenger
Steamer,” I am greatly indebted for their kind permission to draw freely
upon their books: and to the publishers of the two latter, Messrs. Whittaker
and Co. and Messrs. MacLehose and Sons respectively, for the loan of
illustrations. Special thanks are also due to Mr. E. A. Stevens of Hoboken,
New Jersey, U.S.A., not only for information concerning the experiments
made by Colonel Stevens with the screw propeller, but also for the loan of
some unique photographs of early American boats. Mr. A. J. Dudgeon,
M.I.N.A., M.I.C.E., son of the well-known Thames shipbuilder, has revised
a large amount of my work, and was good enough to place at my disposal

Page 10

his valuable scrap-books, from the pictures in which my friend Mr. Ernest
Coffin has drawn several charming line-illustrations and the initial letters to
the chapters. For various assistance I have to thank other friends and
correspondents: Mr. James A. Smith, M.I.N.A; Mr. Harry J. Palmer,
formerly of Shipping Illustrated, New York, and now assistant to Captain
Clark, Lloyd’s agent at New York; Mr. J. W. Little, of Messrs. Little and
Johnson; and Mr. James Gallagher of Paris for his researches at the
Academy of Sciences and elsewhere.
For permission to reproduce many illustrations of models, &c., in the
Science Museum at South Kensington, I am indebted to the Board of
Education; while for particular information I am glad to acknowledge the
especial courtesy of Messrs. Barclay, Curle and Co., Ltd., of Whiteinch,
Messrs. R. and W. Green, Ltd., Messrs. Swan, Hunter, and Wigham
Richardson, Ltd.; and, for revising the portion relating to Floating Docks
and supplying illustrations thereof, to Messrs. Clark and Standfield. To
many other famous shipbuilding firms who have supplied material or
illustrations thanks must also be tendered: Messrs. Harland and Wolff of
Belfast; Messrs. A. and J. Inglis of Glasgow; Messrs. Thornycroft and Co.,
Ltd.; the Carron Company; Messrs. Yarrow; Messrs. Eltringham and Co.,
Ltd.; Messrs. Smith’s Docks Co., Ltd.; Messrs. Palmer’s Shipbuilding and
Iron Co., Ltd.; Messrs. Armstrong, Whitworth and Co., Ltd.; the Parson’s
Marine Steam Turbine Co., Ltd.; the Thames Iron Works and Shipbuilding
Co., Ltd.; the Vulcan Shipbuilding Co. of Stettin; Messrs. W. Denny and
Brothers, Ltd., of Dumbarton; Messrs. Osbourne Graham and Co., Ltd.;
Messrs. William Gray and Co., Ltd.; Sir Raylton Dixon and Co. of
Middlesbrough; Messrs. W. Doxford and Sons of Sunderland; and the
Newport News Shipbuilding and Dry Dock Company, U.S.A.
To many shipowning firms I and my publishers are alike indebted for
information and the loan of illustrative material; the Peninsular and Oriental
Steam Navigation Co., Ltd.; The Cunard Company; the White Star Line; the
American Line; the Pacific Steam Navigation Company; the Orient Line;
Messrs. Shaw, Savill and Co., Ltd.; Lund’s Blue Anchor Line; the Royal
Mail Steam Packet Company; Messrs. Elder, Dempster and Co., Ltd.; the
General Steam Navigation Company; the Isle of Man Steam Packet
Company, Ltd.; the principal Railway Companies owning steam-ships; the
Anchor Line; the Allan Line; Messrs. Brocklebank and Co.; the Bibby Line;

Page 11

Messrs. George Thompson and Son’s Aberdeen Line; the North German
Lloyd, and the Hamburg-American Line.
Certain illustrations appear by arrangement with the editors of the
Magazine of Commerce, the Shipping World, the Syren and Shipping, the
Master, Mate, and Pilot (of New York), the Engineer, and the Shipbuilder.
The photograph of the Minas Geraes is reproduced by special permission of
his Excellency the Chief of the Brazilian Naval Commission.

R. A. Fletcher
June 1910

Page 12

CONTENTS
CHAP. PAGE
List of Illustrations xiii
I. Primitive Experiments in Propulsion — Some Early
Experiments with Steam 1
II. American Pioneers in Steam Navigation 19
III. The Progress of Steam-ship Building in Great Britain 56
IV. Railway Companies and their Steam-ships 102
V. Opening of the Transatlantic Service 122
VI. Development of the Transatlantic Service 149
VII. The Development of Steam Auxiliary — Ocean Routes 164
VIII. Experimental Iron Shipbuilding — The Great Britain 193
IX. Development of Iron Shipbuilding — The Great Eastern 228
X. The Building of Steel Ships — Modern Lines — Turbines 279
XI. Steam-power and the Navy — Other Navies 311
XII. Miscellaneous: Tugs — Cargo-boats — Floating Docks,
etc. — Eccentricities of Design 341
Bibliography 391
Index 395

Page 13

LIST OF ILLUSTRATIONS
PAGE
1. The William Fawcett, the first P. & O. Steam-ship;
with a Bomb Ketch and H.M.S. St. Vincent. [To face title-page
From a painting by Charles Dixon; by kind permission of the Peninsular and
Oriental Steam Navigation Co.
2. The Chancellor Livingston Headpiece to Preface
From a drawing by W. T. Loveday
3. Primitive Paddle-boats 3
From Robertus Valturius, De Re Militari, 1472
4. “Barque à Roues”: Primitive Chinese Paddle-boat 5
Sketched from a drawing
5. “Liburna” or Galley, worked by Oxen 7
From Morisotus, Orbis Maritimi Historia, 1643
6. Jonathan Hulls’ Paddle-steamer, 1737 To face 14
From the drawing in the Science Museum, South Kensington
7. The Marquis de Jouffroy’s Steamboat, 1783 To face 16
From a copy of a French print published in 1816
8. John Fitch’s Oared Paddle-boat, 1786 22
From a contemporary drawing
9. John Stevens’ Phœnix, 1807 To face 28
From a contemporary picture, by courtesy of E. A. Stevens, Esq., Hoboken,
N.J.
10. Robert Fulton’s Clermont, 1807 37
By courtesy of the Shipping World
11. The Paragon, built 1811 To face 40
By courtesy of the Master, Mate, and Pilot
12. The Philadelphia, built 1826 To face 44
From a contemporary picture, by courtesy of E. A. Stevens, Esq., Hoboken,
N.J.

Page 14

13. The De Witt Clinton, built 1828 To face 46
14. The William Cutting, built 1827 To face 48
By courtesy of the Master, Mate, and Pilot
15. The Mary Powell (Hudson River Day Line) 50
Sketched by E. Coffin from a photograph
16. The Hendrick Hudson (Hudson River Day Line),
1906 To face 50
Photograph by courtesy of the Hudson River Day Line
17. The Robert Fulton (Hudson River Day Line), 1909 To face 52
As the last
18. The William M. Mills To face 54
19. The City of Cleveland To face 54
Both by courtesy of the Shipping World
20. Patrick Miller’s Triple Boat the Edinburgh To face 56
From the engraving at South Kensington
21. Model of Miller’s Double Boat To face 58
From the original at South Kensington
22. The Charlotte Dundas: longitudinal section 60
From a drawing
23. Symington’s Original Engine of 1788 To face 60
Preserved at South Kensington
24. Model of the Charlotte Dundas To face 62
From the original at South Kensington
25. The Original Engines of the Comet To face 64
Preserved at South Kensington
26. The Comet, 1812 To face 66
27. The Industry, 1814 To face 68
Both by courtesy of the Institute of Marine Engineers, from the lecture by J.
H. Hulls, delivered Feb. 26, 1906
28. Plan and Lines of the Comet To face 70
29. The Engine of the Leven To face 70
Both by courtesy of Messrs. MacLehose and Sons and of the author, from
Captain Williamson’s “Clyde Passenger Steamers”
30. The Sea-Horse, about 1826 To face 72

Page 15

By courtesy of the Institute of Marine Engineers, from the lecture by J. H.
Hulls, delivered Feb. 26, 1906
31. The Monarch and Trident, convoying the Royal
George Yacht, with Queen Victoria and the
Prince Consort, to Edinburgh, August 1842 To face 80
32. The Trident, in which the Queen and Prince Consort
returned, Sept. 1842 To face 82
Both by courtesy of the General Steam Navigation Co.
33. The Carron To face 84
By courtesy of the Carron Co.
34. The Kingfisher To face 84
By kind permission of the General Steam Navigation Co.
35. The Fingal To face 86
By courtesy of the London and Edinburgh Shipping Co.
36. The Lady Wolseley To face 86
By courtesy of the British and Irish Steam Packet Co.
37. The Ben-my-Chree (I.), built 1845 To face 88
38. The Tynwald (I.), built 1846 To face 90
39. The Mona’s Isle (II.), built 1860, as a paddle steamer To face 92
40. The Ellan Vannin (the foregoing, altered to a screw
steamer and re-named, 1883) To face 94
The last four illustrations by courtesy of the Isle of Man Steam Packet Co.
41. The Majestic To face 96
From a photograph of a contemporary bill, by courtesy of J. W. Little, Esq.,
of Little and Johnston
42. The Lady Roberts To face 98
By courtesy of the British and Irish Steam Packet Co.
43. The Augusta, 1856 100
By courtesy of F. H. Powell and Co., Liverpool
44. The Turbine Steamer Marylebone (G.C. Railway) To face 104
45. The Cambria (L. & N.W. Railway) To face 104
46. The Turbine Steamer St. Patrick (G.W. Railway) To face 114
47. The R.M. Turbine Steamer Copenhagen (G.E.
Railway) To face 116
48. The Scotia (L. & N.W. Railway) To face 120

Page 16

The last five by courtesy of the respective companies
49. The Savannah To face 124
By kind permission of the Master, Mate, and Pilot
50. The Rising Star 130
Drawing by E. Coffin from a very rare picture
51. The Dieppe (L.B. & S.C. Railway) To face 134
By permission of the Company
52. The United Kingdom To face 134
By courtesy of Syren and Shipping
53. The Sirius, from a print of 1837 To face 140
54. The Great Western, from a print of 1837 To face 142
Preserved at South Kensington
55. The President 146
Drawn by E. Coffin from a contemporary picture
56. The British Queen To face 146
From an original oil-painting in the possession of the Author
57. The Britannia, 1840 To face 152
By courtesy of the Cunard Co.
58. The Atlantic 156
Drawn by E. Coffin from a contemporary picture
59. The Adriatic (Collins Line, 1857) To face 160
From “The Atlantic Ferry,” by A. J. Maginnis, by kind permission of the
publishers, Messrs. Whittaker and Co.
60. The Earl of Hardwicke 168
61. The Massachusetts 171
Both drawn by E. Coffin from contemporary pictures
62. The Hindostan, 1842 To face 178
63. H.M. Troopship Himalaya in Plymouth Sound To face 180
Both from prints kindly supplied by the Peninsular and Oriental Steam
Navigation Co.
64. H.M. Troopship Himalaya To face 182
By courtesy of the Thames Iron Works and Shipbuilding Co.
65. The Norman (Union-Castle Line, 1894) To face 184
By permission of the Engineer
66. Maudslay’s Oscillating Engine To face 200

Page 17

From the original at the Science Museum, South Kensington
67. Model of the Engines of the Leinster To face 204
From the original at South Kensington
68. The Pacific 205
Drawn by E. Coffin from a contemporary picture
69. Stevens’ 1804 Engine, showing Twin-screw Propellers To face 208
By courtesy of E. A. Stevens, Esq., Hoboken, N.J.
70. The Q.E.D. 211
Drawn by E. Coffin from a contemporary picture
71. The John Bowes, launched 1852 To face 214
72. The John Bowes, 1906 To face 214
By courtesy of Palmer’s Shipbuilding and Iron Co.
73. The Novelty, built 1839 To face 218
From the model at the Science Museum, South Kensington
74. The Great Britain To face 222
75. Engines of the Great Britain To face 224
From the models at South Kensington
76. The Sarah Sands, 1846 To face 230
77. The City of Glasgow (Inman Line, 1850) To face 236
78. The City of Rome (Inman Line, 1881) To face 242
The last three from “The Atlantic Ferry,” by kind permission of the
publishers, as above
79. The City of Chicago 244
Drawn from a contemporary print
80. The Persia and Scotia (Cunard, 1856 and 1862) To face 244
81. The China (Cunard, 1862) To face 246
82. The Russia (Cunard, 1867) To face 246
The last three from “The Atlantic Ferry,” by kind permission of the
publishers, as above
83. Model of the City of Paris, 1866 To face 248
From the original at South Kensington
84. The Oregon (Cunard and Guion Lines, 1883) To face 250
From “The Atlantic Ferry,” by kind permission of the publishers, as above
85. The America (National Line, 1884) To face 254
From “The Atlantic Ferry,” by kind permission of the publishers, as above

Page 18

86. The Delta leaving Marseilles for the opening of the
Suez Canal To face 260
From a photograph kindly supplied by the P. & O. Co.
87. The Thunder 265
Drawn by E. Coffin from a contemporary picture
88. Model of the Great Eastern To face 270
89. Longitudinal section of the Great Eastern To face 272
From the originals in the Science Museum, S. Kensington
90. Caricature of the Great Eastern To face 274
From a contemporary print
91. Model of the Paddle-engines of the Great Eastern To face 276
From the original at South Kensington
92. The Britannic (White Star Line, 1874) To face 280
By courtesy of the White Star Line
93. The Umbria and Etruria (Cunard) To face 280
By courtesy of the Cunard Co.
94. The Mauretania (Cunard, 1907) To face 282
By courtesy of the Cunard Co.
95. The Campania (Cunard, 1892) To face 282
From “The Atlantic Ferry,” by kind permission of the publishers, as above
96. The Teutonic and Majestic (White Star Line, 1889) To face 288
By courtesy of the White Star Line
97. The Olympic (White Star Line, 1910) To face 288
From the painting by Charles Dixon
98. The Olympic building, October 18, 1909 To face 290
By courtesy of the White Star Line
99. The St. Louis (American Line) To face 294
By courtesy of the American Line
100. The Morea (P. & O. Line) To face 294
By courtesy of the P. & O. Co.
101. The Assiniboine (Canadian Pacific Railway Co.) To face 300
By courtesy of the Canadian Pacific Railway Co.
102. The Kronprinzessin Cecilie (Norddeutscher Lloyd) To face 304
103. The Kaiser Wilhelm II. (Norddeutscher Lloyd) To face 304

Page 19

Photographs by G. West and Son
104. The Turbinia To face 308
Photographs by G. West and Son, and by courtesy of the Parsons Marine
Steam Turbine Co.
105. The Otaki (New Zealand Shipping Co.) To face 310
By courtesy of W. Denny and Sons
106. H.M.S. Waterwitch, armoured gunboat 321
Drawn by E. Coffin from a contemporary picture
107. H.M.S. Minotaur To face 326
By courtesy of the Thames Iron Works and Shipbuilding Co.
108. The Koenig Wilhelm, German Navy To face 328
109. The Baden, German Navy To face 328
110. H.M.S. Devastation To face 330
111. H.M.S. Thunderer To face 330
112. H.M.S. Dreadnought To face 332
113. H.M.S. Lightning, torpedo-boat To face 334
114. H.M.S. Tartar, torpedo-boat To face 334
115. H.M.S. Lord Nelson To face 336
116. H.M.S. Invincible, armoured cruiser To face 336
The last nine from photographs by G. West and Son
117. The Minas Geraes, Brazilian battleship To face 336
By special permission of the Brazilian Naval Commission, from a
photograph kindly supplied by Messrs. Armstrong, Whitworth and Co.
118. The Kearsarge, U.S. Navy To face 340
119. The San Francisco, U.S. Navy To face 340
Both from photographs by G. West and Son
120. The Monitoria To face 348
By courtesy of Messrs. Osbourne Graham and Co.
121. The Iroquois and Navahoe To face 348
By permission of the Syren and Shipping
122. The Monitoria, transverse section 350
By courtesy of Messrs. Osbourne Graham and Co.
123. The old Floating Dock at Rotherhithe, circa 1800 To face 354
By courtesy of Messrs. Clark and Standfield
124. Model of the Bermuda Dock To face 356

Page 20

From the original at South Kensington
125. Self-docking of the Bermuda Dock (well heeled) To face 358
126. Bermuda Dock: Centre Pontoon Self-docked To face 358
127. Bolted Sectional Dock lifting a Vessel To face 360
128. The Cartagena Dock To face 362
The last four by courtesy of Messrs. Clark and Standfield
129. The Baikal To face 362
By courtesy of the Magazine of Commerce
130. The Drottning Victoria To face 366
From a photograph by Frank and Sons, by courtesy of the Shipbuilder and
Messrs. Swan, Hunter, and Wigham Richardson
131. The Ermack To face 370
By courtesy of Sir W. G. Armstrong, Whitworth and Co.
132. The Earl Grey To face 370
By courtesy of the Magazine of Commerce
133. The Royal Yacht Victoria and Albert To face 372
134. The Imperial Yacht Hohenzollern To face 372
Photographs by G. West and Son

PLANS

135. The Evolution of Floating Docks, 1800-1910 389
By courtesy of Messrs. Clark and Standfield

Page 21

CHAPTER I
PRIMITIVE EXPERIMENTS IN PROPULSION—SOME EARLY
EXPERIMENTS WITH STEAM

pinions are divided as to whether the paddle-wheel is a
development from the action of a man paddling a canoe, or
the result of applying to a vessel an ordinary wheel, with
blades to make it bite the water; or it may be stated thus:
Did the paddle-blades grow out of the wheel, or the wheel
out of a number of paddle-blades? There is no satisfactory
evidence one way or the other; suffice it that the idea of
revolving paddles was developed.
How the power which caused the revolution of the paddles was applied at
first is as unknown as the identity of the man who first thought of making
navigation easier by mechanical means. It was probably human power, as
the first inventor can hardly have discovered how to utilise animals for the
purpose, and from what we know of primitive expedients we may
conjecture what the first contrivance used to urge a boat onwards without
sails or oars was like. The craft would be a small one. Perhaps the
proprietor was too poor to hire rowers. Perhaps, a subtle financier, he
realised that if he could bring his goods to a certain place before rival
shippers he would secure the market. Hence, stimulated by poverty or
cupidity or both, he reflected, experimented, and finally invented the
revolving paddle. But his apparatus was probably nothing more than a
smooth, straight branch or tree log, which projected over either side of the
boat and carried at each end paddles fixed radially. He probably used two or
four paddles, as it would be easier to attach them to the axle in pairs. The
radii of the paddles consisted of two poles tied at right angles about the
middle and there fastened to the axle ends, rough-hewn boards or strips of
bark being attached at the extremities of the poles to form the paddle-
blades. The axle was doubtless kept in place either by pins in the gunwales
placed before and after it, or by bringing two of the ribs on either side

Page 22

above the gunwale line and disposing the axle between them. In many
modern row-boats one or other of these plans is adopted for the
accommodation of the oars or sculls. This much being accomplished, it only
remained to apply the power. The inventor now passed a rope twice round
the middle of the axle, and tied the ends together. By hauling on it he got all
the power he was likely to require; to go astern he had merely to pull the
rope the other way. If more power was required more men tugged at the
rope.
When paddles were made larger to suit hulls of larger dimensions, it may
fairly be assumed that a winch turned by several men was used, and that the
power was transmitted to the axle of the paddle by means of an endless
rope. But soon it occurred to the shipowners that animals might be used to
produce the power instead of men. Horses or oxen were made to drive a
turntable or capstan, to work in a cage after the fashion of white mice in
their cylinders, or on a moving floor which imparted its motion to an axle
connected by an endless rope with the axle of the paddle. Such boats,
deriving their power from animals, were built by the Romans, were in use
in the early centuries of the Christian era, and were not unknown in the
nineteenth century in Britain and the United States.

Page 23

Primitive Paddle-boats.
From Valturius’ “De Re Militari,” 1472.

One of the earliest authentic records of a vessel fitted with paddle-wheels
is to be found in Robertus Valturius’ “De Re Militari,” published in 1472,
wherein are pictures[2] of two boats, one of which has five pairs of paddle-
wheels, and the other one pair. Modern engineers know by experience that
if two wheels be placed one behind another—and in the early days of steam
navigation several boats were equipped with two pairs of paddle-wheels—
the hinder wheels, having to work in disturbed and moving water, are
practically useless. But at the time of which Valturius writes the wheels
were so small, the number of revolutions were so few, and the propelling
power they exerted so slight, that no wheel was likely to have its efficiency
much interfered with by any number of wheels in front of it. The wheels
had four paddles each, and were revolved by cranks on their axles, the
cranks of the ten-wheeled boat being connected by a rope to give uniform
action.
[2] The designs have been attributed to Matteo de’ Pasti, who lived at the court of
Malatesta (d. 1464).

Page 24

In the Far East also, wheel-boats were in use long before steam-driven
paddle-wheels were invented. The Chinese certainly used them. In a paper
read at the Society of Arts in April 1858, Mr. John McGregor, a barrister,
who devoted considerable time to the study of early mechanical appliances,
stated that an old work on China contains a sketch of a vessel moved by
four paddle-wheels, and used perhaps in the seventh century. In certain
“Memoires” of the Jesuit Fathers at Peking, published at Paris in 1782,
there appears this quaint description of a “barque à roues”: “This vessel is
42 feet in length and 13 feet in width. The wheels are fixed in an empty
space about a foot high situate underneath the strip between the stout planks
a b. From the axle or centre of the wheels any number of spokes radiate
which act like teeth for the wheels. They enter the water to the depth of a
foot. A number of men make the wheels turn round. The length of the prow
from l to m is 8 feet. The length of the body of the vessel from n to o is 27
feet, and the length of the poop 7 feet. Heads of tigers are represented on
movable boards covered with leather, about 5 feet in height and 2 feet wide.
These boards shelter from the enemy the soldiers who are behind them.
They are removed when the crew decide on boarding the enemy’s vessel.”
The good Fathers in their “Memoires” add a recommendation to experts in
Paris to study the principle with a view to its adoption in French vessels,
and they point out that even if the extra speed attained were ever so slight it
might be sufficient to bring a vessel out of a dangerous situation. It may
well be doubted, however, whether the shipping experts in Paris at that date
profited by this humanitarian suggestion. Be this as it may, the passage
proves that the propulsion of vessels by revolving wheels was not a western
idea only.

Page 25

“Barque à Roues,” Primitive Chinese Paddle-boat.

Panciroli, writing in the sixteenth century, describes an extraordinary
boat of which he had seen a picture. His book is not illustrated; but we find
a representation of a liburna, or galley, which exactly corresponds to
Panciroli’s description,[3] in Morisotus’ (Claude Barthélemy Morisot)
“Orbis Maritimi ... generalis Historia,” published in 1643.
[3] “Vidi etiam effigiem Navium quarundam, quas Liburnas dicunt; quæ ab utroque
latere extrinsecus tres habebant rotas, aquam attingentes: quarum quælibet octo
constabat radiis, manus palmo e rota prominentibus: intrinsecus vero sex boves
machinam quandam circumagendo rotas illas incitabant: et radii aquam retrorsum
pellentes, Liburnam tanto impetu ad cursum propellebant, ut nulla triremis ei posset
resistere.”—Guido Panciroli: Rerum memorabilium, libri ii. Ambergæ, 1599.

The vessel, an Illyrian galley, had six wheels propelled by as many oxen.
The curious picture suggests an unwieldy, top-heavy concern which could
only be of use in still water, and would probably be safest in shallow water,
so that if anything happened the oxen and men could walk ashore without
trouble. The cattle apparently occupy most of the space, an immense bird’s

Page 26

head with a hooked nose juts out in front immediately above the water-line;
this is of course the ram, above which is a platform upon which a dog
stands as the vessel’s figure-head.
It is unnecessary to go in detail into all the schemes devised by inventors
and visionaries for propelling vessels by mechanical means. Several of
them from time to time suggested placing wheels on the outside of the boat,
and “turning the wheeles by some provision so that the wheeles make the
boat goe,” to quote William Bourne’s proposition of 1578, but the “some
provision” constituted a problem which he and many others found too much
for them. David Ramsay in 1618 took out a patent “to make boats for
carriages running upon water as swift in calms and more safe in storms than
boats full sailed in great winds,” and twelve years later another patent is
recorded to his credit for making ships and barges go against the tide. The
optimism of these and other mechanical pioneers was wonderful; indeed,
had their inventive genius only equalled their imagination, some of the
difficulties which until comparatively recently baffled naval engineers and
marine architects would have been long since overcome.

Page 27

“Liburna” or Galley, worked by Oxen.
From Morisotus.

The webbed feet of water-birds suggested to many a form in which
mechanical propulsion could be applied. This was only natural, as early
shipbuilders took as their models the birds which they saw floating before
them. In 1759 a Swiss pastor named Genevois published at Geneva a
proposal to use an oar fitted with a foot which should expand when used for
propelling a boat and contract when being moved forward through the water
for another stroke. Genevois visited London in 1760 to lay his proposal
before the Government. His propellers were to be worked by springs which
in turn were to be compressed by a kind of cannon with a piston. A

Page 28

pamphlet which he issued at the time of his application to the Government
contains the interesting statement that he had been informed that a
Scotchman had propounded a scheme thirty years earlier for propelling
vessels forward by the recoil from the firing of cannon over the stern. The
gunpowder of the period made up in smoke what it lacked in power; hence,
although the vessels of his day were not large, the ingenious Scot “found,
by the experiments made for that purpose, that thirty barrels of Gun-powder
had scarce forwarded the ship the space of ten Miles”; and it is not
surprising that this means of mechanical propulsion shared the fate of all of
its predecessors.[4]
[4] “Some New Inquiries tending to the Improvement of Navigation,” by J. A.
Genevois, 1760.

Many other extravagant schemes might be quoted. Edward Ford in 1646
was quite modest in his patent to “bring little ships, barges, and vessels in
and out of any havens without or against any small wind or tide,” to which
he cautiously added the qualification “if the seas be not rough.” With the
exception, however, of a few sporting proposals of which the Scotch
Gunpowder Plot is a type, no advance in solving the problem of producing
the power for propulsion was made for centuries. The burden of physical
exertion had been shifted from men to animals, but that was all; and yet in
every age during the last two thousand years there seem to have been many
people who were acquainted with the expansive power of steam, a fact
which makes this slow development the more remarkable.
The first person to observe the properties of steam, or at any rate the first
to record his observations, was Hero of Alexandria in 120 b.c., but though
he advanced from theory to practice, his æolipile does not seem to have
answered any useful purpose. This machine consisted of a hollow glass ball
supplied with steam at its axis. The steam escaped by means of a series of
hollow tubes, placed at right angles and projecting from the globe at a circle
on its circumference equidistant from the two poles, the tubes being closed
at the ends and provided with orifices at the sides near the ends. Nothing
came of his invention, so far as is known, and the æolipile remained an
interesting toy and nothing else—a toy, however, which has the honour of
being the first mechanical contrivance in which the expansive power of
steam was used. After this, for many centuries, no attempt was made to use
this great natural agency for the purpose of producing what Bacon called
“fruits” for mankind. Unscrupulous priests worked “miracles” by this

Page 29

means for the edification of their flocks, and doubtless revived thereby
many whose faith had become lukewarm. It never seems to have occurred
to them that a far more direct means of moving mountains was already
under their control.
At last in 1629 the use of steam as a means of producing power was
suggested by Giovanni Branca of Loretto, who, apparently adopting a
simplified form of Hero’s device, planned so that a jet of steam blew
against a series of vanes arranged on the rim of a wheel.
In the seventeenth century also, that eccentric genius the second Marquis
of Worcester published his “Century of Inventions.” In this he suggested a
number of mechanical contrivances, some of which contained the
fundamental ideas of later inventions, the most notable being that of a
steam-engine with a piston and lever; but he does not seem to have
designed any vessel which would justify the claim sometimes made on his
behalf that he was the inventor of the steamboat.[5]
[5] Partington’s edition of the “Century of Inventions.”

About the same time, Sir S. Morland, another experimenter, estimated the
expansive force of water at 2000 times, in which he was not far from the
truth.
England, however, was not the only country to produce inventors. One
Blasco de Garay, who flourished a hundred years before the Marquis of
Worcester, is declared by his champions to have been the first to solve the
problem of propelling a vessel by steam-power. But investigations as to the
accuracy of the story tend to the belief that he did nothing of the kind, and
that the beautifully circumstantial account of his experiment does greater
credit to the imagination of the narrator than to his regard for accuracy.[6]
De Garay’s experiment was made at Barcelona in the year 1543 in the
presence of representatives of the Emperor Charles V. Ravago, the
Treasurer, reported to the Emperor that the vessel would go two leagues in
three hours, but that the machine was complex and expensive, and that the
cauldron in which the steam was generated might burst. This is exactly the
report which a cautious financier, presumably not an expert in mechanics,
might be expected to make. Other reports were more favourable to the
project, the commissioners appointed for the purpose ascribing to the vessel
a speed of a league an hour. What has been established beyond question,

Page 30

however, is that De Garay made the experiment with a boat fitted with
paddle-wheels, but that the wheels were turned by men and not by steam.
[6] Mr. John McGregor reported to the Society of Arts that the claim that De Garay
used a steam-engine is unfounded, human power being used.

Salomon de Caus, a native of Normandy, is sometimes claimed by
French writers to have first thought of using steam as a motive power in
1615, but his invention does not seem to have fructified. Half a century later
the unlucky Doctor Denis Papin, a native of Blois, entered the field of
invention. He came to this country from France in 1675, was elected a
Fellow of the Royal Society in 1681, and in 1690 described a steam
cylinder fitted with a piston which descended by atmospheric pressure
when the steam below it was condensed. He suggested that one of the uses
to which his engine might be put was the revolution of paddle-wheels fitted
to a ship, several cylinders being applied which worked alternately with the
rackwork he designed. He may have been led to this by witnessing in 1681
the experiments on the Thames with a boat designed by Rupert, the Prince
Palatine, with revolving fans, which easily left behind a boat manned by a
number of oarsmen. It has been claimed for Papin that he was the inventor
of the safety-valve, but this is disputed.[7] Prior, however, to his
atmospheric engine he brought out in 1685 a machine for raising or
pumping water, but the Royal Society treated it with contempt and referred
to it as a “mere trick.” Neither of his machines received the recognition
which historians have since decided was their due, and he went back
disheartened to France, whence he was driven by the Revocation of the
Edict of Nantes to Marburg. He reappeared in England in 1707 and
announced a project for moving ships by means of wheels and steam.
Unfortunately for him, Thomas Savery, born in 1658, had already been at
work on the problem, and had brought out his fire-engine, which among
other things he thought might be used to propel ships. His machine lacked
power, and was replaced by one made after the design of his partner
Newcomen. Papin was also associated with Newcomen and Savery at one
time. Savery says of his own machine that he would refer the question of its
suitability for shipping to those more competent than himself to judge.
Papin appealed to the Naval Department to consider his invention, but the
Government of the day, after the manner of Governments when face to face
with a new project, thought it useless, and made severe remarks on his
presumption in continuing to invent for them. He exhibited his invention on

Page 31

the Thames, but no one took any interest in it. Thoroughly disheartened by
the failures which attended all his efforts, Papin went to Germany, and is
stated to have there built a steamer which was actually tried on the Fulda or
the Weser, but the local watermen, fearing the rivalry of the new machine,
smashed it, and that is the last which history has to record of Papin as a
pioneer of steamboats. It is asserted that this boat was built for him by
Newcomen and Savery in this country. As an experimenter he did valuable
work, for he seems to have been the first to have grasped the importance of
the vacuum under the piston.[8]
[7] Hy. Frith’s “Triumphs of Steam.”
[8] Lindsay’s “History of Merchant Shipping.”

In 1730 another remarkable proposition was made for marine propulsion.
Doctor John Allen thought it possible to move a boat by pumping in water
at the bows and pumping it out again at the stern, this scheme being
probably the earliest attempt to secure motion by what has since become
known as the jet-propeller system. Like almost all other inventions of his
period it was crude in its details and does not seem to have been put to any
practical use.
The next inventor who turned his attention to the question was Jonathan
Hulls, for whom it has been claimed, with some show of justification, that
he was the actual inventor of the steamboat. That he did invent a steamboat
is beyond question, but whether his vessel was ever built, and if so whether
it attained any measure of success, are points upon which historical
evidence is not conclusive. But if it was constructed, and there is strong
circumstantial evidence in support of this contention, then to the West of
England, which has contributed so largely to the maritime glory of Britain,
must be ascribed also the honour of being the birthplace of one of the two
inventions which have done more than anything else to aid in the spread of
civilisation and commerce. Hulls was born at Aston Magna in 1699. By
occupation he was a clock repairer, a precarious trade at best. The
difficulties he had to encounter through lack of means were very great, but
he persevered, and a patron at last appeared in the person of a Mr. Freeman,
of Batsford Park, near Chipping Campden, who supplied him with about
£160 to develop and patent his invention. This enabled Hulls to proceed to
London, and he petitioned Queen Caroline, as Guardian of the Realm in the
absence of her Consort George II. at Hanover, for Letters Patent for the

Page 32

invention, which was accordingly granted to him December 21, 1736,
provided he enrolled in Chancery within the following three months a
specification describing his invention.[9] The patent read as follows:
“Whereas our Trusty and Well Beloved Jonathan Hulls hath by his
petition humbly represented unto Our most dearly beloved Consort the
Queen.... That he hath with much Labour and Study, and at Great Expense
Invented and Formed a machine for carrying Ships and Vessels out of or
into any Harbour, &c., which the Petitioner apprehends may be of great
service to our Royal Navy and Merchant Ships, and to Boats and other
Vessels, of which Machine the Petitioner hath made oath that he is the sole
inventor, as by affidavit to his said petition annexed.
“Know ye therefore that we of our special grace, have given and granted
to the said Jonathan Hulls our special license, full power, sole privilege and
authority during the term of fourteen years, and he shall lawfully make use
of the same for carrying ships and other vessels out to sea, or into any
harbour or river.
“In witness whereof we have caused these our letters to be made patent.
“(Witness) Caroline,
“Queen of Great Britain.
“Given by right of Privy Seal at Westminster this 21st day of December
1736.”[10]
[9] Mr. J. H. Hulls’ lecture at the Institute of Marine Engineers on “The
Introduction of Steam Navigation,” February 26, 1906.
[10] From copy of patent in possession of Mr. J. H. Hulls.

Mr. P. C. Rushen, in referring to the experiment, writes:
“About this time it may be presumed that Jonathan set about constructing
a vessel in accordance with his plans, and for this purpose he had the help
of the Eagle Foundry at Birmingham, to which he forwarded rough model
plans and sketches to aid in founding and forging the various parts. Until
quite recent years these relics were existent, but on the sale and demolition
of the foundry they seem to have been destroyed.
“The new vessel was tried on the Avon, but tradition says it was a failure,
by reason of the inventor not providing the proper means to communicate
the power to the paddle. That the experiment was a failure seems evident
from the fact that nothing more was heard of the boat, but for the given

Page 33

reason is very improbable, because the very ingenious means the inventor
describes, although perhaps not quite practical on a large scale, are not
palpably unworkable for a small experimental boat. Even if these means
were a failure, it would be ridiculous to suppose that a clever mechanic
such as Hulls shows himself to be in his pamphlet would be at a loss for
some expedient.

Jonathan Hulls’ Paddle Steamer, 1737.

“The more probable reason of Hulls’ failure was the want of financial
support, that previously accorded him being perhaps withdrawn on the first
hitch in the experiments, or for some other reason, this so disheartening him
that he relinquished the idea. While Hulls had been at work on his project,
he had worn a brown paper cap, as usual with mechanics at that time, and
this fact was taken advantage of in a scathing doggerel, which was
circulated upon his failure, and which ran:
“Jonathan Hull
With his paper skull;
Tried to make a Machine
To go against wind and tide,
But he, like an ass,
Couldn’t bring it to pass
So at last was ashamed to be seen.”[11]

[11] P. C. Rushen’s “History and Antiquities of Chipping Campden in the County of
Gloucester,” 1899.

Page 34

The engine which Hulls used was an adaptation of Newcomen’s. He
published a lengthy description of his boat, in which he states that, in his
opinion, it would not be practicable to place his machine on anything but a
tow-boat, as it would take up too much room to allow of other goods being
carried on the same vessel, and it could “not be used in a storm, or when the
waves are very raging.” Hulls died in London destitute, and the world
inherited his ideas. Steam tow-boats are now found all over the world, and
the despised stern-wheeler of his day was the forerunner of the great stern-
wheelers of the Mississippi.
Another person who took up the subject seriously was a Frenchman,
Jouffroy d’Abbans, better known perhaps as Claude François Dorothée,
Marquis de Jouffroy. His invention was known as the Pyroscaphe. It was
claimed for him by the Marquis de Bausset-Roquefort that “he was the first
who carried out in practice a scheme for navigation by steam, his successful
experiments on the Saône at Lyons in 1783 being attested by official
documents, and by the evidence of thousands of spectators. The glory of the
invention of the means of using steam-power in navigation belongs
therefore to France, as is clearly shown by the archives of the town of
Lyons.”
The Marquis de Jouffroy was born at Roche-sur-Rognon in 1751. A duel
fought while he was page to the Dauphin caused his exile to Provence,
where he studied the methods by which the ancient rowing galleys were
propelled. He returned to Paris in 1775 and conceived the idea of inventing
some form of steamboat while looking at the Chaillot fire-pump which
Périer[12] had erected a short time previously. He communicated his project
to Périer, who made some fruitless experiments and declared the idea
impossible. Jouffroy, however, persevered, and in 1776 had constructed a
machine which he adapted for use on a boat. “His first pyroscaphe was 13
m. long, and 1 m. 95 c. wide. The ‘swimming’ apparatus consisted of rods 2
m. 66 c. in length suspended on either side well forward and carrying at
their extremity frames fitted with hinged flaps with a dip of 50 c. The
frames were capable of describing an arc of 2 m. 66 c. (8 feet) radius and of
1 m. (3 feet) in length, and were drawn forward at the end of the stroke by a
counterweight. A single-acting engine by Watt, installed in the middle of the
boat, set in action these hinged flaps. The construction of this apparatus in a
locality where it was impossible to obtain a cast and bored cylinder was a
work of genius, courage, and patience. Despite its imperfections it was

Page 35

superior to anything attempted up to that time in navigation. The boat
worked on the Doubs at Baume-les-Dames between Montbéliard and
Besançon during the months of June and July.” This system, since called the
“Palmipède,” imitated the movements of aquatic birds, and was the only
one that could be applied to the steam-engine as then known. It was,
however, useless for moving large masses or for working against the
current. “Jouffroy saw the defects caused by the fact that the rapidity of the
boat’s motion prevented the hinged flaps from reopening after the forward
stroke, especially when the pyroscaphe was moving upstream or against the
tide. Hence the engine only acted at intervals instead of keeping up a
sustained movement. But Jouffroy substituted paddle-wheels for the hinged
flaps (volets à charnière) and devised a new machine in which the action of
the steam was made continuous by means of two bronze cylinders, the top
placed lengthwise with the run of the ship, making with the horizon an
angle of about 50 degrees. The bottoms of the cylinders were encased in a
metal box containing a sliding tile which opened and shut, alternately
giving a passage to the steam and the intake of water in each cylinder.
[12] The name is spelt “Perrier” by some writers.

The Marquis de Jouffroy’s Steamboat. 1783.

“By July 1, 1783, Jouffroy had constructed a second boat which was
launched at Lyons. Its dimensions were considerable, the length attaining
46 m. and the breadth 4 m. 50 c. The wheels were 4 m. diameter, the

Page 36

paddles 1 m. 95 c., dipping 65 c. The draught of water of the vessel was 95
c. The total weight was 327 milliers, of which 27 were for the vessel and
300 for the freight. This enormous vessel voyaged against the tide of the
Saône from Lyons to L’île Barbe in the presence of the Commission de
Savants and thousands of spectators, as officially recorded in the archives of
the Municipality of Lyons.” Arago says this vessel continued to navigate the
Saône for sixteen months.[13]
[13] Paper read by the Marquis de Bausset-Roquefort before the Lyons Literary
Society in 1864, and preserved at the Mazarin Library (Academy of Sciences),
Paris.

Jouffroy now thought of starting a company to run boats on the new
system, and applied to the Government for the necessary permission. The
question was submitted to the Academy of Sciences, who appointed a
Commission to inquire into the matter, but among the members of the
Commission was the unsuccessful Périer, whose opposition resulted in the
Academy concluding that the experiments at Lyons were not decisive. The
Marquis had not the means to continue building steamboats and, profoundly
discouraged, he abandoned the rôle of inventor. He had already been
subjected to much ridicule, and it was generally agreed that he must be mad
to think of “making fire and water agree”; he was even nicknamed “Pump
Jouffroy.” He witnessed the experiments of Fulton in France, but did not
think of claiming the merit of his discovery until 1816, when he issued a
publication entitled “Steamboats.” The same year he took out a patent,
formed a company, and on August 20 launched a steamboat at Bercy, but
the venture did not come up to the expectations of the shareholders, and this
was his last effort. Jouffroy died of cholera at the Hôpital des Invalides in
1832. Arago, the historian, says that his claims to be the first inventor of the
steamboat have been established, and, according to Larousse’s
“Dictionnaire universel du XIXe siècle,” Fulton himself openly
acknowledged them in the United States law courts.

Page 37

CHAPTER II
AMERICAN PIONEERS IN STEAM NAVIGATION

owards the end of the eighteenth century American inventors
turned their attention to the problem of navigation by
steam, and to one of them, Robert Fulton, the credit of
having invented the steamboat has usually been given.
Livingston’s “Historical Account of the Application of
Steam for the Propelling of Boats” has been accepted as an
authority on the subject, but as he was Fulton’s friend and
backer, and Fulton married into the Livingston family, there is reason to
question the absolute accuracy of the circumstantial story told by this most
eloquent special pleader, though there is some excuse for his partiality. A
little investigation makes it apparent that Fulton was not the first American
to design a successful steamboat, nor even the first to make the running of
steamboats a satisfactory speculation.
In 1909 a Mr. John Moray of West Virginia presented a petition to
Congress in which he asked for the official recognition of James Rumsay as
the inventor of the steamboat, and the perpetuation of his memory by the
placing of an appropriate bust in the Statuary Hall at the Capitol. According
to the petition “The deed-books of Berkeley County, Va., for the year 1782
record the fact that James Rumsay, a native of Maryland, who was a
millwright and Revolutionary soldier, purchased a farm, and soon after a
pond, for experimental purposes in the line of his calling. On that pond, as
the results of many experiments in steam and hydrostatics by James
Rumsay, the wonderful discovery of the principle of steam navigation took
place. Thoroughly satisfied by continuous experiments that the newly
discovered principle would become of immense value in the world, Rumsay
contracted with his brother-in-law, Joseph Barnes, for the building of a boat
for steam purposes at St. John’s Run, on the Potomac River. The resulting
steamboat was publicly exhibited at Shepherdstown, Va., on the Potomac,
on December 3 and 11, 1787. The great success and useful character of

Page 38

Rumsay’s steamboat were established by sworn testimony of many notable
witnesses, including General Horatio Gates, conqueror of Burgoyne, and by
a multitude of astonished and delighted spectators. This practically
successful trial took place twenty years before the Hudson River trial in
1807, and the speed of Rumsay’s boat was fully equal to that of the
Clermont in its initial trip to Albany—four miles an hour—without sails,
paddles, and the complexities of the Hudson River boat.”
Rumsay afterwards launched on the Potomac a boat propelled by a
steam-engine and machinery, both of which were of his own construction.
His method of propelling the boat was to force out a stream of water at the
stern, a system known as the “Jet,” which has never commended itself to
engineers in general, owing to the friction caused in the pipes by the water
rushing through them. A trial trip, in December 1787, was successfully
made in the presence of a great number of spectators, and resulted in
Rumsay being granted the right to navigate the streams of New York,
Maryland, and Virginia. His scheme was taken up by an organisation
formed in Philadelphia for that purpose, and known as the Rumsay Society.
Benjamin Franklin was among its members. Rumsay also visited England
and the Continent, and obtained patents for his invention in Great Britain,
France, and Holland, but he did not live long enough to develop his
schemes. He made a successful trip on the Thames in 1792, and died in
London the same year.
His great rival was John Fitch, who, in 1785, conceived the idea of using
steam-power for land carriages and afterwards for vessels. His first model
of a steamer carried large wheels at the sides, but these were found to
labour too much in the water, and in his experiments in July 1786 upon a
skiff with a steam-engine having a three-inch cylinder, the wheels were
replaced by paddles or oars supported by a framework above the vessel.
Convinced of the success which must ultimately attend the use of steam-
power, he petitioned Congress and the State Legislature for a grant of
money, but without avail. As a result of his efforts to interest “the leading
scientific and public men of that day, everywhere and at all times,” and his
bold advocacy of the adoption of steam for purposes of navigation, he was
generally considered insane. But in 1786 he succeeded in persuading the
State of New Jersey to grant him for fourteen years the sole and exclusive
right to navigate its waters by steam, and this example was followed in
1787 by the States of New York, Delaware, Pennsylvania, and Virginia. He

Page 39

had earned some money by map-making, and now formed a company and
built a boat of 60 tons. She was 45 feet long with a beam of 12 feet, had six
oars or paddles on each side, and carried an engine with a 12-inch cylinder.
She made a successful trial trip at Philadelphia in 1787. A still larger boat
followed in 1788, and another in 1790. The latter demonstrated “with their
increased speed and facility the value of Fitch’s invention,” and the last was
run during the summer as a passenger boat between Philadelphia and
Burlington at a speed of about eight miles an hour. She appears, from an
illustration in Appleton’s “Cyclopædia of American Biography,” to have
had three large paddles at the stern held in place by a projecting frame, a
cross-beam at the extreme end of the frame supporting the rudder, which
was placed a little distance behind the paddles. Consequent upon the
Virginia patent which gave him the exclusive right of navigating “the Ohio
River and its tributaries” he now designed a boat called the Perseverance,
for freight and passengers on the Mississippi. But as, owing to a storm, she
could not be got ready in time, the default clause in the patent became
operative. Fitch’s associates now left him and his own resources were at an
end, and after one or two other misfortunes he went to France in 1793.
Needless to say, that country was in no mood then to entertain the idea of
building steamboats. Finding no one ready to listen to his schemes, Fitch
departed for London, having deposited his plans and specifications with the
American Consul at Lorient.

Page 40

John Fitch’s Oared Paddle boat, 1786.

A rather curious thing then happened.
“During this absence his (Fitch’s) drawings and papers were loaned by
the Consul to Robert Fulton, then in Paris, in whose possession they were
for several months.”[14] Until now, it must be remembered, Fulton had
scarcely been heard of in connection with steamboats.
[14] Appleton’s “Cyclopædia.”

Meantime the ill-starred Fitch, unable to gain a hearing in England either,
worked his passage back to America as a common sailor. In 1796, still
determined to convince the public of the need for steamboats, he obtained a
ship’s yawl, and fitted her with an engine and screw-propeller. With these
he experimented in New York and, as usual, no one took any interest in the
boat except the proprietor. In 1798 he made and tried upon a small stream
near Bardstown a steamboat model measuring three feet in length, but a few
weeks later he committed suicide by taking poison. His “Journal” contains
the following passage: “The day will come when some more powerful man

Page 41

will get fame and riches from my invention, but nobody will believe that
poor John Fitch can do anything worthy of attention.”
About twenty years later Fitch’s merits as an inventor were recognised by
a Committee of the New York Legislature, which reported that “the
steamboats built by Livingston and Fulton were in substance the invention
patented to John Fitch in 1791, and Fitch during the term of his patent had
the exclusive right to use the same in the United States.”
Other inventors were at work. Fulton was in France thinking over the
Fitch drawings which had been left there in 1793, trying a submarine boat
on the Seine, and in 1801 making a variety of experiments under the
auspices of the French Government.
In America, one Samuel Morey, in 1790, built a strange boat with a
paddle-wheel in the prow, constructed a steam-engine for her, and presently
was voyaging on the Connecticut River at the break-neck speed of four
miles an hour. A few years later he had another boat ready which could do
five miles an hour, this boat having a wheel at the stern, and by request he
took Chancellor R. Livingston and others for a trip in New York waters. The
Chancellor, who had made a trip in Morey’s first boat at Orford, perceived
two things, first, that the speed ought to be increased, and, second, that
there was money in steamboats. He promised Morey 100,000 dollars, it is
believed, if he could run a boat at eight miles an hour, and offered him 7000
dollars for a patent for the North River as far as Amboy for what had
already been accomplished. The latter offer was not accepted. Morey in
1795 took out a patent for a steam-engine, in which the power was to be
applied by crank motion, to propel boats of any size. Two years later he
built a steamer which he placed on the Delaware, and propelled it by means
of two paddle-wheels, one on either side. These wheels gave better results
than any method which had yet been tried.
When, a little later, Livingston went to France and became associated
with Fulton as the financier of his enterprises, it is probable that the
knowledge the former had gained of Morey’s work and Roosevelt’s
experiments, and the latter of Fitch’s designs, proved extremely useful to
both of them. Nicholas J. Roosevelt had attracted some attention by
building a small wooden boat across which was an axle projecting over the
sides, and carrying paddles, the contrivance being made to revolve by a
light cord wound round the middle of the machine and attached to hickory
and whalebone springs. In 1798 he recommended to Livingston a vertical

Page 42

wheel, and the Chancellor replied, “Vertical wheels are out of the question.”
As late as 1802 Fulton favoured chains and floats, and it was not until after
Livingston had communicated Roosevelt’s plan to him that they applied
vertical wheels on Roosevelt’s system to their boat on the Seine.
About this time also Livingston was engaged with John Stevens, his
brother-in-law, and Nicholas J. Roosevelt on the construction of a
steamboat to be used on the Hudson, the New York State Legislature having
granted the necessary monopoly. The State required that the boat should
attain a speed of three miles an hour, but this was not achieved. Livingston
was appointed Minister to France in 1801, and was thus cut off from his
two partners and brought into communication with Fulton. Another version
is that the boat made three miles an hour, and that the State stipulated for
four miles an hour.
Robert Fulton, asserted to be an Irishman by descent, was born in
Pennsylvania in 1765. When a boy he had witnessed the experiments made
on the Delaware by John Fitch, but the problems of steam navigation were
only a few of those which occupied his versatile genius. He came to
England in 1786, and in 1794 invented a marble-sawing machine, a flax-
spinning machine, a machine for ropemaking and a mechanical dredger. In
1795 he published a treatise on canal navigation in which he suggested a
number of improvements in lock construction.
In 1797 he went to France and was for some time occupied in designing
and experimenting with submarine boats. He suggested to the French
Government that his submarine would be useful in destroying the British
Fleet. The Directory would have nothing to do with his plans, but when
Napoleon became First Consul a Commission was appointed to investigate
and report upon them. Beyond agitating the British Government for some
time, however, while he experimented with torpedoes designed to destroy
their fleet, and trying unsuccessfully to sell his invention to the French
Government, nothing was accomplished. He came over to England in 1804
prepared to sell his invention to the British Government. From one point of
view Fulton appears as the inventor of a horrible engine of destruction,
ready to dispose of it to any country which would buy at a remunerative
price.
But there is another aspect of Fulton, and this is exhibited by his
enthusiastic biographer Cadwallader D. Colden. According to this
gentleman, Fulton took no interest “in the then existing contest” between

Page 43

England and France. England and France were to him possible torpedo
buyers and their fleets possible torpedo victims. But his ideals included
universal free trade and the liberty of the seas, and he looked upon the
annihilation of naval armaments as a step in the right direction, as it would
destroy what he called the war system of Europe. If this could be effected
nations would engage in education, science, and a rivalry of peaceful arts.
Fulton has been called a prophet and a statesman; but the doctrine that
warfare will be ended by elaborating a more deadly means of destruction
than has hitherto been known, coupled with the implied assertion that each
invention is the last word in destruction, suggests at once conspicuous
limitations in prophecy and statecraft. He never thought of torpedo
destroyers.
In 1793 Fulton corresponded with Lord Stanhope on the subject of steam
navigation. Lord Stanhope was fully aware that invention was knocking at
the door, for in a letter to Wilberforce he says: “This country is vulnerable
in so many ways, the picture is horrid.... I know, and in a few weeks I shall
prove, that ships of any size may be navigated so as to go without wind and
even directly against both wind and waves.... The most important
consequence which I draw from this stupendous fact is this. It will shortly
render all the navies of the world (I mean military navies) no better than
lumber. For what can ships do that are dependent on wind and weather
against fleets that are wholly independent of either? Therefore the boasted
superiority of the British Navy is no more. We must have a new one. The
French and other nations will for the same reasons have the same.”
He was himself an experimenter, and had been endeavouring to propel a
boat by means of an appliance resembling a mechanical duck’s foot. The
plans which Fulton submitted to him show a boat with an immense bow or
spring fastened to a stumpy mast amidships, operating on a large paddle for
which the rail at the extreme end of a raking stern acted as a fulcrum; a
second plan shows the boat with a three-paddle revolving wheel at the side.
When Livingston went to France in 1801, an enthusiast for steam
navigation, and, what was more important, an enthusiast of considerable
means, Fulton, whom he there met and financed, was stimulated to fresh
exertions. By 1803 a boat to their joint account was built, 70 feet long and 8
feet beam. With this it was proposed to experiment on the Seine. But the
machinery, which is said to have been made by Périer, who opposed the
Marquis de Jouffroy, was too heavy for the hull. The night before the trial

Page 44

trip was to be made was stormy: the boat broke in half and sank.
Notwithstanding this blow to their hopes the partners proceeded with their
attempts. The machinery was recovered and found to be practically
uninjured, and the hull was rebuilt more strongly. The trial trip took place in
August 1803, when the boat made four and a half miles an hour. This was a
very moderate speed and was disappointing to all concerned. Nevertheless a
voyage by a steam-ship had been made, and it is strange that very little
notice was taken of the event in France. Livingston wrote home to America
and described it enthusiastically, and he and Fulton determined to build a
boat for American waters as soon as Fulton should return thither.
Shortly after this experiment Fulton visited Symington, who, as will be
seen in the next chapter, had succeeded, with the assistance of Lord Dundas,
in starting a little steamer, the Charlotte Dundas, on the Clyde as early as
1802. While this boat was being used on the Forth and Clyde Canal, Fulton
introduced himself to Symington, whom he accompanied on a trip in the
boat, the voyage being made solely on Fulton’s account.[15] The American
took copious notes in a memorandum book and, to quote from Symington’s
narrative, “after putting several pointed questions respecting the general
construction and effect of the machine, which I answered in a most explicit
manner, he jotted down particularly everything then described, with his own
remarks upon the boat while moving with him on board along the canal; but
he seems to have been altogether forgetful of this, as notwithstanding his
fair promises, I never heard anything more of him until reading in a
newspaper an account of his death.”
[15] Knight’s “Cyclopædia.”

Page 45

John Stevens’ “Phœnix,” 1807.

Meantime Stevens, left to himself, had, in 1804, built a vessel propelled
by twin screws which navigated the Hudson River. This vessel was
remarkable in many ways. The boiler was tubular, and the screw was almost
identical with the short four-threaded helix which many years afterwards
was generally adopted. It is interesting to note that the screw propeller was
tried so early, for it is generally believed that it was not used at all until
many years after the introduction of paddles. The engine and boiler of
Stevens’ boat are preserved at the Stevens Institute at Hoboken. After his
death his son tried the engine and boiler in a boat, which, in the presence of
a committee of the American Institute of New York, attained a speed of
about nine miles an hour. Although the screw proved its suitability for
propulsion, its superiority was not acknowledged, and for many years
afterwards marine engineers confined their attention to the improvement of
paddle-wheels and the engines for driving them. In 1807, with the
assistance of his son Robert, Stevens built the paddle-wheel steamer
Phœnix, which plied for six years on the Delaware.

Page 46

Dr. James Renwick of Columbia said that “the Stevenses were but a few
days later” than Fulton “in moving a boat with the required velocity,” and
that “being shut out of the waters of New York by the monopoly of
Livingston and Fulton, Stevens conceived the bold design of conveying his
boat, the Phœnix, to the Delaware by sea, and this boat, which was so near
reaping the honour of first success, was the first to navigate the ocean by
the power of steam.” The piston-rod of the Phœnix was guided by slides
instead of the parallel motion of the Watt engine, and the cylinder rested on
the condenser. A point in which the superiority of the Phœnix over the
Clermont was shown, was that the paddle-wheel of the Phœnix had a guard
beam, which the Clermont lacked. The Phœnix was taken to Philadelphia by
sea by Robert Livingston Stevens, son of Robert Stevens. He was
accompanied on this voyage by Moses Rogers, to whom the title of
“Pioneer Steam Navigator” has been given by American historians, partly
on account of this voyage and partly because he was on board the auxiliary
sailing ship Savannah on her memorable voyage to Europe.[16]
[16] See p. 122.

In 1806 Fulton returned to America, having ordered an engine to be made
by Messrs. Boulton and Watt at Birmingham. He did not tell them what he
proposed to do with it, but it was the engine for the first steamboat
constructed by him for American voyages—the famous Clermont. After this
engine was delivered in New York it remained in the Customs while
Brownne, a shipbuilder, constructed the hull. In 1807 the boat made her
first trip on the Hudson.
The original dimensions of the Clermont have been variously stated, the
discrepancies being probably due to the alterations to which the vessel was
subjected, and also to methods of measurement. From a letter which Fulton
wrote it appears that the boat was 150 feet long and 13 feet wide, drawing 2
feet of water.[17] This was no doubt the over-all figure, as other data give
slightly less lengths which would be on the water-line, or the inside
measurements between stem and stern, both of which raked.
[17] Reprinted in the Nautical Gazette, New York, August 22, 1907.

Messrs. Millard and Kirby, of New York, who made most exhaustive
researches into the history of the Clermont with a view to the reproduction
of that historical vessel at the centenary celebration at New York in
September 1909, state that when Fulton worked out his displacement and

Page 47

wetted surface and resistance, his results corresponded with a boat of the
dimensions just given, and no other figures could have given those results.
On November 20, 1807, Fulton wrote to Livingston that the boat was so
weak that she must have additional knees and timbers, new side timbers,
deck beams and deck, new windows, and cabins altered; that she, perhaps,
must be sheathed, her boiler taken out and a new one put in, her axles
forged and ironwork strengthened. With all this work the saving of the hull
would be of little consequence, particularly as many of her knees, bolts,
timbers and planks could be used in the construction of a new boat. His
opinion, therefore, was that a new hull should be built with knees and floor
timbers of oak, bottom planks of two-inch oak and side planks of two-inch
oak for 3 feet high. “She is to be 16 feet wide, 150 feet long; this will make
her near twice as stiff as at present and enable us to carry a much greater
quantity of sail. The 4 feet additional width will require 1146 lb. additional
purchase at the engine, moving 2 feet a second or 15 double strokes a
minute; this will be gained by raising the steam 5 lb. to the inch, as 24
inches the diameter of the cylinder gives 570 round inches at 3 lb. to the
inch—1710 lb. purchase gained. To accomplish this work a good boiler and
a commodious boat running our present speed, of a voyage in 30 hours, I
think better and more productive to us than to gain one mile on the present
boat.”
The first Clermont had a depth of hold of 7 feet. She had masts and sails
but no wheel enclosures, no bulwarks, no berths in the cabin, and no
covering over the boilers; this work being done, according to Fulton’s letter
of August 29, 1807, after his return from the first trip. When she was altered
on account of instability, in the winter 1807-8, she was widened to 16 feet
on the bottom and 18 feet at the deck, which made her much stiffer. It was
then that her poop was built up and various other improvements made.
Her fly-wheels were outside the hull, placed forward of the paddles, and
revolved the same way, and it is related that on a subsequent voyage one of
the paddle-wheels becoming disabled, paddles were affixed to the fly-wheel
and the voyage resumed.
The American Citizen of August 17, 1807, announced that: “Mr. Fulton’s
ingenious Steamboat, invented with a View to the Navigation of The
Mississippi from New Orleans upwards, Sails to-day from the North River
near The State Prison to Albany, the Velosity of the Steamboat is calculated
at four miles an hour; it is said that it will make a progress of two against

Page 48

The Current of The Mississippi, and if so it will certainly be a very valuable
acquisition to the Commerce of the Western States.”
An immense crowd assembled to witness the fiasco which was expected
to mark the first experimental voyage of “Fulton’s Folly,” and jeered Fulton
and his steamer unmercifully. But when the vessel moved into midstream
under the power of her own engines, the crowd cheered as energetically as
only a crowd can when it has been agreeably surprised and the appeal of
facts to its chivalry is irresistible.
“Dense volumes of smoke began to pour forth from the smokestack. The
boiler began to hiss. At one o’clock the hawser was drawn in, the throttle
opened, and to the accompaniment of the stertorous exhaust, the uncovered
sidewheels began to quiver, then slowly to revolve. A hush fell on the
spectators. Fulton’s own hand at the helm turned the bow. The Clermont
moved out into the stream, the steam connections hissing at the joints, the
crude machinery thumping and groaning, the wheels splashing, and the
smokestack belching like a volcano.... One honest countryman, after
beholding the unaccountable object from the shore, ran home and told his
wife he had ‘seen the devil on his way to Albany in a sawmill.’”[18] A
passenger, recording the voyage, says a miller boarded the Clermont at
Haverstraw and said he “did not know about a mill going up stream and
came to inquire about it.”
[18] New York Evening Sun, July 1909.

The boat itself was wedge-shaped at bow and stern, which were cut sharp
to an angle of 60 degrees. She was almost wall-sided. She was flat-
bottomed and keelless, leeway being prevented by two steering boards. Her
tiller was at the back end of the after cabin so that it was difficult for the
steersman to see ahead. The paddle-wheels, 15 feet in diameter, being
uncovered, splashed tremendously, and drenched the passengers. A paddle-
wheel had to be disconnected when it was desired to turn the vessel round.
The Clermont reached Chancellor Livingston’s residence at Clermont,
110 miles from New York, in 24 hours, against the wind, the average speed
being 4·6 miles an hour. The running time for the whole journey to Albany
of 150 miles was 32 hours, or nearly five miles an hour; the return trip was
made in 32 hours, running time, the sails not being used on either occasion.
An eye-witness as she passed up the river thus describes her:

Page 49

“It was in the early autumn of the year 1807 that a knot of villagers was
gathered on a high bluff, just opposite Poughkeepsie, on the west bank of
the Hudson, attracted by the appearance of a strange-looking craft, which
was slowly making its way up the river. Some imagined it to be a sea
monster, whilst others did not hesitate to express their belief that it was a
sign of the approaching judgment. What seemed strange in the vessel was
the substitution of a lofty and strange black smoke-pipe rising from the
deck, instead of the gracefully tapered masts that commonly stood on the
vessels navigating the stream, and, in place of the spars and rigging, the
curious play of the working beam and piston, and the slow turning and
splashing of the huge and naked paddle-wheels, met their astonished gaze.
The dense clouds of smoke, as they rose wave upon wave, added still more
to the wonder of the rustics. This strange-looking craft was the Clermont on
her trial trip to Albany; and, of the little knot of villagers above mentioned,
the writer, then a boy in his eighth year, with his parents, formed a part, and
I well remember the scene, one so well fitted to impress a lasting picture
upon the mind of a child accustomed to watch the vessels that passed up
and down the river. On her return trip, the curiosity she excited was scarcely
less intense—the whole country talked of nothing but the sea monster,
belching forth fire and smoke.
“The fishermen became terrified and rowed homeward, and they saw
nothing but destruction devastating their fishing grounds; whilst the wreaths
of black vapours, and rushing noise of the paddle-wheels, foaming with the
stirred-up waters, produced great excitement amongst the boatmen, until it
was more intelligent than before; for the character of that curious boat, and
the nature of the enterprise she was pioneering had been ascertained.”
According to Colden, those who saw the Clermont at night described her
as “a monster moving on the water, defying the winds and the tide, and
breathing flames and smoke.” She had, he proceeds to say, “the most terrific
appearance from other vessels which were navigating the river when she
was making her passage. The first steamboats, as others yet do, used dry
pine-wood for fuel, which sends forth a column of ignited vapour, many
feet above the flue, and whenever the fire is stirred a galaxy of sparks fly
off, which in the night have an airy, brilliant, and beautiful appearance. This
uncommon light first attracted the attention of crews of other vessels.
Notwithstanding the wind and tide were adverse to its approach, they saw
with astonishment that it was rapidly coming towards them; and when it

Page 50

came so near that the noise of the machinery and the paddles were heard,
the crews in some instances shrunk beneath their decks from the terrific
sight; and others left their vessels to go on shore; while others again
prostrated themselves, and besought Providence to protect them from the
approach of the horrible monster which was marching on the tides, and
lighting its path by the fires which it vomited.”
After the improvements had been made in the Clermont she entered in
the spring of 1809 upon the regular work for which she was intended—the
day service between New York and Albany.
The guards and paddle-boxes, which were mere temporary structures,
were made substantial and permanent, and the cabins were rearranged and
refitted in the most beautiful manner. The Clermont, said Professor
Renwick, “thus converted into a floating palace, gay with ornamental
painting, gilding, and polished woods, commenced her course of passages
for the second year in the month of April.”[19]
[19] The “Master, Mate, and Pilot.”

When rebuilt she was christened the North River and maintained the
service alone until October, when a second Fulton boat, the Car of Neptune,
was launched. She was a larger boat, and ran continuously until 1817, and
the other vessels which were added to the little fleet also proved successful.
The complete list of Fulton’s steamboats would include also the Rariton
(1809), New Orleans (1811), Paragon, Firefly, a Jersey ferryboat, and
Camden (1812), Washington and a York ferryboat (1813), Richmond, a
Nassau ferryboat, Fulton, Vesuvius, and Demologos, a warship (1814),
Aetna, Buffalo, and Mute (1815), Olive Branch, Empress of Russia, and
Chancellor Livingston (1816).
Fulton and Livingston’s enterprise was a financial success almost from
the first, and naturally others thought to share in it; as they could not join
the pioneers they determined to rival them. One of the chief of these was a
Captain Elihu S. Bunker, who maintained a line of sailing sloops between
Hudson City and New York. The steamers were taking the wind out of his
sails in more senses than one, and not liking the prospect of being
becalmed, financially, he determined to go in for steam. A syndicate of
capitalists of Albany backed him. The fact that Livingston and Fulton had
been already granted an absolute monopoly for navigating the waters of the
State of New York by steam deterred them not a whit. They ordered two

Page 51

boats, to be about the size of the Clermont, and called them the Hope and
Perseverance. They were each 149 feet in length, 25 feet beam inside the
paddles, and had a depth of 7 feet 7 inches.

Robert Fulton’s “Clermont,” 1807.

Legal proceedings quickly followed, Livingston and Fulton having their
work cut out to defend their monopoly. How like these boats were to the
Fulton boats is evident from the affidavit of Charles Brownne, the builder
of the Clermont. He says that he has “examined the steamboats Hope and
Perseverance and they are not built like any vessels which navigate by
wind or oars on any of our waters, or any foreign waters that he knows of.
That said steamboats being more than Six the length of their breadth[20] of
beam and flat at bottom are not calculated to navigate with sails only. And
that the first boats of such make of the said steamboats which he ever saw
or heard of was built by him from drawings and directions given to him by
Robert Fulton and constructed to be navigated by steam and wind, and
which boats are now known by the name of North River and Car of
Neptune Steamboats: This deponent also saith that the water wheels; the
guards round the water wheels, the covering to the water wheels; the steps
from the wheel guards to enter the row-boats, space on the guards for wood
for the engine, bins or lockers in the wheel guards and necessaries on the

Page 52

fore part of the wheel guards, are exact copies from the Boats built by him
for Livingston and Fulton, and such water wheels, wheel guards and
conveniences he has never known or heard of to any other kind of boat or
vessel. This deponent further saith that in the said Steamboat Hope the
manner of arranging the rudder with a perpendicular iron bar on its after
part, and leading from its wheel ropes, along the sides of the boat to a
steering wheel before the Chimney of the Boiler and to a Station above the
place of the engineer and fireman, is an exact copy from the boats of
Livingston and Fulton. This deponent objected to this mode of steering at
the time the said Fulton proposed it, believing it to be impracticable, and he
does not know of a like mode of steering to any other kind of vessel. This
deponent also says that the mode of placing the main mast far forward, and
the mizzen mast so far aft, as to leave a convenient space between the two,
which shall not be incommoded by ropes, booms, or yards, and afford room
for spreading an awning for the comfort and convenience of passengers is
the same exactly in the said Hope Steamboat as in the boats built by him for
Livingston and Fulton. That this mode of placing masts so far apart, to the
best of his knowledge, is not known in any other kind of vessel, and would
not answer for a vessel intended to work with wind only, without the aid of
steam, but in union with steam has been proved by three years’ experience
on the North River Steamboat to succeed perfectly well. This deponent
further says that the form and make of the said Hope and Perseverance
steamboats, their wheels, wheel guards, manner of steering, mode of
placing the masts and rigging, mode of arranging the awning, arrangements
of the Cabins and kitchen, suspending their row-boats from the sides
instead of from the stern, as is usual, are in his opinion in all these
combinations and arrangement, exact copies from the Car of Neptune
Steamboat, and more like her than she is like the North River Steamboat
which was first built, and further this deponent saith not.”[21]
[20] Sic: probably means “their length was rather more than six times their beam.”
[21] “Steamboats on the Hudson,” in the “Master, Mate, and Pilot,” October 1909.

The Hope and Perseverance ran throughout the season of 1811 with
passengers and freight, between New York and Albany, and met with as
much of the public patronage as did the other boats. The courts, however,
decided that Captain Bunker and his supporters were acting illegally, and
gave the drastic order that their steamers should be confiscated and handed

Page 53

over to Livingston and Fulton, who did not run them but had them broken
up.
Writing in 1838, in regard to his early experiments, to the Secretary of
the Treasury at Washington, Captain Bunker described an incident which
unfortunately for American steamship records does not stand alone. The
Captain was undoubtedly fortunate that matters were no worse.
“In 1811,” he says, “I had command of the steamboat Hope plying
between New York and Albany. The engine and boilers were made and put
in by Robert McQueen. On the second trip from New York, while Mr.
McQueen’s foreman had still charge of the works on board (they not having
been delivered as completed), this man had a gang of his own men from the
shop, and, while proving the machinery, had a man that he was instructing
to become engineer of the boat. While on the passage, off Esopus meadows,
something appeared to be wrong in the fire-room (which was in charge of a
miserable drunken fireman) and the engine moving very slowly. I found on
examination, that there was not a drop of water in either of the boilers, and
that both of them were red-hot, as well as the flues, and must have been so
for at least half an hour. The heat was great enough to melt down five
solder-joints of steam-pipe, which was made of copper. I immediately
started the forcing pump myself, not thinking that there could be any danger
in the operation; the effect of which was a crackling in the boiler as the
water met the hot iron, the sound of which was like that often heard in a
blacksmith’s shop when water is thrown upon a piece of hot iron. I cannot,
therefore, believe for a single moment that explosions are produced, to such
a degree as I have before recited, by throwing cold water into a red-hot
boiler. In the way above described, I cooled down both of the boilers,
during which time neither of them jumped out of its place; nor do I see how
it could be possible for such an effect to be produced, having always been
of opinion that there could be no other cause for a boiler to burst than the
pressure of steam inside, and not gas produced by letting cold water or
lukewarm water into it; for I deem it impossible for a red-hot boiler to
contain heat enough to explode with any quantity of water that might be
suddenly thrown into it. Besides, it must be remembered that the supply-
pipes are connected with the bottom of all steam-boilers, or are very near to
the bottom; therefore, instead of producing explosion, the forcing of cold or
lukewarm water into hot water must have the tendency to cool it. For
instance, I have known engineers to keep off their feed as long as they

Page 54

possibly dared, when running with another boat, knowing that as soon as
they began to feed, the steam would fall, especially if they could not get a
full supply of steam for the engine.”[22]
[22] The “Master, Mate, and Pilot,” Vol. II. No. 5.

So far as the Hudson was concerned the decision of the courts crushed
Captain Bunker, and frightened off any other possible trespassers on the
monopoly. But Bunker had determined to become a steamship owner, and
being crowded out of the Hudson he started a line of steamers as near New
York City as he could, the Long Island Sound Line. The first of his vessels
he named after his late opponent Fulton. She was built in 1813 and plied for
the whole of her first season in 1814 on the Hudson River, as, the United
States being then at war with England, it was feared that she would be
captured if she ventured up the Sound.

The “Paragon.” Built 1811.

At the time the Fulton boats had to meet Bunker’s opposition, the third
Fulton steamboat, the Paragon, made its first appearance on the river. She
was both faster and larger than her predecessors. She was fitted with two
masts, one stepped very far forward, and the other very far aft. The foremast

Page 55

carried an immense square foresail with a little square topsail above it, and
there was also a large triangular sail carried on the stay from the end of the
bowsprit to the cap of the lower mast. The aftermast carried an ordinary
trysail or mizzen. The vessel had a large rudder and was steered from
amidships, according to a contemporary print.
The following year another Fulton steamer, the Firefly, came on the
scene. She was a small vessel, only 81 feet in length, and though designed
for the lower river service, was used elsewhere as occasion demanded.
Fulton by this time was himself planning the placing of steamers on other
rivers, and in 1814 the Richmond was launched from his designs for the
James River in Virginia. The British-American War at this time rendered it
unsafe to send her south, and as the North River, late Clermont, was about
worn out by now, the Richmond took her place. Fulton seems to have been
associated to some extent with Bunker, for the latter’s boat, Fulton, was
designed by Fulton himself. She was a sloop-rigged vessel with a single
mast stepped well forward, and made considerable use of sails. She was 134
feet in length and 26 feet beam, and had a large square engine-house that
extended rather above the sides of her paddle-boxes. Hitherto all the
American steamers had been of the wall-sided, flat-bottomed type
inaugurated by the Clermont. The Fulton was the first steamer to be
constructed with a round bottom like a sailing ship.
Fulton was also interested in steamboats on the Mississippi and other
western waters. He and Nicholas Roosevelt were associated in 1809 in this
project, and in 1811 the steamer New Orleans was built. It was the pioneer
boat of the service, and descended the Ohio and Mississippi Rivers from
Pittsburg to New Orleans in fourteen days. In 1817 the Chancellor
Livingston appeared on the Hudson and in her general equipment marked a
decided improvement in every respect upon anything that had gone before.
She was the finest vessel without exception that Fulton and Livingston ever
possessed. Her designer was Henry Eckford, one of the leading naval
architects in America. She was, moreover, the biggest steamboat which had
been built in the world, as she was of over 500 tons burden. The building of
this boat was supervised at first by Fulton himself, but he died before it was
completed. The Chancellor Livingston was three-masted, and fore-and-aft
rigged throughout, and carried in addition a large square sail on the
foremast. She had three funnels which were placed forward of the paddle-
boxes and between the fore and main masts. Her engines were of the steeple

Page 56

type. She was square-sterned, and not only carried a deck-house, but the
roof of the deck-house was extended to form a square deck or gallery, and
above this again were a smaller deck-house and a large awning, so that
passengers on either deck were amply protected from the weather. The
gallery, at the stern, was the same shape as the stern itself. It was supported
by stanchions, and carried as far forward as the paddle-boxes. Early pictures
of this vessel represent her as having portholes along the sides of the hull
abaft the paddles, from which it would appear that in the body of the ship
itself there was also passenger accommodation. She was therefore the first
vessel to have three decks devoted to passengers.
The first trip of this boat was made towards the end of March 1817,
between New York and Newburgh, the 65 miles being covered in less than
nine hours, in only three of which was the tide running with the ship.
Coming back she did the distance in eight hours fifteen minutes, for the
most part against wind and tide. Her cost complete was 110,000 dollars.
This boat was not allowed to lie idle, and a statement was published in
December 1821 that the Chancellor Livingston made during the season of
that year “170 trips from New York to Albany. Allowing the distance to be
150 miles the aggregate will exceed 25,000 miles, which would more than
have carried her round the globe. We presume the Richmond has performed
the same number of trips, and when it is considered that these boats are
generally filled with passengers, some idea may be formed of the extent of
travel on the North River.”
Already excursions were very popular. The Chancellor Livingston took
excursionists once a week during July and August as far as Sandy Hook.
The same year, 1821, the steamer Franklin took passengers to the fishing
banks twice weekly, and the Olive Branch of the Philadelphia Line gave its
patrons what its owners called “a sail around Staten Island and turtle feast,”
and it was added that “a fine green turtle will be cooked, and a band of
music provided,” all for one dollar seventy-five cents. Captain Bunker, who
had the Enterprise built in 1818 at Hartford, Connecticut, brought her into
the New York service in 1821, for an excursion starting at half-past four in
the morning from the East River for Sands Point. This is one of the earliest
records of a steamer built elsewhere coming to New York waters to enter
upon the local trade.
Henry Eckford also planned the steamer Robert Fulton, which in 1822
made the first successful steam voyage from New York to New Orleans,

Page 57

and thence to Havana, in which trade she was afterwards engaged regularly.
The Robert Fulton then passed into the possession of the Brazilian naval
authorities, who turned her into a sailing ship and she became the fastest
warsloop in the Brazilian navy.
The Firefly was the first steamer to get round Point Judith, on the Rhode
Island shore, and reach Newport from New York. This was May 26, 1817,
and the voyage lasted twenty-eight hours. The sailing packets on the route,
as usual, resented her incursion, and when the wind was favourable they
usually outsailed her. The competition grew so great between the steamer
and the sailers that the latter made the typical American sporting proposal
not to charge passengers for the voyage between New York and Newport if
they did not reach port before the steamer.
Although the size of the American river steamers had been steadily
increasing, there had not been a great acceleration in the matter of speed.
Even at the time of Fulton’s death few, if any, American river steamers
exceeded an average of seven miles an hour for the trip.
Robert Livingston Stevens, son of John Stevens, built about that time
(1813) the Philadelphia, which attained an average speed of eight miles.
Speed was a question to which he devoted considerable attention, for he
realised its importance, and nearly every vessel he turned out was an
improvement upon its predecessor. The inventions and improvements which
he introduced inaugurated a new era of steamboat construction. Of the fate
which overtook some of these early vessels, it may be noted that the
Clermont died of premature old age, the Car of Neptune was broken up, the
Paragon went to the bottom, and the Hope, the Perseverance, the Firefly,
and the Richmond were broken up.

Page 58

The “Philadelphia.” Built 1826.

According to evidence given before a Select Committee of the House of
Commons in 1817 by Mr. Seth Hunt of Louisiana, there were then ten
steam vessels running between New York and Albany, two between New
York and Connecticut ports, four or five between New York and New Jersey
ports, besides ferryboats on the Hudson and East Rivers. There were also
steamers on the Delaware, between Philadelphia and Trenton, Newcastle,
and Wilmington; also steamers from Baltimore to Norfolk, Virginia, which
crossed the estuary of the Chesapeake. Steamers had been to New London
and New Hartford. The Powhatan steamer of New York was three days
exposed to a gale in the open sea, after which it arrived at Norfolk, Virginia,
and thence steamed up the James River to Richmond. At that time,
according to this witness, there were on the Mississippi two steamers, the
Etna and Vesuvius, which were each of 450 tons, carried 280 tons of
merchandise, 100 passengers, and 700 bales of cotton.
Towards the middle of the last century numbers of steamboats were
placed on the coastal and river services from New York. The Fulton

Page 59

ferryboats Union and William Cutting were both built in 1827; and in the
following year the De Witt Clinton was built in Albany for the passenger
service between New York and Albany; she was 571 tons gross, more than
any of her contemporaries. A notable vessel, then the fastest steamboat ever
built, was the Lexington, which began to run in 1835 between Providence
and New York. As the railway companies were formed about the same time,
the competition between the steamboat companies and the railways was
lively and fares were reduced with American thoroughness. The
Narragansett arrived at Providence in October 1836. She was fitted with a
300-horse-power horizontal engine, which was too heavy for her, for on her
trial trip she rolled over with the directors of the company and their guests
on board. Fortunately no lives were lost. In 1838, the John W. Richmond
appeared as the rival of the Lexington and there were many exciting races
between the two, but two years later the Richmond was sold for
employment elsewhere. The Lexington was burnt in 1840, and the
Richmond met with a similar fate three years later. The Fall River Line was
established in 1847 and has maintained the service to the present day.
All these steamers were built of wood, and as they increased in size they
developed a marked tendency to “sag,” that is, drop in the middle, or to
“hog,” that is, drop at the ends. This tendency was overcome by an
ingenious system of stump-masts and strutts, and iron ties, invented by
Colonel Stevens. There are various methods of applying these stiffeners,
and the peculiar framework of wooden arches and stump-masts which
appears on so many American river steamers is due to the necessity of
employing one or other of these systems for strengthening purposes. In
some of the later vessels (as in the De Witt Clinton) these ties are put into
the framework of the superstructure.
In construction, the development of American steamers on inland waters
since Fulton’s time has proceeded on entirely different lines from those
which marked the progress of river navigation in Great Britain. American
river steamers were designed not only to cope with the traffic in narrower
and shallower places, but to carry whatever was necessary in deeper waters,
and at the same time get through the more difficult places somehow. The
great distances to be travelled on the American rivers rendered necessary
the provision of vessels carrying large quantities of cargo and extensive
accommodation for passengers, whilst the bars occurring at intervals in the
beds of the rivers made it compulsory that the vessels should be of light

Page 60

draught. The construction of English river steamers, on the other hand, has
been conditioned by the comparative narrowness of the English rivers and
the lowness of the many bridges which span them.

The “De Witt Clinton.” Built 1828.

The Fall River Line boats were the pioneers of the modern type of
Hudson River steamers, the first of them being the famous Bay State, plying
between New York and Fall River. She was 315 feet long and 40 feet beam
and of 1500 tons burden. Her engines were of 1500 horse-power. The Bay
State, being intended for Long Island Sound work, was much more strongly
built than those boats which were confined to the Hudson River Line. This
vessel was both the largest and fastest craft of her day. She ran the distance
from Fall River to New York in nine hours fifteen minutes, including a stop
at Newport. In 1864 she was dismantled, and her hull was converted into a
barge, her machinery being placed in a new steamer named Old Colony.
Vessels followed each other in rapid succession, but although rival
companies sprang up with considerable frequency, few of them lasted very
long and their boats, if good enough, were sometimes acquired by the Fall
River Company. One of the most dangerous competitors was the
Merchants’ Shipping Company, which controlled fifteen steamers, and for
which William H. Webb, the famous American shipbuilder, constructed
those two historic boats, the Bristol and the Providence. The line lost two or

Page 61

three of its steamers in rapid succession, and had to suspend payment. The
Bristol and Providence had each two hundred and twenty-three state-rooms.
They were lighted by gas throughout, and were afterwards steam-heated.
Each boat carried a band of music, and for the first time on an American
merchant vessel the officers and crew were in uniform. In 1883 the first iron
steamboat in Long Island Sound, the Pilgrim, was built. She had a double
hull divided into ninety-six water-tight compartments. The Puritan
followed her. The Plymouth was launched in 1890, and was burnt in dock
ten years later, and in August of the following year the present Plymouth
was launched. All these vessels were side-wheelers, the later ones being of
steel, and having a speed of twenty miles an hour.
One of the finest vessels now afloat is the Commonwealth. She is 456
feet in length, 35 feet moulded breadth, 96 feet breadth over the guards, and
has a depth of hull of 22 feet. She has sleeping accommodation for 2000
persons.
Like all steamers on the Fall River Line, the Commonwealth is built of
steel. Seven doorless bulkheads extend to the main deck. The hull is double,
and the space between the bottoms is divided into a great many water-tight
compartments. She has also collision bulkheads on each side at the guards
and a bulkhead athwart ship. Her engine is of the double inclined compound
type, with two high-pressure cylinders 96 inches in diameter, all having a
common stroke of piston of 9 feet 6 inches. The wheels are of the feathering
type with curved steel buckets. Besides the usual auxiliary steam pumps,
there is a large pump for use only on the fire-sprinkler system. Her speed is
twenty-two miles an hour.
During the nineteenth century there was an equally striking development
among the steamers of the various lines on the Hudson River. The Empire
of Troy, to distinguish her from another steamer called the Empire built in
the ’forties and belonging to a rival line, was then the largest river steamer
in the world, being 307 feet over all and of 936 tons register. She was
quickly superseded by the Hendrick Hudson of the Albany Line, which was
the first Hudson River steamer to exceed a thousand tons. This in turn was
eclipsed by the Oregon. The St. John, of 2645 tons, built in 1863, was the
first to exceed 2000 tons, The Adirondack, of 3644 tons, was placed on the
river in 1896, and in 1904 the C. W. Morse, of 4307 tons, appeared.

Page 62

The “William Cutting.” Built 1827.

The Hudson River boats, after the first or experimental types of vessel,
have always been famous for their speed and beauty no less than their
comfort. One of the most famous of them all was the Alida. Two others,
which raced occasionally, were the Oregon and the C. Vanderbilt, one
notable contest in which they engaged being in 1847, for a stake of 1000
dollars. On the way back the Oregon ran short of fuel, whereupon the
owners threw into the furnaces the furniture and everything else that would
burn which they could lay hands on. The time of the run was 3 hours 15
minutes, which gave an average speed of 20 miles an hour. After the heroic
sacrifice made by the Oregonians, it is satisfactory to learn that the Oregon
won by 400 yards. The Alida and the Hendrick Hudson raced from New
York to Albany, the former doing the voyage in 7 hours 55 minutes, the
latter boat being 15 minutes longer on the voyage. The scheduled time of
the present Hudson River Day Line steamers over the same water is 9 hours
30 minutes, from which it would appear that the boats of sixty years ago
were as capable of fast travelling as are their palatial successors of the
present day. One of these, a second Hendrick Hudson, was launched on the
Hudson in 1907, a hundred years from the day of the Clermont’s first
voyage up the river.

Page 63

The “Mary Powell.”

The decade from 1840 to 1850 was the golden age for steamboat
proprietors on the Hudson River, as there was then no railroad competition,
though there were several competitive steam-ship companies. In 1849 there
were no less than twenty steamers on the route between New York and
Albany, and the fares were cut as low as 12¹⁄₂ cents for the 145 miles. One
of the steamers on the river in the ’forties was the Norwich. A few years
later she was converted into a tug-boat, and up to the end of 1909 was still
in active service. She has been repaired so often, however, that not much of
her original hull is left, but her first engine is still in use. A steamer which is
still held in affectionate memory by all frequenters of the Hudson River, the
celebrated Mary Powell, was launched in 1861, and was never eclipsed in
speed by any vessel until the modern torpedo-boats were built. She
frequently covered 27 miles an hour. This remarkable boat came from the
New Jersey yards of Messrs M. A. Allison. Originally she was 260 feet in
length, but in 1874 she was increased to 286 feet, and again in 1897 to 300
feet. Her paddle-wheels were 31 feet in diameter, with 26 floats to the

Page 64

wheel, each float being 10¹⁄₂ feet long by 1 foot 9 inches wide and dipping
3¹⁄₂ feet. One vessel, the Glen Cove, attained notoriety if not fame by being
the first to carry that novel musical instrument known as the calliope.
Fortunately for New Yorkers, the innovation was not popular. The machine
consisted of a large steam chest, on the top of which were arranged a
number of valves according to the number of whistles to be blown. As a
powerful calliope could be heard for a distance of some miles, and as the
instrument frequently consisted of from eight to twelve whistles, and the
selection performed upon it was of the “Shall we gather at the river” variety,
it cannot be said that the English have been the only people to take their
pleasures sadly. Three boats plying in New York Bay carried these
excruciating instruments. The Glen Cove was sold with her calliope to ply
on the James River in Virginia, and was sunk by the Confederates during
the Civil War. The most aggressive calliope was carried on the Armenia. It
had thirty-four powerful whistles.

The “Hendrick Hudson” (Hudson River Day Line), 1906.

Page 65

In 1860, the Daniel Drew, a long and very narrow boat, reduced the time
of the voyage to Albany to seven hours twenty minutes. It is impossible for
the heavy steamers of the present day to travel on the up-river stages as fast
as the lightly built boats of that time, but in the deeper waters of the lower
river they are faster than the lighter vessels. A steamer of the latest type is
the Robert Fulton, built for the Day Line by the New York Shipbuilding
Company of Camden, N.J., and the W. and A. Fletcher Company of
Hoboken. Her trials took place exactly 116 days after her keel was laid, and
she began to run in 1909.
The development of the steam-ships on the lakes was no less remarkable
than on the sea-coasts. At the outset the boats were of wood, which was
gradually superseded first by iron and then by steel, and with the
introduction of the latter has come also their greatest development in
carrying capacity. The first steamer placed in service on the Great Lakes,
above Niagara Falls, was launched in 1818, and bore the picturesque Indian
name Walk in the Water, after a noted Wyandotte chief. She was of 338 tons
gross and built at a spot which is now a part of the City of Buffalo. The
machinery was furnished by Robert McQueen of New York, one of her
owners.
By 1844 there were three large steamers of over 1000 tons each on the
lakes, built wholly for the American passenger service from Buffalo. The
first screw-propelled boat on the lakes was the Vandalia, built at Oswego in
1841. She was one of the earliest vessels to have her machinery placed right
aft. By 1849 there were enrolled at Buffalo, which was the chief lake port,
29 side-wheelers, 18 of which were of from 500 to 1500 tons, and 10
screw-propelled boats of under 500 tons, but by 1862 the number of
steamers had increased to 147 side-wheelers and 203 screw-propelled boats.
The construction of the Welland Canal and the Sault Ste. Marie Canal with
larger locks than hitherto had a most stimulating effect on lake shipping.
American ingenuity devised freight-carrying steamers peculiarly adapted
for work on the lakes. The largest boat on the Great Lakes is the William M.
Mills, a “bulk-freighter.” She is virtually an immense box girder 607 feet in
length, 585 feet length of keel, 60 feet beam, and 32 feet in depth, with
triple-expansion engines. She is built on the hopper and girder system, and
has a cargo hold 447 feet long without obstruction other than three screen
bulkheads fitted for convenience in carrying grain; her cargo capacity is
514,505 bushels of wheat. She and her two sister ships can each carry

Page 66

12,380 tons of ore. Her water-ballast tanks will take 7000 tons, and her
pumps are so powerful that the whole of this quantity can be discharged
overboard in three hours. The officers and crew are accommodated in a
deck-house situated on the forecastle. Above this deck-house are the
navigating bridge and steering-house. The engines are placed at the extreme
end of the vessel, so that the whole space between the engine bulkhead and
the forecastle is devoted to the cargo. The scantlings of the hull throughout
are the heaviest on fresh water.

The “Robert Fulton” (Hudson River Day Line), 1909.

On the Mississippi River and its tributaries a type of large shallow
steamers, propelled by immense side or stern paddle-wheels, was
developed. These vessels were noted for their high superstructures and
towering funnels. Racing was frequent among them.
In April 1838 the Mississippi River steamer Moselle, crowded from stem
to stern with passengers for St. Louis, blew up. She had gone a little way up
the river from Cincinnati for the purpose of exhibiting herself and of
coming back past the city “a-flying.” As she stopped to turn, the boilers

Page 67

exploded, blowing the ship to fragments. The captain, who was in the pilot-
house, was blown about eighty yards away; a boy on board was found dead
on the roof of a house on shore. It was never known exactly how many
perished, but the number is estimated at anything from one hundred to two
hundred. One of the boilers was thrown ashore by the explosion, and in
falling made a large hole in the pavement.[23]
[23] Cincinnati Evening Post, April 25, 1838.

Another accident of that year befell the steamer Oroonoko on the
Mississippi. Her boilers blew up and, the wreck taking fire, about one
hundred lives were lost, most of the victims being burnt to death. The
engineer, before he died, said the boilers were full of water, and that his
department was not in fault, but that the boilers were old and worn out and
not fit for such a boat.[24]
[24] Vicksburg Register.

About the same time two other steamers, the Pioneer and Ontario, were
racing on the river near Cincinnati and collided. The Ontario ran purposely
into the Pioneer, which returned the compliment by deliberately ramming
the Ontario, killing one passenger, dangerously wounding two others, and
smashing the Ontario’s guards. The Pioneer won that race, but intentional
collisions were too much even for the sensation-loving public which
patronised the racing Mississippi steamers and used to bet heavily on the
result, and dangerous racing of this character was for a time tabooed.
One of the most famous races on record was that between the Eclipse and
the Natchez, two magnificent vessels which were very evenly matched. It is
recorded that the immense funnels of these two boats, as they tore along
almost on a level with only a few feet between them, were red-hot, and that
the blaze from their pine-fed furnaces made the dwellers on either side of
the bank think that the vessels were on fire.
The finest passenger steamer which has ever been placed on the Lakes is,
without exception, the City of Cleveland. The hull, built of mild steel, is
divided into ten compartments by water-tight cross bulkheads extending
from the keel to the main deck. The double bottom, which reaches nearly
the entire length of the ship, is also divided into ten compartments, which
can be used for water-ballast, and she has a steadying tank holding 100 tons
of water and situated amidships to check the rolling in a heavy sea. The City
of Cleveland is 400 feet over all, 390 feet keel, 54 feet across the hull, and

Page 68

has a depth of 22 feet. Like nearly all American paddle-steamers she is
decked to the full width of the guards. She has seven decks, the main deck,
which is of steel, being sheathed with wood to deaden the noise of the
handling of cargo. Her electric plant provides 1500 lights, as well as a
search-light of 50,000 candle-power. Her engine was constructed by the
American Shipbuilding Company and consists of an inclined three-cylinder
compound engine, the high pressure being arranged between the two low-
pressure cylinders. The high-pressure cylinder is 54 inches in diameter and
the low-pressure cylinders are each 82 inches and the stroke of piston is 8
feet. The paddle-wheels are 29 feet in diameter and are fitted with
feathering blades, each of which is 14 feet long and 4 feet wide. This
steamer makes two trips a day between Detroit and Cleveland, and is
credited with having attained to a speed of twenty-four miles an hour.

The “City of Cleveland.”

Page 69

The “William M. Mills.”

The Canadian-built lake steamers are similar to those from United States
yards, and a typical specimen of colonial construction is the Midland
Prince, launched in 1907 by the Collingwood Shipbuilding Company of
Collingwood, Ontario, which, like the Collingwood, is an immense
freighter.
One or two “whalebacks,” a type designed for the Lakes by Captain
McDougall, have been seen on the Atlantic occasionally, but they were not
a great success. A vessel of this type visited Liverpool some years ago, the
Charles Wetmore, and having her engines placed aft, and being built with a
perfectly flush whaleback, without hatchways, and with a “scow and pig-
snout” bow, was a decided curiosity. The ingenuity of her design and the
excellent workmanship displayed in her construction impressed naval
architects favourably, but there was nothing to show that she was superior
as a cargo vessel to the single-deck steamers on this side of the Atlantic.

Page 70

The whaleback steamer is less in favour than it was, even in America, but a
good many of them are still to be seen on the Lakes and the Pacific coast.

Page 71

CHAPTER III
THE PROGRESS OF STEAM-SHIP BUILDING IN GREAT BRITAIN

he first steam-ship built in the United Kingdom (and so far
as is known unnamed) was constructed on the River
Carron in 1789 by William Symington, and the engines for
it were made at the Carron Works at a cost of £363 10s.
10d. The following affidavits relating to this vessel are of
interest, as they go far to prove that William Symington
was the inventor of the marine steam-engine, the patent of
which was taken out in 1786:
“I, William Symington, civil engineer, now residing at Falkirk, in the
County of Stirling, in that part of the United Kingdom called Scotland,
produce herewith, and refers[25] to a memorial containing a narrative of his
connection with the invention of steamboat navigation, each page of which
memorial is subscribed by the deponent as his relative hereto, and he
maketh oath and sayeth that the said memorial contains a true narrative of
facts, as connected with the said invention; and he further sweareth that he
did not receive any aid or assistance of any kind to enable him to invent and
apply a steam-engine to the propelling of boats.
“Sworn at Woodburn, in the County of Stirling, upon the first day of
December, in the year one thousand eight hundred and twenty-four, before
me, one of His Majesty’s Justices of the Peace for the County of Stirling.
“(Signed) William Symington.
“(Signed) John Callander, J.P.”

[25] Sic in original.

Page 72

Page 73

Patrick Miller’s Triple Boat the “Edinburgh.”

“Joseph Stainton Esq., of Biggarshiels, manager for Carron Company at
Carron, in the County of Stirling, in that part of the United Kingdom called
Scotland, maketh oath, and sayeth: That he knows William Symington,
engineer at Falkirk. That he has access to know that the said William
Symington made certain experiments in the year one thousand seven
hundred and eighty-nine, by applying a steam-engine to propel a boat along
the Forth and Clyde Canal. That the machinery for said experiment was
made at Carron, under the direction of the said William Symington, and the
expense thereof, amounting to three hundred and sixty-three pounds, ten
shillings and ten-pence, was paid to Carron Company by the now deceased
Patrick Miller, Esq., of Dalswinton. That the deponent has seen the boat in
which the said experiments were made, and has frequently heard of the
experiments mentioned. That in the year one thousand eight hundred and
one, or about that time, the said William Symington was employed by the
now deceased Thomas Lord Dundas to erect a boat and construct a steam-
engine to propel it along the said canal. That the deponent saw the said boat
when completed, and had access to know that it was employed in the way
of experiments to drag vessels along the canal. That it consists with the
deponent’s knowledge, Robert Weir was employed by the said William
Symington about the said boat. That he knew the said Robert Weir, who
now resides at Kincardine, to be a man of respectable character and of
veracity. That the said William Symington afterwards constructed a larger
boat, and the deponent had access to see both the boats, and to know that
they were propelled by steam.”
“Sworn at Carron, in the County of Stirling, upon the thirtieth day of
November, one thousand eight hundred and twenty-four, before me, one of
His Majesty’s Justices of the Peace for the County of Stirling.
“(Signed) John Callander, J.P.
“(Signed) J. Stainton.”[26]

[26] “A Century and a Half of Commercial Enterprise,” by the Carron Company.

Scotland owes her pre-eminence in shipbuilding and marine engineering
to Patrick Miller, an Edinburgh banker who, having retired with a large
fortune to Dalswinton, among other things set himself to ascertain whether

Page 74

some better means of propelling vessels than sails or oars could not be
obtained. He had exhibited at Leith a triple vessel “having rotatory paddles
in the two interspaces driven by a crank,” which was turned by four men.
This he matched against a fast-sailing Customs wherry between Incholm
and Leith Harbour over a distance of six or seven miles, and was very well
satisfied with the victory he secured. But his sons’ tutor, James Taylor of
Cumnock, having taken his turn at the crank, was so convinced by the
violence of the exertion that some more reliable power was needed, that he
urged on Mr. Miller the propriety of employing a steam-engine. Mr. Miller
had placed a new double boat on his lake at Dalswinton, and Taylor, with
his permission, arranged with his friend William Symington to fit it with a
steam-engine. Symington, who was then engaged as a mining engineer, at
Wanlockhead, had constructed a model of a steam carriage in which he had
converted the reciprocating motion of the pistons into a rotatory motion.
Miller and Taylor were shown this model in December 1787. The engine
had only four-inch brass cylinders, made, curiously enough, by George Watt
of Edinburgh. The trial trip of Miller’s boat took place on October 14, 1788,
in the presence of several hundreds of people, and was so successful that
Miller resolved to repeat the experiment on a larger scale. In the next year a
twin vessel, 60 feet long and fitted with an engine with 18-inch cylinders,
attained a speed of seven miles an hour on the Forth and Clyde Canal. For
some reason Miller became dissatisfied with Symington, and abandoned his
project of making a sea trip with a third vessel from Leith to London. The
cost of fitting up a second vessel, for one thing, was greater than he had
anticipated, and he was further discouraged by a miscalculation through
which the machinery was made too heavy for the hull. Symington’s original
engine of 1788 is now at South Kensington, and a photograph of it is here
reproduced.

Page 75

Model of Miller’s Double Boat.

Symington was the only one of the three who persevered.[27] He brought
his design for a steam vessel under the notice of Lord Dundas, who was

Page 76

largely interested in the Forth and Clyde Canal, and suggested to him the
advisability of towing barges by steam-power. The Charlotte Dundas was
accordingly built in 1801 under the patronage of Lord Dundas, and made
her appearance on the canal in 1802. The propelling machinery of the vessel
was a long way in advance of the time, inasmuch as it consisted of a stern
wheel driven by the first horizontal direct-acting engine that was ever
constructed.[28] She was 56 feet in length by 18 feet beam and 8 feet depth,
and towed two barges of 70 tons a distance of nineteen and a half miles in
six hours against strong winds. But complaints were made that the swell she
created damaged the canal banks, and her proprietors were forced to
abandon the enterprise. Thus the Charlotte Dundas, though an unquestioned
engineering success, was a commercial failure, and on being withdrawn
from service was laid up in Lock No. 16 and allowed to rot, a monument to
the genius of her constructor and the prejudice of those who were too
ignorant to recognise the obvious. A photograph of the model at South
Kensington Science Museum, and a section showing her machinery, are
given here.
[27] Chambers’ Journal, 1857.
[28] Sir G. Holmes’ “Ancient and Modern Ships.”

Page 77

The “Charlotte Dundas” (Longitudinal Section).

Page 78

Symington’s Original Engine of 1788.

Symington also brought his steamboat to the notice of the Duke of
Bridgewater, who became his patron and contemplated trying steam-towage
upon the Bridgewater Canal; but on the Duke’s death his executors
repudiated the verbal contract and dashed Symington’s hope to the ground.
He was reduced to abject poverty, and died in the East End some years later.
[29]

[29] Notes and Queries.

The next experiment of importance in steam navigation was made by
Henry Bell of Helensburgh. He was a house carpenter at Glasgow for many
years, and then, having opened a boarding-house at Helensburgh, he
conceived the idea of inducing more visitors to go thither by providing for
their convenience boats moved by paddles worked by manual labour. This
failing, he determined upon a steamboat.

Page 79

He was probably influenced in his decision by the correspondence he had
with Fulton. The exact nature of the relations between Fulton and Bell has
never been satisfactorily determined. The Caledonian Mercury in 1816
published a letter from Bell stating that Fulton wrote to him about Miller’s
boats, and asked for a drawing and description of the machinery. Bell saw
Miller and sent Fulton the required information. The date of this transaction
is not given, though Fulton is said to have written afterwards to Bell that he
had constructed a steamer from the drawings Bell sent.
Bell’s story was that these letters were left in Miller’s hands. Bell further
states that the consideration of the absurdity of writing his opinion to other
countries, and not putting it into practice himself, roused him to design a
steamboat for which he made various models. The result was the Comet,
built for him by John Wood and Co. She was 40 feet on the keel, 10¹⁄₂ feet
beam, and about 25 tons burden. The vessel was inferior to Symington’s.
The furnace was enclosed with brickwork and the fire was not wholly
surrounded by water. The boiler was placed at one side of the vessel, and
the funnel, bent so as to rise from the centre, also had to do duty as a mast.
Bell had previously witnessed the experiments made in 1789 at Carron
with Miller’s second boat, and when Symington’s experiments came to an
end in 1803 he continued to investigate on his own account.
He advertised that his vessel was for passengers only, and that he had “at
much expense, fitted up a handsome vessel to ply upon the River Clyde,
between Glasgow and Greenock, to sail by the power of wind, air, and
steam.” The vessel was to go down to Helensburgh one day and return the
next, thus making three trips each way in the week. Many of the sailing-
boat owners regarded the Comet with undisguised hatred, and its invention
as a device of the evil one. Thus, one Dougal Jamson, a Clyde skipper,
whenever the steamboat passed his slow-going sloop,[30] invariably piped
all hands—a man and a boy—and bade them “Kneel down and thank God
that ye sail wi’ the A’michty’s ain win’, an’ no’ wi’ the deevil’s sunfire an’
brimstane, like that spluttery thing there.”
[30] The Steamship, January 1883.

Page 80

Model of the “Charlotte Dundas.”

The Comet’s engine, which was built by John Robertson, was of four
nominal horse-power with a single upright cylinder of 12¹⁄₂ inches diameter
and 16 inches stroke, and drove a pair of half side-levers by means of two
rods. A connecting-rod from the levers worked the crank shaft, which
carried a heavy fly-wheel. The slide valve was driven by an eccentric on the
main shaft through a rocking shaft, while the condenser was placed between
the side-levers, which drove the vertical air-pump. Originally the engine
was fitted with a smaller cylinder, but after being used for some months this
was replaced by the one described. Steam was supplied by an internal flue
boiler, built by David Napier. The vessel was originally propelled by two
paddle-wheels on each side, driven by spur gear, with the paddles on
detached arms, but this arrangement giving trouble, complete wheels were
substituted, and subsequently, after the vessel had been lengthened about 20
feet, the number of wheels was reduced to two.[31]

Page 81

[31] “The Clyde Passenger Steamers,” by Captain Williamson, and Catalogue of the
Victoria and Albert Museum, London.

They had considerable difficulty with the boiler. Its builder, David
Napier, writes that they first tried to make the internal flues of cast iron, but
finding that would not do they tried malleable iron, “and ultimately
succeeded by various devices in getting the boiler fitted.” The Comet’s first
master was William Mackenzie, originally a schoolmaster at Helensburgh,
and the engineer was Robert Robertson. The crew numbered eight, not
forgetting a piper. According to an advertisement, “the elegance, safety,
comfort, and speed of this vessel require only to be seen to meet the
approbation of the public.”[32] But her speed was unsatisfactory and Bell
arranged with Robertson to make alterations in the engine and paddle-
wheels. She then made six miles an hour, but even this was not sufficient to
attract passengers. The boat was not a financial success, and it is believed
that neither the builders’ nor Robertson’s accounts were ever settled. The
career of the Comet, indeed, was not a long one. On December 13, 1820,
she was wrecked outside Crinan. She parted amidships, and while the stern
drifted away the remainder of the vessel, with Bell, his crew, passengers,
and machinery, stuck fast. All scrambled ashore, and the machinery was
afterwards recovered. Her original engine was put to some strange uses. A
Glasgow coachbuilder took it as payment for a vehicle he had previously
supplied to Bell, and used it to drive the machinery in his coach-works. It
then went to Greenock and was installed in a brewery. Another purchaser
brought it back to Glasgow, and it ultimately came into the possession of
Messrs. R. Napier and Sons of Glasgow, and Messrs. R. and J. Napier in
1862 presented it to the South Kensington Museum.
[32] The Glasgow Chronicle, August 14, 1812.

But the Comet was not the only boat with which Robertson was
concerned. Wood built the Clyde for him in 1813, and she began her work
in June of that year. She was 72 feet long with a beam of 14 feet and depth
of 7 feet 6 inches, and regularly went from Glasgow to Gourock and back in
about 3¹⁄₂ hours each way, including a few stoppages, on a coal
consumption of 24 cwt. The Tay was built for him at Dundee in 1814, but
he had the engine built at Glasgow. She plied for some time between Perth
and Dundee, and in 1818 was back at Glasgow, being then known as the
Oscar. In 1814 Robertson had two other boats built at Dundee, for which he

Page 82

provided the engines. These were the Caledonia and the Humber, and are
thought to have been the first steamers sent from Scotland to England.
Rivals quickly appeared on the scene, for the Comet had shown that what
had hitherto been looked upon as an impossible undertaking could now be
regarded as a commercial speculation. In 1813 the Elizabeth was built and
was followed shortly afterwards by the Clyde. The Elizabeth was sent to
Liverpool and was the first British steamer to make a sea voyage. The
vessel was in charge of Colin Watson, his cousin, neither of them nineteen
years of age, and a boy.[33] The engine of the Elizabeth was only 8 horse-
power. The three adventurers brought the vessel in safety from Glasgow to
Liverpool through a violent gale—a very remarkable performance. This
voyage was made in 1815.
[33] Letter from Mr. K. Y. Watson in the second edition of Mr. John Kennedy’s
“History of Steam Navigation.”

Page 83

Page 84

The Original Engines of the “Comet.”

Watson left Glasgow for Grangemouth on May 8, and on the following
day started from Grangemouth with the Elizabeth, bringing her along the
canal. Obstacles of one sort or another caused detention in the canal,
specially at Lock No. 27, and Bowling was not reached until May 12. The
voyagers arrived at Port Glasgow on the 13th, where another stay was made
while the damages sustained in navigating the canal were repaired, and
preparations were made for the sea voyage.
The Clyde was left on June 2, but the little vessel had to be brought up in
Lamlash, Isle of Arran, there being a “dreadful storm at night,” as the
captain narrates. They sailed from Lamlash about one o’clock in the
afternoon of the 4th, “and after undergoing great peril, reached Port Patrick
the same night twelve o’clock.” A lengthy stay was made there, due partly
to an accident, the nature of which is not stated, “but principally the want of
money,” till Saturday 24th, when they left Port Patrick. The Elizabeth’s
adventures were by no means over, for she was obliged to bring up in
Ramsey Bay, Isle of Man, an accident throwing off one of her paddles. The
financial difficulty having been further overcome to the extent of six
guineas, the Elizabeth left the Isle of Man with a fine breeze, “day lovely,
but, after working all day and night, we found on the morning of
Wednesday 28th, we had been deceived by our compass and were off the
coast of Wales.
“We again unshipped our paddles, and drifted nearly to Dublin ere we
could again get them to work, but luckily did effect that and anchored off
George’s Dock Pier, Liverpool.”[34]
[34] The full log appears in Mr. Colin Watson’s “Doubly in Crown Service”; the
original log is stated to be preserved in Brown’s Museum.

Another famous vessel of this period was built in 1814 at Fairlie by
William Fyfe. This was the Industry, known in later years as the Coffee Mill
because of the grinding noise made by the cog-wheels in her machinery.[35]
She is also remarkable as being the only trading steamer ever built at the
Fairlie yard, for William Fyfe steadfastly refused to construct anything but
yachts and smart fishing smacks.[36]
[35] Mr. John Hastie’s Address to the Institute of Engineers and Shipbuilders in
Scotland, December 2, 1880.
[36] “The Clyde Passenger Steamers.”

Page 85

The year 1814 saw the building of the Princess Charlotte and Prince of
Orange, the first British steamers with engines by Boulton and Watt. In the
same year at Dumbarton, Archibald MacLachlan built the Marjory, the first
steam vessel to enter the Thames. She was sent through the Forth and Clyde
Canal and down the east coast, and as her beam was wider than the canal
locks her wings had to be removed.
Steamship building now proceeded with great energy. In 1815 boats were
built in Ireland at Cork, and the first voyage of a steamer from Glasgow to
London was made by the Thames, while in England the London river
steamboat service was opened.
The Thames, previously the Argyle, is described by the Times, July 8,
1815, as a steam yacht, and as a “rapid, capacious, and splendid vessel,”
which “lately accomplished a voyage of 1500 miles, has twice crossed St.
George’s Channel, and came round the Land’s End with a rapidity unknown
before in naval history.... She has the peculiar advantage of proceeding
either by sails or steam, separated or united, by which means the public
have the pleasing certainty of never being detained on the water after dark,
much less one or two nights, which has frequently occurred with the old
packets.”

Page 86

The “Comet,” 1812.

The Thames always did her journey, a trip to Margate, in one day. “Her
cabins,” says the Times eulogist, “are spacious and are fitted up with all that
elegance could suggest or all that personal comfort requires, presenting a
choice library, backgammon boards, draught tables, and other means of
amusement. For the express purpose of combining delicacy with comfort a
female servant tends upon the ladies.” The Thames was of 70 tons register,
79 feet on the keel, 16 feet beam, and carried engines of 14 horse-power.
Her funnel did duty as a mast, and carried a large square sail. “A gallery
upon which the cabin windows opened projected so as to form a continuous
deck, interrupted only by the paddle-boxes, an arrangement which had the
further effect of making the vessel appear larger than she really was.”[37]
She also displayed on her sides eighteen large painted ports, besides two on
her stern, which gave her such a formidable appearance that several naval
officers stated in evidence before a Parliamentary Committee that they
would have attempted to reconnoitre her before bringing her to. For in those
days merchant vessels carried cannons and did not hesitate to show their
noses through the ports if need were.
[37] Kennedy’s “History of Steam Navigation.”

Page 87

Her voyage to London was made under the command of a former naval
officer named Dodd. She sailed from Glasgow about the middle of May,
carrying, besides Dodd, a mate, engineer, stoker, four seamen, and a boy.
The first night out they met a heavy gale, and instead of being off the Irish
coast as Dodd intended, they found themselves in the morning perilously
near Port Patrick, its rock-bound coast being less than half a league on their
lee. Dodd saw that his only hope of safety was to run the engine for all it
was worth, and the little steamer managed to fight her way against the wind
and a tempestuous sea, gaining at the rate of about three miles an hour. Two
passengers, a Mr. and Mrs. Weld, joined the ship at Dublin.[38] Weld’s
journal records that he went to see the vessel “and found her on the point of
starting with a number of curious visitors upon an experimental trip in the
Bay.” He was so pleased that he asked Captain Dodd, who at once
consented, to take him as a passenger to London, and Mrs. Weld “resolved
on sharing the dangers of the voyage.”
[38] Chambers’ Journal, April 25, 1857.

When the adventurous journey was resumed several persons went with
them as far as Dunleary, now Kingstown, where they landed after being
violently sea-sick owing to the rough water. Some naval officers on board
prophesied that the vessel could not live long in heavy seas. Kingstown was
left, and the steamer soon found herself in as rough a sea as ever. The next
morning they arrived off Wexford. The smoke led the people to suppose the
vessel was on fire, and all the pilots in the place put off to her help, but their
dreams of salvage were disappointed. The weather becoming worse, Dodd
sought safety in Wexford Bay. They sailed again for St. David’s Head. Both
paddle-wheels met with an accident and had to have a blade cut away, the
vessel’s progress, however, suffering but slightly in consequence. Milford
Haven was safely reached, but when nearing the port they met the
Government mail packet from Milford to Waterford under full sail. They
had passed the packet about a quarter of a mile when Dodd thought he
would send some letters by her to Ireland; accordingly the Thames was put
about, overhauled the packet, and sailed round her. The letters having been
put aboard, Dodd took his boat again round the packet, although the latter
was under way, and then continued his journey. At Milford the engine and
boiler were cleaned. But after leaving Milford the pilot declined to attempt
to round the Land’s End that night. Dodd put into St. Ives, where the

Page 88

Thames was again mistaken for a ship on fire. There being no shelter at St.
Ives he went on to Hayle. Off Cornwall Head a tremendous swell from the
Atlantic met the steamer, and the waves were of such a height as to render
her position most alarming. Dodd battled on, and after a night’s struggle
rounded the Land’s End. At Plymouth and Portsmouth officials and
thousands of sightseers went to see her, and at Portsmouth the Port Admiral
was asked to grant the voyagers a guard that order might be preserved.

The “Industry,” 1814.

The Thames steamed up the harbour with wind and tide at nearly
fourteen miles an hour. A court-martial which was being held at the time on
one of the warships hurriedly adjourned to witness the wonderful sight.
Margate and London were reached in due course, the ninety miles’ run from
Margate to Limehouse being done in ten hours.
Sir Richard Phillips, in his “Million of Facts,” published in 1839, writes:
“In her first voyage to Margate none would trust themselves, and the editor
and three of his family with five or six more were the first hardy
adventurers. To allay alarm he published a letter in the newspapers, and the
end of that summer he saw the same packet depart with three hundred and

Page 89

fifty passengers!” They must have been packed as tightly as herrings in a
barrel.
Another steamer on the Thames in 1815 was the Defiance. She was
possibly the first steamer to be built on the banks of the Thames, but as
there is no discoverable record of the fact, it is equally possible she was
built as a sailer, and was fitted with engines. The Majestic appeared in
1816, and is thought to have been the first steamer employed in towing
ships. On August 28, 1816, she towed the Hope, an Indiaman, from
Deptford to Woolwich at a rate of three miles an hour against the wind.[39]
[39] Kennedy’s “History of Steam Navigation.”

It is recorded that prior to the appearance on the Thames of the Marjory,
Defiance, and Thames, a man named Dawson in 1813 had a steamer on the
river plying between Gravesend and London. This Dawson is stated to have
made steamship experiments in Ireland, and according to his own account
he built a steamboat of 50 tons burden, worked by a high-pressure steam-
engine as early as 1811, which, by one of those singular coincidences
frequently met with in the history of inventions, he named the Comet.[40]
[40] Stuart’s “History” and Knight’s “Cyclopædia.”

The first steam vessel known with certainty to have been built on the
Thames was the Regent, designed by Isambard Brunel, and built in 1816 by
Maudslay, the founder of one of the most famous shipbuilding firms
London river has known. She was of 112 tons, with engines of 24 horse-
power, and her machinery and paddles together were so light that they only
weighed five tons. She was placed on the London and Margate passenger
service, and in July 1817 was burnt off Whitstable. Fortunately no lives
were lost.
An apparently insignificant incident which occurred in 1818 resulted in
one of the most important discoveries in the history of the marine engine.
James Watt the younger happened to be on the steamer Dumbarton Castle,
built a year earlier, when the engineer told him that the vessel had grounded
the previous evening, and that the rising tide, turning the paddles the wrong
way, had caused the engines to reverse. Watt explained to the engineer the
importance of this, and at last took off his coat and showed what could be
done with the engines. Before that date the reversing of machinery on
steamers was either unknown or not generally practised. Watt’s discovery
enabled the steamer to take its position at Rothesay Quay with precision

Page 90

and promptitude, the custom previously having been to stop the engine
some distance from the point of mooring and allow the vessel to drift
alongside.[41]
[41] “The Clyde Passenger Steamers,” by Captain J. Williamson.

Plan and Lines of the “Comet.”

Page 91

The Engine of the “Leven.”

After the experimental voyages described above it was not long before
owners of steam vessels and enterprising shippers generally recognised the
benefits to be derived from the establishment of regular coastal steamship
services. The year 1816 saw steam communication established between
Great Britain and Ireland with the Hibernia of 112 tons register, which
enjoyed the distinction of being the first boat employed in cross-channel
service in the British Islands. She was built for the Holyhead and Howth
service, was lugger-rigged, nearly 80 feet in length, and about 9 feet
draught, and her passages averaged about seven hours.
David Napier now introduced a great change in the shape of the fore part
of steamers’ hulls, which added to the superiority of their speed over sailing
ships. Hitherto steamers had been built with the bluff bows which
characterised the sailers. Napier observed that the obstruction caused to a
ship’s progress by bows of this shape was very great, especially in dirty

Page 92

weather. He was crossing from Glasgow to Belfast on one of the sailing
packets which then did the journey in anything up to a week, and perched
himself on the bows, where he remained, heedless of the waves and spray
which continually dashed over him. He was engaged in watching the bows
and the waves, and thinking. Occasionally he turned to the captain and
asked if the sea was rough. The captain said it could not yet be called very
rough. The weather grew worse, and at last a tremendous wave, breaking
over the vessel, swept her from stem to stern. Napier went back to the
captain and asked, “Do you call it rough now?” The captain replied that he
could not remember a worse night in his experience. To his astonishment
Napier was delighted with this answer, and went down to his cabin
remarking, “I think I can manage if that is all.”[42]
[42] An account of this voyage by Napier is given in the American Admiral Preble’s
“History of Steam Navigation.”

Subsequently he made a series of tank experiments with models, and
these resulted in the adoption of the fine wedge-shaped bows which
distinguished the steamships he afterwards built. This was the origin of the
first great departure from sailing-ship models in steamboat construction.
In 1820 regular communication between Dover and Calais was
established by the Rob Roy, a Scotch-built boat. In the previous year the
Talbot had been built by Wood for the Holyhead and Dublin service. She
was 92 feet long by 18 feet beam with a tonnage of 150. For this boat D.
Napier provided the engines, while the first steamer engined by Robert
Napier was the Leven, built in 1823. The Leven’s engine, of the side-lever
type, is still preserved on Dumbarton pier.
In 1822 the St. George Steam Packet Company launched two large and
powerful steamers, the St. Patrick and St. George, for the trade between
Liverpool and Dublin, and a few years later their Sea-Horse sailed weekly
between Hull and Rotterdam. The Original Steam Packet Company also ran
the Waterloo and the Belfast on this route. A third company was now
projected. Mr. C. W. Williams of Dublin came over to Liverpool to seek
financial support for his project of building steamers for the same route.
Failing at Liverpool, he returned to Dublin and met with such
encouragement that in the following February he came back to Liverpool,
and placed an order with Wilson, popularly called “Frigate Wilson,” the
leading shipbuilder of his time on the Mersey, for the first steamer of what
was destined to become one of the most famous steamship companies in the

Page 93

world, the City of Dublin Steam Packet Company. This vessel, the City of
Dublin, was to be constructed to carry general cargo besides livestock and
passengers, and to maintain the service throughout the year. She was
probably the first steamer designed to carry both passengers and cargo.
Williams saw that it was as much to the interest of merchants to have their
goods delivered with regularity as it was to the interest of passengers to
reach their destinations punctually.

The “Sea-Horse.” About 1826.

Merchants were equally quick to see the advantages of punctual delivery,
and the Williams enterprise prospered. The following month he contracted
with Wilson for the building of the Town of Liverpool, there being some
delay in placing this contract as Wilson had just contracted to build the
steamer Henry Bell for the Liverpool and Glasgow trade. The City of
Dublin’s maiden voyage was made on March 20, 1824.
Meanwhile the Dublin and Liverpool Steam Navigation Company had
been founded, and started trading operations in September 1824 with the
steamer Liffey. In December of the same year the Mersey was added, and in

Page 94

1825 the Commerce. The last named was the largest vessel so far employed
in cross-channel traffic. She was built at Liverpool by Messrs. Grayson and
Leadley.
The competition among the companies was exceedingly keen, and
increased as they added to their respective fleets. The City of Dublin
Company paid little heed to what was known as the Original Company, but
found its work cut out in competing with the other two. The first really
serious rate war broke out, and seems to have spread to the steamer
companies in the Scottish and North of Ireland passenger trade.
Not content with cutting rates to vanishing-point, the northern rivals
indulged in lively newspaper polemics in the shape of advertisements,
which praised their own boats and gave the lie direct to the manifestos of
their opponents. The owners of the Swift, sailing from Glasgow, advertised
the “great superiority” of their vessel “over the cock boat that is puffed off
as sailing direct from the Bromielaw.” “For the sake of strangers coming
from a distance it may be proper to state that her power and size are double,
and her speed so much greater, that when the two vessels start together the
Swift runs the other out of sight in five or six hours.”
The George Canning was the vessel referred to in this contemptuous
manner and her owners retorted in kind. Their advertisement referred to the
“contemptible article in the Swift’s advertisement” as “stating a gross
falsehood knowing it to be such.” The Swift is challenged to produce a
single instance of ever having accomplished her passage from Belfast in so
short a time as the George Canning, and the public are informed that the
two have never yet sailed together either from Belfast or Glasgow, and the
Swift is asked when and where she ran the other out of sight.[43] So matters
went on until the Swift was sold to the London, Leith, and Edinburgh
Shipping Company in 1826. The companies actually carried saloon
passengers from Belfast to Glasgow for 2s. a head; second cabin passengers
went for 6d., and deck passengers went free.
[43] Glasgow Herald, June 30, 1825.

The war on the Liverpool and Dublin route ended in the Liverpool
Companies carrying saloon passengers for 5s. and steerage passengers for
6d. each, one of the vessels conveying on one voyage seven hundred
steerage passengers at that fare.

Page 95

Negotiations between the City of Dublin Steam Packet Company and the
Dublin and Liverpool Steam Navigation Company followed, by which the
former purchased the Navigation Company’s steamers. They had then a
fleet of fourteen vessels and entered upon a long career of prosperity,
chequered by occasional battles with rival companies. A rate war with the
Langtry Company of Belfast ended in the steerage fare between Liverpool
and Belfast being reduced to 3d., including bread and meat. For a time, too,
there was rivalry between the Dublin Company and the Waterford
Commercial Steam Navigation Company, which in 1837 joined in the trade
between that city and Liverpool with the iron paddle-steamer Duncannon,
of 200 tons, built by Laird of Birkenhead. This was probably the first iron
steamer built for the cross-channel service, but by no means the first to be
seen in Irish waters.
While the companies were struggling, passengers were even carried free
between Liverpool and Waterford, and sometimes between Liverpool and
Dublin. “A story is told of a passenger going into the Dublin Company’s
office at Waterford, and inquiring the cabin fare to Liverpool. He was told
he would be taken for nothing, to which he replied, ‘That is not good
enough, you must feed me as well.’” There is a tradition also that when one
of the rival companies of the Liverpool and Dublin service “advertised its
willingness to carry passengers for nothing, and to give them a loaf of
bread, the other company capped the offer by the addition of a bottle of
Guinness’ stout.”[44] The fight continued for three years, until the City of
Dublin and the Waterford Company came to terms. This settlement brought
about peace between the Belfast and the British and Irish Companies, the
former sharing the Liverpool and Belfast trade with the Cork Company,
while the British and Irish Company shared the London and Dublin trade
with the Waterford Company. This truce continued for several years, but the
war had sent nearly all the Waterford trade to Liverpool, to the detriment of
the line running between Waterford and Bristol. A dispute followed between
the Waterford and Bristol Companies and was maintained until the Bristol
Company bought off the Waterford Company with an annual subvention of
one thousand pounds.
[44] Kennedy’s “History of Steam Navigation.”

The increase in the number of steamers from 1820 onwards was
extraordinary. In 1825, forty-four steamers were building at London and

Page 96

Liverpool alone, with tonnages varying from 250 to 500. Most of these
vessels were built for the coastal service, the only international voyages
being between the British coast, France, and the Netherlands. In 1818,
according to Dodd, steamers were employed on the Clyde in the
conveyance of merchandise, though for the most part vessels propelled by
the new invention, as it was generally called, were confined to passengers,
the goods being sent by sailing boats. In 1820 and 1821 no steamers were
employed in the foreign trade, but in 1822 it appears that the entrances
inward of steamers engaged in the foreign trade numbered 159, with a
tonnage of 14,497, while the clearances numbered 111 with a total of
12,388 tons. The coasting trade in that year for the United Kingdom was
215 vessels entered inward, with a tonnage of 31,596, and the clearances
numbered 295 with an aggregate tonnage for the year of 42,743. The year
1823 saw a falling off in the entrances and clearances in the foreign trade,
but in the following year there was a partial recovery which was continued
in 1825; and in 1826 the number of entrances of steam vessels was 334,
with an aggregate tonnage of 32,631, the clearances being 268 with a
tonnage of 27,206. In that year also the coasting trade showed 2810
entrances of 452,995 tons, and 3833 clearances of 518,696 tons. By 1828
the coasting entrances rose to 5591, with an aggregate of 914,414 tons, with
6893 clearances and an aggregate tonnage of 1,009,834. French-owned
steamers first appeared in the United Kingdom records in 1822, when there
were ten entrances of 520 tons altogether. In 1823 the entrances from
France had shrunk to seven, of a total of 364 tons, and the clearances were
the same; but by 1827, 74 entrances of French steamers are recorded, and
43 clearances.
In 1829 Holland appears for the first time in the list with one steamer
entered and cleared. But in 1830 the steamer traffic between the two
countries had grown so that the entries of Dutch steamers numbered twenty-
three, with an aggregate of 6463 tons, and the clearances thirty-two with
8992 tons. By 1836 the entries in the United Kingdom coastal trade were
13,003, with an aggregate tonnage of 2,238,137, and the clearances 12,649
with an aggregate of 2,178,248 tons. In 1837 Belgium, France, and Spain
figured in the returns, and in 1838 Portugal and Brazil. Russia and Turkey
were added to the list in 1839. In that year the United Kingdom coastal
entries numbered 15,556 of 2,926,521 tons, and the clearances 15,498 of

Page 97

2,894,995 tons. These figures do not include vessels in ballast nor those
with passengers only.
The report of the Commissioners appointed by the Privy Council in 1839
to inquire into steamship accidents, shows that some laxness prevailed in
regard to registration, no fewer than 83 unregistered steam vessels being
discovered, most of which were in the passenger trade; thirty-seven of these
were on the Mersey, sixteen on the Thames, twenty-six on the Humber, and
four on the rivers on the east coast of Scotland. The Commissioners added
that there were probably many others unregistered, as they did not visit all
the ports.
On the other hand, there were only twenty-five registered steamers on the
Humber, Ouse, and Trent, and thirty-nine at Liverpool. Two Liverpool
companies owned more vessels than the total number registered there. The
Commissioners found that nineteen-twentieths of the large number of
trading steamers between Ireland and Liverpool, some of which were
registered in English and some in Irish ports, were owned in Ireland. The
report further stated that of the 766 steam vessels tabulated as belonging to
Great Britain, Ireland, the Isle of Man, Guernsey, and Jersey, 484 might be
considered as river steamers and small coasters, and 282 as large coasters
and sea-going ships.
The total number of registered vessels at the end of 1838 was 677, with a
total registered tonnage of 74,510, a total computed tonnage of 131,080,
and estimated horse-power 54,361. Unregistered vessels numbered 83 of
9638 tons gross, and 2129 estimated horse-power. The foregoing particulars
show how rapidly the number of steamers increased for some years.
Services seem to have been started between almost every two or three
ports of the United Kingdom. The little wooden vessels were long-lived,
and had some unique experiences owing to the venturesome characters of
their captains, owners, or charterers. Provided the vessel would float and
get along it seemed to be the opinion of its owners that it could go
anywhere and carry anything. Thus a vessel built for river traffic was
thought suitable for deep-sea work also. It is not surprising to find that
many of the steamers changed hands frequently. They were renamed at
every change, and the resulting confusion makes it difficult to trace their
history.
It seems fairly certain, however, that accidents were frequent, and it
became necessary to devise means of carrying boats which would

Page 98

accommodate at least a considerable number of the passengers if necessary.
Regulations as to the compulsory carriage of life-buoys, life-belts, rafts,
floating seats, and other contrivances for supporting people in the water did
not come into force until many years after. The sole means of safety in the
early days of steam navigation were the boats and such wreckage as
happened to float if the vessel sank or went to pieces. But most of the
steamers were so small, and on their voyages so crowded, that they could
not carry nearly as many boats as were required.
The boats were generally carried on the tops of the paddle-boxes. A
suggestion which was carried into effect, especially in some of the larger
ocean-going steamers, was that the paddle-boxes should be built square and
be detachable from the guards, so that if a disaster should befall the vessel
they could be used as boats. This contrivance had numerous disadvantages,
not the least of them being the unwieldiness of the paddle-boxes, and the
difficulty of managing them when afloat. Another suggestion was that each
steamer should carry two large boats of equal dimensions which could be
used as the tops of the paddle-boxes. The main advantage claimed for this
idea was that it would not add materially to the weight of the vessel.
Captain George Smith, in the ’thirties, contrived a peculiarly shaped
lifeboat which would fit over the paddle-wheels and take the place of the
paddle-boxes, and might when occasion required be turned right side
uppermost and launched outside the paddle-wheel. He tried this experiment
on the steamer Carron. “The upper section,” he wrote, “of her paddle-wheel
is covered by a lifeboat 25 feet long, 9 feet beam, and having four air-tight
cases which may be removed if required on particular occasions. This
lifeboat is capable of containing between forty and fifty persons. When in
her place over the paddle-wheel the midship thwarts are unshipped, which
admits of the wheel revolving within 6 inches of her keelson; she lies
bottom upwards on two iron davits, which enable her to be turned over and
lowered by six men in two or three minutes.”
The early river steamers were often overcrowded, which is not to be
wondered at in those days of insufficient control, and a cartoon of the
period represents the passengers as hanging on to the rigging, the bowsprit,
the funnel, and anything else of which they could catch hold. Complaints of
reckless speed and careless navigation were frequent, and the Worshipful
Company of Watermen and Lightermen gave orders that the speed should
not exceed five miles an hour: but the captains of the Thames steamers were

Page 99

often fined for breaking the rules, as they were in the habit of racing against
boats belonging to rival companies. As to overcrowding, the Times of April
16, 1838, thus delivered itself: “It would be as well if some measures be
adopted to prevent steamers being overcrowded during the Easter holidays.
During the last Easter and Whitsuntide holidays the steamers were crammed
with passengers in a fearful manner, the small vessels carrying 500 and 600
passengers at one trip, and the larger ones 1000 and 1500 persons, as
closely packed as negroes in the hold of a slave-ship.”
By 1846 the rivalry among the companies on the river brought about the
usual rate war. The steamers and the Watermen’s Company were often at
loggerheads, and neither always agreed with the City Corporation. An
attack of the City Corporation employees upon those of the Watermen’s
Company was valiantly resisted, and the watermen went to gaol in
consequence. Punch commented on this as follows: “Considerable
excitement has been occasioned by some experiments which have lately
been tried in the Thames navy, on the same principle as that recently
applied to the Bellerophon, which was got ready for sea in sixty hours, and
got unready again with equal promptitude. The Waterman No. 6 took in
coals and ginger-beer, manned her paddle-box, lit her fire, threw on a
scuttle of coal, filled her boiler, blackleaded her funnel, tarred her taffrail,
and pitched her stoker into her engine-room, all within twenty minutes, and
sailed away from her moorings at Paul’s Wharf amidst the cheers of her
checktaker. This manœuvre was accomplished for the purpose of striking
terror into the minds of the civic forces at Blackfriars Pier, who are only
tranquil at present in compliance with the terms of a recent armistice.”
The modern development of the coastal steamer service has naturally
been confined to a strict meeting of its own requirements, and it is not
proposed to go at length into all the minutiæ of the differences between the
steamers of the various lines. Some of the most famous companies have
already been mentioned and their early struggles with competitors
described. In connection with coastal and cross-channel traffic it will now
be sufficient to sketch the careers of a few others which have helped to
make steam-ship history.

Page 100

TRINITY MONARCH ROYAL GEORGE TRIDENT
YACHT

The “Monarch” and “Trident” (General Steam Navigation Co.)
convoying the Royal Yacht with the Queen and Prince Consort to
Edinburgh, 1842.

General Steam Navigation Company
To London shipowners belongs the credit of establishing one of the
oldest steam-ship companies in the world, the General Steam Navigation
Company. It was founded as far back as 1820 and its first steamer, the City
of Edinburgh, was built expressly for trade between Edinburgh and London
by Messrs. Wigram and Green at Blackwall, and was launched on March
31, 1821. Her engines were by Boulton and Watt, and were of 80 horse-
power nominal.
A steam-ship of any kind was a novelty at that time, and the launch of
such a large vessel on the Thames attracted the attention of all classes. The
Duke and Duchess of Clarence, who were afterwards William the Fourth
and Queen Adelaide, accompanied by the Duchess of Kent and a large suite,
paid a special visit to the wharf to see her. The royal party expressed

Page 101

themselves as much surprised by the magnificence of the accommodation
provided for the passengers as by the noble and graceful proportion of the
vessel in which such powerful machinery had been placed. The City of
Edinburgh was followed in June 1821 by the James Watt, launched by
Messrs. Wood and Co. of Port Glasgow, and at that time described as “the
largest vessel ever seen in Great Britain propelled by steam.” Her engines
were of 100 nominal horse-power, and drove paddle-wheels 18 feet in
diameter with sixteen floats, which were 9 feet in length by 2 feet broad.
The company was incorporated in 1824 and then and for many years
afterwards occupied a place second to none in the British mercantile marine
as carrier of passengers, mails, goods, and cattle on the leading routes from
London to the North, and to the principal commercial ports of Western
Europe. The Earl of Liverpool, of 168 tons register and 80 horse-power,
was built for the company at Wallis’s yard on the Thames in 1822.
An early picture of this vessel shows her to have been two-masted,
carrying on the foremast three jibs, two topsails, and a trysail, and on the
mizzen two enormous flags, one several yards long bearing the name of the
vessel, and the other, half the size of her spanker, being the company’s
house flag, while at the stern she displayed an immense ensign, and at the
bows a little Union Jack. Her paddle-boxes were rather forward of
amidships, and a tall funnel with a spark-catcher above stood a short
distance in front of the mizzen-mast.
In 1833 this company built the Monarch, of which a contemporary
newspaper says, under the heading “Gigantic Steamboat”:
“The dimensions of the Monarch, Edinburgh steamer, launched a few
days since are as follows:—extreme length 206 feet 1¹⁄₂ inches, width of
deck 37 feet, width outside the paddles 54 feet 4 inches, length of keel in
the tread 166 feet; length of deck from the stem to the taffrail 193 feet,
depth in hold 18 feet. The extreme length given above is within 2 feet of the
largest ship in the British Navy; she is larger than any of His Majesty’s
frigates, and longer than our 84-gun ships. Her tonnage is somewhat more
than 1200 tons, and the accommodation below is so extensive that she will
make up 140 beds, and 100 persons may conveniently dine in her Saloons.”

Page 102

The “Trident,” in which the Queen and Prince Consort returned, Sept.
1842.

The Trident, built in 1842, was another of the company’s famous ships,
and was probably the first steam-ship in which a reigning sovereign went
for a lengthy sea voyage. Queen Victoria paid her first visit to Scotland and
made the return journey from Edinburgh with Prince Albert and their suite
on this vessel. An interesting description of the voyage appeared in “Leaves
from the Journal of our Life in the Highlands.” The Queen remarked of the
accommodation on the Trident “that it was much larger and better than on
the Royal George,” which was the royal yacht of the period, and that it was
“beautifully fitted up.” The Trident soon lost sight of all the accompanying
vessels, except the company’s steamer Monarch, which “was the only one
that could keep up with us.” Writing a few days later to the King of the
Belgians the Queen says: “We had a speedy and prosperous voyage home of
forty-eight hours on board a fine, large, and very fast steamer, the Trident,
belonging to the General Steam Navigation Company.”
These vessels, of course, were of wood, but when iron steamers were
introduced and paddles gave way to the screw propeller, the company was

Page 103

not slow to see the advantages of the innovations, and to adopt them for its
services.
In modern times this company has distinguished itself by its zeal for self-
improvement. Every important development in steam-ship construction and
engineering has been marked by the company by an addition to its fleet, one
of the most recent being the Kingfisher, the first steam turbine-driven
passenger steamer on the Thames.

London and Edinburgh Shipping Company
Probably on none of the British coasts was the advent of the steamer
hailed with more pleasure than on the east coast. Travel between London
and the east of Scotland, before railways were possible, and when the land
journey had to be made by stage-coach or on horseback, or a sea journey
performed in sailing smacks, was a tedious operation. The smacks were
large of their sort, and as comfortable as vessels of that period usually were
(which is not saying much), but the North Sea was as turbulent then as now,
so that passengers who went down to that part of the sea in smacks usually
had an experience which lasted them a lifetime.
The London and Leith service of the present day is maintained by a line
of steamers as good as any on the coast. The existing company was not the
first to trade between the two ports whence it takes its name, but its history
connects it with the earliest attempts to found a regular service between the
English and Scottish capitals. This was established in 1802 by the old
Edinburgh and Leith Shipping Company, with six smacks. About seven
years later there was established a London and Edinburgh Shipping
Company, which possessed ten smacks. There had previously been a Leith
and Berwick Company, so called because Berwick was a port of call
between the Forth ports and London. This was the Union Company, which
for fifty years previously had traded from Berwick. It was absorbed by the
London and Leith Shipping Company in 1812, and this combination was
joined by another in 1815. The existing company is the lineal descendant of
the combination of the three.
Before steam was used “it was not an uncommon experience,” says an
historical publication issued by the London and Edinburgh Shipping
Company, “for a smack to lie windbound in the roads for days before
venturing out of the Forth, and instances were more than traditional of a

Page 104

smack with a cabin full of passengers being tossed about on the North Sea
for days or weeks, and then forced to come back to Leith for the
replenishment of stores, without having been any nearer to London than
when she set out.” On one occasion a smack in which there were seven
cabin passengers was nine days at sea, the year being 1825, and the month
March. Upon leaving Leith for London and getting well into the North Sea
they were driven towards Norway for four days, when a “welcome change
of wind set in, which drove them back towards Scotland with equal
rapidity.” Having sighted the Bell Rock they continued the voyage to
London, and made a good run in spite of the loss of some spars and canvas.
The passengers were “unhappy” and at times were not allowed on deck for
fear of being washed overboard. Another smack was three weeks
endeavouring to get to London and then had to return for more stores. Prior
to the smacks the voyages were usually made by brigs of anything between
160 to 200 tons, which sailed when their owners thought they had enough
cargo and passengers aboard.

The “Carron” (Carron Co.).

Page 105

The “Kingfisher” (General Steam Navigation Co.).

Presumably no one sailed by smack who could afford to coach between
Scotland and London, but the coach fare in 1824 was £13 and the smack
fare £4. Passengers by smack had a fair chance of witnessing a sea-fight,
during which the ladies would be locked up in the cabin while the martially-
inclined among the passengers might be called upon to assist the crew in
repelling the attack of a French privateer. The smacks were superseded by
the celebrated Aberdeen schooners or themselves converted to that rig, and
the schooners bravely upheld the reputation of sail as long as possible
against the all-conquering power of steam. But in 1850 the company
introduced steam and the fine clippers were withdrawn. It is this company’s
proud boast that it has never lost a passenger.

The Carron Company
The Carron Company, manufacturers of iron goods, maintained a
passenger service between Carron and London with sailing sloops long
before steam-ships were invented. So long ago as 1779 the company
advertised in the Edinburgh Advertiser as follows:
A t C A R R O N — F o r L O N D O N.

To ſail March 5, 1779

Page 106

THE GLASGOW, Robert Paterſon maſter, mounting
fourteen twelve pounders, and men anſwerable. For
freight or paſſage, apply to Mr. G. Hamilton, Glaſgow,
Meſſ. James Anderſon & Co. Leith, or the Carron
Shipping Company at Carron Wharf.
N. B. The Carron veſſels are fitted out in the moſt
complete manner for defence, at a very conſiderable
expence, and are well provided with ſmall arms. All
mariners, recruiting parties, ſoldiers upon furlow, and all
other ſteerage paſſengers who have been accuſtomed to
the uſe of fire arms, and who will engage to aſſiſt in
defending themſelves, will be accommodated with their
paſſage to or from London, upon ſatiſfying the maſters
for their proviſions, which in no inſtance ſhall exceed
10s. 6d. ſterling.
The Carron veſſels ſail regularly as uſual, without
waiting for the convoy.

As the sloops carried the company’s famous carronades there can be no
doubt that they were well armed. The company can boast a more ancient
connection with steam-ship building than any other firm in the British Isles,
for they constructed the hull for one of the Miller boats and assisted in the
construction of one of Symington’s engines. Miller is reported to have
examined Symington’s engines at the Carron works. The company soon ran
steamers instead of sailing vessels along the east-coast route and have
continued to do so up to the present day, the latest additions to their fleet
being the Thames by A. and J. Inglis, and the Carron, 308 feet long, which
has her steering gear fitted aft at the rudder head and controlled by
hydraulic action on the telemotor principle.
An interesting fact in connection with the Carron Company is that the
first set of complete castings for James Watt’s steam-engine were made at
their works, and were erected at the house of Dr. Roebuck, who was one of
the founders of the company and a personal friend of Watt. A part of the
cylinder of this engine marked “Carron 1766” is still preserved at the
works. John Smeaton, of Eddystone Lighthouse fame, was also associated
with the Carron works.

Page 107

The “Fingal” (London and Edinburgh Shipping Co.).

Page 108

The “Lady Wolseley”
(British and Irish Steam Packet Co.)

Dundee, Perth and London Shipping Company
This company dates, like others on the east coast, from the time when the
voyage between the Thames and Scotland was only performed by sailing
smacks, and of these they ran nineteen. But in 1834 the smacks were
removed and paddle-steamers took their place. Their first steamers were the
Dundee and the Perth, each boat having a commander as well as a sailing
master. They were wonderful vessels for the time, being of 650 tons burden
and 300 horse-power. They were advertised as “these splendid and powerful
steamers”; the cabins were “airy, commodious” (epithet beloved of steam-
ship companies), and “elegant.” The company’s present-day fleet consists
of the London and the Perth, each of 1737 tons and 3000 horse-power.

Isle of Man Steam Packet Company

Page 109

No steamer company holds a more honourable position in the coastal and
passenger trade than the Isle of Man Steam Packet Company. The vessels in
early years were known as “the little Cunarders,” a compliment which they
well deserved. The appearance of the vessels of the two companies was
much the same, and the red and black funnel has always been a
distinguishing feature of both lines. The first boat of the Isle of Man
Company was built by John Wood of Glasgow in 1830, and named the
Mona’s Isle, a title which has been borne by more than one distinguished
successor. She was schooner-bowed, and carried on her paddle-boxes,
which were placed well forward, the familiar three-legged sign of
Manxland. The engines of the first Cunarder built for the transatlantic
service were by Napier, who also built the hull, and this steamer was to all
intents and purposes a large edition of the Mona’s Isle, whose engines he
had previously built. Her dimensions were 116 feet in length by 19 feet
beam, with a depth of 10 feet, and 200 gross tonnage. She cost £7042, and
when sold in 1851 after twenty-one years’ service, in which she proved a
most profitable vessel, she fetched £580.
But the first steamer seen in Manx waters was the Henry Bell, named
after the constructor of the historic Comet; she was on her way from the
Clyde to Liverpool to be placed on the service between Liverpool and
Runcorn and put in at Ramsey Bay. In May of the following year the
Greenock arrived at Douglas, whence she took some passengers to Laxey,
and, as a local chronicler puts it, “moved by apparent enchantment.” The
Mona’s Isle was thought to be too large and valuable to risk being used in
winter, and a smaller boat was therefore ordered from the same builder.
This was the Mona, and after her arrival in July 1832, she was engaged in a
service between the island and Whitehaven and in taking visitors on trips
round the island. Even before the advent of the steamers, the Isle of Man
had become a favourite place at which to spend the summer, especially
among the people of the north and west counties. If affection for the island
could induce so many hundreds of people to brave the discomforts of a
voyage from the Mersey to Douglas and back again in the small sailing
packets which then were the means of communication, it is little wonder
that the advent of the steamers, restricted in dimensions as they were, poor
in accommodation, and slow travellers, should have increased her
popularity. Occasionally the sailing packet took as long as a week to make
the trip, and it was hailed as an extraordinary circumstance that a vessel

Page 110

trading between Douglas and Whitehaven was able to make fifty-two
voyages each way in the course of a year. In 1813 also, a sailer took three
days and nights to get within sight of Liverpool, and was then driven back
by stormy weather to the island.

The “Ben-my-Chree” (I.). Built 1845.

The Mona had one mast on which she could carry a jib, a forestay-sail, a
mainsail, and a topsail, and her funnel was abaft the paddle-boxes, which
were amidships. She was faster than her predecessor, and usually did the
journey between Liverpool and Douglas in about seven and a half hours.
She once reached Whitehaven from Douglas in a trifle over four and a half
hours, which was claimed to be one of the fastest pieces of travelling on
record. The Queen of the Isle, which was the company’s third ship, was the
fastest vessel afloat at the time. These three boats, according to a bill issued
in 1834, were known as the Royal Mail and War Office steam-packets,
though they never had any connection, so far as the company has been able
to ascertain, with the War Office. A Liverpool firm purchased the Mona in
1851 and sold her to the City of Dublin Company, who ran her for several
years, until she was hopelessly outclassed in size and accommodation by
newer boats. She was then used as a tug, and so spent the remainder of her
days.

Page 111

The first steamer ordered by the company to be built in the island was the
first King Orry, by John Winram, with engines by Robert Napier. This boat
was the last of the company’s wooden paddle-steamers. She was a very
reliable boat but not particularly fast, for she usually took about seven hours
for the trip each way. In 1843 the Queen of the Isle was relieved of her
engines, sold, and turned into a full-rigged sailing ship and met her fate off
the Falkland Islands.
The Ben-my-Chree, a three-masted schooner, the first of the company’s
steamers to be built of iron, was fitted with the Queen of the Isle’s engines.
The Tynwald, a larger steamer still, followed in 1845, and was herself
followed by the Mona’s Queen, a rather smaller vessel but faster, and
bearing a figure-head which the carver said was a likeness of Queen
Victoria; be that as it may, the vessel was named in commemoration of the
visit of the Queen to the island in 1847.
Hitherto the company’s steamers had been of little more than local
interest; the Douglas was now ordered and she acquired international fame.
This vessel was the first of the Manx boats in which the straight stem was
adopted. She was built in 1858; her length between perpendiculars was 205
feet, with a beam of 26 feet and a depth of 14 feet, and a gross tonnage of
700. The Tynwald, which was of the same tonnage was 188 feet long, by 27
feet beam, and 13 feet 6 inches depth. The Douglas was thus longer in
proportion to her beam than any of her predecessors, and being powerfully
engined, made 17¹⁄₄ knots on her trial trip. She did the passage between
Liverpool and Douglas in 4 hours and 20 minutes, and was the fastest sea-
going paddle-steamer afloat.
The situation at this time between the Northern and Southern States of
the United States of America was becoming strained, and there were
already indications of the approaching conflict. After four years’ service the
Douglas was sold, through a third party, to the Confederate agents.

Page 112

The “Tynwald” (I.). Built 1846.

In a coat of grey paint, with her upper works altered, carrying two or
three guns, and rechristened the Margaret and Jessie, the trim Manx boat
became one of the most famous blockade-runners the Southern States
possessed. Her career was brief, but exciting. In 1863 she was sighted off
Abaco by the Federal steamer Rhode Island, which chased her to Eleuthera
in the Bahamas and fired upon her when she was only 250 yards off shore.
Shot and shell were rained at her by the gunboat, many of the missiles
passing beyond the fugitive and striking the shore. At length a shot
penetrated her boiler, and another struck her bows so that she had to be
beached. This is her last recorded exploit. Contradictory stories are told of
her. One states that she was patched up, refloated, and became a peaceful
trader among the islands; another, that she was wrecked where she lay; yet
another that she resumed her blockade-running under another name, though
this may be explained by the fact that blockade-runners often changed their
names and disguises, and that one of them may have had a name somewhat
similar; and a fourth story is that she was turned into a sailing schooner and
ultimately became a coal-barge.
The next boat built by the company was the no less famous Ellan Vannin,
first named the Mona’s Isle. She was an iron vessel built in 1860. Her
dimensions were: length 198 feet 6 inches, breadth 22 feet 2 inches, depth

Page 113

10 feet 7 inches, with a gross tonnage of 380. Her indicated horse-power
was 600 and her nominal horse-power 100. She averaged about 12 knots.
She was lost with all on board at the mouth of the Mersey in the terrible
gale of November 1909. She was originally a paddle-boat, but was
converted into a twin-screw steamer in 1883, and was then renamed the
Ellan Vannin. Her regularity of passage and her immunity from accident
were as noteworthy under her new conditions as under the old, and until she
ended her career under circumstances which make her loss one of the most
remarkable mysteries of the shipping of the port of Liverpool, she was
looked upon as the mascot of the fleet.
Three years later the Snaefell was ordered; she was 326 feet in length, by
26 feet beam, with a gross tonnage of 700, and was propelled by engines of
240 nominal horse-power. She brought down the passage from Douglas to
Liverpool to 4 hours 21 minutes.
The Royal Netherlands Steamship Company, being in want of a fast
steamer for the conveyance of the mails between Queenborough and
Flushing, bought the Snaefell and afterwards chartered the second Snaefell
built in 1876, of rather larger dimensions, and with a gross tonnage of 849,
and engines of 540 nominal horse-power and 1700 indicated, capable of
driving her at an average speed of 15 knots. In 1871 the second King Orry
was built. She was 290 feet in length by 29 feet beam, with a depth of 14
feet 7 inches, and of 1104 gross tonnage, and was much the largest steamer
the company had possessed up to this time. Her engines were of 622
nominal horse-power, and 4000 indicated, and her speed was 17 knots. Her
original length was 260 feet, and another 30 feet were added in 1888. The
second Ben-my-Chree was built to the order of the company in 1875, and
was 310 feet in length, 1192 gross tonnage, and with a speed of 14 knots.
She was the only passenger vessel for some time in the British Isles to be
fitted with four funnels, two of which were carried before and two abaft the
paddle-boxes. From this peculiarity of her construction she was known to
her patrons and to the west of England shipping people as the floating
coach-and-four. What advantage was gained by the four funnels is not
known, for they held a lot of wind.
The second Mona, a much smaller vessel, followed in 1878 and was the
first of the company’s fleet to be fitted with a screw. Three years later the
Fenella, which in its general dimensions was almost a sister ship to the
second Mona, was built and was the first to be fitted with twin screws. She

Page 114

was so successful that the conversion of the Mona’s Isle into a twin-screw
boat followed. The company returned to paddle-wheels for their next vessel,
the third Mona’s Isle, which was the first to be built of steel, of which
material all the company’s subsequent boats have been constructed. The
Mona’s Isle was 330 feet 7 inches between perpendiculars, 38 feet 1 inch
beam, 15 feet 1 inch depth of hold, and of 1564 gross tonnage. Her engines
were of 1983 nominal horse-power, and 4500 indicated, and her speed was
17¹⁄₂ knots. Two years later the little Peveril was launched, also bearing a
name of historical association in the island. She was the company’s first
steel twin-screw boat, and was lost in September 1899, not far from where
the Ellan Vannin went down. The second Mona’s Queen, only slightly
smaller than the second Mona’s Isle, followed in 1885, and in 1888 the
sister vessels Prince of Wales and Queen Victoria were added to the fleet.

The “Mona’s Isle” (II.). Built 1860 as a Paddle Steamer.

They were each 330 feet between perpendiculars, 39 feet 1 inch beam, 15
feet 2 inches depth of hold, with a gross tonnage of 1557. The engines of
each were of 925 nominal horse-power, and of 6500 indicated, and their
average speed was 20¹⁄₂ knots. Both these were paddle-vessels. The third
Tynwald was launched in 1891, and is a twin-screw ship. The Empress
Queen, the biggest paddle-steamer the company ever possessed, was

Page 115

ordered in 1896 from the Fairfield Company. She is 360 feet 1 inch between
perpendiculars, 42 feet 3 inches beam, and 17 feet depth of hold. Her gross
tonnage is 2140; her engines, of 1290 nominal horse-power and 10,000
indicated, gave her then a speed of 21¹⁄₂ knots, which has since sometimes
been exceeded. The third Douglas and the third Mona call for no special
comment, except that the former was the Dora of the London and South-
Western Railway, from which the Manx Company purchased her in 1901,
and that the last-named steamer was the last paddle-boat ordered by the
company. The directors in 1905, finding the need of newer and faster
vessels, ordered the steamer Viking, propelled by triple screws driven by
turbine machinery, and so successful was she that the third Ben-my-Chree
was added in 1908.
It may be questioned if any other of the coasting companies presents in
its vessels such an illustration of the development of steam-ships and steam-
engines, from the insignificant little tubs no bigger than river barges to the
latest examples of the shipbuilder’s art.
The opposition which the Manx Company has had to fight has been
severe. Its first steamer, the Mona’s Isle, on her first voyage found herself
pitted against the Sophia Jane, the boat which afterwards made the first
steam voyage to Australia. It would be more correct to say that in this case
the Mona’s Isle was the opposition boat, as the Sophia Jane, which
belonged to the St. George Company, was already on the service. The older
boat got in first by something less than two minutes. But new steamers
seldom attain their best speed at first, and the newcomer soon developed
such speed that the old boat was left behind on every voyage afterwards in
which they competed, and once came in after a rough trip three and a half
hours behind. The rivalry resulted in the usual rate war, and the St. George
Company brought its fares down to 6d. single. But neither this step nor the
placing of the splendid steamer St. George on the service did the Manx
Company any harm. The first race between their vessels was remarkable for
an ingenious piece of seamanship on the part of the commander of the
Mona’s Isle. The little paddle-boats of those days usually felt a strong beam
wind to such an extent that the paddle on the windward side would be out of
the water half of the time, and that on the lee side half buried owing to the
boat heeling over. The captain, judging that the dirty weather which then
prevailed would continue next day, spent the night before the race in
shifting the cargo and coal on board his boat to the windward side. When

Page 116

the two vessels left the Mersey in the morning the St. George was in
beautiful trim, and the Manx boat was leaning over on one side in a fashion
which caused those who did not understand what had been done to laugh at
her. When the open sea was reached it was the St. George’s turn to heel over
before the gale, and the Mona’s Isle went along practically on an even keel,
using both her paddles to the best advantage, while the St. George had one
nearly buried and the other beating the air uselessly much of the time. Of
course the Mona’s Isle won. This incident is interesting as it shows the
daring nature of the expedients which the captains of the little steamers of
those times were prepared to adopt.

The “Ellan Vannin” (the foregoing altered to a Screw Steamer and
renamed, 1883).

This rivalry was destined to end in the wreck of the St. George. The
Manx captain, having probably a better knowledge of local conditions than
the commander of the St. George, foresaw that a south-easterly gale was
rising, which always blows inshore at Douglas. As soon, therefore, as he
landed his passengers he put to sea again, but the St. George was anchored
in the bay, and during the night as the gale freshened she was blown on the
Connister Rocks and went to pieces. All on board were saved by the
Douglas lifeboat, whose captain was one of the founders of the Royal

Page 117

Lifeboat Institution. The St. George Company maintained the opposition for
a little while longer, until another vessel, the William the Fourth, was lost.
They then retired from the service altogether.
The St. George Company was itself an opposition line at first to that
established by Messrs. Little and Co.; but the last-named firm have
maintained their steamship connection with the island until within the last
few years. It is little wonder that the Manx Company was started to
supersede the St. George Company, for the latter, having no opposition
during the winter months, used for that station its slowest and smallest
boats, which were devoid alike of adequate comfort and shelter for the
passengers.

Messrs. James Little and Co.
This firm, which was established as early as 1812, despatched in 1819
the first steamer which ever carried passengers from the Clyde to Liverpool.
This was the Robert Bruce, a small vessel of 98 feet in length; she was soon
followed by the Superb, and in 1820 by the Majestic, and two years later by
the City of Glasgow. The steamers on the Liverpool and Glasgow service
called at Port Patrick and Douglas, and in 1828 Messrs. Little inaugurated
their Glasgow and Belfast service with a new vessel, the Frolic. It was for
this service also that some years later they ordered, from Messrs. Denny
and Co. of Dumbarton, the Waterwitch, which was the first screw steamer
built on the Clyde. Another of their most notable boats was the Herald, a
Clyde paddle-steamer, built in 1866 and placed by them on the Barrow and
Isle of Man service the following year. They afterwards added those fine
steamers Manx Queen, Duchess of Devonshire, and Duchess of Buccleuch,
which were so successful that the rivalry between them and the Isle of Man
Steam Packet boats became very keen, the Barrow route to the Isle of Man
being shorter than the Liverpool.
The evident popularity of the Isle of Man services has proved a sore
temptation to speculators to start rival lines to those already in existence.
The Isle of Man Steam Packet Company had a virtual monopoly of the
Liverpool and Manx service for close on half a century, but in 1887 two
large and fast paddle-steamers, Queen Victoria and Prince of Wales, each of
1657 tons, built by the Fairfield Company for the Isle of Man, Liverpool,
and Manchester Company, were started in opposition. Both vessels are

Page 118

stated to have done the journey in a trifle over three hours, and the Prince of
Wales once accomplished it in under the three hours. After another season’s
conflict the two boats were bought by the Manx Company. Another
opposition company tried its fortunes for a season with the Lancashire
Witch, a twin-screw steamer, which now, under the name of the Coogee,
belongs to the great Australian shipowning firm, the Huddart Parker and
Co. Proprietary, Ltd. There have been several other attempts at opposition
with boats neither so fast nor so comfortable as those of the established
company.

Page 119

Page 120

“The Majestic.”

THE MAJESTIC,
Captain OMAN,
AND

THE CITY OF GLASGOW,
Captain CARLYLE,
Sail from GREENOCK every MONDAY, WEDNESDAY,
and FRIDAY, at One o’Clock in the Afternoon, and from
LIVERPOOL, every MONDAY, WEDNESDAY, and FRIDAY, at
Ten o’Clock in the Forenoon, calling off PORT PATRICK, and at
DOUGLAS, ISLE OF MAN, both in going and returning from
LIVERPOOL.
These Packets carry no Goods, being expressly fitted up for
the comfort and accommodation of Passengers.
FARES.

Page 121

For the First Cabin, including Provisions and Steward’s Fees.
To Port Patrick. To Isle of Man. To Liverpool. To Greenock.
From Greenock, £1 1 0 £1 10 0 £2 5 0 £0 0 0
Port Patrick, 0 0 0 1 1 0 1 11 0 1 1 0
Isle of Man, 1 1 0 0 0 0 0 17 0 1 10 6
Liverpool, 1 11 6 0 17 0 0 0 0 2 5 0
For the Second Cabin without Provisions.
To Port Patrick. To Isle of Man. To Liverpool. To Greenock.
From Greenock, £0 10 0 £0 10 0 £0 10 0 £0 0 0
Port Patrick, 0 0 0 0 10 0 0 10 0 0 10 0
Isle of Man, 0 10 0 0 0 0 0 9 6 0 10 0
Liverpool, 0 10 6 0 9 6 0 0 0 0 10 0
Children under Twelve Years of Age Half Price.

ON DECK.
A Coach, £4 15 0 A Horse, £2 10 0
A Chaise, 4 0 0 Dogs, per couple, 0 10 0
A Gio, 2 10 0

Parcels Forwarded to the Isle of Man and all Parts of England.
The Proprietors will not be accountable for the Delivery of any Parcel of the Value of Two
Pounds and upwards, unless entered, and paid for accordingly.
Passengers are put on Board and landed at Greenock, Douglas, and Liverpool, free of expence.
The Passage between Greenock and Liverpool is generally made with Twenty-five hours.
May 1, 1826.
JAMES LITTLE, Agent, Greenock,

The British and Irish Company, etc.
In 1836 the British and Irish Steam Packet Company was inaugurated. A
copy of an old sailing bill of that year makes curious reading. Its reference
to the “legal quays” is also interesting as reminding us of a condition of
affairs which has now passed away. The “legal quays” were those reserved
by the Government for the cross-channel mail steamers, and also those at
which special facilities were given to encourage subsidised lines.
This was not, however, by any means the first company to run steamers
between Dublin and London, the City of Dublin Company having preceded
it by several years, as also did the Cork Steamship Company, and the St.
George Company. The first steamers of the British and Irish Company were

Page 122

the City of Limerick, Devonshire, and Shannon, but it would appear from
the bill just quoted that the Devonshire and Shannon gave place to, or were
supplemented by, the Nottingham and Mermaid.
This bill, according to the company’s handbook, was issued in 1836. The
Duke of Cornwall, added to the fleet in 1842, was, like the others, a little
wooden paddle-steamer, and schooner-rigged; she was the last of the
vessels of this type purchased by the company. Three years later, by which
time the superiority of the screw for sea-going steamers had already
compelled recognition, the company showed its enterprise by placing two
auxiliary screw steamers, the Rose and Shamrock, on its London and Dublin
service, each of them proving an unqualified success. That decade will ever
be memorable for the introduction of iron vessels with screw propellers. In
1850 the company purchased the Foyle, one of the finest iron steamers in
existence at the time, and in the summer of the next year established its
regular service between Liverpool and London, with calls both ways at the
intermediate south of England ports. It ran for a year a service between
London and Limerick with the screw steamer Rose, which was disposed of
the next year. Two fine steamers, the Nile and the Lady Eglinton, were
secured in 1852, and the chartering of the latter vessel as a troop and
storeship by the Government during the Crimean War, and the wreck of the
Nile off Cornwall, caused the cessation of the company’s London and
Liverpool service.
An interesting connection between the company and the transatlantic
service is found in the history of the invariably unsuccessful attempts to
inaugurate a service between Galway and America.
The Lady Eglinton made two trips between the Irish port and the St.
Lawrence in 1858. This vessel was lengthened in 1865 by 30 feet. One of
the company’s boats, a little paddle-steamer named the Mars, which
maintained a local service between Dublin and Wexford, was a good sea-
boat, and sufficiently speedy for her size to attract the attention of the
agents of the Confederate States of America, who purchased her for use as a
blockade-runner. In this she was fairly successful for some little time, but
accounts differ as to what became of her. It is stated that a blockade-runner
of that name was wrecked on one of the keys off Florida in endeavouring to
escape from a Federal gunboat. Another version is that the Mars received a
hostile shell between wind and water, which exploded inside the ship so
that she went down. In 1865 the Lady Wodehouse was built for the company

Page 123

at Dublin by the shipbuilding firm of Walpole, Webb and Bewley, who four
years afterwards built the Countess of Dublin. The year 1870 was one of the
most important in the history of the company, for it bought the steamers of
Messrs. Malcomson’s London and Dublin Line, the Cymba and Avoca, and
has since had a monopoly of that service. The Lady Olive, of 1096 tons,
acquired in 1879, was the last iron vessel the company had built; all the
succeeding vessels have been of steel.

The “Lady Roberts”
(British and Irish Steam Packet Company).

The engines of the earliest boats were of the usual side-lever type. These
in time gave place to compound engines, and the modern steel vessels have
triple-expansion engines. The present fleet consists of the Lady Olive and
the Lady Martin, of 1365 tons gross, the latter, built by Messrs. Workman
and Clark at Belfast in 1888, being the company’s first steel ship. The Lady
Hudson-Kinahan, of 1375 tons, was built by the Ailsa Shipbuilding
Company at Troon in 1891, and this company also constructed in 1897 the

Page 124

Lady Roberts, of 1462 tons gross, while the Lady Wolseley was launched in
1894 by the Naval Construction Company at Barrow.

The Powell and Hough Lines
These, like nearly all of the older coastal lines that were associated with
the firm of H. Powell and Co., started with small sailers between Liverpool
and London, with calls at the various ports on the south coast. The history
of the line has been one of continued progress, and it maintains at the
present time a regular service of fast steamers between London and
Liverpool, calling at Falmouth, Plymouth, Southampton, and Portsmouth.
Its earlier steamers, as was only natural in the then imperfect state of steam
navigation, were, compared with the present boats, small, but were fully up
to the average of the coasting fleet, and in many cases could not be
surpassed by any vessels trading on the coast, or even by some making
ocean voyages. The Augusta, built in 1856, with a gross tonnage of 188,
and 50 horse-power, was a screw steamer, and carried three masts. On the
foremast were square sails. The company’s latest vessels are the Masterful
and Powerful. The Masterful is of 2600 tons and is built of steel throughout,
and the Powerful is of 2200 tons; the improvement in their accommodation
compared with that of the boats of fifty years ago is as noticeable as is the
increase in size. These vessels are two of the few in the coasting trade fitted
with submarine signalling apparatus. The Powell Line also has cargo
services between Liverpool and Bristol and a number of ports on the south
coast, and between Manchester and Bristol Channel ports and certain south-
coast ports.
Associated with this line are the steamers of Messrs. Samuel Hough and
Co., the vessels of the two companies sailing as a rule alternately.

Alexander Laird and Co.
The St. George Company withdrew from the Clyde and Mersey trade in
1822, and in 1823 Alexander Laird and Co. began the Liverpool, Clyde, and
Isle of Man service with the steamer Henry Bell, built by Wilson of
Liverpool. In 1824 Mr. Laird placed on the Glasgow and Liverpool service
the James Watt, which had been a couple of years with the General Steam
Navigation Company. She was rigged as a three-masted schooner, and had

Page 125

the distinction of being the first steamer entered at Lloyd’s. Laird’s service
between Glasgow and Inverness was started in 1825, and in the following
year the sailings were changed from fortnightly to weekly.
In 1827 Messrs. T. Cameron and Co. started a service of steamers
between Glasgow and the north and west of Ireland, but in 1867 it was
taken over entirely by Messrs. Laird and Co.

The “Augusta” (Powell Line, 1856).

The Northman (1847) and Irishman (1854) were among the earliest iron
steamers built; they belonged to the Glasgow and Dublin Screw Steam
Packet Company, under which name Messrs. Cameron ran a service
between those ports and were opposed by the Sligo Steam Navigation
Company until an arrangement was made between Laird’s and the Sligo
Company. The Irishman was the last steamer to carry the white funnel with
a black top which was the distinguishing-mark of the old St. George
Company. Other vessels of increasing size and importance were added from
time to time and the Laird Company’s fleet now comprises twelve ships, of
which the latest is the Rowan, a beautiful steel vessel of about 1500 tons,
launched in 1909.

Page 126

CHAPTER IV
RAILWAY COMPANIES AND THEIR STEAM-SHIPS

he railway companies early saw the advantages to be gained
by the addition of steam-ship services to and from the
ports to which their lines ran. Steam-ship owning by the
railway companies was not permitted by Parliament at one
time, and the proposal, whenever brought forward, was
strongly opposed by the private steam-ship owners. The
first company to enter the field was probably the North
Lancashire Railways, which were subsequently absorbed by the London
and North-Western Railway Company, and which, in conjunction with the
City of Dublin Steam Packet Company, instituted in 1844 a steam-ship
service between Fleetwood and Dublin, the Hibernia being the first steamer
employed for the purpose. The venture was a success and brought to the
Dublin Company such an immense increase in its trade between England
and Ireland that in the following year the directors decided to add to their
line three auxiliary screw schooners and five paddle-steamers.
In 1839, the Government arranged that the mails should be despatched
every morning and evening from Liverpool to the Irish capital, via
Kingstown, on the arrival of the mail trains from London. The morning
service was by Admiralty steam packet and the evening service by the boats
of the Dublin Steam Packet Company. The strong rivalry which
immediately sprang up between the two services was intensified by the
agreement between the North Lancashire Railways and the City of Dublin
Company, and resulted in a vast improvement being effected in the steamers
employed. For ten years this battle of the services was waged with unabated
vigour on both sides, but finally in 1850 the Admiralty withdrew their
steamers and left their rivals in full possession of the carriage of the Irish
mail service.
The Dublin Company was not, however, long permitted to enjoy the
fruits of their well-earned victory over the Admiralty, but was almost

Page 127

immediately involved in a similar conflict with the Chester and Holyhead
Railway Company, this time over the conveyance of the mails from
Holyhead to Dublin. Recognising the importance of Holyhead as a port, the
directors of the Dublin Company had not only placed some of their vessels
there, but had also put in a tender for the Trans-Irish Channel mail service,
which was accepted by the Admiralty. The Chester and Holyhead Railway
Company, who were also steamship owners, were under the impression that
no one could compete with them, and believing that they could obtain their
own terms from the Admiralty neglected to tender. Prior, however, to the
ratification by the Government of the Admiralty’s acceptance of the City of
Dublin Company’s tender, the railway company, by some means best
known to itself, obtained information of what was going on and used every
means in its power to bring pressure on the Government to prevent the
conclusion of the contract. These efforts were so far successful that fresh
tenders were asked for by the Admiralty. From the facts which have since
been made public, it would appear that the Dublin Company were not at all
fairly treated in the first instance, because the amount at which they
tendered having been allowed to leak out, the Chester and Holyhead
Railway Company was enabled to undercut them. Fearing that similar
tactics might be employed on the second contract, the Dublin Company, in
consideration of the importance of the issue involved, put in at a very much
lower figure than on the former occasion, secured the contract, and without
loss of time inaugurated their new service. Further complications ensued
owing to the persistent attempts made by the Chester and Holyhead
Railway Company to wrest the contract from their opponents. They,
however, were unsuccessful and the matter was finally settled in favour of
the Dublin Company by the appointment of a Parliamentary Committee,
which reported in favour of the arrangements already made.
Before many of the railway companies became steam-ship owners they
made working arrangements with existing steam-ship lines. This method of
dealing with the passenger, coasting, and over-sea traffic was due, not to
any lack of initiative on the part of those responsible for the management of
the railways, but to the uncompromising antagonism of the steam-ship
companies, who objected to the railway companies being permitted to own
steamers. A Bill empowering the Chester and Holyhead Railway Company
to purchase and work steamboats was brought before Parliament in 1848,
but was strongly opposed by the steam-ship companies on the ground that it

Page 128

would create undue competition and would interfere with their existing
rights, and further, that over-sea competition was outside the legitimate
sphere of a railway company’s operations. The directors and large
shareholders of the Chester and Holyhead Company retaliated by forming
themselves into a small independent firm to run steamboats between
Holyhead and Ireland. The necessary capital was subscribed, and four new
iron passenger steamers, the Anglia, Cambria, Hibernia, and Scotia, were
built. They were each of 589 tons gross, and were 207 feet long, 26 feet
beam, and 14 feet in depth, having a draught of 8 feet 10 inches. Each
carried 535 passengers. Parliament was thus placed in a difficult position,
because even if the Bill were thrown out, the boats were advertised to run
on August 1, 1848, and as they belonged to a private firm the Legislature
and the opposition companies were powerless to interfere. A month later, at
the half-yearly meeting of the Chester and Holyhead Railway Company, the
directors reported that their Bill had been successfully passed, and that the
boats had commenced running on the advertised date. These boats were
able to attain a speed of from 14 to 15 knots per hour. The opposition of the
steam-ship companies, although not entirely killed, was less effective than
formerly. The battle was won by the railway companies, and steam-ship
owning by railway companies is now regarded as a matter of course.

The Turbine Steamer “Marylebone” (G.C. Railway).

Page 129

The “Cambria” (L. & N.W. Railway).

Along the south-east and south coasts, between Harwich and Falmouth,
the greater part of the Anglo-Continental passenger traffic, with a large
amount of goods traffic, is carried by railway-owned steamers. To meet the
heavy requirements of the cross-channel service between Dover and Calais,
the South-Eastern and Chatham Railway Company run steamboats. These
are the large paddle-steamers Empress, Dover, Calais, Lord Warden, Le
Nord and the Pas-de-Calais, and the three turbine steamers Queen, Victoria,
and Empress. The Victoria was built by Messrs. W. Denny Bros.,
Dumbarton, and is one of the finest boats owned by the company. On her
trials she attained a speed of over 22¹⁄₂ knots, being 1³⁄₄ knots in excess of
the guarantee and sufficient to make the Channel passage under the hour.
The Empress, built by the same firm, is generally similar to the Victoria; she
is 310 feet long, 40 feet in moulded breadth, and 24 feet 6 inches deep from
the awning deck, which extends from stem to stern. The rudder is of the
balanced type, of a form specially designed by the builders for their turbine
vessels, and is worked by a steam tiller, controlled on the flying bridge by a
telemotor. For convenience in canting and backing out of English and
French harbours the vessel is fitted with a large bow rudder worked by

Page 130

steam steering-gear controlled by a wheel on the flying bridge. The
propelling machinery consists of three turbines, each driving a separate
shaft and propeller. For their Folkestone-Boulogne service the company
also have the steamers Princess of Wales, Duchess of York, Grace, and
Mabel, each of which is exceedingly fast and powerful.

London, Brighton, and South Coast Rly. Co.
A considerable amount of difficulty was experienced by the London,
Brighton, and South Coast Railway Company in their preliminary attempt
to open up the Newhaven-Dieppe route in 1847. As Brighton was a very
unprotected departure and arrival station, and they were unable to come to
terms with the Shoreham Harbour authorities, the company decided on
Newhaven as the base for their cross-channel operations. The Brighton,
Newhaven, and Dieppe steamers carried both passengers and cargo. As, at
that time, it was illegal for railway companies to own steamboats, the
South-Eastern Railway Company entered a complaint, and the London,
Brighton, and South Coast Railway Company were mulcted in a heavy fine
for the cross-channel trading that had already been carried on. The service
was in consequence completely stopped and the boats sold. For three years
Anglo-Continental trade was left to private steamship owners, and then an
arrangement was entered into with Messrs. Maples and Morris to run
steamers ostensibly on their own account, but really on behalf of the
company. Among the earlier steamers thus employed were the Ayrshire
Lassie, Culloden, and Rothesay Castle, all built at Glasgow. The extra
amount of business anticipated from the Great Exhibition of 1851
necessitated fresh arrangements being made in connection with the service,
and an agreement was entered into by which Mr. Maples was to run his
steamers for seven years. In the meantime the company endeavoured, but
unsuccessfully, to obtain powers to own steamers themselves. At the
expiration of Maples’ contract, it was extended for another four years.
During the second period the powers for which the company had been
asking were granted by Parliament, but Maples would not release them till
his contract expired. When he did leave the service he took with him the
Paris, Rouen, Dieppe, Marco, Hope—the latter an iron brig noted for
having about seven feet of false keel—and another, and £38,000 in hard
cash, which he subsequently lost. The three Scotch boats mentioned ran

Page 131

through the whole of the summer of 1851, at the end of which the Aquila
was also chartered for the company. Two of Maples’ privately-owned boats
on the Newhaven-Dieppe service were the screw steamers Collier and
Ladybird. The latter was about 160 feet long, of 150 horse-power and
steamed 11 knots. She was fitted with inverted geared engines to work the
screw shaft, the ratio being 2¹⁄₂ to 1. Subsequently she went to Australia,
and in 1854 carried the first Sydney to Melbourne mail. One of the most
remarkable of the earlier boats employed by the London, Brighton, and
South Coast Railway Company was the Wave Queen. She was built in 1852
by Messrs. Robinson Russell and Co. for a Belgian gentleman, whom she
did not suit, and was sent to Newhaven by Mr. Scott Russell until he could
get the Lyons and Orleans ready for use. She was of iron with a length of
200 feet, but her breadth was little more than 13 feet. For her beam she was
one of the longest boats ever constructed, and consequently attracted a
considerable amount of attention. Her engines were of 80 horse-power. She
had clipper bows with very fine lines even for so narrow a vessel, and she
had also an exceedingly long overhanging counter. A special feature of her
construction was the total absence of sheer, and she enjoyed the reputation
of being a swift and dry boat. According to contemporary records she was
held to be the smallest vessel then afloat capable of attaining the speed
required. Her engines were of the oscillating type and made fifty
revolutions per minute, and steam at 25 lb. pressure was supplied by two
tubular boilers. These were 15·7 feet long, 10·5 feet wide, and 6·5 feet
high, having a total grate area of 100 square feet and 2342 square feet of
heating surface. The aggregate weight of engines, boilers, and water was
55¹⁄₂ tons. Her paddle-wheels, which were unusually small for her length,
were 12·4 feet in diameter, and each had sixteen feathering floats 6 feet by
2 feet 6 inches, her average speed being 15¹⁄₂ knots and her load
displacement 225 tons with a gross register of 196 tons. On one of her trips
she ran into the West Pier fourteen feet, but although she remained fixed
during one tide she did not start even a rivet, and was got off on the next
tide without having admitted a drop of water.
The London, Brighton, and South Coast Railway Company started their
Littlehampton trade in 1866. In 1875 the company acquired from Messrs.
Elder the celebrated Paris, commonly spoken of as the most handsome
steamer that ever crossed the Channel. Larger and faster vessels being
required about this time for the Dieppe and Honfleur routes, they purchased

Page 132

the Honfleur from Messrs. Gurley Bros. She was 376 gross tonnage, had
engines of 45 n.h.p., with two cylinders of 18 inches and 34 inches diameter
and a piston stroke of 18 inches. The twin-screw Rennes, built in 1866, was
sent to the Thames to be overhauled, and her engines were compounded by
Messrs. J. and W. Dudgeon, the result being a great increase in speed and a
reduction of somewhere about 45 per cent. in coal consumption. Two new
screw steamers, the Newhaven and Dieppe, were built for the company by
La Société des Forges et Chantiers at Havre, but owing to structural
imperfections, a considerable amount of trouble was experienced before
they could be made to meet the requirements of Lloyd’s and the Board of
Trade. At their best they were very slow. A great increase in traffic being
expected from the Paris Exhibition of 1878, two paddle-steamers, the
Brighton and Victoria, were ordered from Messrs. Jno. Elder and Co. of
Govan. Their bridges were filled with the first steam-steering gear ever seen
at Newhaven. A larger type of boat than had been used heretofore was
adopted in 1882, when the Normandy and Brittany were purchased from the
Fairfield Company of Glasgow, and in 1885 the Lyons and Italy were
obtained from Govan for the cargo trade. The vessels now employed are the
Arundel, Brighton, Calvados, Dieppe, Paris, Sussex, and Trouville.

London and South-Western Rly. Co., etc.
Farther westward on the south coast, an equally important line of
communication between England and France is maintained by the
steamboat service now carried on by the London and South-Western
Railway Company from Southampton to Havre and Honfleur, St. Malo and
the Channel Islands. The early boats employed in the cross-channel traffic
were all of much the same type and size on whatever line they were
engaged, and as the same limitations of ports applied to those run by the
South-Western Railway Company as to the steamers of other companies,
there was little to choose between them in regard to speed, seaworthiness,
or accommodation.
During the early years of the past century the mail and passenger service
between England and the Channel Islands was performed by cutters similar
to those employed in the French mail service between Dover and Calais.
Later the mails were conveyed under the auspices of the Admiralty from
Weymouth to Guernsey and Jersey by the ships of H.M. Navy, Meteor,

Page 133

Dasher, Wildfire, and Cuckoo. The Dasher was employed until very recent
years in guarding the fisheries off Jersey.
The first records of the steam-packet services from Southampton are
dated 1835, and mention a service between Southampton and Havre twice a
week in each direction by the Camilla, of 186 tons; and between
Southampton and the Channel Islands by the Ariadne, 218 tons, these
vessels being the property of the South of England Steam Navigation
Company, who appear to have been the pioneers of these services. Even at
that time there was opposition on the Channel Islands Station by the Lord
Beresford and on the Havre station by the Apollo, both vessels belonging to
the British and Foreign Steam Navigation Company. About one hundred
passengers were carried to the Channel Islands on each trip during the
summer season of 1835.
One of the earliest steamers employed in the Channel Islands service was
the Lady de Saumarez (January 1836) of 350 tons, belonging to the British
and Foreign Steam Navigation Company, with two 40-horse-power engines
and fitted with Seaward’s improved vibrating paddles.
In May 1836 the Monarch was launched from the shipyard of Rubie and
Blaker, Northam, and was the largest steam vessel which had been
constructed on the Itchen. Her dimensions were 140 feet long, 23 feet beam,
360 tons, and she was built in four months. Her engines, of 120 horse-
power, were supplied by Horseley and Co. of Tipton, near Birmingham, and
the vessel was sent to London to receive them. The Monarch was placed on
the Havre station by her owners, the South of England Steam Navigation
Company. On June 2, 1836, the Atalanta, of 400 tons and 120 horse-power,
was launched from the yard of Mr. Thomas White, West Cowes. She began
running on the Channel Islands station for the South of England Steam
Navigation Company during the month of July. The Atalanta was
lengthened by Mr. White some years later, her bows being cut off and up-
ended in his yard for a workmen’s shelter. She ended her days as a coal-
hulk in Jersey.
In July 1836 the Watersprite, a vessel of 200 horse-power, was put on the
Channel Islands station by the British and Foreign Steam Navigation
Company, which two years later became the Commercial Steam Packet
Company. This company owned also the Grand Turk, a vessel of 500 tons
and 300 horse-power, and she was reputed to be the fastest and most
handsomely furnished ship of her day. Her saloon was 50 feet in length by

Page 134

30 feet wide. She ran both to Havre and the Channel Islands, and in 1841-
1842 had opposed to her the steamer Robert Burns.
The Grand Turk was chartered in 1848 for two years to run between
Alexandria, Beyrout, Tripoli, and other Mediterranean ports with
passengers and mails. On her return she plied between Southampton and
Morlaix for the South-Western Steam Packet Company.
The Transit, another of the old steamers of the South-Western Steam
Packet Company, was running in 1836 under the ownership of the British
and Foreign Steam Navigation Company, between Southampton and
Spanish ports, carrying cattle and general cargo. She is recorded to have
made the passage from Lisbon to Falmouth in three and a half days during
the winter of 1836. When withdrawn from this trade she was run to the
Channel Islands by the South-Western Steam Packet Company, and she,
too, ended her days as a coal-hulk.
Between 1838 and 1845 the mail service between England and the
Channel Islands appears to have been performed by a steam-packet service
from Weymouth, of which no reliable records can be discovered. The
transfer of this mail service to the steamers of the South-Western Steam
Packet Company from Southampton took place on April 1, 1845. But in
October 1899, when the steamers of the London and South-Western
Railway Company from Southampton and the Great Western Railway
Company from Weymouth were joined in the Channel Islands service the
mails were once more carried via Weymouth three days a week during the
winter months.
The advertisement columns of the Hampshire Advertiser of 1845 refer to
the “South-Western Steam Packet Company” as the owners of the cross-
channel steamers, and they seemed to have remained so until 1860, when
their steamers were taken over by the London and South-Western Railway
Company.
The merchants of the Channel Islands started an opposition company,
called the Weymouth and Channel Islands Steam Packet Company, with the
steamers Aguila, Cygnus, and Brighton. This opposition continued until
1888, when the service was taken up by the Great Western Railway
Company. After keeping up a keen opposition to the London and South-
Western Railway Company for eleven years an amicable arrangement was
entered into for a joint service, which still continues.

Page 135

In consequence of the opposition of the Weymouth and Channel Islands
Steam Packet Company a South-Western Railway Company’s steamer, the
Wonder, was sent to Weymouth. This ran until 1860, when the Weymouth
service was given up by the London and South-Western Railway and all
their energies were concentrated upon the Southampton route.
Although steamers ran from Southampton to Jersey and thence to St.
Malo from 1845, the regular connection between Jersey and France was by
a French company’s steamer called the Comet. This company was bought
out by the London and South-Western Railway Company in 1867. The
latter company then commenced running their steamer Dumfries regularly
from Jersey to Granville and St. Malo in connection with the Southampton
and Channel Islands service.
In 1860 a direct service was opened between Southampton and St. Malo
by the new iron screw steamer St. Malo, the first of this type built for the
London and South-Western Railway.
The paddle-steamer South-Western, the first iron steamer employed in the
Channel Islands service, had a speed of about 12 knots. She was 131 tons
net and was sold in 1863. Her floats were taken off and after being rigged
for the purpose she was sailed out to Japan.
After the South-Western came the Wonder, Express, Courier, and
Dispatch. They each had a speed of thirteen to fourteen knots. The Express
was built and launched in six weeks. At the time she was laid down the
engines put into her were in the yard ready for a Government steamer, but
were used for the Express instead. This same Express was the steamer
which brought Louis Philippe a fugitive from France in 1848, her
commander on that occasion being Fred Paul, R.N., who had been lent by
the Government to the company for that purpose. Louis Philippe, disguised
as a fisherman, crossed from Honfleur to Havre in a fishing smack and was
put on board the Express lying in the avant-port of Havre. As soon as his
feet touched her deck, Commander Paul, who was lying under a full head of
steam, slipped her moorings, steamed away and landed the fugitive at
Littlehampton. A brass plate stating the facts was fastened to the sofa in the
saloon, on which Louis Philippe slept. The Express was lost on September
20, 1859, on the passage from Jersey to Southampton in the Jailer Passage
off the Corbière Lighthouse, Jersey.
The next steamers acquired by the company were the Alliance in 1855,
Havre, Normandy, and Southampton in 1860, and Brittany in 1864. Until

Page 136

she was outclassed by larger and faster ships the Alliance was on the Havre
route. She was afterwards transferred to the service between Jersey and St.
Malo, and was sold in 1900.
The Havre ran alternately to her name-port and the Channel Islands until
her career was ended on February 16, 1875, by the Platte Boue, a sunken
rock in the Russel Passage near Guernsey. There was no loss of life and the
mails were also saved.
Equal ill-fortune attended the Normandy. This boat, which was employed
almost exclusively on the Channel Islands service, was sunk on March 17,
1870, in collision with the screw steamer Mary while on the outward
passage, some twenty-five of the passengers and crew being drowned. The
Southampton, built by Palmer in 1860, was reckoned the strongest vessel of
her tonnage at that time. In 1880 she was lengthened and given new engines
and boilers by Day, Summers and Co., and was engaged in the Channel
Islands trade until 1880, when the service was entirely performed by screw
steamers. She was then transferred to the Havre route and continued
running there until the present twin-screw steamers, Columbia and Alma,
came out and superseded her. Her last piece of active service was to make a
trip round the fleet at Spithead on the occasion of the Jubilee Naval Review
in 1897. The Brittany, built at Cubitt Town in 1864, was also employed in
the Channel Islands trade until 1880, when, like the Southampton, she was
transferred to the Havre route until 1894. Her last appearance was at the
same review. She was lengthened thirty feet and given new engines and
boilers in 1883. The company in 1868 purchased for their Channel Islands
service the Waverley, a paddle-steamer of about fifteen knots, which had
been employed running from Silloth to Dublin. She was the finest ship
which had yet been employed on that service. She came to grief on June 5,
1873, when she struck upon the Platte Boue rock. The whole of the
passengers, mails, and baggage were brought off in safety.

Page 137

The Turbine Steamer “St. Patrick” (G.W. Railway).

The outbreak of hostilities between France and Germany in 1870 brought
about the purchase by the company of the paddle-steamers Alice and
Fannie. These each had a speed of fifteen knots, and were placed on the
Southampton-St. Malo route and conveyed horses and provisions for the
French. Both ships ran backwards and forwards for some months at their
highest possible speed, only remaining at the quay side just long enough to
load and discharge cargo.
The Waverley was also employed during that period running to and from
Havre taking British provisions for the French, and conveying to England
fugitive French families and all the valuables they could bring with them.
These valuables were transhipped in Southampton Water to a steamer of the
French Transatlantique Company, which was moored there for that purpose.
The Fannie and Alice ran alternately upon the Havre and Channel Islands
stations until 1887, when they were sold out of commission. They were
always favourites owing to their speed and spacious deck and cabin
accommodation.
In 1871 the company purchased the paddle-steamer Wolf, which had been
sunk for some time in Belfast Lough. She was employed, until sold in 1900,
on the Havre route.

Page 138

The first screw steamer to be employed in the Channel Islands mail and
passenger service was the steam yacht Griffin, purchased in 1865 from a
Mr. Beard, a Scotch iron-master.
The Diana was the first of the new screw boats built for the company and
was launched in 1877, and in 1881 was supplemented by the Ella and in
1882 by the Hilda. Nine years later these vessels, together with the paddle-
steamers Brittany and Southampton, were in their turn superseded by the
twin-screw steamers Lydia and Stella. The latter had a very successful
career until March 30, 1899, when she foundered on the Casquets, her
sailings being taken by the Alberta. A further change was made in 1894, the
Southampton, Brittany, and Wolf being replaced by the Columbia and Alma,
which were faster and more up-to-date boats. In 1896 the Princess Ena, a
twin-screw vessel, was launched to replace the Hilda, and the Vera was also
purchased as an auxiliary boat for the Channel Islands and Havre routes.
Numerous additions have since been made by the company to their fleet,
which now numbers twenty-six vessels. These are the Ada, Alberta,
Alexandra, Alma, Atalanta, Bertha, Cherbourg, Columbia, Duchess of
Albany, Duchess of Connaught, Duchess of Edinburgh, Duchess of Fife,
Duchess of Kent, Ella, Frederica, Guernsey, Honfleur, Laura, Lydia,
Lymington, Princess Ena, Princess Margaret, Solent, South-Western, Vera,
and Victoria. These steamers all carry sufficient coal for the out and home
trip, with an additional quantity to meet any contingency that may arise.

Great Western Rly. Co.
Another important south-coast mail and passenger service is carried on
by the Great Western Railway Company from its southern terminus at
Weymouth to the Channel Islands and Brittany. Formerly this company also
conveyed mails and passengers between England and Ireland by their line
of steamers from Milford to Rosslare. This has since been discontinued in
favour of the Fishguard-Rosslare route.

Great Eastern Rly. Co.
Working arrangements exist between certain of the railway companies
and the steam-ship lines, one of the most important being the joint service
maintained by the Great Eastern Railway Company and the General Steam

Page 139

Navigation Company from London to Hamburg, via Harwich. The steamers
on this route sail twice weekly. There is also an agreement between the
Great Eastern Railway Company and Danish Royal Mail steamers of the
Forenade Line of Copenhagen by which these vessels convey passengers
three times per week between Harwich and Esbjerg. The Great Eastern
Railway Company also maintains a fleet of fast and powerful steamers for
their Anglo-Continental mail and passenger business. This was started in
1863, when the company chartered two steamers for carrying goods
between Harwich and Rotterdam. This service was made a biweekly one in
1864, and a similar service was also run to and from Antwerp. The
company then introduced four new steamers specially built for the trade and
conveying both passengers and cargo. In 1882, owing to the development of
the traffic, the Harwich services to and from Rotterdam and Antwerp were
extended to every week day.

The R.M. Turbine Steamer “Copenhagen” (G.E. Railway).

Page 140

The Hook of Holland quay at the mouth of the River Maas was finished
in June 1893 and the company’s steamers began to call there. This greatly
accelerated the service to Berlin and other parts of North Germany and a
daily service was then started. In the same year the company acquired larger
steamers for this service. A new railway line round Rotterdam was opened
in May 1899 which shortened the journey to Berlin; and in May 1903 an
express train was run between the Hook of Holland and Berlin in
connection with the steamers. Since the opening of this route the passenger
traffic has trebled.
The company now have a fleet of eleven fast and powerful turbine and
twin-screw steamers, all of which are fitted with apparatus for wireless
telegraphy and submarine signalling. The latest addition is the Royal Mail
turbine steamer Copenhagen, with a speed of 20 knots, on the Harwich-
Hook of Holland route. In her passenger accommodation she has many
features of the latest type of Atlantic liner.

Great Central Rly. Co.
Farther along the east coast, the Great Central Railway Company
maintains a service between Grimsby and several of the Continental ports.
The company in 1864 secured parliamentary powers to run steamers to
Hamburg, Rotterdam, Antwerp, Flushing, Lubeck, Stockholm, Copenhagen,
Revel, Cronstadt, St. Petersburg, and Königsberg. Subsequently they
purchased the Anglo-French Company’s fleet and began to run steamers to
Hamburg in July 1865. In April 1866, the railway company initiated a new
service of steamers between Grimsby and Rotterdam, and in the August of
the following year the service was extended to Antwerp. On December 1,
1885, the sailings between Grimsby and Hamburg were increased from two
to four per week; and on July 1, 1891, a daily service was established. The
sailings between Grimsby and Rotterdam were increased in September
1906 from two to three per week, and early in 1907 two new 18-knot
turbine steamers Marylebone and Immingham were placed on this service.
In essential particulars these are sister ships, though differing somewhat
in their internal arrangements. The Immingham has a length over all of 282
feet, beam 41 feet, and depth moulded 21 feet 6 inches. Accommodation is
provided for seventy first and twenty-four second-class passengers, and
three hundred in the third class, besides one thousand tons of cargo. She is

Page 141

driven by three Parsons turbines actuating three shafts. These two steamers
marked a new era in the Continental service from the Humber, being far in
advance in accommodation and speed of anything hitherto employed.

London and North-Western Rly. Co.
On the west coast the principal part of the cross-channel, Irish mail,
passenger, and cargo traffic is divided between the services organised by the
London and North-Western Railway Company, the Midland Railway
Company, and the Great Western Railway Company. For four years after
the London and North-Western Railway Company had absorbed the Chester
and Holyhead Railway, they continued to work the Irish service with the
boats acquired from the latter company. A new type of paddle-boat, 230 feet
in length, with carrying capacity of 700 tons, their speed being fourteen
knots per hour, and conveying both passengers and cargo, was then put on
for the service. The first of these, the Stanley, was built by Messrs. Caird of
Greenock, and had as sister boat the Alexandra, constructed by Laird of
Birkenhead. These vessels did excellent work and were afterwards
supplemented by the Countess of Erne, Admiral Moorsom, Duke of
Sutherland, Duchess of Sutherland, and Edith, all boats of a similar type.
Two of these, the Duchess of Sutherland and the Edith, were in 1888 and
1892 respectively converted into twin-screw steamers. The Duchess was
sold in 1908, but the Edith is still employed in the North Wall cargo service.
This service was, in 1876, supplemented by a day express boat in each
direction between Holyhead and Dublin North Wall, two paddle-steamers,
Rose and Shamrock, being built by Messrs. Laird Bros. of Birkenhead. A
night service in each direction was started in 1880 with the Lily and Violet,
built by Messrs. Laird. They were each 310 feet long and had a gross
tonnage of 1035 tons, with a speed of 19 knots per hour. The Lily was sold
in 1900 and ran for some time between Liverpool and the Isle of Man. The
Violet was also disposed of two years later. In 1884, the Banshee, another
paddle-boat of the Lily type, was built for the company by Messrs. Laird,
and ran until February 1906, when she was sold out of the service. On
December 15, 1897, the Cambria, the first of a new class of steel twin-
screw steamers which almost equal the great ocean liners in speed,
magnificence, and comfort, was placed on the North Wall service. She was
followed by the Hibernia on February 2, the Anglia on May 2, 1900, and by

Page 142

the Scotia on April 23, 1902. The Scotia is 337 feet 6 inches in length, has a
moulded breadth of 39 feet, with a depth to the awning deck of 29 feet 6
inches. The twin screws are driven by two sets of triple-expansion engines
of 7000 horse-power, the eight single-ended boilers giving steam at a
pressure of 160 lb. per square inch. There are four cylinders to each set of
engines, which are balanced on the new Schlick principle, so as to avoid
vibration. Even in the worst weather she can accomplish a speed of 21
knots. Her accommodation provides for 600 saloon and 700 third-class
passengers.
A direct service between Holyhead and Greenore was opened in 1873
with the three paddle-driven boats Eleanor, Isabella, and Earl Spencer.
These served until 1895, when, at the suggestion of Captain Binney, the
company’s Marine Superintendent, three new steamers of greater speed and
capacity—the Rosstrevor, Connemara, and Galtee-More—were ordered for
the service. These vessels are 280 feet in length, with a gross tonnage of
1000 tons, and a maximum speed of 18 knots. The engines are triple-
expansion of 2500 horse-power, and the boats are propelled by twin screws.
In 1908 the Rosstrevor was replaced by the Rathmore, the former vessel
being converted into a cargo and cattle steamer. The Rathmore is 300 feet
long, and has a gross tonnage of 1600 tons; her engines are of 6180 horse-
power and give a speed of 20¹⁄₂ knots per hour.

Page 143

The “Scotia” (L. & N.W. Railway).

The goods, cattle, and general cargo traffic between Holyhead and North
Wall, Dublin, is served by eight cargo boats, all of which are twin-screw
ships. They convey third-class passengers but are not provided with any
first-class accommodation.
For very many years the Midland Railway Company were partners in the
Barrow Steam Navigation Company, whose fleet maintained a daily service
between Barrow and Belfast and, during the season, between Barrow and
the Isle of Man. When Heysham Harbour was opened in September 1904,
the Midland Company put on a fleet of seven powerful and magnificently
fitted steamers of the most modern type for their Heysham-Belfast service.
They also bought out the other partners in the Barrow Steam Navigation
Company, which has now been dissolved. Two of the vessels formerly
belonging to the Barrow Steam Navigation Company were disposed of at a
comparatively recent date and have been broken up. As regards the existing
fleet, the Londonderry is installed with the Lodge-Muirhead system of
wireless telegraphy. The Antrim and the Donegal will shortly be similarly
equipped. There is a wireless telegraphic station at Heysham and wireless

Page 144

communication was first established on the company’s service nearly six
years ago. The Londonderry and Manxman are propelled by turbines, whilst
the Antrim, Donegal, Duchess of Devonshire, and City of Belfast are twin
screws. During the season, the Isle of Man service between Heysham and
Douglas is maintained by the Manxman and the Duchess of Devonshire.
Except on Sundays, a nightly service between Heysham and Belfast is
carried on regularly by the Antrim, Donegal, and Londonderry, whilst the
City of Belfast runs on alternate days from Barrow and Belfast.

Page 145

CHAPTER V
OPENING OF THE TRANSATLANTIC SERVICE

hen once the ability of steam-ships to make open-sea
passages such as those between Liverpool, Belfast, and
Glasgow had been demonstrated, shipowners began to turn
their attention to the possibility of steamers crossing the
Atlantic. The first steam vessel which is known to have
made the crossing is the Conde de Patmella. Unfortunately
very little is known about this boat. She sailed from
Liverpool on October 20, 1820, for Lisbon, and arrived there in the
remarkably short time of four days. Thence she sailed for the Brazils, being
the first steam vessel to cross the Atlantic from east to west. In the year
1819 the Savannah, a sailing vessel using an auxiliary steam-engine,
crossed the Atlantic, but as this vessel sailed nearly the whole of the way
and scarcely used her engines except when leaving or entering port, she
cannot be described as having made the first steam crossing, although this
claim is often put forward by American writers. But this voyage of the
Savannah is of great historical interest, as it proved what many had
doubted, viz., the possibility of a sailing vessel with steam auxiliary
crossing the Atlantic, and carrying enough coals for her purpose. This boat
when built was not intended for a steamer. Messrs. Scarborough and Isaacs
of Savannah thought that a sail-plus-steam crossing could be made, and
they accordingly instructed Moses Rogers (who, it has already been
mentioned, had made the first sea trip by steamboat from New York to the
Delaware in 1807 with Stevens’ Phœnix) to look out for a hull in which an
engine could be placed for the experiment. He found the Savannah then
being built by Francis Ficket, of the firm of Ficket and Crocker, at New
York, and she was accordingly purchased for Scarborough and Isaacs. Her
engine is stated to have been built at Morristown, New Jersey, by Stephen
Vail, though Daniel Dod[45] of Elizabeth, New Jersey—one of the foremost
marine engineers of America at that time—who built the boilers and paddle-

Page 146

wheels, is sometimes said to have been responsible for the engines also. The
paddle-wheels were constructed with eight radii, which were hinged at the
axle, so that they could be folded and removed from the paddle-shaft, and
stowed on deck in dirty weather. She was a full-rigged ship of 350 tons
burden, 130 feet in length by 26 feet beam, and 16¹⁄₂ feet depth. Her trial
trip in New York Bay in March 1819 was considered satisfactory, although
the steam pressure employed was only 2 lb., while the estimated pressure
was 10 lb. On March 28, 1819, she sailed for Savannah. Her engines were
not used until April 2, when her wheels were placed on the paddle-shafts.
They were shipped and unshipped at intervals, until the conclusion of the
voyage on April 6. At Charleston, South Carolina, President Monroe, of
“Doctrine” fame, visited her. She then returned to Savannah, and sailed
thence for Liverpool on May 24 carrying neither passengers nor cargo.
[45] Dod was killed in 1823 by the explosion of a boiler on a steamer whose
engines he was testing after having made some experimental alterations.

On this first voyage to Savannah, which occupied 207 hours, the engines
were running for only 4¹⁄₂ hours. On June 17 she arrived off the coast of
Ireland, where the revenue cruiser Kite pursued her, under the impression
that she was a ship on fire, and three days later she was off Liverpool. The
voyage occupied 29 days 11 hours, and according to the record kept by
Rogers, which is now preserved in the United States National Museum,
steam was raised six times on the voyage and the engines were run for a
total of 80 hours. The reason the engines were used so little was that she
had a very insufficient supply of fuel. She steamed up the Mersey, her
arrival—the arrival of the first vessel under steam from America—being
witnessed by thousands of persons, some of whom could hardly believe
their eyes, so often had the voyage been described as impossible of
accomplishment.
Extracts from the Savannah’s log read:
“Saturday, May 22, 1819.—These twenty-four hours begins with fresh
breezes at N.E. at 7 a.m. got steam up, winded ship, and hove up the anchor,
at 9 a.m. started with the steam from Savannah, at 12 a.m. anchored at
Tybee stowed the boat and spars and lashed them. Latter part light breezes
at S.E. and flying clouds.
“Sunday, May 23, 1819.—These twenty-four hours begins with fresh
breezes at east and clear, latter part light breezes and clear.

Page 147

“Monday, May 24, 1819.—These twenty-four hours begins with light
breezes and clear at 5 a.m. got under way off Tybee Light and put to sea
with steam and sails, at 6 a.m. left the pilot, at 8 a.m. took off the wheels in
twenty minutes, middle part pleasant. Course E.N.E., wind S.S.E., the ship
going 6.7.8. to 9 knots, and without her wheels.
“Tuesday, May 25, 1819.—These twenty-four hours begins with light
breezes and pleasant, all sail set to the best advantage at 12 a.m. Tybee
Light bore W. 6 S. 8 leagues distant from which I take my departure.”

The “Savannah.”

The ship continued under canvas until May 30, when at 8 a.m. steam was
got up for ten hours. And on June 18 the captain entered: “4 p.m. Cork bore
W. 6 S. 5 leagues distant. At 2 a.m. calm, no cole to git up steam.”
A later entry on Sunday, June 20, 1819, reads: “5 p.m. shipped the wheels,
frld. the sails, and running to the River Mercer at 6 p.m. came to anchor off
Liverpool with the small bower anchor.”
The voyage was not without its humorous side. The sailing master,
Rogers, communicated to the New London (Connecticut) Gazette an
account of their experiences. The Cape Clear telegraph station had reported
a ship on fire, and the Admiral at Cork despatched a cutter to her relief.

Page 148

“Great was their wonder at their inability,” says the paper, “with all sail
in a fast vessel, to come up with a ship under bare poles. After several shots
were fired from the cutter the engine was stopped, and the surprise of her
crew at the mistake they had made, as well as their curiosity to see the
singular Yankee craft, can be easily imagined. They asked permission to go
on board and were much gratified by the inspection of this naval novelty.
On approaching Liverpool hundreds of people came off in boats to see her.
She was compelled to lay outside the bar till the tide should serve for her to
go in. During this time she had her colours all flying, when a boat from a
British sloop of war came alongside and hailed. The sailing master was on
deck at the time and answered. The officer of the boat asked him—‘Where
is your master?’ to which he gave the laconic reply, ‘I have no master, sir.’
‘Where’s your captain, then?’ ‘He’s below; do you wish to see him?’ ‘I do,
sir.’ The captain, who was then below, on being called, asked what he
wanted, to which he answered—‘Why do you wear that pennant, sir?’
‘Because my country allows me to, sir.’ ‘My commander thinks it was done
to insult him, and if you don’t take it down he will send a force that will do
it.’ Captain Rogers then exclaimed to the engineer—‘Get the hot-water
engine ready.’ There was no such machine on board, but the order had the
required effect and the boat sheered off.”
From Liverpool the Savannah sailed for St. Petersburg, calling at
Elsinore and Stockholm. This voyage lasted thirty-three days, on ten of
which the vessel was under steam; and twice the machinery was run for a
spell of fifty-two hours. Eighteen hours was her longest spell while crossing
the Atlantic. The homeward voyage was made in the stormy months of
October and November. The paddles were unshipped throughout that
voyage and were not again used until November 30, when she arrived at
Savannah, the ocean journey having been made under sail only. The cost of
purchasing and fitting out the Savannah for this experimental voyage was
£10,000. In December she returned to New York, her machinery was
removed, and she was then used as a sailer between New York and
Savannah until 1822, when she left her bones on the shores of Long Island.
One of the earliest steamers to cross the Atlantic in a west-bound
direction was a little vessel called the Rising Star.[46] It was decided in 1818
that she should be built, but it was not until 1820 that her construction was
begun. It has even been disputed that this vessel made the voyage at all, and
many of the principal books of reference do not mention her; nevertheless,

Page 149

it appears to be indisputable that she existed, that she made the voyage to
Chili, and that she had an eventful career which lasted several years, and
was finally wrecked; and that the circumstances under which she left this
country for Chili in connection with the Chilian revolution in favour of
independence, and the events subsequent to her arrival as far as paying for
the steamer is concerned, reflect as little credit upon the Chilian
Government as upon that of Great Britain. Early in the last century the
relations between Chili and Spain became strained to breaking-point. The
Chilian people determined to free themselves from the yoke of Spain and to
establish a republic. Whatever may be the case now, there is little question
that one of the characteristics of all the South American States at that time
and for many years afterwards was an extraordinary ingratitude towards
those who had in any way helped them. The history of that revolution and
of the prominent part which Lord Cochrane played in bringing it to a
successful issue are too well known to need recapitulation, but a short
reference to it is not out of place in considering the circumstances under
which the Rising Star was sent on her journey.
[46] The “Dictionary of Dates” and the American “Universal Gazetteer” give the
name of the vessel as the Rising Sun, but this would appear, from Lord Dundonald’s
papers, to be incorrect.

In a recent letter to the writer Lord Dundonald says: “In 1817, when my
grandfather, the tenth Earl of Dundonald, was engaged by the Chilian
Government to create and take command of the Chilian Navy, he made a
stipulation that a steamboat should at once be constructed and sent out to
Chili to take part in the war, his opinion being that the great disparity in
numbers between the Chilian Navy and the Spanish Navy in the Pacific
would be neutralised by the advantage obtained in utilising a steam vessel
for purposes of war. The vessel was constructed on the Thames at
Rotherhithe, and my grandfather had anticipated going out in her, but as she
took longer in construction than was expected, he went out with his wife
and two children in the Rose merchantman of 300 tons.
“It appears that the Rising Star was taken out by my great-uncle, Major
the Hon. William Cochrane, but apparently she arrived in Chili when my
grandfather had practically swept the seas of the Spanish fleet; a revolution
had just taken place on her arrival and there was no money available to pay
for the Rising Star. The history of the claim made against the Chilian
Government by Major the Hon. William Cochrane of course need not be

Page 150

gone into except in a word or two; as you will understand, Chili was at that
time a prey to revolution and a poor country with little money and little
credit; she repudiated obligations at that time and would be much ashamed
of her action now.”
Don José Alvarez, the Chilian agent, in a communication to Lord
Cochrane, had called attention to the “unfortunate delay,” and urged him to
embark immediately with his family in the ship Rose to proceed to Chili.
The agent’s letter contained “the assurance that I will attend to the affairs of
the Rising Star, and take care that everything is done to her.”
The memorial of the Hon. William Erskine Cochrane to the President of
the Chilian Republic many years later, in reciting the circumstance, states
that Mr. Edward Ellice, then an eminent English merchant and a well-
wisher to the independence of Chili, undertook the completion and
equipment of the Rising Star, but after having expended £8000 and the
machinery being found defective, he declined making any further advance,
and being unable to obtain repayment of the sum he had expended or the
funds requisite for the necessary alterations and equipment he advertised
the vessel for sale. Don Alvarez then wrote to Lord Cochrane on April 18,
1820, announcing Messrs. Ellice and Co.’s intentions and solicited his
assistance and added: “I shall, on the part of the Government of Chili, agree
to the following terms: The ship, engines and stores to be sold or made over
to any one of your nomination for £6000; by that person and at his expense,
the engines must be altered in the following manner, viz., the pipes which
convey the steam from the boilers to be removed and larger ones provided.
Alterations to be made in the condensers. The paddle-blades to be altered.
The smoke apparatus to be completed and fitted, and the effect of the
engines tried. The ship must then undergo any necessary repairs in her hull
and rigging, when she must be manned, victualled, insured, and conveyed
to Chili at the expence of the purchaser; boats and pumps of which she is
now deficient must also be provided. The amount of these various items,
together with the interest of money and profit, to be calculated at nine
thousand pounds, so that on the arrival of the vessel at Chili she will be
purchased by Government at fifteen thousand pounds.[47] In addition to
which the licences formerly granted to Messrs. Ellice for the importation of
goods to the amount of 40,000 dollars[48] of duties shall be made over and
transferred to the person who undertakes this matter, and all property

Page 151

conveyed out in the Rising Star shall be admitted into Chili free of
duties.”[49]
[47] This includes the £6000 paid for the ship.
[48] These were originally granted as a bonus.
[49] No goods were taken out in the ship.

The Rising Star was completed, and arrived at Valparaiso in April 1822.
But Lord Cochrane’s work was practically over and she was therefore not
required for the purpose originally intended of enabling the Chilians to cope
with the Spanish Navy. In June 1823 there was a sudden change of
government in Chili, and the O’Higgins Cabinet was overthrown. The
change was accompanied by the restless outbreaks which have often
marked political differences in the South American States, and a good many
of the papers relating to the building of the Rising Star and sending her to
Chili were destroyed.
The new Chilian Government, being very short of money, took advantage
of the destruction of the papers and repudiated the obligation to Lord
Cochrane. It would take too much space to go into the details of this
lamentable affair, but it is sufficient to say that the vessel was sold, that the
Cochrane interest in her vanished, and the Hon. Wm. E. Cochrane was
called on for payment of a considerable additional sum solely in
consequence of the vexatious delay of the Chilian Government in saying
whether they would or would not fulfil their engagement.

Page 152

The “Rising Star.”

From a journal kept by Major W. E. Cochrane it appears that on May 31,
1820, he made his first payment of £50 on account of the vessel to Mr. Kier,
engineer. He seems to have visited very frequently the yard at Deptford
where the vessel was built, sometimes with the Chilian agent, and payments
on account of construction of £50 or so are frequent. By the 14th of the
following September the engines were sufficiently advanced to undergo a
trial, with what result is not stated. On October 6, he paid Mr. Ellice £2000
on account of the price of the ship. On the 17th he paid her another visit,
when the engines were tried, and on the 18th he went again and tried the
open paddles. Extensive alterations to the engines were necessary, for on
November 11 there appears the item that he paid the balance of Kier’s
account for that work, £163 4s. 11d. On January 30, 1821, he went and took
dimensions for the smoke-burning apparatus.
The Rising Star left the dock on February 5, when the engineers received
£1 for working on Sunday. On the 7th, the wheels were tried and one of
them broke, and on the 8th he ordered the wheels to be brought to town. On

Page 153

the 16th, a payment was made of £79 19s. “for the deeds relating to the
purchasing of the Rising Star.” On the 21st, he paid a bricklayer for
constructing the smoke-burning apparatus in the flues of the boilers.
Presumably the repairs were effected after the ship had been returned to
dock, for on February 22 she was taken out of dock again. On March 20,
the name of Captain Scott, as master, first appears. On the 24th, Major
Cochrane “went to the ship and got the balance wheels fixed,” and on the
26th “tried the wheels, which did not propel.” The weights were taken off
the paddles on the following day and reversed, and another trial was made
of which the result is not stated, and there was yet another trial on the 11th
of the following month. In April he paid to Mr. Brent, the builder, for
docking the Rising Star, £120 15s. 3d. On May 9 he ordered “my new
vertical paddles,” which were erected on the 29th. On this date there is a
curious entry: “Steward and boat 6s. 6d.,” which is probably the first
recorded instance of a ship’s steward receiving a tip. The wheels were tried
while the vessel was in dock on June 8, and were found to act well, and
Don José Alvarez visited her the next day.
On the 11th of that month the first real trial of the ship took place, for the
entry reads: “Tried the ship with my vertical paddles. She went from 5 to 6
knots, (standard broke).” A new standard was ordered and on July 5, “tried
my new paddles, went 20 miles at the rate of 5³⁄₄ knots an hour.” On the
18th of that month he paid Brent’s bill for alterations and repairs, £193 3s.
8d. On September 4 the ship was taken five miles down the river, and on
the 11th he “ordered her into dock to have her paddle-case closed (on
account of insurance).” The paddle-cases were fitted on the 13th, and on
October 17 she went down to Gravesend. Then comes a series of entries
which are interesting as showing the rates of pay at the time.
They are as follows, and are dated October 18:
Paid one month’s wages to Captain Scott £10 0 0
Paid William Ford, Carpenter, for the voyage 13 10 0
Mr. Cook, Mate, one month’s voyage[50] 4 0 0
To Cluly, 2nd Mate, one month’s wages 3 0 0
To Leach, Steward 6 0 0
Wages of Seamen 20 6 6

[50] Wages is probably meant.

The Rising Star sailed from Gravesend on October 22, 1821. Numerous
heavy bills came in shortly afterwards, among which are “Insurance on ship

Page 154

£800,” and Mr. Brown’s account, in which is included the heavy expenses
at Cork, when the ship put in there in distress, having sprung a leak off the
coast of Portugal, £913 9s. 1¹⁄₂d.
Altogether the actual outlay in cash amounted to £13,295 4s. 4¹⁄₂d. The
sum agreed upon in the arrangement with Don Alvarez was £15,000, to
which was added the interest to the year in which the claim was made
thirty-four years later, bringing the total amount of the claim of the
Cochrane family on account of this little steamer to £40,500.
Mr. W. Jackson went to Chili to join Lord Cochrane as secretary, and
remained with him in that capacity until his lordship’s return to England.
Mr. Jackson wrote on June 20, 1856, from Melton Mowbray: “I sailed in
her [the Rising Star] to Valparaiso, having been appointed joint agent with
Mr. Barnard, already at that place, for her transfer to the Chilian
Government. She arrived there in April 1822 in excellent condition, having
proved herself a very superior sea-boat, frequently going twelve knots an
hour. She was then tendered to the Government on the terms of the contract,
but they first claimed her in virtue of a partial advance they had made for
the building of the hull, and failing to obtain possession on that ground they
repudiated the contract with Alvarez altogether, without assigning any valid
reason for so doing. The sum agreed to be paid on her delivery was
£15,000, no part of which was there received.”
Unfortunately, little is known as to the nature of her machinery or means
of propulsion. An illustration of the Rising Star, published in 1821,
represents her as a full-rigged ship and carrying two funnels placed abreast
and situated between the main and fore masts; but she seems to have neither
paddle-boxes nor uncovered paddle-wheels. The description attached to the
picture states that the Rising Star was “built under the direction of Lord
Cochrane upon the principle of navigating either by sails or by steam, the
propelling apparatus being placed in the hold and caused to operate through
apertures in the bottom of the vessel.”
From this it may be conjectured either that the paddles were discarded or
that she was also fitted with some modification of the jet system.
Although no further attempt was made to send a steamer across the
Atlantic for many years, the project was not lost sight of, and schemes
innumerable were formed and abandoned. Ten years after the Savannah’s
voyage some Dutch merchants purchased the Curaçoa, a Clyde-built vessel
of 320 tons, and despatched her to the West Indies from Antwerp. Her

Page 155

engines were of 100 horse-power, and consumed slightly over seven pounds
of coal per indicated horse-power per hour, but there is no record of her
having attempted to make the voyage under steam.
The first steamer to cross the Atlantic from west to east depending largely
though not entirely on her own steam was the Royal William, built by James
Goudie for the Quebec and Halifax Steam Navigation Company at Quebec,
in the shipyard of Black and Saxton Campbell, upon the lines of an early
Clyde steamer, the United Kingdom, built by Steele of Greenock in 1826 for
the London and Leith service. She was 176 feet long, and 146 feet between
perpendiculars. Her beam was 27 feet, and outside the paddle-boxes 43 feet
10 inches, and her depth 17 feet 9 inches. Her tonnage is variously given as
830 gross[51] and 1370 b.m.[52] She had side-lever engines of 180 horse-
power[53] or 200 horse-power,[54] by Boulton and Watt. She was engined at
St. Mary’s foundry, Montreal. Her launch took place on April 29, 1831, and
after trading for a time between Quebec and Nova Scotian ports she was
sold to another company, which ultimately tried the experiment of sending
her across the Atlantic. Mr. Samuel Cunard was one of the directors of this
company, but there is nothing to show that he assisted in the promotion of
the scheme to send her over the ocean.[55] Nevertheless it is a fact that “the
idea of starting a line of steamers to connect the two countries had occurred
to his mind as early as 1830.”[56] On August 4, 1833, the Royal William
sailed from Quebec, coaled at Pictou, and began her journey. She is said to
have steamed the greater part of the way, some writers say the whole of it,
and arrived at Gravesend on September 11 after calling at Cowes. Probably
owing to there being another vessel of the same name a few years later,
some misconception has arisen as to her performance, for as a matter of
fact, the first Royal William did not steam all the way, but made a
considerable portion of the voyage under sail alone. It is to the credit of
Canadians, however, that this steamer was despatched, and it is upon this
particular enterprise that the claim of the Canadians to have made the first
steam-ship voyage across the Atlantic is founded. The subsequent history of
this vessel is interesting. She stayed in the Port of London for a few weeks,
after which she was chartered by the Portuguese, and while in their service
her speed attracted the attention of the Spanish Government. The Spaniards
purchased her towards the end of 1833 at the time of the first Carlist
rebellion and changed her name to the Ysabel Secunda. It was shortly after
this that she obtained the doubtful honour of being the first steamer to fire a

Page 156

gun in war, the Spaniards having armed her with six cannon. Her eventful
career ended when she went to pieces on the Santander rocks.
[51] “The Atlantic Ferry.”
[52] Kennedy’s “History of Steam Navigation.”
[53] Ibid.
[54] “The Atlantic Ferry.”
[55] Ibid.
[56] “History of the Cunard Company.”

The “Dieppe” (L.B. & S.C.R.).

Page 157

The “United Kingdom.”

These two voyages stand in a class by themselves, and both mark a
distinct step forward in the progress of the modern mercantile marine. The
earliest steamboats, whether European, British, or American, were smooth-
water vessels only, and were admitted to be of an elementary and
experimental character. The Charlotte Dundas and Comet in Scotland and
the Clermont and Phœnix in America were much beyond anything that had
preceded them, and were significant as indicating a perception of the
possibility of extending the activity of steam-propelled boats from the
placid waters of canals or rivers to the greater waters of harbours, ports, and
estuaries. The four vessels first named demonstrated, each in her own way,
that it was necessary to build the hull to suit the engine, instead of acquiring
a hull and putting an engine into it and trusting to luck. The Phœnix showed
in 1807 that a vessel constructed to carry a steam-engine of a suitable size
could be trusted on the open sea, by steaming from New York to the
Delaware. A few years later, the Clyde shipbuilders showed that they could

Page 158

construct steamers which should go down the Clyde estuary and even essay
the journey to Ireland.
It is true they used sails whenever possible, but when winds or tides were
against them the engines alone were depended on. Vessels with two and
three masts were employed, and as marine engines were made of greater
size, power, and weight, vessels of greater dimensions were equipped with
them, and the coastal service was inaugurated. By this time the engine had
become a powerful auxiliary to sail on short voyages for which large bunker
space was not required. The maintenance of the coastal voyages in all
weathers proved the thorough seagoing qualities of the steamers. In
estimating the value of the Savannah’s voyage and its place in the history of
steam navigation, it must not be forgotten that she was a sailing vessel, was
built to be one, that the form of her hull was not altered in any way when
she was engined, and that on her return, when her machinery was taken out
of her, she resumed her place in her country’s trade as a sailer. Quebec’s
Royal William, on the contrary, was designed and built to be a steam
auxiliary vessel, and it was not until she had established herself in that
capacity that her voyage to the Mother Country was decided upon. The
performances of these two ships were thus of great importance; they
demonstrated, in the case of the Savannah, that a little sailing ship could
carry a small auxiliary engine which might help her in and out of port, and
at other times if it were necessary and fuel permitted; and in the case of the
Royal William that a steam packet could essay an ocean voyage and depend
both upon her sails and steam-engines to enable her to reach her destination
in good time.
No further attempts were made, however, until 1838, which was destined
to become a memorable year.
Before this, various companies had been proposing to build steamers, but
nothing had been done. In 1828 an Act of Parliament was obtained for the
incorporation of the Valentia Transatlantic Steam Navigation Company,
which was to run a line of steamers from the west coast of Ireland to
America. The company proposed to build a steamer at a cost of £21,000.
She was to carry fifty cabin passengers and as many in the steerage, and
200 tons of cargo in her hold. It was suggested that she should be of about
800 tons displacement, with engines of 200 horse-power, and her speed was
to be such that she could make six voyages each way in twelve months. The
company announced in 1828 that it would commence operations

Page 159

immediately, but the public held aloof, and seven years later matters were
no further advanced.
Then the project was revived, and considerable interest was taken in it
because it was suggested that the enterprise should be worked in connection
with the new railway from London, the new Post Office packets and the
Valentia Railway.
It was at this time that Dr. Lardner, a man of recognised scientific
attainments, made his remarkable assertion regarding the impossibility of
establishing steam navigation between New York and Liverpool. According
to a report of a meeting at which Dr. Lardner was present, that gentleman
pointed out that “the only difficulty would be as to the run from Valentia to
St. John’s.” He continued: “As a last resource, however, should the distance
between Valentia and St. John’s prove too great they might make the Azores
a stage between, so there remained no doubt of the practicability of
establishing a steam intercourse with the United States. As to the project of
making a voyage directly from New York to Liverpool, it was, he had no
hesitation in saying, perfectly chimerical, and they might as well talk of
making a voyage from New York or Liverpool to the moon.”[57]
[57] Liverpool Albion, December 14, 1835.

While England was listening to the depressing remarks of Dr. Lardner,
America was at work.
In 1835 Junius Smith[58] from Massachusetts began to consider the
navigation of the ocean by steamers, and in 1836 he proposed to form the
British and American Steam Navigation Company. The company was
actually established in 1837 by Mr. Macgregor Laird with a capital of
£1,000,000, but Smith’s connection with the scheme ceased, as he saw
himself unlikely to make as much out of the enterprise as he had
anticipated.
[58] The name is given as “Junius Smith” in Appleton’s “Cyclopædia of National
Biography.”

Mr. Kennedy’s “History of Steam Navigation,” however, states that
Doctor Julius Smith organised in 1836 “a transatlantic steam-ship company
bearing the title of the ‘British Queen Steam Navigation Company,’ with a
capital of £1,000,000, and Mr. Macgregor Laird as secretary.” The most
remarkable event in the annals of this company is the voyage of the Sirius
from London to New York in 1838. “The Sirius! The Sirius! The Sirius!

Page 160

Nothing is talked of in New York but about the Sirius. She is the first steam
vessel that has arrived here from England, and a glorious boat she is....
Lieutenant Roberts, R.N., Commander, is the first man that has navigated a
steam-ship from Europe to America.”[59] The Sirius was sent across the
Atlantic really as a desperate remedy against competition.
[59] New York Weekly Herald.

The Transatlantic Company had placed a contract as early as 1836 with
Messrs. Curling and Young of Blackwall, London, for the construction of
the British Queen steam-ship, but the bankruptcy of Messrs. Claude
Girdwood and Co. of Glasgow, who had contracted to build the engines,
caused considerable delay. Enterprising rivals at Bristol, seizing the
opportunity, formed the Great Western Steamship Company to build and
equip the Great Western, which they determined to put on the service before
the British Queen could be got ready. In this they were successful, and to
save the honour of their own company the British Queen directors hired the
Sirius from the Cork Steamship Company. It was known at the time that she
was too small to be employed as a regular transoceanic trader, and even
before she started on her first voyage the announcement was made that she
would make two voyages only.
She was 178 feet long, 25¹⁄₂ feet broad, 18¹⁄₄ feet deep, and of 703 tons
register. Her engines, like those of all other vessels of her time, were of the
side-lever type; their cylinders were of 60 inches diameter, and had a stroke
of 6 feet, and she carried a surface condenser similar to those now in use.
She was a two-masted vessel, carrying three square sails on the foremast,
her aftermast being fore-and-aft rigged only. She had one funnel situated
abaft the paddle-boxes, which were about amidships. A picture of the vessel
is in existence which represents her as three-masted, and with her paddles
rather far forward, but this is inaccurate. She was almost a new ship at this
time, and it is not likely that a mast would have been taken out of her
between her launch and her Atlantic voyage. Her schooner bows bore as
figurehead a dog with a star between his front paws.
The Sirius left London, sailing from East Lane Stairs, on March 28. She
took no goods, as she was intended to be a passenger steamer only. On
going down the river she overtook the Great Western “with a respectable
pleasure party on board,” and a trial of speed was the consequence. When
the Sirius had reached Gravesend she was upwards of a mile ahead of her

Page 161

rival. She had made the distance from Greenwich to Gravesend against a
strong tide in one hour and fifty-six minutes. Both ships had their colours
hoisted, and the banks of the river were thronged with spectators. Soon after
the departure of the Sirius the American Line packet-ship Quebec came
down the river in tow, and wagers were freely laid that the Quebec would
arrive before the Sirius at New York. But those who backed the Quebec lost
their money.
The Ocean, a vessel belonging to the Irish Company, acted as tender to
the Sirius when the latter called at Cork, and arrived there from Liverpool
on April 3, with mails and passengers for the venturesome little craft. At a
few minutes after ten o’clock on the morning of the 4th, the Sirius
proceeded on her voyage. The day was beautifully fine, every vessel in the
harbour was decked with flags in honour of the event, a salute was fired
from the battery on shore, and every boat which could be pressed into
service was crowded with enthusiastic sightseers when, accompanied by the
Ocean, the vessel left the harbour. The Ocean went with her as far as the
entrance to the bay.
The Watt, which arrived at Liverpool on April 8, reported having sighted
on April 5, in latitude 51° N. and longitude 12° W., the Sirius bound for
New York, bravely encountering a westerly gale. “When it is considered,”
the Liverpool Standard of the day naively remarked, “that this is the first
steam vessel to cross the Atlantic, this information may not be altogether
unimportant.”
New York was reached at ten o’clock in the evening of April 22, not
without some adventure. Lieutenant Roberts, her commander, was
determined to carry the voyage through, but it was only “thanks to stern
discipline and the persuasive arguments of loaded firearms” that he brought
the crew round to his way of thinking, as they became somewhat
demoralised by continuous head-winds and declared that it was utter
madness to proceed in so small a vessel. There were 94 passengers on
board, of whom 30 were in the state-cabin, 29 in the fore-cabin, and 35
were steerage passengers.[60]
[60] It has been said the Sirius carried no passengers. According to Notes and
Queries, the New York Herald, of April 28, 1838, in reporting the arrival of the
Sirius, says that forty-two passengers were on board, of whom eleven were females,
for whose accommodation a stewardess was carried. A contributor to Notes and
Queries quotes the authority of the Registrar-General of Shipping and Seamen for
the statement that the stewards’ department consisted of three stewards, one

Page 162

assistant, two cooks, and a boy, and he asks whether this staff would have been
required in an ordinary boat of 412 tons if there were no passengers.

The “Sirius,” from a Print of 1837.

The passage occupied sixteen and a half days, and the average speed was
8¹⁄₂ knots per hour; about twenty-four tons of coal per day being consumed.
Her arrival at New York was hailed with delirious enthusiasm, and the
excitement was yet further intensified when it became known on the
morning of the 23rd, only a few hours after the Sirius had anchored off the
Battery, that another steam-ship was sighted making its way to the port, and
that the approaching vessel was greater than any steam-ship ever seen in
American waters.
This was the Great Western, and New York celebrated the double arrival
with that strenuous abandon attainable only in the Empire City.
The Great Western was built at Bristol by Patterson. She was brought
round to London and left London again for the western port on March 31.
Off Southend she was discovered to be on fire, and the heat and smoke

Page 163

were so great that all the engine-room staff had to take refuge on deck.
Fortunately they had forgotten to stop her engines, and the vessel was
beached on the Chapman Sands, her decks were cut into, and volumes of
water were poured upon the flames. The fire was soon extinguished, and the
damage was found to be much less than was feared. She floated on the tide
and resumed her voyage under her own steam to Bristol. The fire was due
to the ignition of the felt packing round the boilers. Owing to this adventure
the Great Western did not sail from Bristol for New York quite as early as
was expected, and it was this delay which enabled the Sirius to gain pride of
place. The Great Western left for New York three days after the departure of
the Sirius from Cork. Her average speed to New York was 208 knots per
day, and she used 655 tons of coal on the voyage. Another account,
published in 1840, says that of her 660 tons of coal only 452 were used
when she reached New York. On her homeward voyage her speed was
nearly 9 knots an hour as against the 8·2 knots outward, but she burnt only
392 tons of coal, the difference being accounted for by the fact that on the
outward voyage she experienced very rough weather. Although she made a
much faster passage than her little rival, it is but fair to remember that she
was nearly twice her size, and with engines developing more than twice the
horse-power.
A contemporary writer thus describes the Great Western: “The officers,
crew, and engineers are about sixty in number. The saloon is 75 feet long,
21 feet broad, exclusive of recesses on each side, where the breadth is 34
feet and the height 9 feet. The decorations are in the highest degree tasteful
and elegant, and the apartment may vie with those of the club-houses of
London in luxury and magnificence. The splendour of a saloon is, however,
a matter of very inferior consequence, and it is higher praise to state that the
more essential parts of the vessel and all her machinery are examples of
mechanical skill and ingenuity which cannot be surpassed.”

Page 164

The “Great Western.” From a Print of 1837.

The saloon was decorated with about fifty panels, the larger ones,
according to a contemporary description, representing “rural scenery,
agriculture, music, the arts and sciences, interior views and landscapes, and
parties grouped, or engaged in elegant sports and amusements; the smaller
panels contained beautifully pencilled paintings of Cupid, Psyche, and other
aerial figures.”[61] Every berth and cabin had a bell communicating with the
stewards’ room, the method of communication being described as follows
for the instruction of travellers: “When the attendance of the steward is
required, the passenger pulls the bell-rope in his berth, which rings the bell
in the small box (in the stewards’ room) and at the same time by means of a
small lever forces up through a slit in the lid a small tin label with the
number of the room painted requiring the services of the steward, and there
remains, until the steward has ascertained the number of the room and
pushed it down again. Thus, instead of an interminable number of bells
there are only two. This arrangement, which is alike ingenious as it is
useful, is deserving the notice of architects.”[62]

Page 165

[61] The Mirror.
[62] Civil Engineer and Architect’s Journal.

From the same publication it appears that the floors are of great length
and overrun each other. “They are firmly dowelled and bolted, first in pairs
and then together by means of 1¹⁄₂-inch bolts about 24 feet in length, driven
in four parallel rows. The scantling is equal in size to that of our line-of-
battle ships; it is filled in solid and was caulked within and without up to the
first futtock heads previously to planking, and all to above this height of
English oak. She is most closely and firmly trussed with iron and wooden
diagonals and shelf-pieces, which with the whole of her upper works are
fastened with screws and nuts to a much greater extent than has hitherto
been put in practice. Her engines are the largest marine engines yet made.
The boilers are constructed with several adaptations for the economy of
steam and fuel on an entirely new principle. There are four distinct and
independent boilers, any number of which can be worked as circumstances
require. The wheels have the cycloidal paddles. The figure-head is a demi-
figure of Neptune with gilded trident, and on each side are dolphins in
imitation bronze.”
The Sirius made two transatlantic voyages as advertised, and was utilised
henceforward for the trade for which she was built, namely, carrying
passengers and goods between ports on the coast. She traded chiefly
between Liverpool, Cork, Glasgow, and London, and occasionally to St.
Petersburg, and at last, in June 1847, she was wrecked in Ballycotten Bay.
While the Sirius and Great Western had been monopolising the attention
of the public, the directors of the City of Dublin Steam Packet Company,
who had already formed a company to join in the transatlantic traffic,
determined upon making their start with the new paddle-steamer Royal
William. This was not the Canadian Royal William, but a boat built in 1836
by Wilson of Liverpool, with engines by Fawcett and Preston, and one of a
quartet intended to compete with the Government steamers carrying the
mails between Liverpool and Kingstown. She was a faster vessel than any
of the Government boats. One voyage, in which she created a record which
stood for some time, was when she was engaged between London and
Dublin, and did the 260 miles run from Falmouth to Kingstown in 23 hours.
She was slightly shorter than the Sirius, but her capacity was 817 tons
gross, and her engines of 276 horse-power. Although she had
accommodation for eighty passengers, she had on board only thirty-two

Page 166

when she started from Liverpool on Thursday, July 5, 1838. She carried no
cargo, all the space apparently being used for fuel.
“Coal filled her bunkers, her holds, and even her well-deck, so that her
paddles were buried six feet, her sponsons were submerged, and it was
possible, by leaning over the bulwarks, to wash one’s hands in the water
that surged at the vessel’s sides.”[63] Her departure from Liverpool was
celebrated in a manner befitting the occasion; the spectators gathered by
thousands, and every cannon on either side of the river that could be used to
fire a salute was requisitioned, while the steamers and large sailing ships
anchored in the river, many of which carried guns, joined in the salute. The
outward voyage lasted nineteen days, but she did the passage back in
fourteen and a half days.
[63] Kennedy’s “History of Steam Navigation.”

While she was being got ready, the directors accepted an offer from Sir
John Tobin to run a steamer, which was built for him, alternately with the
Royal William. She was named the Liverpool, and was of 1150 tons,
carrying engines of 404 horse-power. She sailed on October 20, 1838, and
had got about one-third of the way across the Atlantic when it was found
necessary to turn back on account of bad weather. She accordingly took
refuge at Cork. A stay of ten days was made there, and she eventually
arrived at New York on November 23.
The British Queen, as befitted her name, was launched on the Queen’s
birthday in 1838, and made her first voyage from London to New York in
July 1839. She was commanded by Lieutenant Roberts, formerly of the
Sirius, and was at that time the largest and fastest steam vessel afloat; and
with Roberts in charge, it is not to be wondered at that she did some good
work. Lieutenant Roberts, writing to a friend from New York, says in the
course of a letter dated June 1, 1840: “I can only state there is not a faster
seagoing vessel in the World, and time will tell. We have beat the Great
Western every voyage this year and [word illegible] last year; therefore
whoever gave you the idea of our Speed and Power were perfectly ignorant
of Steam and Steam Vessels. I have made the passage from Portsmouth to
New York shorter than ever performed, only 13 d. 11 h. from Pilot to Pilot.
Let Great Western do that if she can, though she has ten hours’ shorter
distance to run. I sail at 1 p.m. this day with full cargo and every berth taken,
and sincerely do I wish to make a short passage.” He adds: “I intend trying

Page 167

for some shore berth ... but will not leave till I command the first iron vessel
to steam across the Atlantic.” This was not to be, however, for he was in
command of the President when that ill-fated vessel left New York with one
hundred and thirty-six passengers on March 12, 1841. No trace of her has
been found from that day to this.

The “President.”

The President was launched on December 7, 1839, on the Thames by the
same builders, Messrs. Curling and Young. She was almost a sister ship to
the British Queen, as far as appearance and general equipment went, but the
engines of the second vessel were slightly more powerful.

Page 168

The “British Queen.” From an Original Painting in the Possession of the
Author.

The following comparative table, showing the dimensions of these
vessels, was published in 1840:
Great British
Dimensions. Western. Queen. President.
Extreme length (feet) 236 275 265
Extreme length under deck (feet) 212 245 238
Extreme length keel (feet) 205 225 220
Breadth within the paddle-boxes (feet) 35·4 in. 40 41
Breadth, including paddle-boxes (feet) 59·8 in. 64 64
Depth of hold at midships (feet) 23·2 in. 27·6 in. 23·6 in.
Tons of space 679¹⁄₂ 1053 --
Tonnage of engine-room (feet) 641¹⁄₂ 963 --
Total tonnage (tons) 1321 2016 1840
Power of engines (horses) 450 500 540

Page 169

Diameter of cylinders (inches) 73 77¹⁄₂ 80
Length of stroke (feet) 7 7 7¹⁄₂
Diameter of paddle-wheels (feet) 28·9 in. 30·6 in. 31
Total weight of engines, boilers, and water (tons) 480 500 500
Total weight of coals, twenty days’ consumption (tons) 600 750 750
Total weight of cargo (tons) 250 500 750
Draught of water with the above weight of stores (feet) 16·8 in. 16·7 in. 17

They were square-sterned vessels, barque-rigged, and carried a long
white funnel with a black top. The paddles were placed almost amidships,
with the funnel abaft the paddle-boxes. The Great Western might be
described as a four-masted barquentine. She had one funnel carried between
the fore and main masts, and the paddles were set abaft the main-mast. All
three vessels had engines of the side-lever type. Those of the British Queen
were supplied by Napier from the Clyde, and those of the President by
Fawcett and Preston of Liverpool. The Great Western’s engines were built
by Maudslay, Son, and Field of London.
The President was built of oak with fir planking, her upper deck being
flush from bows to stern. The stern was ornamented with the British and
American arms, supported by the lion and eagle, appropriately painted. And
for a figure-head she had a bust of Washington. The paddle-boxes were
decorated with a five-point star. The first attempt to float the President was
not a success owing to the tide not being high enough. A second attempt the
following day also failed, but on the third day, Monday, December 9, 1839,
she was floated, and towed out of the dock and down to Blackwall, where
she was safely moored.
After the loss of the President in 1841, the British and American Steam
Navigation Company sold the British Queen to the Belgians and retired
from business altogether, leaving the Great Western practically in sole
possession of the Atlantic. But, as the next chapter will show, this splendid
isolation was not hers for long.

Page 170

CHAPTER VI
DEVELOPMENT OF THE TRANSATLANTIC SERVICE

he success which attended the voyages of the Great Western,
and the manifest superiority of that steam-ship over the
brigs which were then thought good enough to carry the
mails across the Atlantic, induced the Government in
October 1838 to invite tenders for the conveyance of the
mails to America by steam vessels. Circulars were
distributed broadcast, and one of them reached Samuel
Cunard, a merchant of Halifax, Nova Scotia, who, as already stated, had
entertained for many years the idea that the mails might be conveyed across
the Atlantic more speedily than the “coffin brigs,” as the Government’s
vessels were contemptuously termed, could carry them. From the year
1830, Cunard had been actively endeavouring to forward his scheme, but so
little was thought of the powers of the steam-ship that the local merchants
condemned his ideas as visionary and refused their co-operation.
Accordingly he came to London but met with as little sympathy and
financial support there as at Halifax. Fortunately for him and for the world,
he was able to take a letter of introduction from the Secretary of the East
India Company to Mr. Robert Napier, at that time the foremost steam-ship
builder on the Clyde, and probably in the world. Mr. Napier had just
achieved a remarkable success in the construction of one of the earlier Isle
of Man boats, the Mona’s Isle, and the experiences through which she
passed in triumph in one or two of her earliest voyages had greatly
increased the fame of her builder. Mr. Napier himself used to say that he
was largely indebted for his prosperity and reputation to the name made for
him by the Mona’s Isle. He introduced Cunard to John Burns of Glasgow,
who was already extensively engaged in the steamer coasting trade between
Scotland, England, and Ireland, and he in turn introduced Cunard to his
Liverpool partner, David MacIver. After hearing Cunard’s explanation of
his project, the partners decided to support it, and such was their reputation

Page 171

for enterprise and for achieving success in everything they undertook that,
through their instrumentality, the whole of the capital required, amounting
to £270,000, was obtained. Backed up by Burns and MacIver, and with the
promised support of Napier, Cunard was among those who tendered to the
Admiralty for the conveyance of the mails once a fortnight between
Liverpool, Halifax, and Boston. A tender was also offered by the Great
Western Steamship Company, on whose behalf it was urged that their Great
Western was already in existence and was prepared to undertake the work at
once, and that the Cunard Company would either have to charter steamers
or wait till they could be built. But the Government accepted the Cunard
tender and a contract was signed for seven years, it being stipulated that
four suitable steamers should be employed instead of three as originally
required, and further, that the dates of arrival and departure should be
adhered to. In consideration of these more onerous conditions the subsidy
was increased from £60,000 to £81,000 per annum. The first four vessels of
the Cunard Line, or as it was then formally known, “The British and North
American Royal Mail Steam Packet Company,” were practically sister
ships. There was little choice between them in size or power of engines, nor
was there much difference in their internal arrangements. These vessels
were built on the Clyde, the Britannia by R. Duncan, the Arcadia by John
Wood, the Caledonia by C. Wood, and the Columbia by R. Steel. The
orders were placed with four different builders so that the steamers might be
ready as soon as possible. They were all launched in 1840, and all were
fitted with the ordinary side-lever engines by Robert Napier, who had
brought this type of engine to a high pitch of perfection. The Britannia was
207 feet long by 34 feet 4 inches broad, with a moulded depth of 24 feet 4
inches, and had a tonnage of 1154; her engines indicated 740 horse-power
and gave her an average speed of 8¹⁄₂ knots on a coal consumption of 38
tons per day. Her cargo capacity was about 225 tons. Each of these vessels
was fitted to carry 115 cabin passengers but none in the steerage. All were
adapted for the transport of troops and stores in time of war. The first
steamer actually sent across the Atlantic for the Cunard organisation was
the Unicorn, which left Liverpool on May 16, 1840, for Halifax and
Boston, and was then employed for several years between Picton and
Quebec, in connection with the liners, and carried both mails and
passengers. The first departure under the mail contract, however, was on
Friday, July 4, 1840. That a Friday should be selected for the inauguration

Page 172

of the service, even though it was “Independence Day” in America, was
received with much shaking of the head by those who clung to the sailors’
superstition concerning the unlucky nature of Friday, but nothing untoward
happened, and the choice of “Independence Day” for the first departure of
the new line was hailed in America as a most graceful compliment. The
voyage to Boston lasted 14 days 8 hours. The mail service was continued
with conspicuous regularity for three years, when it was found that the
traffic had increased to such an extent that the four steamers were no longer
able to cope with it. Accordingly in 1843 the Hibernia was added, and in
1845 the Cambria, sister ships of 210 feet in length between perpendiculars,
35 feet 9 inches beam, 24 feet 2 inches moulded depth, 1422 tons gross, and
with engines of 1040 indicated horse-power, and an average speed of 9¹⁄₄
knots.
In 1844 the Britannia, on arriving at Boston in February of that year in a
particularly severe winter, became ice-bound. When the day came for her
departure for Liverpool, the Bostonians showed their appreciation of the
line and of the regularity of communication it maintained with England by
cutting at their own expense a channel seven miles long and a hundred feet
wide through the ice to liberate her, her sailing being only two days behind
time. In 1847, even with the two extra ships, the company was unable to
cope with the demands made upon it, and the commerce between the two
countries had increased to such an extent that the Government felt bound
when the time came for the renewal of the contract to require that the
service should be doubled. It was stipulated that the company should
provide a vessel of not less than 400 horse-power nominal and capable of
carrying guns of the largest calibre. Its steamers were to leave Liverpool,
calling at Holyhead if required, every Saturday for New York and Boston
alternately, the Boston steamer touching at Halifax, and the New York one
to do so also if required by the Admiralty. For these augmented sailings the
subsidy was raised to £173,340 per annum, at which figure it remained to
the end of 1867. This change necessitated the building of four new ships,
namely, the Niagara, Canada, America, and Europa. They were 251 feet
long between perpendiculars, 35 feet beam, 26 feet 3 inches moulded depth,
and of 1825 tons gross register, and had engines of 2000 indicated horse-
power, which gave them an average speed of 10¹⁄₄ knots. In 1850 the Asia
and Africa were added to the fleet; they were sister ships, 266 feet between
perpendiculars, 40 feet beam, 27 feet 2 inches depth, and of 2226 gross

Page 173

tonnage, and had engines of 2400 indicated horse-power, with an average
speed of 12¹⁄₂ knots. In 1852 the Arabia was built, 285 feet between
perpendiculars, 8 inches more beam, with a depth of 29 feet, and a gross
tonnage of 2402. Her engines developed 3250 horse-power and gave her an
average speed of 13 knots.

The “Britannia” (Cunard, 1840).

The building of the Arabia marks the close of the first period in the
history of the Cunard Line for, in 1855, the company began to build iron
ships. She was intended to be a reply to the steamers of the Collins Line.
For some reason or other the Americans made very few attempts to enter
upon the transatlantic steam-ship trade until nearly the middle of the
nineteenth century. Probably they were satisfied with the performances of
their sailing clippers, as they had good reason to be, for the clippers often
made faster passages than the early Cunarders. From 1838 to 1847 every
Atlantic liner flew the British flag, but in 1845 the United States Congress
passed an Act authorising contracts to be made with owners of American
vessels, steamships preferred, for the regular transportation of the United
States mails.

Page 174

As an American writer says:
“This Act of 1845 is all-significant as the beginning of American steam-
ship service in the foreign trade. Not until national protection was offered in
the form of generous subsidies could our enterprising merchants and sailors
see their way clear to enter into the rivalry with the State-aided steam fleets
of Europe. The mail subsidy legislation of 1845 was a wise step and
indispensable, but it was too long delayed. Congress should have acted five
years before, when the first Cunarder, floated and maintained by a liberal
subsidy from Parliament, came across the ocean, beating the time of our
celebrated packet ships. Individual resource could never compete with the
great treasury of the British Empire.”[64]
[64] “The American Mercantile Marine,” by W. L. Marvin.

In 1847 the Americans made a determined effort to establish a fortnightly
service between New York and Bremen, calling at Southampton or Cowes.
This venture was known as the Ocean Steam Navigation Company, and
though it had a contract for carrying the American mails in return for a
subvention of 200,000 dollars, it ceased operations in little more than a
year. It had two wooden paddle-steamers, the Washington and Hermann,
built by Westervelt and Mackay for Mr. Edward Mills. Both were barque-
rigged and carried a great spread of canvas.
The Washington was 236 feet in length, by 39 feet beam, 31 feet depth,
and of about 2000 tons gross. The Hermann was slightly larger. The
Washington, on her first voyage eastward in June of that year, was pitted
against the Britannia, which the Americans expected to beat easily, but
though the American boat had twice the engine-power, and the Cunarder
was seven years old, the latter arrived two days ahead.
The New York and Havre Steam Navigation Company, another American
enterprise, was founded in 1848 to carry the mails between those ports for a
subsidy of 150,000 dollars per annum and to touch at Southampton. Its first
vessel was the wooden paddle-steamer Franklin, 263 feet in length, of
about 2184 tons, and 1250 indicated horse-power. She sailed on her first
voyage in 1850, and was joined in the service by the Humboldt, a slightly
larger vessel, in the following year. In December 1853 the Humboldt was
wrecked near Halifax, and the Franklin went to pieces on Long Island in
1854. The company ordered two other vessels, the Arago and Fulton, which
were launched in June 1855 and February 1856 respectively. They were

Page 175

rather larger than the Humboldt, but instead of lever engines had oscillating
cylinder engines, the cylinders being 65 inches diameter with a 10-foot
stroke. Until they were ready the company maintained the service, after the
loss of its earlier boats, with chartered vessels.
The New England Ocean Steamship Company, formed by Messrs.
Harnden and Co. of Boston, placed the iron screw-steamer Lewis of 1105
tons on the service between that port and Liverpool in October 1851, but
withdrew her the next year.
By 1850 there were no fewer than seven or eight lines of steamers trading
between New York and Liverpool. The Cunard Company had eight of the
finest steamers in the world, and the ninth, the Africa, was expected shortly
to arrive from the builders at Glasgow.
An agitation had been maintained for some years in America for a
subsidised American steam-ship service, which should surpass the British
line. The Government at last was prevailed upon to promise financial
support to a line of steamers under certain conditions, and the necessary
legislation was passed by Congress in March 1847. The vessels were to be
of the highest class, of great speed, and of superior passenger
accommodation, and so fitted that they could be turned into war steamers at
small expense. Mr. K. Edward Collins of New York, owner of the well-
known Dramatic Line of sailing ships, so called because they were named
after famous theatrical people, organised the line and was well supported by
American capitalists and influential commercial men generally.
The Collins Line, as the organisation was called, undertook, by a contract
signed in November 1847, to provide a mail service between New York and
Liverpool, fortnightly in summer and monthly in winter, with five first-class
steam-ships, for which 19,250 dollars per trip for twenty round trips, or
385,000 dollars a year, were to be paid, but as the first four ships built for
the line were very much larger, swifter, and more expensive and more
valuable to the nation[65] than the exact terms of the contract required, the
Government in 1852 increased the subsidy to 858,000 dollars a year.
[65] Marvin’s “American Mercantile Marine.”

Page 176

The “Atlantic.”

Money was spent upon the Collins liners like water, and everything in
every department was of a most costly and luxurious description. Indeed, so
lavish was the expenditure upon the Collins boats that even had they not
met with the series of disasters which afterwards befell them, and had the
line not been deprived by the United States Government of its subsidy for
carrying the mails, it is doubtful whether it would ever have been a
commercial success. Thus a description of the Atlantic says: “Her interior
fittings are truly elegant, the woodwork being of white holly, satin wood,
rosewood, &c., so combined and diversified as to present a rich and costly
appearance. In the drawing-room the ornaments consist of costly mirrors,
bronze-work, stained glass, paintings, &c. On the panels between the
stateroom passages are the arms of the different States of the Confederacy
painted in the highest style of art, and framed with bronze-work.
“The pillars between are inlaid with mirrors, framed with rosewood, and
at the top and bottom are bronzed sea-shells of costly workmanship. In the

Page 177

centre of each are groups of allegorical figures, representing the ocean
mythology of the ancients, in bronze and burnished gold. The ceiling is
elaborately wrought, carved and gilded.” The vessel was steam-heated, an
improvement introduced for the first time in steam-ships.
The Atlantic left New York on April 27, 1850, with about a hundred
passengers on board and a valuable cargo. Outside Sandy Hook she met
some drifting ice which damaged her paddles, and she had to proceed at
reduced speed across the ocean as the weather was too tempestuous to
permit of the floats being repaired. On May 8, one of her condensers gave
way, and the steamer was hove-to for forty hours, after which she resumed
her voyage still at reduced speed. She arrived at Liverpool on May 10. The
Pacific sailed from New York on May 25, and was followed by the Arctic,
Baltic, and Antarctic. Their beam was such that they could not enter any
existing docks at Liverpool, and a dock at the North End was therefore
constructed for their accommodation.
Special interest attached to the arrival of the Atlantic owing to the
presence in the river of the new Cunarder Asia, just built by Messrs. Steel at
Greenock, and engined by Robert Napier. An opportunity was thus afforded
of comparing these two representative vessels, as the Asia, outward bound,
steamed past her rival and exchanged salutes.
The Atlantic and her sister ship the Arctic excelled in dimensions every
steam-ship hitherto built. The length was 276 feet on the keel and 282 feet
on the main deck, beam 45 feet, breadth across paddle-boxes 75 feet, depth
of hold 31 feet 7 inches, diameter of paddle-wheels 36 feet, diameter of
cylinder 96 inches, stroke 9 feet; the side-lever engines were of 1000 horse-
power, and the tonnage 2860. The saloons were 67 feet long by 20 feet
wide, and the dining saloons 60 feet long by 42 feet wide.
Two remarkable points of difference between them and the Cunarders
and all British steamers at that time were their rounded sterns and straight
cutwaters without bowsprits. Powerfully engined though they were, they
depended considerably on sail-power. Their paddles, like those of so many
American steamers, were placed rather far aft, the idea being that a more
uniform immersion of the blades was thus obtained. The Collins steamers
were all built with flat floors (a departure in the shape of the hull to which
considerable exception was taken but which was justified by events), long,
wedge-like bows, and a long, easy run to the stern. The frames were of
white and live oak, and the stout timbers were filled in solidly to the turn of

Page 178

the bilge. The huge oak keelsons were specially heavy under the boilers and
engines. The planking was hard pine, metal-fastened below the water-line
by copper bolts and above by galvanised iron. The frames were
strengthened by a latticework of iron bands. Their wood construction was
more massive than that of a line-of-battle ship. In his patriotic efforts to
gain the Atlantic supremacy for his country Collins did far more than the
Government required. The Arctic and Atlantic were built by W. H. Brown of
New York, and their construction was superintended by G. Steers, who
modelled the schooner-yacht America, the winner of the cup which has not
yet been “lifted.” Mr. Faron, of the firm Sewell and Faron, chief engineer to
the United States Government, was the chief engineer of the company, and
designed the Arctic and Baltic boilers. These were arranged with double
furnaces and had lower water-spaces connected by a row of tubes, round
which the heated gas circulated; there was also a hanging plate which
checked a too rapid flow to the funnel and increased the combustion. The
Arctic burned about 83 tons of coal in 24 hours, which gave her a speed of
316·4 knots for the day. Her gross consumption was 87 tons when she
covered 320 knots in 24 hours.
The funds subscribed were exhausted long before the construction of the
boat was finished, and the Government not only granted the company’s
appeal for assistance, but went further and released the company from its
obligation to build the fifth steamer. It increased the subsidy to 33,000
dollars per round voyage, but in return it demanded an increased speed,
which, according to Mr. Bayard in Congress, would enable the Collins
steamers to overtake any vessel they wished to pursue, and escape from any
vessel they wished to avoid.
For some years the Collins Line seemed to have secured the premier
position in the Atlantic trade. Its vessels eclipsed the Cunarders in size,
speed, and luxury. The company, however, was expensively, almost
wastefully, managed, and the steamers were run extravagantly. Great though
its income was, its expenditure was greater. At its best the Collins Line
never paid a dividend and its fall was hastened by two terrible disasters. Its
first great calamity was the loss of the Arctic, which was rammed by the
French iron steamer Vesta in a very thick fog between sixty and seventy
miles from Cape Race. The Arctic was so well built that, although three
large holes were torn in her side, through two of which the water poured, no
apprehension was felt for her safety, and her captain sent a boat in charge of

Page 179

one of his officers to the other vessel to rescue those on board if necessary.
One of the Vesta’s crew was killed in the collision, and several others on
board were injured. The rest of the crew and passengers made a rush for her
boats and launched two, one of which was swamped; the other was
occupied by two of the crew and several passengers, who, disobeying their
captain’s orders, cut their boat adrift and were soon lost to sight in the fog.
Meanwhile on the Arctic it had been discovered that the steamer was
sinking. Preparations were made to save the lives of the passengers and
crew by means of the boats. One of the tackles of the first boat to be filled
gave way while it was being lowered to the water, and all her occupants,
except one sailor who seized the other tackle and a lady who clung to him,
were precipitated into the sea and drowned. Among those who lost their
lives at this time were Mrs. Collins, the wife of the managing owner, and
their son and daughter. The second boat was lowered without mishap and
was provisioned and quickly filled with passengers. The water continued to
pour into the ship, and she was headed for the nearest port, but in about a
quarter of an hour the furnaces were put out. All the other boats but one left
the ship, the exception being a large lifeboat which there were not sufficient
seamen left on board to launch.
This boat is believed to have been filled by passengers, who thought that
it might be left afloat when the ship went down. It is probable that it was so
crammed that it had no chance of floating, and that it was sucked down with
its occupants in the vortex caused by the sinking of the steamer.
The loss of life is variously stated. One version is that the Arctic had
three hundred and sixty-five persons on board of whom only eighty-seven
survived. An American writer, however, states: “The Arctic foundered with
two hundred and twelve of her passengers and one hundred and ten of her
crew.”[66] The Vesta left St. Peter’s the day before the disaster with one
hundred and forty-seven passengers and a crew of fifty, of whom thirteen
were reported missing when she reached St. John’s.
[66] “The American Mercantile Marine,” by W. L. Marvin.

Page 180

The “Adriatic” (Collins Line, 1857).

The Pacific, a sister ship to the Arctic, was the next of the Collins liners
to succumb to the perils of the sea. She sailed from Liverpool for New York
in January 1856 and never reached her destination, and not a trace of her
has been discovered to reveal her fate. The loss of these two splendid
steamers within two years seriously crippled the Collins organisation.
Mr. Collins, to replace the Arctic, ordered the fifth steamer which was
stipulated for in the contract with the United States Government at the time
the line was started. This steamer, the Adriatic, like the other four vessels of
the line, was in excess of the American Government’s requirements, and
was larger, speedier, and even more luxuriously fitted than any of her four
predecessors. She was built by George Steers at New York and launched in
April 1855. She was 355 feet in length, 50 feet beam, and 33 feet deep, with
a gross tonnage of 4144 tons. Her cost was £240,000. It was hoped that this
splendid vessel would retrieve the falling fortunes of the Collins Line, but
in the following month a bitter attack was made in Congress upon the
policy under which the line had been granted Government aid, and in
consequence of this attack the subsidy to the line was reduced. The mail pay
to the Collins Line was lessened by the withdrawal of the 473,000 dollars
added in 1852; and the original subsidy of 385,000 dollars, or considerably

Page 181

less than half the amount on which Collins had been relying, was now to be
paid to the company. This was further reduced to 346,000 dollars, and in
1858 the subsidy was withdrawn altogether. The line ceased operations at
once. The Adriatic made one trip to Liverpool and, after lying idle there for
some time, passed into the hands of the promoters of the Galway Line.
An equally unfortunate enterprise was the attempt to establish a line
between Galway and America.
The project of connecting the west coast of Ireland with Newfoundland
by a line of fast steamers has always had its attractions for those who are
seeking to cut down the ocean voyage to a minimum, but so far as the
passengers are concerned, the prospect of a long land journey from St.
John’s or Halifax to New York has always militated against the scheme.
There are also the no less serious drawbacks of a trip across the Irish Sea to
Dublin or other Irish port, continued by a railway journey to Galway before
finally embarking on the ocean voyage. For the conveyance of mails this
might be the fastest possible route, but until the Government adopt the
exceedingly unlikely course of subsidising a line of mail packets for this
purpose, the Galway-Newfoundland route has no prospect of becoming a
serious factor in the North Atlantic traffic.
The first proposal to use Galway was made in 1851, when some of the
Irish railway authorities and an American named Wagstaff visited the port,
and in June of that year sent the steamer Viceroy to New York via Halifax.
She was a wooden cross-channel boat and not suited for the work, and
nothing more was done in the matter until 1857, when the project was
revived by a Manchester man named Lever. Two steamers, the Indian
Empire and Propeller, were chartered for the enterprise and sailed for New
York via Halifax in the next year. In the autumn of that year, the
Newfoundland Government contracted with the promoters of the line to
carry the mails monthly from Galway to St. John’s, and a service of six
steamers was to be established. The British Government and the company
entered into a contract whereby the company was to carry the mails from
Galway to Portland (Maine), and to Boston and New York. Four steamers
were ordered but were not up to the requirements of the postal authorities in
respect to speed, and one or two were not perfectly seaworthy, and the
effort to maintain the service with chartered steamers not being satisfactory
—only the last of the Collins liners, the Adriatic, which had been
purchased, being able to run to stipulated time—the company, after a series

Page 182

of misfortunes which probably constitutes a record, went into liquidation,
and the mail contract was cancelled, after resulting in a heavy financial loss
to every one who had anything to do with it.

Page 183

CHAPTER VII
THE DEVELOPMENT OF STEAM AUXILIARY

he Atlantic was not the only scene of steam-ship enterprise
in the early part of the nineteenth century, for merchants
and shipowners recognised the importance of a faster and
more regular communication between England and the Far
East, and began to consider the desirability of employing
steam-ships as soon as these vessels had shown that they
could be used for sea voyages. At a meeting held in
London in 1822 and attended by a number of merchants engaged in the
Eastern trade, it was decided to form a steam-ship company to establish
regular communication with India via the Cape of Good Hope, and to send
Lieutenant Johnston to India to endeavour to interest merchants there in the
scheme. The meeting naturally was in favour of the all-sea route by the
Cape, but Johnston went to India via Suez, and became so convinced of the
superiority of the latter route for mails and passengers and light
merchandise that he became an enthusiastic advocate for its adoption. His
mission to Calcutta was so successful that, in December 1823, Lord
Amherst, the Governor, officially signified approval of steam-ship
communication between the two countries, and recommended the Council
to make a grant of 20,000 rupees to any British person or company who
should, before the end of 1826, “permanently establish steam
communication between England and India, either by the Cape of Good
Hope or the Red Sea, and make two voyages out and two voyages home,
occupying not more than seventy days on each passage.”[67]
[67] Lindsay’s “History of Shipping.”

Thanks to the generosity of the Rajah of Oude a sum of 80,000 rupees
was subscribed in India. The enthusiasm shown in the East for the project
induced the promoters in London to charter the Enterprise, which was then
being built by Messrs. Gordon and Co. at Deptford. Johnston returned to
England, and when the Enterprise was completed he was appointed her

Page 184

captain. She was a wooden paddle-steamer, 122 feet on the keel, and 27 feet
beam, and of 479 tons register. Her engines of 120 horse-power were
estimated to give her a speed of eight knots per hour in good weather. Her
boiler, which was of copper in one piece, cost £7000 and weighed about 32
tons. She sailed from London on August 16, 1825, and arrived at Calcutta
on December 7. Her stoppages to replenish her bunkers occupied ten days,
so that her actual travelling time was ninety-three days. She depended
largely on sail. This voyage is of importance as it was the first made to
India by a vessel built for ocean navigation and fitted with an auxiliary
engine.
The Enterprise cost £43,000, and soon after her arrival, as the first
Burmese war was then in progress, the Indian Government gave £40,000
for her.
The Falcon, a sailing ship of 176 tons, and having steam auxiliary, went
to Calcutta in 1825, but it is to the steamer Enterprise that the honour
belongs of having first reached Calcutta as a steamer. All that the voyage of
the Falcon proved was that she arrived safely; her engines were not much
used and her small size shows that even if she had been filled with coal she
could not have steamed all the way to Calcutta, nor were there sufficient
coaling stations to enable her to do so.
The pilot of the Enterprise at Calcutta was Thomas Waghorn, then in the
Bengal pilot service. The Calcutta Steam Committee, on behalf of the
Indian Government, consulted him in 1827 on the question of the
establishment of steam navigation between England and India, but though
he visited a number of towns in England, his project of establishing a
regular line of steamers via the Cape of Good Hope was not carried out.
This, however, was not his only scheme.
One of the difficulties in the way of establishing steamers on the Red Sea
route was the high price of coal at Suez. Waghorn ascertained that coal
could be brought to Suez by camel from Cairo at a reasonably cheap rate,
and he therefore urged the adoption of this route. While he was still in
England he heard that the East India Company intended to send the
Enterprise from India to Suez, and he then offered to make a trial voyage.
He was appointed courier to the East, and left London in 1829, undertaking
to carry despatches to Bombay and return with the reply in three months, a
time which was usually occupied by sailing ships in voyaging one way.
When he reached Suez he found that the Enterprise had broken down on the

Page 185

way, and he accordingly took an open boat and began the journey down the
Red Sea. Fortunately, the company’s sloop Thetis, which had been sent to
look for him, picked him up and took him to Bombay, and he returned to
London in the appointed time. A steamer service down the Red Sea was
then established. The Hugh Lindsay made the voyage from Bombay to Suez
and back once a year until 1836, when two large steamers, the Atalanta and
Berenice, took her place. During these years Waghorn devoted himself to
overcoming the difficulties and dangers of travel across the desert from
Alexandria to Suez.
“He associated with the Arabs, he lived in their tents, and gradually
taught them that pay was better than plunder. He established a regular
service of caravans, built eight halting-places between Cairo and Suez, and
made what had been a dangerous path beset with robbers a secure highway.
Before he left Egypt in 1841 he had a service of English carriages, vans,
and horses to convey travellers.”[68]
[68] “Dictionary of National Biography.”

Meanwhile the service on the Cape route had been steadily improving.
By 1840, Messrs. Green of Blackwall owned a fleet of splendid East
Indiamen fitted with auxiliary steam. One of them, the Earl of Hardwicke,
which may be taken as typical of the others, had a steam-engine of 30
horse-power, working paddle-wheels intended to propel her in light airs and
calms, such as are common in the region of the tropics. These paddles could
be disengaged in one minute from the engine whenever it was desired to use
sails alone. Although the Earl of Hardwicke was of 1600 tons, the space
occupied by her boilers and engine was only 24 feet in length and 10 feet in
width of the main deck, no part going into the hold or above deck. This
engine in calm weather could give the ship a speed of five knots an hour on
a coal consumption of three tons in twenty-four hours. In August 1840, in
steaming from London to Spithead on her way to Calcutta, she beat the
Wellington by twelve hours, the steam-engine working for upwards of forty
hours. The ship was expected to make the voyage in 75 days, which,
considering that she would have to go round the Cape, was quick work. She
was a sister ship to the famous Vernon, with which the experiment of
auxiliary steam for a regular East Indiaman was first made. The Vernon
went from Calcutta to Spithead in 86 days, and for the first eight days and
nights, in going down the Bay of Bengal, the wind was so light that she had

Page 186

to use her engines all the time. On the run from the Cape to Spithead she
made the then shortest passage on record of 32 days, during which she used
her steam nine days. The engines of the Vernon were constructed by Messrs.
Seaward and Capel, of the Canal Ironworks, Limehouse, who were also
builders of many other marine engines, some of large size, including that of
the Nicholai, the largest steamer then belonging to Russia.

Page 187

Page 188

The “Earl of Hardwicke.”

When the Vernon left Blackwall on her trial trip her engines gave her a
speed of about three and a half miles an hour, against a strong wind. Both
these vessels, like all the rest of the Indiamen, were full-rigged ships. They
were built to be sailing ships with steam auxiliary, and therefore were
necessarily very differently constructed from the vessels which were
launched about the same time for the North Atlantic trade, such as the Great
Western, the President, and the British Queen, all of which were steamers
with sail auxiliary. The interdependence of the two means of propulsion
must not be lost sight of in considering the naval architecture of the period.
The Indiamen of Messrs. Green illustrated the adaptation of steam as an aid
to sailing vessels, which even then had not attained their full magnificence
and power, but which showed continual improvement in speed as fresh ones
were built. This improvement was partly forced upon sailing-ship builders
by the opinion, universally held at that time, that steam could never
supersede sail for long voyages, owing to the difficulty of carrying enough
coal. The steamers designed for the North Atlantic trade, on the other hand,
were only intended for a short voyage—short, that is, in comparison with
those made by the Indiamen. Consequently, the North Atlantic liners have
developed as steamers first and foremost with sail auxiliary, and the latest
flyers on this ocean would be of little use as flyers if trading to the Far East
or Australia, because they could not carry enough coal and would have to
stop frequently to replenish their bunkers, while the liners of the southern
and eastern oceans would be equally unable to compete on the North
Atlantic routes.
Some sailing ships with steam auxiliary were, however, seen on the
Atlantic. One of the most remarkable boats of the time was the
Massachusetts. She arrived at Liverpool after a run of thirty days from New
York, which she left on November 17, 1845. She had an Ericsson screw-
propeller, which could be lifted when it was desired to run her under sail
only. Her screw was merely an auxiliary and was only intended to be of use
in calms or against light head winds. She was confessedly an experiment.
Her engine-space meant one-tenth less cargo-space, but it was the owner’s
idea that, if the voyage were accomplished with so much greater rapidity
than the ordinary packet ships could achieve as to recompense them for the
loss of tonnage, the experiment would be a success. Her owner was Mr. R.

Page 189

B. Forbes of Boston, and she cost altogether about £16,000. She sailed from
Liverpool for New York, beating such well-known sailing ships as the
Shenandoah and Adirondack by thirteen days, and the Henry Clay by five
days.

The “Massachusetts.”

The United States Nautical Magazine in 1845 said: “Let it be distinctly
understood that we do not call her a steamer or expect her to make
steamboat speed except under canvas; her steam-power is strictly auxiliary
to her canvas.” The Massachusetts was the first ship of a line intended to
run between New York and Liverpool under the American flag. Her length
on deck was 161 feet, and her beam 31 feet 9 inches, with 20 feet depth of
hold, and she was about 751 tonnage. Her full poop extended as far forward
as the main-mast, and contained accommodation for thirty-five passengers.
Her bow was very sharp. She carried what is known as a false bow, which
increased her sharpness, and was filled in on somewhat original lines. In her

Page 190

equipment everything that could be devised was provided. She carried
lensed lights on each bow, and also aft between the main and mizzen masts.
Her ventilators were similar to those on the Cunard steamers. Each stool,
chair, and settee had airtight compartments, so that it could be used as a
lifebuoy; she was well supplied with boats in case of accidents. The fact
that she had an engine did not interfere with her sail equipment, for she was
square-rigged throughout and carried skysails on all three masts. Her sail
area was 3833 yards. A peculiarity of her rig was that all the masts were
fidded abaft the lower masthead; but the advantages of this innovation were
not found, in this or any other ship in which they were tried, to be very
great, and it was not commonly adopted. It was thought that by fidding the
masts in this fashion a vessel might be kept more steadily on her course
when it became necessary for the sailors to reef or take in sail. She carried a
condensing engine with two cylinders, working nearly at right angles, of 26
inches diameter with a stroke of three feet. She had two “waggon” boilers,
each 14 feet long, 7 feet wide, and 9 feet high, with a furnace to each, and a
blowing engine and blower for raising steam quickly. The diameter of the
propeller was nine and a half feet. It was made of wrought copper and
composition metal, and could be raised out of the water when the steam-
power was not required. This was effected by means of a shaft from the
engine-room through the stern, above and parallel to the propeller shaft.
The upper shaft revolving raised the propeller and placed it close against
the flat of the stern, where it was secured with chains. The propeller shaft
passed close to the stern-post on the larboard side, and rested in a socket
bolted to the stern-post, and was further supported by a massive brace
above. Messrs. Hogg and Co. of New York constructed the engines to
Captain Ericsson’s design. The rudder had the peculiarity of a “shark’s
mouth” cut across it. This is an opening or gap extending a considerable
distance across the rudder so that the rudder itself shall not be impeded by
the screw-shaft which extends beyond it, the upper and lower portions of
the rudder passing above and below the shaft when turned in that direction.
Several steam auxiliary vessels were thus fitted, but it was not long ere the
plan was adopted of cutting away the dead wood in front of the rudder-post
and placing the screw before the rudder instead of behind.
This enterprise was short-lived, as the vessel made but two round
voyages and thereafter remained in American waters. A sister boat, the
Edith, was purchased by the United States Government before she had

Page 191

made a voyage. The Massachusetts was chartered to carry American troops
to Mexico in 1846, and continued in the United States Navy until 1870,
when she was sold and converted into the sailing ship Alaska, under which
name she made some good passages.
The Vanderbilt, also an auxiliary steamer, built by Simonson of New
York for his uncle, Commodore Vanderbilt, in 1855, was 331 feet in length,
and had a gross tonnage of 3360. She was probably the first and perhaps the
only American-built vessel with two overhead beams to cross the Atlantic;
certainly her appearance attracted no small amount of attention. Her two
cylinders were each 90 inches diameter and 12 feet stroke; her indicated
horse-power was 2800 and her boiler-pressure was as high as 18 lb. The
engines were built at the Allaire works. She ran on the New York, Havre,
and Cowes route until November 1860, besides going once to Bremen in
1858, and on the outbreak of war was presented by the Commodore to the
United States Government. She was afterwards laid up and bought in 1873
by a San Francisco firm, who removed the engines and turned her into the
full-rigged three-masted ship The Three Brothers; she was next bought by a
British firm to end her days as a hulk at Gibraltar.
One of the last of the vessels carrying steam for admittedly auxiliary
purposes only was the clipper Annette, built by Messrs. Russell and Co. in
1863. She was fitted with a screw and a small oscillating engine with
cylinders 3 feet in diameter and 3 feet stroke, and a tubular boiler 9¹⁄₂ feet
long by 13 feet high gave steam at 20 lb. pressure. Her screw was 11 feet in
diameter with 22 feet pitch, and a universal joint connected it to the engine-
shaft so that it could be lowered or raised as desired. The masts carried
1418 square yards of canvas.
The full-rigged, fast-sailing clipper ships, fitted with auxiliary screw
propellers, found one of the finest representatives of their class in the Sea
King, which was built at Glasgow for the trade with China, where several
splendid vessels, fast under sail and carrying powerful auxiliary engines,
were engaged. They were peculiarly suitable for those waters, for the
coaling stations were few and far between, and coal was expensive, and
their engines consumed a great deal more fuel in proportion to results than
do those of modern steamers. The Sea King was composite built; that is, she
had an iron frame with wood planking. Her screw could be lifted when the
wind was favourable, and her ability to show a clean pair of heels to most
sailing craft afloat is proved by her making the passage home from

Page 192

Shanghai in seventy-nine days, or, after allowing time for coaling en route,
seventy-four days. She was of 1018 registered tonnage, and her engines
were of 200 nominal horse-power; she was 220 feet in length by 32¹⁄₂ feet
beam, and 20¹⁄₂ feet depth.
Her career for a time was exciting. She was one of the many vessels
bought by the agents of the Confederate States in 1864, nominally as a
blockade-runner, but she became a privateer—pirate the Northerners called
her—and as such she had the distinction of being the only vessel which
carried the Confederate flag round the world. Her name was changed to
Shenandoah when she was purchased; she was neither the first nor the last
famous sailing vessel of that name. The last Shenandoah, the biggest
wooden sailing vessel ever built in America, a four-masted barque, returned
the fire of a Spanish gunboat in the recent Spanish-American War, and then
out-sailed her. The commander of the Shenandoah of the ’sixties was James
Tredell Waddell, whose record justified his appointment. He was formerly
an officer in the United States Navy, and was wounded and lamed for life in
a duel in 1842. He nevertheless served in the Mexican War and then
commanded the American storeship Release at the building of the Panama
Railway. All his officers and crew were down with yellow fever, but with a
few convalescent seamen he sailed his vessel to Boston. He declined, in
1862, the offer to command one of the vessels in the bomb fleet then being
fitted out to attack New Orleans, but instead he got through the blockade
from Annapolis to Richmond and joined the Confederate Navy. He was in
command of the ram Louisiana when the Southern fleet was attacked and
scattered by the Federal fleet under Admiral Farragut, and sank the
Louisiana rather than let her be captured. Next he was ordered to take
command of the Shenandoah, then being fitted out at Liverpool for a cruise
in the Pacific. He commissioned his ship off Madeira in October 1864 and
set sail for the south. He captured and either burnt or sank nine American
sailing ships before he arrived at Melbourne on January 25, 1865, but the
ship’s stay was a short one, for it was expected an American vessel or two
would be on her track, and she left Port Phillip on February 8, 1865. Three
months later she began her destructive work among the whalers in the
Okhotsk and Behring Seas and the Arctic Ocean. Three months after
General Lee had surrendered at Appomattox Court-house, the Shenandoah
continued her activity, and it was not until the British barque Barracouta
was spoken that Waddell learnt that the war was ended. Waddell then sailed

Page 193

the Shenandoah to Liverpool and surrendered her to the British
Government, by whom she was handed over in November 1865 to the
United States Consul. During her career under Waddell’s command she
captured thirty-eight vessels, of which six were released on bond and thirty-
two were sunk or burnt. She afterwards passed into the possession of the
Sultan of Zanzibar, and some years later was lost with all hands in a gale.
Waddell returned to America in due time and commanded the San
Francisco, of the Pacific Mail Line, until she struck a rock and went to the
bottom. All the passengers were saved and Waddell was the last to leave the
ship.[69]
[69] Appleton’s “Cyclopædia of American Biography.”

The other most notorious blockade-runner and commerce-harrier was the
Liverpool-built Alabama, a wooden three-masted screw steamer, rigged as a
barque; she was of 1040 tons register and 220 feet in length and had
horizontal engines of 300 nominal horse-power, operating one propeller and
giving her a speed, under steam, of nearly 13 knots, while with steam and
sail together she could cover 15 knots. The story of her exploits and of her
destruction by the United States wooden cruiser Kearsarge off Cherbourg in
June 1864, and of the “Alabama claims,” is too well known to need
repetition here.[70]
[70] A good account may be found in Appleton’s “Cyclopædia.”

The mail route between England and India via the Cape was admittedly
slow; and it seemed possible to carry the mails by way of Suez in a much
shorter time. The eastern half of this service was maintained in a very
inefficient manner by the East India Company. The British Government had
inaugurated in February 1830 its mail steam-packet service from Falmouth
to the Mediterranean. Up to this date the mails had been carried in sailing
brigs, although steam navigation with the Mediterranean had already been
established and the steamers beat the sailing brigs by many days. The first
of these Government steam packets was the Meteor, and the others
employed included the African, Messenger, Firebrand, Echo, Hermes,
Colombia, Confiance, and Carron.
The Dublin and London Steam Packet Company, under the management
of Messrs. Bourne, decided in 1834 upon establishing a line of steamers
between London and the Spanish peninsula. The proposed line was to be
called the Peninsular Steam Navigation Company, and its first steamer was

Page 194

probably the Royal Tar. This steamer, by the way, had previously been
chartered in 1834 to Don Pedro and then to the Queen Regent of Spain.
It is hardly correct, however, to describe these Admiralty vessels as
warships, for the Admiralty steam vessels at that time were gunboats, or
despatch vessels, steam for line-of-battle ships not being used until some
years later.
The Peninsular Company chartered a number of vessels for its early
service, but it was not until 1837 that it commenced to despatch mail-
packets regularly from London to Lisbon and Gibraltar under contract with
the British Government, which at that time and for twenty years afterwards
was represented by the Lords Commissioners of the Admiralty. This
contract was tendered for by both the Peninsular Steam Navigation
Company and a concern called the British and Foreign Steam Navigation
Company, but the latter was unable to convince the Government that it
possessed the resources, both financial and shipping, which would enable it
to carry out the engagement. The Peninsular Company, on the other hand,
was able to give the required assurance. The company undertook, in return
for an annual subsidy of £29,600, to convey the mails monthly to the
Peninsula. The pioneer vessel of this service was the Iberia, of 690 tons and
200 horse-power, which sailed in September 1837. Altogether the company
had ten vessels, two of which were chartered from the City of Dublin
Company.
The statement is often made that the steamer William Fawcett[71] was the
first boat of the company; she was built in 1829 by Caleb Smith of
Liverpool, and her engines were by Messrs. Fawcett and Preston, also of
Liverpool; and after being used for some years as a ferry-boat on the
Mersey she was placed on the Liverpool and Dublin route and may have
been “chartered for a short time to the Peninsular Steam Navigation
Company in 1835 or 1836, as she does not appear in the company’s
advertised sailing list for 1838.”[72]
[71] See the Frontispiece to this book.
[72] Kennedy’s “History of Steam Navigation.”

In 1839 the British and French Governments arranged that the Indian
mails should be sent by way of Marseilles and thence taken by an Admiralty
packet to Malta to be transhipped to another Admiralty packet for
conveyance to Alexandria. As was to be expected, an arrangement of this

Page 195

sort, involving such possibilities of delay, did not last long, and the
Government advertised for tenders for the mails to be carried between
Alexandria and England, with calls at Gibraltar and Malta both ways. Four
tenders were sent in, and that of the Peninsular Company, which offered to
do what was required for £34,200, was accepted. The company also offered
to charge reduced fares to officers travelling on the public service and to
carry Admiralty packages for nothing.
The urgency of a more regular steam communication between England
and India than was supplied by the sailing or auxiliary Indiamen was now
being extensively discussed, and the Government was asked to subsidise a
line of steamers between England and Calcutta which should make the
passage in thirty days. The Peninsular Company offered to carry the mails
between England and Alexandria with the two steamers Great Liverpool
and Oriental, and in 1840 the company was incorporated by Royal Charter
under the name of the Peninsular and Oriental Steam Navigation Company,
with a view to the extension of its operations to the Far East. The Great
Liverpool was of 1540 tons, and had been built for the Liverpool and New
York trade, and the Oriental was of 1600 tons and 450 horse-power. The
company was afterwards requested to place two smaller steamers on the
Malta and Corfu branch of the mail service, and did so for no less than
£10,712 below what it had cost to maintain the Admiralty packets.

Page 196

The “Hindostan” (P. & O. Company, 1842).

The inadequate service maintained between Calcutta and Suez had given
rise to many complaints, and at last, after considerable pressure had been
brought to bear on the East India Company by the Government in London,
the former consented to enter into a contract with the P. & O. Company for
the conveyance of the mails between these two points. The company
despatched its first steamer to India in September 1842, this being the
Hindostan, a fine vessel of 2017 tons, and 520 horse-power. She was a
three-masted vessel, and carried square sails on the foremast, and of her two
funnels one was set before and the other abaft the paddles. Her departure
was regarded as of national importance, and the warships she passed as she
left port were manned in her honour. She was placed on the route between
Calcutta and Suez, with calls at Madras and Ceylon; and as other steamers
followed, the company was soon able to contract for the conveyance of the
mails monthly from Ceylon to Hong-Kong, with calls at Penang and
Singapore, for a subvention of £45,000. The company received £115,000
for its service between Calcutta and Suez. The Eastern services were
attended with no little difficulty. At Suez and Aden fresh-water supplies had

Page 197

to be organised, and coaling stations, docks, and store establishments had to
be established wherever necessary.
The scramble over the isthmus of Suez, whence came the name of the
“overland route,” was one of the great drawbacks of this way to the East,
and many persons preferred to travel to India by way of the Cape. In spite
of its name the overland route was mostly a waterway, for the Mahmoudieh
Canal enabled the P. & O. Company to transport its passengers and goods
from Alexandria to the Nile, where they travelled by steamer to Cairo, and
the land portion of the journey was rather less than 100 miles across the
desert from Cairo to Suez. Caravans, sometimes numbering more than three
thousand camels, were employed to convey a single steamer’s loading
between Suez and Cairo. In passing from the Red Sea to the Mediterranean
port every package had to undergo three separate transfers.
“For nearly twenty years this system of working the company’s traffic
continued in operation, but it sufficed for carrying on a trade which, for the
value of the merchandise in proportion to its bulk, has, it may safely be
said, never been equalled. It attained sometimes the annual value of forty
millions sterling.”[73]
[73] P. & O. Handbook, 1905 edition.

The East India Company’s service between Suez and Bombay was as bad
as that formerly maintained with Calcutta, owing to indifferent management
and unsuitable steamers, and as it cost about 30s. per mile, whereas the P. &
O. maintained its services to India and China for 17s. per mile, there was a
renewal of the agitation for the service to be taken out of the control of the
East India Company and entrusted to a concern which could work it better
and more economically. Parliament in 1851 supported the agitation, but the
East India Company would not give way until the fates were too strong for
it; one lot of Bombay mails went to the bottom in a native sailing vessel in
which they had been placed at Aden, as the company had no steamer ready
for them at Suez. At the request of the Government, the P. & O. Company
agreed to take over this service for a subvention of £24,000 per annum, as
against the £105,000, or thereabouts, which the old arrangement had cost.
The P. & O. Company opened its Australian service in 1852 as a branch
line, but this connection proved so beneficial to the company and the
Australian Colonies alike, that in course of time it was made a main-line
service, to the mutual advantage of the company and the Colonies. So many

Page 198

of the company’s steamers were employed in the Crimean War and during
the Indian Mutiny for the Army, that the Australian portion of the service
was dropped for some time.

H.M. Troopship “Himalaya” in Plymouth Sound. (The “Royal George,”
120 Guns, in background.)

In 1852 the company added eleven vessels to its fleet, including the
celebrated Himalaya, then the largest steam-ship afloat and the fastest
ocean-going vessel, with the possible exception of a few on the North
Atlantic. Eleven of the company’s steamers were chartered to the
Government as transports during the Crimean War, and one of them, the
Colombo, was nicknamed Santa Claus when she arrived at Sebastopol one
Christmas Eve with presents and sorely needed stores and provisions for the
troops.
The East India Company in 1855 asked for tenders for the Calcutta and
Burmah mails, and an agreement was entered into with Messrs. McKinnon
and Co. of Glasgow, but the steamers they employed were unsuitable and

Page 199

small and the enterprise was a failure. Two steamers, the Baltic and Cape of
Good Hope, were sent out for the work, and fortunately for the owners were
acquired soon afterwards as transports during the Indian Mutiny.
This undertaking was known as the Calcutta and Burmah Steam
Navigation Company, and was at that time purely local in its operations. Its
steamer the Cape of Good Hope was lost in a collision in the Hoogly, and
another steamer of the line was wrecked while on her way out to India on
her first voyage while off the coast of Ireland.
However, the company changed its name in 1862 to the British India
Steam Navigation Company, Ltd., and notwithstanding its inauspicious start
under its old name, it has grown apace and is now one of the principal lines
trading between England and the Eastern Hemisphere.
The opening of the Suez Canal in 1869, which threatened serious
financial loss to the P. & O. Company, proved of great benefit to the British
India Company. The P. & O. “for thirty years had built up and depended for
existence upon the only traffic which was possible in connection with the
transit through Egypt, viz., the conveyance of passengers and goods at rates
which were necessarily high, owing to the conditions under which the work
had to be carried on. These conditions and the rates depending on them
were swept away by the opening of the canal, and the financial
consequences were such that for some time the future existence of the
company appeared to hang doubtfully in the balance. The company’s work
had therefore to be reorganised, and a new fleet procured with what
diligence was possible under the adverse condition of reduced, and at one
time of vanished, profit.”
This extract from the company’s Handbook is interesting, but considering
how long the Suez Canal was in building, the company can hardly be said
to have made any undue haste in anticipating the coming change.
The difficulties of the P. & O. Company, caused by the opening of the
Suez Canal, were increased by the objections which the Post Office raised
to the use of the canal for the passage of the mails instead of the Egyptian
Railway, but it gave way on this point “for a pecuniary consideration, that is
to say, for a sensible abatement of the subsidy, which was not an easy
matter to arrange at a time when the company was struggling for existence.
However, the company made some concession, and it was finally arranged
that the heavy mails which were then sent from England by sea should in
future be carried by the Suez Canal, but it was not till 1888, when the

Page 200

company had reduced their charge for the conveyance of the mails by
nearly £100,000 per annum, that the accelerated mails sent via Brindisi
were also transferred to the Canal Route. The company’s connection with
the Overland Route through Egypt, which had existed for half a century,
was then finally closed.”[74]
[74] P. & O. Handbook.

H.M. Troopship “Himalaya.”

The Union Line was founded in 1853 as the Union Steam Collier
Company, and it made a start with five little steamers, the largest of which
were the Dane and Norman of 530 tons. The outbreak of the Crimean War,
and the consequent withdrawal of the P. & O. steamers from the
Southampton and Constantinople service for use as transports, saw the
Union vessels placed upon that service till they also were engaged as
transports, and a sixth vessel was acquired. When the war was ended, the
steamers were placed for a time in the Southampton and Brazil trade, but it
was not a very profitable venture and they were diverted to the South
African trade, the company receiving a subsidy of £30,000 a year for five
years for carrying the mails to and from the Cape of Good Hope. The first

Page 201

sailing was made by the Dane in September 1857, and the sailings
thereafter were monthly. The subsidy was increased by £3000 the following
year on condition that calls were made at St. Helena and Ascension.
In 1857, Rennie’s “Aberdeen” Line, after having been for many years in
sail, went in for steam and despatched its first steamers, Madagascar and
Waldensian, from London to South Africa, carrying the mails between Cape
Town and Durban. These are stated to have been the first steamers on the
South African coast. The Madagascar, of 500 tons, was commanded by
Captain George Rennie. Like all the long-distance steamers of her time, she
carried a large spread of sail, but her engines, like those of most of her
contemporaries, were calculated to be able to render her independent of the
wind if it did not happen to be suitable, and therein they marked a great
improvement upon those of an earlier type, which were merely assistants to
sail. The steamers built in the later ’fifties were intended to place reliance
principally on their engines, because of the regularity of passage thereby
secured, rather than upon their sail-power; so that even by this time,
although the vessels were described as auxiliary steamers, a more correct
description would have been that they were steam-propelled vessels
carrying a large spread of canvas.
In March 1859, Messrs. J. and W. Dudgeon issued a circular on the
subject of steam navigation direct to Calcutta round the Cape, pointing out
that “steam hereafter will be almost exclusively employed in the transport
of goods between East India and Australia and the United Kingdom may be
taken for granted; this is merely a matter of time.” The circular continued
that the Cape route would certainly be simple and safe, and therefore
superior to the overland route, especially if it could be rendered expeditious
and profitable. The conditions required that vessels of not less than 5500
tons, builders’ measurement, be supplied at a total cost per vessel of
£150,000; the voyage, it was anticipated, would take thirty or thirty-five
days, or only a couple of days more than the overland route. As a correct
forecast of the size of vessels which until a few years ago conveyed the
great bulk of the merchandise between Britain and the Far East, this
statement is interesting and shows how accurately the needs of the traffic
were estimated.

Page 202

The “Norman” (Union-Castle Line, 1894).

In 1855 Messrs. A. and J. Inglis of Pointhouse, Glasgow, entered into a
contract “with a degree of boldness which only complete success could
have justified. They undertook to build the steamer Tasmanian to the order
of the European and Australian Steam Navigation Company. The
machinery, of over 3000 horse-power, was at that time considered of the
largest size, and to undertake the erection of it in a little wooden shop
barely twenty feet high, and furnished with a fifteen-ton crane, was almost
heroic. The soleplate of this set of engines weighed 40 tons, and had to be
lowered with screw-jacks into a pit dug out to give height under the
travelling crane. Messrs. Inglis actually built up the crank-shaft themselves,
working the material in the smithy. The Tasmanian proved one of the fastest
screw steamers built up to that time, having easily attained over 14¹⁄₂ knots
at Stokes Bay. Her consumption of coal, about three pounds per indicated
horse-power, was for that day extremely moderate. The engines were
constructed with three cylinders, had a built crank-shaft, valves at the side,
variable expansion, steam reversing gear, a built propeller, and other fittings
which are still reckoned in that comprehensive term, ‘all modern

Page 203

improvements.’ The engines worked most successfully until the general
adoption of the compound engine made so many admirable contrivances
obsolete.”[75] Shortly after building the Tasmanian, Messrs. A. and J. Inglis
began to build for the British India Company with excellent results to all
concerned, and since then they have constructed many vessels for this
famous company.
[75] Engineering, July 30, 1897.

In July 1858, owing to the failure of the European and Australian Mail
Company, the Royal Mail Steam Packet Company agreed with the Lords
Commissioners of the Admiralty to continue the Australian mail service,
and entered into a mail contract for eight months for a subsidy at the rate of
£185,000 per annum, giving a monthly sailing, with Government guarantee
of £6000 a month under certain circumstances if there were loss in the
working.
The line of mail packets between Panama, New Zealand, and Sydney was
maintained in connection with the R.M.S.P. service to the West Indies and
Panama with the mails, and was regarded as a useful alternative to the line
from Point de Galle to King George’s Sound and other Australian ports. The
Panama, New Zealand, and Australian Royal Mail Company was granted a
yearly subsidy of £9000 for the main line, excluding the intercolonial
services, the amount to be increased to £110,000 if the New Zealand
Government should afterwards stipulate for a higher rate of speed. The
Ruahine, the second vessel laid down, but the first completed for this line,
was constructed by Messrs. Dudgeon, and was a brig-rigged steamer of
1500 tons, and was 265 feet long, 34 feet beam, and 25 feet 7 inches deep,
and had engines of 354 nominal horse-power, driving Dudgeon’s double
screws. She had accommodation for 100 cabin passengers, 40 second cabin,
and 65 in the steerage. She left London on her maiden voyage in April
1865, and made the voyage to her final Australian port in 63 days, of which
she was only 55 days actually at sea, the other days being accounted for by
calls en route. She was expected to make the passage between Panama and
Wellington in 25 days.
The Pacific Steam Navigation Company, which celebrated the seventieth
anniversary of its foundation in February 1910, owes its inception to the
enterprise of William Wheelwright, an American, who was born at
Newburyport, Massachusetts, in 1794, and died in London while visiting

Page 204

England in September 1873. He began his business life as a printer’s
apprentice, but soon went to sea, and by the time he was nineteen years old
he was in command of a ship. He was captain of the Rising Empire when
she was wrecked in 1823 off the Plate, and then shipped as supercargo on a
vessel bound from Buenos Ayres to Valparaiso. The following year he was
appointed United States Consul at Guayaquil and five years later removed
to Valparaiso. With the view of extending American commerce and
supplying better communication than then existed on the coast, he
established in 1829 a line of passenger vessels between Valparaiso and
Cobija, and in 1835 decided to place steamers on the west coast. It took him
three years to obtain the necessary concessions from the South American
countries concerned. American capitalists fought shy of his proposals, so in
1838 he came to England, where he was well received. His plan included
the adoption of the route across the Isthmus of Panama, though many years
passed before this portion of it was realised. The necessary capital,
£250,000, was raised in 5000 shares of £50 each, and a Royal Charter was
granted on February 17, 1840. The two wooden paddle-steamers, Chili and
Peru, were built for the line by Messrs. Curling, Young and Co. of London
in 1839; they were sister vessels and were each about 198 feet long by
about 50 feet over the paddle-boxes and were brig-rigged, of about 700 tons
gross, and had side-lever engines of about 150 horse-power by Miller and
Ravenhill. In 1840 they passed through the Straits of Magellan, Mr.
Wheelwright being on board one of them, and received a series of national
welcomes along the west coast. Coaling difficulties were serious, and at one
time the boats were laid up for three months. At last, in order to secure a
sufficient supply, Mr. Wheelwright began to operate mines in Chili. These
vessels were not, as has often been stated, the first steamers to enter the
Pacific, for in 1825 a small steamer, the Telica, belonging to a Spaniard,
tried to trade on the coast, but was a financial failure and the owner blew up
his vessel and himself with gunpowder at Guayaquil.
The Pacific Steam Navigation Company came near to being a failure, but
held on, and in 1852, having secured a further postal contract, the company
added four larger vessels of about 1000 tons each to its fleet, all of them
being employed on the purely local service.
In 1852 there was a bimonthly service from Valparaiso to Panama, where
the line had a connection across the isthmus with the Atlantic navigation. In
1855 the Panama Railway was opened, and the company’s activity was

Page 205

greatly increased. In the following year also the company adopted the
compound type of engines, which was only just brought out, being, it is
stated, the first steam-ship proprietary to do so for ocean traffic, and
influenced probably by the immense saving thereby made in fuel
consumption.
Contracts were made in 1848 by the United States Government with
George Law, an American financier and shipowner, and his associates, to
carry the American mails from New York to Aspinwall on the Isthmus of
Panama, and with C. H. Aspinwall to convey the mails on the Pacific side
from Panama to San Francisco and ports beyond. This was the inauguration
of the Pacific Mail Line, and its first steamer, the California, sailed from
New York in October of that year for San Francisco. The gold rush was at
its height and the demand for the steam-ships was so great that she was
quickly followed by the Pacific and Oregon, the latter built in 1845. All
three were wooden paddle-steamers about 200 feet long and of nearly 1060
tonnage, and made good passages round Cape Horn.
With the arrival of the three steamers on the west coast, the transisthmian
route was adopted for passengers and light merchandise, and the Ohio and
Georgia, which Law had built, carried, in 1849, the first passengers by
steam-ship to the isthmus from New York.[76]
[76] Marvin’s “American Merchant Marine.”

When the Pacific Mail Company established a competing line between
New York and Chagres, Law placed an opposition line of four steamers on
the Pacific. In 1851 the rivalry was ended by his purchasing their steamers
on the Atlantic side, and selling to them his new line from Panama to San
Francisco.
Twenty-nine fine steamers, of a total of 38,000 tons, were built in ten
years for the two branches of the Californian trade, and the Pacific Mail
Company, representing an amalgamation of the Law and Aspinwall
interests, assumed the position, which it has retained ever since, of the
leading American steam-ship company in the Pacific. The company is
asserted to have carried 175,000 passengers to the “golden west” in that
decade and to have brought back gold to the value of forty million pounds
sterling.
“The Administration, which was so liberal in helping the Collins Line to
beat the British, contracted with the Pacific Mail Steamship Company,

Page 206

formed in 1847, for a service from Panama to Astoria, and from New York,
Charleston, and New Orleans to Havana, from which port the company
already had a connecting line to Chagres (Colon), thus completing the
connection between the coasts.... The speed from Panama to San Francisco
was more than ten miles an hour. Thus the United States had line traffic of
first-class character connecting its remote coasts before it had an American
line to Europe. At Panama it connected with the Pacific Steam Navigation
Company, giving service to Peru and Chili, so that before the middle of the
century the Pacific had at least 5000 miles continuous steam line traffic.”[77]
[77] “The Ocean Carrier,” by J. Russell Smith.

The Royal Mail Steam Packet Company in the seventy years of its
existence has played an eventful part in the history of the mercantile
marine. Its earliest steamers were wooden paddle-boats, and were among
the best, but in spite of their excellence they experienced an extraordinary
run of misfortunes, and losses by fire and wreck marred the records of the
company for several years after its incorporation in 1839. Its charter has
been revised and extended from time to time, one clause being that the
whole of the share capital must be British owned, and the management
British. In its long career it has served almost every port in the West Indies
with the mails, and has had no less than fifty-three contracts. At one stage
its management was subjected to some strong criticism, but under its
present management the company has prospered by leaps and bounds,
affording an excellent illustration of the value of well-directed energy and
enterprise.
The history of the Royal Mail Steam Packet Company is the record of the
development of the steamship connection between this country and the
West Indian Colonies. In 1840 the original contract was entered into with
the Admiralty Commissioners for executing the office of Lord High
Admiral for the commencement of the mail service to the West India
Colonies, the Spanish Main, New York, Halifax, Mexico, Cuba, &c.
The conditions under which the mail contract was to be carried out were
somewhat onerous. One was that the company should receive on board
every vessel a naval officer or other person and his servant to take charge of
the mails, and that every such person should be recognised and considered
by the company as the agent of the Commissioners in charge of the mails.
He was empowered to require a strict observance of the contract and “to

Page 207

determine every question whenever arising relative to proceeding to sea, or
putting into harbour, or to the necessity of stopping to assist any vessel in
distress, or to save human life.” A suitable first-class cabin was to be
furnished at the company’s expense, and appropriated to the officer’s use;
he was to be victualled by the company as a first-cabin passenger without
charge, and should he require a servant, such servant, “and also any person
appointed to take charge of the mails on board,” should also be carried at
the company’s cost. From which it would appear that some very
comfortable places were at the disposal of the Admiralty. The Admiralty
representative was also to be allowed a properly manned four-oared boat to
take him ashore whenever he felt inclined to go. Various penalties were
applicable for breaches of the contract, the fines ranging from £100 for
doing something of which the official did not approve to £500 for a delay of
twelve hours, and a further £500 for every twelve hours “which shall elapse
until such vessel shall proceed direct on her voyage in the performance of
this contract,” so far as the Barbadoes mails were concerned, and of £200
for mails for other places. Another stipulation was that naval officers were
to be charged only two-thirds of the ordinary fares as passengers. The
company’s subsidy was to be £240,000 per annum.
The company’s first steamer, the Forth, was launched at Leith in 1841,
and on January 1, 1842, the West Indian mail service was established by the
sailing of the steamer Thames from Falmouth. On completion of her voyage
she proceeded to Southampton, which has been the terminal port of the
company ever since. The company organised transit by mules and canoes
across the Isthmus of Panama in 1846, opening up the route via Colon and
Panama to the Pacific ports.
In the same year the Admiralty, in order to make a through mail
communication between England and the West Coast of South America,
contracted with the Pacific Steam Navigation Company for the carrying of
mails from Panama in connection with the R.M.S.P. service to Colon, and
the next year the latter company made through arrangements with the
Pacific Steam Navigation Company and the Panama Railroad Company for
traffic from Southampton (via Panama) to the South Pacific Ports.
Enough has been written to indicate in some detail the progress made in
steam-ship construction. Wood was the material chiefly used until near the
middle of the nineteenth century. Iron then began to take its place and the
screw-propeller to supersede the paddle-wheel. Some iron screw steamers

Page 208

have already been mentioned, but this was inevitable, as no hard and fast
line can be drawn across the history of invention and commercial
enterprise, to separate iron from wood and screw from paddle. The screw
propeller had actually been tried by Stevens in 1802, and iron boats for
inland waters were built as early as 1787.
But the general adoption of iron for building steam-ships and of the
screw for the propulsion of ocean-going ships marks a new era in the
history of steam-ship building.

Page 209

CHAPTER VIII
EXPERIMENTAL IRON SHIPBUILDING

he suitability of iron for shipbuilding purposes had been
admitted long before the construction of wooden vessels
reached its limit as a profitable undertaking. The first
experiments with iron were on a small scale, but they
demonstrated the theory of displacement, so that observant
marine builders had it borne in upon them that flotation
depended rather upon the displacement of the floating
body than upon the specific gravity of the material for which the floating
body was constructed. But the general public was unconvinced, and making
deductions from a limited knowledge of the subject, cried: “Put a piece of
iron on the water and see if it will float.” With the increase in the size of
wooden steamers and sailing vessels there came the demand for stronger,
heavier, and thicker timbers for all parts. This meant so much more
unremunerative weight of hull to be carried and so much less space
available in proportion to the size of the vessel; so that in time the limit of
carrying cargo at a profit and of staunchness of construction was bound to
be reached.
In wooden steam-ships the limit of length was about 275 feet over all; the
Great Eastern, built in 1858, proved that there was apparently no limit to
the length of the iron ship.[78]
[78] Mr. John Ward’s Presidential Address to the Institution of Engineers and
Shipbuilders in Scotland, 1907.

This length has been exceeded by a few American wooden sailing
vessels. The largest square-rigged vessel ever built in America, the
shipentine Shenandoah, was of wood; her dimensions being 299·7 feet,
beam 49·1 feet, and depth 19·9 feet; 3407 tons gross and 3154 net. She was
built at Bath (Maine) in 1890 for Messrs. A. Sewall and Co., and was
acquired a couple of years ago by the United States Government for a hulk
at San Francisco, but has since been recommissioned. Though not a clipper

Page 210

in the strict sense of the word, she was a fast sailer and is sometimes called
the last of the Yankee wooden clippers.
As wooden hulls were made larger they displayed a tendency, especially
when they were built to carry propelling engines, to sag or hog, that is to
say, to droop amidships or at the ends. This difficulty was ingeniously
overcome in America, where wooden steamers were built longer and lighter
and shallower than in Great Britain to suit the vast rivers of that country, by
Stevens, who introduced his hogging frame, to which fuller reference has
been made in Chapter II. But in the steamers of Great Britain, which were
entirely for deep sea, this arrangement was impossible, and the solution of
the difficulty had to be found in the use of a material other than wood.
The only substitute was iron. The change from wood to iron meant a
saving in weight of hull of about thirty to forty per cent., while it is asserted
that in a few cases there has been an even greater difference. The saving
also meant that the difference in weight could be added to the weight of the
cargo, without increasing the displacement; while another advantage was
that the beams and ribs and stringers were of smaller dimensions, and the
space thus gained, added to that obtained by the substitution of thin iron
plates for wooden planking several inches thick, also very considerably
increased the space available for the stowage of cargo. Practically every
part of a ship was of wood until 1810, in which year the scarcity of oak
resulting from the extensive felling of trees in the English forests compelled
the use of iron for the knees or connections between the deck-houses and
the ribs, and for the breast-hooks and pillars of ships.
An experimental iron barge was made in 1787 by J. Wilkinson the
ironmaster.
As early as 1809 it was proposed by Richard Trevithick and Robert
Dickenson that ships should be built of iron, but the proposal was received
with derision. The Vulcan, built in 1818 at Faskine near Glasgow, is, so far
as is known, the first iron vessel constructed for commercial purposes, and
so well was she built that as recently as 1875 she was engaged in
transporting coal on the Forth and Clyde Canal, and looked little the worse
for wear. Her builder was one Thomas Wilson.
The first iron steamer, however, was the Aaron Manby, built in 1821 at
the Horseley Iron Works near Birmingham, to the order of Captain Napier,
afterwards Admiral Sir Charles Napier, and Mr. Manby. She was put
together at Rotherhithe, and in May 1822 at Parliament Stairs took on board

Page 211

a distinguished party of naval officers and engineers, whom she conveyed
for a trip of several hours up and down the river between Blackfriars and
Battersea. A contemporary newspaper described her as “the most complete
specimen of workmanship in the iron way that has ever been witnessed.”
This little vessel was 106 feet long and 17 feet broad, and carried a 30-
horse-power engine. Her wheels were of the type known as Oldham’s
revolving bars. Her only sea voyage was to France under the command of
Captain Napier. Upon arrival she was employed on the Seine or Loire.
Another iron vessel intended for navigation on the Seine was shortly
afterwards made in this country, and the parts sent to France to be put
together.
Little appears to have been attempted in this country for some years in
the way of iron shipbuilding, although in Ireland three or four small iron
sailers or steamers were constructed for inland navigation purposes. But in
1828 John Laird of Birkenhead had his attention directed to iron
shipbuilding, and completed his first iron vessel there the following year.
Other builders followed where he showed the way, and in less than three
years there were shipbuilders on the Thames, Clyde, and east coast of
Scotland who were launching iron vessels, the great majority of which were
sailing ships. The famous yards on the Cheshire side of the Mersey
remained for some time the headquarters of the new industry. The first iron
vessels for the United States—not the first iron-plated vessels, and this is a
distinction which should be noted—were launched there, and so immediate
was the recognition of the advantages of iron ships over wooden ones that
by 1835 there had been built at Laird’s the first iron vessels for use on the
rivers Euphrates, Indus, Nile, Vistula, and Don. They were small compared
with the wooden vessels afloat.
The Garry Owen, built in 1834 by MacGregor, Laird and Co. of iron,
was only 125 feet in length, 21 feet 6 inches beam, with two engines
totalling 90 horse-power. There were no Lloyd’s rules as to scantlings for
iron steamers in those days, and builders put in as much material as they
thought necessary for the strength of the vessel, which usually meant a
liberal allowance. The Garry Owen was not much to look at, but she was
very strongly built, a circumstance which had a great deal to do with the
development of iron steam-ship building. She nearly came to grief on her
first voyage, for she was overtaken by a violent storm, which drove her and
several other vessels ashore. These others were of wood. Some of them

Page 212

were soon pounded to pieces by the heavy seas, and those that escaped total
loss were badly damaged; but the Garry Owen, though bumped and dented
somewhat, was able to get afloat again little the worse and return under her
own steam.
If a steamer strongly built of iron could survive a storm and stranding
which ended the careers of several wooden ships of larger dimensions, it
was admitted that there was no valid reason why other iron vessels should
not prove equally safe, especially if they were larger. It was considered that
iron steamers might find useful employment in short voyages, and several
were built.
One of the chief of these vessels was the Rainbow, launched in 1837 for
the London and coastal trade. She was 185 feet long by 25 feet beam, and
of 600 tons, with engines of 180 horse-power.
The use of iron in construction was not the only factor in the tremendous
change which was coming in shipbuilding. A new form of propulsion was
necessary, and it was found in the screw propeller.
Before considering this, however, the development in the construction of
paddle-wheels and of the engines designed for paddle-boats may be noticed.
The ordinary paddle-wheel had the floats fixed upon the radial arms, but
it was soon found that an improvement could be made by causing the floats
to assume a position vertical, or nearly so, at the moment of contact with
the surface of the water, and to retain that position until the float had left the
water. To effect this the floats are not bolted to the arms but pivoted, and are
retained in the required position by means of levers operated by an
eccentric pin. By this means a much greater propulsive force was exerted.
The old style of paddle-wheel with fixed floats is now very seldom
employed. These wheels are now only to be found in vessels in which the
expense of construction has to be cut down to a minimum, or in a certain
type of steamer plying in shallow rivers, where the wheel is rather large,
and the dip of the float slight; but here again economy of construction may
count for more with the proprietor of the boat than the increased speed he
could obtain with the more expensive feathering wheels. Many of the
modern wheeled vessels have floats of steel, but in the great majority of
cases wood is employed, elm being largely used for this purpose. The floats
are usually about four times as long as they are broad. Various forms are
used, some being left square at the corners, others are rounded, others again
have the outer edge elliptical in shape, and the experiment has also been

Page 213

tried with a fair measure of success of inclining the floats to the axis of the
wheel, instead of having them parallel to it. The advantages claimed for this
last method are that the stream of water formed by the rotatory motion of
the paddles is driven slightly away from the sides of the vessel, instead of in
a direction parallel with her length. Wheels of this type, however, lose much
of their effectiveness when the engines are reversed. Radial wheels are
sometimes made with the floats adjusted so that they enter the water almost
perpendicularly, but they are much more oblique under this arrangement
when leaving the water.
A difficulty which paddle-vessels have to contend with is that of securing
a proper immersion of the floats. For a vessel in smooth water the
immersion of the top edge is usually calculated at about one-eighth of the
breadth of the float; but for a vessel intended for general sea service, an
immersion of not less than half the breadth of the float is allowed, that is to
say, the float at its moment of deepest immersion has a height of water
above it equal to half its diameter. If the float goes much deeper the
efficiency of the wheel becomes impaired. This is a point which has to be
taken into consideration in designing paddle-boats, so that the maximum
power shall be available when the vessel is fully laden, and shall not be
much lessened when the vessel is running light. The earliest steamers
suffered greatly in this respect as their designers had not discovered the
right size of wheels or floats to suit the hulls. A loaded vessel consequently
went very slowly owing to the great depth to which her floats were
immersed. To overcome this difficulty an ingenious system of what can best
be called reefing was invented. Affixed to the axle of the wheel was a rod
with an arrangement of cogs at the end, and these fitted into a series of teeth
in rods affixed to the floats, so that it was a simple matter to expand or
contract the effective diameter of the wheel by altering the position of the
floats as required. The same result has sometimes been obtained by a
system of levers, but the toothed wheel business was the older. It was tried
on a few of the earlier boats on the Clyde, not always, however, with
success.
A peculiarity of some of the larger paddle-wheels in use in America is
that they are not only of much greater size than those in use in Great Britain
in proportion to the size of the boat, but they have a proportionately less
immersion and the wheel is constructed in a very different fashion. The
floats, instead of being of one piece, as here, are constructed of three

Page 214

narrow fixed strips, two of which are on the same radius but have a space
between them equal to the breadth of the third strip, which is placed a few
inches behind the vacant space. It is contended that this method disturbs the
water less than the broad float and increases the propelling efficiency.
Probably the most notable instance is the great wheel of the Sprague.
Referring now to the construction of the engines of the earliest boats,
Symington’s Charlotte Dundas used a horizontal direct-acting engine, and
the general arrangement of her machinery would be considered creditable
even at the present day.[79] The engine of the Savannah was of the inclined
direct-acting type. The type of engine which Newcomen invented has been
retained for many years, but the oscillating or walking beam which is such a
conspicuous feature of nearly all the American river craft has been placed
by engineers in this country below the crank axle instead of above. The type
of engine with the beam below the crank axle is known as the side lever. It
is a type peculiarly suitable to paddle-wheels, and this being the only
method of propulsion adopted on this side of the Atlantic for many years,
there was little change for a considerable period in the shape of the engines,
which therefore attained to a high stage of perfection until the limit of their
profitable employment was reached. When larger engines became
necessary, in consequence of the rapidly increasing size of vessels, the great
weight of the side-lever engines proved a serious drawback.
[79] Sennet and Oram’s “The Marine Steam-Engine,” 1898.

Engineers were not long in devising a more compact form of machinery,
and direct-acting engines were introduced, these involving the abandonment
of the use of the heavy side levers. As the side-lever engines were made
larger it became customary to use two beams, one on each side, and a rod
from one end of each of these connected with a cross-piece at the top of the
piston-rod. The other ends of the double beam were united by a cross-piece
which carried from its centre the rod or lever which worked the crank of the
paddle-shaft. Where it became necessary to use two engines in one vessel,
they were so arranged that while one rod and crank were at their period of
least activity, the other pair were exerting their greatest effort. The system
of condensation of steam, which it would take too much space to describe
in detail, is also a matter of great importance in determining the power of
the engine, but the principle upon which the condensation is effected is well

Page 215

known, and the various methods of condensation can easily be ascertained
from the numerous handbooks on engineering.

Maudslay’s Oscillating Engine.

Another early form of marine engine was that in which the side levers
were arranged as levers of the third order, the fulcrum being at one end and
the steam cylinder placed between it and the connecting-rod. The peculiar
motion thereby given to the machinery caused this type to be known as the
grasshopper engine, from a fancied resemblance to the long legs of a
grasshopper. The direct-acting engines were much more compact, more
powerful, and lighter than the old side levers. The necessity of providing a
connecting-rod of sufficient length was met by Messrs. Maudslay by the
provision of two cylinders. The cross-head was not unlike the letter T, the
foot of which passed down between the cylinders, and the lower end of this

Page 216

was fitted with a journal from which the connecting-rod extended to the
crank in the axle. A still further improvement was made when the
oscillating engines were invented, which form an even more compact and
simple type. Messrs. Maudslay fitted a pair of oscillating engines in 1828
into the paddle-steamer Endeavour, and subsequently into several ships.
This form of engine was improved upon by Mr. John Penn, the famous
engineer at Blackwall, and the perfection which he gave it has not been
surpassed.
The great feature of this method is that the trunnions are hollow, and the
steam is admitted to and exhausted from the cylinders through them. The
connecting-rod is dispensed with and the upper end of the piston-rod acts
directly on the crank pin. This type of engine is the most economical for
space and weight that has yet been provided for paddle-wheel engines, the
majority of which of late years have been made on this system.
Its adaptability for certain classes of work has given the paddle-wheel a
long lease of life. Paddles are peculiarly suitable for certain conditions, such
as smooth waters and shallow rivers, where speed and light draught
combined with considerable carrying power are essential. The Indian rivers,
for instance, early demanded suitable steamers, and the paddle-steamers
Lord W. Bentinck, Thames, Megna, and Jumna were built of iron in 1832
for the East India Company for the navigation of the Ganges. They were
designed and constructed by Maudslay, Sons, and Field, and fitted with
oscillating cylinder engines of 30 nominal horse-power. They were flat-
bottomed and were shipped to India in pieces. They were 120 feet in length,
22 feet beam, and had a draught of 2 feet. Their tonnage was 275, builders’
measurement.
The steamers sent to India, however, from over sea were not the only
ones in that country.
As far back as 1820 there was launched at Bombay the first steamer built
in India; she was intended for service on the River Indus. Her engines were
designed by a Parsee. She must have been a familiar object to many
hundreds of Anglo-Indians during her long career. She was only broken up
as recently as 1880, and her end came not through weakness but through
her supersession by more modern and commodious boats.
There is a custom peculiar to Bombay, and stated to be of Parsee origin,
[80] of driving a silver spike into the stern of a vessel at its launch. This is
said to be analogous to the placing of coins under the foundation-stone. The

Page 217

ceremony was observed at the launching of a paddle-steamer at Bombay in
1875, when a nail some seven inches in length and three-quarters of an inch
in diameter was used, but whether such a ceremony took place at the launch
in 1820 is not recorded. If it is a Parsee ceremony, however, it is quite likely
to have been observed, for the East clings faithfully to its traditions.
[80] Notes and Queries.

A paddle-wheel steamer built in 1859 for service on the Indus had a
draught of only 20 inches. The hull was a frameless cellular raft, but the
walls of the deck cabin were worked into the depth of the vessel, which was
thus made a girder 200 feet in length, and by this contrivance the engine
and boilers, weighing 150 tons, were supported. A couple of plate girders
having a run of 115 feet were included in her middle length. These were 15
feet deep and formed the sides of the cabins, and they also projected under
the deck for a distance of 35 feet. The hull of the vessel was practically a
long, flat, shallow box; the stern was rounded and the keel was turned up
about 2 feet to allow of the water rising easily. The bow was rather fine and
designed on the wave-line principle. The engines were of 688 horse-power
and the boilers had a pressure of 25 lb. The paddle-wheels were 14¹⁄₄ feet in
diameter. Her load displacement was 331 tons and her draught when laden
was only 24 inches.
The Ly-ee-moon, launched in 1860 by the Thames Iron and Shipbuilding
Company, resembled in some respects the steam-yacht of the Queen. She
was built for Messrs. Dent and Co. for service between Hong-Kong and
Shanghai, and was 270 feet in length and 27 feet 3 inches beam with a
draught of 12 feet 6 inches. She was of 1003 tons register and 1394 tons
displacement; her oscillating engines had cylinders of 70 inches diameter,
with a stroke of 5¹⁄₂ feet. She was the first merchant vessel fitted with
Lindsay’s apparatus for scaling the boilers with superheated steam. The
paddles were 22 feet diameter. She had two masts, the foremast carrying
lower yard, topsail yard and topgallant yard, and the trysails reached to the
topmast head and gave her a good spread of canvas. She also carried several
guns, and the sponsons were so fitted that the guns could be worked on
them in case of need. Her speed was from 18 to 19 miles an hour. She
afterwards passed into the possession of the Japanese; the story goes that
when she was making her first run with Japanese only on board, the
Japanese engineers, being unable to stop the engines, put the helm hard

Page 218

over and sat down to wait with true Oriental patience until the steam gave
out and she stopped of her own accord. The Ly-ee-moon afterwards passed
into Australian ownership and she ran for a long time in the excursion and
coastal trade, and was finally wrecked in March 1886, when seventy
persons lost their lives.
The paddle-steamer Leinster was one of four constructed of iron for the
mail service between Holyhead and Kingstown in 1860 by Samuda Bros.
She had nine water-tight bulkheads. A vessel intended for this service, on
which exceedingly rough weather is at times encountered, through which
the vessels are driven at full speed in order to ensure the punctual delivery
of the mails, has to be built very strongly to stand the strain of the rough
seas. For this purpose the paddle-boxes were formed of iron plates
internally, continued from the sides and bulwarks of the vessel together
with a strong girder extending from each bow. Two of the four, the Ulster
and Munster, were withdrawn from the service in 1896-7 and turned into
barquentines, their places being taken by larger vessels of the same names.
The present bearers of the names are twin-screws and have triple-expansion
engines. The engines of the former boats had each two oscillating cylinders,
98 inches in diameter and having a stroke of 78 inches, situated
immediately below the paddle-shaft. They had each eight multitubular
boilers bearing steam at 20 lb. pressure, arranged in pairs, four before and
four abaft the engines, and with their ends backed to the sides of the vessel
so as to allow of the stoking of the furnaces from a middle gangway. The
paddle-wheels, 32 feet diameter, had fourteen floats 12 feet in length by 5
feet in width. The indicated horse-power was 4751, and the average speed
in all weathers was 15¹⁄₂ knots.

Page 219

Model of the Engines of the “Leinster.”

Messrs. Scott, Russell and Co. launched at Millwall in September 1854,
for a Sydney company, the steamer Pacific, which was expected to prove
one of the fastest vessels afloat. She was 270 feet in length over all, breadth
82 feet, depth 34 feet, and tonnage 1200. She had oscillating engines of 450
horse-power nominal and over 1000 effective, four independent boilers, and
her feathering paddle-wheels were of exceptional strength. She was
estimated to steam sixteen miles an hour.

Page 220

The “Pacific.”

There was launched in the beginning of 1861 by Messrs. Pearse and Co.
of Stockton-on-Tees, for the conveyance of troops on the lower Indus, a
vessel which fulfilled the rather unusual requirements of a Government
Commission appointed to discover the best means of navigating the Indian
rivers which, though broad, are often shallow in places, and abounding in
sandbanks. This vessel was 377 feet over all, beam 46 feet, breadth over
paddle-boxes 74 feet, depth 5 feet, with a displacement at 2 feet draught of
730 tons. Her tonnage was 3991 under the old system of measurement. Her
engines, by Messrs. James Watt and Co., were of 220 nominal horse-power,
with horizontal cylinders of 55 inches diameter and 6 feet stroke. The
paddle-wheels were 26 feet in diameter. The hull was of steel strengthened
longitudinally by four arched girders, two of which carried the paddle-
wheels, and the other two extended nearly the full length of the ship. Other
girders strengthened her athwartships. She had no rudders in the ordinary
sense, but was steered at each end by blades, which were raised from or

Page 221

lowered into the water at the required angle. The vessel had two tiers of
cabins, and could accommodate 800 troops and their officers.
The paddle-steamer Athole, built by Messrs. Barclay, Curle and Co., Ltd.,
in the year 1866, was the first steamer to be fitted with the saloon above the
upper deck. The credit for this improvement rests entirely with the late Mr.
John Ferguson, who was then manager of the shipbuilding yard. So
impressed were Lloyd’s that they desired Mr. Ferguson to patent his
improvement, but this he refused to do as he considered it ought to be given
to the shipbuilding world free of royalty.
Messrs. A. and J. Inglis were the builders in 1882 of the steel paddle-
steamer Ho-nam, which has the distinction of being one of the few, and
probably the first, English-built vessels constructed on the American plan.
She was rigged as a two-master carrying fore and aft sails only. Her paddles
were placed very far aft, and she was fitted with a walking beam-engine.
She was constructed for the Chinese coastal trade and was of 2364 tons
gross register, and was so successful that others of the same type followed.
These necessarily brief notices of some of the more remarkable paddle-
boats of modern times, together with references in other chapters to paddle-
steamers of still more recent years, are sufficient to show that the earlier
form of propulsion has never been entirely superseded by the screw.
Possibly the earliest definite attempt to apply the screw for propelling
purposes was made by David Bushnell in his abortive submarine exploit, an
account of which appears in Chapter XII. hereafter;[81] but the propeller
seems to have been very primitive. The screw propeller was also proposed
in 1752 by the mathematician Daniel Bernoulli. A patent was granted in
1794 to William Lyttleton for a screw propeller which was caused to
revolve by an endless rope passing round a wheel at the end of the axle. It
was a distinct attempt to solve the problem and nearly succeeded, but it
failed because there was too much of it. Had he been contented to use one
pair of blades he would have obtained better results than by using two pairs
of wide blades and two odd blades, arranged with three blades on either
side of the axle so that his propeller became really a long spiral wheel. He
also failed from the lack of sufficient power to drive the wheel, as manual
labour only was used. Still, a boat fitted with this screw was tried at the
Greenwich Dock, London, and a speed of two miles an hour was stated to
have been obtained.
[81] See p. 376.

Page 222

In 1800 Mr. Shorter, master of the transport Doncaster, brought out two
plans of propulsion. One was in the form of two duck-foot paddles with an
alternate movement; the other was a two-bladed screw propeller. The latter
was attached to an inclined shaft carried by a universal joint to the deck of
the vessel. One of these methods was said to have moved the Doncaster at a
speed of about a mile and a half an hour, the contrivance being driven by
eight men running round a capstan. It is difficult to believe from the picture
which accompanies his plan, dated 1800, that a transport of the size
depicted could have been moved at half that speed with the apparatus
shown, although the fact that it was mechanically propelled is attested by
credible witnesses.
The first really successful screw-propelled boats were those of Colonel
John Stevens, which were in operation on the Hudson River from the years
1802 to 1806, and were the first to be used for the effective navigation of
the waters of any country. References have already been made to Stevens’
experiment with paddle propulsion in 1796. When he, Chancellor
Livingston, Nicholas J. Roosevelt, and Isambard Brunel were making
experiments in steam propulsion on the Passaic River, New Jersey, they
tried a horizontal centrifugal wheel in a boat of 30 tons, drawing water from
the bottom of the boat and discharging it at the stern. This is in its general
principles similar to the plan that Mr. Ruthven tried in England on the
Waterwitch more than half a century afterwards. They also, unsuccessfully,
attempted to use elliptical paddle-wheels.
Probably the best description of Colonel Stevens’ propeller is that which
he himself contributed to the Medical and Philosophical Journal of New
York in January 1812. He refers to the “mischievous effects necessarily
resulting from the alternating stroke of the engine of the ordinary
construction” which induced him to turn his attention to the rotary principle
of steam-engine construction. “For simplicity, lightness, and compactness
the engine far exceeded any I have yet seen. A cylinder of brass, about eight
inches in diameter and four inches long, was placed horizontally on the
bottom of the boat: and by the alternate pressure of the steam on two sliding
wings, an axis passing through its centre was made to revolve. On one end
of this axis, which passed through the stern of the boat, wings like those on
the arms of a windmill were fixed, adjusted to the most advantageous angle
for operating on the water. This constituted the whole of the machinery.
Working with the elasticity of the steam merely, no condenser, no air-pump

Page 223

was necessary; and as there were no valves, no apparatus was required for
opening and shutting them. This simple little steam-engine was, in the
summer of 1802, placed on board a flat-bottomed boat I had built for the
purpose. This boat was 25 feet long, and about 5 or 6 feet wide. She was
occasionally kept going until the cold weather stopped us. When the engine
was in the best order, her velocity was about four miles an hour. I found it,
however, impracticable, on so contracted a scale, to preserve due tightness
in the packing of the wings in the cylinder for any length of time. This
defect determined me to revert again to the reciprocating engine.”

Page 224

Stevens’ 1804 Engine, fitted into Open Boat with Twin-Screw Propellers.

Page 225

Stevens and his son were crossing the Hudson in this boat on one
occasion when the boiler, which was constructed of small tubes, gave way,
and the next boiler was constructed with the tubes placed vertically. The
engine was kept going for a fortnight or three weeks in the latter part of the
summer of 1804, the boat making excursions for two or three miles up and
down the river, and for a short distance he could get a speed out of it of
seven or eight miles an hour.
Stevens’ early experiments with the screw propeller taught him that a
vessel driven by only one screw has a tendency to move in a circle. This
tendency is displayed in single-screw vessels to the present day. As is well
known, a vessel driven by a right-handed screw will deflect slightly to the
left, and a vessel driven by a left-handed screw will have a tendency to turn
to the right. The explanation given of this peculiarity in the Stevens’ boat by
Dr. P. Jones, who was superintendent of the United States Patent Office up
to the date of its reorganisation under the law of 1836, in the Journal of the
Franklin Institute for 1838, is that this tendency was due to the lessened
resistance, as the vanes of the propeller rose towards the surface, in
consequence of the greater ease with which the water was removed out of
the way. Consequently Stevens overcame this difficulty by using two such
wheels placed side by side and revolving in reverse directions.
The original screw-engine is still in existence in the Museum of the
Stevens Institute at Hoboken, New Jersey. The original boat, of course, has
long since disappeared. A replica of it was tried with the old engine on the
Hudson in October 1844, and attained a speed of eight miles an hour.
One great difficulty which early steamers had to contend with was that of
boiler pressure. It should be remembered that the five distinct means
Stevens proposed in connection with his screw propeller were:
1. The short four-bladed screw propeller.
2. The use of steam of high pressure.
3. The multitubular boiler.
4. The quick-moving engine connected directly to the propeller shaft.
5. Twin screws.
Not one of these means was applied to steam-ships until about forty years
later, but all have contributed since their adoption to the success of the
ocean navigation of the present day.
Stevens’ plan for working twin screws by a single cylinder is the most
simple that could be devised. When the screw propeller came into use this

Page 226

plan was revived both in America and in Europe, and was known in France
as the “Etoile” engine.
The principal reason for Stevens’ failure with the screw propeller was
that there were no tools or competent workmen in America to construct
properly the steam-engines that he planned between 1800 and 1806, and
success was therefore impossible. He therefore reverted to the paddle-wheel
with its slow-moving engine and the boilers then in use, carrying steam at a
pressure of two or three pounds above the atmosphere. Stevens was not
disposed to abandon the screw entirely, for he presented a plan in 1816 to
the United States Government for a warship propelled by that means, but
nothing came of it.
In the spring of 1825 an advertisement appeared in the Times offering a
hundred guineas for a means of propelling vessels without paddles, and in
that year a company was formed for applying the gas vacuum engine to
canal navigation.

The “Q.E.D.”

Page 227

Some of the earlier steam-engine-propelled iron vessels were strange
craft. Designers and builders felt that they were entering upon new ground,
and being less trammelled by tradition allowed their fancy free play. Their
plans were occasionally daring in their originality and came astonishingly
near to achieving success.
A freakish-looking vessel was launched on July 15, 1844, from the yard
of her owner and builder, Mr. Cootes, at Walker-on-Tyne. She was a collier,
built of iron, and carried a screw propeller driven by a small engine. On this
account she is said to have been the first iron screw collier, antedating by
some years the John Bowes, to which the honour is usually given. This ship
was confessedly an experiment and was named the Q.E.D., and as her name
was not changed during her career she no doubt gave satisfaction. The sea-
borne coal trade was largely confined to wooden brigs of comparatively
small tonnage. The Q.E.D. was barque-rigged, “with taut masts and square
yards, the masts raking aft in a manner that is seldom seen except in the
waters of the United States. She was provided with a 20-horse-power
engine by Hawthorn, which turned a propeller (screw), a compound of
several inventions, having four flies or flaps at right angles with each other,
the bend of each flap at an angle of 45 degrees from the centre.”
On her first voyage to London,[82] when she had about twenty keels of
coal on board, she grounded on the Gunfleet Sands, but was refloated
undamaged after some of her cargo had been thrown overboard.
[82] Mr. Charles Mitchell, afterwards head of the shipbuilding firm which
amalgamated with Sir W. G. Armstrong and Co. under the style of Armstrong,
Mitchell and Co., Ltd., went to sea in this vessel for one or two voyages, to watch
the behaviour of her engines.—“The Making of the River Tyne,” by L. W. Johnson.

Constructionally she presented several very novel features, which
embodied the iron shipbuilding science of the time. Her over-all length was
150 feet, beam 27 feet 6 inches, and with the 340 tons of coal on board she
was constructed to carry, she drew 11 feet 9 inches aft and 10 feet 3 inches
forward. She is said to have been the first water-ballast vessel, for her hold
was divided into separate chambers and each chamber had a false floor,
between which and the hull was the space for water-ballast. The water,
which was her only ballast, was admitted through taps and was pumped out
by her engine. This was just a small steam auxiliary, capable of giving her a
speed of four knots in a calm. Her mizzen-mast was of iron and hollow and
was used as a funnel for the engine fires, so that when her furnace was

Page 228

going her mizzen rigging appeared to be on fire. Her bows had a sharp
wedge-shape with considerable sheer, her stern overhung to an unusual
degree, and her counters were very flat so as to lift her stern to the sea. The
stern bore an armorial bearing with the motto “Spes mea Christus,” and
“Q.E.D of Newcastle.” The cabin was commodious, with a raised roof
surrounded with window lights, and had four sleeping compartments, with a
stateroom for the captain. A swinging compass was suspended, having a
magnet on each side, and one before it, to counteract the attraction of the
iron. Her shrouds were of wire rope served over with a strong double screw
to each, a method in use to the present time. The main-mast from step to
cap was 65 feet, the main yard 52 feet, and the mast, from the keel to the
royal truck, was 130 feet.
As she steered with ease, sailed well, and exceeded expectations with the
screw propeller, confidence was expressed “that the time is not far distant
when our ships of the line will be fitted with engines and screws in a
somewhat similar manner.” Four years after her launch her engines were
removed and she was rigged as a barquentine. She ultimately went to the
bottom of the English Channel in 1856.
As a steam collier the Q.E.D. can scarcely have been a success or her
engines would not have been taken out of her. Probably the first real
steamer to which the title can be applied was the John Bowes, built at
Messrs. Palmer’s yard, formerly in the possession of Mr. Cootes. Messrs.
Palmer Brothers and Co. established the fifth yard on the Tyne for iron
shipbuilding purposes and the John Bowes was their first vessel. Two steam
colliers of a sort had already been built on the Mersey, but they were little
better than steam barges. This, the first seagoing steam collier with a screw
propeller, was 167 feet over all, 25 feet 7 inches beam, 15 feet 6 inches
depth, and of 270 tons register. The firm started in 1851, and about this
period the working of the new Midland coalfields began seriously to affect
the sale of north country coal, which had hitherto been conveyed to London
in small collier brigs. It now became imperative in the interests of colliery
owners to devise some means by which the staple produce of the district
could be conveyed to the metropolis expeditiously and regularly. Sir (then
Mr.) Charles Palmer, who was connected with several large collieries in
Northumberland and Durham, therefore designed the John Bowes with a
carrying capacity of 650 tons, and capable of steaming nine miles an hour.
She was launched on June 30, 1852. The experiment proved a complete

Page 229

success, and to it may be attributed the important development of iron
shipbuilding on the north-east coast which afterwards took place. The John
Bowes was the forerunner of a long list of screw colliers, and was speedily
followed by the William Hutt, the Countess of Strathmore, and numerous
vessels of a similar type.
Captain Blackett, R.N., speaking at the launch of the John Bowes,
expressed the opinion that paddle-wheel ships were doomed altogether. The
chairman, Mr. Charles M. Palmer, referred to the superiority of the vessel
over the sailing brigs, and added: “The application of iron to shipbuilding,
especially to colliers, gives great advantages. There being much more space
than is required for cargo, the surplus in the John Bowes is available for
water-ballast, by placing an inner bottom, with compartments, thus saving
much detention and expense, the water being pumped out by the engine
used for the screw propeller. When this description of collier is brought into
general use, and the coal merchants can be supplied with regularity, and,
moreover, cannot take advantage of the fleets, they will no doubt purchase
from the coalowners at a price on board in the north, and thus obviate the
ruinous speculations now existing, and present the most effectual mode of
regulating the trade. I am aware that in substituting iron screw steamers for
wooden sailing vessels we are running counter to the wishes of many
shipowners, but I am satisfied we are taking the right course; we have the
public with us: and I am confident of success.” His confidence is justified
by the history of the Tyne.

Page 230

The “John Bowes.” Launched 1852.

The “John Bowes,” 1906
(passing Palmer’s Shipyard, where she was launched, 1852.)

Page 231

Numerous attempts were made to solve the problem of the proper
application of the screw propeller. Most of them were fantastic and a few
were even absurd. The difficulties that inventors had to surmount were so
great that it is no wonder many gave up the struggle in despair,
notwithstanding the obvious advantages of this method. They had to decide
where the propeller should be placed so as to give the best results, without
interfering with the steering powers of the rudder. They had to ascertain the
best material for the bearings of the propeller shaft in order to avoid the
wearing away or the overheating of the shaft and bearings through the
friction caused by its revolutions; for worn bearings meant leakage and
excessive vibration, and the latter meant an ever-increasing strain on the
structure of the ship, this being particularly the case with wooden vessels.
By degrees these obstacles were overcome, but the questions of the
number, size, and shape of the blades, their pitch, or theoretical forward
movement in making a complete turn, their degree of immersion and their
most efficacious speed, are taxing the brains of the most skilled naval
engineers and architects of the present day. Obviously, these questions are
of the highest importance to all students of marine engineering no less than
to steam-ship owners. As the power of the engines increased other
considerations had to receive attention, including the best material for the
construction of the propeller and the best methods of building or casting it
to stand the enormous strains imposed upon it by the work it had to
perform.
Almost simultaneously John Ericsson, the famous Swedish inventor, and
Francis Pettit Smith, a Middlesex farmer, were engaged in experiments. Mr.
(afterwards Sir) F. P. Smith made, in 1836, a clockwork model of a boat
with a screw propeller, and it was so successful that he built a steam launch
in order to try the experiment on a larger scale. This boat, the F. P. Smith,
was about 29 feet long and 5 feet 9 inches beam, and was tried in the
Paddington Canal in 1837; its power was derived from a steam-engine with
a cylinder having a diameter of 6 inches and a stroke of 15 inches. The
propeller was of wood with two full turns, and was placed some distance in
front of the sternpost, where it was driven by a system of bevel wheels from
the engine to the shaft. The propeller lost a blade on one of its trips, thereby
adding to the speed of the vessel, and this led Mr. Smith to instal another
screw with one turn only, or a half-turn on each blade. A metal propeller
was afterwards substituted, and the boat went from London to Folkestone

Page 232

and other places on the coast at an average speed of five to five and a half
knots.
It is stated Mr. Smith built a vessel of 60 tons[83] which, with a screw
propeller, attained a speed of seven or eight miles an hour and went from
Blackwall to Margate in eight and a half hours, and that she also towed the
British Queen steamer into the West India Dock. This probably refers to the
F. P. Smith, the assertion that she was of 60 tons being erroneous. The
results of the experiment were so satisfactory that a syndicate was formed
which took the matter up and brought out the Ship Propeller Company, to
whose capital Messrs. Rennie, the shipbuilders, subscribed £2000.
[83] Historic Times, March 1849.

This syndicate built the steam-ship Archimedes, the first seagoing vessel
driven by a screw propeller. She was of 232 tons, and had engines of 80
horse-power. The cylinders were 37 inches in diameter and of 3 feet stroke,
and the screw, being geared in the proportion of a fraction over five to one,
made 140 revolutions per minute to about 27 revolutions of the engine
shaft. The screw was formed of plates of iron fastened to arms of wrought
iron, keyed upon a wrought-iron shaft. The boiler was suited to the shape of
the vessel. The engines, chimney, boiler, coal-boxes, driving machinery, and
propeller weighed altogether rather more than 64 tons. The propeller was
fitted in such a way that it could be brought on deck for repair or when not
required for use. The ship was 125 feet over all and 22¹⁄₂ feet beam. Various
types of propeller blades were tried with her, and she was also sent on a
voyage round the ports of Great Britain to demonstrate the effectiveness of
this method of propulsion. On this trip she called at Bristol, where the Great
Britain was under construction, and was thus the cause of the screw
propeller being adopted for that ship.
One of the tests to which the Archimedes was subjected was a voyage
between Dover and Calais in the company of two of the Post Office
packets, which she beat handsomely. She went from London to Portsmouth
in 1839, and continuing her voyage round the ports of the British Islands, to
provide ocular proof to all interested, put in at Plymouth, where she was
boarded by Admiral Sir Grayham Moore and the Commander-in-Chief, who
were then convinced of the usefulness of the screw.
The next year the Novelty was built for the owners of the Archimedes by
Mr. Wimshurst at Blackwall, to demonstrate still further the seagoing merits

Page 233

of a screw-propelled vessel. Her two-bladed screw was placed as near the
sternpost as possible, and one of its features was that it had only a quarter of
a turn to the blade. Her boilers worked at a steam pressure of sixty pounds
above that of the atmosphere, the highest then attempted, and up to then
regarded as impossible for a steamer. She took a general cargo to
Constantinople, to which port she was the first screw cargo boat to go; but
as on her return objections were raised that the pressure was too high, other
engines were substituted working at only a quarter of the pressure. She was
one of the few vessels in which the mast was used as a funnel, her mizzen-
mast being made hollow and of iron for the purpose: she is also said to have
been the first vessel to be fitted with an iron mast.
John Ericsson in 1836 patented a propeller consisting of two drums from
which projected seven helical blades connected by an external hoop. The
blades were inclined in opposite directions, thus forming a double screw
propeller, the propellers being placed immediately behind the rudder, which
had the usual “shark’s mouth” to allow of steering. The shafts were made so
that one passed through the other, the outer one being tubular. The drums
revolved in opposite directions, that nearer the sternpost moving at a
slightly faster rate than the after drum. This method of arranging the
propellers was adopted with a view to avoiding the loss caused by the
motion imparted to the water by the single screw, but it was found that the
trouble caused by the contrivance was not worth the results obtained.
Another drawback was that the extra friction induced by one shaft operating
within the other was so great that the contrivance was practically useless
where a high speed was desired. The steamer Francis B. Ogden was tried
with this type of propeller in 1837, and towed the American sailing ship
Toronto, of 630 tons burden, on the Thames at the rate of five miles an hour.
The Francis B. Ogden was about double the tonnage and power of Smith’s
boat, being 45 feet long and having a high-pressure two-cylinder engine
giving the propellers about 30 revolutions per minute. Ericsson’s next
experiment was with the Robert F. Stockton, which was built by Laird at
Birkenhead in 1838. She was 63 feet long and of 33 tons, and had engines
of 30 horse-power. Prior to this his screw boat towed the Admiralty barge
with my Lords of the Admiralty on board on the Thames, but the effort to
convince them of the practicability of the method was doomed to failure,
since they had previously decided that as the power was applied at the stern
the vessel would not steer.

Page 234

Model of the “Novelty.” Built 1839.

The Robert F. Stockton crossed the Atlantic under canvas in 1839, and
after one of the screws had been removed as useless, she was employed for
a quarter of a century as a single-screw tugboat on the Delaware, under the
name of the New Jersey. Commodore Robert F. Stockton in that year
induced Ericsson to resign his office in London as superintending engineer
of the Eastern Counties Railway and go to the United States. Several
vessels were fitted with his propellers for river and inland waters navigation
in America.
Mr. Ogden, who was American Consul at Liverpool from 1829 to 1840,
and at Bristol from 1840 to 1857, “is credited with having first applied the
important principles of the expansive power of steam and with the
employment of right-angular cranks in marine engines. In 1813 he received
a patent for low-pressure engines with two cylinders, working expansively,
and the cranks being adjusted at right angles, and in 1817 the first engine
ever constructed on this principle was built by him in Leeds, Yorkshire. He
submitted his plan to James Watt, at Soho, who declared at once that it was
a beautiful engine and that the combination was certainly original.”[84]

Page 235

[84] Appleton’s “Cyclopædia of American Biography.”

The definite adoption of the screw propeller, both for the Royal Navy and
the Mercantile Marine, may be said to have taken place in 1840-41. For
some years no bearings of brass or other metal could be got to stand the
strain of the stern shaft, “and at one moment it seemed as if the screw must
be abandoned and the paddle-wheel reverted to. Mr. Penn solved the
problem by using lignum-vitæ wood bearings, which, lubricated by water,
were found to act without any appreciable wear, and in this simple way the
screw has already been able to reach a point of development from which we
can now calmly look back upon the financial risks and terrors which beset
the early days of steam navigation.”[85]
[85] The Times.

The difficulty of steering screw-propelled vessels was considerable,
principally owing to the method of placing the screw in an aperture in the
deadwood, while at the same time retaining the full underbody aft. The full
power of the screw could not thus be exerted, and the attendant churning of
the water interfered with the steering power of the rudder. A system of
double rudders was brought out in an attempt to solve the difficulty, but the
disadvantages it possessed were against its general adoption. These rudders
were hung respectively one on each side of the forepart of a somewhat
extended sternpost, against which they lay when amidships, moving out as
required to steer the ship, or both could be moved outwards to help to stop
her. The sternpost was really a vertical hollow box through which the screw
framing passed, the screw working behind it and beyond the rudders. Later
improvements in shipbuilding rendered this device unnecessary.
The difficulty was solved by the simple expedient of placing the
sternpost farther aft so as to give room for a greater space in the deadwood
in which the propeller was to act.
The superiority of the screw to paddles was now being gradually
admitted, and the number of small vessels fitted with screws increased. But
no one had as yet dared to launch a large screw steamer for ocean voyages.
The honour of being the first to do this was gained by the Great Western
Steamship Company. The Great Western, which has been mentioned in
Chapter V, had been so successful that her owners felt justified not only in
ordering another vessel but in determining that their new steamer should be
the largest afloat and illustrate the latest theories of construction. There

Page 236

were already rumours of competition in the North Atlantic trade, and the
Great Western directors did not intend to be forestalled. They decided to
build an iron ship and it was accordingly announced that the Great Western
was to be followed by the Great Britain, of iron. This project was roundly
condemned by the public. The fact that iron steamers were already in
existence on Irish waters did not count for much. These might be good
enough for Irish lakes and rivers but would be unfit for the Atlantic Ocean.
The Garry Owen was already forgotten.
The Great Western Company, however, persisted. The Great Britain was
designed by the younger Brunel and launched in 1843. Her length of keel
was 289 feet, and length from figure-head to taffrail 320 feet. Her beam was
51 feet. The total depth from the under side of the upper deck to the keel
was 31 feet 4 inches. Her tonnage was 3500 tons and her displacement at 16
feet was 2000 tons. Her cargo capacity was 1200 tons measurement, and her
coal bunkers held 1000 tons. Since no shipbuilder had the necessary data
for the construction of such a vessel, and shipbuilders as a whole were by
no means favourably disposed towards iron ships, possibly because they
had not the plant necessary for their construction, and as there was also a
very widespread belief that a vessel of the size and dimensions of the Great
Britain could not be built of iron, the directors were unable to find a
contractor who would undertake her construction. They were therefore
obliged to instal the plant for building the ship and the engines also. She
was built under the supervision of Paterson of Bristol, who was responsible
for the Great Western. It was at first intended that the Great Britain should
be a paddle-steamer and her lines followed in several respects those of the
best paddle-steamers of the day; though the Great Britain herself contained
so many novel features and was of so experimental a character that it could
hardly be said that she followed anything.
Little had been done to demonstrate the power of the screw propeller,
which for some unfathomable reason was considered to be suitable only for
small vessels. However, after the construction of the Great Britain had been
commenced, the steamer Archimedes, fitted with Smith’s screw propeller,
arrived at Bristol during her tour of the ports and demonstrated once and for
all that the screw propeller could be used in seagoing vessels, and that,
provided engines of sufficient power were installed, the screw propeller was
more suitable for large hulls built to make ocean voyages than the best

Page 237

paddle-wheels then designed. But many years were to elapse before the
shipping industry generally accepted this view.
The advantages of the screw, as proved by the Archimedes, were not,
however, lost upon the enterprising directors of the Great Western
Steamship Company, and they did not hesitate to order the designs of the
Great Britain to be altered so that she could be fitted with a screw instead
of paddles. She was not built on a slip whence she might have been
launched into the river, but in an excavated dock, and when she was afloat
in the dock it was found that she was too big to be got out of it. That is to
say, that having been fitted with her engines while still in dock, their weight
immersed her to such an extent that she could not float out. This was owing
to the dock officials’ delay in finishing alterations to the dock entrance, and
not to any mistake or negligence on the part of the steamer officials. She
was water-borne on July 19, 1843, and was christened by Prince Albert. The
floating was attended by vexatious mishaps. The Great Britain was attached
by a hawser to the tug Avon, which was outside the dock, but at the critical
moment the hawser broke. The bottle of wine thrown at the ship by the
Prince fell several feet short. He threw another bottle of champagne, which
struck the bows, and the wine and broken glass fell upon the men below,
who were pushing against her sides to keep her off the dock walls.

Page 238

Model of the “Great Britain.”

Her figure-head consisted of the royal arms, flanked with a beehive, two
cog-wheels, a dove, square, and the caduceus of Mercury in bronze on a
white ground, with a scroll above and below. Her anchor was on Porter’s
newly invented patent, which had been satisfactorily tested in the Navy for
three years.
Her designer and builder took no chances. She was put together as
strongly as possible, and it was well that this was so, for in her eventful
career she was altered so frequently and so much that had she not been
excellently put together she would very soon have succumbed to ship
surgery. Her keel was formed of iron plates varying from three-quarters of
an inch thick in the middle to one inch at the ends.
The plates of the hull under water were from three-eighths to half an inch
at the top, except the upper plate, which was five-eighths of an inch. She
was clincker-built and double riveted throughout. Towards the bow and
stern and in the upper strakes the thicknesses were reduced gradually to
seven-sixteenths. The ribs were of angle iron six inches by three and a half,
by half an inch thick at the bottom of the vessel and seven-sixteenths thick
at the top. The boiler platform was of plate iron supported upon ten iron

Page 239

keelsons. The hull was divided into five compartments by water-tight iron
bulkheads. The decks were of wood and consisted of the cargo deck, two
cabin decks, and the upper deck.
The beams for the support of the decks were bars of angle iron about
three inches across with an additional bar measuring five inches by half an
inch riveted on the side. The beams were from 2 feet 4 inches to 3 feet
apart. There were also between the angle-iron bars and deck planks a series
of diagonal flat tension bars, forming a continuous horizontal truss from
end to end in each principal deck; these bars were riveted to the angle irons
at the crossings and at the ends in order to prevent horizontal straining. The
engine-room was strengthened by adding nine additional double ribs and
sixteen additional reverse ribs riveted to the original framing. Her three
boilers were each 33 feet in length, 10 feet wide, and 24 feet high; she had
24 fires, 12 fore and 12 aft, with a total surface of fire-box of 288
superficial feet. Her chimney was 8 feet in diameter and about 45 feet high;
her four cylinders were 7 feet 4 inches diameter with a piston-stroke of 6
feet. Her two condensers of wrought iron three-quarters of an inch thick
were 12 feet in length. The main wrought-iron shaft measured 15 feet 9
inches.
The engines were after Sir Mark Brunel’s patent in the position of the
cylinders, except that they were disposed at an angle of about 60 degrees.
The pitch of the screw was 13 feet 2 inches and its diameter 15 feet. It was
six-bladed, and the screw shaft was revolved by four endless chains.
The crew numbered one hundred and thirty all told and she could
accommodate three hundred and sixty passengers. Her principal promenade
saloon was 110 feet in length by 48 feet at the widest part and 7 feet high,
and had two staircases at each end. Her first-class dining-room was 100 feet
in length by 50 feet wide and 8 feet high, with staircases communicating
with those of the promenade saloon. Seeing how far she excelled all other
steam-ships, she well merited being called by the newspapers a “stupendous
steam-ship” of “unparalleled vastness.”

Page 240

Model of Engines of the “Great Britain.”

Her rig was as unique as her hull. She had six masts, of which only the
second carried square sails, all the others being fore and aft rigged, and her
one funnel was placed between the second and third masts. Five of her
masts were stepped on turntables on deck so that they could be lowered and
offer less resistance when going against a head wind. The lines of the ship
were very fine, especially about the entrance from the forefoot. There was
little of the “cod’s head and mackerel tail” style of build about her. She was
admitted to be rather full amidships, for the accommodation of the engine,
but was thought to approach as near the figure of least resistance as
possible. The hull had a slight sheer and the vessel realised the expectation
that she would be what sailors call “a dry ship.”
After getting out of the dock at last she left for London, where she
arrived in January 1845 after a stormy voyage which tested her thoroughly.

Page 241

She remained five months at Blackwall, being visited by the Queen and
Prince Albert, and left in June of that year with about eighty passengers for
Liverpool, calling at a number of ports en route. She left the Mersey for
New York on July 26 with from forty-five to sixty passengers (accounts
differ) and about 600 tons of cargo. The voyage lasted 14 days 21 hours,
and her average speed was nine and a half knots, but the engines were only
worked at about 600 horse-power. New York was disappointed with her, as
her six low masts contrasted unfavourably with the tall graceful masts of
the American ships. She made the return journey in a day less.
On a subsequent voyage she broke one of the blades of her propeller, but
as she made between ten and eleven knots, using both propeller and sail, it
was decided when she was docked for repairs that her new propeller should
have four blades only. In September 1846 she ran on the rocks in Dundrum
Bay on the coast of Ireland, and was not refloated until August 1847.
Thanks to her strong construction she was able to withstand a winter’s
storms and a stranding of eleven months.
After being brought to Liverpool, she lay for some time at the North
Docks and, as the Great Western Steamship Company thought the repairs
would be too costly, she was purchased by Messrs. Gibbs, Bright and Co.,
formerly agents for the company, and they decided to refit her. The rolling
plates attached to the sides of the hull were removed. An oak keel was
bolted through upon the iron plates which had done duty for a keel when
she was first built, to prevent rolling. Her bottom for about 150 feet had to
be entirely renewed. The bows and stern were strengthened by double
angle-iron framing secured by three tiers of iron stringers 2 feet 3 inches
wide and five-eighths of an inch thick. Ten new keelsons were placed in the
ship running her entire length, half as deep again as those formerly used.
The various alterations resulted in the cargo capacity being increased by
about 1000 tons, partly through the space saved by new boilers and partly
through the construction of a deck-house 300 feet long and 7 feet 6 inches
high. New bulwarks were erected higher than the previous ones. The
number of masts was now reduced to four.[86] Two of the lower masts were
iron cylinders and the two centre masts were ship-rigged, carrying royals.
The fore and jigger were fore and aft rigged, but whereas the topsail of the
foremast was shaped like a lugsail that of the jigger was carried on a gaff,
according to a contemporary picture. The old engines were of 1000 nominal
horse-power, but it is a question if they ever worked over 600 horse-power;

Page 242

the new engines were nominally 500 horse-power. Her new pair of
oscillating engines were by John Penn and Son, engineers, Greenwich, and
had cylinders 82¹⁄₂ inches diameter and 6 feet stroke. By the use of cog-
wheels the screw shaft made three revolutions to one of the engine.
[86] According to a description and picture in the Illustrated London News she had
five masts, the first, fourth, and fifth masts being fore and aft rigged, but the fifth
mast is probably an incorrect addition to the picture. If she had five masts the
number must soon have been reduced.

The screw was three-bladed, 15 feet 6 inches diameter, and 19 feet pitch.
There were six boilers, and her bunkers held 700 tons, and other
accommodation enabled her to stow 510 tons more. To lessen the vibration
experienced from the screw and machinery, eight new wrought-iron beams
were placed transversely through the vessel, locking her sides together. The
bases on which the machinery rested were made stronger, and she was
further strengthened by massive iron entablature beams to the engines,
buttressed by a framing of teak wood, each piece being 20 inches wide and
3 feet deep, running on either side of the engines transversely and
diagonally to the sides of the ship. This solid timber extended 17 feet 6
inches on each side of the engine. The whole of this framing was bolted
together and to the sides of the ship by wrought-iron bolts. The new
arrangement of the boilers gave her a lessened coal consumption.
Little more need be said about this steamer. She made one voyage
afterwards to New York and back, and being then acquired by Messrs.
Antony Gibbs and Sons was placed in the Australian trade at the time of the
gold fever, and continued a regular voyage between England and Australia
for many years. She was afterwards patched up afresh and had her engines
removed, but was then such a failure that though she got as far as the
Falkland Islands, leaking badly, she was abandoned to the underwriters, and
is now ingloriously ending her days as a coal hulk.

Page 243

CHAPTER IX
DEVELOPMENT OF IRON SHIPBUILDING

fter the launching of the Great Britain in 1845, steam-ship
building was carried on with great activity, though the
change from wood to iron and from paddles to the screw
was gradual. Many wooden vessels, both steamers and
sailers, continued to be built, as the prejudice against iron
for ship construction died slowly. The screw propellers
were at first simply auxiliary to sail. This was due to three
causes: mistrust of the propeller, the cost of continually running it, and the
difficulty of carrying sufficient coal.
Describing the gradual evolution of the steam-ship in its early days, Mr.
John Ward, a director in Messrs. Denny’s famous firm, in his Presidential
Address to the Institution of Engineers and Shipbuilders in Scotland, in
1907, said:
“The necessities of the screw propeller after its general adoption
demanded a much greater increase of engine revolution than constructors in
the early days, or for some years after, deemed it prudent to adopt. Thus a
great variety of design, including beam, steeple, oscillating, and other forms
of machines were used, all with gearing between the engine and the
propeller. But a few direct-acting engines appeared very early, and
gradually, as engineers gained confidence, the latter type became universal,
and assumed the form of the inverted cylinder in the so-called steam-
hammer engine which was the universal type for mercantile purposes until
the end of the century.
“John Elder we may look upon as the father of multiple-expansion
engines. He, together with his partner Charles Randolph, was trained in the
marine school of Mr. Robert Napier, Vulcan Foundry, Glasgow. In 1852
they commenced business, and by 1856 had constructed several four-
cylinder compound engines. Randolph, Elder and Co. entered into a
contract for a set of engines, the coal for which, on trial, would not exceed 3

Page 244

lb. per indicated horse-power per hour. The trial ... worked out at 2¹⁹⁄₂₀ lb.”
In regard to coal consumption, the Pacific Steam Navigation Company’s
boats Callao, Lima, and Bogota, after being brought home from the Pacific
coast to be re-engined, all showed a consumption of from 2 to 2¹⁄₂ lb. (per
indicated horse-power) of best Welsh coal. The Bogota’s speed with the old
engines was 9·75 knots and the coal consumption not less than 38 cwts. per
hour. On her outward voyage with new engines she “gave a mean speed of
10·47 knots with 19 cwts. of coal per hour.” The steam-pressure was 22 lb.
and the horse-power was about 950 indicated.
“These early fathers seemed to see into the future. Walter N. Neilson, in
his Presidential Address (1859), refers to the ‘three grand requirements (of
marine engines) as—a safe and suitable boiler for 100 lb. and upwards; a
good arrangement of engine to receive the initial force of the steam without
shock or liability to derangement, and carry out expansion to the greatest
practical limits; and, lastly, an efficient surface condenser.
“John Elder was among the first to adopt the surface condenser and the
cylindrical boiler, and he thus in the ’fifties brought to a successful issue
these three grand requirements. We must go back to these early days to
realise what it meant to make a boiler which would be safe for 100 lb.; steel
plates of the present day weighing tons were then represented by puddled
iron plates weighing hundredweights. This led John Elder to try a water-
tube boiler, practically the modern Yarrow boiler, also a spiral tube boiler,
but probably none of these was successful owing to the salt-water difficulty,
evaporators not being introduced till many years afterwards.”
As the adaptability of iron for constructional purposes became more
generally recognised, it led to the proposal that steamers should be built on
the longitudinal principle instead of with an ordinary keel and a series of
transverse ribs. The use of iron also enabled shipbuilders to increase the
safety of their vessels considerably by means of transverse bulkheads, the
number of these being increased until, even as early as 1838, the iron
steamers then being built for the Glasgow and Liverpool line were each
divided into five sections, any three of which were estimated to be
sufficient to keep the steamer afloat if the other two should become
waterlogged through collision. Several vessels were constructed on
modifications of the longitudinal system, the chief among them being the
Great Eastern. In 1853 James Hodgson of Liverpool issued a circular on
the advantages of iron sailing ships, in which he pointed out not only the

Page 245

greater strength obtained by using iron but the comparative cheapness of
construction. The circular stated that a wooden ship of 1000 tons would cost
£16 10s. per ton, and an iron ship £13 10s. per ton, both fitted for trade to
the East. The wooden ship would not carry more than 1500 tons, whereas
an iron ship built from the same external lines would carry 1800 tons, and
this difference at £5 per ton out and home, added to allowances for
insurance, depreciation, and interest, would make a difference in favour of
the iron ship of £2295.

The “Sarah Sands,” 1846.

What was true of sailing ships was equally true of steamers, and Hodgson
had shown this some years before the publication of his circular, when he
built the Sarah Sands.
The Sarah Sands afforded an excellent example of the strength of iron
ships if well and substantially built. She grounded on the Woodside Bank in
the Mersey when carrying 1000 tons dead weight, and remained high and
dry until the tide flowed again, during which time she did not sustain the
slightest damage. She experienced several mishaps at one time and another,
which demonstrated not only the superior manner in which she was put
together, but also the superiority of iron ships over wooden ones, for it is

Page 246

difficult to suppose that a wooden vessel would have withstood all these
casualties without sustaining serious damage. The Sarah Sands was built in
1846 at Liverpool; she was 182 feet between perpendiculars, 33 feet beam,
32 feet deep, and of 1400 gross tonnage. Her engines were of 300 indicated
horse-power and were built by Messrs. Bury, Curtice, and Kennedy of
Liverpool. She had two oscillating cylinders of 50 inches diameter and a
stroke of 3 feet, working upwards to the crank shaft, and a still greater
novelty was the application of a direct coupling between the crank shaft and
the screw shaft. Her boilers were of the wet-bottomed type, and had six
furnaces besides return tubes, the steam pressure being 9 lb. She was four-
masted and heavily canvassed, carrying courses, topsails, and topgallant
sails on the main and mizzen masts, while she was fore and aft rigged,
including topsails, on the fore and jigger masts; her head sails included a
large fore staysail and two immense jibs.
She made her first voyage from Liverpool to New York in January 1847,
in connection with the Red Cross Line, and remained in this service until
the end of 1849, when she was transferred to the American coastal route
between Panama and San Francisco, being probably the first iron screw
vessel to go round South America. The discovery of gold in Australia
caused her to be sent to Sydney with a crowded passenger list of gold-
seekers, and she was thus the first iron screw steamer to cross the Pacific to
Australia; she afterwards came back to Liverpool and was again placed on
the New York trade, and in 1854 was sent to Canada and was the first iron
screw steamer in that trade also. On her return passage she struck the rocks
in the St. Lawrence, near Belle Isle, and remained fast four days and nights.
When she returned to Liverpool it was found that she had not started so
much as a rivet, which says a good deal for the strength of her construction.
This was destined to have another unnecessary proof, for as she left the
graving dock she capsized owing to her ballast having been removed and
not replaced, but again she was none the worse. Next she was employed as
a transport for troops to India in 1857, and caught fire in her saloon, but as
the hull was of iron the fire was subdued and she put into Mauritius with the
whole after-part burnt out. This ended her career as a steamer, for she
returned to England under sail and was converted into a sailing ship, and in
the following year met with a disaster which even her tough frame could
not withstand; she struck on the rocks near Bombay and went to pieces.

Page 247

In 1850 several boats were designed for mail service in any weather for a
run not exceeding sixty miles and on which sleeping accommodation was
not required. One of the best of the type was Her Majesty, built and engined
by Robinson and Russell in 1850 for the Portsmouth and Ryde station. She
was an iron paddle-steamer. The engines had two oscillating cylinders 27
inches in diameter with 30 inches stroke, and made 58 revolutions per
minute. Her tubular boiler, 9·75 feet long, 11·25 feet wide, and 6 feet high,
developed steam at 20 lb. pressure. The heating surface was 1234 square
feet. Engines, boilers, and water weighed 30·5 tons. The paddles were
11·16 feet in diameter and each had nine fixed floats. There were three
masts and the sail area was 64 square yards. Her speed was 12·8 knots;
displacement, 93 tons; length, 127 feet; extreme beam, 26 feet.
The steamer Crœsus, for the Australian trade, launched at Mare’s yard,
Blackwall, in June 1853, for the General Screw Shipping Company, was the
largest vessel yet built for the firm. She was of 2500 tons, with engines by
Messrs. G. and J. Rennie, of 400 horse-power.
Messrs. Maudslay, like Messrs. Penn and other eminent engineers, had
been in the habit of having the ships for which they contracted built by
other firms, while they themselves supplied the engines. They decided to do
their own shipbuilding, and accordingly opened a yard at East Greenwich.
The first vessel launched there was the Lady Derby, of 530 tons gross, built
for the General Iron Screw-Collier Company.
Those were the days when Thames shipbuilding was at its zenith. While
trade was good, freights high, and shipowning was profitable, shipowners
did not mind paying high prices for their vessels; but as the north-east coast,
the Mersey, and the east and west coasts of Scotland developed their iron
shipbuilding facilities, and by reason of their proximity to the coal and iron
fields were able to obtain these commodities at lower prices than the
Thames shipbuilders could secure them, they were able to underbid the
Thames shipbuilders and secure the industry, with the result that there is
now but one shipbuilding establishment of importance in the Thames
equipped to turn out a large warship or liner. Its competitors and neighbours
of half a century ago vanished one after another. Some have passed out of
existence, others have become merely repairing yards, and two or three
have gone elsewhere and prospered. The one survivor is the Thames Iron
Works and Shipbuilding Company, which, on the site made historic by Mr.

Page 248

Penn’s enterprise, proudly endeavours to hold its own and maintain the
traditions of the river.
Mare’s shipbuilding yards on the shores of Bow Creek, near its entrance
to the Thames, started in a very small way, but within seventeen years it
extended until it was employing nearly 400 hands. In 1845, a large portion
of the Essex side of the yard was a marsh, covered with water at high tide.
By 1854 it was one of the principal shipbuilding yards in the world. The
wages of the workmen at Blackwall averaged for eighteen months £5000
per week, and some weeks it was £1600 more. The yards of Messrs. Green,
Messrs. Scott Russell, Messrs. Dudgeon, Messrs. Maudslay, Messrs.
Samuda, Messrs. Yarrow, and Messrs. Thorneycroft, to mention only a few,
besides a host of smaller builders, employed their thousands of hands; but
never a keel is laid there now. The banks of the river which rang to the
stroke of the shipwrights’ hammers are silent; the slips are unoccupied or
devoted to other uses, the furnaces are cold; the machinery is sold or
dismantled, and fragments of it may yet be seen rusting ingloriously on the
scrap-heap. Dawn now brings no activity to the shipbuilding yards of the
Thames, and dusk adds nothing to their stagnation. Steam-ship repairing
work is nearly all that London river sees now. If, as sailors say, ships have
spirits that return to the yards where the vessels were built, when those
ships are lost or broken up, there must be many homeless phantoms
haunting the banks of the historic stream, seeking rest and finding none, and
perchance, as did certain of the ships they represent, going down the river
with the tide never to return: a ghostly fleet bearing many mysteries which
shall not be solved till the day when the insatiable sea is called upon to
surrender all it has taken captive.
The general superiority of iron screw steamers over those of wood led to
the introduction of a number of types designed to meet the requirements of
special trades.
James Hodgson, who, in addition to the Sarah Sands, built the Antelope,
the first iron screw steamer to leave Liverpool for the Brazils, introduced
the tubular type of iron vessels. The Carbon, a vessel of this type, was built
by him for the Eastern Archipelago Company in 1855. In the construction
of this boat he proposed to dispense with the ordinary side frames
altogether.
He stated in his synopsis that calculations of the strength of thirty frames,
in a ship that had answered exceedingly well, showed that a partial

Page 249

bulkhead or frame projected from the side of the vessel to the extent of only
20 inches was more than equal in strength to the thirty frames, if it were
supported on two bearings at a given distance and weighted on the upper
side in the middle. This frame, of 20 inches deep, would carry more than
the whole of the thirty frames, and when the bulkhead was extended across
to the other side of the ship there would be a great preponderance of
strength in favour of the bulkhead. But, in dispensing with frames, it might,
in some cases, be necessary to increase the plating for the sides, to give
some additional strength. Since the strength of the materials increased as
the square of the thickness, the addition of one-eighth to five-eighths of an
inch plate increased the strength to resist a blow sideways, or in a lateral
direction, by nearly 50 per cent. The strength of the vessel was further
increased by placing the bulkhead in the widest part of the ship, amidships,
and by other bulkheads placed midway between the midship bulkhead and
the bow and stern, should it be deemed advisable; and also by the
interposition of stiffening plates. Other strengthening means were also
recommended. The vessel would be, he contended, “capable of sustaining a
considerable pressure, either externally or internally, having round,
swelling, or convex sides, with a ridge or rib on the lower side which
answers the purpose of a keel.”
Vessels of this type were expected to be much more economical to build,
and no more expensive to run than those built on the ordinary lines. It was
disputed whether a tubular vessel being without frames, floors, &c., would
be strong enough for all purposes. An accident to Mr. Hodgson’s tubular
cargo vessel, The Carbon, however, seemed to justify his contentions, for
she stranded badly when being launched, so that her stern was submerged at
high water. She was towed up the slip again, and refloated, and it was found
that only two plates required repairs. The Carbon was running until quite
recent years in the east coast coal trade to London.
Another important development in construction was due to Mr. J. Scott
Russell, who has been described, like Sir I. K. Brunel, as a man before his
time. Mr. Russell’s services to steam navigation in his exposition of the
wave-line theory of ship construction were of incalculable benefit to the
science. His object was to diminish the resistance offered by the water to
the passage of the ship, and the modifications he made in the lines of the
hull not only effected this to a very remarkable degree, but also increased

Page 250

the seaworthiness and speed of the vessels. He designed a number of small
vessels suitable for special trades or to meet particular requirements.
One introduced about 1855, for North Sea work, was an iron screw
steamer with a long parallel middle body which made a capacious ship, the
fore and after parts being designed in accordance with his wave-line theory.
Another of his cargo vessels, having a greater length of parallel middle
body and wave-line ends, had the screw propeller abaft the rudder, which
was entirely below the propeller shaft, there being a loop in the rudder stock
through which the propeller shaft passed. A second vessel of this type, but
rather longer in proportion to its beam, was designed for the Baltic trade,
and had the peculiarity that its forecastle extended as far as the midship
deck-house.

The “City of Glasgow” (Inman Line, 1850).

The period from 1845 to 1880 is remarkable for the progress made in
steam-ship building prior to the general adoption of steel for the
construction of ocean vessels.
The early history of the Cunard Line has already been related. Before the
last wooden Cunarders were built, the Inman Line appeared on the scene

Page 251

with a service of iron steamers with screw propellers, the first being the
City of Glasgow, launched in 1850 by Tod and McGregor on the Clyde, for
a transatlantic service they themselves intended to establish with Glasgow
as its headquarters. The side-lever engine of the ordinary type was modified
for this vessel, as it was fitted with two beams working across the ship. The
cylinders were on one side of the ship, and on the other was a large wheel
which geared three to one with ordinary teeth into the propeller-shaft
pinion. Her machinery was placed low down in the hold so as to leave her
decks as free of encumbrances as possible.
She was a three-decked vessel of 1069 tons gross, 227 feet long by 33
feet beam and 25 feet depth; and her engines of 350 horse-power drove a
two-bladed screw of 13 feet in diameter and 18 feet pitch. She was designed
to carry 52 passengers in the first class; 85 in the second class, and 400 in
the steerage, and a crew of about 70. The hull was divided by five water-
tight bulkheads into six compartments, and as a further provision for the
safety of her passengers and crew she carried six lifeboats. Her fresh-water
tanks contained no less than 13,000 gallons. She was barque-rigged, of
almost yacht-like lines, and had a graceful clipper bow. The City of
Glasgow made a few voyages between Glasgow and New York in the
spring and summer of 1850.
Mr. William Inman of Liverpool had meanwhile been preparing for the
establishment of a line of steamers between Liverpool and America. His
idea was that modern iron vessels, equipped with screw propellers, were
bound to supersede paddle-wheel vessels, and also that there was money to
be made in the emigrant trade. His decision to place fast steamers in this
trade, however, was as much philanthropic as commercial, for he was
profoundly moved by the reports of the sufferings and inconveniences
experienced by emigrants in sailing ships, no less than by the accounts of
the fearful mortality among them. The carrying of emigrants was, at that
time, confined to sailing ships, many of which were wholly unsuited to the
purpose. The steamer companies catered chiefly for those who could afford
to pay well. Mr. Inman determined to cater for the emigrant traffic also, and
for forty-two years the line bearing his name was pre-eminent in this branch
of the work of the Atlantic ferry.
Practically the only steamer which met the requirements he had in mind
was the City of Glasgow, and in the autumn of 1850 she was acquired by
the founders of the Inman Line.

Page 252

“It was on December 10, 1850, that the Liverpool and Philadelphia
Steamship Company was established. Their agents were Messrs.
Richardson Bros. and Co., who had already a number of packet ships of
their own. They were the chief owners of the City of Glasgow, and their
junior partner was Mr. William Inman, who managed the shipping
department of the business.” This extract from the “Official Guide” of the
Inman and International Steamship Company Ltd., published about 1888, is
of interest in view of the various accounts of the inception of the company
which have been made public. The first sailing of the City of Glasgow for
her new owners took place on December 17, 1850, from Liverpool for
Philadelphia. She was under the command of Captain Matthews, who
formerly had charge of the Great Western.
In June 1851, the City of Manchester, by the same builders and also of
iron, was purchased by the Inman organisation. She was of 2125 tons and
carried “overhead” or “steeple” geared engines of 350 horse-power. Her
cylinders and proportion of gearing, however, were identical with those of
the City of Glasgow.
In October 1851 the City of Pittsburg was built at Philadelphia and was
the first American-built screw-propelled steamer in the North Atlantic
service. The City of Philadelphia was delivered by Messrs. Tod and
McGregor in 1853, being of slightly greater tonnage than her predecessor
from the yard; but she was eclipsed by the City of Baltimore ordered the
same year, the dimensions of the last named being: 326 feet in length, 39
feet breadth, 26 feet depth, 2472 tons gross and 1774 net.
This vessel took the place of the City of Glasgow, which in March 1854
disappeared in mid-ocean with 480 souls on board. In September of the
same year the City of Philadelphia was wrecked off Cape Race, but there
was no loss of life.
“Inman’s iron screws,” as they were dubbed, were attracting attention,
and it was recognised as merely a question of time when steamers of this
type would prove successful rivals to the paddle-boats.
Mr. Inman became sole managing director in October 1854, as the result
of the offer of the British Government to charter certain of the steamers as
transports during the Crimean War, the use of the vessels for this purpose
being disapproved by Messrs. Richardson, who were Quakers. About this
time the company purchased the Kangaroo from the Pacific and
Australasian Company, and ordered the City of Washington from Messrs.

Page 253

Tod and McGregor. The Kangaroo was 257 feet in length, 36 feet in
breadth, 27 feet depth, and had a gross tonnage of 1719 tons. The City of
Washington was 358 feet in length, 40 feet in breadth, and 26 feet depth,
with a gross tonnage of 2870 tons.
The Crimean War saw a great demand by the Allies for transports, and as
the French Government offered better terms than the British Government,
the City of Manchester was chartered to the French, and was followed by
the City of Baltimore, and six months later, when she had concluded her
trial trips, by the City of Washington. Upon the termination of their
engagement as transports these vessels returned to the Liverpool and
Philadelphia service.
For some time Mr. Inman had been considering the advisability of
making New York his American port instead of Philadelphia, and when the
Kangaroo, with all her passengers on board, was frozen up in the Delaware
and her departure for Liverpool was delayed for five weeks, he inaugurated,
in December 1856, a monthly service to New York with the City of
Washington. Two months later the Inman sailings were increased to
fortnightly, the sailings in the alternate weeks being undertaken by the
Collins liners. This arrangement was very short-lived, for in the same
month the Collins Line service was withdrawn. In 1857 also, the title of the
organisation was changed to “The Liverpool, New York, and Philadelphia
Steamship Company,” to mark the extension of the service to New York.
In October 1857 Mr. Inman’s Company bought up the Glasgow and New
York Steamship Company, and placed two of the vessels, the Edinburgh
and the Glasgow, in the trade between Liverpool and New York. By 1860
the demands upon the resources of the line were such that the first City of
New York was ordered from Tod and McGregor. She was 336 feet in length,
by 40 feet beam, and 28 feet depth, and was of 2360 tons gross. Her engines
were of the horizontal, trunk type, and she was the first vessel of this line in
which engines of this design were installed.
The rivalry between the Inman and Cunard Lines was intense, and
neither company produced a steamer which the other did not seek to
surpass, but the Inman Company forged ahead both in the matter of speed
and passenger accommodation and became for a time the premier company
on the Atlantic. The White Star Line, however, entered the “ferry” with
vessels of a different type, and the competition between the three great
companies became keener than ever. The first City of Paris was added to

Page 254

the fleet in 1866. Her Cunard rival was the Russia. The City of Brussels, of
3081 tons, began her sailings in October 1869. She was the last of the
Inman Line to be fitted with the long wooden deck-house which was a
conspicuous feature of so many ocean-going steamers. Her average speed
was between 14 and 15 knots, which was slightly increased when she was
re-engined in a few years’ time. In December 1869 she made the voyage
from New York to Queenstown in 7 days 20 hours 33 minutes, a record
which remained unbeaten until September 1875, when the City of Berlin
made the westward passage in 7 days 18 hours and 2 minutes, and the
homeward run in 7 days 15 hours 48 minutes. The City of Brussels was the
first vessel, apart from the Great Eastern, in the North Atlantic trade, in
which McFarlane Gray’s steam-steering gear was introduced.
The dangers inseparable from the North Atlantic traffic led to the
adoption by the company in 1870 of the “lanes” or routes across the ocean
as suggested by Lieut. Maury of the United States Navy, a more southerly
course being taken during the months from January to August, to avoid the
icebergs from the northern regions. The Cunard and other steam-ship
companies adopted the system about the same time.
The City of Berlin was contracted for by Messrs. Caird and Co. in 1873,
and when she was launched the Inman fleet counted up thirty-one vessels
with a total of 76,766 tons. The rivalry between the builders of the great
ocean-going liners, no less than between the firms owning the ships and the
officers of the ships themselves, was very great, and Messrs. Caird were
successful in their endeavour to turn out a vessel which should be admitted
to be the finest ocean-going steamer afloat. The rapid acquisition of one
first-class vessel after another placed the Inman Company in the front rank.
This steamer was 489 feet long on the keel, and 513 feet over all, by 45 feet
beam and 36 feet depth. Her speed was about 16 knots. She was of 5491
tons gross and 3139 tons net. She had a pair of engines of the inverted
direct-acting compound type, with high- and low-pressure cylinders, and of
1000 nominal horse-power, but on her trial trip the indicated horse-power
was 5200, and this was sometimes exceeded in her voyages. Her low-
pressure cylinder was 120 inches in diameter, and the high-pressure was 72
inches. Her twelve boilers were heated by thirty-six furnaces, the boilers
being so arranged that any number of them could be cut off.
It was pointed out by the Nautical Times that while the nominal horse-
power of the City of Bristol, added to the fleet in 1860, was as one to ten as

Page 255

regards the gross tonnage, that of the splendid City of Berlin, put on the line
in March 1875, was as one to five and a half. She could accommodate 400
passengers, of whom 200 were in the saloon, 100 in the second cabin, and
the remainder in the steerage, and her crew numbered 150. Electricity as a
means of lighting was introduced into the transatlantic trade on this steamer
in November 1879.
All the Inman vessels hitherto launched were ship-rigged, and all had the
graceful clipper bows for which the line was famous, the Inman fleet being
unequalled for beauty. At times, as they were overhauled, they were barque-
rigged, and one or two were given a three-masted schooner rig.

The “City of Rome” (Inman Line, 1881).

In June 1881 the beautiful City of Rome was launched at Barrow for the
company, and sailed on her maiden voyage in the following October. She
was constructed of iron throughout, and was 560 feet in length by 52¹⁄₂
beam and 37 feet depth, and was of 8144 tons gross. This was the first of
the company’s steamers to have three funnels, and being placed between the
main and mizzen masts at regular spaces they served to add to the
appearance of the vessel. Her machinery marked another important
innovation as, although the engine was on the three-crank system, it had

Page 256

three high-pressure cylinders of 46 inches diameter each, and three low-
pressure cylinders of 86 inches diameter each, arranged on the tandem
method, and the piston had a stroke of six feet. The eight boilers worked up
to 90 lb. pressure, with forty-eight furnaces so arranged that a water-tight
bulkhead was fitted fore and aft and formed the coal bunkers, but this
arrangement was modified afterwards. This splendid vessel did not come up
to expectations in the matter of speed and was returned to the builders.
In 1875 the company was converted into the Inman Steamship Company,
Ltd. The City of Rome was the last steamer the founder of the line ordered,
and he died before her completion. No further additions were made to the
fleet of the Inman Company. After the company and fleet were acquired by
the International Navigation Company in 1886, the new firm also bought
the City of Chicago while she was on the stocks for the Dominion Line.
This vessel was the only one under the Inman flag to have a straight stem.
She ran for several years, and was then lost on the south coast of Ireland.

The “City of Chicago.”

Page 257

The “Persia” and “Scotia” (Cunard, 1856 and 1862).

The first iron steamer built by the Cunard Company was the Persia, and
she deserves more than a passing mention because of the association with
her of David Kirkaldy, Napier’s draughtsman, to whom modern steel
shipbuilding owes the discovery of the way to toughen steel and remove its
brittleness. Kirkaldy’s drawings of the Persia are stated to have been the
only steam-ship designs ever exhibited at the Royal Academy. He was also
the first on the Clyde to give the question of trial performances the attention
it deserved. The first trial trips recorded by him, on the Larriston, on
September 22 and October 18, 1852, were printed when the Admiralty
asked for particulars of the respective behaviour of a Smith’s and a
Griffith’s propeller. But he was not allowed to continue his researches in
this direction, and even the Persia left the Clyde without a single diagram
having been taken, for although Kirkaldy was in the engine-room during the
entire trial, he had not permission to record her performances. He obtained
data concerning many vessels “so as to be able to deduce the variations of
behaviour and relative economy, and trace such to their respective origins,
e.g., whether any variation was due wholly or in part to the difference in the
shape of the vessels, in the propellers, in the engines, or in the boilers. The
utility of these investigations was signally demonstrated in the case of two

Page 258

vessels, Lady Eglinton and Malvina ... the former proved a great success on
her trial trip, and the latter a comparative failure. He was able to trace the
cause of the failure and in great measure to rectify it. He clearly foresaw
that the time was surely approaching when his employers would require to
estimate for and construct vessels to fixed requirements as to draught,
speed, and economy of working.”[87]
[87] “Illustrations of David Kirkaldy’s System of Mechanical Testing,” by Wm. G.
Kirkaldy.

The drawings of the Persia were made for his own pleasure, and the first
intimation of their existence was the announcement in the papers that they
had been admitted to the Academy. By Napier’s instructions they were
exhibited at the Paris Exhibition of 1855 together with drawings of the
steam-ships Europa, America, Niagara, and Canada. Napier received a
gold medal and the Legion of Honour as exhibitor, and Kirkaldy received a
medal as draughtsman. The drawings of these four ships were placed in the
Louvre Museum after being presented to the Emperor Napoleon.
The Scotia, the second and last of the Cunard iron paddle-steamers,
followed in 1862. She was 379 feet in length, of slightly greater beam and
depth than the Persia, and of 3671 tons, and her engines of 4900 indicated
horse-power gave her a speed of nearly 14¹⁄₂ knots. The Persia was sold in
1868, and was converted into a sailing ship. The Scotia was kept in the
service as long as possible, as she was a favourite with the public, but her
very limited cargo space and her immense consumption of coal made it
impossible to run her except at considerable loss. She was consequently
withdrawn in 1875, and sold to the Telegraph Construction and
Maintenance company, which had her re-engined and turned into a twin-
screw boat. She remained in the service of this company for many years,
and was used for cable-laying purposes. These were not, however, the
Cunard Company’s first iron steamers, as they had already had for some
time two smaller vessels of iron in their Liverpool and Continental service.
By this time the Cunard directors were convinced, by the success of the
Inman steamers, and by the advice of the engineers whom they consulted,
that the paddle-steamer had reached its utmost point of development.
Henceforth they built screw steamers, the first being the China, launched in
1862, and followed by the Java in 1865, and the Russia in 1867.

Page 259

The “China” (Cunard, 1862).

The “Russia” (Cunard, 1867).

Page 260

The Russia, and the Inman steamer City of Paris, the finest commercial
vessels afloat, left New York on the same day in February 1869, within
about an hour of each other and arrived at Liverpool with only thirty-five
minutes difference between them. They made the run across the Atlantic,
with the twenty minutes’ stop at Queenstown, in about eight days, eighteen
hours. The City of Paris started first, and got in at 3.45 a.m., and the Russia
at 4.20. The vessels were in company for four days. Once the Russia passed
the City of Paris, but the Inman liner took the lead again, and at another part
of the voyage the Cunarder recovered her lost ground. As racing, however,
was strictly forbidden by the rules of the two companies, and the ships’ logs
showed that no extra pressure of steam was used, it is supposed that in this,
as in many other cases of supposed ocean racing, the race existed mainly in
the imagination of the passengers, who for lack of anything else to do
worked themselves up into a frenzy of excitement about it. The captains, of
course, merely concerned themselves with putting in all the seamanship
they knew. Pictures published at the time show that both vessels were under
full sail, and even carried stunsails.
The China, after some years’ service, was sold and converted into the
sailing ship Theodor, and proved as fast after the change as when a steamer.
She foundered at sea in 1908.
In 1866 another competitor appeared on the North Atlantic. The fate of
the Collins and Galway Lines did not deter Mr. S. B. Guion from
inaugurating a rival service to that maintained by the Cunard and Inman
Lines, and for a time it seemed as if he would be successful in wresting
from the splendid vessels of these companies the premier position on the
Atlantic. The steamships which he placed on the service between Liverpool
and New York were at that period superior in size, speed, and luxury to any
of their competitors. He started the service with the Manhattan, and thus
inaugurated in 1866 what may be called the great race of the greyhounds of
the Atlantic. The Manhattan was built by the Palmer Company of
Newcastle-on-Tyne, and was the first of seven steamers comprising the line.
Her length was 343 feet, her beam 42 feet 6 inches, and her depth 28 feet,
and her register was 2866 tons. She had accommodation for 72 passengers
in the first class, and 800 in the second class, and besides taking 1000 tons
of coal could carry 1500 tons of cargo. A feature of this vessel was the
attention paid to the comfort of the second-class passengers, the cabins for
this class being on the main deck and thoroughly ventilated, wherein they

Page 261

showed a marked improvement on the many other vessels carrying
emigrants. She was fitted with low-pressure inverted direct-acting surface
condensing engines, designed by Messrs. J. Jordan and Co. These had
cylinders of 60 inches in diameter, with a piston stroke of 42 inches. The
Chicago and the Merrimac, sister ships, followed from the same builders.
The Chicago was wrecked in a fog on the rocks near the entrance to Cork
Harbour, and, a contrast to some of the disasters to Atlantic liners, not a life
was lost, the whole of the passengers and crew, numbering 130, being
landed by the ship’s boats within an hour of the accident. The earlier Guion
liners were brig-rigged steamers, and some of them carried the new
American double topsails on both masts. Other boats which formed a part
of the earlier fleet of the Guion Line were the Nebraska, Minnesota,
Colorado, Idaho, and Nevada. In 1870 these were augmented by the
Wyoming and Wisconsin, also built and engined by Messrs. Palmer. These
were each 366 feet long, 43 feet broad, 34 feet deep, and of 3238 tons
register. Among other distinctive features they had the first compound
engines on the transatlantic route. These had one vertical high-pressure
cylinder of 60 inches in diameter, and one double-trunk horizontal low-
pressure cylinder of 120 inches in diameter, both working on the same
crank, and having a stroke of 42 inches. Great expectations as to speed were
entertained when the Montana and Dakota, from the Palmer yards, were
brought into the service in 1872. They exhibited a new design in hull and
machinery as they had an abnormal slope of side, flush steel plating, and
water-tube boilers. These vessels each had a length of a little over 400 feet,
with a breadth of 43³⁄₄ feet and a depth of 40³⁄₄ feet. Like the Wyoming and
Wisconsin, they had compound engines, one high-pressure cylinder of 60
inches diameter, working inverted on a forward crank, and two low-
pressure cylinders working horizontally on the after crank. The Montana’s
boilers were constructed of a series of cross-tubes 15 inches in diameter and
were intended to carry a head of 100 lb. of steam, but in consequence of an
explosion when at 70 lb. pressure, they were replaced by ordinary tubular
boilers with a pressure of 80 lb. of steam. The Dakota was wrecked on the
Welsh coast in May 1877, and a similar fate befell the Montana three years
later. Seven years passed and then the Arizona was brought into the Guion
service. She was of iron and was built and engined by Messrs. John Elder
and Co. of Glasgow. Her dimensions were: 450 feet long, 45¹⁄₈ feet broad,
35³⁄₄ feet deep, with a register of 5147 tons. She differed from the earlier

Page 262

boats of the line by being four-masted, carrying square sails on the fore and
main masts, having two funnels, and having her saloon accommodation
amidships; in all these particulars, as well as in the straight cutwater, she
bore a strong resemblance to her rivals of the White Star Line.

Model of the “City of Paris,” 1866.

Although there was no deviation in her hull from the existing type, her
machinery displayed some novel features. Her engines were compound
with three crank shafts, each having one cylinder. The high-pressure
cylinder was 62 inches in diameter, and was placed in the centre, between
the low-pressure cylinders each of 90 inches, and all had a piston stroke of
66 inches. Steam was generated in seven boilers capable of withstanding 90
lb. pressure, and furnished with thirty-nine furnaces, which had an average
coal consumption of 125 tons per day, or in round figures 25 per cent. in
excess of her fastest rivals, which were then in the White Star Line. On her
homeward voyage from New York in July 1879, the Arizona succeeded in
breaking the record, and repeated the feat on her outward passage in May

Page 263

1880, when she made the passage from Queenstown to New York in 7 days,
10 hours, 47 minutes, thus proving herself for two years in succession the
fastest boat on the Atlantic. While on her homeward passage in November
1879, the Arizona collided at full speed with an iceberg. Although she gave
the berg a direct blow she is one of the few vessels that have managed to
survive after such an experience. It was stated at the time that there was a
projecting spur of ice from the berg under water, and on this the ship slid.
Her weight caused the berg to rock, and it was to this circumstance alone
that she owed her safety, for the rocking of the huge mass of ice enabled her
to slip off the spur into deep water again. A tremendous quantity of ice,
dislodged by the shock, crashed down upon her deck, doing a considerable
amount of damage, and she had only drifted a few hundred yards from the
berg, after the impact, when an immense portion of it fell at the spot where
only a few moments previously the ship had rested. This is one of the
narrowest escapes recorded in the annals of the sea. Fortunately, her
collision bulkhead withstood the enormous strain, and the vessel received a
magnificent, though entirely undesired, testimonial to the soundness and
stability of her construction. She put into St. John’s, Newfoundland, and
was found to be so badly damaged that she had to have entirely new bows.
The success of the Arizona led to the building of the Alaska, which proved
another triumph for Messrs. John Elder and Co., for the speed she
developed won her the title of the Atlantic Greyhound, her homeward
passage in June 1882 being less than seven days. This remarkable run was,
however, eclipsed by the Oregon, the last vessel added by the Guion
Company prior to its dissolution; she sailed from Liverpool to New York on
October 6, 1883, and accomplished the passage from Queensland to Sandy
Hook in 6 days 10 hours 9 minutes. The Oregon was an iron vessel built
and engined by Messrs. John Elder and Co., on similar lines to, but of
greater dimensions than, the Arizona and the Alaska. She was no less than
500 feet in length, 54 feet wide, 40 feet deep, and registered 7375 tons. Her
engines were compound and consisted of one 70-inch high-pressure
cylinder placed in the centre, and two low-pressure 104-inch cylinders, with
a 6-foot stroke; her boilers had a steam-pressure of 110 lb., and her average
daily consumption of coal was 310 tons.

Page 264

The “Oregon” (Cunard and Guion Lines, 1883).

From about this time the passenger service across the Atlantic began to
assume proportions and a degree of importance to which it had never before
attained. Hitherto the steamers engaged on the transatlantic route had
depended considerably on their cargo capacity as a means of meeting
expenses, but with the demand for larger and faster vessels—and faster
vessels could only be made larger—there was developed an express
passenger boat which depended almost wholly on its passenger
accommodation and carried a much smaller amount of cargo than some of
the older and smaller vessels then engaged in the trade. The Guion Line did
not wholly meet these requirements, and on the death of Mr. S. B. Guion,
the line gradually dropped out of existence, the remaining vessels of the
famous fleet of steamers being dispersed in various directions. Some years
before this happened, however, the White Star Line began to build steamers
for the Atlantic.
The White Star Line has always been the line of big ships. In its sailing-
ship days it owned some of the finest wooden clippers afloat, famous alike
for their size and speed. When Mr. T. H. Ismay in 1867 took over the
management of the line and formed with some friends the Oceanic Steam
Navigation Company, there were already in existence the Cunard, Inman,

Page 265

Guion, and National Lines, which had secured such control of the Atlantic
trade that it seemed almost rashness for the new line to venture to compete
with them. “Nothing venture, nothing win”; the line now holds a position
second to none in the world for the magnificence and size of its steamers.
All its vessels have been built by Messrs. Harland and Wolff at Belfast. The
first of the fleet was the Oceanic, launched on August 27, 1870, which
started on her maiden voyage and the inaugural voyage of the fleet on
March 2, 1871. Several vessels of the same type followed in rapid
succession, all having the straight stem, four masts, and single funnel which
were the distinguishing marks of the White Star steamers in those days. The
Oceanic was 420 feet long, 41 feet beam, 31 feet deep, and had a registered
tonnage of 3707. These steamers were somewhat differently designed from
the other boats on the North Atlantic. The high bulwarks and narrow
wooden deck-houses were dispensed with, and instead another iron deck
was added with open iron railings round it, there being thus nothing to hold
any water that might come on board. The saloons were amidships and
extended the entire width of the vessel, and the staterooms were placed
before and after the saloon and were better lighted and ventilated than those
of any other steamers. The engines also were of a novel type; they were
compound, four-cylindered, and arranged tandem, with two high-pressure
cylinders each 41 inches diameter and two low-pressure each 78 inches in
diameter, working on two cranks and having a stroke of five feet. The
engines were arranged fore and aft, and each formed a complete engine in
itself, so that either could be worked in case of accident to the other. The
Oceanic inaugurated the era of the modern type of express ocean liner.
After a few voyages some alterations were made in her, which added to her
efficiency, her masts being shortened, and a whaleback being built over her
stern. In 1875 she was transferred, together with her sisters the Belgic and
Gaelic, to the Pacific to inaugurate the White Star steam service between
Hong-Kong, Yokohama, and San Francisco.
Two famous sister ships the White Star Line had were the Germanic and
Britannic, built in 1875 and 1874 respectively; they were each 455 feet
long, 45 feet broad, 33 feet 9 inches deep, and of 5004 tons register. The
hulls were built at Belfast, but the engines were by Maudslay, Sons and
Field and similar to those of the Oceanic. With a speed rather above 16
knots, they were the first to reduce the passage to below seven days.
Numerous experiments were made with a lifting propeller in the Britannic,

Page 266

but they were not a success and the principle was never tried in any more of
the company’s boats. The company sought also to improve the lighting of
their steamers. The old system of lighting a ship by candles was seldom
more than enough to make the darkness visible, and oil lamps were not
always much better; so an attempt was made to install a gas-lighting
apparatus. It worked very well while the vessel was in port, the experiment
being made on the Adriatic in 1872, and the Celtic in 1873; but there was a
certain amount of leakage through the working of the ship in a sea-way and
the experiment was abandoned. Oil lamps were then installed in these
steamers and remained in use until superseded by electric light. Another
White Star experiment was with the oscillating saloon, intended to keep
berths and staterooms level while the ship was rolling, but this was no more
a success on the broad Atlantic than it was on the English Channel when
tried in the steamer Bessemer.
Other lines which have played a conspicuous part in the North Atlantic
trade are the State, the Beaver, and the National Lines, all of which owned
some very fine steamers. The last named was founded to run a line between
Liverpool and the ports of the Confederate States when the war should
terminate, but it proved a financial failure and the promoters then decided to
enter the Liverpool and New York trade. Its three vessels, Louisiana,
Virginia, and Pennsylvania, were the largest cargo-carriers on the ocean,
being of nearly 3500 tons gross. Three larger steamers, The Queen, Erin,
and Helvetia, were added in 1864, and three more in the next two years.
The Italy, of 4300 tons, was regarded as a wonderful ship on account of her
size, and is stated to have been the first of her type in which compound
engines were fitted. Other and larger steamers were added to the fleet to
meet its extensive requirements, until it sustained not only a weekly service
each way between Liverpool and New York, but also had regular sailings
from London to New York, calling at Havre. Its steamers were not beautiful
or fast, but were very steady, made cargo-carrying a feature, and conveyed a
great number of emigrants. Then the National Line surprised every one by
bringing out in 1884 one of the most beautiful and graceful steamers ever
seen on the Atlantic, and certainly the fastest of her day—the America,
which, as she was built of steel, belongs properly to a later period of ship
construction. She was 5528 tons gross, built and engined by Messrs. J. and
G. Thomson, and was sold in a few months to the Italian Government.

Page 267

Some years later the line began to decline and it is now a part of the
“Combine,” only two or three vessels being under its flag.

The “America” (National Line, 1884).

The first mail steam-ship line between Liverpool and Canada was started
by McKean, McLarty, and Lamont of Liverpool in 1852 under contract with
the Government, but the effort was a failure, and in the next year H. and A.
Allan undertook the work. Their first steamer was the Canadian in 1853,
followed by the Indian, North American, and Anglo-Saxon, and as the
Grand Trunk Railway was completed next year to Portland, this town
became the winter terminus of the line and Montreal the summer terminus.
Upon the completion of the intercolonial railway in 1876, connecting
Quebec with Halifax, the Nova Scotian port became the winter terminus of
the Allan Line. By 1882 the service had increased to such an extent that the
sailings were made weekly instead of fortnightly. In 1862 the Allans
established a line between Glasgow and Montreal; a few years afterwards
sailings were made between London and Canada, and more recently still
Continental calls were added.

Page 268

The Donaldson Line, established in 1855, has for many years maintained
a service between Glasgow and Montreal, its vessels ranging from sailers to
some of the finest steamers entering the St. Lawrence River. Its present
service is performed with the twin-screw steamers Athenia and Cassandra,
and nine single-screw boats; and another twin-screw boat, the Saturnia, is
shortly to be delivered, and will be of about 8000 tons, the largest in the
company’s fleet. The salient feature of the Donaldson Line passenger
steamers is the carriage of one class of cabin passengers only, called second
cabin. This enables travellers to enjoy the best the ships afford, the
accommodation being equal to that on many long-distance steamers, such
as those that go to Australia. Its first steamer to Montreal was the Astarte in
1874, upon the withdrawal of the line from the South American trade in
which it had been engaged up to then; and its Canadian service, fortnightly
at first, became weekly in 1880. A line to Baltimore, Maryland, was
established in the winter of 1886-7, and the winter service to Canada began
with the Baltimore boats calling at Halifax on their west-bound voyages.
No further attempt was made by the Americans to establish a line of
steamers across the Atlantic until 1871, but in that year Messrs. Cramp of
Philadelphia received orders for four large steamers of over 3000 tons each,
and these with some English vessels maintained the service of the American
Line. In 1884 the Red Star Line took over the line and ran the boats as
cargo steamers. They were again transferred in 1893 to another American
Line which three years later sold them. In the meantime, the later American
Line ordered a number of vessels and, besides buying up the Inman Line,
absorbed the Inman and International, which owned the steamers City of
Paris and City of New York. The new owners dropped the words “City of,”
and also had two steamers built in America to comply with the Act of
Congress under which the line was formed.
The screw propeller was naturally not long in commending itself to the
builders of ships for the long voyages to India and Australia.
Mr. John Dudgeon, in an article published in 1856 on steam expansion
and the suitability of expansion engines for long voyages, was almost
prophetic in his remarks on the relative value of the screw propeller and the
paddle-wheel. In the article he said:
“The application of this property in steam to Australian screw steam
navigation, would, if adopted, effect a radical change in the whole question.
When we find that vessels of the magnitude of the Great Britain have to run

Page 269

thousands of miles out of their course to get a fresh supply of coal, it
becomes a question whether that state of matters may not be amended. I
therefore propose that vessels of, say, 2000 tons be built and fitted with
engines working up to 1100 horses actual power, which would ... consume
1609·5 lb. of coal per hour, and with this power the vessel would steam at
least 10 knots an hour ... equal to 19 tons 4 cwt. per day and a speed of 240
knots; 500 tons of coal would therefore be enough for a run of twenty-five
days, and 6000 nautical miles. Should it be deemed prudent to carry a
reserve stock, coal for an additional 1500 miles would still not seriously
interfere with the carrying properties of a large vessel, while it would
obviate the necessity of having any stoppage but the Cape between Great
Britain and Port Phillip. A vessel of 2000 tons builders’ measurement will
carry at least 2000 tons dead weight, over and above her own weight of ship
and machinery. Presuming that she takes coal for 9000 miles, or 750 tons,
we still have a balance of 1250 tons for cargo and, in a well-arranged
vessel, room for 350 passengers. Now I apprehend that as regularity and
multiplied means of communication are the prime wants in all commercial
matters, we should do better to sail such ships as these, with frequent
departures, than if we were to build vessels of double the size, and have
double the time to wait for a full freight and a full complement of
passengers. No doubt that in a vessel double the size we may manage to
carry coal for the whole distance to Port Phillip, but I apprehend that the
delay of waiting for freight and passengers would more than balance the
delay of coaling at the Cape. It must also be cheaper to send out coals in
vessels adapted for the trade of carrying coal, than to occupy the valuable
room in even a large vessel which ought to be appropriated to the carriage
of that class of goods which will pay for rapid steam communication. The
sole question at issue is: Can a vessel of from 2000 to 3000 tons be worked
with an economy equal to a vessel of from 4000 to 6000 tons? I contend
that not only is such the case, but that the balance of returns, and
convenience to the public, must be in favour of the moderate-sized vessel.
With such Leviathan vessels there is, first, the double outlay upon one ship
and corresponding interest of capital; secondly, there is a double risk in case
of losing the ship; a correspondingly higher premium of insurance;
additional risk of not having full cargo; additional time required for
procuring freight, stowing, and loading vessel, and the almost impossible
feat to be performed of finding a sufficiently large body of passengers ready

Page 270

to go at the same time; the impossibility of entering the ordinary docks in
the kingdom necessitating the use of a port of embarkation at a distance
from the main channel of business. The whole of these weighty objections
then have to be balanced by the economy theoretically presumed to be
attainable by the increased capacity of vessels for carrying coal, cargo, and
passengers. It appears obvious that coal-carrying can be done cheaper by
auxiliary vessels, where the station is in a direct line, than by the vessel
carrying them herself. It is only when the power of carrying coal is so small
or the consumption is so large, that the vessel is forced to make a great
number of stoppages, and make considerable detours to arrive at coaling
stations, that stopping to coal becomes so serious an evil.”
The writer goes on to contend that the propeller should be placed outside
the rudder, so that a coarse pitch may work with proper effect, “as it is
clearly proved that working the propeller in the deadwood destroys a large
portion of its useful effect, so much so that an increase in the pitch of a
propeller to the extent of one-third does not show more slip (when used
behind the rudder) than the two-thirds when used before it.” He further
contended that the proportion of stroke to diameter should be greater in an
engine that is to drive a screw propeller direct than what is required for
applying the same power to a paddle-wheel, and it would soon be found
that as an instrument of propulsion, even for great speed, the screw would
not be inferior to the most approved patent paddle-wheel.
One has only to read a declaration of this character, by one of the leading
shipbuilders of his day, and then compare the situation, the difficulties of
which appeared to him wellnigh insuperable, but every one of which has
passed away, with the frequent sailings of the enormous vessels which
journey the whole of the way between England and Australia under steam
alone without stopping, and carry passengers by the hundred, to realise the
phenomenal developments which have marked the progress of the last fifty
years.
Races between steamers fitted with the rival modes of propulsion were
not uncommon, but did not always take place with official sanction, though
the results were carefully noted. One most exciting race was held by
arrangement in the Channel to test the relative capacities of twin-screw and
paddle boats in March 1865, the competitors being the twin-screw steamer
Mary Augusta and the London, Chatham, and Dover Railway Company’s
new steamer La France, said to be the fastest boat in the Channel service.

Page 271

The screw boat left Greenhithe early in the morning and steamed down to
Dover to wait the departure of the mail steamer. The latter, when time was
taken, was about three cables’ length ahead of and on the weather bow of
the Mary Augusta. The screw drew level, but a hot bearing developed in her
starboard engine, necessitating that engine making fewer revolutions and
causing her to steer badly. She continued to gain however, her rival,
according to a contemporary record, “emitting such immense volumes of
steam and smoke from her two funnels as satisfactorily proved that the
engines were having more steam than they could make use of, and that La
France could never at any time or under any circumstances during her yet
short career have been driven with more purpose to win than at the
present.” After the heated bearing was cooled the Mary Augusta resumed
her full speed and the race was her own from that moment, and she reached
Calais Pier three and a half miles ahead. The Mary Augusta returned to
England at full speed without entering Calais Harbour. The time occupied
by her in the double run from Dover to Calais and back was 2 hours 45
minutes 10 seconds, a rate of speed never equalled by any screw steamer
before. She went to the Thames at full speed in a violent north-east gale and
was back at Gravesend at a quarter-past nine the same evening.
We will now continue the history of the steam-ship services to the East,
Africa, and South America. The P. & O. steamer Himalaya has already been
mentioned. She was built of iron, was launched at Mare’s shipyard at
Blackwall in May 1853, and was originally intended to carry paddle-wheels
driven by engines of 1200 horse-power, but at an early stage in her
construction it was decided that she should be a screw boat. Her engines, by
John Penn and Son, were of 700 horse-power. This steamer was 340 feet
between perpendiculars and 46 feet 2 inches beam, and of 3550 tons.
One notable steamer the company had was the Delta, launched in 1859
by the Thames Iron Works and Shipbuilding Company, and described as the
handsomest of her class yet built on the Thames. She was a clipper-bowed
vessel, carrying stump bowsprit, had two masts, and was fore and aft
schooner-rigged. Her masts and her two funnels raked aft considerably, and
gave her the appearance of possessing great speed. She was 350 feet in
length over all, with a beam of 35 feet 3 inches. The engines, by Penn of
Greenwich, were previously in the Valetta, from which they were taken to
make room for machinery of less power. The change was of benefit to the
Valetta, as she did equally well with her new engines. At her trial in Stokes

Page 272

Bay the Delta averaged rather more than 14¹⁄₂ knots an hour, stated to be a
greater speed than had been attained there by any previous vessel. She was
double the tonnage of the Valetta and carried 300 tons more coal, and had
1200 tons more displacement. Her engines, of 400 nominal horse-power,
gave an indicated horse-power of over 1600.

The “Delta” leaving Marseilles for the Opening of the Suez Canal.

The company kept abreast of the times in its steam-ships, and without
displaying any recklessness was not behind in adopting innovations likely
to be advantageous. Its experiences with the compound engine were not
such, however, as to encourage it to take the lead with new inventions. Its
first essay in this direction was in the Mooltan, built in 1860, and by 1864
several steamers had been constructed with the new and costly engines.

Page 273

“But the result was a grave disappointment. The economy was
undoubted; but the machinery, although it had been fitted by one of the
most eminent firms in the country, regardless of cost, was found to be
unreliable. The accidents were numerous, and although comparatively
slight, they occurred so frequently that the efficiency of the mail service
was in danger of being impaired. The result was that several of the ships
thus fitted had these costly engines replaced by less complex machinery,
involving the company in serious loss. The Mooltan was an example of a
vessel fitted with appliances in advance of the age. Not only were her
engines of the new type, but she was likewise fitted with hydraulic steering
gear and refrigerating machinery; and all these appliances had eventually to
be removed, because they could not be relied on to work satisfactorily
throughout a long voyage. It was not until 1869 that the company succeeded
in building a steamer with high and low pressure machinery which could be
considered thoroughly successful.”[88]
[88] P. & O. Company’s Handbook.

The African Steamship Company was incorporated in 1852 to carry out a
contract with the British Government for conveying the mails monthly to
the principal ports of the west coast of Africa and to Madeira and Teneriffe,
and also to establish a line of steamers between Sierra Leone and the West
Indies. The contract for the mails was entered into by Mr. Macgregor Laird
in December 1851, and was for ten years from the ensuing December,
commencing with an annual payment of £23,250 and diminishing by £500 a
year during the continuance of the contract, thus averaging £21,500 per
annum.
Five steamers were built for this service by Laird of Birkenhead; they
were of iron and were screw-propelled vessels. By 1860 the company was
in difficulties and it was proposed to wind it up, but the directors were
persuaded to try a service between Liverpool and the west coast of Africa,
with excellent results to all concerned for a time, but the control of the
company was not too efficient in London and the concern dwindled until, in
1891, it passed into the possession of Elder Dempster and Co., and then
progressed even more rapidly than it had previously declined.
The Royal Mail Steam Packet Company, who it will be remembered
launched their first steamers in 1841, adopted the screw propeller in 1849
when they launched the Esk. They were the first to adopt screw propulsion

Page 274

for the conveyance of mails. The company assisted the Panama Railroad
Company in 1850 by lending them 125,000 dollars towards the completion
of the railroad across the isthmus, and in January 1851 opened a mail
service from Southampton to Brazil and the River Plate. Several of their
steamers were chartered as transports during the Crimean War. The Dee was
chartered in 1860 to the French Government to convey the “Irish Brigade,”
which had been raised in Ireland to fight for Pope Pius IX. against
Garibaldi, from Havre to Cork on their return from Italy.
In the following year the Confederate States commissioners, Messrs.
Slidell and Mason, were taken by force in West Indian waters by the
Federals from the R.M.S.P. Trent. The “Trent affair,” as the ensuing
international crisis was called, ended in January 1862, when the company’s
La Plata arrived at Southampton with the two commissioners on board.
The Shannon, one of their steamers, arrived at Southampton in August
1864 from the West Indies with a record consignment of specie, consisting
of gold and silver to the value of £1,511,426 in 2207 packages, which was
transferred to the Bank of England in forty-one waggons. In 1869 the
R.M.S.P. transatlantic steamers extended their voyage from Rio de Janeiro
to Buenos Ayres, thus avoiding transfer to smaller vessels at Rio de Janeiro;
the Douro being the steamer inaugurating this extension.
The steam-ship Victoria, built of iron in 1852 for the Australian Royal
Mail Steam Navigation Company, gained the prize of £500 offered by the
colonies for the fastest voyage to Australia. Her time from Gravesend to
Adelaide was sixty days, including two days’ stay at St. Vincent. She was
designed by Messrs. I. K. Brunel and J. Scott Russell for a speed of ten
knots under full steam, and to provide as much passenger accommodation
and space for high-priced cargo as her coal requirements would permit. She
was 261 feet on the water-line and registered 1350 tons. The entrance and
run of the ship were of the wave-like form, while the central 45 feet were
parallel; the bilges were round, the topsides tumbled home, and there was
no external keel, so that she was very heavy in a seaway. The hull was in
twelve water-tight compartments, and longitudinal bulkheads were carried
through from the engine and boiler rooms so as to separate the coal from
the machinery. The engines were of the oscillating type. The ship had four
masts and a sail area of 1540 square yards. Under steam alone the engines
at full power made 59 revolutions per minute and gave a speed of 11 knots,
with a coal consumption of 37 tons per 24 hours. Under sail alone, with the

Page 275

screw held vertically, the speed was 5¹⁄₂ knots, but when the screw was
allowed to run freely the speed increased to 7¹⁄₂ knots. Her average speed
was nearly 11³⁄₄ knots.
The Pacific Steam Navigation Company’s operations were confined to
the west coast of South America until 1865, when, in pursuance of a
supplemental charter, it extended its sphere to the River Plate. Steamers
were specially built for the service, and in 1868, the Pacific, after being
about three years on the coast, sailed for Liverpool from Valparaiso to
inaugurate the new mail service. Six other iron screw vessels were added
and the venture proved so profitable that it was determined to make the
sailings fortnightly, and the steamers Chimborazo, Aconcagua, Garonne,
Cuzco, and Lusitania were built. All these steamers were afterwards in the
Orient Line’s service to Australia, together with the John Elder, which was
one of the earlier batch of boats on the Liverpool-Valparaiso route. Seven
more steamers were added in 1871, and by 1873 the number of new vessels
totalled eighteen. They were all clipper-bowed barque-rigged steamers and
were very handsome craft. After this the company went in for the straight
stem and pole-masted type of steamer.
The rivalry in the various over-sea trades was very great, and no sooner
did one shipowner secure a vessel which surpassed its competitors than
other owners sought to improve upon it. The sailing ships were soon
obliged to give way to the steam auxiliary vessels, especially when craft
like the Lightning appeared. The Lightning was built by the Hendersons of
Glasgow, and so pleased were her owners, Messrs. Apcar of Calcutta, and
their representative, Captain Durham, with her, that he ordered the Thunder.
The Thunder was built by Mr. Lungley at his yard on the Thames and
engined by Messrs. Dudgeon, and was an improved edition of her
predecessor.
The Thunder was launched in December 1859, and soon demonstrated
that she was the fastest steamer yet provided with a screw propeller. She
was a handsome vessel, ship-rigged, with clipper bows, and her masts and
funnels had a slight rake which gave her a very attractive appearance. Her
length was 240 feet between perpendiculars, beam 30 feet, depth 22¹⁄₂ feet,
and her tonnage, builder’s measurement, was 1062. The engines were of
210 nominal horse-power with cylinders of 55 inches diameter, and a piston
stroke of three feet. A peculiarity in her boilers was that they consumed the
fuel and heat in furnaces and tubes to the point that the remainder escaped

Page 276

up the chimney and heated the superheater to a temperature of 300 degrees,
without regulation. On her trial trip she travelled at the rate of at least
seventeen statute miles per hour, and afterwards did even better. Her coal
consumption also was the lowest then attained, being about one pound per
indicated horse-power per hour. Her screw was of the ordinary type and was
placed outside the rudder. The Lightning and the Thunder were both
employed in the China trade.

The “Thunder.”

The first ocean-going screw steam-ship of her class to which the modern
double or twin-screw system was applied was the iron vessel Far East,
which was launched from Dudgeon’s yard, Millwall, towards the close of
1863. She was intended for the China tea trade of the owners of the
Lightning and Thunder. The Far East was 227 feet between perpendiculars
and 210 feet on the keel; 34 feet beam, 22 feet moulded depth, and 20 feet 6
inches depth of hold; her depth at load water-line was 17 feet, her

Page 277

displacement 2200 tons, and her builder’s measurement tonnage 1258 tons.
On her upper deck she had a capacious poop and forecastle, and there were
deck-house and cabins amidships. Her engines were of 150 nominal horse-
power, driving a two-bladed lifting screw under each quarter. The engines
had annular combined cylinders, the diameter of the high-pressure cylinder
being 24 inches and of the expansive cylinder 50 inches, with a piston
stroke of 24 inches. The screws were 8 feet 2 inches in diameter, with a
pitch of 16 feet. Each of the two boilers had six furnaces with 109 square
feet of firebar surface, and a tube surface of 1883 feet. The shafting of the
screws projected through a wrought-iron tube of great strength bolted to a
false iron bulkhead clear of the ship’s frame. The tube at its outer end was
connected with a wrought-iron slide, which guided the screw to the well
when being lifted, or to the shafting when being lowered. The screws were
raised by a worm and barrel apparatus. The lower and top masts were of
iron bolted together through flanges, and the topgallant masts fitted closely
into the topmast heads, so that the masts from deck to button looked like
immense slender poles. There were no tops, but light iron cross-trees spread
the rigging, and preventive top and topgallant backstays were carried far aft
of the lower rigging. Her funnel was placed well abaft the main-mast. She
was given a full rig on all three masts, and in addition carried fore and main
try-sails.
No sooner was she afloat than the double-screw steamer Pallas was sent
into the water from the adjoining slipway; this being the first time on record
that two iron twin-screw vessels were launched from the same yard on the
same day.
In January 1865 the double twin-screw steam-ship, Louisa Ann Fanny,
was launched, and as it was thought she might possibly be acquired by the
Confederates, the bunkers were so arranged as to afford ample protection
for her engines from hostile shot. Her machinery consisted of horizontal
direct-acting engines with cylinders of 40 inches diameter, and 22¹⁄₂ inch
stroke, driving two three-bladed screws of 9 feet 3 inches diameter and a
pitch of 17 feet 3 inches, the distance from centre to centre of the screws
being 10 feet 10 inches. She attained, when loaded, a speed estimated at
15³⁄₄ miles an hour after allowing for the tide.
Want of space has prevented the relation of further details of the steam-
ship history of the period, though a few from the long list of steam-ship
companies of other countries may be mentioned. The Messageries

Page 278

Maritimes de France grew out of a company formed to carry inland mails.
In 1851 they contracted to carry some of the oversea mails, and extending
their operations as the years went on are now the largest steam-ship
company in France. The next largest French company is the Compagnie
Générale Transatlantique, which was formed in 1862 and is also a mail
carrier. To this company belong the largest steamers ever constructed in
France. The Hamburg-America Company of Germany launched its first
steamer, the Borussia, in 1855 for the Atlantic service, and the
Norddeutscher Lloyd followed in 1856 with the Bremen. These boats were,
however, built in Great Britain, as all large German steam-ships were until
comparatively modern times. The Austrian Lloyd Steam Navigation
Company, which belongs to Trieste, was founded as far back as 1836 for the
Mediterranean service.
This chapter may be fitly brought to a conclusion with a reference to the
Great Eastern—the wonder and the failure of her age in popular estimation.
To the general public she appeared as an extraordinarily large ship which
was a complete failure as a commercial undertaking. To a few she was the
embodiment of all that skill and scientific genius had conceived in
construction up to that time. She was the great illustration of the
longitudinal system of construction invented by Scott Russell, and of the
use of longitudinal and transverse bulkheads.
Scott Russell’s invention of the longitudinal frame was due to his
perception of the fact that as vessels increased in size the longitudinal strain
would become greater, especially when they were carrying heavy
machinery amidships or nearly so. In the vessels of the size then
constructed the longitudinal strain experienced by small iron ships was
comparatively small. One method adopted to strengthen hulls longitudinally
was to give them a number of floor-plates, forming a strong continuous
keelson. Other keelsons were also constructed to run fore and aft near the
bilges; a bilge stringer was added, while on the outside, bilge keels were
sometimes fixed. Russell introduced the system in 1835, but the registration
societies did not look with approval on the innovation and nothing came of
it at the time.
As ships were made larger, however, the nature of the stresses they had to
bear became better understood, and precautions had to be taken to prevent
the hogging and sagging to which they are subjected by the motion of the
sea, besides the lateral and other stresses. In 1835-6 Mr. Russell built three

Page 279

small iron vessels, one of which had a longitudinal middle-line bulkhead
and four transverse bulkheads connected by longitudinal stringers and
without transverse frames. The other two had no longitudinal bulkheads but
were fitted with a greater number of transverse partitions and stringers. He
applied the latter method in 1850 to a small iron screw boat on the Humber,
and in her some deep web plates were fastened by angle irons to the shell-
plating and were also stiffened with angle irons along the inner edge. The
inventor described this arrangement as being ordinary transverse bulkheads
with the whole of the centre portion removed. The same year he built an
iron paddle-steamer, 145 feet in length by 15 feet beam, and 7 feet 6 inches
depth, on the longitudinal principle. Notwithstanding its extraordinary
length in proportion to its beam and depth the vessel was a perfect success.
One notable vessel constructed on this principle was the Rhenus, 197 feet
over all, by 25 feet extreme breadth, and 9 feet depth, and drawing only 3
feet of water. These vessels, which were almost experimental in character,
were followed by several others of a more highly developed type, such as
the Baron Osy, a fine and fast paddle-steamer launched in 1855 for the
London and Antwerp service. She was strengthened with the partial or open
bulkheads of the type already described, which acted as frames, and had
broad top stringers under the deck. This vessel had an oscillating
condensing engine with two cylinders, and her paddles gave her a speed
above that of other vessels on the route. The success achieved by her, both
in regard to constructional strength and seaworthiness, had not a little to do
with the designing of the Great Eastern. Before this, however, in 1852,
Scott Russell designed with Brunel, who was consulting engineer to the
Australian Royal Mail Steam Navigation Company, two steamers, the
Victoria and Adelaide, on the wave-line principle, but they were not on his
longitudinal system though including some of its features. In these vessels
he introduced for the first time fore and aft bulkheads amidships combined
with a part iron deck. They had an important influence on the adoption of
the longitudinal system, as the constructional strength of the vessels was
provided for by the addition of a flat keelson extending almost to the bilges
and connected at either side with a longitudinal bulkhead which formed the
coal bunkers and rose as high as the main deck, the hull thereby being
transformed into a powerful box-girder. The experience derived from these
vessels caused them to be the forerunners of the Great Eastern, and like her
they were a financial failure. They could not carry enough fuel for the

Page 280

voyage, and this and other considerations led Brunel to design the great ship
in an attempt to solve the difficulties to which these vessels had directed
attention. He estimated that the vessel would be able to attain a speed of 15
knots at a less coal consumption per ton than any steamer in existence. The
Eastern Navigation Company was formed in 1851 and decided on the
construction of a steamer in accordance with his views. It was proposed to
run a line of big steamers to the East, via the Cape of Good Hope, and as
the vessels were referred to as Leviathans the name Leviathan was chosen
for the first (and, as it happened, the last) vessel the company ever owned.
This was the Great Eastern. The lines of the vessel were designed by
Russell, who also built the hull. The details of the ship’s construction were
settled by Russell and Brunel; the longitudinal system was adopted,
together with the bulkhead system, to which Russell attached such
importance.
The Great Eastern was built with an inner skin from the keel to the
water-line, thus being a double-hulled vessel. The inner and outer skins
were of the same thickness of iron plates, the bottom plates being one inch
thick and the other plates three-quarters of an inch. The space between the
two hulls was 34 to 36 inches, and this was estimated to hold 2500 tons of
water-ballast if required. The transverse iron bulkheads divided the ship
into a number of compartments, each sixty feet long, and in order to add to
the strength of the ship and increase her safety in case of collision, there
was no opening in these bulkheads lower than the level of the second deck.
For 350 feet of her length the vessel had two longitudinal bulkheads 36 feet
apart, beside which there was a second intermediate bulkhead up to the
main deck, forming a coal bunker. Five of her six masts were of iron and
hollow, and the sixth of wood.

Page 281

Model of the “Great Eastern.”

The project of building this enormous ship was received with enthusiasm
by the public. Every item of news, correct or otherwise, was welcomed
eagerly, and the newspapers vied with each other in the extravagance of
their assertions. She had both paddle-wheels and a screw propeller, and it
was confidently stated that she would attain a speed of even twenty-five
miles an hour, and this, it was thought, might be exceeded if she had a
strong favourable wind and used both her mechanical aids. Her size was
expected to make her indifferent to the storms of the ocean, and her
behaviour at sea was confidently prophesied under all sorts of conditions.
Chambers’ Journal published an article in which the powers of the vessel
were set forth, and in which it said:
“It has generally been conceived that the ill-fated President steam-ship
snapped across some Atlantic wave, as a match might be snapped between
the fingers; the still more gigantic Great Western, Himalaya, Atrato, and
Persia have, however, since that unfortunate accident, continued to plough
their ways in safety through the ocean storms. The Great Britain lay for
months among the breakers of the rock-bound coast of Ireland, and yet
finally floated off unscathed, to render good service to the British
Government as a transport in time of need. The grand experiment of the
cyclopean order of naval architecture is, however, in preparation, and
shortly to be put to the test. The Great Eastern Steam Navigation Company

Page 282

have for some time been engaged in building an iron ship upon a scale, both
as regards absolute dimensions and strength of material, that will at once
change all its leviathan predecessors into pigmies.
“The upper deck runs flush and clear from stem to stern for a breadth of
about twenty feet on either side, thus affording two magnificent
promenades for the passengers just within the bulwarks. These promenades
will be each rather more than the eighth part of a mile long. Four turns up
and down either of them would exceed a mile by 256 feet. The vessel when
launched will be more than as long again as the steam-ship Great Britain; it
will be nearly three times as long as the line-of-battle ship the Duke of
Wellington, and nearly as long again as the Himalaya; eighty-eight feet
more would make it as long again as the Persia, at present the longest
vessel afloat upon the ocean.
“It is anticipated that this multiplication of internal braces and supports
will be sufficient to enable the hollow hull to resist, as a whole, very much
more violence and much heavier strains than the elements can ever inflict
upon it.
“It is calculated that a sharp long wedge of this kind, impelled by the
force of nearly 4000 horses, and extending its length on the water along a
distance of nearly 700 feet, will pass through it with the speed of twenty
miles an hour. This would be amply sufficient to enable it to make the
voyage to India, round the Cape of Good Hope, in thirty days, or to
Australia in thirty-three days.
“The anchors alone will weigh 55 tons, and there will be 200 tons of
capstans, cables, and warps connected with them. These ponderous
implements obviously could not be wielded by human hands, and
accordingly steam-sailors will be prepared to do what the flesh-and-blood
sailors would not be able to accomplish. There will be journeymen steam-
engines stationed conveniently for effecting the anchoring and weighing,
and, indeed, for performing many other services ordinarily carried out by
the crew. Possibly there will be steam-steersmen for the guidance of the
mass. It is on account of this supplementary and subsidiary steam-service
that only 400 men will be needed to work so vast a ship.

Page 283

Longitudinal Section of the “Great Eastern.”

“Once again, how will the winds and the waves affect this leviathan
mass, when they chance to be in their surly and ungenial moods? A
connected mass of 27,000 tons is not as easily heaved as a cork or a cockle-
shell; but the storm-winds and the storm-waves of the open ocean have a
tremendous power. What will they do then, with this stupendous morsel,
when they have it fairly within their clutches? The heaviest hurricane-wind
blows with a force that would act upon a square foot of resisting surface
with a pressure equivalent to a weight of 40 lb. Such a wind could only heel
the leviathan with its full load out of the perpendicular to the extent of six
inches even if it struck it quite on the side! The waves of a fresh sea run
about 100 feet long. Those of a moderate sea are 300 feet long. Of such the
leviathan would take two at once, and would preserve the while almost an
even keel. The highest storm-waves ever seen on the wide and deep ocean
are only 28 feet high from trough to crest, and 600 feet long from trough to
trough. Of course the leviathan would still take two at a time, when the

Page 284

crest of one was near to the bow, and the crest of the other near to the stern.
Under the most unfavourable circumstances such waves would not disturb
the horizontal equilibrium of the deck line to the extent of more than five
degrees.... The captain of the leviathan will have a cabin for himself,
situated conveniently near the centre of his domains, on the mid-deck, and
between the huge paddle-boxes. But placed here like a spider lurking in the
centre of its web with outstretched attentive feelers, he will have to use his
telescope to see what is going on at the bows and stern; and the old
contrivance for issuing orders, the speaking trumpet, will be altogether out
of date and valueless in his hands. His voice, even with this aid, would
hardly be heard half-way to the stern. He will have to signal his directions
to his officers by semaphore arms by day and by coloured lamps by night.
He will also have electric-telegraphs ramifying to the engine-rooms, and to
other places to which it may be necessary that his instructions should be
instantaneously communicated. The compasses will be placed aloft on a
staging reared forty feet above the deck, to remove them from disturbing
influences inherent in the vast masses of iron below; and it is proposed that
strong shadows of the needles shall be cast from a tube, so that the
steersman may at once watch these shadows, and so follow exactly the
movements of the compasses as they traverse. It is also proposed to carry a
perpetual moonlight diffused around the ship, emanated from an electric
light planted on the foremast head.
“Up to the present time £350,000 has been expended upon this wonderful
construction, and by the time the vessel is ready for sea, this sum will have
been augmented into nearly £800,000. It will, however, be understood that
there is a fair capacity in the vast vessel for yielding a revenue ample
enough to render the undertaking a commercial success, notwithstanding
this great cost, when it is borne in mind that if the fares for a single outward
or homeward passage to India or Australia for the three classes be fixed
only at £65, £35, and £25 respectively, the passage-money alone for the
voyage out and home would amount collectively to something beyond
£300,000 if all the berths were occupied. It is an interesting fact that naval
engineers fix the amount of tonnage required in a steam vessel designed for
any particular voyage by a very simple standard; they consider that one ton
of burden is needed for every mile to be traversed; hence it is that this vast
steam-ship has been made capable of carrying 25,000 tons. It is intended to

Page 285

go in every voyage 25,000 miles: it is a distance equal in extent to the
circumference of the world.

Caricature of the “Great Eastern,” from a Contemporary Print.

“It is estimated that this great vessel with 5000 tons of merchandise and
her complement of 4400 living beings would still be able to store enough
coal for her consumption during a complete circumnavigation or a voyage
out and home.”
The iron plates used in the construction of her hull weighed 10,000 tons
and to fasten them together required three million rivets. Her length was
680 feet, breadth 82¹⁄₂ feet, depth 58 feet, and displacement 27,384 tons.
The paddle-engines were of 1000 nominal horse-power and worked up to
3411; and weighed no less than 836 tons. The four cylinders weighed when
finished 28 tons each, they were 74 inches in diameter and had a stroke of
14 feet. Each of the two right-angle cranks was driven by two cylinders,
inclined at a mean angle of 22¹⁄₂ degrees from the vertical. Each paddle-
wheel was worked by a complete double-cylinder engine and could be
revolved without the other if necessary. Four double-ended tubular box
boilers supplied steam for the paddle-engines at 24 lb. pressure. They were

Page 286

each 17¹⁄₂ feet long by 17 feet 9 inches wide, and 13 feet 9 inches high, and
had forty furnaces and 4500 square feet of heating surface. Each boiler
weighed fifty tons and contained about forty tons of water. Her first paddle-
wheels were 56 feet in diameter, but these were damaged in some rough
weather, and the next pair, only 50 feet in diameter, were much stronger and
equally serviceable in the matter of speed and lasted out the ship. Her
calculated speed under both screw and paddles was 15 knots and under the
wheels alone seven knots. She certainly never approached the fanciful
speeds predicted for her by the newspaper enthusiasts, and it is only fair to
her builders and designers to say that these prophecies did not originate
with them.
The engines for the screw propeller by James Watt and Co. were
horizontal and direct-acting, and were of 1800 nominal horse-power and
4886 horse-power indicated. They weighed 500 tons. Six double-ended
tubular rectangular boilers gave steam at 25 lb. pressure. The propeller was
a four-bladed cast-iron screw 36 tons in weight, and of 24 feet diameter and
44 feet pitch. The shaft of the propeller weighed 60 tons and was 150 feet in
length. So as not to interfere with her speed when the screw should not be
working, two small auxiliary engines were fitted to keep it revolving when
disconnected from the main engines. Her speed under the screw alone was
about nine knots.
Her longitudinal bulkheads were carried to the uppermost deck, which
was perfectly flush and extended from one end of the ship to the other. An
iron deck connected the head of each longitudinal bulkhead with the ship’s
sides and this, being at the greatest possible distance from the bottom of the
girder, was in a position to contribute most to the longitudinal strength. The
Britannia Bridge over the Menai Straits has its top and bottom flanges of
cellular construction, and Brunel practically repeated this formation in the
Great Eastern, by making both the bottom and the upper deck cellular.
The launch of the Great Eastern was arranged for November 3, 1857,
and it was not till then that it became known that this was to be the vessel’s
name and not Leviathan. The vessel moved only a few feet and then stuck.
One of the causes of the hitch was that the ship was being launched
sideways, thereby greatly adding to the difficulties of the operation. Another
attempt a few days later did not move her an inch. On January 11 she was
got a little nearer the water and the next day was moved a little farther; she
was finally launched at the next spring tides at the end of the month.

Page 287

Model of the Paddle-Engines of the “Great Eastern.”

“It is incomprehensible how so eminent an engineer as Brunel should
have made such a mistake as to attempt to force so huge a fabric broadside-
on into the river. The costly experiment added £120,000 to the cost of the
ship, and practically ruined the company.”[89]
[89] Kennedy’s “History of Steam Navigation.”

As the company had not the money to finish her, it was wound up and the
ship was sold to another company, formed to take her over, the price being
£160,000. It was necessary to raise another £300,000, and as the financiers
would not find the money, the public was appealed to and responded to the
extent of £50,000 from some of the humblest classes in the community,
“without any expectation of profit, but solely that they might hear of the
great ship, which they looked upon as the pride of England, being fairly
afloat on the deep waters.”[90]

Page 288

[90] Illustrated London News, August 13, 1859.

Her first trial trip took place in September 1859 and was marred by an
explosion which killed six men, wounded several others, and wrecked the
saloon. She was designed to carry 800 first-class passengers, 2000 second-
class, and 800 third-class, or 10,000 troops, it being expected that the
Government would utilise her as a troopship. Her first voyage was made,
not to India, to which she never went, but to New York, to which she took
36 passengers. She left Southampton on June 17, 1860, and arrived on June
28, all New York turning out to see her. Her best day’s run was 333 miles,
and at no time did she exceed 14¹⁄₂ knots an hour. On her homeward voyage
she did rather better, as she carried 212 passengers and a large cargo in a
passage of 9 days 11 hours. Her one experience as a trooper was when she
took 2125 soldiers to Canada at the time of the Trent affair. On her next
outward voyage she met with a gale in which her steering gear was
rendered useless and she was nearly lost. In 1865 she was engaged in laying
the Atlantic cables. She was employed in this kind of work for some years,
off and on, until in 1886 she was acquired by an enterprising drapery and
tea firm and used as a show-place and advertisement. In 1890 she was sold
to be broken up, and thus disposed of in small lots at little better than old
iron prices. The Great Eastern was an unlucky ship from start to finish.
From the bankruptcy of Mr. Scott Russell some time before she was
launched until she was left to rust on a Mersey mud-bank, almost every one
concerned with her had a share of her misfortune. The one task in which she
acquitted herself well was the Atlantic cable-laying.
But her significance in the history of steam-ship construction must not be
under-estimated. Sir William H. White’s opinion on this point was given in
his address to the Institution of Civil Engineers, in 1903, as follows;
“Having recently gone again most carefully through Brunel’s notes and
reports, my admiration for the remarkable grasp and foresight therein
displayed has been greatly increased. In regard to the provision of ample
structural strength with a minimum of weight; the increase of safety by
water-tight subdivision and cellular double bottom; the design of propelling
machinery and boilers, with a view to economy of coal and great endurance
for long-distance steaming; the selection of forms and dimensions likely to
minimise resistance and favour good behaviour at sea; and to other features
of the design which need not be specified, Brunel displayed a knowledge of
principles such as no other ship-designer of that time seems to have

Page 289

possessed, and in most of these features his intentions were realised. To him
large dimensions caused no fear. ‘The use of iron,’ he remarks, ‘removes all
difficulty in the construction,’ and experience of several years has proved
that size in a ship is an element of speed, strength, and safety, and of greater
relative economy, instead of a disadvantage, and that it is limited only by
the extent of demand for freight, and by the circumstances of the ports to be
frequented.”

Page 290

CHAPTER X
THE BUILDING OF STEEL SHIPS

s early as 1853 mild cast steel had been suggested for
shipbuilding, and in 1855 Howell introduced it as
“homogeneous metal,” but shipbuilders took little notice
of the suggestion for some years. Robert Napier and Sons
received orders in 1858 for some high-pressure boilers and
marine machinery where lightness combined with strength
was of the utmost importance, and it was proposed to use
“homogeneous metal” for the one and puddled steel for the other instead of
the wrought iron which was ordinarily employed. Steel as then made was
very brittle and many attempts were made to remedy this defect. David
Kirkaldy made a series of important experiments which lasted three and a
half years and attracted the attention of the Scottish Shipbuilders’
Association. His principal service was the discovery and placing on record
of the effects of oil hardening upon the properties of steel.
The Ma Robert is said to have been the first steel steamer ever built; she
was constructed by Laird’s for the Livingstone expedition to the Zambesi.
High tensile steel was used with a limit of elasticity of about twenty-three
tons, which is very similar to the metal used in the Mauretania and
Lusitania where stresses are to be met. Strength and lightness were essential
in the Ma Robert and therefore the new material was used. The little vessel
was 73 feet long, 8 feet wide, and 3 feet deep, and was flat-bottomed and of
very little draft. But the hull corroded badly and leaked very much, and the
steamer came to grief on a sandbank in the Zambesi.
The Rainbow, built of steel plates in 1858, was a smart, handsome
paddle-boat, schooner-rigged, and carrying two very tall masts. She had a
high-pressure engine and her steam-pipe emitted the energetic snort which
was peculiar to the locomotive of the time. Indeed her high-pressure
machinery made such a noise that she could be heard from one side of the
Mersey to the other. She was intended for the Niger Exploration expedition,

Page 291

and on her trial attained a speed of between twelve and thirteen miles an
hour. She was 130 feet long by 16 feet beam. Although her plates were only
one-eighth of an inch thick she had the stiffness and rigidity of a strong
ship, and there was almost an entire absence of vibration from the engines.
Her boilers, which were of puddled steel plates, were proved up to 200 lb.
on the square inch, though they were only worked at 50 to 60 lb. The engine
was of 60 nominal horse-power, working up to 200 indicated. The hull was
divided athwartship and longitudinally by bulkheads into ten or twelve
water-tight compartments.
It must be remembered that these experimental steel boats were intended
for inland navigation, and being taken to Africa were withdrawn from the
observation of practically every one who was competent to judge of the
relative merits of iron and steel. Certainly no one attempted to build a steel
boat for the ocean for some years afterwards, and it was not until 1875,
when the Admiralty, acting upon observations made in the dockyards of
France where steel was being used, represented to British manufacturers the
importance of improving the quality of steel, that the Siemens-Martin
process was brought out, and in consequence two cruisers were constructed
of steel produced in this way.

The “Britannic” (White Star Line, 1874).

Page 292

The “Umbria” and “Etruria” (Cunard).

With the launching of the Rotomahana, an ocean steel steamer of 1777
tons gross built by W. Denny and Bros. in 1879 for the Union Steamship
Company of New Zealand, the iron age of the steamer may be said to close
and the age of steel to begin. It has been shown how iron slowly but surely
replaced wood in construction; when the superiority of steel to either had
been practically demonstrated the change from iron to steel was rapid. In
1891 over 80 per cent. of the steam-ships under construction were of steel.
The Rotomahana was followed in 1881 in the transatlantic trade by the
Allan liner Buenos Ayrean. The Allan Line has always been to the fore in
the provision of first-class steamers. They were the first to have a steel
ocean steamer; the first to adopt bilge keels on vessels, the Parisian in 1884
being fitted with them; and they were the first to make the experiment with
turbine-driven steamers for ocean traffic in the Victorian and Virginian in
1903. These two vessels are 540 feet in length by 60 feet in breadth, and 40
feet 6 inches in depth. They are of 12,000 tons register, and have a speed of
17 knots. Besides these, the company has five twin-screw boats of tonnages
ranging from 9000 to 11,000 tons, and twenty-two screw boats from 3000
to 5395 tons.
The Cunard Line’s first steel steamer was the Servia, built by Messrs. J.
and G. Thomson, and completed in 1881. She was 515 feet in length, and of
7392 gross tonnage, and her engines, of 10,000 indicated horse-power, gave
her a speed of 17 knots. Incandescent electric lamps were fitted in her, she

Page 293

being the first of the fleet to carry them. The Aurania, of slightly less
length, but of equal speed, and also of steel, was built in 1883. After her
came the Umbria and Etruria, steel single-screw steamers, with engines of
14,500 indicated horse-power, giving them a speed of 20 knots. The sisters
Campania and Lucania, steel twin-screw vessels of 12,952 tons, were
added for the New York trade, and later the Caronia and Carmania. They
were sisters except in their engines; the latter being the company’s first
turbine experiment, and having triple propellers. They are each 675 feet in
length by 72 feet 6 inches beam, and 43 feet 9 inches moulded depth.
The Etruria was sold in 1909 to the shipbreakers for £16,750, and with
her there ended another chapter in the history of the navigation of the North
Atlantic. She was a “flyer” only a few years before being disposed of, her
record passage from Queenstown to New York being 5 days 20 hours 55
minutes, and her eastward passage 6 days 37 minutes. She was built to
outstrip the Oregon, a vessel built for the Guion Line in 1883 by John Elder
and Co., and known from her speed of 18 knots as “the greyhound of the
Atlantic.” The same builders were ordered by the Cunard Company to
eclipse her, and constructed two steamers, the Etruria and Umbria, which
for many years were the fastest ships afloat. Before they left the builders’
hands, however, the Oregon was acquired by the Cunard Company. The two
Cunarders had the largest compound engines in existence. These boats were
500 feet between perpendiculars, 57 feet 3 inches beam, and 40 feet
moulded depth. They were each of 8127 tons gross, and had engines of
14,500 indicated horse-power, giving them an average speed of 19 knots. It
was stated of them at one of the meetings of the Cunard Company that “no
ships ever gave their owners less uneasiness than these two, and no ships
have done such an extraordinary amount of good work. They are
monuments that cannot lie to the skill of the design and the faithfulness of
the labour that went to their accomplishment.”

Page 294

The “Mauretania” (Cunard, 1907).

Page 295

The “Campania” (Cunard, 1892).

The Cunard express steamer Mauretania, sister ship to the Lusitania,
launched at Clydebank, was constructed on the Tyne by Messrs. Swan,
Hunter, and Wigham Richardson, Ltd., who were already represented in the
Cunard fleet by the Ultonia, Ivernia, and Carpathia. A description of the
Mauretania given by the builders and the Cunard Company states that the
flat keel-plate is five feet wide and three and three-quarter inches thick, and
forms a portion of the bottom of the ship. Associated with this flat keel is a
vertical keel, five feet high and one inch thick, and to this vertebra are
attached, directly or indirectly, the frames and beams which make up the
skeleton. The double bottom is divided by this vertical keel and the
transverse frames into compartments in which water-ballast may be taken.
The tops of these tanks are carried well round the turn of the bilge, so that
should the bilge keels be torn away and the hull pierced, the entering water
would be confined between the inner and outer bottoms. As a further

Page 296

precaution towards securing insubmersibility, the lower deck is made
completely water-tight. Below it are the orlop and lower orlop decks, and
above are the main, upper, shelter, promenade, upper promenade, and boat
decks—nine decks in all. Automatically closing water-tight doors are fitted
in the bulkheads, and can be closed from the navigating bridge in a few
seconds. The Mauretania has 175 water-tight compartments, so that it is
claimed for her that she is as unsinkable as a ship can be.
“The steel plates which cover the ribs or framing of the vessel or are used
for the decks, bulkheads, and casings, or in other ways, number 26,000, the
largest being about 48 feet in length, and weighing from four to five tons.
To secure these plates to each other and the structural framework of the
ship, over 4,000,000 rivets have been used, aggregating in weight about 500
tons. The largest rivets are used in the keel-plate, and these are eight inches
in length and weigh 2³⁄₄ lb. The main frames and beams placed end to end
would extend thirty miles; the rudder, which has two sets of steering gear,
both of which are below the water-line, weighs 65 tons, and the diameter of
the rudder stock is 26 inches. The castings for the stem, stern-post, shaft
bracket and rudder together weigh 280 tons. Her ground gear is, with that
manufactured for her sister ship, the Lusitania, the strongest yet made. The
three anchors each weigh ten tons, while the 1800 feet of cable is composed
of 24-inch links, the iron in which is 3³⁄₄ inches in diameter and the weight
of each link about 1¹⁄₂ cwts. This mighty harness has been vigorously tested,
sample links and shackles emerging successfully from a test strain of 370
tons.
“The principal measurements of the Mauretania are:
Length 790 feet.
Breadth 88 „
Depth (moulded) 60 „
Gross tonnage 32,500 tons.
Displacement tonnage 45,000 „
Load draught 37 ft. 6 ins.
Height of funnels 155 feet.
Diameter of funnels 24 „
Height of masts 216 „

“Figures, however, convey but a bare idea of the great size. A favourite
standard of comparison in shipping is the leviathan of Brunel, the Great
Eastern, the mammoth steamer, which, born before its time, yet solved in
her construction many of the most difficult problems with which the

Page 297

modern builders of big ships have to grapple; yet the Mauretania quite
dwarfs the gigantic Great Eastern, as the following figures show:
Great Eastern. Mauretania.
Length 692 feet. 790 feet.
Breadth 80 „ 88 „
Displacement 27,000 tons. 45,000 tons.
Paddle, screw, and sail. Quadruple screws.
Speed 13 to 14 knots. 25 knots.

“The Great Eastern was an experiment, but there is nothing of the
experiment about the Mauretania and her sister, the Clyde-built ship
Lusitania. The valuable data obtained from the running of the 20,000-ton
turbine Cunarder Carmania has afforded a valuable object-lesson in
adapting the turbine method of propulsion to liners of the leviathan class,
demonstrating the suitability of the steam turbine to the largest type of
vessel.
“The Mauretania is propelled by turbine engines of about 70,000
indicated horse-power, driving four shafts, each of which is fitted with one
three-bladed propeller of manganese bronze. The outermost shafts are each
connected with a high-pressure turbine, the inner shafts being rotated by the
low-pressure turbines.
“The boilers and turbine engines of the Mauretania were constructed by
the Wallsend Slipway and Engineering Company, Ltd., of Wallsend-on-
Tyne. There are twenty-three double-ended and two single-ended boilers,
and one hundred and ninety-two large furnaces. The boiler plates are the
largest yet made. The steam is conducted from the boilers into the turbines,
of which there are four.” The turbines contain about 3,000,000 blades,
rotating four shafts, the united length of which is close upon 1000 feet with
a weight of about 250 tons, each shaft carrying 17,000 or 18,000 indicated
horse-power. Under the covenant with the Government made at the time she
was arranged to be built, she is fitted for an armament of 12 six-inch guns.
Her rudder and both sets of steering-gear are below the water-line, and in
the way of the engine and boiler rooms there are side bunkers which, filled
with coal, are equivalent to an armour-belt round the vulnerable portion of
the ship.
Although the Mauretania and Lusitania are usually spoken of as sisters,
there are some differences in the design. They are the same length, but the
former is six inches deeper, which adds about 500 tons to her registered

Page 298

tonnage. Special high tensile steel was used to a greater extent in the
construction of the Mauretania, making that vessel something like 1000
tons lighter. Her lines are slightly finer, and it has been claimed to account
for her speed that there is some superiority in her engines.
In regard to the structure of the Lusitania, it is stated that with the whole
structure of mild steel Lloyd’s accepted a stress of ten tons to the square
inch, and that in view of the strains thrown upon the upper works a high
tensile steel of less scantling was adopted for those parts; a material having
been discovered with a tensile strength 20 per cent. greater than mild steel,
a reduction of 6 per cent. in the scantlings was allowed from those for mild
steel. The Cunarders were not the first vessels by many years in which high
tensile steel of a strength of thirty-six tons was used, as it was introduced
twenty-three years ago in the steam-ship America.
Whether the great Cunarders pay in the financial sense is known only to
the management of the line, but there is no denying that they are a great
national asset. A detailed estimate, published at the time they were about to
make their first voyages, placed the expenditure at £17,990 per voyage, and
the income, allowing for a full passenger list, at £31,350.[91] But this did not
profess to be more than a general estimate and in no sense official. The
question has been raised in various quarters whether an equal speed could
not have been obtained from reciprocating engines with a less consumption
of coal; as a reply to this view it has been pointed out that the sizes that
would have been required for the ingots, &c., for the machinery were
beyond the capabilities of our steel manufacturers, and thus, as so often has
happened, the new set of conditions was met by the new development of
invention.
[91] Liverpool Courier, November 18, 1907.

Kaiser
Campania. Oceanic. Baltic. Wilhelm II. Lusitania.
Displacement 20,000 26,100 33,000 26,000 41,500
Draught 30 30 30 30 32
Speed 22 20 16¹⁄₂ 23¹⁄₂ 25
I.H.P. 30,000 29,000 16,000 38/40,000 65,000
Consumption of coal, tons per day 485 400 260 660 840
Length, b.p. 598 685 709 684 760
Breadth 65 68·3 75·6 72·3 88
Depth 43 49 49 52·6 60·5
Gross tonnage 12,950 17,274 23,800 19,360 28,830

Page 299

12 double
Number of boilers 13 16 8 - - 24
7 single
Total cost £615,000 £739,000 £800,000 £927,200 £1,250,000

“The above table shows at a glance the ships that have come between the
Campania and the Lusitania. The Baltic shows the type of steamer that pays
the best, going across at a moderate speed sufficient for most people while
at the same time carrying an enormous amount of cargo.”[92]
[92] Shipping World, January 2, 1907.

Alterations have been made in the propellers of both these steamers with
a view to finding the size, pitch, number of blades, material, weight, and
number of revolutions per minute and the other details upon which
efficiency depends, but the result is carefully guarded. Such tests are
expensive.
In 1889 the White Star Company built the Teutonic of 10,000 tons,
which, like her sister ship the Majestic, was intended to be an armed
mercantile cruiser. These two vessels, which each took nearly three years in
building, were at that time the finest the world had seen, and the speediest,
and were regarded with such wonder that at the naval review in 1889, one
of them was visited by the German Emperor and the late King Edward (then
Prince of Wales) and many distinguished officers of the Navy. The Majestic
soon brought the record from Queenstown to New York down to 5 days 18
hours 18 minutes, but this was reduced by the Teutonic to 5 days 16¹⁄₂
hours.
The second Oceanic, also of steel and a twin-screw boat, was placed in
the Liverpool and New York service in 1899. She was 704 feet in length
and was the first vessel to be built longer than the Great Eastern, but in
other respects she was smaller, her beam being 68·3 feet, her gross tonnage
16,900 and her displacement tonnage 26,100. The indicated horse-power of
the Oceanic was 29,000 as against the 11,000 of the Great Eastern, and her
speed was 21¹⁄₂ knots as compared with 13. In equipment, too, she was
regarded as the last possible word in luxury and magnificence. Her
promenade deck was 400 feet long, and the saloon was 80 by 64 feet, the
latter surmounted by a glass dome 21 feet square.
Two enormous steamers, the Celtic in 1901 and the Cedric in 1902, of
20,904 tons gross, again established a record for size; the latter is slightly
the larger vessel, but in other respects they are sisters. These were the last

Page 300

vessels built for the White Star Line as an independent organisation, as in
the following year the line became a part of the great Morgan Combine
though still retaining its individuality of management.
The Republic, a White Star steamer which had just left New York for
England, was rammed off Nantucket in January 1909 by the Italian Lloyd
steamer Florida inward bound. The White Star liner Baltic took off from
the Florida all the passengers that had been saved from the Republic. The
latter vessel was kept afloat all night by her water-tight compartments. All
the while she was afloat she signalled by wireless telegraphy for assistance
and this brought the Baltic and other vessels on the scene. The Republic was
built in 1903 for the Boston-Liverpool trade of the Dominion Line and was
named the Columbus, and was afterwards taken over by the White Star. She
was a twin-screw steel steamer of 15,378 tons gross, and the largest vessel
which has yet been lost at sea.

The “Teutonic” and “Majestic” (White Star Line, 1889).

Page 301

The “Olympic” (White Star Line, 1910). From the Painting by Charles
Dixon.

A notable event in the trade with Canada was the introduction of the
White Star liners Megantic and Laurentic, which are run as White Star-
Dominion Line steamers to save possible complications with other lines in
the Canadian trade. They are important, not only on account of their size,
but also because of the engineering experiments they embody, the Megantic
standing for the highest perfection of the twin-screw balanced reciprocating
engine, while the Laurentic is remarkable for the introduction of
reciprocating engines and low-pressure turbines. In other respects they are
sister ships. They are the largest vessels yet placed in the Canadian trade.
The Laurentic was launched in September 1908 at Belfast by Messrs.
Harland and Wolff, and the Megantic left the slips the following December.
They are each 565 feet long by 67 feet 4 inches beam, and about 15,000
tons gross. Each carries 260 first-class passengers, 420 second-class, and
over 1000 in the third class. Their cargo capacity is also very great. They

Page 302

are singled-funnelled, two-masted steamers. Like all the other vessels of the
White Star Line they have been constructed throughout on the most
approved principles, nothing that long experience and practical knowledge
could suggest being wanting to make them as perfect as possible in all
particulars.
The last three or four years have seen the advent of the largest steamers
afloat, and before the end of 1910 they will be eclipsed by one of the two
steamers, the Olympic and the Titanic, now building for the White Star Line
by Harland and Wolff at Belfast, which are to be of about 45,000 tons each.
At present the largest White Star vessel is the Adriatic, launched in
September 1906 and placed upon the service to New York in the spring of
1908. This gigantic ship is 709 feet 2 inches in length, 75 feet 6 inches
beam, and 52 feet deep, and her displacement is over 40,000 tons. Besides
the usual luxurious fittings of the vessel, which are all in accordance with
the traditions of the White Star Line—she is in this respect an improved
version of all her great predecessors—she has an electric passenger lift
giving communication between the various decks, a gymnasium, and a full
set of turkish baths besides plunge bath, massage couches, and electric
baths. The hull is divided into twelve water-tight compartments, the
bulkheads being fitted with doors which can all be closed instantaneously
from the bridge if desired, and there are no fewer than nine steel decks.
The Inman and International liners City of New York and City of Paris,
steel twin-screw steamers, were launched in 1888 and 1889. These two
steamers marked one of those epochs of complete transformation in type of
vessel necessitated by the public demands and rendered possible by the
advance of engineering science.[93] They had considerable beam and their
subdivision into water-tight compartments was more thorough than in any
vessel hitherto built. Another innovation in their construction was the
arrangement of fore and aft bulkheads in addition to the transverse
bulkheads. Both these ships were of the Inman type with clipper bows and
the usual long graceful lines, but they spread less sail than any of their
predecessors, being fitted simply with three pole masts carrying fore and aft
schooner rig only. The funnels of each boat, which were three in number,
were placed between the fore and main masts. Each vessel carried two
separate engines built on the three-crank system, and the boilers were
constructed to work at the then unusual pressure of 150 lb. to the inch. The
rudder was in many respects different from that usually constructed for

Page 303

merchant steamers, and more nearly approximated to the type adopted in
the Navy, in which, as a protection against hostile projectiles, the rudder is
wholly submerged. This form of rudder was introduced in these two
steamships as they were intended to be used as auxiliary cruisers. The
rudder itself was constructed on a modification of the balanced system, in
which a portion of the rudder is placed forward of the stock. Both these
steam-ships made some very rapid passages, the City of Paris in May 1889
bringing down the time of the transatlantic journey to less than six days.
These were the last vessels added to the Inman and International Line. In
March 1893 the line was reorganised and became the American Line. This
company launched the St. Louis and St. Paul built at Cramp’s yard at
Philadelphia. The two American-built ships were each 554 feet in length
and of 11,600 tons gross register. They held the record for the New York-
Southampton service for some years. During the Spanish-American War
they were used as auxiliary cruisers.
[93] “The Atlantic Ferry.”

Page 304

The “Olympic” building, October 18, 1909 (White Star Line).

Page 305

The increase in the size of steam-ships is not confined to the Atlantic
alone, but is a feature of all the great lines whatever part of the world they
may serve. The Peninsular and Oriental, the Pacific Steam Navigation
Company, the Ellerman Lines, all the passenger lines trading to North
America, the Royal Mail Steam Packet Company, the Orient Line and the
principal lines trading to the Far East, are all the possessors of steamers of
12,000 tons or over, though in the case of those that use the Suez Canal the
size is limited by the fact that if they were made any larger they might have
difficulty in getting through the canal at all. The heavy canal dues, which
are already a serious item to the owners of all steamers using the canal,
would be more onerous still if the vessels were of greater size, and as it is,
some of the lines trading to Australia deliberately take the Cape route so as
to avoid this expense.
Lloyd’s Register’s Annual Summary issued in January 1910 contains the
following on the production of large steamers since 1893:
“The number of large steamers launched in the United Kingdom during
1909 has been less than during any of the previous four years. During the
years 1893-6, on an average, ten vessels of 6000 tons and upwards were
launched per annum in the United Kingdom; in the following four years,
1897-1900, the average rose to 32, at which figure it stood for the four
years 1901-4, and at 30 for the four years 1905-8. During 1909 only 19
such vessels were launched. Of vessels of 10,000 tons and upwards only
three were launched in the four years 1893-6; 24 were launched during the
four years 1897-1900; 27 were launched during the four years 1901-4, and a
similar number during the four years 1905-8.
“During 1909 six vessels of 10,000 tons and above were launched, the
names of which are as follows:
Balmoral Castle 13,000 tons gross.
Orvieto 12,130 „ „
Osterley 12,129 „ „
Otranto 12,124 „ „
Mantua 10,885 „ „
Ruahine 10,758 „ „

“At the present time there are under construction 37 vessels of 6000 tons
and upwards, of which eight are of over 10,000 tons each.
“The average tonnage of steamers launched in the United Kingdom
during 1909 is 2092 tons: but if steamers of less than 500 tons be excluded

Page 306

the average of the remaining steamers reaches 3080 tons gross.
“Of the vessels launched in the United Kingdom 16 are capable of a
speed of 17 knots and above. The fastest of these vessels is the turbine
yacht Winchester (26 knots). The fastest merchant vessels are five steamers
intended for Channel service (two turbine and three twin-screw vessels), all
of which attain the high speed of 22 knots.”
Of late years the P. & O. Company has added several magnificent vessels
to its fleet, of a size and degree of equipment superior to any of their
predecessors, mostly of the “M” class, so called because all their names
begin with that letter. These are Moldavia, Mongolia, Macedonia,
Marmora, Mooltan, Morea, and Malwa, and they mark a new epoch in the
history of the company’s shipbuilding operations, as they far exceed in size
the largest previous type as represented by the China, Persia, Egypt, and
others, which in their turn were far ahead of all the steamers before them.
The Marmora and Macedonia, built at Belfast by Messrs. Harland and
Wolff, are each of 10,500 tons, and are 530 feet long by 60 feet broad, with
a moulded depth of 37 feet. Accommodation is provided for 377 first and
187 second saloon passengers. The Moldavia and Mongolia, built at
Greenock by Messrs. Caird and Co., have a gross register of about 10,000
tons, and are 520 feet long by 58 feet broad and 33 feet deep. They have
been fitted for the conveyance of 348 first and 166 second saloon
passengers. The arrangements in connection with the passenger
accommodation are in advance of anything hitherto attained in the
company’s steamers in respect to comfort, roominess, light, and ventilation.
All the cabins are on the main, spar, hurricane, and boat decks, and most of
the inside ones are lighted from the outside of the ship by a passage-way to
the scuttle.
The vessels have a coal capacity of 2000 tons in bunkers and reserves,
and have a limited cargo space of about 3500 tons, half this space being
fitted with the most up-to-date appliances for the conveyance of refrigerated
produce.
The fifth of this class of steamers, the Mooltan, was built by Messrs.
Caird and Co., Greenock.
The Morea and Malwa combined the best features of all these steam-
ships. They are of 11,000 tons register, with engines of 15,000 indicated
horse-power driving twin screws, giving them a speed of 18 knots. The
former was built by Messrs. Barclay, Curle and Co., being the largest which

Page 307

has yet left their yards. This shipbuilding firm, by the way, claims to be the
oldest on the Upper Clyde, and has probably built and engined first-class
mail steamers for as many companies as any other shipbuilding
establishment in existence. The Malwa was built by Caird and Co.
It is thirty-eight years since Barclay, Curle and Co. began building for the
P. & O. line, their first steamer being the Zambesi in 1873.

The “St. Louis” (American Line).

Page 308

The “Morea” (P. & O. Line).

It is now some years since steel-built vessels propelled by new and
economical machinery became the premier cargo carriers in the Australian
trade. Recognising that it would no longer be profitable to build sailers to
compete against the steam-ships, many of the sailing-ship owners decided
to adopt steam-power and to dispose of their sailing ships as the opportunity
offered. The principal steamer lines which brought about this change were
the Peninsular and Oriental Steamship Company and the Orient Line. The
steam-ships of the Orient Line began to run in June 1877, when the
Lusitania, chartered from the Pacific Steam Navigation Company, was
despatched from London to Adelaide, Melbourne, and Sydney via the Cape
of Good Hope. In the following year the joint efforts of Messrs. Anderson,
Anderson and Co. and Messrs. F. Green and Co. founded the Orient Steam
Navigation Company. The service at first was to be monthly, but it was
soon evident that fortnightly sailings were imperative to meet the demands
upon the line by shippers and passengers. The fortnightly service was
determined upon in the beginning of 1880, the company obtaining the co-
operation of the Pacific Steam Navigation Company. Among the earlier
vessels were the Cuzco, Garonne, Chimborazo, Cotopaxi, Lusitania, and
Sorata, which were some of the finest that had ever crossed to Australia.

Page 309

The Orient Company afterwards built the steam-ship Orient, an iron vessel,
and at that time the largest and finest steam-ship afloat. She remained in
active service for no less than thirty years, and was disposed of to be broken
up only a few months ago, when she was still as sound as on the day she
was launched, her only defect being that she was unequal to modern
requirements. The Orient Company also built the Austral, which had the
misfortune to sink in Sydney Harbour whilst coaling. She was raised again
and continued in active service until a few years ago. The Orient Company
for some years carried the mails to Australia with vessels the ownership of
which was shared by the founders of the line, Messrs. Anderson, Anderson
and Co., and Messrs. R. and H. Green and Co. and the Pacific Steam
Navigation Company, the line being then known as the Orient-Pacific Line.
The Royal Mail Steam Packet Company bought out the Pacific Steam
Navigation Company and for some years the line was known as the Orient
Royal Line. The Orient proprietary, however, recently bought out the Royal
Mail Steam Packet Company, and the Orient Company are now the
exclusive owners of the service. New vessels have from time to time been
added to the fleet, all of which are of steel and propelled by twin screws.
When the Government of the Australian Commonwealth entered into a
fresh contract with the Orient Company in 1908, for the conveyance of the
mails, for a subsidy of £170,000 per annum until 1920, the company placed
orders for the building of five new splendidly fitted steam-ships which are
among the largest and fastest travelling to Australia. On the Orient mail
route to Australia eleven ports are visited between London and Brisbane,
and the journey is thus relieved of the monotony and tedium usually
incidental to a long sea voyage. Notwithstanding the many calls made, the
voyage to Sydney is made in 43 days, or in 33 days if the railway is made
full use of.
Messrs. Geo. Thompson’s Aberdeen Line of steamers is a direct
descendant of one of the most famous of the clipper lines. At one time it
owned about 25 sailers of the highest class, including the Thermopylæ,
Patriarch, and Miltiades; the first named made the fastest passage on record
for a sailing ship to Australia, 60 days from London to Melbourne, and with
the others afterwards distinguished herself in the tea races. Such was the
speed and reputation of the Aberdeen Line clippers that the company did
not find it necessary to adopt steam until 1881, but then they decided to be
well ahead of the times, and on the advice of the late Dr. Alexander Kirk

Page 310

had the steamer Aberdeen, which they ordered, fitted with the first set of
triple-expansion engines that had ever been applied to a large ocean-going
steamer. This vessel was followed in 1884 by the Australasian, and then by
the Damascus, and other vessels of the same high class were added as
required. How great is the care taken of passengers is shown when it is
stated that in all its long career not one of the company’s vessels has ever
lost a life except through natural causes. The vessels of this line travel by
way of the Cape, where a call is made. The steamer Miltiades, added in
1903, accomplished on her maiden voyage the fastest passage ever made up
to then from London and Plymouth to Melbourne, and a year or two after,
when required at a few days’ notice to take the running of the regular mail
boat via the Suez Canal, landed the Australian mails more than 24 hours
before time.
The old proprietary of Geo. Thompson and Co. was turned into a limited
liability company in 1905, and both Messrs. Ismay, Imrie and Co., who
represented the White Star Line, and the Shaw, Savill, and Albion
Company, Ltd., accepted the invitation to become interested in it. Hitherto
its largest vessels were the Marathon and Miltiades, each of 6800 tons, but
in 1907 the Pericles was launched by Messrs. Harland and Wolff, being
named after an old clipper of the line which in her day was one of the finest
and fastest ships ever built. The Pericles was a twin-screw steel steamer of
over 11,000 tons register with two sets of quadruple-expansion engines, and
her scantlings and fittings were in most cases considerably beyond the
requirements of the Board of Trade and the Admiralty Transport
Department. Her length was 500 feet, and her beam 62 feet. She was
unfortunately lost in 1910 by striking an uncharted rock off the West
Australian coast.
The first regular cargo line of steamers between England and Australia
was established in 1880 by the late Mr. W. Lund, who previously owned a
large number of sailing vessels. These steamers were started as cargo boats
but carried a limited number of passengers, and as newer steamers were
added they became very favourably known for the comfort of their
accommodation. The first steamer owned by the Lund, or, as it is better
known in the South African and Australian trades, the Blue Anchor Line,
was the Delcomyn. In 1909, their largest steamer, the Waratah, a fine screw
steamer of 9000 tons, was mysteriously lost with all on board between

Page 311

Durban and Cape Town. The Blue Anchor Line has recently been acquired
by the P. & O. Company.
The Shaw, Savill, and Albion Company, Ltd., is an amalgamation,
formed in 1883, of the two historic firms whose names it embodies. The
united company ceased a couple of years ago to despatch sailing ships, but
the main result of the combination has been the placing on the route of
some of the finest passenger and cargo steamers afloat, and the inauguration
of a fortnightly service between London and New Zealand. Shaw, Savill
and Co. in the early days made London their main port of departure, and
just in the same way the Albion Company adhered to the Clyde. The joint
concern covers the whole ground. The steamers of the line are built
specially for the company, and are expressly designed for the Colonial
trade, and are second to none in comfort, celerity, and security combined.
The outward voyage of the steamers is via Teneriffe, Cape Town, and
Hobart; and the homeward trip is made via Cape Horn, calling at Monte
Video or Rio de Janeiro and Teneriffe.
The company has played an important part in the development of the
frozen meat traffic between England and New Zealand. The machines used
are those patented as the “Haslam” and “Bell Coleman,” known as the
Patent Dry Air Refrigerators, though in the later steamers the CO2 system is
installed. The Shaw, Savill, and Albion Company, Ltd., were the pioneers in
this trade. They fitted up the first sailing ship with refrigerating machinery,
and successfully inaugurated an industry which has since grown to such
vast dimensions.
The company is one of the largest carriers of frozen meat in the world,
bringing over to this country in their steamers considerably over 2,800,000
carcases of mutton per annum.
All the company’s present steamers are of steel, and most are twin screw,
their tonnage ranging from 5564 in the Karamea to 10,000 in their newest
boats, the Pakeha and Rangatira. Its service is maintained in connection
with the White Star Line, which supplies four or five steamers of 12,000
tons each.
By few firms has such an extraordinarily rapid progress been shown as
by that known as Elder, Dempster and Co., of which the late Sir Alfred
Jones was the head. After his death the line was acquired by Lord Pirrie,
who transferred it to a new company bearing the name of Elder, Dempster
and Co., Ltd. The firm originally consisted of Alexander Elder and John

Page 312

Dempster, who founded the British and African Steam Navigation Co., Ltd.,
in 1868, and in 1879 Mr. (afterwards Sir) Alfred L. Jones was admitted to
partnership. Under his direction the firm became of considerable
importance, but it was not until he and Mr. W. J. Davey became partners
and sole managers that the firm progressed by leaps and bounds and rapidly
became one of the largest and most influential commercial houses in the
world. Its energies were tremendous and its successes no less so. The
Beaver Line of steamers to Canada from Liverpool was at one time the
property of this firm, who sold it to the Canadian Pacific Railway. The
shipping companies controlled by Elder, Dempster and Co. included the
British and African Steam Navigation Company (1900), Ltd., the African
Steamship Company (incorporated under Royal Charter), Elder, Dempster
Shipping, Ltd., Cie. Belge Maritime du Congo, Imperial Direct West India
Mail Service, and the Compañia de Vapores Correos Interinsulares
Canarios.
Only a few years have elapsed since the banana was almost a curiosity
here, but thanks to the enterprise of Elder, Dempster and Co., who
practically created the tropical fruit trade and built several steamers for the
conveyance of tropical fruit to England, the banana has become most
popular. The West India Islands, especially Jamaica, have derived immense
benefit from this trade, the encouragement of this and other tropical
products having brought it no small measure of prosperity. For this work the
Imperial Direct West India Mail Service, Ltd., was established in 1901,
maintaining at first a fortnightly and then a weekly service from Bristol to
Jamaica. In connection with this service there are numerous inter-island
services.
The Royal Mail Steam Packet Company in 1905 inaugurated their
splendid “A” class of steamers, of which the Aragon, Amazon, Avon,
Araguaya, and Asturias are examples. The largest of these is the Asturias of
12,500 tons.
In part directly and in part through its connections the company’s
enterprise extends to all parts of the world. It acquired in 1907 an interest in
the Shire Line of steamers engaged in a regular service from London to Port
Said, Suez, Colombo, Penang, Singapore, Hong-Kong, Shanghai, Nagasaki,
Kobe, and Yokohama; and in 1908 it took over the old-established Forwood
Line service from London to Gibraltar, Morocco, Las Palmas, Teneriffe,
and Madeira.

Page 313

The repairs effected to ships since they have been built of steel are no
less wonderful than the building of the ships themselves. It is by no means
uncommon for a ship to be cut in half, the pieces drawn asunder, and the
intervening space built up. The repairing of the Suevic by fitting it with a
new bow was not the first operation of the kind. The Milwaukee was
similarly treated at Wallsend by Armstrong. The destroyer Syren lost her
bows by stranding at Berehaven, but the after portion with the machinery
was saved and given new bows by the Palmer Company, the two parts
being towed to Haulbowline for the purpose. The Norddeutscher Lloyd
steamer Hudson had her bows so badly damaged by fire that she had to be
provided with new ones. Nor are the repairing feats effected by the
steamers’ engineers in mid-ocean, often in circumstances of extreme
difficulty, less praiseworthy and remarkable, especially when it is a matter
of patching a fractured propeller shaft while the vessel is rolling in the
trough of a heavy sea and the work has to be performed in the semi-
darkness of the shaft tube.
The steamer Norfolk, in 1906, after her engines broke down in the Indian
Ocean, was taken into Fremantle under improvised sail. The sails were
made of tarpaulins stitched together and the necessary spars were
improvised out of derrick booms.

Page 314

The “Assiniboine” in Sault Ste. Marie Canal (Canadian Pacific Railway
Co.).

The steamer Hansa broke down in October 1908 in the South Pacific
through the propeller jamming against the rudder stock. After a delay, the
shaft broke when the steamer was 1281 miles out from Newcastle, New
South Wales, for New Zealand. The shaft tank was flooded and the ship
drifted in circles with sea anchors out, under such sail as the crew could set,
while the engineers worked for almost twenty days—night and day—and
sometimes more than waist-deep in water in the stern tube, till they
managed to repair the shaft. Then the funnels of the steamer were used as
masts and tarpaulins were rigged to them as sails. But such sails as they
could set were insufficient and she drifted broadside on. The ship was
picked up and finally brought into port, but by that time she was able to get
her own engines to work and release the strain on the towing steamer.

Page 315

Repair work of a totally different kind is associated with steamers built to
be severed and joined up again. The Canadian Pacific Railway steamer
Assiniboia, for instance, was constructed by the Fairfield Company at
Govan in 1907 for service on the Great Lakes and was so made that she
could be cut in half in order to pass through the canals to reach her
destination, after which the pieces were reunited.
That a vessel should be built in order that she may be sunk and raised
was the unique experience of the steamer Transporter, built by Messrs.
Vickers, Sons and Maxim, Barrow-in-Furness, in 1908. Some time
previously the Japanese Government placed with the firm an order for two
submarine vessels, and a special steamer had to be constructed to carry
them. This vessel is over 250 feet long, very broad and with large
hatchways. When the submarines were ready for shipment the steamer was
taken to Liverpool and sufficiently submerged in dock to allow of them
being floated into the hold. She was then pumped dry, and after being
overhauled she left for Japan.
The most serious competitors British shipbuilders have are those of
Germany. The industry there is of comparatively modern growth, and it is
not more than a few years since all the large steamers required by German
owners were built in Great Britain. All the early steamers of the Hamburg-
Amerika Linie and also of the Norddeutscher Lloyd were constructed here,
but in the early ’seventies, owing to the patriotism of a Secretary of State
for the Navy in encouraging the construction of warships in German yards,
shipbuilding was taken up in earnest and there are now shipyards in
Germany capable of turning out steam-ships in every respect equal to the
best that British establishments can produce. At first, German competition
was not regarded very seriously by British builders, nor were German
owners altogether enamoured of the products of their own yards owing to
the lack of uniformity in the quality of the materials employed. The
foundation of the Germanischer Lloyd during the ’sixties meant that a new
influence was exercised upon German shipbuilding equivalent to that
exercised by Lloyd’s upon the British mercantile marine. It was not,
however, until 1882 that the Hamburg-Amerika Linie inaugurated the
serious competition between German and British builders by entrusting the
building of the mail steamer Rugia to the Vulcan Shipbuilding and
Engineering works at Stettin, and the Rhaetia to the Reiherstieg
Shipbuilding and Engineering Works at Hamburg. Previous to this the

Page 316

German yards had been constructing small steamers, the first of which there
is any record being the Weser, built about 1816, at the Johann Lange yards.
Iron shipbuilding was established at what is now the Stettin Vulcan yard in
1851 and the same year the “Neptun” yard was founded at Rostock. The
first German iron steamer was built at the Schichau Works at Elbing in
1855, and from 1859 to 1862 the machinery for wooden gunboats was
supplied. Two iron steamers were launched by Klawitter at Dantzic in 1855,
in which year also the Godefroy wooden shipbuilding yard, the present
Reiherstieg yard, laid the keel of the first iron ocean-going steamer built on
the North Sea coast. The Norddeutsche Werft was started in 1865 at the
newly created naval harbour of Kiel, and in 1879 was united with the
Maschinenbau-Gesellschaft, formerly Egells, whence arose the well-known
Germania shipbuilding establishment.
Without entering upon debatable economic questions it may be asserted
as a fact that German shipbuilding is a State-developed industry. Little was
done until von Stosch, Minister of the Navy, in introducing a Bill for the
establishment of a German Navy defined once for all the relations between
the German Navy and the German industries. Not only did the State give
assistance by the placing of orders, but further assistance was afforded in
1879 by the exemption from import duty of mercantile shipbuilding
materials, a concession the importance of which was recognised when the
Norddeutscher Lloyd placed an order with the Vulcan yard in 1886 for six
imperial mail steamers for the East Asiatic and Australian lines. These were
the first large iron passenger steamers built in Germany. Being Government
mail steamers, German material was to be used in their construction as far
as possible.
Before this, the Vulcan and the Reiherstieg yards had each shown what
they could do by building an ocean steamer of about 3500 tons. Several
English-built steamers were bought for the N.D.L. in 1881 and the
following years, but in 1888-90 the company had three steamers of 6963
tons gross built by the Vulcan Company; these vessels had engines of
11,500 indicated horse-power and a speed of 18¹⁄₂ miles an hour. In these
steamers were adopted central saloons and a long central deck-house with a
promenade deck above, while on the main deck a dining-room, extending
from one side of the ship to the other, was built. In these ships also German
decorators and furnishers were given the opportunity to distinguish
themselves and rival the British, and they did so. Steam-ship after steam-

Page 317

ship was produced, each one excelling its predecessor, until the N.D.L.
decided upon the construction of the Kaiser Wilhelm der Grosse under the
onerous condition that if she did not come up to the very strict requirements
they imposed, the Vulcan Company should take her back. One condition
was that the ship should be exhibited in a trial trip across the ocean to New
York. The Barbarossa type, corresponding to the White Star intermediate
vessels, appeared in the ’nineties, carrying a large number of passengers
and having great cargo capacity. In 1894 the twin-screw vessels Prinz
Regent Luitpold and Prinz Heinrich were added with special equipment for
the tropics. Since then steamers have been added to the fleet with almost
startling rapidity to cope with the company’s many services, all the
important German yards being favoured with orders. The largest steamer
the company has is the George Washington, launched in November 1908 by
the Vulcan Company, which is the greatest steamer yet constructed in
Germany. She is 725¹⁄₂ feet in length with a displacement of 36,000 tons,
while her gross registered tonnage is 26,000 tons. She is a first-class twin-
screw steamer with five steel decks extending from end to end; she has also
thirteen water-tight bulkheads, all of which reach to the upper deck and
some even to the upper saloon deck. Contrary to the English practice, which
is to reduce the number of masts as much as possible in these big liners, she
has four masts, all steel poles, and carries 29 steel derricks. Her
accommodation is for 520 first-class passengers in 263 staterooms, 377
second-class passengers in 137 staterooms, 614 third-class passengers in
160 staterooms, and 1430 fourth-class passengers in eight compartments,
this vessel being the first in which four classes of passengers are carried.
Besides the 2941 passengers she has a crew of 525. She has two four-
cylinder, four-crank, quadruple-expansion engines of 20,000 horse-power,
which give her a sea speed of 18¹⁄₂ knots.

Page 318

Photo. G. West & Son.

The “Kronprinzessin Cecilie” (Norddeutscher Lloyd).

Page 319

Photo. G. West & Son.

The “Kaiser Wilhelm II.” (Norddeutscher Lloyd).

With this steamer and four others only slightly less in size, the Kaiser
Wilhelm der Grosse, the Kronprinz Wilhelm, the Kaiser Wilhelm II., and the
Kronprinzessin Cecilie, the company is able to carry out its ambition of
maintaining a weekly express service between Bremen and New York.
The other great German shipping organisation, the Hamburg-Amerika
Linie, started with a fleet of sailing ships, but inaugurated its steam service
in 1856 with the Borussia, built by Caird of Greenock, who in the next few
years executed orders for a number of vessels for the line. This steamer was
one of the best of her day. The progress of this line, which claims with good
reason to be the greatest shipping organisation in the world, has been
extraordinary. Long ago it was adopted as its motto “My field the World,”
and well it has acted up to it. Its fleet had grown by 1897 to sixty-nine
steam-ships with a total of 291,507 tons register, in addition to several
smaller steamers for coastal and harbour work.

Page 320

Its extension in the last few years has been phenomenal. Among its
largest and fastest boats are the Cleveland and Cincinnati, Koenig Wilhelm
II., Amerika, Kaiserin Auguste Victoria, Patricia, President Grant,
President Lincoln, and Deutschland, the last being one of the fastest afloat.
Some of its larger vessels have been built at Belfast, notably the Amerika,
and the Spreewald and others of her class at the Middleton yard, Hartlepool.
In March 1909, the fleet comprised 164 ocean steamers of a total of
869,762 tons register, and 223 smaller steamers of 46,093 tons, or a total of
387 steamers and 915,855 tons. Both these companies, by their direct
services and the numerous lines which they control, are in connection with
every port of importance throughout the world.
With regard to engineering developments, it must be remembered that
high-pressure and multiple-expansion engines were known before 1879.
The little Enterprise was engined by Wilson of London, in 1872, with a
pressure of 150 lb.; the Sexta, engined by the Ouseburn Engine Works of
Newcastle-on-Tyne in 1874, had boilers with a pressure of 120 lb. and
triple-expansion engines working on three cranks; the Propontis, engined in
the same year by Elder, of Glasgow, was also fitted with triple-expansion
engines. Mr. Perkins’ tri-compounds came out in the ’seventies, the Isa
(yacht) in 1879, with a pressure of 120 lb.; and there were a few others.
With the exception of the Isa, all the others may well be designated
experiments that failed, and it was owing to the success of this little yacht
that the possibility of the ordinary boiler for still higher pressures suggested
itself.[94]
[94] Paper on “Cargo Boat Machinery,” by Mr. J. F. Walliker, Institute of Marine
Engineers.

The Propontis, built in 1864, was re-engined and fitted with tri-
compounds and new boilers in 1874. The boilers (of the water-tube type)
were a failure, and were replaced by cylindrical boilers in 1876, at a
reduced pressure of 90 lb. With these she worked till 1884, when her boilers
were renewed. Dr. Kirk declared “that the want of a proper boiler had
delayed the introduction of the triple expansion.”
Plates of five tons in weight and upwards are in common use for boiler
shells, yet in 1881 hardly a firm on the north-east coast would undertake to
build a boiler for 150 lb. pressure.
The success of the triple engine resulted in many vessels being converted
and fitted with new boilers, while others were re-engined.

Page 321

Messrs. Palmer, in the James Joicey, fitted an interchangeable crank-
shaft with the crank-pin on the centre engine, made with a coupling at each
end to fit into a recess in the web. It was seen at quite an early stage of tri-
compounds that the three-crank engine, with cranks at equal angles, from its
easy turning moments, would be the most satisfactory, and its universal
adoption in new engines was only the work of a very short time. The
steamers Aberdeen and Claremont, both launched in 1881, were the first to
have commercially successful triple-expansion engines.
As to how high steam-pressures may go, it is recorded that the yacht
Salamander, with triple-expansion engines, had the valve set at 600 lb.
The invention of the turbine has been the most remarkable event in the
modern history of the steam-engine. The following passages, taken from the
Hon. C. A. Parsons’ paper on turbines, read at the Engineering Exhibition,
1906, give an account of its adoption for purposes of steam navigation:
“Turbines in general use may be classified under three principal types,
though there are some that may be described as a mixture of the three types.
The compound or multiple expansion type was the first to receive
commercial application in 1884; the second was the single bucket wheel,
driven by the expanding steam-jet, in 1888; and lastly a type which
comprises some of the features of the other two, combined with a sinuous
treatment of the steam in 1896. The compound type comprises the Parsons,
Rateau, Zoelly, and other turbines, and has been chiefly adopted for the
propulsion of ships. The distinctive features of these varieties of the
compound type lie principally in design; nearly all adopt a line of flow of
the steam generally parallel and not radial to the shaft. In the Parsons
turbines there are no compartments: the blades and guides occupy nearly
the whole space between the revolving drum and the fixed casing, and the
characteristic action of the steam is equal impact and reaction between the
fixed and moving blades. The chief object is to minimise the skin friction of
the steam by reducing to a minimum the extent of moving surface in contact
with the steam, and another, to reduce the percentage of leakage by the
adoption of a shaft of large diameter and great rigidity, permitting small
working clearances over the tops of the blades. The other varieties of
turbines have all multicellular compartments in which the wheels or discs
revolve.”
The first vessel to be fitted with a turbine engine was the little Turbinia,
in 1894, and successful though she was it was found necessary in the two

Page 322

following years to make a number of experiments which resulted in radical
changes in the design and arrangement of the machinery. The first engine
tried was of the radial flow type, giving about 1500 horse-power to a single
screw. A speed of only 18 knots was obtained. Several different propellers
were tried with this engine, and the result not being satisfactory the original
turbine engine was removed, and the engines finally adopted consisted of
three turbines in series—high pressure, intermediate pressure, and low
pressure—each driving a separate shaft with three propellers on each shaft.
A reversing turbine was coupled with the low-pressure turbine to the central
shaft. The utility of the turbine for fast speed having been demonstrated by
the Turbinia, the destroyers Viper and Cobra were built and given Parsons
turbines and propellers, and the Viper showed herself the fastest in the
world with a speed of 36·86 knots per hour. These two vessels came to
grief, through no fault, however, of the turbines.

Photo. G. West & Son.

“Turbinia.”

Page 323

Captain Williamson, the well-known steamer manager on the Clyde, was
the first to order a turbine-propelled boat for commercial purposes, this
being the steamer King Edward, built in 1901. She gave such excellent
results that the Queen Alexandra was ordered. The South Eastern and
Chatham Company was the first railway company to order a turbine
steamer, The Queen, 310 feet long and of 1676 tons gross, with engines of
7500 horse-power. The first ocean liners fitted with turbines were the Allan
liners Victorian and Virginian, built in 1904, each of about 10,754 gross
tonnage and having turbine engines of about 12,000 horse-power. The
Cunard Line built a turbine steamer in the following year, the Carmania,
with turbines of 21,000 horse-power and of 19,524 tons gross. So
satisfactory, apparently, was the experiment that the Cunard Line next
ordered the Lusitania and Mauretania with turbine engines of 70,000 horse-
power each.
After the two torpedo vessels already mentioned, the Admiralty ordered
the Velox and Eden, which had additional engines for obtaining economical
results at low speeds. Then came the third-class cruiser Amethyst, and
comparative trials with sister vessels fitted with reciprocating engines
showed the superior economy of the Amethyst’s engines. Next the
Dreadnought was fitted with turbine engines. Another conclusive proof of
the superiority of the turbine was afforded by the steamer Princesse
Elisabeth on the Ostend and Dover service, which in her first year averaged
24 knots as against the 22 knots of the Princesse Clementine and Marie
Henriette on an average coal consumption per trip of 23·01 tons, compared
with their 24·05 and 23·82 tons respectively. The turbine boat also does the
trip in about 15 per cent. less time than the other two, or, “to reduce the
turbine boat to the displacement and speed of the paddle-boats, and
assuming that the indicated horse-power varies as the cube of the speed, the
mean consumption of the Princesse Elisabeth would be about 17 tons as
against 24 tons in the paddle-boats, thereby showing a saving of over 25 per
cent.” Many other vessels have been fitted with turbine machinery,
including the royal yacht.
The multiple propellers tried in some of the earlier vessels were found to
be less satisfactory than single propellers on each shaft.
The first in which a combination of reciprocating and turbine engines
was installed was the Otaki by Denny, for the New Zealand Shipping
Company.

Page 324

The “Otaki” (New Zealand Shipping Co.).

Page 325

CHAPTER XI
STEAM-POWER AND THE NAVY

he steam vessels first built for the Navy were hardly worth
calling warships and were of little or no value for fighting
purposes. The first steam-propelled vessel in the Navy was
the Monkey, of 210 tons, built at Rotherhithe in 1820 and
fitted with engines of 80 nominal horse-power by Boulton
and Watt. She had two cylinders of about 35¹⁄₂ inches
diameter and 3 feet 6 inches piston-stroke. The Active, of
80 nominal horse-power, was launched by the same firm two years later,
and in 1823 Messrs. Maudslay began with the Lightning that connection
with the Royal Navy which was maintained as long as the firm was in
existence. Up to 1840 about seventy steam vessels were added to the
Government fleet, the majority of which were given side-lever engines and
flue boilers with a steam-pressure of about 4 lb. to the square inch above the
air-pressure. All these vessels were chiefly used for towage and general
purposes, including mail carriage when necessary, and not as warships.
There was a gradual improvement in the size of the vessels, and in 1832 the
Rhadamanthus was constructed by Maudslay, Sons, and Field with engines
of 220 nominal horse-power and 400 indicated. Her machinery weighed
275 tons.
The steamer Salamander appeared in 1832, and thereafter several
similarly propelled wooden-hulled steamers were added to the Navy.
Between 1840 and 1850 tubular boilers were generally adopted, the boilers
being lighter and more compact than those previously in use, enabling the
working pressure of the steam to be increased to ten or fifteen pounds above
that of the atmosphere. All these vessels had paddle-wheels. Warships
similarly propelled were adopted by other nations also, but with the
exception of skirmishes with the natives of uncivilised or semi-civilised
countries, vessels of this type were not tested in serious warfare until the
war in the Crimea. Even then many of the British and French warships were

Page 326

stately wooden three-deckers. Such vessels of the attacking fleets as were
paddle-driven usually suffered badly about the wheels when they ventured
within range of the Russian guns; while those, chiefly despatch vessels and
gunboats, which had screws, were comparatively safe so far as their
propellers were concerned, but were too weak to engage the Russian
batteries. Floating armoured batteries were therefore decided upon, some of
which had screw propellers, single or twin, but from the marine, apart from
the military, point of view, they achieved no great success.
Long before this, however, the screw propeller had proved so reliable and
the advantage of its position below the water-line was so obvious that the
Admiralty could no longer maintain its prejudice, and the warsloop Rattler
was built at Sheerness in 1843 and fitted with a screw propeller. Her
displacement was 1078 tons. Her engines, of 437 indicated horse-power,
had a spur gearing by which the revolutions of the screw were increased to
four times those of the crank. The steamer Alecto had paddle-engines of the
direct-acting type, and of about the same power as those of the Rattler. The
two vessels were made fast stern to stern with only a short distance between
them to test the powers of their respective methods of propulsion, and
although each did her best the screw boat towed the other at a speed of
nearly 2¹⁄₂ knots. Of course a test of this sort could not demonstrate the
superiority of one method over the other; all that it proved was that the
Alecto was less powerful than the Rattler. A similar contest took place in
the English Channel in June 1849, between the screw corvette Niger and the
paddle-sloop Basilisk. The tug-of-war lasted an hour, and the Niger towed
the Basilisk stern foremost 1·46 knots. These two vessels were very evenly
matched in every respect, and the test in this case left no room for doubt as
to which was the better method.
The first screw-propelled vessel in the British Navy was the Dwarf, built
as the Mermaid by Messrs. Ditchburn and Mare at Blackwall in 1842, and
as she attained at her trial the guaranteed speed of twelve miles an hour, the
Admiralty fulfilled its promise and took her over and then renamed her. She
was engined by Messrs. J. and G. Rennie. Her cylinders were vertical, of 40
inches diameter with 32 inches stroke, and the propeller was on their
conoidal principle in which three blades are used, the surface of which,
according to the specification, is “obtained by the descent of a tracer down
the surface of a cone or conoid,” this giving an increasing pitch. The vessel

Page 327

was 130 feet long and of 164 tons measurement. Three years later she was
used for a series of experiments with a variety of screw propellers.
Of the many inventions brought under the notice of the Admiralty and of
private shipowners, one which attained a considerable measure of success
was the contrivance patented by Taylor and Davies in 1836, and known as a
modified and improved form of Bishop’s disc engine. It was tried in a
pinnace, the Geyser, built in 1842 by Rennie.
In this form of engine the steam chamber is partly spherical, and the end-
covers are cone-shaped, while the chamber contains a piston or circular disc
fitted with a central boss that fits into spherical seats made in the covers,
and a projecting arm placed at right angles to the disc engages with a crank
arm on the screw shaft. A fixed radial partition intersecting the disc divides
the chamber into four cells, to which steam is admitted by a slide valve. In
1849 H.M.S. Minx was equipped with one of these engines having a disc of
27 inches diameter, in addition to the high-pressure engine, and coupled to
the propeller shaft in such a manner that it was not necessary to disconnect
the horizontal engines. With the disc engine the vessel attained a speed 11
per cent. higher than without. Improvements in other engines, however,
rendered inevitable the relegation of the disc engine to the list of superseded
contrivances.
In 1838 Mr. John Penn’s oscillating engines with tubular boilers were
fitted in some of the boats running above London Bridge, and attracted the
attention of the Admiralty. The Admiralty yacht Black Eagle was turned
over to him and he installed, instead of her former engines, oscillating
engines of double their power, with tubular flue boilers, the change
entailing no addition to the weight or engine space. The advantages of this
installation were so great that many other vessels were similarly treated,
among them being the royal yacht Victoria and Albert. His trunk engine,
designed for the propulsion of warships carrying a screw, and capable of
being placed below the water-line so far as to be out of reach of hostile shot,
achieved an even greater success, and in 1847 Mr. Penn was instructed to
place engines of this type in H.M.S. Arrogant and H.M.S. Encounter. These
were so satisfactory that orders for engines were received for vessels
ranging from a small gunboat, to be fitted with engines of 20 horse-power,
to vessels like the Sultan, with engines of 8629 horse-power, and Neptune
(ex Independencia), with 8800 indicated horse-power. Up to the time of his
death his firm fitted 735 vessels with engines having an aggregate actual

Page 328

power of more than 500,000 horses. Among them were the Orlando, Howe,
Bellerophon, Inconstant, Northampton, Ajax, Agamemnon, Hercules,
Sultan, Warrior, Black Prince, Achilles, Minotaur, and Northumberland.
The barque-rigged steam frigate Penelope attracted as much attention in
the Admiralties of the world as did the advent of the first Dreadnought a
few years ago. She was an ordinary 46-gun frigate, and might have attained
neither more nor less publicity than fell to the lot of other ships of her class.
Her conversion in 1843, however, into a steam frigate made her famous.
She was described as “a war steamer of a magnitude unequalled in our own
or any foreign service, with an armament that will enable her to bid
defiance to any two line-of-battle ships, especially as her steam will give
her the means of taking a commanding position.”[95] She was one of the old
French Hebe class of frigates, of which there were between thirty and forty
lying in the various British ports in good condition, but considered useless,
as larger frigates had been introduced by other powers. She was cut in half
amidships and lengthened by 63 feet, the new middle space being devoted
to her engines and boilers and to bunkers capable of holding 600 tons of
coal. In addition to her crew of 300 officers and men, she could
accommodate 1000 soldiers, with provisions and water for a voyage to the
Cape of Good Hope. Her armament as a steamer consisted of two 10-inch
pivot guns, each weighing 4 tons 4 cwt.; eight 68-pounders capable of firing
both shot and shell, and fourteen 32-pounders. Her two steam-engines were
believed to be of greater power than any yet made, having a combined
horse-power of 625 horses. The cylinders had a diameter of 92 inches with
a piston stroke of nearly 7 feet. The engines were direct-acting, and similar
to those of the Cyclops, Gorgon, and other steam frigates in the Navy. A
recess between the two foremost boilers contained the step for the main-
mast, which therefore stood almost in the centre of the engine- and boiler-
room. The funnel was placed abaft the main-mast, but the paddles were
before it.
[95] Illustrated London News, July 1843.

In 1845, Admiral Fishbourne adopted Scott Russell’s wave-line principle
and made certain recommendations as to the lines on which a ship of war
should be built. These were: “the buttock-lines are continuous curves, to
minimise pitching; with the same object a fine bow and full afterbody are
provided. To promote steady steering there is a long run of perpendicular

Page 329

side, a long keel, a lean forefoot, and a fine heel, while to insure powerful
action of the rudder the draught of water is greatest aft; the floor rises aft
from the midship section.”
But although shipbuilding of the modern type was initiated nearly three-
quarters of a century ago, and iron vessels as warships had proved their
utility more than once in the “affairs” of other nations, the British Admiralty
remained faithful to wooden three-deckers long after a radical change in
their allegiance would have been justified. It took a long time to convert the
Admiralty. As early as 1842 an iron frigate was built by Laird at
Birkenhead, called the Guadeloupe, for the Mexican Government. It was
187 feet long by 30 feet beam and 16 feet depth. An iron vessel, the
Nemesis, was used in the Crimean War and was struck fourteen times by the
enemy’s shot, the holes in every instance being clean and free from
splinters. The Admiralty was not convinced, however, and as late as 1861
ordered nearly a million pounds’ worth of wood for warship construction.
Other iron vessels carrying heavy guns, the Nimrod, Nitocris, Assyrian,
Phlegethon, Ariadne, and Medusa, were built for the East India Company at
Laird’s. The Admiralty had their first iron vessel, the Dover, built there,
followed by the Birkenhead troopship, both paddle-steamers. The
brigantine-rigged steam frigate Birkenhead was 210 feet in length between
her perpendiculars, 60 feet 6 inches breadth outside the paddle-wheels, and
37 feet 6 inches inside the paddle-wheels, and had a depth of 23 feet. Her
engines of 556 horse-power were by George Forrester and Co. A peculiar
feature she had in common with several of her contemporaries was that she
was clincker-built below water and carvel-built above. The unhappy ending
of this ship is one of the most tragic events in the annals of the British
Navy. She sailed from Queenstown, January 1852, for the Cape, having on
board a portion of the 12th Lancers and of nine infantry regiments. She
struck a pointed rock off Simon’s Bay, South Africa, and of the 638 persons
on board no fewer than 454 of the crew and soldiers perished. The
remainder, many of whom were women and children, were saved by the
boats.
The honour of being the first British steam iron warship belongs to the
Trident, a paddle-steamer, launched from Ditchburn and Mare’s
shipbuilding yard at Blackwall in December 1845. Her length was 280 feet,
the length of engine-room 45 feet, her beam 31 feet 6 inches, her breadth
over paddles 52 feet 6 inches, her depth of hold 18 feet, and she was of 900

Page 330

tons burden, including machinery, coals, water, guns, and stores. Her
displacement at launching was 385 tons; the engines of 330 horse-power
had oscillating cylinders, and her boilers were of a tubular pattern. She was
designed by the builders. Her ribs were double, each rib being composed of
two angle irons 4 inches by 3¹⁄₂ inches by half an inch thick, riveted
together, and in one entire length from the gunwale to the keel, there being
270 pairs of these double ribs. The iron skin was three-quarters of an inch
thick at the keel, and half an inch at the gunwale. The skin contained 1400
plates of iron which were riveted to each other and to the ribs and the keel
by 200,000 rivets. Each rivet was wrought red-hot and required the united
labours of three workmen and two boys to fix it in its corresponding hole.
The price of iron when the ship was commenced was £8 10s. per ton, and
when it was launched £16. The Trident carried two long swivel guns of 10-
inch bore, one forward and one aft, to fire in line with the keel, and had also
four 32-pounder broadside guns.
The Greenock, built by Scott, Sinclair and Co. at Greenock in 1849, was
a second-class steam frigate and was the first steam frigate ever launched
on the Clyde for the British Navy. Her length was 213 feet and her tonnage
1413 tons Admiralty measurement, with engines of 565 horse-power by the
same builders. The screw propeller was 14 feet in diameter, constructed on
F. P. Smith’s principle, and though it weighed seven tons, could be
disengaged from the machinery and raised from the sea with ease. “The
funnel also is to have some peculiar mode by which its hideous and crater-
like physiognomy can be made at once to disappear, and leave the ship
devoid at once of this unsightly feature, and of those cumbrous
excrescences, paddle-boxes, giving her all the appearance and symmetry of
a perfect sailing ship.”[96] Her figure-head was a bust of the late Mr. John
Scott, father of the head of the firm who built her. The keel, stem, and stern
were of solid malleable iron, measuring 5 inches thick by 9 inches deep.
The Greenock was the only one of four vessels ordered by the then Board of
Admiralty, to be fitted as a frigate and propelled with full power. She was
armed on the main deck, and her model was so designed as to enable her to
fight her bow and stern guns in line with the keel, in which important
qualification she stood almost alone in the Navy.
[96] Illustrated London News, May 12, 1849.

Page 331

The value of private shipbuilding yards able to undertake Admiralty work
at short notice was abundantly proved during the Crimean War.
“In 1854, at the commencement of the Crimean War,” said the Times in
an article on the building of warships in private establishments, “when
Admiral Napier found himself powerless in the Baltic for want of gunboats,
it became imperative to have 120 of them, with 60 horse-power engines on
board, ready for next spring, and at first the means for turning out so large
an amount of work in so short a time puzzled the Admiralty. But Mr. Penn
pointed out, and himself put into practice, an easy solution of the
mechanical difficulty. By calling to his assistance the best workshops in the
country, in duplicating parts, and by a full use of the admirable resources of
his own establishments at Greenwich and Deptford, he was able to fit up
with the requisite engine-power ninety-seven gunboats. This performance is
a memorable illustration of what the private workshops of this free country
can accomplish when war with its unexpected requirements comes upon
us.... Altogether during the Crimean War 121 vessels were fitted with
engines for our Government by Mr. Penn.”
Two paddle-wheel gunboats, Nix and Salamander, were launched in 1851
by Messrs. Robinson and Russell for the Prussian Government, which
exchanged them during the Crimean War for a frigate called the Thetis, and
they were renamed Recruit and Weser. They were double-ended and could
steam in either direction without turning. The paddle-frigate Dantzig, built
by the same firm for the same foreign Government, had the peculiarity of
being able to carry guns on her sponsons. The last wooden battleship built
for the Navy was the Victoria, 121 guns, launched in 1859, commissioned
in 1864, and discarded in 1867. She was engined by Maudslay with
horizontal return connecting-rod engines indicating 4400 horse-power and
giving her a speed of 12 knots. The Bann and Brune were built by Scott
Russell as improvements on the Salamander, and were on the longitudinal
system with wave-lines, and they had internal bulkheads separating the
engine and boiler rooms from the bunkers.
The success of the floating batteries at the Crimea was held by the French
to justify the construction of a sea-going ironclad, and the Gloire resulted.
Experiments in America had shown the possibility of the plan, but the
French naval architect, Dupuy de Lôme, considered that it would be
sufficient to plate existing vessels. The Gloire was a big wooden ship cut
down and iron-plated.

Page 332

This stirred the Admiralty to activity and the Warrior was ordered. The
launch of this vessel on the Thames was regarded as an event of national
importance, and in spite of the cold day at the end of December 1860 on
which she took the water, the attendance was exceedingly large, even the
tops of the tall chimneys of the neighbourhood having been let out for the
day to enthusiastic sightseers. She was frozen down to the ways so firmly
that it was with the utmost difficulty that she could be got into the water at
all. Tugs, hydraulic presses, the hammering by hundreds of men on the
ways, and the firing of cannon from her deck to start her by concussion
were all tried separately and then together, and at last the ship glided slowly
into the water. The beauty of her lines was remarkable as she floated in her
light trim, and afterwards, when she was properly equipped and in sea-
going trim, she was one of the most beautiful ships the country ever
possessed. She was iron built throughout, frame and plating being alike of
the metal. She was 420 feet over all, 58 feet in breadth, and 41 feet 6 inches
in depth from spar deck to keel. She was of 6177 tons builders’
measurement. Her engines, which were of 1250 nominal horse-power,
weighed about 950 tons, but her bunkers only held 950 tons, or enough coal
for six days’ steaming. She was divided into twenty-seven water-tight
compartments at the bows and stern, and as the whole of her sides were so
armoured as to afford protection to the vital parts of the ship, it was stated
that even if the fore and stern parts of the ship were shot away, the centre
would remain as a floating battery.

Page 333

The “Waterwitch.”

The Waterwitch is chiefly remarkable for the trial given in her to Mr.
Ruthven’s system of hydraulic propulsion. A small boat was fitted with the
machinery and tried on the Thames. A vessel provided with the Ruthven
apparatus was built to the order of the Prussian Government in 1853, and
for many years worked satisfactorily on the Oder. The chief engineer of
Portsmouth Dockyard, when testifying to the Government as to the
capabilities of the Ruthven method, said it afforded extraordinary facilities
for manœuvring under steam, and he saw no reason why a speed should not
be attained with it equal to that of the paddle or screw. A vessel called the
Seraing was built by the Belgian shipbuilding firm of Cockerill and fitted
with a Ruthven propeller, and when tried against a paddle-wheel vessel of
the same form, tonnage, and horse-power was found to have about 10 per
cent. greater speed than the other. The testimony of the chief engineer of the
Portsmouth Dockyard resulted in the Waterwitch experiment. The hull of
this vessel was constructed by the Thames Iron Works and Shipbuilding

Page 334

Company, and the design of the engines and the construction of the
enormous turbine wheel, of which the propeller consists, were entrusted by
the Admiralty to Messrs. Dudgeon. The Waterwitch was built of iron and
was of 778 tons measurement, 162 feet in length by 32 feet in breadth, and
13 feet 9 inches in depth. She was flat-bottomed, broad in proportion to her
length, and double-ended and had a rudder at each end. Her armour
consisted of a belt of plating 4¹⁄₂ inches in thickness at the water-line and
centrally on her broadside, with armour-plated bulkheads across her upper
deck, the object of the latter arrangement being to enable her to fight her
guns over her deck in line with her keel, through gunports in the thwartship
bulkheads as well as through broadside ports. For the machinery, and in the
bottom of the vessel near the centre, was a long and shallow iron box with
its length in the direction of the vessel. The lower side of this box had an
immense number of small rectangular orifices, admitting water from
outside and under the ship’s bottom, the passage of the water being
controlled by valves which were only opened when the engines were at
work. The turbine wheel drew the water in through the bottom of the vessel
and ejected it through copper propulsion pipes and nozzles, through an
aperture on each side of the ship, a little below the water-line.
The propelling power of the hydraulic wheel is obtained from the force
and volume of the column of water ejected by the wheel from the discharge
pipes, on a principle that a gun recoils on being discharged, but with this
difference, that the recoil from the water-wheel is continuous. If the column
of water were discharged towards the stern the vessel moved forward, and if
towards the stem it moved in the other direction; if discharged in both
directions the vessel remained stationary, and if discharged forward on one
side and towards the stern on the other, the vessel turned either on her
centre as on a pivot, or if the pressure were greater in one direction than in
the other, in a circle the size of which depended on the pressure of the
discharge from either set of nozzles. No reversing of the engines or of the
hydraulic wheel was required under any circumstances, the direction and
force of the discharge being regulated by a series of valves. The hydraulic
wheel was fixed immediately over the sluice valves and water-box, and
revolved in a cast-iron circular case 19 feet in diameter. The wheel was
itself 14 feet 6 inches in diameter and weighed eight tons, and was fitted
with eleven vertical or radial arms and blades. The engines were of 160
nominal horse-power, and steam was supplied by two ordinary tubular

Page 335

boilers. At her trial the Waterwitch covered the measured mile in Long
Reach in 6 minutes 20 seconds. At other trials later in the day she averaged
9 knots.
The shape of the vessel and the fact that she could be steered in either
direction with equal facility were of undoubted advantage from the point of
view of manœuvring, but the trials can hardly be called successful so much
as experimental, as it was ascertained that she would probably have done
better had her nozzles been differently placed and provision made for
altering the size of the nozzles according to the speed at which the vessel
was required to travel. The machinery itself, however, worked beautifully.
The Government ordered a number of comparative tests to be made in
which the efficacy of the Waterwitch method could be judged against that of
the double-screw system installed in the gunboats Viper and Vixen, all three
vessels being of the same size. The two gunboats were not the best of their
kind as they had double sternposts with a cavernous recess between them
and flat overhanging sterns.
Mr. M. W. Ruthven, son of the inventor of the system, it being under his
father’s patent that the Waterwitch machine was built, in addressing the
Institute of Marine Engineers a few years ago, said:
“My efforts to make a ship safe, from an engineer’s point of view, lie in
the method of propulsion. My plans are to apply all the engine-power of the
ship to pumps for propulsion, and which can be used for pumping out
leakage and propelling at the same time. In the largest pump I have made,
800 indicated horse-power discharged 350 tons of water a minute, and
propelled the vessel faster than her sister ships with twin screws. The
hydraulic propeller is of greatest value for the highest speeds, and has the
greatest power of control. As the hydraulic is capable of subdivision to a
great degree, the greatest amount of safety is possible. After an experience
of sixty years of hydraulic propulsion, I am still of opinion that it is the
means by which greater safety can be obtained at sea, and by which the
highest speeds can be obtained with safety and economy.”[97]
[97] Institute of Marine Engineers’ Transactions, vol. ix.

This, however, was said before such phenomenal speeds were obtained
with turbines and combined turbine and reciprocating engines.
A number of lifeboats fitted with jet-propelling machinery have been
built by, among others, Messrs. Thornycroft, and have given every

Page 336

satisfaction. Whatever be the advantages of the system, and they are many,
the drawbacks are very great, and the hydraulic method has been generally
condemned because of the friction engendered by the pumping of such
large quantities of water, and the probability of the inlet orifices becoming
choked by sand, mud, or floating matter.
Notwithstanding its evident advantages, the screw propeller, whether
single or double, had many enemies. It was asserted to be the cause of
premature decay in both wood and iron vessels, and stringent orders were
even given to ship captains to use canvas except in extreme cases when
steam was absolutely necessary. “Our screw navy is, therefore,” said a
paper of that period, “more of a sailing than a steam navy.” The twin-screw
arranged by Messrs. Dudgeon was claimed to have developed the principle
in such a way as to leave no doubt of its superiority over the single
propeller. Twin-screws were no new thing at this time. Captain Smith,
known as “Target Smith” because of his movable target in use on the
Excellent, had experimented with some with a considerable measure of
success, but it was Messrs. Dudgeon who solved the problem of twin-screw
propellers for ocean-going steamers. They demonstrated that as good results
could be got from two small propellers as from one large one.
The first application of twin-screws on the modern principle was made
by Messrs. J. and W. Dudgeon in the Flora in November 1862.
Twin-screws were tried by the Admiralty some years earlier in the
construction of the iron-cased floating batteries, but were driven in those
vessels by one motion from the engines. The adoption of the twin-screw in
their case enabled the Admiralty to build vessels that required only a
moderately light draught of water, and carried, for their tonnage, an
enormous weight of armament and armour, besides the weight of their
engines; but the vessels had no increased powers of turning nor could they
manœuvre rapidly under steam in any circumscribed space. The double
independent screws overcame these drawbacks.
A small vessel in the Clyde worked two screws also, with two rudders,
the idea, as acknowledged by the adaptor, having been derived from the
model exhibited in the Exhibition of 1851 by Mr. John Sturdee, master
shipwright’s assistant at Portsmouth Dockyard.
An unusual degree of interest attached to the trial of the steam-ship Flora
by reason of the fact that each of her twin-screws was to be operated by its
own engine. In the light of future events it is worthy of note that up to this

Page 337

time it was thought that the twin-screw would be useful for smaller vessels
and gunboats carrying six guns or less; whereas the Flora, as representative
of ships capable of carrying large armaments of guns, with considerable
engine-power, and a light draught of water, and with a power of
manœuvring such as could not be possessed by a single-screw vessel,
marked a step forward in the march of improvement which was destined to
have far-reaching results, both in the Navy and the Mercantile Marine. So
important was the trial deemed that the Admiralty sent special
representatives to report thereon. The Flora was an iron vessel, 150 feet
long, 22¹⁄₂ feet beam, and 13 feet depth, and of 365 tons. She had two
independent engines and screws, the latter being placed one under each
quarter, and therefore in front of the rudder, in contrast to the prevailing
system of placing a single screw right astern and behind the rudder. The
cylinders of the two engines were 26 inches in diameter, with a stroke of 21
inches; and the propellers were each of 7 feet diameter with a pitch of 14¹⁄₂
feet. She had two tubular boilers working at 30 lb. pressure, and one high-
pressure boiler working at 50 lb. pressure, the latter boiler being intended to
be used for producing a steam blast in the chimney and to dry the steam
from the two common boilers. The engines were of 120 horse-power
collectively. She was rigged as a fore-and-aft schooner. The principal test to
which the vessel was subjected tried her capabilities of being manœuvred.
With the helm hard over and the engines going full speed ahead, the first
circle was made in 3 minutes 14 seconds, the next in one second less time,
and the third circle in 3 minutes 16 seconds, the diameter of the circle being
about three lengths of the ship, but slightly diminished each time. The ship
was then tested with one screw working ahead and the other astern. One
circle was made in 3 minutes 39 seconds, and another in 3 minutes 49
seconds; “in making these circles the action of the ship’s hull was
extraordinary, the central part being stationary, and both ends moving round
equally. The circle was made on a pivot from the ship’s midship section.
The vessel was then put in a straight course, stopped, and from a state of
rest the engines were started, one ahead and the other astern, the circle
being completed in 3 minutes 55 seconds and the diameter being as before
within the ship’s length.”[98] The Flora proved herself faster than any other
steamer of her size and horse-power, and became, thanks to her speed, one
of the most successful blockade-runners during the American Civil War.
[98] Illustrated London News, November 29, 1862.

Page 338

H.M.S. “Minotaur.”

The experiments in the Flora, and afterwards in the Hebe and Kate,
which were of about the same dimensions and power, were considered so
satisfactory that a trial on a larger and more important scale was made in the
summer of 1863 with the Aurora. This was an iron vessel, 165 feet in
length, with a beam of 23 feet, and a depth of 13 feet 6 inches. Her engines,
of 120 collective nominal horse-power, drove two three-bladed screws, each
independently of the other; the screws were 7 feet in diameter and had a
pitch of 14 feet 6 inches. The cylinders were of 26 inches in diameter with a
stroke of 21 inches. On her trials she steered equally well with either
propellers or rudder, and in the matter of speed passed everything she came
across, including the Sea Swallow, one of the fastest paddle-boats on the
Thames. The distance from Tilbury to the Nore, twenty nautical miles, was
done in 1 hour 17 minutes, “an almost unparalleled rate of speed,
considering the vessel’s horse-power of engine and hull displacement.”[99]
[99] Times, August 1863.

The Experiment was the first twin-screw boat built for the Navy. The
engines were direct-acting, horizontal, high-pressure, and drove two three-

Page 339

bladed propellers, having a diameter of 3 feet 6 inches. She was built by
Dudgeon in February 1863.
Some interesting experiments were also carried out in February 1863
with a steamer called the Edith, built by Dudgeon with a view to testing
further, for the benefit of the Admiralty, whose representatives were present,
the advantages of the twin-screw for naval manœuvring purposes. This
vessel was not constructed for the Navy, however, but for commercial
service across the Atlantic. She was rather larger than the Experiment, being
175 feet in length, 25 feet in breadth, and drawing 9 feet aft and 6 feet 6
inches forward. The twin-screws, each driven by its own engine, were
three-bladed and had a diameter of 8 feet 6 inches, and a pitch of 16 feet.
On her trial run down the river with the Admiralty officials on board, a
speed was attained of nearly 12 knots against the tide, and nearly 15 knots
with the tide, the engines averaging 100 revolutions a minute under 28 lb.
steam-pressure. The vessel turned a complete circle in 3 minutes 29 seconds
with her own centre as a pivot, and then the action of both screws was
suddenly reversed. Their action upon the vessel was instantaneous, the
revolving motion of the ship being changed to the opposite direction with
the greatest ease. The manœuvre was repeated several times, and the vessel
thus represented a revolving battery mounted with heavy ordnance, too
heavy for training upon any given object by ordinary appliances. The hull
became the carriage for such heavy guns, and trained them upon any given
point by revolving under the action of the screws alone.

Page 340

Photo. G. West & Son.

The “Koenig Wilhelm,” German Navy.

Page 341

Photo. G. West & Son.

The “Baden,” German Navy.

The American Navy up to the time of the Civil War was not taken into
very serious consideration by the other nations, but in that momentous
struggle the Federals awoke to the need of thoroughly effective vessels and
built them quickly. They were the last to take to iron ships of war but they
more than made up for the delay. In scarcely a year after the launch of
Ericsson’s Monitor, the first ship of its class possessed by the Federal
Government, there were built, or building, close upon twenty of these
vessels. Various modifications were introduced but the principle was the
same. This was the turret on the deck, where the armament of the vessel
was placed, it being sought to construct an effective battery for defensive
operations rather than to build a sea-going ship.
The contest between the Confederate iron protected Merrimac and the
Federal wooden warships, which ended disastrously for the latter, and the
battle between the Monitor and the Merrimac proved that the old wooden
three-deckers had become obsolete and that they would be perfectly useless

Page 342

against a steam ram like the Merrimac and harmless against an ironclad ram
like the Monitor.
For a time rams and turrets were regarded as all-important. The extreme
in this combination was reached in the French ironclad ram Taureau. She
was one of the most peculiar warships ever constructed. Seen end on she
looked like a tremendous buoy, surmounted by a turret, a funnel, and two
masts. A side view showed that an immense bow extended forward as a
long ram, and that the turret was situated near the bows. The prow was of
bronze and weighed eleven tons, and projected some forty feet under the
water. Her deck view represented her as almost pear-shaped, with
cylindrical sides, and she had her greatest beam at about the water-line. She
was iron-clad for about three feet above the water-line amidships and aft,
but the turret and bows had 5 inch armour. Altogether she was about 197
feet long by 48 feet beam, and carried one heavy gun in the turret.
A combination of three-decker and ironclad ram was the French warship
Magenta, constructed in 1862. She had an enormous ram like the Taureau
and carried eighty guns, and was barquentine rigged.
In England, Captain Coles began in 1859 to urge the construction of
vessels of the cupola or turret type, and after the lesson of the famous
contests in America between the two ironclads, the British Admiralty
decided to try Captain Coles’ boats experimentally. He advocated the
cutting down of the three-deckers into one-deck ships, carrying on this one
deck one or more turrets or cupolas in which the guns should be placed.
These turrets were capable of being turned so that the guns in them could be
fired in any direction, and he proposed that a portion of the bulwarks should
be hinged in order that they could be let down when it was required to fire
the guns, and thus form a sort of additional protection to that portion of the
ship’s side above the water-line, while when raised they would add to the
seaworthiness of the vessels by keeping the water off their decks. Vessels
built according to Captain Coles’ plans, it was contended, would be floating
defences “which would be at once thoroughly manageable, impervious to
shot, movable with ease, and seaworthy. Nor would they be so monstrous
and unsightly to a nautical eye as the inventions of our American cousins.
They would be fitted with masts and yards, having the one peculiarity of
being made of one uniform size, so that ships of all classes abroad could be
furnished at depots, in case of accident, or ships meeting each other could
exchange with or supply their comrades,” to quote from one of the

Page 343

descriptions published at the time. Another advantage was that the
conversion of heavy frigates and line-of-battle ships into iron-plated
vessels, fitted with the Coles shield, could be effected at a comparatively
moderate cost. Experiments with the cupola were tried on the Trusty and
Hazard with success. The standardisation of masts and rigging was another
point on which Captain Coles laid stress. The cupola system had so much to
recommend it that Sir William Armstrong wrote to the Times endorsing it as
solving the problem of working the heaviest guns. Could shipbuilding have
stood still at that period the system would have been an unqualified success,
but the rivalry between armour-makers and gunmakers was so intense that
no sooner did an armour-plate maker produce a plate impenetrable to
existing guns and projectiles than the gunmakers set to work to produce a
gun and projectile which should smash the armour plate.

Photo. G. West & Son.

H.M.S. “Devastation.”

Page 344

Photo. G. West & Son.

H.M.S. “Thunderer.”

The steam corvette Pallas, launched at Woolwich in 1865, differed
materially from any other vessel hitherto constructed. She was originally
intended to be built of iron, but as the necessary machinery was not then in
existence at Woolwich, she was constructed of wood and iron-plated, and
had a belt of armour to protect the most important parts. She was rigged as
a ship so that she might keep at sea for a considerable time, the sails
enabling her to economise her fuel. In order to increase her seaworthiness
she was made high above the water, her fixed bulwarks being eighteen feet
above the water-level. She was also designed to be able to fight end on. The
engines were of 600 horse-power, and, to counteract the enormous strains
the screw propeller was expected to impose, a new system of stern
construction was adopted whereby the sternposts and deadwood were
connected with the sides by internal iron bulkheads, decks, and flats, and

Page 345

external brass castings. The Pallas was 2372 tons burden, and was intended
to be a faster vessel than any wooden frigate in the Navy. The fastest
wooden frigate afloat and complete then was the Mersey, which once got up
to 13¹⁄₄ knots an hour. The Pallas was provided with Mr. Reid’s new bow,
known as the U bow from its shape. This bow gave considerable buoyancy
where it was needed to support the ram, but its shape created a wave
forward and thus militated against the vessel’s speed.
H.M.S. Minotaur, launched in 1865, was almost the last of the great
sailing warships carrying a ram and having powerful auxiliary machinery.
She had five square-rigged masts, and all five topsails were on the divided
principle.
The German ironclad Prinz Hendrick, built by Laird Brothers of
Birkenhead, and launched in October 1866, was barque-rigged, and was
fitted with Captain Coles’ tripod masts. She was also fitted with revolving
turrets, hinged bulwarks, and a sliding funnel.
The Hercules, begun in June 1866, and launched in February 1869, was
one of the best specimens of the entirely iron-built, iron-armoured frigates
the Navy possessed at that time. Her ram bow did not protrude so far as in
former vessels and only weighed about five tons. The armour plating on the
sides of the ship weighed 1145 tons. The total weight of metal worked into
the ship was 4252 tons. The bulwarks were of wood, but below them the
first two strakes were of plates 6 inches thick; next was a strake of 8-inch
armour covering the lower portion of the main deck or central box battery;
then two strakes of 6-inch armour, then a belt of 9-inch armour along the
water-line, then a strake of 6-inch plates resting above the double skin of
the hull itself. The 9-inch plates were backed by 10 inches of teak, inside of
which was an iron skin 1¹⁄₂ in. thick, supported by vertical frames 10 inches
deep and 2 feet apart, while further stiffening structures were also included.
The engines worked up to over 7000 indicated horse-power. The vessel also
afforded an illustration of the tendency to reduce the number of guns and
increase their weight. To add to her steering capacities she had a balanced
rudder which was itself jointed and hinged upon the line of pivot.

Page 346

H.M.S. “Dreadnought.”

The carrying of such quantities of armour was against the maintenance of
high speed at sea, and accordingly the unarmoured iron frigate Inconstant
was launched later in the same year. She carried sixteen guns and was faster
than any other warship afloat.
The Prussian ironclad Koenig Wilhelm, built by the Thames Iron Works
and Shipbuilding Company, from designs by Mr. E. J. Reid, in 1869, was
commenced for the Turkish Government, and was built on the longitudinal
system, having a series of wrought-iron girders or frames extending from
end to end of the ship. There was an inner skin on the inner sides of the
frames and ribs, as though one ship was inside another. She was then the
heaviest vessel ever docked in the Thames, as she weighed 8500 tons. Her
armour was 8 inches thick amidships and tapered slightly towards the ends.
The year 1869 was remarkable for the introduction into the British Navy
of large ironclads without masts or sails and relying upon steam alone for
their propulsion, and these vessels also demonstrated the most perfect form
then understood of the turret ship as applied to a sea-going warship of large

Page 347

capacity. The Devastation, built at Portsmouth, and the Thunderer at
Pembroke, were the first of this class, and were claimed to be more
formidable than any other warships in existence both for offence and
defence. They were each of 285 feet in length and 4406 tons, as compared
with the first ironclad Warrior, 380 feet and 6019 tons, and the Minotaur, of
400 feet length and 6021 tons. The Warrior’s armour was 4¹⁄₂ inches of
hammered plate that would break under the impact of heavy shot; that of
the Minotaur was 5¹⁄₂ inches of rolled armour, in each vessel there being a
strong backing of teak and iron plating built into the frame. The two turret
ships had 12 inches of rolled armour plating on a teak backing built into an
immensely strong framing 18 inches thick, and the whole was backed up
with an inner skin of iron plating 1¹⁄₂ inches thick. The thickest armour then
in use in the French Navy was 8¹⁄₄ inches and was carried only by rams of
the Bélier class. These vessels also included an improvement in the bracket-
frame system of construction, first introduced in the Bellerophon by Mr.
Reid. The “breastwork monitor” of the Devastation type was regarded as an
improvement on the American types of monitors. The turrets were mounted
on Captain Coles’ system and each turret carried two 30-ton guns. The ships
were driven by independent twin-screws and had a speed of 12¹⁄₂ knots.
In 1870 the ill-fated Captain was lost. She was designed by Captain
Coles and built by Messrs. Laird as a sea-going turret vessel. The principal
armament was four 25-ton Armstrong guns carried in two turrets, one fore
and one aft; these turrets were 27 feet diameter outside and 22¹⁄₂ feet inside,
half the thickness of the wall consisting of iron plating. This ship behaved
admirably on her trials and also on an experimental cruise, and was sent to
sea with the fleet in September of that year. From some reason never
explained satisfactorily she capsized without warning, and went down in a
few seconds during a gale in the Bay of Biscay before daylight on the
morning of September 7. Only nineteen of the 500 persons on board were
saved, among the drowned being Captain Coles himself.
This disaster evoked such an amount of criticism as to the vessel’s
stability and seaworthiness that no more of the type were constructed, the
turret ships subsequently built being modifications of the principle.

Page 348

Photo. G. West & Son.

H.M.S. “Lightning.”

Page 349

Photo. G. West & Son.

H.M.S. “Tartar,” Torpedo Boat.

Armour-plated batteries found their chief representatives in the batteries
of the time of the Crimean War, of which the Glatton and Terror may be
regarded as types, and the double-turret principle was developed in such
vessels as the Cerberus. The Terror was built by Palmer’s for the
destruction of the Cronstadt forts. She had three masts carrying square sails
on the fore-mast, and excessively sloping sides and bluff ends, and would
form a remarkable contrast to the graceful lines of the modern battleship.
The Terror was built, armour-plated, and launched in about three months,
thanks to Sir Charles Palmer’s invention of rolling instead of forging the
armour plates.
The battle of Tsushima afforded naval architects some valuable lessons,
and the Dreadnought and the Lord Nelson may be regarded as the first
results. The Japanese-built Satsuma is virtually on the same lines, there
being little to choose between the Satsuma and the Lord Nelson.

Page 350

The Dreadnought’s turbine machinery drives four shafts, and
immediately aft of the inner shafts are twin rudders to give the ship greater
steering facilities. The Admiralty adopted turbines, according to an official
statement, because “of the saving in weight and reduction in number of
working parts, and reduced liability to breakdown; its smooth working, ease
of manipulation, saving of coal consumption at high powers, and hence
boiler-room space and saving of engine-room complement; and also
because of the increased protection which is provided for with this system,
due to the engines being lower in the ship: advantages which more than
counterbalance the disadvantages. There was no difficulty in arriving at a
decision to adopt turbine propulsion from the point of view of seagoing
speed only. The point that chiefly occupied the committee was the question
of providing sufficient stopping and turning power for purposes of easy and
quick manœuvring. Trials were carried out between the sister vessels Eden
and Waveney, and the Amethyst and Sapphire, one of each class fitted with
reciprocating and the other with turbine engines.... The necessary stopping
and astern power will be provided by astern turbines on each of the four
shafts.
“These astern turbines will be arranged in series, one high- and one low-
pressure astern turbine on each side of the ship, and in this way the steam
will be more economically used when going astern, and a proportionally
greater astern power obtained than in the Eden and Amethyst.”
Messrs. John I. Thorneycroft and Co.’s first torpedo-boat for the British
Navy was the Lightning, of 18 knots, but the firm’s Tartar, launched in
1907, broke all records by travelling at 35·67 knots.
The latest destroyers have a speed of 33 knots, though the coastal
destroyers have a speed of only 26 knots. Another remarkable feature in the
Navy of late years has been the number of vessels to be fitted with oil-
burning apparatus instead of coal.
The destroyer Mohawk, built by J. Samuel White at Cowes, is 270 feet in
length, 25 feet beam, and 765 tons displacement, and contains water-tube
boilers and turbines of 14,000 horse-power, and attained a speed of forty
miles an hour. She carries no coal, oil fuel being used, of which her bunkers
can take seventy-three tons. The Tartar’s record was broken by the
destroyer Swift, 345 feet in length with a displacement of 1800 tons, and
having quadruple turbine engines giving her a speed of 36 knots.

Page 351

The cruiser Invincible, launched by Armstrongs at Elswick in April 1907,
is a first-class armoured cruiser 530 feet in length and of 17,250 tons
displacement, and has turbine engines of an equivalent horse-power of
40,000 and a speed of 25 knots.

Photo. G. West & Son.

H.M.S. “Lord Nelson.”

Page 352

Photo. G. West & Son.

H.M.S. “Invincible,” Armoured Cruiser.

The construction of warships has resolved itself into a struggle to attain
an ever-increasing speed combined with offensive power and great range of
action, and warships of varying types have been produced with startling
rapidity, so that one powerful vessel after another has been evolved, each
superseding its predecessor in some degree, until there are “Dreadnoughts”
and “Super-Dreadnoughts” carrying guns and armour and possessing a
speed undreamt of a few years ago. Among smaller vessels, torpedo-boats,
destroyers, scouts, cruisers of various classes, commerce destroyers,
cruiser-battleships, and submarines now take their places in the nation’s
fleet. There is no telling in what direction the next development will be. The
battle of the boilers has played an important part in the development of the
warship, and it is safe to say that had this struggle not taken place to

Page 353

produce a boiler which should give a great pressure of steam quickly, the
speed of the warship as now known would not have been attainable. Twin
screws are succeeded by triple screws, and these are to be followed by
quadruple screws.
The second-class protected cruiser Bristol, launched at Messrs. John
Brown and Co.’s Clydebank establishment in February last, is of special
interest as she embodies the introduction of yet another method of
propulsion. When it became known that an experiment was to be made
there was some speculation as to whether the gas system was to be tried, as
the experiments in the gunboat Rattler are understood to have been
successful, and it is well known that more than one engineering firm has
been giving attention to the subject. The Rattler experiments did not prove
that the requisite power could be developed by the method, and the Bristol
experiment is an installation of the “Brown-Curtis” turbine, this vessel
being the first of recent years for the British Navy in which Parsons turbines
have not been placed. She is of 4850 tons displacement and is to have a
speed of 25 knots. Four sister ships, also building, are fitted with Parsons
turbines. The Bristol will have twelve Yarrow water-tube boilers, and the
furnaces will use either coal or oil. Two other British warships, one an
improved Bristol, are to be fitted with Curtis turbines, besides vessels for
other Powers, and another experiment which will be watched with
considerable interest is the combination of Parsons and Curtis turbines
proposed to be placed in the 32-knot destroyers under construction for the
Argentine Government by Cammell, Laird and Co.
Foreign Governments, the French especially, have made many
experiments in warship building and designing, for the attempts to develop
fixed types have failed in this country as elsewhere, as the type has been
generally superseded almost before the specimen vessel has been
completed. This was particularly the case with the turrets when first
introduced. The barbette system has descended from it, and in turn has been
subjected to numerous changes. The amount of sail carried by modern
gunboats and cruisers, if any, is reduced to the smallest quantity, the masts
being little else than signalling poles; while in the big battleships and
cruisers the masts, which were at one time of the “military” pattern and
were used as hoists for ammunition, being made hollow and of large
diameter for the purpose, have in their turn given way to skeleton masts and
tripods, and combinations of the two, of a strictly utilitarian character. The

Page 354

bringing down of a mast, fitted for wireless telegraphy, at the first round in
some firing practice recently, showed that naval architects have not yet
reached the last word in the development, or diminution, of the masts.
Some exceedingly powerful battleships have been built in this country
for foreign nations, among the latest being the Minas Geraes, by
Armstrongs on the Tyne, for Brazil, which represents all that is most
modern in the construction of a warship, this vessel and her sister being two
of the most powerful battleships ever designed. They show, too, what
private yards can accomplish.

The “Minas Geraes,” Brazilian Navy.

Many of the vessels which defeated the Russians at the battle of
Tsushima were built in this country. Both Germany and Japan, which were
among Britain’s best customers for warships, now depend, entirely in the
case of Germany and almost entirely in that of Japan, upon their own
shipbuilding yards. The Germans have been building warships of the

Page 355

“Dreadnought” class and making such improvements as they thought suited
to their needs, and of late years have been producing a number of vessels
equal in power and speed to the British ships, and, if some people are right,
of even greater fighting capacity in every way. The rise of Germany to the
position of a first-rate Naval Power has been rapid, and the sacrifices the
country has made to obtain its magnificent Navy have been great.
The American Navy has developed in its own way. The naval architects
of the United States have been unfettered by the traditions of the navies of
other countries and their products have been remarkable for the number of
vessels designed to meet special circumstances. This was particularly the
case during the Civil War, when all sorts of steamers, from excursion boats
to tugs, were pressed into service, and many gave an exceedingly good
account of themselves. A remarkable vessel which was expected to
revolutionise naval warfare was the Destroyer, in which a special make of
dynamite gun was fixed, but it was hopelessly outranged by other guns. The
opposition to steam in the Navy was as bitter in America as in this country
when the innovation was first proposed. James Kirke Paulding, a member
of Van Buren’s Cabinet in 1837, disliked steamers so much that he wrote
that he would “never consent to see our grand old ships supplanted by these
new and ugly sea-monsters”; and elsewhere he wrote “I am steamed to
death.”
In 1858 the American naval architect, John Willis Griffiths, built to the
order of the American Government the gunboat Pawnee, which was fitted
with twin screws and a drop bilge to increase the stability at the least
expenditure of engine-power. The Pawnee carried a frigate’s battery, but it
is stated to have drawn only ten feet of water. He also, in 1866, designed
and constructed triple screws for great speed.
The United States decided upon a very powerful Navy a few years ago,
and sent a splendid fleet on a tour round the world as an object-lesson. As it
is contended that the life of a battleship as a fighting unit of the first class is
only fifteen years, an extensive modernising process has been going on. The
sister ships Kentucky and Kearsarge were constructed with superimposed
turrets, two fore and two aft, the lower turrets having two 13-inch guns and
the upper turrets two 8-inch guns each, but this method of placing the
turrets has not commended itself to naval architects of other countries, and
has not been repeated in the American Navy.

Page 356

The warships Wilmington, Kearsarge, Missouri, Arkansas, West Virginia,
Charleston, Virginia, North Carolina, and Delaware are among those built
by the Newport News Shipbuilding and Dry Dock Company, and several
have been constructed by Messrs. Cramp at Philadelphia and by the Union
Iron Works at San Francisco.
The battleship of the future, in the opinion of one eminent shipbuilder at
least, will be very different from existing types. Messrs. Vickers, Sons, and
Maxim, who are no mean authorities on warship construction, were stated
recently to have been engaged in elaborating plans for a mastless vessel,
propelled by a system of gas machinery, without funnels or other deck
obstructions, of a greater speed than any warship afloat, and able to fire ten
12-inch guns on either broadside and six of them either right ahead or
astern, without counting a number of smaller guns. Such a vessel would be
propelled by four screws.

Page 357

Photo. G. West & Son.

The “Kearsarge,” U.S. Navy.

Page 358

Photo. G. West & Son.

The “San Francisco,” U.S. Navy.

Page 359

CHAPTER XII
MISCELLANEOUS APPLICATION OF STEAM-POWER
Tugs — Cargo-boats — Floating Docks — Ferries — Icebreakers — Yachts — Eccentricities of

Design — Conclusion

ot the least important of the types of steamers which throng
the ports of the world—or which used to do so, for their
number is decreasing—is the tugboat. Up to a few years
ago it played a most important part in the work of a port;
every sailing ship entering port usually engaged the
services of a tug; many ports, like that of London, could
not be entered at all by a large sailing ship without the
services of “a fair wind ahead,” as sailors often call the tug, and in the
waters outside the Port of London the tugboats found one of the best
“pitches” in their business. To be towed safely into port might mean a
saving of many days in avoiding the waiting for a wind. The tug was
equally useful to a ship leaving port, as she might not only tow her into the
open sea, but might even take her right out of sight of land altogether, in
helping her along until a favourable slant of wind was met. At ports like
Liverpool sailing-ship masters often, when wind and tide were favourable,
brought their ships into port under full sail without a tug, though probably
three or four of them kept her company in the hope that their services would
be required, as they generally were when the time came to enter dock.
Nowadays sailing ships are few in number and are becoming fewer, and
steamers seldom require aid. They enter and leave port under their own
steam and even at times dispense with a tug when passing through the dock
entrance, their own steam or a steam capstan ashore being found sufficient.
But a certain amount of towing has still to be done, and the tug is then
able to prove herself indispensable. She has often to tow a ship from one
coast port to another, while for rescue work on the coast their services mean
all the difference between success and failure. A lifeboat is towed to a
wreck or vessel in danger. The tug, which has perhaps been several hours

Page 360

fighting her way forward against a howling gale and a terrific sea which
threatens to overwhelm her, then stands by, and a paragraph in the papers to
that effect is about all the recognition she gets, yet the perils undergone by
the men on the tug are no less real than those of the lifeboatmen. Year in
and year out the tugs pursue their calling, and it must indeed be bad weather
that will induce a tugboat captain to seek the shelter of a harbour if his
bunkers are fairly full and he sees a chance of doing business.
The feats performed by some tugs are extraordinary. They will undertake
a voyage of a few thousand miles as serenely as one of as many yards.
Cleopatra’s needle, in its strange cylinder ship, was towed to this country,
after being lost adrift in the Bay of Biscay, by a well-known London tug.
Among the most remarkable recent feats are the towing of immense
unwieldy floating docks from this country to South American west-coast
ports; it is not too much to say that a tug-owner will cheerfully undertake to
tow anything that will float from any one seaport to any other.
The cargo steamer until ten or fifteen years ago possessed no special
features. It was simply a big box carrying propelling machinery and as
much cargo as possible on the smallest attainable registered tonnage. Such
vessels were usually loaded and discharged by the necessary machinery on
the quay side, while if the transfer of cargo had to be to or from barges
alongside, the operation was likely to be tediously performed by means of a
derrick or two, or a gaff with tackle that might or might not be worked by a
steam-winch. The increasing size of vessels and the use of steel for steamer
building rendered imperative the adoption of faster methods, and the
demands for special steamers adapted for particular trades brought about
the development in cargo steamers of special types. These types have to a
very large extent taken the trade away from the steamer of the “tramp”
class, which wandered from port to port taking cargoes of anything or
everything from anywhere to anywhere. They were usually slow and
uncomfortable boats and the complaints made as to the condition of some
of them were fully justified. The demand for better cargo accommodation
was met by the supply of vessels of various types which are a tremendous
advance upon the old “tramp,” and their advent compelled the builders of
ordinary cargo carriers to produce a better and larger steamer in every way,
and fitted with modern appliances for the rapid and satisfactory handling of
cargo.

Page 361

The cargo “tramps,” built about 1902, were on an average about 350 feet
long, 2800 tons gross and 4000 tons dead weight. In build they were of the
poop, bridge, and forecastle deck type with main deck below the upper
deck, and fitted with double bottoms. The appliances for working cargo are
extraordinarily complete and effective. To each hatch there are usually two
winches and two derricks, having 5 tons lift each, with, as a rule, a heavy
derrick capable of lifting from 20 to 30 tons; the last is portable, so that it
can be used at either of the two main hatches. Cathead davits have been
dispensed with as, with stockless anchors, they are not required owing to
the anchors stowing up the hawse pipes. Officers, &c., are berthed in
deckhouses built on the bridge deck, leaving the bridge ’tween deck clear
for cargo. Electric light and steam-heating are fitted to all rooms,
advantages not enjoyed by older boats.
About the year 1904 the shelter-deck type reached its present stage of
perfection, the advantage of this type being increased cargo capacity on a
small net tonnage. The accommodation of officers and engineers is fitted in
midship deckhouses and side houses. Much more attention is now paid to
the ventilation of the holds and ’tween decks, more especially in coal-
carriers, where efficient ventilation is of the highest importance. The
adoption, within very recent years, of wide-spaced pillars in holds and
’tween decks has greatly improved the facilities for stowage of large cargo.
The four desiderata of a modern cargo-boat are that she should have a
low registered tonnage in comparison with her capacity, ample water-ballast
tanks, large hatchways, and holds as free from obstruction as possible.
Three or four methods are practised by builders for attaining these objects,
and every builder has made modifications of them as time has shown the
necessity of the changes to meet varying trade conditions.
The principal types of cargo vessels are the turret, trunk, cantilever, and
side tank.
The earlier modern ocean-going steamers were usually flush-decked.
This left the machinery openings bare in the deck, so a bridge was added for
their protection, and the flush deck was further encroached upon by the
addition of a forecastle and poop. In some cases the quarter deck was
raised, which was an awkward arrangement on account of the change it
necessitated in the structure and framing, and in others the bridge and poop
were joined. What is sometimes called the “three island” type, a very
appropriate name in rough weather when the steamer takes a sea on board,

Page 362

came into great favour; it consists of a forecastle, bridge, and poop, and
many vessels of considerable size have been built in that style. The cattle
trade was responsible for some important changes in design, the “wells”
where the cattle are carried being given iron and steel shelters, which thus
form the shelter decks, a type of light deck introduced into the
superstructure of most ocean-going steamers.
The secret of the turret steamer is strength without unnecessary weight.
Every ton of steel that can be kept out of a ship without reducing her
strength adds a ton to her carrying capacity. This object is partly achieved in
the turret steamer by the large amount of flanging adopted in the
construction of these vessels. This is shown in the whole of the sheer strake
and stringer plates, in the deck and frames of the cellular bottom work, and
with great success in the joggled plating of the hull. Since 1895, when the
Doxfords introduced a new method of rolling ships’ plates with joggled
edges, they have built all their vessels under this system, making “packing”
unnecessary. The turret gives longitudinal strength in the hull and leaves the
hold clear. The strength is so great that in a steamer in which, by the
substitution of deep for ordinary frames, all internal supports, beams, and
girders are dispensed with, a clear hold is obtained. The firm claims that 58
cubic feet per ton dead weight under hatches is secured against 52 to 54
cubic feet per ton in the ordinary type. Thus the turret carries more on a
given displacement, and having a lower registered tonnage, can earn more
freight and save expenses. There are several designs of turret steamers
adapted to different trades. Their suitability for bulk cargo, such as coal, or
for large and heavy packages, is evident, while other types are equally
suitable as passenger steamers, not a few lines having adopted them.
Another advantage is that deck cargoes of wood can be carried with perfect
safety on the turrets. Some of the cargo-boats designed for the ore and coal
trade have their machinery right aft, and their holds are absolutely clear of
obstruction of any kind whatever. Many of these are mastless but are fitted
with twin derricks, a 10,000-ton boat carrying as many as seven pairs. The
first of the mastless type was the Teucer. Convention fixed the depth of hold
at about 15 feet, but now a depth of 26 feet and more is becoming fairly
common. All cargo vessels are built on the box-girder system, which
ensures great strength and capacity, and permits of enormous hatchways,
and marine engineers have solved the problem of providing greater speed
without additional expense.

Page 363

Messrs. Doxford, in their latest attempt to solve the problem of the
easily-shifting cargo in bulk, proposed that vessels intended for this trade
should have inner upright walls fitted some distance from the hull, and so
arranged that when the vessel is heeled over within the usual range of
inclinations of a vessel at sea, the weight of the cargo and the buoyancy
create a restoring couple in all conditions of loading. The spaces between
the cargo-hold and the outer shell may be left empty or used for water-
ballast as required. In some instances the bottom is reduced in depth as
much as the loading regulations will allow.
Among the more notable features of recent years in cargo-boats specially
adapted for the coal, iron ore, and other dead-weight trades is the patent
cantilever framed type of steamer built by Sir Raylton Dixon and Co., Ltd.,
Cleveland Dockyard, Middlesbrough, on the Harroway and Dixon patents.
This type of boat has the advantage of having totally unobstructed holds
with very large hatchways and an additional 75 per cent. water-ballast,
which is placed in the tanks inside the cantilever construction at the top of
the holds under the deck. In these steamers the space on either side and
under the decks is used for water-ballast, which is carried in triangular tanks
at either side of the vessel, immediately beneath the main deck. The tanks
extend from the coamings to the sides of the ship, the greatest side of the
triangle being towards the cargo and supported by the cantilever framing;
the tank framing and plating increase the strength of the hull materially. The
sloping topsides thus formed prevent bulk cargo shifting. An advantage to
the owner is that the tanks are exempt from tonnage measurement. When
these tanks are filled with water and also the lower and peak tanks the
vessel is seaworthy even if the cargo-space is empty.
This additional water-ballast has the special merit of immersing the ship
deeper when in ballast only, consequently giving more power to the
propeller and rendering the ship more manageable when light, as well as
supplying unique security in case of damage, for when one of these boats is
loaded and the topside tanks are empty, they correspond to the air tanks of a
lifeboat and thus prevent the ship from sinking.
These vessels in some cases have been fitted with shelter decks right fore
and aft for the carriage of cattle and horses, and indeed would be suitable
for passenger service, for which the very easy rolling movement would be a
great recommendation.

Page 364

This type of vessel has been on the market for about four years and
already some 200,000 tons have been built. One of the largest steamers built
on this plan is the Echunga, 405 feet long, 56 feet beam, and 28 feet 8
inches moulded depth. She was built in 1908 for the Adelaide Steamship
Company. Her net register is 2245 tons, her dead-weight capacity 8400
tons, and her measurement 11,000 tons. Her topside tanks contain 1350
tons, and her total water-ballast is 3200 tons.
In the steamers built by Messrs. William Gray and Co., Ltd., of West
Hartlepool, water-ballast is carried not only in the double bottoms but in
side tanks, the inner skin of the double bottoms being carried a considerable
distance up the sides. A hull within a hull is thus formed, the intervening
space being used as water-ballast tanks. Not the least advantage is the great
additional strength the ship is given. The trunk system of shipbuilding
adopted by Messrs. Ropner and Sons, Ltd., of Stockton-on-Tees, differs
from the turret by having a double wall on each side, and has not the
rounded turret base. The steamer Thor, built for a Norwegian owner, has
only one hold, no less than 250 feet in length, the engines being placed aft.
Messrs. R. Craggs and Sons, Ltd., of Middlesbrough, have made a
speciality of building tankers, and were the designers and contractors for
the first ocean steamer to load oil in bulk. Their stringerless system of
construction is, they claim, the last word in transverse framing, and has
numerous advantages for single-deck vessels.
During the last three years three distinct innovations in steam-ship
construction have been made. All three are of a revolutionary character, and
two are likely to have no small influence upon the construction of both
passenger and cargo steamers, while the third is of great importance for the
rapid loading and discharging of coal and ore cargoes. The first of these is
the Isherwood system of longitudinal ship construction, in which the
transverse frame as ordinarily understood is dispensed with, but deep
transverse web frames are placed at intervals of 15 to 18 feet apart and
extending right round the ship, forming both frame and beam together.
These frames are intersected by longitudinal frames consisting of sections
of convenient form, preferably bulb angles, spaced about 20 to 30 inches
apart, just as transverse frames are under the ordinary system. The fore and
aft frames are fitted beneath the deck also, and are spaced from 30 to 50
inches apart. In the double bottom the fore and aft girders are formed of
plates and angles.

Page 365

The first general cargo vessel on this plan was the Craster Hall, launched
in February 1908 by Messrs. William Hamilton and Co., Ltd., Port
Glasgow. Her length is 392 feet 6 inches; breadth, 50 feet; depth, 29 feet to
the upper deck; dead weight, 7300 tons.

The “Monitoria.”

The “Iroquois” and the “Navahoe.”

Two oil-tankers, the Paul Paix and Gascony, have been built by Messrs.
Craggs and Sons on this system. One of them grounded off Calais with a
cargo of oil or benzine on board, and on being dry-docked for examination
was found to have no damage to her plates whatever. All the steamers built
on the Isherwood plan have a marked absence of vibration even when
running light.
The corrugated steam-ship Monitoria, launched in the summer of 1909
by Messrs. Osbourne Graham and Co., Sunderland, to the order of the
Ericsson Shipping Company of Newcastle-on-Tyne, is another departure
from accepted ideas. She is an ordinary “tramp” steamer so far as
dimensions and engine-power go; her only difference, and it is an important

Page 366

one, is that she has two corrugations running along each side between bilge
and load water-line, and extending from the turn of the bow to the turn of
the quarter. These corrugations do not project very greatly, but according to
the inventor, they so affect the stream and wave action around and under the
vessel that a source of wasted energy is prevented, and more power
becomes available for propulsion. The Monitoria’s dimensions are: length,
288 feet 6 inches over all; breadth, 39 feet 10¹⁄₂ inches; the breadth over the
corrugations is nearly 42 feet. The space for bulk cargoes is greater than on
her sister ships by the cubic contents of the corrugations, but the tonnages
remain unaltered. As a sea-going ship it was found that the corrugations
made her much steadier, acting as though they were bilge keels, and that the
coal consumption was less, notwithstanding that she made faster time than
her sister vessels under precisely similar conditions.

The “Monitoria”: Transverse Section.

Page 367

The third innovation is the application of the belt-conveyor principle to a
collier. The steamer Pallion, in which the machinery is installed, is
equipped throughout with twin belt conveyors which, travelling fore and aft
the vessel in a space under the cargo, carry the cargo towards the stern,
whence it is carried on other belts at the front of the poop for delivery. The
latter belts are carried on swivel booms which can be raised or lowered or
moved sideways, so that the cargo is delivered direct by the belts into
railway trucks on the quay or into barges, and the operation can be
conducted at the rate of 250 tons an hour on each side of the vessel
simultaneously. Under this system no shoots are used, and there is no
handling of the coal. The Pallion requires only about six hours to discharge
a full cargo with six men, as against over a hundred men and eleven hours
in the ordinary way. Her water-ballast tanks can be emptied or filled as fast
as the cargo is placed in her or taken out. She was built by the Doxford firm
at Sunderland for a Newcastle Shipping Company.
The carrying of petroleum in bulk has spread enormously of late years in
both steamers and sailing vessels specially designed for the purpose. In all
such vessels the method of the subdivision of the holds into tanks is of the
greatest importance, together with that of ventilation, and every builder and
owner of such vessels has his own theories as to the best means to be
adopted. A later type of tanker has the engines astern. A further innovation
in this class of steamer is to fit them for burning oil fuel, the two big tankers
Oberon and Trinculo having had the necessary installation placed in them
last year at Smith’s Dock, North Shields, sometimes called “the home of
tank-steamer repairing work.”
An economical method of transporting oil in bulk across the Atlantic is
adopted in the case of the steamer Iroquois, which herself carries about
10,000 tons of oil in bulk, and also tows with her the sailing barge Navahoe,
carrying an equal quantity, one set of engines thus doing duty for both
cargoes. The Navahoe is the largest sailing ship in the world, is schooner-
rigged on all her six masts, and is able to make her way to port in case she
becomes separated from her consort.
The floating dock is one of the most interesting of the many
developments in connection with the naval and mercantile marine of the
second half of the nineteenth century. Like all innovations, floating docks
were received with derision.

Page 368

Now they have proved their worth, but circumstances are easily
conceivable in which all the marvels they have already accomplished will
be far eclipsed by what they may be called upon to do. In the case of a
naval battle, for instance, it may be a matter of impossibility for a crippled
warship to enter a dry dock, or even to get to one; but a floating dock can be
sent to meet the injured warrior and possibly save it from going to the
bottom altogether.
The floating dock is a sort of raft, and the first man who ever hauled a
boat from the water upon another boat or raft to repair, it started the idea of
the floating dock. The first real floating dock, as the term is now
understood, was probably that which was improvised in the Baltic Sea, so
tradition says, by the skipper of a vessel which had sustained some damage
in those waters. He bought an old hulk, removed the stern, and in its place
constructed a flap gate. His vessel was then floated into the hulk, the flap
gate was closed and the water pumped out. Floating docks of this type were
almost the only kind known up to the beginning of the nineteenth century,
and are in use to-day at some ports for small yachts, fishing-boats, and
vessels of similar dimensions.
With the growing size of vessels, greater docking facilities became
necessary, and, as the commerce of the world increased and ports were
developed, demands arose for docking accommodation which could not
always be met, owing in some cases to financial difficulties, and in others to
the engineering difficulties connected with the localities. As a solution of
the problem, the floating dock, as it is known to-day, was invented. In spite
of the opposition with which it was greeted, the new contrivance held its
own, and its merits became generally recognised.
The difficulties and the cost of constructing dry docks are very great, and
the time taken in the work may run into years; one dock, indeed, is stated to
have taken fifteen years to complete.
As an instance of rapidity of floating-dock construction, the Vulcan
Company of Stettin required a dock 510 feet long and of 11,000 tons lifting
power at short notice. The complete dock with all machinery and fittings
was launched within seven and a half months, and within eight months and
thirteen days of the inception of the project, the dock, after being towed
across the North Sea and moored in place at its site, was sunk ready to
receive its first ship. The Havana dock was delivered at Havana within
eleven months after the signing of the contract for its construction; the

Page 369

actual time expended on it, dating from the day the first plate was laid until
the complete dock was launched, was six months and a day. Both these
docks are of over 10,000 tons lifting power. How long would it have taken
to excavate and build graving docks capable of receiving vessels of the size
that these docks can accommodate?
No dry dock can take a vessel larger than itself, and in reckoning the
dimensions of a dock for receiving purposes it must be remembered that its
cill is a fixture, that the width of the entrance at the cill must not be made
greater than the strength of the structure will permit, and that though a dock
may in other respects be able to receive a vessel it cannot do so if that
vessel through any mishap should draw as much water as that at depth of
cill, or if in heeling over, its bilges should be wider than the width of the
dock entrance. None of these drawbacks apply to the floating dock. These
immense modern structures of steel and iron can receive vessels longer than
themselves, and in the case of the off-shore docks, can receive vessels wider
than themselves.
Should a vessel be heavily down by the head or stern, a floating dock can
be tilted to lift it, and should the vessel be heeling over, the dock itself can
be inclined so that it shall receive it without difficulty. Yet another
advantage is that the floating dock can be used in any kind of ordinary
weather. Lying at its moorings it is head on to wind and sea. The amount of
surface it opposes to the direct action of wind and sea is comparatively
slight. The very massiveness of its structure reduces longitudinal and lateral
motion to a minimum, especially when submerged. Even with a fairly
heavy sea running, a damaged and leaking vessel can be brought upon the
dock where its weight, added to that of the dock itself, makes the combined
structure additionally stiff, so that the necessary repairs can be undertaken
in safety as soon as the vessel is lifted, and with as much ease as if the dock
and its burden were in still water. Floating docks also can be used at any
state of the tide, but he would be a rash man who attempted to warp a vessel
into an ordinary dry dock with the tide running past the entrance with any
degree of strength.

Page 370

Old Floating Dock at Rotherhithe,
circa 1800.

The earliest type of the modern floating dock is that known as the box
dock. It consists of a pontoon divided into cells or compartments, and
having on either side a large wall also divided into compartments arranged
in tiers, the ends of the structure between the walls being open. The earliest
of these docks were made of wood, and compared with those of later date
were of small dimensions. One of the most noteworthy wooden docks was
that at Rangoon, launched in February 1866, and having a length of 300
feet, with a breadth of 90 feet, and an inside breadth of 70 feet, and able to
take vessels drawing from 15 to 16 feet of water. There is also at Altona a
wooden floating dock built in 1868 and still in active use; it is 138 feet in
length, and can lift vessels up to 420 tons register. The early floating docks
were usually in transverse section like the capital letter U, and followed
fairly closely the form of the round-bottomed ships of the time. As the
girder principle, however, became introduced in shipbuilding it was
recognised that floating docks must be constructed approximating to that

Page 371

shape, and modern floating docks are now built rectangular in transverse
section, though in constructional details this form is a modification of the U
shape.
Floating docks themselves are in occasional need of repair, and when it
was found that they could be constructed of a greater size than any then
existing dry dock, it being customary to dry dock them for repair, the
necessity arose of devising a means whereby the repairs could be made
without taking the floating dock out of the water. Sometimes a dock can be
tilted endways or sideways as occasion requires, for a portion of its under-
water surface to be exposed, but there is obviously a limit to this operation
and to the effectiveness with which work under these conditions can be
carried out. This difficulty was met by constructing docks on the sectional
principle, whereby any two sections of a floating dock constructed in three
sections can lift the other one; while with off-shore docks, which are
usually built in two sections, either can lift the other. An attempt to careen
the old U-shaped Bermuda dock nearly capsized her altogether.
One of the earliest—if indeed not the earliest—of self-docking double-
sided docks is that associated with the name of Mr. Rennie, and now
generally known as the Rennie type, or, in an attempt made at uniform
classification of self-docking docks by Messrs. Clark and Standfield, who
probably have had greater experience of floating-dock designing than any
other firm in the world, the “sectional pontoon” dock. This is an extremely
simple form of dock, consisting of a series of similar pontoons connected
together into a whole by the walls or side girders, which run along each side
on top of the pontoon, to which they are attached by bolts. In self-docking,
any particular pontoon can be unbolted from underneath the walls, allowed
to sink slightly, and then be drawn out sideways, turned half round, and
lifted on the rest of the dock. The type is also very suitable for erection
abroad, for the pontoons can be built and launched separately, and, being
but light structures, require no expensive launching slips, whilst the side
walls can be erected on top of the pontoons after they are afloat.[100]
[100] “Modern Floating Docks,” by Lyonel Edwin Clark, M.I.N.A.

The first Bermuda Dock, launched at North Woolwich by Messrs.
Campbell, Johnstone and Co., in September 1868, was the largest built up
to that time, and was ordered by the Admiralty for the use of British ships in
the West Indian Squadron. It was 381 feet in length, 123 feet 9 inches in

Page 372

extreme breadth, and had a total depth of 74 feet 5 inches. Caissons
enclosed a dock space of 333 feet by 83 feet 9 inches in width, capable of
receiving a vessel of 3000 tons. The section of the dock is of U form
throughout, though for convenience of towing, a tapered bow of wood was
added, and remained until it rotted off at Bermuda. The dock was designed
by Mr. Campbell. The sides consisted of a cellular space 20 feet in width,
and midway between the inner and outer skin was a water-tight bulkhead,
running the whole length of the structure. Each side was subdivided by
longitudinal bulkheads into three compartments, named from the bottom,
the “air,” “balance” and “load” chambers, and was further subdivided into
twenty-four water-tight cells. The dock was fitted with four steam engines
and pumps on each side. Hitherto all floating docks had been built in
sections, shipped to their destinations and erected there. The Bermuda dock,
however, was towed there, experimentally, and so successfully was the
work accomplished that the towing of floating docks across the ocean has
become the rule, and some wonderful feats of towing have been performed.
This dock, becoming unequal to the requirements of modern shipping, gave
place to the present dock built at Wallsend in 1902.

Model of the Bermuda Dock.

Page 373

The length of the present Bermuda dock is 545 feet over the keel blocks,
its width of entrance 100 feet, and it is capable of normally taking vessels
drawing 33 feet of water over keel blocks 4 feet high. The walls themselves
are 53 feet 3 inches high, and 435 feet in length, and they form girders of
enormous strength. Three pontoons, secured to the lower portions of the
walls by fish-plate joints, lugs, and taper-pins, form the bottom or deck of
the dock. The middle pontoon is a rectangle 96 feet by 300 feet; the end
pontoons, each 120 feet long, taper for 49 feet towards their outer
extremities to facilitate towing.
At this immersion the walls have a freeboard of 3 feet 6 inches, which in
urgent cases might be safely reduced by a foot or more in order to increase
the depth of water over the blocks. Its lifting power up to pontoon-deck
level is 15,500 tons, but by utilising the “pound” formed by the bulwark
surrounding the pontoon decks, additional lifting power up to 17,500 tons
can be gained. The dock, without its machinery, weighs 6500 tons. When
called upon to perform its maximum lift the dock is sunk until the summit
of its walls is but 2 feet 6 inches above sea-level. Water is admitted into the
three pontoons and the two side walls, and from them removed by eight 16-
inch centrifugal pumps at a rate sufficient to lift an ironclad of 15,000 tons
in three and a half hours. In order that the dock may not tilt as it rises, the
whole is divided into fifty-six divisions, each of which is separately
connected with the pumps. By turning off cocks, water can be left in any
desired divisions, and the dock forced to incline in any direction for
purposes of cleaning and repairs. When undergoing its official tests the
Bermuda dock lifted H.M.S. Sans Pareil over 11,000 tons, and after its
arrival at Bermuda it received and raised completely out of the water
H.M.S. Dominion, when that vessel was badly damaged through stranding
and was so down in the water as to displace nearly 17,000 tons.
It is specially important that a structure of this kind should be self-
docking, that is, able to lift any part of itself clear of the water. To expose
the bottom of one side the dock is first lowered to a depth of 20 to 21 feet,
the water inside the wall compartments being brought to the same level as
that of the water outside. The dock is then raised by emptying the pontoons,
and when these are exhausted the water is released from the side to be
exposed until the outer corner is two feet or more clear. The pontoons are
lifted in turn by withdrawing the pins of one, and allowing it to float, while
the rest of the dock sinks. The pontoon is then made fast to the walls at its

Page 374

floating level, and the dock emptied, so exposing the whole of the bottom of
the raised pontoon. The two end sections can be treated simultaneously, and
floated if required on to the central portion, but the latter must be moved
only when the other pontoons are in position. Electric lights and hauling
machinery are distributed over the dock. A crane capable of lifting five tons
runs along each wall from end to end.
A somewhat similar dock to that at Bermuda, slightly shorter but of
greater lifting power, was designed for the Navy Department of the United
States of America, and constructed by the Maryland Steel Company at
Baltimore, and stationed at Algiers near New Orleans. Its length is 525 feet
over blocks, its entrance 100 feet, and its lifting power up to pontoon-deck
level no less than 18,000 tons, making it as regards lifting power then the
most powerful dock in the world. This lifting could be increased to 20,000
tons by using the “pound.” Its hull weight is 5850 tons.

Self-docking of the Bermuda Dock (well heeled).

Page 375

Bermuda Dock: Centre Pontoon Self-docked

It is interesting to note the different methods adopted by the
Governments of the two countries for the shoring or berthing of the ships on
the dock. The English custom in the case of ironclads of the pre-
Dreadnought era, and also that of Italy and Japan, is to support the armour
belt on more or less vertical shores inserted under an angle-iron firmly
attached to the belt.
These shores are put into position as the ship is rising, and, as the water
recedes, more and more shores are inserted. The Bermuda dock has large
and heavy altars constructed for this purpose. The American custom is to
strengthen the bilges of their ironclads with strong bilge docking keels,
forming, with the keel proper, a level bottom. No shores are required
beyond those necessary to centre the vessel, and no great care is required in
adjusting the berth, and one set of bilge blocks does for all sizes of vessels.
The American plan affords a great saving in weight and quantity of shores,
and, what is more important, a great saving in time, not only in the

Page 376

preparation of the berth and centreing of the ship, but also in the actual
lifting. With the American plan it would be perfectly feasible to dock a
vessel completely in the time required to centre and adjust her with shores
disposed according to English practice.
The Penarth Floating Dock was constructed in 1909 at Wallsend to the
order of the Penarth Ship Building and Ship Repairing Company, Ltd. The
dock is of the off-shore or single-walled type, and is one of the finest of its
kind. It has an over-all length of about 380 feet, an extreme width of 75
feet, and is capable of accommodating vessels having a beam of 55 feet,
with a draught of water up to 18 feet, and a displacement of 4200 tons. Its
pumping machinery consists of four centrifugal pumps and engines, for
which steam is supplied by two large Babcock and Wilcox boilers, working
at 160 lb. pressure. This plant can lift a vessel of 7000 tons dead weight in
three-quarters of an hour. For self-docking, the dock is divided transversely
into two equal portions, each with its own pumping plant, so that either
section can be docked by the other portion. A powerful steam capstan is
fitted at each end of the top wall to assist in warping vessels into position
when lifting or otherwise. It has eight mechanical side shores in addition to
the usual accessories for facilitating the rapid handling of vessels, such as
bilge shores, roller fenders, rubbing timbers, and bollards. A duplex
reciprocating pump, with a capacity of about 100 tons per hour, has a
connection to the main drain of the dock, and enables practically the whole
of the water to be pumped out of the dock. On the delivery side the pump is
connected to a service-pipe, which has connections at intervals for 3-inch
delivery hose. The pump is capable of throwing three jets of water to a
height of 40 feet.
To enable this floating dock to enter the wet dock in which it was to
work, the entrance to which is several feet less than the width of the dock, a
joint was provided running the whole length of the pontoon. On arrival of
the dock in Penarth roads this joint was disconnected, and the separate
sections towed into the wet dock, and reconnected, and the necessary
attachment made to the quay wall.

Page 377

Bolted Sectional Dock Lifting a Vessel.

The Callao floating dock, the towing of which to its destination from the
Tyne was the most hazardous towing feat ever accomplished, merits special
attention, both on account of the completeness of its equipment and of the
extraordinary interest which was manifested in its journey. It is one of the
double-sided self-docking type, known as “bolted sectional,” and is divided
into three separate portions. It is capable of lifting vessels having a
displacement of 7000 tons, but it is so designed that this lifting capacity
may be increased to 9500 tons at some future period by the addition of a
fourth section, making the over-all length about 510 feet, the present length
being 385 feet. Its extreme width, i.e., the clearance between the rubbing
fenders, is 70 feet, and the draught over keel blocks is sufficient to take
vessels drawing 22 feet. As in previous floating docks built on the Clark
and Standfield principle, each section has its own independent pumping
machinery and steam-supply. Such usual accessories as keel and bilge
blocks, mechanical side shores, rubbing timbers, flying gangways, head
capstans, &c., are supplied, and there is also a heavy mooring outfit of
anchors and cables. The dock was launched in June 1908, and at that time
satisfactorily completed a self-docking trial by lifting one of the end

Page 378

pontoons alongside the Wallsend shipyard. For this purpose the three
sections of the dock were disconnected, and the two end sections were
turned round end for end, so that their points came opposite to the central
section which is square-ended. They were then lowered under the water and
drawn in under the central section. On pumping out the end sections they
rose, bringing up with them the central section, which was then resting on
their pointed ends. The dock left the Tyne on August 20 of that year, in
charge of the powerful Dutch tugs Roodezee and Zwartezee, each of which
has an indicated horse-power of 1500, their bunker capacity being 650 tons
and 600 tons respectively. The dock in its journey to Callao was manned by
a captain, mate, engineer, and nine sailors.
It was fastened to the tugs by extra superior Manila ropes of 18 inches,
with 30 fathoms of flexible steel wires of 4¹⁄₂ inches circumference on both
ends, while each tug had on board a new spare rope of precisely the same
size and quality. One tug broke down on the way, and another had to be sent
to Monte Video to take her place.
The time taken on the journey was 225 days, but after deducting the
delays in the Thames and at Monte Video, the time occupied on the passage
was only a little over four months.
The long voyage down the Atlantic, culminating in the passage of the
dreaded Straits of Magellan, caused the vessel to be kept upon the marine
reinsurance list almost from start to finish.
The distance from the Tyne to Callao does not represent a world’s record
for a tow of this nature, inasmuch as it has been exceeded by the Dewey
Dock built by the Maryland Steel Company of Baltimore for the United
States Government, which, in the summer of 1906, was towed from
America to the Philippines, a distance of 13,089 miles, in 150 days.
Great Britain, though a large builder and the principal designer of
floating docks, does not possess very many; possibly the number and
excellence of the dry docks scattered round her coasts may be the
explanation. But as dry docks are costly to make or alter, the British
Admiralty has ordered the construction at Wallsend of a floating dock
which will take the largest battleship afloat or likely to be built for some
years to come. In anticipation of the possible needs of the mercantile
marine, plans have been prepared for a floating dock with a lifting power of
45,000 tons.

Page 379

The largest floating dock in existence at present is at Hamburg, which
has a better equipment in this respect than any other port in the world. It
was built by Messrs. Blohm and Voss, the shipbuilders, for their own use,
and was completed last year and can lift 35,000 tons. Hamburg has
altogether eighteen iron and steel floating docks. Bremen has three large
floating docks, two of which, if used together, have a lifting power of 3300
tons. The third dock, 385 feet long by 83 feet inside measurement, can lift a
vessel of 10,500 tons.
Other countries also have provided themselves with floating docks;
indeed there are few nations of any importance which have not several
floating docks, modern in type, of great lifting power, and thoroughly
equipped. A few, like Austria, reserve the docks for naval purposes only.

Page 380

The “Baikal.”

Page 381

The Cartagena Dock.

The life of the iron or steel floating dock of whatever type is likely to be
far longer, if care be taken of the structure, than might at first be supposed.
Rennie’s Cartagena dock, built of iron in 1859, was in such splendid
condition when the proposal was made to build a Havana dock that as a
counter-proposal it was suggested to send the Cartagena dock there. The
Nicolaieff built in 1876, has been uninterruptedly employed ever since in
lifting the vessels of the Russian Navy. The Victoria Dock is 310 feet in
length, and of the hydraulic-lift type, with a lifting power of 3000 tons, and
has nine pontoons or trays of a total length of 2185 feet, and an aggregate
lifting power of 17,060 tons; the pontoons were constructed between 1857
and 1876, the largest of them being of 5000 tons. The Malta dock, also of
the hydraulic type, is 340 feet in length, with a lifting power of 4000 tons,
and was built in 1871. It has two pontoons of 4000 and 2500 tons
respectively. The hydraulic floating dock at Bombay, built in 1872, was
rather larger, being 400 feet in length with a lifting power of 8000 tons, its
pontoon of the same length lifting 6500 tons. These lifts were designed by
the late Edwin Clark, M.I.C.E., who introduced floating docks from which
the present types have directly sprung. These hydraulic docks are no longer
at work.

Page 382

The carrying of railway trains by ferry-steamers across stretches of water
too large to be bridged over is no new thing, there being several such in the
United States and Canada. Many of the vessels thus employed are of
considerable size. These waters are comparatively landlocked, and the
traffic, except in unusually stormy weather, is seldom interrupted. The
American ferry-boats are double-ended, so that a train can enter at one end
and leave at the other after crossing the water, the ends of the ferry-boat and
of the pier supporting the shore lines being constructed to fit exactly. Most
of the modern American ferry-boats taking railway trains have two, three,
or four sets of rails on their decks, and accommodate their passengers on a
deck above, where the saloons and cabins are situated. Where the railway-
level is different on the two sides of the water, the boat or the landing-stage
is provided with hoisting machinery which raises the train to the desired
level, a truck or two or a passenger coach at a time.
The nature of the work these railway ferry-steamers have to perform, and
the fact that every one has to be built to suit the special conditions of the
ferriage where it is to be employed, make it inevitable that no two of them
are alike, except such as may be sister vessels employed on the same
station. In Russia the conditions are very difficult. The current of the River
Volga is swift, the height of the water-level varies as much as 45 feet, and
as the ice is frequently two feet in thickness the work of maintaining the
ferry is not to be undertaken lightly. The vessel by which the service is
performed was built by Messrs. Armstrong, Mitchell and Co. To enable it to
be sent to its destination it was constructed in four parts, so that it would
pass through the Marinsky Canal to get to the Volga. The boat is 252 feet
long by 55 feet 6 inches broad, and 14 feet 6 inches deep. It has four lines
of rails, converging at the bow into two, and altogether can accommodate
twenty-four trucks. At the bow is a high framework for a hydraulic hoist
which lifts the trucks between the deck and the rails ashore, a distance of 25
feet, the difficulty of negotiating the remaining portion of the difference in
the level being overcome by there being two levels of rails on the landing-
stage. The propelling machinery, of the surface-condensing type with twin
screws, gives the vessel a speed of nine knots an hour. The bronze
propellers are unusually strong and heavy to withstand blows from the ice
in the river; the actual ice-breaking to keep the passage clear is performed
by another steamer.

Page 383

A ferry-steamer of a different type is that which plies across Lake Baikal
in Central Asia in connection with the Transasiatic Railway. As the lake is
frozen over for nearly half the year and the vessel has to do duty as an
icebreaker as well, the hull has been made extraordinarily strong and heavy.
The stem and stern are of massive steel castings. The vessel, which is of
steel throughout, is 290 feet in length by 57 feet beam, and the draught of
water is rather over 18 feet. The hull bears an outer plate an inch thick and 9
feet wide, placed from end to end along the water-line as a further
protection against the friction of the ice. The vessel is also subdivided
extensively into water-tight compartments in addition to the usual
bulkheads. Over the railway deck are large and sumptuous public and
private staterooms. Three sets of triple-expansion engines have been
installed with boilers working at a pressure of 160 lb.; there are twin
propellers at the stern, and a third propeller at the bow.
This vessel is also remarkable as being probably the most rapidly
constructed vessel of her size in existence. Not six months elapsed from the
time the order was received until the steamer was built, unbuilt, and packed
on board a steamer ready for departure to Russia, this including also the
making of the engines. The packages were conveyed as far as possible
along the Siberian Railway and thence by sledges to Lake Baikal, where the
ship was re-erected.
The only sea-going railway ferry-steamer in existence is the Drottning
Victoria, launched in January 1909 from the Neptune Works of Messrs.
Swan, Hunter, and Wigham Richardson, Ltd., to the order of the Royal
Administration of the Swedish State Railways. She was built to ferry trains
across the Baltic, between Sassnitz in Germany and Trelleborg in Sweden, a
distance of 65 nautical miles. High sea-going qualities were necessary as
the voyage is occasionally a very rough one. The vessel is 354 feet in length
by over 50 feet beam, and is propelled by twin-screw triple-expansion
engines, supplied with steam from four large boilers working under
Howden’s system of forced draught. The trains are carried on two tracks on
the car deck, occupying nearly the whole surface of the deck. Above and
below this deck is very luxurious passenger accommodation. The vessel has
been designed to be very steady at sea, and has unusually large bilge keels
fitted to minimise the rolling. Spring buffers and other necessary appliances
are arranged to prevent the cars from moving when at sea. A bow rudder is
fitted as well as the stern rudder, and both are controlled by steam from the

Page 384

captain’s bridge. The steamer has been divided into a very large number of
water-tight compartments, which, with the bulkhead doors with which she
is fitted, render her practically unsinkable. She is also to be fitted with a
submarine signal installation. The ventilating and heating are ensured by an
installation of thermo tanks, enabling fresh, warm air to be forced into all
the rooms in winter and fresh cool air in summer. Her speed is over 16
knots per hour, and the journey is made within four hours.
The performances of this boat are being watched with no small amount
of interest, as it has been suggested that if she should prove equal to all
requirements a modification of this form of steamer might be successful in
the cross-Channel service between Dover and Calais, or other ports on
either side of the English Channel.

Photo. Frank & Sons, South Shields.

The “Drottning Victoria.”

Ferry-boats of other types exist by the score, from barges upwards,
propelled by an extraordinary assortment of contrivances, some of the older
and quainter of which have been referred to in an earlier portion of this
book. The historic Tyne ferries were withdrawn not long since for financial

Page 385

reasons, but an attempt is being made to restart them. The ferries at
Glasgow and over the Mersey have each their own special features, and
even the Thames has not always been without penny steamers. The Thames
Steamboat Company and other organisations have made the experiment.
The later effort of the London County Council to establish a service
deserved a better fate, for the boats were well built and the engines were
compact and powerful for their size.
The necessity of keeping open waterways which Nature wishes to close
annually by freezing over, led to the invention of a species of vessel
planned with that object. The most famous ice-breaker is the Ermack,
launched in 1899 by Messrs. Armstrong, Whitworth and Co. for the Russian
Government, for which she was designed by Vice-Admiral Makaroff. Many
of the harbours of northern Europe are frozen over for the greater part, and
sometimes the whole, of the winter, to such an extent that the ice attains a
thickness of several feet; and navigation is at a standstill so far as those
ports are concerned. The only way of keeping a channel open is to prevent
the ice from freezing too thickly to permit of the passage of vessels, and this
is done by keeping a vessel moving frequently up and down the channel to
break the ice before it can freeze so thickly as to become impassable.
An ice-breaking ship, to perform its allotted task, must be both weighty
and powerful, and capable of travelling at a speed sufficient to give her the
required momentum so that she may break the ice by the sheer force of the
blow she delivers when she rams it, and she must be strong enough to inflict
and not sustain damage by the collision. Further, besides cracking the ice
into fragments weighing a few score tons apiece, she must be able to slide
upon the ice and crush it by sheer weight. The Ermack is 305 feet long, 71
feet beam, and 42 feet 6 inches deep. She had three screws aft and, when
first built, had a fourth screw forward, the forefoot being considerably cut
away to allow it to operate between the stem and keel. The idea was that the
forward screw would agitate the water under the ice about to be struck and
thus lessen the support the ice received from the water, and that it would
also prevent an accumulation of ice under the ship’s bottom by creating a
current of water towards the stern where the after propellers would throw
the ice astern of the ship. This screw was found to be less useful than was
expected, or rather it was discovered in practice that as good results could
be obtained without it as with it in dealing with the massive Arctic ice, or
any ice over a certain thickness, and when the ship was sent back to her

Page 386

builders a few years later to be lengthened, the forward propeller was taken
out and not replaced. When the alterations were made the bow was severed
in dry dock, and another bow having been built it was launched and floated
into the dock and attached to the vessel. This bow is of a different shape
from the other and has proved to be even more effective than the old one.
Three screws aft are necessary in an ice-breaker of this size in order to give
the power for the proper performance of her duties and also to enable her to
be steered in very limited areas, greater steering facilities being obtainable
by this means than by any other. The Ermack is fitted with three sets of
triple-expansion machinery, having cylinders 25 inches, 39 inches, and 64
inches diameter, with a 42-inch stroke of piston, working at a pressure of
160 lb. The boilers are six in number, 15 feet in diameter by 20 feet long,
working under forced draught. The machinery develops about 10,000 horse-
power.
One of the Ermack’s feats was to rescue the coast defence armour-clad
General Admiral Apraxine, which had got frozen in after stranding in the
Baltic.
She finds no insuperable difficulty in smashing her way through ice 12 or
13 feet in thickness. The first piece of ice she ever attacked was drift ice
about five feet thick, through which she went easily with her engines giving
her little more than half-speed. The most serious test was against ice
estimated at 25 feet thick, consisting of 5 feet of field ice, 9 feet of pack ice
above it, and ice 11 feet thick, and perhaps more, below the field ice. Thick
snow on top of thick field ice forms the most serious obstacle, the snow
forming an immense cushion or ridge which becomes worse the more an
effort is made to get through it. On another occasion she made her way by
ramming through ice 34 feet in thickness. Another experience was to rescue
eight of nine steamers which were nipped in the ice; the ninth was so badly
squeezed by the ice that she sank before the Ermack could force her way to
her.
A smaller ice-breaker, the Sampo, built by the same firm for Finland, has
gone through sheet ice 12 inches thick at a speed of 8¹⁄₂ knots, and
frequently through drift ice 10 or 12 feet thick.
On the other side of the Atlantic, whenever a severe winter is
experienced, many of the Canadian and United States lake and coast ports
are only kept open by means of ice-breaking ferry-steamers. Of the latter
type is the Scotia, built by Armstrong, Whitworth and Co. for the carriage

Page 387

of railway trains across the Straits of Canso to and from Port Mulgrave,
Nova Scotia. She is 282 feet in length, and on the rails laid on her decks she
is capable of taking a load of nine Pullman cars, and can also accommodate
an express locomotive and tender weighing as much as 118 tons. She has an
ice-breaking propeller and a rudder at each end, and has two sets of triple-
expansion engines of 1200 horse-power each. Her speed is rather over
twelve knots.
About four years ago the ice-breaking and surveying steamer Lady Grey
was launched by Messrs. Vickers, Sons, and Maxim at Barrow-in-Furness
for the Canadian Government, and performed some exceedingly effective
work, particularly in the St. Lawrence River or in duties associated with the
Marine and Fisheries Board. A larger and faster vessel being required, the
builders were asked to provide a steamer which, while preserving all the
qualities of an ice-breaker, should yet be able to attain a speed of seventeen
knots, and be capable of use for a variety of purposes. The Earl Grey was
launched in June 1909, and besides fulfilling these requirements has been
engaged in the passenger traffic across the Northumberland Straits. She has
been fitted with special quarters, enabling her to be employed as an official
yacht by the Governor-General. Provided with a cut-water or schooner stem
with a short bowsprit, an elliptical stern, and two steel pole schooner-rigged
masts, which rake considerably, and having been designed with a graceful
sheer, she has more of the appearance of a large yacht than an ice-breaker
intended to be able to make her passages in all sorts of weather and under
widely varying conditions. The hull is built with extraordinary strength; the
frames are very closely spaced in order to take up the thrust of the pack ice
which in winter may sometimes be piled round the vessel; the shell plating
is of unusual thickness, and the outer skin is double right fore and aft along
the water-line and to the bottom of the keel in the fore body, where the
friction of the ice tends in the case of ice-breaking steamers to wear away
the material. The ordinary practice of this and all other ice-breakers, in
whatever part of the world, is to utilise their weight to break the ice by
rising upon it and crushing it. In order to possess as great a weight as
possible, large tanks are built into the fore part of the Earl Grey which can
be filled or emptied at a rate of 250 tons an hour. The vessel is also
equipped for breaking ice when going astern, the counter having been
suitably strengthened to resist the shocks; while to secure the rudder from
injury it has been built into the form of the ship so that her movements are

Page 388

not impeded by the ice-floes. The Earl Grey is 250 feet in length, 47 feet 6
inches beam, 17 feet 7 inches depth, and 3400 tons displacement. She has
accommodation for fifty first-class passengers and twenty in the second
class, and under these circumstances winter ice-breaking excursions may
yet become the vogue among those in search of a new sensation.

The “Ermack.”

Page 389

The “Earl Grey.”

The introduction of steam-propelled vessels was objected to by sailing-
yacht owners, but the advantages of auxiliary power in yachts intended for
cruising overcame all opposition, and in the course of a few years the
number of yachts of all rigs, even cutters, fitted with auxiliary power,
steadily increased. Machine-driven yachts are intended as cruisers. A few
steam-yachts had paddle-wheels, the latter being specially favoured for all
vessels intended for Government or for Royal use, where sea-going
qualities were required. One of the most notable of this type was the
Victoria and Albert, built to the order of her Majesty the late Queen
Victoria, which was, at the time of her launch, one of the finest yachts
afloat. Among the earliest of the Royal yachts was the screw steamer Fairy,
which was built for the late Queen in 1845 at the Thames Iron Works,
Shipbuilding and Engineering Company’s yard at Blackwall, then owned by

Page 390

Messrs. Ditchburn and Mare. This was the first iron vessel owned by the
British Government. Her dimensions were: length 144·8 feet, breadth 21
feet 1¹⁄₂ inches, draught 6 feet, displacement 210 tons, horse-power 416,
and speed 13·21 knots.
It is only fitting that the finest Royal yachts afloat intended purely for
pleasure purposes should be at the disposal of the monarch of the leading
maritime nation, and the latest Royal yachts built for the late King Edward
merit this description. They are the present Victoria and Albert and the
Alexandra, the latter built in 1908. Other modern Royal yachts of note are
the German Emperor’s Hohenzollern, which is heavily armed and can be
utilised as a fast cruiser if necessary, and the Russian Pole Star and
Standart.
Amongst the celebrated Royal yachts of the past belonging to foreign
rulers are the iron paddle-steamer Faid Gihaad, built in 1852 by Messrs.
Ditchburn and Mare for Said Pasha, the then Khedive of Egypt. She was a
flush-decked barquentine, 285 feet in length between perpendiculars, 318
feet over all, with a breadth of beam of 40 feet and a tonnage of 2200. Her
engines were of 800 horse-power and were built by Messrs. Maudslay and
Field. She was equipped as a war vessel and carried an armament of two
84-pounder pivot guns, twelve 32-pounder broadside guns on the upper
deck, and fourteen 32-pounders on the main deck. Like everything else that
the Pasha indulged in, the Faid Gihaad illustrated his taste for luxury.
Externally the vessel was painted white from the water-line, below which
she was copper-coloured. The stern was ornamented with a gold scroll, and
each paddle-box had a crescent and star in gold. Three years before the
building of the Faid Gihaad there was constructed at Alexandria, by order
of Said Pasha, a steam-frigate called the Sharkie, which was sent to this
country to be fitted with steam-engines and a screw propeller. She was 220
feet in length, was rigged as a second-class frigate, and had engines of 550
horse-power by Miller and Ravenhill. These were capable of driving her
nearly 11 knots an hour. Her armament consisted of 36 guns of heavy
calibre. The furniture and panelling of the cabins were richly inlaid with
ivory and mother-of-pearl, which may have admirably suited the taste of
Said Pasha in these matters, but can hardly have conduced to the efficiency
of the vessel as a fighting machine.

Page 391

Photo. G. West & Son.

The Royal Yacht “Victoria and Albert.”

Page 392

Photo. G. West & Son.

The Imperial Yacht “Hohenzollern.”

In the days when the Papal States were a power in the land and his
Holiness was not a voluntary prisoner in the Vatican, the then occupant of
St. Peter’s chair was the possessor of a very fine armed screw steam-yacht,
the Immacolata Concezione. She was built by the Thames Iron Works and
Shipbuilding Company, with engines by Messrs. J. Seaward and Co. of
Millwall. She carried eight brass 18-pounder guns, and was a three-masted
full-rigged ship of some 627 tons burden. The engines were of 160 nominal
horse-power and 300 indicated, and were capable of giving her a speed of
13 knots an hour.
Among other famous iron vessels which were either specially built or
employed as Royal yachts in the middle of the last century may be
mentioned the Jerome Napoleon, constructed by M. A. Normand at Havre

Page 393

for the late Prince Napoleon, afterwards Emperor of the French; the
Peterhoff, built by Messrs. Ditchburn and Mare at Blackwall in 1850 for the
late Emperor Nicholas of Russia, which was wrecked on her outward
voyage to the Baltic; the Falken, built at Deptford in 1858 by Messrs. C.
Langley for the late King Frederick VII. of Denmark. She was an iron
schooner-rigged vessel 127 feet in length, and could steam at 10 knots an
hour. The Miramar was a favourite yacht with the late Empress of Austria.
The Russian Imperial Yacht Livadia was circular and shallow, and is the
only large turbot-shaped yacht afloat. These yachts, however, have been
gradually superseded by vessels of a thoroughly modern type. As a case in
point, the Princess Alice, owned by H.S.H. the Prince of Monaco, and
constructed by Messrs. R. and H. Green at Blackwall in 1891, is built of
steel frames with teak planking, her bottom being covered with copper
sheeting. Thus in her general finish she is one of the finest specimens of
marine architecture on the composite principle which ever took the water.
Unlike most Royal yachts, she is used not merely for pleasure but also for
scientific research, for the Prince of Monaco is well known for his
contributions to the scientific knowledge of ocean depths and all that
pertains thereto. The expeditions which he has organised, and most of
which he has conducted in person, are invariably made on this yacht, which
is splendidly equipped for the purpose. In order that she may be able to
cover a large radius of action, she is fitted with an unusual coal capacity and
can store in her bunkers sufficient to carry her 3700 miles. Under steam
alone she can make 9 knots an hour, and with steam and sail combined she
has been known to attain to nearly 12 knots an hour.
The Safa-el-bahr, designed and constructed in 1894 by Messrs. A. and J.
Inglis of Glasgow for his Highness the Khedive of Egypt, is also a steel-
built two-decked yacht. She is schooner-rigged, and is fitted with three-
stage expansion engines with cylinders 18 inches, 29 inches, and 48 inches
in diameter, giving a piston stroke of 36 inches. These are supplied with
steam at a pressure of 160 lb. from two boilers having a heating surface of
2300 square feet, and give an indicated horse-power of 1200, with a speed
of 14·1 knots per hour. Her tonnage under yacht measurement is 677 tons.
She has a length of 221 feet, breadth 27·1 feet, depth 17·3, with a draught
of 12 feet.
As private yacht-owning is a pastime in which only the wealthy can
indulge, and as almost all private yachts are built to suit the fancy of their

Page 394

owner, a considerable individuality is displayed by them. They range in size
from vessels not bigger than a ship’s boat to ocean-going liners. The
Winchester, the latest boat of her class yet devised, is a triple-screw turbine
yacht, bearing a strong resemblance to a torpedo boat. Her dimensions are:
length 165 feet, breadth 15³⁄₄ feet, depth 9³⁄₄ feet, and displacement 180
tons. She was built in 1909 for Mr. W. P. Rouss, a prominent member of the
New York Yacht Club, by Messrs. Yarrow and Co. of Scotstoun. The
propelling machinery consists of three Parsons marine steam turbines
constructed by Messrs. Yarrow. She has two Yarrow water-tube boilers, and
her furnaces are fitted to burn oil fuel. The hull is of steel. At her trials at
Skelmorlie she easily maintained a speed of 26³⁄₄ knots, which was ³⁄₄ of a
knot in excess of the speed stipulated in her building contract; and it was
believed that a much higher rate could have been achieved, as 250 lb., the
full working pressure of her boilers, was not reached, the high pressure of
her high-power turbine being only 160 lb.
The Iolanda, of about 2000 tons yacht measurement, was built for an
American owner in 1908, and was then stated to be the second largest
privately owned yacht in the world. She was both constructed and engined
by Messrs. Ramage and Ferguson, Ltd., Leith. Her length over all is about
305 feet; beam 37 feet 6 inches; depth 23 feet. Her twin-screw machinery is
of the triple-expansion four-crank type of 3000 to 4000 indicated horse-
power. Her boilers are partly cylindrical marine return tubular and partly
water-tube. This combination, the first installed in any yacht, affords the
advantage of being able to raise steam and get under way at practically a
moment’s notice, or provides additional speed at short notice when
required, while the bunker capacity of some 550 tons gives the yacht a very
extensive ocean-steaming radius. She is provided with motor and steam
launches, quick-firing guns, electric-lighting apparatus, which is accredited
as being the largest ever installed in a private yacht, and includes
arrangements for manipulating the Marconi wireless telegraphy.
Among eccentricities of design in steamboats may be mentioned cigar
ships, vessels shaped like birds, early submarines, double-hulled boats, and
numerous other extravagances. One of the earliest submarines was
contrived by a Dutchman named Hollar, about 1653, but whether this
wonderful vessel ever got beyond the imaginative or paper stage is
unknown. There is a picture of it in the British Museum. This singular craft
was to be 72 feet in length, 12 feet high, and 8 feet beam, with a wheel in

Page 395

the centre where it “hath its motion.” The description says it was built at
Rotterdam. The inventor undertook in one day to destroy 100 ships. “It can
go from London to Rotterdam and back in one day, and in six days can go
to the East Indies, and can also run as fast as bird can fly.” “No fire, no
storm, no bullets can harm her unless it please God.” There is no further
trace of her.
The first submarine which achieved any measure of success was that of
David Bushnell, an American, who devised it in the hope of blowing up a
British warship and failed egregiously. Bushnell, who was born at
Saybrook, Conn., in 1742, devoted a large amount of attention to submarine
warfare. His idea was to fix a small powder magazine to the bottom of a
vessel and explode it by means of a clockwork apparatus. He constructed a
tortoise-shaped diving boat, made of iron, and containing sufficient air to
support a man for half an hour. This boat, called the American Turtle, was
propelled by a sort of screw or oar worked from inside. It could be
immersed by admitting water through a valve in the bottom, and lightened
by pumping the water out again. She was tried, without success, against the
British warship Eagle in New York harbour, and a later attack on the
Cerberus left that frigate unharmed, but blew up an American schooner and
some of her crew.
The Gemini twin steamer, invented by Mr. Peter Borrie, was a double-
hulled boat, launched in the summer of 1850. The keels and stems were not
placed in the centre of the hulls but towards the inside of them, thus making
the water-lines very fine on the inside. This was intended to diminish the
tendency of the water to rise between the hulls. The inner bilges were much
fuller than the outer ones, the idea being to afford a greater degree of
buoyancy on the inside, in order to support the weight of the deck. The
steamer was 157¹⁄₂ feet long over all, and 26¹⁄₂ feet broad on deck. Each hull
was 8¹⁄₂ feet broad, with a space 9¹⁄₂ feet between them. The frames were of
angle iron, and the keels were formed by carrying the plates downwards, so
as to form channels for the bilge-water inside the hulls. This arrangement
was intended for river craft of this type, but for sea-going vessels drawing
more water the inventor planned keels of iron bars, with the garboard-
strakes riveted upon them in the customary way. The plating was not carried
to the top of the frames on the inner side of the hulls, except at the space in
the middle for the paddle-wheel, but was carried up to the deck, thus
forming an arch between the two hulls, which were bound together with

Page 396

stays. The hulls were divided into water-tight compartments. The vessel
was two-ended and could travel in either direction without turning. There
was a rudder at each end, placed in the centre of the opening between the
two hulls. It was constructed somewhat in the manner of the balanced
rudder of later years, as it was affixed, to a vertical shaft in such a way that
it was divided into two unequal parts, and when left free would
accommodate itself to the vessel’s motion. The steamer was estimated to
carry from 800 to 1000 passengers.
Whether in the sailing days or since, the crossing of the Channel between
Dover and Calais has been attended with an amount of misery altogether
disproportionate to the shortness of the voyage. It is therefore not surprising
that inventors have at one time and another attempted to design vessels
which should give the maximum of speed and comfort and the minimum of
sea-sickness. The English Channel Steamship Company, Limited, was
formed in 1872 to adopt the plan of a steam-ship designed by Captain
Dicey, and construct the steam-ship Castalia. His idea was that two large
hulls should be used, and placed at such a distance apart that each should
act as an outrigger to the other, and the whole structure should remain
comparatively steady. The Castalia was built by the Thames Iron Works
Company. She was 400 feet long, and each hull had a beam of 20 feet, with
a depth of hold of 20 feet. The distance between the two hulls was 35 feet,
and they were united by strong girders. The hulls were very sharp at the
ends, and flat in the floors, and the draught of water was only 6 feet. The
inner sides of the hulls had a freeboard of 14 feet, and the uniting girders
were slightly arched, but a difference in the methods of fixing them to the
hull was made, compared with previous experience with double-hulled
vessels. In former attempts to solve the problem of the navigation of twin
steamers, the connecting beams had usually been placed in such a way that
their ends extended under the decks of the hulls. This in the case of wood
was manifestly a plan which did not permit of a very large vessel or of a
certain limit of strength being exceeded. Captain Dicey’s scheme in
adopting the arched form of girder was to utilise to the utmost the strength
of the iron, and bind with the utmost rigidity the whole structure together.
Where the girders entered the hulls the upper part was just under the deck;
the girders were carried right across to the outer sides of each hull,
additional strength being provided by bolting every girder to a bulkhead.
The space between the hulls was decked over, and allowed ample

Page 397

accommodation for passengers. Each hull carried a powerful engine for
driving a large paddle-wheel, the wheels being placed with a space between
them amidships between the two vessels. The vessel could be steered at
either end, thus obviating the necessity of turning, and a navigating bridge
extended across the tops of the two paddle-boxes. It was even claimed that
the ship would be large enough to carry railway trains across the Channel,
but this does not seem to have been tried. As she drew only a trifle over 6
feet of water she could enter the harbours on either side of the Channel at
any state of the tide, and though she was steady enough as a sea boat she
was too slow, and was withdrawn from service.
A double-hulled boat of a somewhat different type, and from which great
things were expected, was the Calais-Douvres. Her principal features were
to be an increase in speed and stability, and by means of the steadiness of
her double hull, the abolition of sea-sickness. She was an enlarged Castalia.
The expectation of her owners on these points was not realised and after a
few trips she was withdrawn from service and replaced by another and
more efficient vessel of the ordinary type.
To the category of magnificent failures there should be added the steam-
ship Bessemer, launched at Hull in 1874 and designed by and named after
Mr. (afterwards Sir) Henry Bessemer. The object her designer had in view
was to mitigate the horrors of the cross-Channel passage, and to accomplish
this he fitted his boat with a spacious saloon which, by means of a series of
pivots and a gyroscope, would remain in a level position without
oscillation, no matter how much the vessel might roll or how rough the
weather might be. These arrangements worked perfectly in theory, but
immediately the Bessemer went to sea for her trials and the test became a
practical one, it was discovered that she must be relegated to a conspicuous
place among the successes that might have been. Everything about her was
on a lavish scale. A peculiarity was that she had four paddle-wheels, two a
side, an experiment that has never been successful. Her form also was
against her, and in dirty weather she would have been a wet ship, difficult to
steer, and almost helpless.
On her private trial trip the Bessemer attained a speed of eleven knots in
crossing from Dover to Calais, but was thirty-five minutes in getting
alongside the French pier.
One of the most extraordinary vessels ever designed was that known as
the Connector. She was not rigid, but was built of sections which could be

Page 398

joined together, so that she would bend in accord with the motion of the
waves. The joints were constructed by giving to the after end of all sections
(but the last) a concave form so that it would overlap the convex bow of the
adjoining section. These were joined and hinged by massive iron bolts
resting in stout wrought-iron sponsons built into the ship’s sides and
framework. If necessary one of the sections could be disconnected and the
other three joined up. As each section was fitted with a fore and aft rig, like
a cutter, it could make its way under sail alone if necessary. The engine was
contained in the hindmost section, which really pushed the other three
along. She was intended to be used as an iron screw collier in the London
and North-East coast coal trade. Each section was to act as a lighter, and
could be left where desired, while the others were sent to their respective
destinations, to be picked up again in turn when it was desired to reunite the
vessel, and send her for another cargo. The advantage claimed for this
peculiar system was that vessels of very light draught, and of length far
greater than hitherto and carrying the largest cargoes, might be used without
the danger of breaking their backs, or even straining, the yielding of the
joints neutralising that liability; also that their great length, light draught,
and narrow midship section, permitted unprecedented speed, while the
facility for detaching part of the vessel in case of collision, fire, sudden
leakage, or grounding with a falling tide, would afford a means of saving
life and a portion of hull and cargo, when otherwise all would be lost. A
company called the Jointed Ship Company was formed to exploit this
novelty in ship construction. Like other experimental schemes it was not a
success, the theory of the designers and the practice of Father Neptune not
being in accord.
The Winans cigar ship, as her name indicates, was shaped like a huge
cigar. Messrs. Winans began experimenting in the ’fifties at Baltimore with
a view to ascertaining the amount of water-friction sustained by surfaces of
differing smoothness at various speeds, the relative resistance of
proportions and speeds, and whether any advantages were to be gained
from spindle-shaped vessels as compared with ordinary vessels. These
experiments resulted in the launching in October 1858 at Ferry Bay,
Baltimore, of a spindle- or cigar-shaped vessel having about its middle a
ring bearing flanges set at an angle calculated to strike the water and propel
the vessel. She had four powerful engines placed amidships, and rudders at
both ends measuring 4 feet by 3 feet. She was 16 feet in diameter at the

Page 399

widest part and 180 feet long, and it was expected she would cross the
Atlantic in four days; she belied those expectations. The owners stated that
she was designed “to obtain greater safety, despatch, uniformity, certainty
of action, as well as economy of exportation by sea.” They believed that
“by discarding sails entirely, and all the necessary appendages, and building
the vessel of iron, having reference to the use of steam alone, these most
desirable ends may be even still more fully attained than by vessels using
both sails and steam.” They continue: “The vessel we are now constructing
has no keel, no cutwater, no blunt bow standing up above the water-line to
receive blows from the heaving sea, no flat deck to hold or bulwark to
retain the water; neither masts, spars, nor rigging.” The plan and position of
the propelling wheel were supposed to be such that its minimum hold of the
water would be much greater in proportion to tonnage than the maximum
hold of the propelling wheel or wheels in ordinary steamers. The engines
were high pressure with a cut-off variable from one-sixth to full stroke;
combined, they were to exert threefold more power in proportion to
displacement of water than those of the most powerful steam-packets then
built. Her boilers were of the locomotive type, consuming 30 tons of coal in
twenty-four hours, the smoke, &c., being carried away by two funnels. She
was divided into several water-tight compartments. With 200 tons of coal
on board she was to displace about 350 tons of water, and accommodate
about twenty first-class passengers and the United States mail, with room to
spare for small valuable packages, specie, &c. The same principles and
properties which were to adapt the vessel to high average speed were
claimed to be also adapted to the cheap, safe and sure transportation of
freight as compared with vessels using sails only or sails and steam
combined. There was a railed-in space on her upper surface for the deck.
Messrs. Winans’ first cigar ship, though not fulfilling all the hopes
formed of her, was, on the whole, sufficiently successful to encourage the
continuance of the experiments, for in the two following years she was
severely tested both for speed and seaworthiness in all sorts of weather.
Another vessel was built at St. Petersburg in 1861 with a submerged screw
propeller at the stern, which gave so much more satisfactory results than the
revolving belt apparatus that Messrs. Winans were encouraged to order a
third spindle ship. This was built by Mr. John Hepworth of the Isle of Dogs,
and was named after her inventor, Mr. Ross Winans. This boat was 256 feet
in length with a diameter and depth of 16 feet, and was circular in form

Page 400

throughout. The top of the vessel was strengthened for 130 feet amidships
by four longitudinal ribs of steel which supported the deck, and also
rendered the top as strong to resist tension and other strains as the bottom.
Internally there were iron ribs running round the vessel 4 inches deep and 3
feet apart in the engine and boiler room, and 7 inches deep and spaced 6
feet elsewhere. The bottom and side plates were of iron, were thicker
amidships than at the end, while the bottom was further strengthened and
protected outside the skin plates by a plate of iron 1 inch thick and 33
inches across at its widest and diminishing to a point at the ends. The skin
plates of the top were of toughened steel ³⁄₈ inch thick amidships. The two
screw propellers, one at either end, were 22 feet in diameter and were only
half immersed in the water, though it is difficult to imagine what advantages
were supposed to be gained by incomplete immersion, seeing that the
exposed part represented so much dead weight to be carried, to say nothing
of the other drawbacks. A space 48 feet 6 inches long amidships was
devoted to the engines and boilers. Each of the four boilers had a fire-box,
and was surmounted by two vertical cylinders containing vertical tubes;
while the centre portions of the boilers were tubeless to allow of more ready
cleaning and a better circulation. A fan increased the draught and also the
ventilation of the ship. The engines were surface-condensing. The problem
of allowing the longest possible stroke was ingeniously solved. Above each
of the three jacketed steam cylinders was a shaft, carrying two cranks and
working by the sides of the cylinder, the piston-rods passing the shaft and
connecting with a cross-head above, which was connected with the cranks
by two rods. The three engines were joined by a system of return cranks and
a peculiar coupling, which prevented cross-strains from the transmission of
power from engine to engine, and from the shafts of the different engines
getting out of line. The ship could carry coal for twelve days at normal
consumption. On deck it carried two masts and two funnels, all having a
considerable rake aft.
In 1860, Captain George Peacock, F.R.G.S., formerly a London
merchant, and then residing near Exeter, invented a yacht in the shape of a
swan. Her title, the Swan of the Exe, was displayed on a banneret, the brass
rod of which was held in the swan’s beak. This mechanical bird was 17 feet
6 inches in length, with a maximum beam of 7 feet 6 inches, and its height
from the keel to the top of the back was 7 feet 3 inches. Its neck and head,
which were gracefully curved, rose 16 feet above the water. Its long neck

Page 401

had to do duty as a mast for supporting by means of halliards the two
wings, each of which consisted of a double lateen sail. The halliards passed
through gilt pendant blocks, attached to a ring, fastened round the neck just
below the head. The vessel itself consisted of twin boats beneath the water-
line, there being an oblong compartment in the centre, though viewed from
the front or side it appeared to consist of one hull only. She had two
powerful webbed and feathering feet, constructed of steel, to propel her.
These were placed between the keels or hulls, and worked by a lever
attached to a contrivance such as is seen on old-fashioned hand fire-
engines, operated by two or four persons as required. With two oars which
she could also carry, her fishtail-shaped rudder, her feet, and her wings, she
could get up a speed before the wind of five miles an hour. She was only
intended for ornamental waters or inland lakes. Her interior fittings
suggested those of a first-class railway carriage, with plate-glass windows
at the sides, &c. Her centre table was big enough for ten persons to dine
comfortably at, and at night it could accommodate a mattress upon which to
sleep. A description of her at the time adds: “In the table are small apertures
which open to the water underneath, and thus afford the opportunity of
fishing while sitting at table. Any aquatic prey thus obtained may be dressed
in a multum-in-parvo cooking apparatus on board, the smoke from which is
conveyed through the bird’s neck, and out at its nostrils. In the breast of the
bird is a ladies’ cabin fitted up as a boudoir.” The Swan was of about 5 tons
register, and when fully stored and carrying 15 persons, only drew 17
inches of water. About the only thing of which the inventor had not thought
was to make one eye green and the other red, to represent ship’s lights.
The only ship of her kind ever built with a hot-air engine was the
Ericsson, named after her inventor and generally called the Caloric,
because of her peculiar engines. These had four immense cylinders which
drove paddle-wheels 32 feet in diameter, the energy being transmitted by a
contrivance Ericsson invented and termed the “regenerator.” The shape of
the furnaces and the small amount of fuel they required, together with the
absence of boilers, enabled a greater amount of space to be devoted to the
accommodation of merchandise and passengers. The vessel was 250 feet
long, 40 feet broad, 31 feet deep, and had a gross tonnage of 1920. She was
built in 1852, of wood, and was asserted to have made a speed of 12 knots
an hour on her trial trip, but she never came anywhere near this
subsequently.

Page 402

The absence of funnels and the presence of two large paddle-boxes made
her one of the most extraordinary vessels ever seen. She made one slow
journey across the Atlantic to Liverpool and back to America, and after
another set of caloric engines had been tried in her with about as much
success, in regard to her speed, as the first, she was fitted with engines of
the ordinary type.
Three other inventions which have not yet passed the experimental stage
are the Hydrocurve, the Hydroplan, and the Hydroplane.
The hydroplan is a motor-boat carrying two enormous propellers, one
above the stem and the other above the stern, which revolve in the air and
not in the water. The vessel is said to have been invented by a gentleman
named Fortanini, and with a 70-horse-power motor is claimed to have
attained, on Lake Maggiore, two or three years ago, a speed of 40 miles an
hour. For all practical purposes the hydroplan may be described as a
“skimming dish” hull gliding on the surface of the water, its draught being a
few inches only.
For some time past some attention has been directed to the trials, on the
Illinois River, of a curious type of aquatic motor, named the hydrocurve.
Instead of ploughing through the water, the hull of the hydrocurve displaces
the water, not sideways as with an ordinary type of vessel, but downwards
from the surface, each particle of water being moved in one direction only.
According to a report published in the Popular Mechanic of Chicago, this
curious vessel on her first trial made a speed of 35 miles an hour. In a
further test she achieved 1¹⁄₈ mile in 1 minute 30 seconds, or, roughly
speaking, 45 miles an hour. She is 40 feet in length and carries an 80-horse-
power motor. The bottom of the boat is concave, lengthways and across.
The theory that with an increase in speed the tendency of a ship is to rise,
so that when travelling at a fast rate she will draw less water than when
going slowly, and consequently will have less resistance and less skin
friction, has attracted the attention of naval architects for many years. So far
as theory is concerned, there is nothing to prevent a vessel being built on
this principle, but when it comes to considering stability, it is another
question altogether. The principle is based upon the well-known theory that
if the hull of a vessel be made flat in the bottom and inclined slightly, so
that it forms an inclined plane, the vessel will rise to an extent governed by
the speed at which it travels. The Rev. C. M. Ramus, of Rye, Sussex, in
1872 improved on this theory by making a flat bottom in two inclined

Page 403

planes, one behind the other, so that each should have an equal lifting
power. The Admiralty tested several models made by him, but without
satisfactory results, probably due to the comparative inefficiency of the
screw-propelling machinery of the period. An American engineer, named
Fauber, taking advantage of improved propelling machinery, designed a
vessel on these lines with hydroplanes attached directly to the bottom, and a
year or two ago it carried six persons at a speed of 35 miles per hour. If a
vessel of this size can be constructed and retain its stability, there is no
reason why one of much greater size should not be built. The development
of the principle is that the planes should be placed at some distance below
the bottom of the hull, so that when the vessel travels at a considerable
speed, it shall rise out of the water and be supported by the planes, which
shall skim along the surface. This, however, can only be achieved at present
by sacrificing stability to speed. An improvement in construction is to shape
the bottom of the hull like a very wide letter V, with a series of planes
underneath. It is claimed that an ocean liner can be built on this system,
carrying six propellers arranged in three pairs, and that the necessary air
would be pumped under the vessel by the action of the propellers as she
travelled along.
A steamer on wheels, but intended to travel on the water, was invented a
few years since by a Frenchman named Bazin. He constructed a model,
which worked well and was on the scale of one-twenty-fifth of the liner he
hoped to see built some day. The model consisted of four pairs of hollow
wheels or discs, each wheel being in appearance like two immense soup-
plates set face to face and set on edge. These wheels were caused to
revolve, thereby reducing the friction of the water to a minimum, and the
vessel was propelled by a screw. The decks, being built on a framework
over the axles, had space for ample accommodation, and in order that the
speed of the ship should not suffer it was intended to carry no cargo. A
vessel on this plan was constructed and launched on the Seine. The platform
was 126 feet long by about 40 feet wide, and each wheel was about 32 feet
in diameter and about 10 feet at its greatest width. The total weight of the
boat was about 280 tons. The boat proved her utility when tried. The
inventor estimated that an ocean-going liner constructed on this system
would easily cross the Atlantic at a rate of thirty knots an hour.
It is impossible to say what the development of the steam-ship will be in
the future. The piston engine has probably reached its utmost development,

Page 404

or very nearly so, and much more in that direction is not to be expected.
Naval architects are already considering whether the existing lines of the
steam-ship are the best for speed, and a design has been brought out for a
steamer constructed on what are known as tetrahedral lines. There has
recently been described in the Scientific American a vessel, a model of
which has been constructed, designed upon this tetrahedral principle. It is
contended that this form for ships offers less resistance than any, and that by
it alone can the greatest attainable speed at sea be reached. Yarrow boilers
with Schultz turbines are recommended for vessels of this type.
A proposal for fast Atlantic travelling, which has not gone beyond the
paper stage, is that three long narrow hulls should be built parallel to each
other and supporting the main body of the hull. The inventor claims that the
method would enable a greater speed to be attained than by any existing
liner, and at a less cost; but readers who have followed the development of
the steam-ship will recollect that this suggestion provides a curious parallel
to the experiments of Patrick Miller with his triple-hulled boats in the
eighteenth century.
Few, however, will doubt that, great as have been the changes in
shipbuilding and steam-propulsion during the last hundred years, there will
be changes as great in the present century.

Page 405

C. Watson’s Dock at Rotherhithe, lifting H.M. Brig “Mercury.”
From Watson’s Specification.—A.D. 1785.

The Bermuda Floating Dock, lifting a 15,000-Ton Ironclad of the
“Majestic” Class.
From the Contract Drawings.—A.D. 1900.

Page 406

The Vulcan Co.’s Floating Dock for Hamburg, lifting a 36,000-Ton Ship
of the “Mauretania” Class.
From the Contract Drawings.

The Evolution of Floating Docks, 1800-1910.

Page 407

BIBLIOGRAPHY
Adamson, A. Sea-borne Traffic. (Paper read before the Institute of
Marine Engineers.)
Aisbitt, M. W. Shipbuilding Ancient and Modern.
American “Fall River” and “Hudson River Day” Lines, publications
of.
American “Merchants’ Magazine.”
American Report of the Merchant Marine Commission.
Appleton’s Cyclopædia of American Biography. 1887-9.
Bates, Captain W. The American Marine.
Bourne, John, C.E. Treatise on the Screw Propeller, Screw Vessels,
and Screw Engines.
Brassey’s Naval Annual.
Buckwell, G. W. The History of the Newhaven and Dieppe Service.
(Paper read before the Institute of Marine Engineers, 1891.)
“Cassier’s Magazine.”
“Century Magazine.”
Channing, E., and Lansing, M. F. The Story of the Great Lakes.
“Chamber’s Journal.”
Clark, Lyonel E., M.I.N.A. Floating Docks.
Colden, Cadwallader C. Life of Fulton.
Cunard Line, History of. 1886.
“Daily News.”
Dictionary of National Biography.
Dictionnaire Universel.
Drewry, T. Propellers.
Encyclopædia Britannica.
“Engineering.”
“Engineer,” The.
Furman, Franklin de R., M.E., and Humphreys, A. C., M.E., Sc.D.,
LL.D. A History of the Stevens Institute of Technology. 1905.
Goodeve, T. M., M.A. The Elements of Mechanism.

Page 408

—— Text-book on the Steam-engine.
Haldane, J. W. C. Atlantic Liners and their Engines.
—— Steam-ships and their Machinery. 1893.
Hall, Henry. American Navigation.
—— Shipbuilding Industry of the United States.
Holmes, Sir George, C.V., K.C.V.O., C.B. Ancient and Modern Ships.
1906.
Hulls, J. H. Lecture on the Introduction of Steam Navigation.
(Delivered before the Institute of Marine Engineers, February 6,
1906.)
“Illustrated London News.”
“Illustrated Times.”
Inman Line Official Guide.
“International Marine Engineering.”
Johnson, R. W. The Making of the River Tyne.
Journal of the American Society of Naval Engineers.
Kennedy, John. History of Steam Navigation. 1903.
Knight’s Encyclopædia.
Latrobe, J. B. A Lost Chapter in the History of the Steamboat.
Lindsay, W. S. A History of Merchant Shipping.
—— Our Merchant Shipping.
Link of Empire, A: or Seventy Years of British Shipping. (Souvenir of
the Seventieth Year of Incorporation of the Royal Mail Steam Packet
Company.) 1909.
“Liverpool Journal of Commerce.”
“Liverpool Courier.”
Macfarlane. History of Propellers.
Maginnis, A.J., M.Inst.C.E. The Atlantic Ferry: Its Ships, Men, and
Working. 1900.
Marvin, W. L. The American Merchant Marine.
“Master, Mate, and Pilot.” (New York.)
Mechanic’s Register.
Morrison. American Steam Navigation.
Morse, J. T., jun. Benjamin Franklin.
Murray, Robert, C.E. Rudimentary Treatise on Marine Engines and
Steam Vessels; together with Practical Remarks on the Screw and
Propelling Power as used in the Royal and Merchant Navy. 1852.

Page 409

“Nautical Gazette.”
“Nautical Magazine.”
Nimmo, J., jun. American Treasury Department’s Report, 1870.
Orient Line Guide.
Palmer’s Shipbuilding and Iron Company. Some Account of the
Works of. 4th edition, 1909.
Parsons, Hon. C. A. The Development of the Marine Steam Turbine.
(Paper read before the Institute of Marine Engineers. Sept. 29,
1906.)
P. & O. Company’s Handbook.
“Penny Magazine.”
Phillips, Sir R. A Million of Facts.
Renwick, James. Robert Fulton. 1845.
Seaton, A. E. A Manual of Marine Engineering. 1890.
“Scientific American.”
Semmes, Captain Raphael. Voyages of the Sumter and Alabama.
Sennet, R., and Oram, H. J. The Marine Steam-engine. 1898.
Shaw, Savill and Albion Co.’s Guide.
“Shipbuilder,” The.
“Shipping.”
“Shipping Illustrated.”
“Shipping World,” The.
Sinclair, A. Two Years on the Alabama.
Smith, J. Russell. The Ocean Carrier.
Sparks’ Library of American Biography.
“Standard,” The.
“Steam-ship,” The.
Stevens, Francis B. The First Steam Screw Propeller Boats to navigate
the Waters of any Country. (Reprint from the Stevens Indicator, Vol.
X., April 1893.)
Stretton, Clement E., C.E. The History of the Holyhead Railway
Boat Service. (A Paper read on the occasion of the Jubilee of the
Railway Companies’ Working, August 1, 1898.) 2nd edition
(enlarged), 1901.
“Times,” The.
Transactions of the Institute of Marine Engineers.

Page 410

Walliker, J. F. Twenty Years of Progress in Cargo-boat Machinery.
(Paper read before the Institute of Marine Engineers, Feb. 12, 1900.)
Watson, Colin. Doubly in Crown Service.
Wells, D. A. Our Merchant Marine.
Williams, Harry, R.N. The Steam Navy of England, 1893.
Williamson, Captain James. The Clyde Passenger Steamer: Its Rise
and Progress during the Nineteenth Century. 1904.

Page 411

INDEX
(N.B.—All vessels are indexed under Ships named.)
Aberdeen Line, Rennie’s, 183; Thompson’s, 296
Aberdeen schooners, 85
Accidents, steam-ship, inquiry into, 77
Adelaide Steamship Co., 347
Admiralty, the, steam packet, 102; vessels, 176; and floating docks, 356, 362; and private
shipbuilding yards, 319; and twin screws, 325; and wooden three-deckers, 316
Æolipile of Hero of Alexandria, 9
Africa, West, mail service, 261
African Steamship Co., 261, 299
Ailsa Shipbuilding Co., 99
Alabama claims, the, 176
Albany Line, 48
Albion Co., 298
Alexandria-England, carriage of mails, 178
Alexandria-Suez, travel between, 167
Algiers, U.S.A., floating dock, 358
Allaire Works, 173
Allan Line, 254-255, 281
Allen, Dr. John, and jet-propeller, 12
Allison, Messrs. M. A., New Jersey, 50
Altona floating dock, 355
Alvarez, Don José, Chilian Agent, 128
America, steam vessels in, in 1817, 45
America, South, West Coast of, 263
American Civil War, vessels in the, 90, 98, 175, 329; blockade-runners, 327
American ice-breaking steamers, 369-371
American Line, 256, 291
American mail service, 150, 188
American Navy, the, 329, 339
American pioneers in steam navigation, 19
American river steamers, design of, 46
American Shipbuilding Co., 54

Page 412

American steam-ships and foreign trade, beginnings of, 153
American subsidy to steam-ship service, 155
American train ferry-boats, 363
Amherst, Lord, 164
Anderson, Anderson & Co., 294
Anglo-French Co.’s fleet, 118
Animal-driven paddles, 2
Apcar, Messrs., Calcutta, 264
Appleton’s “Cyclopædia of American Biography,” 19, 23
Armour plates, 331 et seq.
Armstrong, Mitchell & Co., 212, 364
Armstrong, Whitworth & Co., 336, 367, 369
Armstrong, Sir William, and cupola vessels, 330
Aspinwall, C. H., 188
Atlantic cable-laying by Great Eastern, 277
“Atlantic Greyhound” title won by Alaska, 250
Atlantic Liners. See Allan, American, Beaver, Collins, Compagnie Générale Transatlantique,
Cunard, Dominion, Donaldson, Galway, Guion, Hamburg-Amerika, Inman, National,
Norddeutscher Lloyd, Red Star, State, and White Star Lines
Atlantic records, 241, 250, 282, 288
Atlantic routes adopted, 241
Atlantic service. See Transatlantic
Australia, Cape route to, 291; discovery of gold, 232; first steam voyage to, 94; prize for
fastest voyage to, 263
Australian mail service, 185, 295
Australian Royal Mail Steam Navigation Co., 263
Australian service of P. & O. Co., 180
Australian steamers, the coaling of, 256
Australian trade cargo carriers, 294, 297
Austria, Empress of, yacht of, 373
Austrian-Lloyd Steam Navigation Co., 267
Babcock and Wilcox boilers, 359
Baikal, Lake, ferry, 365
Baltic, Swedish railway ferry, 365
Banana trade, West Indies, 299
Barclay, Curle & Co., Ltd., 206, 294
Barnes, Joseph, 20
Barrow-Belfast service, 121
Barrow-Isle of Man service, 96, 121
Barrow Steam Navigation Co., 121
Batteries, floating, 312, 320
Bazin, M., invents steamer on wheels, 387

Page 413

Beard, Mr., Scotch ironmaster, 115
Beaver Line, 253, 299
Bell, Henry, of Helensburgh, 61; relations with Fulton, 61; designs a steamboat, 62
Bell indicator for steward, 143
Belt conveyors, 349
Berlin, service to, 117
Bermuda floating dock, 355-357
Bernoulli, Daniel, 207
Bessemer, Sir Henry, and gyroscope boat, 379
Bilge keel, 281
Binney, Capt, L. & N.W.R. Marine Superintendent, 120
Bird-foot propellers, 7, 27, 207
Birmingham, Eagle Foundry, 4
Bishop’s disc engine, 313
Black and Saxton Campbell, Quebec, 134
Blackett, Capt., R.N., 214
Blockade-runners, 90, 98, 174, 175, 327
Blohm and Voss floating dock, 362
Blue Anchor Line, 297
Boats driven by animals, 2
Boats for safety, 78
Boilers, 229-230, 306; without water, 39; pressure, 210; tubular, 209; in warships, 337
Bombay floating dock, 363
Bombay, steamer launched at, 202
Borrie, Peter, 376
Boston-Liverpool trade, 288
Boulton and Watt engines, 30, 66, 81, 134, 311
Bourne, Messrs., 176
Bourne, William, proposition (1578), 6
Bows of steamers, shape of, 71
Branca, Giovanni, and steam (1629), 9
Brazil trade, 183
Bremen-New York service, 305
Bremen floating docks, 362
Brent, Mr., Deptford, 131
Bridgewater, Duke of, 61
Brighton, 106
Bristol-Waterford trade, 75
British and African Steam Navigation Co., Ltd., 299
British and American Steam Navigation Co., 138, 148
British and Foreign Steam Navigation Co., 110, 111, 177

Page 414

British and Irish Steam Packet Co., 97
British and North American Royal Mail Steam Packet Co. See Cunard Line
British India Steam Navigation Co., 181, 185
British Queen Steam Navigation Co., 138
British steam-ships, beginnings of, 56
Brown, John, & Co., Clydebank, 337
Brown-Curtis turbine, 337
Brown, Mr. W. H., New York, 158
Brownne, Charles, builder of the Clermont, 36
Brunel, Isambard K., 78, 208, 236, 263; designs the Great Britain, 221; and the Great Eastern,
269-278
Brunel, Sir Mark, 224
“Bulk freighter,” 82
Bulkheads, 230, 235
Bunker, Captain Elihu S., rivals Fulton, 36, 39
Burmese War, 165
Burns, Mr. John, and Mr. S. Cunard, 150
Bury, Curtice, and Kennedy, Liverpool, 231
Bushnell, David, designs submarines, 206, 276; and applies screw propeller, 206
Caird, Messrs., of Greenock, 119, 241, 293, 294, 305
Calcutta and Burmah Steam Navigation Co., 181
Calcutta, steamers to, via the Cape, 184; and Suez service, 178; to Spithead, length of passage
in 1840, 167
Calcutta Steam Committee, 166
California gold rush, 188
Californian trade, 188
Callao floating dock, 360
Calliope, the, musical instrument, 50
Caloric engines, 384
Cameron, T., & Co., Messrs., 100
Cammell, Laird & Co., 338
Campbell, Johnston & Co., floating dock at Bermuda, 356
Canada, mail steam-ship line to, 254; lines to, 255
Canadian-built lake steamers, 55
Canadian claims for first steam crossing of Atlantic, 135
Canadian ice-breaking steamers, 369-371
Canadian Pacific Railway, 299
Canadian trade, 289
Canso, Straits of, railway ferry, 369
Cantilever-framed steamers, 346
Cape route to India, 167

Page 415

Cape to Spithead, length of passage (1840), 169
Cape of Good Hope mail subsidy, 183
Cape Town-Durban mails, 183
Cargo-boats, 342-352
Carron Shipping Co., the, 85-87
Carron Works, 56
Cartagena floating dock, 363
Cattle steamers, 345
Caus, Salomon de, 10
Ceylon-Hong-Kong mails, 179
“Chambers’ Journal,” account of the Great Eastern, 271-275
Channel Islands service, 109-112
Chester and Holyhead Railway Co., 103; absorbed by L. & N.W.R., 119
Chili, 189
Chili coal mines, 187
Chilian Revolution, The Rising Star and the, 126
China, P. & O. Co. service to, 180; ships for, 206
China trade, 173; ships in, 265
Chinese paddle-wheels, ancient, 4
Cigar (shaped) ships, 375, 380
City of Dublin Steam Packet Co. See Dublin
Clark, Edwin, and floating docks, 363
Clark and Standfield and floating docks, 355, 361
Cleopatra’s Needle, 341
Clippers, Yankee wooden, 194
Clyde, Bell’s steamboat on the, 62; first Cunarders built on the, 151; first steamer on the, 28;
steamers on the, in 1818, 76. See also Glasgow
Clyde ferries, 366
Clyde to Liverpool, first passenger-steamer, 95
Coach fare, Scotland to London, 85
Coal at Suez, 166
Coal consumption, 229; of turbines, 309; in early voyages across Atlantic, 142
Coal, difficulty of carrying, for long voyages, 169
Coalfields, Midland, 213
Coaling for steamers, 256
Coastal steam-ship service, development of, 80; British, 71
Coasting trade of the United Kingdom in 1822-39, 76, 77
Cochrane, Hon. William E., 127, 129
Cockerill (Belgian firm), 321
“Coffin brigs,” 149
Colden, Cadwallader D., on Robert Fulton, 26
Coles, Capt., and cupola vessels, 330; tripod masts, 332; drowned, 334

Page 416

Collier belt conveyors, 349
Colliers, screw, 214
Collier, steam, with a screw, first, 213
Collingwood Shipbuilding Co., Ontario, 55
Collins, Mrs., and children drowned, 160
Collins, Mr. K. Edward, New York, 155
Collins Line, 153, 155 et seq.; construction of ships, 158; secures premier position, 159;
extravagances and losses, 159; subsidy reduced and line ceased, 161; service, 240
Collisions, intentional, 53
Colon, service to, 191
Commercial Steam Packet Co., 111
Compagnie Belge Maritime du Congo, 299
Compagnie Générale Transatlantique, 267
Compañia de Vapores Correos Interinsulares Canarios, 299
Confederate States of America, steamers, 90, 98, 174; commissioners, 262
Connecticut River, Morey’s steamboat on, 24
Continental passenger traffic, 105
Cootes, Mr., Walker-on-Tyne, 211, 213
Cork Steamship Co., 97, 139
Corrugated steam-ship, 349
Craggs, R., & Sons, Ltd., 348, 349
Cramp, Messrs., Philadelphia, 256, 291, 340
Crimean War, 98; iron vessel in the, 316; and shipbuilding yards, 319; floating batteries, 312,
320; P. & O. steamers employed, 180; steam-ships in the, 312; transports, 183, 239, 262
Cruisers, armed mercantile, 287, 291
Cunard Line, 281-287; first Cunarder based on Manx steamer, 87; beginnings, 150; sizes, &c.
of first steamers, 151; increase of business, 152; builds iron ships, 153; rivalry with Inman
Line, 240; first iron steamer, 243; last paddle-steamer, 246; adopt screw-steamers, 246
Cunard, Mr. Samuel, 134, 149
Curling, Young & Co., Messrs., 138, 146, 187
Curtis turbines, 338
Cutters in Channel Islands service, 109
Cutwaters, straight, 158
Dalswinton, 58
Davey, Mr. W. J., 299
Dawson’s steamer, London-Gravesend, 70
Day Line, 49, 51
Day, Summers & Co., 114
Decks for passengers, 42
Delaware River, early steamboats on the, 25, 29
Dempster, John, 299
Denny Bros., Dumbarton, ships by, 96, 105, 281, 310

Page 417

Dent & Co., 203
Destroyers, 336
Dewey floating dock, 362
Dicey, Capt., 377
Dickenson, Robert, and iron ships, 195
Dieppe-Honfleur route, 108
Displacement, theory of, 30, 193
Ditchburn and Mare, Blackwall, ships by, 233, 234, 260, 313, 371, 372
Dixon, Sir Raylton, & Co., Ltd., 346
Docks, dry, difficulties of, 353; floating, 352-363
Dod, Daniel, 123
Dodd, Capt., of the Thames, 67
Dominion Line, 243, 288
Donaldson Line, 255
Dover-Calais service, 72, 105; designs to prevent sea-sickness, 377-379; race, paddle v. screw,
259; proposed railway ferry, 366
Doxford, Messrs., and the rolling of ships’ plates, 345; and shifting cargo in bulk, 346, 351
Dramatic Line, 155
Dublin and Liverpool Steam Navigation Co., 73, 74
Dublin and London Steam Packet Co., 176
Dublin, City of, Steam Packet Co., 72, 74, 89; service to London, 97; Irish mail service, 102-
104; and transatlantic service, 144
Dublin-London service, 97
Dublin-Wexford service, 98
Duck-foot paddles, 7, 27, 207
Dudgeon, Messrs. J. & W., ships and engines by, 108, 184, 186, 234, 264, 265, 322; expansion
engines and screw propellers, 256; first apply twin-screws, 325
Duncan, R. (shipbuilder), 151
Dundas, Lord, 28, 57, 59
Dundee, Perth, and London Shipping Co., 87
Dundonald, Lord, 127, 129
Dundrum Bay, Great Britain ashore, 225
Dupuy de Lome, M., 320
Durham, Capt., 264
Dutch steamers, 76
Dynamite gun, 339
East, communication between England and the, 164
East India Co. and steamers to India, 166; inefficiency of service, 176; services, 180, 181; iron
ships for, 317
East Indiamen with auxiliary steam, 167
Eastern Archipelago Co., 235
Eastern Navigation Co., and the Great Eastern, 270 et seq.

Page 418

Eckford, Henry, naval architect, 42
Edinburgh and Leith Shipping Co., 84
Edinburgh-London service, 81; by sea, 84
Edward VII., yachts of, 371
Egyptian royal yachts (Khedive’s), 372, 374
Elbing-Schichau Works, 303
Elder, Alexander, 299
Elder, Dempster & Co., 262, 298, 299
Elder, John, 229
Elder, John, & Co., Govan, 108, 109, 249, 250, 251, 282, 306
Electric lighting on steamers, 242; incandescent lamps, 281
Ellerman Line, 291
Ellice, Mr. Edward, and Chilian independence, 128
Emigrant traffic to America, 238
Engines: compound, 185, 187, 261; of earliest boats, 199 et seq.; gas vacuum, 211; Ogden’s,
219; multiple-expansion, 229, 256, 306; reciprocating, 286; triple-expansion, 296; high-
pressure, 306; turbine, 307; reciprocating and turbine, 310; hot-air, 384; piston engine
development, 387
English Channel Steamship Co., 377
English river steamers, construction of, 46
Ericsson, John, hot-air engines, 384; screw propellers, 170, 215, 218
Ericsson Shipping Co., 349
Ericsson’s Monitor, 329
“Etoile” engine, 210
European and Australian Steam Navigation Co., 184, 185
Excursions in early steamboats, 43
Exhibition of 1851, extra traffic from, 107
Fairfield Co., Govan, 96, 109, 301
Fall River Line, 46, 47
Falmouth-Mediterranean service, 176
Fares, passenger, under competition, 74
Faron, Mr., 158
Farragut, Admiral, 175
Fauber (American engineer) and hydroplane, 386
Fawcett & Preston, engines by, 144, 148, 177
Ferguson, Mr. John, 206
Ferry steamers for railway trains, 363-366
Ficket, Francis (Ficket and Crocker), 123
Finland ice-breaker, 369
Fishbourne, Admiral, 316
Fishguard-Rosslare service, 116
Fitch, John, as inventor of steamboats, 21; his ideas taken by Fulton, 23, 24

Page 419

Fleetwood-Dublin service, 102
Fletcher, W. & A., Co., Hoboken, 51
Floating docks, 352-363
Folkstone-Boulogne service, 106
Forbes, Mr. R. B., Boston, 170
Ford’s (Edward) patent of 1646, 8
Forenade Line of Copenhagen, 117
Fortanini hydroplan, 385
Forth and Clyde Canal, 57, 59
Forwood Line, 300
France-England, first steamer communication between, 72
Franco-German War, 115
Franklin, Benjamin, 21
Freeman, Mr., of Chipping Campden, 13
French Government, experiments in warships, 338; and Crimean War transports, 240
French steamers entering British ports, 76
French Transatlantic Co., 115
Fulton, Robert, as inventor of steamboats, 19; and drawings of John Fitch, 23, 24; financed by
Livingston, 25; his career, 25; experiments with submarines, 26; corresponds with Lord
Stanhope, 27; steamboat experiments, 28; relations with Symington, 28; the Clermont, 30;
list of his steamboats, 35; relations with Bell & Miller, 61
Funnels, four, 92; masts used as, 212, 218
Fyfe, William, of Fairlie, 66
Galley, Illyrian, propelled by oxen, 6
Galway-America service, 98; to Portland, Maine, 162; to Newfoundland, route, 162
Galway Line to America, 161-163
Gas-lighting experiment, 253
Gas-machinery propulsion, 340
General Iron Screw-Collier Co., 233
General Screw Shipping Co., 233
General Steam Navigation Co., 81-83; joint service with G.E.R., 117
Genevois (J. A.) propellers (1759), 8
German Emperor’s yacht, 371
German Navy, 303
German shipbuilding, 302; State-developed, 303
Germania shipbuilding establishment, 303
Germanischer Lloyd, 302
Germany as a Naval Power, 339
Gibbs, Antony, & Sons, 227
Gibbs, Bright & Co., 226
Glasgow ferries, 366
Glasgow-Inverness service, 100

Page 420

Glasgow-Ireland service, 100
Glasgow-Liverpool service, 100. See also Clyde
Glasgow, transatlantic service from, 237
Glasgow and Dublin Screw Steam Packet Co., 101
Glasgow and New York Steamship Co., 240
Gordon & Co., Deptford, 165
Goudie, James, 134
Graham, Osbourne, & Co., 349
Grand Trunk Railway, 255
Gray, Wm., & Co., Ltd., West Hartlepool, 347
Gray’s (McFarlane) steam steering gear, 241
Grayson & Leadley, Liverpool, 73
Great Central Railway Co.’s steamers, 118
Great Eastern Railway Co.’s steamers, 116-118
Great Western Railway Co.’s service to the Channel Islands, 112; other services, 116
Great Western Steamship Co. formed, 138; and American mails, 150; and ocean screw
steamer, 220
Green, F., & Co., 294
Green, R. & H., & Co., 167, 234, 295, 373
Griffiths, John Wm., 339
Griffith’s propeller, 245
Grimsby-Continent service, 118
Guion, Mr. S. B., founds the Guion Line, 247; progress of the line, 248-251; death of Mr.
Guion and line dissolved, 251
Gurley Bros., 108
Hamburg floating dock, 362
Hamburg-Amerika Linie, 267, 302, 305-306
Hamburg Reiherstieg Shipbuilding Works, 302, 303
Hamilton, William, & Co., Ltd., Port Glasgow, 348
Harland & Wolff, ships built by, 252, 289, 293, 297, 305
Harnden & Co., Boston, 155
Harroway and Dixon cantilever framed steamers, 346
Harwich-Antwerp service, 117
Harwich-Esbjerg service, 117
Harwich-Hook of Holland service, 117
Harwich-Rotterdam service, 117
Havana floating dock, 353
Hawthorn, engine by, 212
Hendersons of Glasgow, 264
Hepworth, Mr. John, 382
Hero of Alexandria and steam, 9

Page 421

Heysham Harbour, 121
Heysham-Isle of Man service, 121
Hodgson, James, Liverpool, on cost of iron ships, 230; introduces tubular iron vessels, 235
Hogg & Co., New York, 172
Hogging and sagging, 46, 194, 268
Hogging frame, Stevens’, 46, 194
Hollar’s submarine (1653), 375
Holyhead-Dublin service, 72, 103, 110
Holyhead-Greenore service, 120
Holyhead-Kingstown service, 204
Hong-Kong-Sans Francisco, White Star service, 243
Hong-Kong-Shanghai service, 203
Hook of Holland, 117
Horseley & Co., Tipton, 110
Horseley Iron Works, 195
Hough, Samuel, & Co., 100
Howden’s forced draught, 366
Howell’s “homogeneous metal,” 279
Huddart, Parker & Co. Proprietary, Ltd., 97
Hudson River steamboats, 25, 29, 30, 47; screw boats, 207
Hudson River Day Line, 49
Hulls, double, 270, 347, 375; triple, 388
Hulls, Jonathan, as inventor of the steamboat, 12
Humber, Continental service from the, 118
Hunt, Seth, of Louisiana, 45
Hydraulic propulsion, 321-325
Hydrocurve, 385
Hydroplan, 385
Hydroplane, 386
Iceberg, Guion liner’s escape from, 250
Ice-breaking steamers, 367-371
Imperial Direct West India Mail service, 299
India, first steamer built in, 202; steam communication with, 164; Government subsidy, 164;
purchase vessel, 165; mails to, 176, 177; traffic to, 184
Indian Mutiny, P. & O. steamers employed owing to, 180
Indian rivers, navigation of, 205
Indus, the, steamers on, 202
Inglis, A. & J., Glasgow, ships built by, 86, 184, 185, 206, 374
Inman and International Line, 290-291
Inman Line, 237-243; rivalry with Cunard Line, 240; absorbed by American Line, 256
Inman, Mr. William, 237, 243

Page 422

Intercolonial Railway, Canada, 255
International Navigation Co. acquires Inman steamers, 243
Ireland, early iron ships in, 196
Ireland-England, first steam communication, 71
“Irish Brigade,” 262
Irish cross-Channel service rivalry, 74
Irish mail, &c., traffic, 102, 119
Iron barge, experimental, 195
Ironclads, advent of, 320; without masts, 333
Iron ships: first on Long Island Sound, 47; first cross-Channel, 75; introduction of screw
propellers, 97; introduction of iron, 191; length of, 194; suitability, 193; saving in weight,
194; proposal to build iron ships decided, 195; first vessel for commercial purposes, 195;
first iron steamer, 195; growth of iron shipbuilding, 196 et seq.; strange vessels, 211;
developments, 230; cost of iron ships, 230; tubular type, 235; first Cunarder, 243;
Admiralty’s conservatism against iron, 316
Isherwood system of construction, 348
Isle of Man, Liverpool, and Manchester Co., 96
Isle of Man Steam Packet Co., 87-94. See also Man, Isle of
Ismay, Mr. T. H., 251
Ismay, Imrie & Co., 296
Jackson, Mr. W., 132
Jamaica fruit trade, 299
Jamson, Dougal, and the steamboat, story of, 62
Japanese engineers, story of, 203
Japanese submarines, 301
Japanese warship building, 339
Jersey fisheries guardship, 110
Jersey-France service, 112
Jesuit Fathers of Peking, “Memoires” of, 4
Johnston, Lieut., 164
Jointed Ship Co., 380
Jones, Sir Alfred L., 298, 299
Jones, Dr. P., and single screw, 209
Jordan, J., & Co., engines by, 248
Jouffroy d’Abbans, Marquis de, 15
Kiel naval harbour, 303
Kier, Mr., engineer, 130
Kirk, Dr. Alexander, and triple-expansion engines, 296, 306
Kirkaldy, David, drawings by, 243; and hardening of steel, 279
Klawitter, Dantzic, 303
Laird, Messrs., Birkenhead, ships built by, 75, 119, 262, 279, 316, 317, 332, 334

Page 423

Laird, Alex., & Co., Messrs., 100
Laird, John, of Birkenhead, and iron shipbuilding, 196
Laird, Mr. Macgregor, 138, 261
Lake steamers, American, 51
Lange, Johann, shipyard, 302
Langley, Messrs. C., Deptford, 373
Langtry Co., of Belfast, 74
Lardner, Dr., and transatlantic steam navigation, 137
Launch, Indian custom at, 202
Law, George, and American mails, 188
Leith and Berwick Co., 84
Lever, Mr., of Manchester, 162
“Leviathans,” 270
Life-boats as paddle-boxes, 79
Life-buoys, belts, &c., 78
Lighting of ships, 253
Lindsay’s boiler-scaling apparatus, 203
Little, James, & Co., Messrs., 95-97
Littlehampton, 108
Liverpool and tugboats, 341; first iron screw steamer from, 235; dock to accommodate
American liners, 157; steam-ship companies, 77
Liverpool, voyage of the Elizabeth to, from Glasgow, 64
Liverpool-Bristol service, 100
Liverpool-Dublin mail service, 102
Liverpool-Isle of Man service, 87-94, 96
Liverpool-Kingstown service, 144
Liverpool-London service, 98, 99
Liverpool-New York service, 240
Liverpool-Philadelphia service, 240
Liverpool-Valparaiso service, 264
Liverpool and Philadelphia Steamship Co., 238
Liverpool, New York, and Philadelphia Steamship Co., 240
Livingston, Chancellor R., and Morey’s steamboats, 24; finances Fulton, 25; experiments in
steam propulsion, 208
Livingstone expedition, steel steamer for, 279
Livingston’s “Historical Account of the Application of Steam for the Propelling of Boats,” 19
Lloyd’s, first steamer entered at, 100
Lodge-Muirhead wireless telegraphy, 121
London and tugboats, 341; shipbuilding, 233-234; City Corporation employees and the
Watermen’s Co., 80; County Council steamers, 367; river steamboat service opened, 66
London, Glasgow to, first steamer, 66
London-Hamburg service, 117

Page 424

London-Margate service, 70
London and Edinburgh Shipping Co., 83-85
London and Leith Shipping Co., 84
London and North-Western Railway Co.’s steamers, 119-121
London and South-Western Railway Co.’s steamers, 109-116; Manx boat purchased from, 93
London, Brighton, and South Coast Railway Co.’s steamers, 106-109
London, Leith, and Edinburgh Shipping Co., 74
Long Island Sound, First iron steamboat on, 47
Long Island Sound Line, 40
Longitudinal system of ship construction, 268, 348
Louis Philippe of France, escape of, 113
Louvre Museum, Kirkaldy’s designs in, 246
Lund, Mr. W., 297
Lungley, Mr., ship built by, 264
Lyttleton, Wm., 207
McDougall, Capt., 55
McGregor, Mr. John, and early Chinese paddle-wheels, 4
McGregor, Laird & Co., 196
MacIver, Mr. David, and Mr. S. Cunard, 150
McKean, McLarty, and Lament, 254
Mackenzie, William, master of the Comet, 63
McKinnon & Co., Glasgow, 181
MacLachlan, Archibald, 66
McQueen, Robert, 39, 52
Mahmoudieh Canal, 179
Mails, officer in charge of, to West Indies, 190
Mails to America, 149; to India, 176, 177; to Ireland, 102
Makaroff, Vice-Admiral, 367
Malcomson’s London and Dublin Line, 99
Malta floating dock, 363
Man, Isle of, first steamers at, 88; first built there, 89; history of the Manx service, 87-94;
Barrow service, 96
Manby, Mr., 195
Maples and Morris, Messrs., 106, 107
Mare’s Shipyard, Blackwall. See Ditchburn and Mare
Marine engines. See Engines
Marinsky Canal, 364
Maryland Steel Co., Baltimore, floating docks, 358, 362
Maschinenbau-Gesellschaft, 303
Mason, Mr., 262
Masts on steam-ships, 41; used as funnels, 212, 218; tripod, 332; on warships, 338

Page 425

Mastless steamers, 346
Maudslay, Sons & Field, founder of the firm, 70; engines by, 148, 201, 202, 233, 253, 319,
372; connection with the Royal Navy, 311; yards of, 234
Maury, Lieut., 241
Mediterranean ports, 111
Mediterranean service, 267
Merchants’ Shipping Co., 47
Mersey ferries, 366
Messageries Maritimes de France, 267
Mexican Government and iron frigate, 316
Mexican War, 174
Middleton Yard, Hartlepool, 305
Midland Railway Co.’s steamers, 121
Milford-Rosslare service, 116
Millard and Kirby, Messrs., and Fulton’s Clermont, 50
Miller and Ravenhill, engines by, 187, 372
Miller, Patrick, 57, 58, 388
Mills, Mr. Edward, 154
Mississippi River steamers, 53; Fitch’s steamboat, 23; Fulton’s steamboat, 32; Moselle and
Oroonoko blown up, 53; intentional collisions, 53
Mitchell, Mr. Charles, 212
Monaco, Prince of, yacht of, 373
“Monitors,” 334
Monroe, President, 123
Moore, Admiral Sir Grayham, 217
Moray, John, on James Rumsay as inventor of steamboats, 19
Morey, Samuel, invents a steamboat, 24
Morgan Combine, 228
Morisot’s “Orbis Maritimi,” 6
Morland, Sir S., 10
Motor-boats (hydroplane), 385; (hydrocurve), 385
Napier, Admiral Sir Charles, 195
Napier, David, and the boiler of the Comet, 63; and the shape of bows of steamers, 71;
provides engines, 72
Napier, Robert & Sons, engines by, 72, 88, 89, 147, 151, 157; and Mr. S. Cunard, 149; present
engine of the Comet to South Kensington Museum, 64; and David Kirkaldy, 243; and high-
pressure boilers of steel, 279
Napoleon III., yacht of, 373
National Line, 254
Naval Construction Co., Barrow, 99
Navy, Royal, steam-power and the, 311-340; last wooden battleship, 319; first twin-screw
boat, 328; ironclads without masts, 333; torpedo boats, 336; destroyers, 336; development,

Page 426

336
Neilson, Walter N., 229
New England Ocean Steamship Co., 155
New York celebrates the arrival of early steamers, 141
New York-Aspinwall mails, 188
New York-Bremen service, 154
New York-Chagres line, 188
New York-Havana service, 189
New York-Liverpool, lines in 1850, 155
New York and Havre Steam Navigation Co., 154
New York Shipbuilding Co., Camden, N.J., 51
New Zealand Government subsidy, 185; service to, 298
New Zealand Shipping Co., 310
Newcomen and Savery, 11
Newfoundland Government and mails, 162
Newhaven-Dieppe service, 106
Newport News Shipbuilding, &c., Co., 340
Niger exploration, 280
Norddeutsche Werft, 303
Norddeutscher Lloyd, 267, 302, 303-305
Normand, A, Havre, 373
North Lancashire Railways, 102, 103
North Sea, 84
Northumberland Straits passenger service, 370
Oak, scarcity of, and use of iron for ships, 195
Ocean liner, express, modern type of, 252
Ocean Steam Navigation Co., 154
Oceanic Steam Navigation Co., 252
Ogden, Mr., American Consul, 219
Oil-tank steamers, 348, 351
Oldham’s revolving bars, 195
Orient Line, 264, 291, 294-296
Orient-Pacific Line, 295
Orient Royal Line, 295
Original Steam Packet Co., 72
Ostend-Dover service, 309
Oude, Rajah of, generosity of, 165
Ouseburn engine works, 306
Overcrowding passenger steamers, 79
“Overland Route” to India. See Suez
Pacific coast of S. America trade, 187

Page 427

Pacific and Australasian Co., 239
Pacific Mail Line, 188
Pacific Steam Navigation Co., 186, 187, 189, 191, 229, 263, 291, 294, 295
Paddle-wheels, evolution of, 1; motive-power, 1; animal-driven, 2; early forms, 2, 4; early
experiments, 10, 12; Jouffroy’s invention, 17; Morey’s inventions, 24; Roosevelt’s
invention, 25; Patrick Miller’s invention, 58; vertical, 25; disconnecting, 33; Seward’s
invention, 110; development in construction, 197-199; duck-foot paddles, 207; elliptical,
208; horizontal centrifugal, 208; superseded by screw, 191
Paddle v. screw races, 259; tests, 312
Paddle-boxes as lifeboats, 78
Palmer, Sir Charles, 214
Palmer Bros. & Co., ships built by, 114, 213, 247, 248; and rolled armour plates, 385
Panama-Astoria service, 189
Panama-San Francisco mails, 188, 189
Panama, New Zealand, and Australian Royal Mail Co., 185
Panama Railway, 174, 187, 191, 262
Panama route, 187
Panciroli’s “Rerum memorabilium,” 6
Papal yacht, 372
Papin, Dr. Dennis, inventions of, 11
Paris Exhibition, 1878, traffic, 109
Parsee custom at launch, 202
Parsons, Hon. A. C., on turbines, 307
Parsons turbines, 118, 307, 338
Passengers carried by Sirius across Atlantic, 141; first steamer for passengers and cargo, 72
Patersen, Capt. Robert, 86
Paterson of Bristol, 141, 221
Paul, Capt. Fred, R.N., 113
Paulding, James Kirke, 339
Peacock, Capt. George, and mechanical swan yacht, 383
Pearse & Co., Stockton-on-Tees, 205
Penarth floating dock, 359
Peninsular and Oriental (P. & O.) Co., incorporated, 178; first steamer to India, 179; transport
over Suez isthmus, 179; services to India and China, 180; subsidy for Indian mails, 180;
Australian service, 180; difficulties on opening of Suez Canal, 182; overland route through
Egypt closed, 182; ships, 260-261; increase of size of ships, 291, 293; and Australian trade,
294; acquires Blue Anchor Line, 297
Peninsular Steam Navigation Co., 176-178; becomes the P. & O. Co., 178
Penn, John, and Son, engines by, 226, 233, 260; oscillating engines, 201, 314; number of
engines fitted by, 315; for the Crimean War, 319; and screw bearings, 219
Périer’s fire pump, 16
Perkins’ tri-compound engines, 306
Peru, 189

Page 428

Petroleum steamers, 351
Philadelphia Line, 43
Philippines, floating dock for, 362
Phillips, Sir Richard, 69
Pirrie, Lord, 298
Porter’s patent anchor, 223
Portsmouth-Ryde, 232
Potomac, early steamboats on the, 20
Powell (H. & Co.) Line, 99
Propeller, screw. See Screws
Propelling vessels by recoil from cannon, 8; by animals, 2; by steam, early experiments, 10-
11; by pumping water, 12; by screws, 29. See also Paddle-wheels
Propelling without paddles, reward for, 210
Pyroscaphe, the, 15
Quebec and Halifax Steam Navigation Co., 134
Racing, Ocean, 247; steamboat, 53; paddle v. screw, 259
Railway companies and their steamships, 102-121
Railway trains, ferrying of, 363-366
Ramage and Ferguson, Ltd., Leith, 375
Rams, 329
Ramsay’s (David) patent boats (1618), 6
Ramus, Rev. C. M., and hydroplane, 386
Randolph, Charles, 229
Randolph, Elder & Co., 229
Rangoon wooden dock, 354
Rate wars, 74, 80, 94
Rateau turbines, 307
Red Cross Line, 231
Red Sea steamer service, 166; to the Mediterranean transport, 179
Red Star Line, 256
Refrigerators, 298
Registration of steamers, 77
Reid, Mr. E. J., designs Koenig Wilhelm, 333
Reid’s U bow, 332
Reiherstieg yard, Hamburg, 302, 303
Rennie, Capt. George, 183
Rennie’s “Aberdeen” Line, 183
Rennie, G. & J., engines by, 233, 313; and Ship Propeller Co., 216; floating docks, 355, 363
Renwick, Dr. James, 29
Repairs to steam-ships, 300
Reversing machinery, 70

Page 429

Richardson Bros. & Co., 238, 239
Rivalry between steam-ship companies, 73
Roberts, Lieut., R.N., 138, 145
Robertson, John, 62
Robertson, Robert, engineer, 63
Robinson and Russell, 232, 319
Roebuck, Dr., 86
Rogers, Capt., of the Savannah, 125
Rogers, Moses, pioneer steam navigator, 30, 123
Roosevelt, Nicholas J., invents paddle-boat, 25; associated with Fulton, 42; experiments in
steam propulsion, 208
Ropner & Sons, Ltd., 348
Rostock “Neptun” yard, 302
Rotterdam, railway round, 117
Rouss, Mr. W. P., yacht of, 374
Royal Academy, steam-ship designs exhibited at, 245
Royal Mail Steam Packet Co., 185, 189-191, 262-263, 291, 295, 299-300
Royal Netherlands Steamship Co., 91
Royal yachts, 371-374
Rubic and Blaker, Northam, 110
Rudders, bow, 106; balanced for turbine vessels, 105; submerged, 290
Rumsay, James, as the inventor of the steamboat, 19
Rumsay Society, 21
Rupert, Prince Palatine, and boat propeller, 11
Rushen, Mr. P. C., on Jonathan Hulls’ invention, 14
Russell & Co., clipper built by, 173
Russell, Robinson & Co., 107
Russell, Mr. Scott, and the Wave Queen, 107; and wave-line construction, 236, 316, 320;
shipbuilding on the Thames, 204, 234; designs Victoria, 263; and the Great Eastern, 268,
278
Russian Government ice-breaker, 367; Navy floating dock, 363; royal yachts, 371, 373
Ruthven’s hydraulic propulsion, 208, 321-325
“Sag,” 46, 194, 268
Sail power on liners, 158
Sailing clippers, American, fast passages of, 153
Sailing vessels, engines put into, 135, 136; vessel with steam as auxiliary crosses Atlantic,
122; steam auxiliary to, 164-192
St. George Steam Packet Co., 72, 94, 97, 100, 101
St. Lawrence River ice-breaker, 369
Saloons above deck first fitted, 206; oscillating, 253
Samuda Bros., 204, 234
San Francisco Union Iron Works, 340

Page 430

Saône, paddle-steamer on the (1783), 17
Sassnitz-Trelleborg railway ferry, 365
Sault Ste. Marie Canal, 52
Savery, Thomas, invention of, 11
Scarborough and Isaacs, Messrs., 122
Schlick balancing of engines, 120
Schultz turbines, 388
Scott, Capt., of Rising Star, 131
Scott, Mr. John, figure-head of, 318
Scott, Russell & Co., Millwall, 204
Scott, Sinclair & Co., Greenock, 318
Screw propellers, invention of 29; first Manx steamer to use, 92; for sea-going steamers, 97;
supersede paddle-wheels, 191; tried in 1802, 192; earliest attempts to apply, 206, 207;
movement of vessels with single screw, 209; twin-screws, 210; first ocean steamer with
twin-screws, 265; fantastic forms, 215; first sea-going vessel with screw, 216; definitely
adopted, 219; lifting propeller, 253; for long voyages, 256; adopted for mail boats, 262;
multiple screws, 310; first vessel in the Royal Navy with, 313; removable screws, 318; twin
screws, 325; tests of twin screws, 326
Sea-sickness, steamers to prevent, 253, 377-379
Sea voyage, first British steamer to make a, 64
Seamen, pay of, in 1821, 132
Seaward and Capel, Limehouse, 169
Seaward, J., & Co., Millwall, 373
Seaward’s vibrating paddles, 110
Seine, first iron steamer on the, 195
Sewall & Co., 194
Sewell and Faron, 158
Shaw, Savill & Albion Co., 297
Shelter deck, 344
Ship Propeller Co., 216
Shipbuilding, German competition, 302. See also Thames
Ships named:
Aaron Manby, 195
Aberdeen, 296, 307
Achilles, 315
Aconcagua, 264
Active, 311
Ada, 116
Adelaide, 269
Adirondack, 48, 170
Admiral Moorsom, 119
Adriatic, 161, 163, 253, 289

Page 431

Aetna, 35
Africa, 153, 155
African, 176
Agamemnon, 315
Aguila, 112
Ajax, 315
Alabama, 175
Alaska, 172, 250
Alberta, 116
Alecto, 312
Alexandra (L. & S.W.R.), 116
Alexandra (L. & N.W.R.), 119
Alexandra (Royal Yacht), 371
Alice, 115
Alida, 49
Alliance, 113, 114
Alma, 114, 116
Amazon, 300
America (Cunard Co.), 152, 245, 286
America (National Line), 254
America (Yacht), 158
American Turtle, 376
Amerika, 305
Amethyst, 309, 335
Anglia, 104, 120
Anglo-Saxon, 255
Annette, 173
Antarctic, 157
Antelope, 235
Antrim, 121
Apollo, 110
Aquila, 107
Arabia, 153
Arago, 154
Aragon, 300
Araguaya, 300
Arcadia, 151
Archimedes, 216, 222
Arctic, 157-160
Argyle, 66
Ariadne, 110, 316

Page 432

Arizona, 249
Arkansas, 340
Armenia, 51
Arrogant, H.M.S., 314
Arundel, 109
Asia, 153, 157
Assiniboia, 301
Assyrian, 316
Astarte, 255
Asturias, 300
Atalanta, 116, 110, 111, 166
Athenia, 255
Athole, 206
Atlantic, 156, 158
Atrato, 271
Augusta, 99
Aurania, 281
Aurora, 327
Austral, 295
Australasian, 296
Avoca, 99
Avon, 222, 300
Ayrshire Lassie, 106
Balmoral Castle, 292
Baltic, 157, 158, 181, 287, 288
Bann, 319
Banshee, 119
Barbarossa, 304
Baron Osy, 269
Barracouta, 175
Basilisk, 313
Bay State, 47
Belfast, 72
Belgic, 253
Bélier, 334
Bellerophon, 80, 315, 334
Ben-my-Chree, 89, 92, 93
Berenice, 166
Bertha, 116
Bessemer, 253, 379
Birkenhead, 317

Page 433

Black Eagle, 314
Black Prince, 315
Bogota, 229
Borussia, 267, 305
Bremen, 267
Brighton, 109, 112
Bristol, 47, 337
Britannia, 151, 154
Britannic, 253
British Queen, 138, 145-147, 169, 216
Brittany, 109, 114, 115, 116
Brune, 319
Buenos Ayrean, 281
Buffalo, 35
C. Vanderbilt, 49
C. W. Morse, 48
Calais, 105
Calais-Douvres, 378
Caledonia, 64, 151
California, 188
Callao, 229
Caloric, 384
Calvados, 109
Cambria, 104
Cambria (Cunard Co.), 151
Cambria (L. & N.W.R.), 120
Camden, 35
Camilla, 110
Campania, 282, 287
Canada, 152, 245
Canadian, 254
Cape of Good Hope, 181
Captain, 334
Car of Neptune, 35, 36, 38, 44
Carbon, 235
Carmania, 282, 285, 309
Caronia, 282
Carpathia, 283
Carron, 79, 86, 176
Cassandra, 255
Castalia, 377

Page 434

Cedric, 288
Celtic, 253, 288
Cerberus, 335, 376
Chancellor Livingston, 35, 42, 43
Charles Wetmore, 55
Charleston, 340
Charlotte Dundas, 28, 59, 135, 199
Cherbourg, 116
Chicago, 248
Chili, 187
Chimborazo, 264, 295
China, 246, 247, 293
Cincinnati, 305
City of Baltimore, 239
City of Belfast, 121
City of Berlin, 241, 242
City of Bristol, 242
City of Brussels, 241
City of Chicago, 243
City of Cleveland, 54
City of Dublin, 72
City of Edinburgh, 81
City of Glasgow, 96, 237
City of Limerick, 97
City of Manchester, 238
City of New York, 240, 256, 290
City of Paris, 241, 246, 256, 290
City of Philadelphia, 239
City of Pittsburg, 239
City of Rome, 242
City of Washington, 239
Claremont, 307
Clermont, 20, 29 et seq., 49, 135
Cleveland, 305
Clyde, 64
Cobra, 308
Coffee Mill, 66
Collier, 107
Collingwood, 55
Colombia, 176
Colombo, 181

Page 435

Colorado, 248
Columbia, 114, 116, 151
Columbus, 288
Comet (Bell’s), 62, 135
Comet (Dawson’s), 70
Comet (French Co.), 112
Commerce, 73
Commonwealth, 48
Conde de Patmella, 122
Confiance, 176
Connector, 379
Connemara, 120
Coogee, 96
Copenhagen, 118
Cotopaxi, 295
Countess of Dublin, 98
Countess of Erne, 119
Countess of Strathmore, 214
Courier, 113
Craster Hall, 348
Crœsus, 233
Cuckoo, H.M.S., 110
Culloden, 106
Curaçoa, 133
Cuzco, 264, 295
Cyclops, 316
Cygnus, 112
Cymba, 99
Dakota, 248
Damascus, 296
Dane, 183
Daniel Drew, 51
Dantzig, 319
Dasher, H.M.S., 110
De Witt Clinton, 45, 46
Dee, 262
Defiance, 69
Delaware, 340
Delcomyn, 297
Delta, 260
Demologos, 35

Page 436

Destroyer, 339
Deutschland, 305
Devastation, 333
Devonshire, 97
Diana, 115
Dieppe, 107, 109
Dispatch, 113
Dominion, H.M.S., 358
Doncaster, 207
Donegal, 121
Dora, 93
Douglas, 90, 93
Douro, 263
Dover, 105, 317
Dreadnought, 309, 315, 335
Drottning Victoria, 365
Duchess of Albany, 116
Duchess of Buccleuch, 96
Duchess of Connaught, 116
Duchess of Devonshire, 96, 121
Duchess of Edinburgh, 116
Duchess of Fife, 116
Duchess of Kent, 116
Duchess of Sutherland, 119
Duchess of York, 106
Duke of Cornwall, 97
Duke of Sutherland, 119
Duke of Wellington, 272
Dumbarton Castle, 70
Dumfries, 113
Duncannon, 75
Dundee, 87
Dwarf, 313
Eagle, 376
Earl Grey, 370
Earl of Hardwicke, 167
Earl of Liverpool, 82
Earl Spencer, 120
Echo, 176
Echunga, 347
Eclipse, 54

Page 437

Eden, 309, 335
Edinburgh, 240
Edith, 119, 172, 328
Egypt, 293
Eleanor, 120
Elizabeth, 64
Ella, 115, 116
Ellan Vannin, 91
Empire, 48
Empire of Troy, 48
Empress, 105
Empress of Russia, 35
Empress Queen, 93
Encounter, H.M.S., 314
Endeavour, 201
Enterprise, 43, 165-166, 306
Ericsson, 384
Erin, 254
Ermack, 367, 368, 369
Esk, 262
Etna, 45
Etruria, 281, 282
Europa, 152, 245
Excellent, 325
Experiment, 328
Express, 113
F. P. Smith, 216
Faid Gihaad, 372
Fairy, 371
Falcon, 165
Falken, 373
Fannie, 115
Far East, 265
Fenella, 92
Firebrand, 176
Firefly, 35, 41, 44, 45
Flora, 325
Florida, 288
Forth, 191
Foyle, 98
Francis B. Ogden, 218

Page 438

Franklin, 43, 154
Frederica, 116
Frolic, 96
Fulton, 35, 41, 154
Gaelic, 253
Galtee-More, 120
Garonne, 264, 295
Garry Owen, 196, 221
Gascony, 349
Gemini, 376
General Admiral Apraxine, 368
George Canning, 74
George Washington, 304
Georgia, 188
Germanic, 253
Geyser, 313
Glasgow, 86, 240
Glatton, 334
Glen Cove, 50
Gloire, 320
Gorgon, 316
Grace, 106
Grand Turk, 111
Great Britain, 217, 221, 256, 271
Great Eastern, 193, 230, 241, 268-278, 284, 288
Great Liverpool, 178
Great Western, 138, 141-144, 145, 147-148, 150, 169, 220, 238, 271
Greenock, 88, 318
Griffin, 115
Guadeloupe, 316
Guernsey, 116
Hansa, 301
Havre, 113, 114
Hazard, 331
Hebe, 315, 327
Helvetia, 254
Hendrick Hudson, 48, 49
Henry Bell, 73, 88, 100
Henry Clay, 170
Her Majesty, 232
Herald, 96

Page 439

Hercules, 315, 332
Hermann, 154
Hermes, 176
Hibernia, 71, 102, 104, 120, 151
Hilda, 115, 116
Himalaya, 180, 260, 271
Hindostan, 179
Hohenzollern, 371
Ho-Nam, 206
Honfleur, 108, 116
Hope, 36, 38, 39, 45, 69, 107
Howe, 315
Hudson, 300
Hugh Lindsay, 166
Humber, 64
Humboldt, 154
Iberia, 177
Idaho, 248
Immacolata Concezione, 372
Immingham, 118
Inconstant, 315, 333
Independencia, 315
Indian, 254
Indian Empire, 162
Industry, 66
Invincible, 336
Iolanda, 375
Irishman, 100, 101
Iroquois, 351
Isa, 306
Isabella, 120
Italy, 109, 254
Ivernia, 283
James Joicey, 307
James Watt, 81, 100
Jerome Napoleon, 373
John Bowes, 211, 213
John Elder, 264
John W. Richmond, 46
Jumna, 202
Kaiser Wilhelm II., 287, 305

Page 440

Kaiser Wilhelm der Grosse, 304, 305
Kaiserin Auguste Victoria, 305
Kangaroo, 239
Karamea, 298
Kate, 327
Kearsarge, 176, 340
Kentucky, 340
King Edward, 309
King Orry, 89, 92
Kingfisher, 83
Kite, 124
Koenig Wilhelm, 333
Koenig Wilhelm II., 305
Kronprinz Wilhelm, 305
Kronprinzessin Cecilie, 305
La France, 259
La Plata, 262
Lady de Saumarez, 110
Lady Derby, 233
Lady Eglinton, 98, 245
Lady Grey, 369
Lady Hudson-Kinahan, 99
Lady Martin, 99
Lady Olive, 99
Lady Roberts, 99
Lady Wodehouse, 98
Lady Wolseley, 99
Ladybird, 107
Lancashire Witch, 96
Larriston, 245
Laura, 116
Laurentic, 289
Le Nord, 105
Leinster, 204
Leven, 72
Leviathan, 270, 276
Lewis, 155
Lexington, 45, 46
Liffey, 73
Lightning, 264, 311, 336
Lily, 119

Page 441

Lima, 229
Livadia, 373
Liverpool, 145
London, 87
Londonderry, 121
Lord Beresford, 110
Lord Nelson, 335
Lord W. Bentinck, 202
Lord Warden, 105
Louisa Ann Fanny, 267
Louisiana, 175, 254
Lucania, 282
Lusitania (Cunard Co.), 279, 282, 309
Lusitania (Orient Line), 264, 294
Ly-ee-moon, 203
Lydia, 116
Lymington, 116
Lyons, 107, 109
Ma Robert, 279
Mabel, 106
Macedonia, 293
Madagascar, 183
Magenta, 330
Majestic, 69, 96, 287
Malvina, 245
Malwa, 293
Manhattan, 247
Mantua, 292
Manx Queen, 96
Manxman, 121
Marathon, 297
Marco, 107
Margaret and Jessie, 90
Marie Henriette, 309
Margery, 66, 69
Marmora, 293
Mars, 98
Mary, 114,
Mary Augusta, 259
Mary Powell, 50
Marylebone, 118

Page 442

Massachusetts, 170-172
Masterful, 100
Mauretania, 279, 282, 309
Medusa, 316
Megantic, 289
Megna, 202
Mermaid, 97, 313
Merrimac, 248, 329
Mersey, 73, 331
Messenger, 176
Meteor, 176
Meteor, H.M.S., 110
Midland Prince, 55
William M. Mills, 52
Miltiades, 296, 297
Milwaukee, 300
Minas Geraes, 338
Minnesota, 248
Minotaur, H.M.S., 315, 332, 333
Minx, H.M.S., 314
Miramar, 373
Missouri, 340
Mohawk, 336
Moldavia, 293
Mona, 88, 89, 92, 93
Monarch, 82, 83, 110
Mona’s Isle, 87, 88, 91, 92, 94, 95, 150
Mona’s Queen, 90, 93
Mongolia, 293
Monitor, 329
Monitoria, 349
Monkey, 311
Montana, 248
Mooltan, 261, 293
Morea, 293
C. W. Morse, 48
Moselle, 53
Munster, 204
Mute, 35
Narragansett, 45
Natchez, 54

Page 443

Navahoe, 351
Nebraska, 248
Nemesis, 316
Neptune, 315
Nevada, 248
New Jersey, 219
New Orleans, 35, 42
Newhaven, 109
Niagara, 152, 245
Nicholai, 169
Nicolaieff, 363
Niger, 313
Nile, 98
Nimrod, 316
Nitocris, 316
Nix, 319
Norfolk, 300
Norman, 183
Normandy, 109, 113, 114
North American, 255
North Carolina, 340
North River, 35, 36, 41
Northampton, 315
Northman, 100
Northumberland, 315
Norwich, 49
Nottingham, 97
Novelty, 217
Oberon, 351
Ocean, 140
Oceanic, 252, 287, 288
Ogden, Francis B., 218
Ohio, 188
Old Colony, 47
Olive Branch, 35, 43
Olympic, 289
Ontario, 53
Oregon, 48, 49, 188, 250, 282
Orient, 295
Oriental, 178
Orlando, 315

Page 444

Orleans, 107
Oroonoko, 53
Orvieto, 292
Oscar, 64
Osterley, 292
Otaki, 310
Otranto, 292
Pacific, 157, 161, 188, 204, 264
Pakeha, 298
Pallas, 266, 331
Pallion, 349
Paragon, 35, 41, 44
Paris, 107, 108, 109
Parisian, 281
Pas de Calais, 105
Patriarch, 296
Patricia, 305
Paul Paix, 349
Pawnee, 339
Penelope, 315
Pennsylvania, 254
Pericles, 297
Peru, 187
Perseverance, 23, 36, 38, 45
Persia, 243, 271, 293
Perth, 87
Peterhoff, 373
Peveril, 93
Philadelphia, 44
Phlegethon, 316
Phœnix, 29, 123, 135
Pilgrim, 47
Pioneer, 53
Plymouth, 47
Pole Star, 371
Powerful, 100
Powhatan, 45
President, 146-148, 169
President Grant, 305
President Lincoln, 305
Prince of Orange, 66

Page 445

Prince of Wales, 93, 96
Princess Alice, 373
Princess Charlotte, 66
Princess Ena, 116
Princess Margaret, 116
Princess of Wales, 106
Princesse Clementine, 309
Princesse Elisabeth, 309
Prinz Heinrich, 304
Prinz Hendrick, 332
Prince Regent Luitpold, 304
Propeller, 162
Propontis, 306
Providence, 47
Puritan, 47
Q.E.D., 211
Quebec, 140
Queen, 105
Queen, The, 254, 309
Queen Alexandra, 309
Queen of the Isle, 89
Queen Victoria, 93, 96
Rainbow, 197, 280
Rangatira, 298
Rariton, 35
Rathmore, 120
Rattler, 312, 337
Recruit, 319
Regent, 70
Release, 174
Rennes, 108
Republic, 288
Rhadamanthus, 311
Rhaetia, 302
Rhenus, 269
Rhode Island, 90
Richmond, 35, 41, 43, 45
Richmond, John W., 46
Rising Empire, 186
Rising Star (or Sun), 126-133
Rob Roy, 72

Page 446

Robert Bruce, 96
Robert Burns, 111
Robert F. Stockton, 218
Robert Fulton, 44, 51
Roodezee, 361
Rose (Dublin), 97, 98
Rose (L. & N.W.R.), 119
Rose (Merchantman), 127
Rosstrevor, 120
Rothesay Castle, 106
Rotomahana, 281
Rouen, 107
Rowan, 101
Royal George, 83
Royal Tar, 176
Royal William (Canadian), 134, 136
Royal William (Dublin Co.), 144
Ruahine, 186, 292
Rugia, 302
Russia, 241, 246
Safa-el-bahr, 374
St. George, 72, 94, 95
St. John, 48
St. Louis, 291
St. Malo, 113
St. Patrick, 72
St. Paul, 291
Salamander, 307, 312, 319, 320
Sampo, 369
Sans Pareil, H.M.S., 358
Sapphire, 335
Sarah Sands, 231, 235
Satsuma, 335
Saturnia, 255
Savannah, 30, 122-126, 136, 199
Scotia, 104, 120, 246, 369
Sea-Horse, 72
Sea King, 173
Sea Swallow, 327
Seraing, 321
Sexta, 306

Page 447

Shamrock, 97, 119
Shannon, 97, 262
Sharkie, 372
Shenandoah, 170, 174, 175, 194
Sirius, 138-144
Smith, F. P., 216
Snaefell, 91, 92
Solent, 116
Sophia Jane, 94
Sorata, 295
South-Western, 113, 116
Southampton, 113, 114, 115, 116
Sprague, 199
Spreewald, 305
Standart, 371
Stanley, 119
Stella, 116
Stockton, Robert F., 218
Suevic, 300
Sultan, 314, 315
Superb, 96
Sussex, 109
Swan of the Exe, 383
Swift, 73
Syren, 300
Talbot, 72
Tartar, 336
Tasmanian, 184
Taureau, 329
Tay, 64
Telica, 187
Terror, 334
Teucer, 346
Teutonic, 287
Thames, 66, 86, 191, 202
Theodor, 247
Thermopylæ, 296
Thetis, 166, 319
Thor, 348
The Three Brothers, 173
Thunder, 264

Page 448

Thunderer, 333
Titanic, 289
Toronto, 218
Town of Liverpool, 73
Transit, 111
Transporter, 301
Trent, 262, 277
Trident, 82, 83, 317
Trinculo, 351
Trouville, 109
Trusty, 331
Turbinia, 308
Tynwald, 89, 90, 93
Ulster, 204
Ultonia, 283
Umbria, 281, 282
Unicorn, 151
Union, 45
United Kingdom, 134
Valetta, 260
Vandalia, 52
Vanderbilt, 172
C. Vanderbilt, 49
Velox, 309
Vera, 116
Vernon, 167, 169
Vesta, 159
Vesuvius, 35, 45
Viceroy, 162
Victoria, 105, 109, 116, 263, 269, 319
Victoria and Albert, 314, 371
Victorian, 281, 309
Viking, 93
Violet, 119
Viper, 308, 323
Virginia, 254, 340
Virginian, 281, 309
Vixen, 323
Vulcan, 195
Waldensian, 183
Walk in the Water, 51

Page 449

Waratah, 297
Warrior, 315, 320, 333
Washington, 35, 154
Waterloo, 72
Watersprite, 111
Waterwitch, 96, 208, 321
Watt, 140
Wave Queen, 107
Waveney, 335
Waverley, 114, 115
Wellington, 167
Weser, 302, 319
West Virginia, 340
Wildfire, H.M.S., 110
William Cutting, 44, 45
William Fawcett, 111
William Hutt, 214
William M. Mills, 52
William the Fourth, 95
Wilmington, 340
Winans, 380
Winchester, 374
Wisconsin, 248
Wolf, 115, 116
Wonder, 112, 113
Wyoming, 248
Ysabel Secunda, 135
Zambesi, 294
Zwartezee, 361
Shire Line, 300
Shoreham Harbour, 106
Shorter, Capt., 207
Siemens-Martin steel process, 280
Sierra Leone-West Indies service, 261
Simonson of New York, 173
Slidell, Mr., 262
Sligo Steam Navigation Co., 101
Smack, journey by, Scotland to London, 85
Smeaton, John, 86
Smith, Caleb, of Liverpool, 177
Smith, Sir Francis Pettit, 215

Page 450

Smith, Capt. George, 79
Smith, Junius (or Julius), 138
Smith, Capt. “Target,” and twin screws, 325
Smith’s Dock, North Shields, 351
Smith’s screw propeller, 222, 245
Société des Forges et Chantiers, Havre, 109
South African trade, 183
South America, Pacific Coast trade, 187; service with England, 191
South American States, ingratitude of, 127
South-Eastern and Chatham Railway Co.’s steamboats, 105; complain of L.B. & S.C.R. Co.,
106; first railway to order turbine steamer, 309
South Kensington Science Museum, exhibits in: Symington’s engine, 59; model of the
Charlotte Dundas, 61; engines of the Comet, 64
South of England Steam Navigation Co., 110, 111
Southampton-Channel Islands service, 110
Southampton-Havre and Honfleur service, 109, 110
Southampton-Morlaix service, 111
Southampton-St. Malo service, 113, 115
Southampton-South Pacific ports, 191
South-Western Steam Packet Co., 111, 112
Spain, steamers to, 176
Spanish-American War, sailing vessel in, 174; auxiliary cruisers, 291
Spanish Government purchase Royal William, 135
Spanish Navy and Chilian Revolution, 127
Speed of early steamboats, 24, 33
Stainton, Joseph, 57
Stanhope, Lord, and Fulton’s inventions, 27
State Line, 253
Steam auxiliary to sailing, development of, 164-192
Steamboat companies and railways, competition in America, 45
Steamboat, Fulton’s, impressions of, 32, 33, 34
Steam condensation, 200
Steam-engines: steam experiment of Hero of Alexandria (120 b.c.), 9; of Giovanni Branca, 9;
of the Marquis of Worcester, 9; of Blasco de Garay, 10; of Salomon de Caus, 10; of Dr.
Denis Papin, 11; of Thomas Savery, 11; of Jonathan Hulls, 12; of Jouffroy d’Abbans, 15; of
James Rumsay, 20; of John Fitch, 21; of Robert Fulton, 31; Symington the inventor of the
marine engine, 56; his engine, 58; first horizontal direct-acting engine, 59; Bell’s engines,
62; Robertson’s engines, 62, 64; Napier’s engines, 72; side-lever type, 72. See also Engines
Steam-frigates, 315
Steam-heating of ships introduced, 157
Steam-pressures, 307
Steam-ship companies’ antagonism to railway-owned vessels, 104

Page 451

Steam-ships, competition between sailers and steamers, 44; increase from 1820, 75; British
ships in 1838, 77; change of ownership and renaming, 78; first to fire a gun in war, 135;
development and progress, 259; Lloyd’s summary quoted for size of large vessels, 291-393;
repairs to ships, 300; built in halves, 301; first in the Royal Navy, 311; eccentric designs,
375 et seq.; future development, 387
Steel, Messrs., of Greenock, ships built by, 134, 151, 157
Steel ships, the building of, 279-310; first steel steamer, 279; first ocean steamer, 281;
Steel, toughened, 243
Steering-gear, steam, 109, 241
Steering screw-propelled vessels, 220
Steers, Mr. George, 158, 161
Stern-wheelers, 15
Sterns, rounded, 158
Stettin, Vulcan Shipbuilding, &c., Works at, and shipbuilding, 302; floating dock, 353
Stevens, Col. John, constructs a steamboat, 25; and screw-propellers, 29, 192, 207-210; and
stiffeners for sagging hulls, 46, 194
Stevens, Robert, 29
Stevens, Robert Livingston, 30, 44
Stevens Institute, Hoboken, original screw-engine at, 209
Stockton, Commodore Robert F., 219
Sturdee, Mr. John, 326
Submarines, Fulton’s, experiments with, 24, 26; early submarines, 375; transport of Japanese
submarines, 301
Suez, Isthmus of, passage of the, 179
Suez-Bombay service of the East India Co., 180
Suez Canal, opening of, 181; mails carried via, 182; limits size of vessels, 291
Suez route to India, 164 et seq.
Swan, Hunter, and Wigham Richardson, Ltd., 283, 365
Swan-shaped yacht, 383
Swedish State Railways ferry across the Baltic, 365
Sydney-Melbourne mail, 107
Symington, William, of Falkirk, and Fulton, 28; builds first British steamer, 56; his engine, 58,
59
Tank steamers, 348, 351
Taylor and Davies’ engine, 313
Taylor, James, of Cumnock, 58
Telegraph Construction and Maintenance Co., 246
Tetrahedral principle of construction, 388
Thames, the, first steam-vessel to enter, 66; first built on, 69; shipbuilding on the, 233-234
Thames Iron Works and Shipbuilding Co., 203, 233, 260, 322, 333, 371, 372, 377
Thames passenger steamers, overcrowding, 79; rivalry of companies, 80; ferry-steamers, 367.
See also London

Page 452

Thames Steamboat Co., 367
Thompson’s (George, & Co.) Aberdeen Line, 296
Thomson, J. & G., 254, 281
Thorneycroft, Messrs., Thames Works, 234; jet-propelling lifeboats, 324; torpedo boats, 336
Tobin, Sir John, 145
Tod and McGregor, 237, 239, 240
Torpedo, Fulton and the, 26
Torpedo boats, 336
Towing. See Tugboats
“Tramp” steamers, 343
Transasiatic railway ferry, 365
Transatlantic Co., 138
Transatlantic steam service, the beginnings of, 98, 122-148; first steamer to cross, 122; sail
with steam auxiliary, 122; first crossing from West, 134; Canadian claims, 135; early steam
voyages, 138-144
“Trent Affair, the,” 262, 277
Trevithick, Richard, and iron ships, 195
Triple-hulled boats, 388
Tsushima, Battle of, 335, 339
Tubular vessels, 235
Tugboats, 341-342; the first steam tug, 69
Turbine-driven steamers, 281, 307-309; first on the Thames, 83; turbines of the Dreadnought,
335
Turret steamers, 345
Turrets, 329, 340
Twin screws. See Screw
Twin steamers, 376-379
Tyne, the, iron screw steamers built on, 215; the ferries, 366
Union Co. (London-Leith), 84
Union Line founded, 182; vessels as transports, Crimean War, 183; Brazil and South African
trade, 183
Union Steamship Co. of New Zealand, 281
United States, first iron vessels for the, 193; U.S. mails and American vessels, 153. See also
America, Transatlantic
Vail, Stephen, 123
Valentia, 137
Valentia Transatlantic Steam Navigation Co., 137
Valparaiso-Cobija steamers, 186
Valparaiso-Panama service, 187
Valturius’ “De Re Militari,” 4
Vanderbilt, Commodore, 173
Vickers, Sons & Maxim, 301, 369; new battleship, 340

Page 453

Victoria, Queen, first steam-ship journey, 82; visit to Isle of Man, 90; royal yachts, 371
Victoria floating dock, 363
Volga, River, ferry, 364
Waddell, James Tredell, career of, 174-175
Waghorn, Thos., Bengal pilot, and Suez route to India, 166-167
Wagstaff, 162
Walliker, Mr. J. F., on engines, 306
Wallis’s yard, 82
Wallsend, floating docks built at, 357, 361, 362
Wallsend Slipway and Engineering Co., Ltd., engines by, 285
Walpole, Webb, and Bewley, Messrs., Dublin, 98
Ward, Mr. John, 194; on the evolution of the steam-ship, 228
Warships, construction of, 336; British-built for foreign Powers, 338; of the future, 340;
Wooden v. iron, 329
Water-ballast, 212, 347
Waterford Commercial Steam Navigation Co., 74
Waterford trade, 75
Watermen and Lightermen, Worshipful Co. of, 79
Watson, Colin, 64, 65
Watt, George, 58
Watt, James, and Ogden’s engine, 219
Watt, James, the younger, and reversing machinery, 70
Watt, James, & Co., engines for Pacific, 205; engines for Great Eastern, 276
Watt’s, James, steam-engine, 86
Wave-line theory of construction, 236, 316
Webb, William H., American shipbuilder, 47
Weir, Robert, 57
Weld, Mr. and Mrs., 68
Welland Canal, 52
West Indian fruit trade, 299
West Indies, R.M.S.P. Co.’s service, 189
Westervelt and Mackay, Messrs., 154
Weymouth and Channel Islands Steam Packet Co., 112
Weymouth-Channel Islands service, 110, 112
“Whalebacks,” 55
Wheel-boats, early, 2, 4
Wheelwright, Wm., 186
White, J. Samuel, Cowes, 336
White, Mr. Thomas, West Cowes, 111
White, Sir William H., on the Great Eastern, quoted, 278
White Star-Dominion Line and Canadian trade, 289

Page 454

White Star Line, 241, 251-253, 287-290
Wigram and Green, Messrs., 81
Wilkinson, J., and iron barge, 195
Williams, Mr. C. W., Dublin, 72
Williamson, Capt., and turbine boat, 308
Wilson, (“Frigate Wilson”), of Liverpool, 72, 100, 144
Wilson, of London, engines by, 306
Wilson, Thomas, shipbuilder, 195
Wimshurst, Mr., Blackwall, 217
Winans’ cigar ship, 380
Wireless telegraphy, 121, 288
Wood, C., shipbuilder, 151
Wood, James, & Co., Messrs., of Port Glasgow, 81
Wood, John, & Co., of Glasgow, 62, 87, 151
Wood construction of steam-ships, 191, 193
Wooden ships, length of, 193; sagging hulls, 46, 194
Worcester, Marquis of, “Century of Inventions,” 9
Workman & Clark, Messrs., Belfast, 99
Yachts, auxiliary power in, 371; steam-yachts, 371; royal yachts, 371-374; private yachts, 374-
375
Yarrow & Co., Messrs., 234, 374
Yarrow boilers, 388
Zoelly turbine, 307

Page 455

Printed by Ballantyne & Co. Limited
Tavistock Street, Covent Garden, London

Uniform with this Volume

A IL IN G S HIP S
THE STORY OF THEIR DEVELOPMENT
FROM THE EARLIEST TIMES TO THE
PRESENT DAY
By E. KEBLE CHATTERTON

With a Coloured Frontispiece by Chas. Dixon, and over 130 Illustrations
from Photographs, Models, &c. Extra Royal 8vo, 380 pages, in designed
cover, cloth gilt, 16s. net.
“This is a book that can be read with both pleasure and profit by any one who takes an interest
in ships and the sea, which means every English man, woman, and child ... its author has set down
all that is and ever has been known concerning those vessels which have navigated the ocean under
sail. The text is helped out by a series of really beautiful illustrations.... From the Seaman’s point of
view the book is above all praise, as no man can write lovingly of ships and not deal in the
technicalities of the craft of the mariner. This has been done here with a certainty and sureness of
touch which is the outcome of an absolutely perfect knowledge of the subject, and at the same time
with such clearness and simplicity of style that the land-lubber can read and understand.... There is
no unnecessary wealth of detail in this book, but at the same time no important facts are slurred
over, no important change in build or rig is ever missed. It is this that makes of it such eminently
satisfactory reading.... A work of such special and remarkable value that it is certain to survive as a
classic on this particular subject.”—Pall Mall Gazette.
“It is the full and complete history of the Sailing Ship from early Egyptian times to the
present, written, not by a “dry-as-dust” or a book-worm, but by a man who is passionately devoted
to the sea.... The volume, as might only be expected of the publishers, is beautifully printed, and is
filled with excellent illustrations showing every shape of the development of sailing ships. It is
impossible to do justice to Mr. Chatterton’s book within a small space.... There is nothing left to be

Page 456

desired in the matter of plans, pictures, or index, and we can only offer our hearty congratulations
to the author on a very fine piece of work.”—The World.
“It is not only a book that the average British boy will gloat over and revel in to his heart’s
content, but it is even one that his elders will find abundant interest in—sufficient to chain their
attention once they essay to dip into its pages. The book itself is made beautiful with a hundred and
thirty illustrations, while it is not often that one comes across a work got up in such excellent style,
or that does such real credit to its publishers.”—United Service Gazette.
“Mr. Chatterton has the right temper and inclinations for writing a book of this sort.... He has a
practical knowledge of sailing, and an evident passion for what Stevenson called “the richest kind
of idling”—hanging about harbours and docks and picking up sea-lore from communicative
“shellbacks.” Besides this, he is a scholar in naval learning.... The illustrations in the book are
excellent ... this book should be in every naval library.”—Spectator.
“We need only say that the whole book is as interesting as a romance, and as informing as an
encyclopædia, while not a single page can be called dull or dry. The numerous illustrations are
excellent and appropriate, and the whole book deserves the highest praise and commendation.”—
Bookseller.
“A monument of research.”—Daily Mail.
“Interesting and instructive ... both timely and welcome.”—Times.
“Admirable ... his criticisms are always those of the seaman as well as of the expert.”—
Westminster Gazette.
“Beautifully printed and copiously illustrated. ‘Sailing Ships and their Story’ will be found
most interesting and instructive to every lover of the sea.... The work is one that should be found in
the library of every yachtsman.”—Yachting World.
“Must be considered ... a standard work.”—Yachting Monthly.
“Mr. Keble Chatterton’s final chapter on the development of the fore and aft rig will be of
special interest to yachtsmen.”—Daily News.
“This is a heartfelt book ... it will long hold first place as an authoritative work.”—Nation
(New York).
“A work full of fascination, and abounding with accurate information.”—The Field.
“It is just the sort of book to have for handy reference on board the yacht when one sits on
deck in the gloaming of the second dog-watch smoking a pipe and arguing with a nautical friend. It
is a book, too, for the marine artist, its one hundred and thirty illustrations being technically
correct.”—The Dial (Chicago).
“Mr. Chatterton has produced a valuable book.”—Daily Chronicle.
“Altogether it is the most absorbing historical work of its kind I have ever read.”—Collier’s
Weekly.
“... Likely to be recognised as a standard work on the subject....”—Court Journal.
“There isn’t one ‘dry’ or uninteresting page in the whole treatise.”—Maritime Review.
“A work that will prove a veritable classic of the sea, and make of him the standard historian
of the sailing ship.”—Nautical Magazine.
“To compress the history of the development of the sailing vessel from the rude dug-out of
prehistoric Nile explorers to the iron clippers of to-day into some three hundred pages is a feat of
which Mr. Chatterton may well be proud.”—Naval and Military Record.

Page 457

SIDGWICK & JACKSON, LTD.
3 ADAM STREET, ADELPHI, LONDON, W.C.

Page 458

Transcriber’s Notes
Inconsistencies in spelling, hyphenation, formatting, etc.
have been retained, except as mentioned below. French
and German accents have not been changed or added
unless listed below. The inconsistent and unusual use
of units (knots for both distance and speed, yards for
both length and area, etc.) is as in the source document.
List of Illustrations: numbers 128 (Cartagena Dock) and
129 (Baikal) are in reverse order in the list compared to
the text. This has not been rectified so as to not mix up
the photo credits. Some other discrepancies between
the list and the captions have been rectified, as
mentioned below.
Page 147, table: the contradicting units (feet, inches) are
as printed in the source document.
Page 229, ... the ‘three grand requirements (of marine
engines): the closing quote mark is lacking.
Page 361 (and Index), ... the powerful Dutch tugs
Roodezee and Zwartezee ...: they were called the
Roode Zee and the Zwarte Zee.
Changes made
Footnotes and illustrations have been moved out of text
paragraphs; some ditto signs have been replaced with
the dittoed text. Page references under illustration
giving the page number opposite which the illustration
was printed have been deleted.
Some obvious minor typographical and punctuation errors
have been corrected silently.
List of Illustrations: illustration numbers have been
added. Illustrations numbers 33 (originally Kingfisher)
and 34 (originally Carron) interchanged cf. the order of
the illustrations in the text; ditto for numbers 44

Page 459

(Cambria) and 45 (Marylebone), numbers 51 (Dieppe)
and 52 (United Kingdom), and numbers 94 (Campania)
and 95 (Mauretania).
Perier and Périer have been standardised to Périer.
Page 65: ... to bring up in Ramsay Bay ... has been
changed to ... to bring up in Ramsey Bay ....
Page 86: ſatisfying has been changed to ſatiſfying.
Page 118: Konisberg has been changed to Königsberg.
Page 187: Miller and Ravenhall has been changed to
Miller and Ravenhill.
Page 320: Dupuy de Lome has been changed to Dupuy de
Lôme.
Index entries changed to conform to the text: Belier to
Bélier; Bernouilli to Bernoulli; Browne, Charles to
Brownne, Charles; Cambia (Cunard Co.) and Cambia
(L. & N.W.R.) to Cambria (Cunard Co.) and Cambria
(L. & N.W.R.) (ships); Chipping Camden to Chipping
Campden (entry Freeman, Mr.); Dupuy de Lome to
Dupuy de Lôme; Fire-brand to Firebrand (ship);
Grayson & Leadly to Grayson & Leadley; Humbolt to
Humboldt (ship); Jorden, J., & Co. to Jordan, J., & Co.;
Jouffrey d’Abbans to Jouffroy d’Abbans; Jumma to
Jumna (ship); Liffy to Liffey (ship); Maudsley, Sons &
Field to Maudslay, Sons & Field; Morisot’s “Orbis
Maritimi,” to Morisotus’ “Orbis Maritimi,”; Munroe,
President to Monroe, President (also moved to proper
place); Prince Regent Luitpold to Prinz Regent
Luitpold (ship); Rubic and Blaker to Rubie and Blaker;
James Rumsey to James Rumsay (entry Moray, John);
Salamon de Caus to Salomon de Caus (entry Steam-
engines); Sans Pariel to Sans Pareil (ship); Shaw, Savil
& Albion Co. to Shaw, Savill & Albion Co.; Winan’s
cigar ship to Winans’ cigar ship.

Page 460

*** END OF THE PROJECT GUTENBERG EBOOK STEAM-SHIPS ***

Updated editions will replace the previous one—the old editions will
be renamed.

Creating the works from print editions not protected by U.S. copyright
law means that no one owns a United States copyright in these works,
so the Foundation (and you!) can copy and distribute it in the United
States without permission and without paying copyright royalties.
Special rules, set forth in the General Terms of Use part of this license,
apply to copying and distributing Project Gutenberg™ electronic
works to protect the PROJECT GUTENBERG™ concept and
trademark. Project Gutenberg is a registered trademark, and may not
be used if you charge for an eBook, except by following the terms of
the trademark license, including paying royalties for use of the Project
Gutenberg trademark. If you do not charge anything for copies of this
eBook, complying with the trademark license is very easy. You may
use this eBook for nearly any purpose such as creation of derivative
works, reports, performances and research. Project Gutenberg eBooks
may be modified and printed and given away—you may do practically
ANYTHING in the United States with eBooks not protected by U.S.
copyright law. Redistribution is subject to the trademark license,
especially commercial redistribution.

START: FULL LICENSE

Page 461

THE FULL PROJECT GUTENBERG™ LICENSE
PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg™ mission of promoting the free
distribution of electronic works, by using or distributing this work (or
any other work associated in any way with the phrase “Project
Gutenberg”), you agree to comply with all the terms of the Full Project
Gutenberg License available with this file or online at
www.gutenberg.org/license.

Section 1. General Terms of Use and Redistributing
Project Gutenberg electronic works

1.A. By reading or using any part of this Project Gutenberg electronic
work, you indicate that you have read, understand, agree to and accept
all the terms of this license and intellectual property
(trademark/copyright) agreement. If you do not agree to abide by all
the terms of this agreement, you must cease using and return or destroy
all copies of Project Gutenberg electronic works in your possession. If
you paid a fee for obtaining a copy of or access to a Project Gutenberg
electronic work and you do not agree to be bound by the terms of this
agreement, you may obtain a refund from the person or entity to whom
you paid the fee as set forth in paragraph 1.E.8.

1.B. “Project Gutenberg” is a registered trademark. It may only be
used on or associated in any way with an electronic work by people
who agree to be bound by the terms of this agreement. There are a few
things that you can do with most Project Gutenberg electronic works
even without complying with the full terms of this agreement. See
paragraph 1.C below. There are a lot of things you can do with Project
Gutenberg electronic works if you follow the terms of this agreement
and help preserve free future access to Project Gutenberg electronic
works. See paragraph 1.E below.

1.C. The Project Gutenberg Literary Archive Foundation (“the
Foundation” or PGLAF), owns a compilation copyright in the

Page 462

collection of Project Gutenberg electronic works. Nearly all the
individual works in the collection are in the public domain in the
United States. If an individual work is unprotected by copyright law in
the United States and you are located in the United States, we do not
claim a right to prevent you from copying, distributing, performing,
displaying or creating derivative works based on the work as long as
all references to Project Gutenberg are removed. Of course, we hope
that you will support the Project Gutenberg mission of promoting free
access to electronic works by freely sharing Project Gutenberg works
in compliance with the terms of this agreement for keeping the Project
Gutenberg name associated with the work. You can easily comply with
the terms of this agreement by keeping this work in the same format
with its attached full Project Gutenberg License when you share it
without charge with others.

1.D. The copyright laws of the place where you are located also govern
what you can do with this work. Copyright laws in most countries are
in a constant state of change. If you are outside the United States,
check the laws of your country in addition to the terms of this
agreement before downloading, copying, displaying, performing,
distributing or creating derivative works based on this work or any
other Project Gutenberg work. The Foundation makes no
representations concerning the copyright status of any work in any
country other than the United States.

1.E. Unless you have removed all references to Project Gutenberg:

1.E.1. The following sentence, with active links to, or other immediate
access to, the full Project Gutenberg License must appear prominently
whenever any copy of a Project Gutenberg work (any work on which
the phrase “Project Gutenberg” appears, or with which the phrase
“Project Gutenberg” is associated) is accessed, displayed, performed,
viewed, copied or distributed:

This eBook is for the use of anyone anywhere in the United States
and most other parts of the world at no cost and with almost no
restrictions whatsoever. You may copy it, give it away or re-use it
under the terms of the Project Gutenberg™ License included with

Page 463

this eBook or online at www.gutenberg.org. If you are not located
in the United States, you will have to check the laws of the
country where you are located before using this eBook.

1.E.2. If an individual Project Gutenberg electronic work is derived
from texts not protected by U.S. copyright law (does not contain a
notice indicating that it is posted with permission of the copyright
holder), the work can be copied and distributed to anyone in the United
States without paying any fees or charges. If you are redistributing or
providing access to a work with the phrase “Project Gutenberg”
associated with or appearing on the work, you must comply either with
the requirements of paragraphs 1.E.1 through 1.E.7 or obtain
permission for the use of the work and the Project Gutenberg
trademark as set forth in paragraphs 1.E.8 or 1.E.9.

1.E.3. If an individual Project Gutenberg electronic work is posted
with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any
additional terms imposed by the copyright holder. Additional terms
will be linked to the Project Gutenberg License for all works posted
with the permission of the copyright holder found at the beginning of
this work.

1.E.4. Do not unlink or detach or remove the full Project Gutenberg
License terms from this work, or any files containing a part of this
work or any other work associated with Project Gutenberg.

1.E.5. Do not copy, display, perform, distribute or redistribute this
electronic work, or any part of this electronic work, without
prominently displaying the sentence set forth in paragraph 1.E.1 with
active links or immediate access to the full terms of the Project
Gutenberg License.

1.E.6. You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form, including
any word processing or hypertext form. However, if you provide
access to or distribute copies of a Project Gutenberg work in a format
other than “Plain Vanilla ASCII” or other format used in the official

Page 464

version posted on the official Project Gutenberg website
(www.gutenberg.org), you must, at no additional cost, fee or expense
to the user, provide a copy, a means of exporting a copy, or a means of
obtaining a copy upon request, of the work in its original “Plain
Vanilla ASCII” or other form. Any alternate format must include the
full Project Gutenberg License as specified in paragraph 1.E.1.

1.E.7. Do not charge a fee for access to, viewing, displaying,
performing, copying or distributing any Project Gutenberg works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8. You may charge a reasonable fee for copies of or providing
access to or distributing Project Gutenberg electronic works provided
that:

• You pay a royalty fee of 20% of the gross profits you derive from the
use of Project Gutenberg works calculated using the method you
already use to calculate your applicable taxes. The fee is owed to the
owner of the Project Gutenberg trademark, but he has agreed to donate
royalties under this paragraph to the Project Gutenberg Literary
Archive Foundation. Royalty payments must be paid within 60 days
following each date on which you prepare (or are legally required to
prepare) your periodic tax returns. Royalty payments should be clearly
marked as such and sent to the Project Gutenberg Literary Archive
Foundation at the address specified in Section 4, “Information about
donations to the Project Gutenberg Literary Archive Foundation.”

• You provide a full refund of any money paid by a user who notifies
you in writing (or by e-mail) within 30 days of receipt that s/he does
not agree to the terms of the full Project Gutenberg™ License. You
must require such a user to return or destroy all copies of the works
possessed in a physical medium and discontinue all use of and all
access to other copies of Project Gutenberg™ works.

• You provide, in accordance with paragraph 1.F.3, a full refund of any
money paid for a work or a replacement copy, if a defect in the
electronic work is discovered and reported to you within 90 days of
receipt of the work.

Page 465

• You comply with all other terms of this agreement for free distribution
of Project Gutenberg™ works.

1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™
electronic work or group of works on different terms than are set forth
in this agreement, you must obtain permission in writing from the
Project Gutenberg Literary Archive Foundation, the manager of the
Project Gutenberg™ trademark. Contact the Foundation as set forth in
Section 3 below.

1.F.

1.F.1. Project Gutenberg volunteers and employees expend
considerable effort to identify, do copyright research on, transcribe and
proofread works not protected by U.S. copyright law in creating the
Project Gutenberg™ collection. Despite these efforts, Project
Gutenberg™ electronic works, and the medium on which they may be
stored, may contain “Defects,” such as, but not limited to, incomplete,
inaccurate or corrupt data, transcription errors, a copyright or other
intellectual property infringement, a defective or damaged disk or
other medium, a computer virus, or computer codes that damage or
cannot be read by your equipment.

1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES -
Except for the “Right of Replacement or Refund” described in
paragraph 1.F.3, the Project Gutenberg Literary Archive Foundation,
the owner of the Project Gutenberg™ trademark, and any other party
distributing a Project Gutenberg™ electronic work under this
agreement, disclaim all liability to you for damages, costs and
expenses, including legal fees. YOU AGREE THAT YOU HAVE NO
REMEDIES FOR NEGLIGENCE, STRICT LIABILITY, BREACH
OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE
FOUNDATION, THE TRADEMARK OWNER, AND ANY
DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE
LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES

Page 466

EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
DAMAGE.

1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you
discover a defect in this electronic work within 90 days of receiving it,
you can receive a refund of the money (if any) you paid for it by
sending a written explanation to the person you received the work
from. If you received the work on a physical medium, you must return
the medium with your written explanation. The person or entity that
provided you with the defective work may elect to provide a
replacement copy in lieu of a refund. If you received the work
electronically, the person or entity providing it to you may choose to
give you a second opportunity to receive the work electronically in lieu
of a refund. If the second copy is also defective, you may demand a
refund in writing without further opportunities to fix the problem.

1.F.4. Except for the limited right of replacement or refund set forth in
paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO
OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.

1.F.5. Some states do not allow disclaimers of certain implied
warranties or the exclusion or limitation of certain types of damages. If
any disclaimer or limitation set forth in this agreement violates the law
of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted by
the applicable state law. The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6. INDEMNITY - You agree to indemnify and hold the
Foundation, the trademark owner, any agent or employee of the
Foundation, anyone providing copies of Project Gutenberg™
electronic works in accordance with this agreement, and any
volunteers associated with the production, promotion and distribution
of Project Gutenberg™ electronic works, harmless from all liability,
costs and expenses, including legal fees, that arise directly or indirectly
from any of the following which you do or cause to occur: (a)

Page 467

distribution of this or any Project Gutenberg work, (b) alteration,
modification, or additions or deletions to any Project Gutenberg work,
and (c) any Defect you cause.

Section 2. Information about the Mission of Project
Gutenberg

Project Gutenberg is synonymous with the free distribution of
electronic works in formats readable by the widest variety of
computers including obsolete, old, middle-aged and new computers. It
exists because of the efforts of hundreds of volunteers and donations
from people in all walks of life.

Volunteers and financial support to provide volunteers with the
assistance they need are critical to reaching Project Gutenberg’s goals
and ensuring that the Project Gutenberg collection will remain freely
available for generations to come. In 2001, the Project Gutenberg
Literary Archive Foundation was created to provide a secure and
permanent future for Project Gutenberg and future generations. To
learn more about the Project Gutenberg Literary Archive Foundation
and how your efforts and donations can help, see Sections 3 and 4 and
the Foundation information page at www.gutenberg.org.

Section 3. Information about the Project Gutenberg
Literary Archive Foundation

The Project Gutenberg Literary Archive Foundation is a non-profit
501(c)(3) educational corporation organized under the laws of the state
of Mississippi and granted tax exempt status by the Internal Revenue
Service. The Foundation’s EIN or federal tax identification number is
64-6221541. Contributions to the Project Gutenberg Literary Archive
Foundation are tax deductible to the full extent permitted by U.S.
federal laws and your state’s laws.

The Foundation’s business office is located at 41 Watchung Plaza
#516, Montclair NJ 07042, USA, +1 (862) 621-9288. Email contact

Page 468

links and up to date contact information can be found at the
Foundation’s website and official page at www.gutenberg.org/contact

Section 4. Information about Donations to the Project
Gutenberg Literary Archive Foundation

Project Gutenberg™ depends upon and cannot survive without
widespread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can be
freely distributed in machine-readable form accessible by the widest
array of equipment including outdated equipment. Many small
donations ($1 to $5,000) are particularly important to maintaining tax
exempt status with the IRS.

The Foundation is committed to complying with the laws regulating
charities and charitable donations in all 50 states of the United States.
Compliance requirements are not uniform and it takes a considerable
effort, much paperwork and many fees to meet and keep up with these
requirements. We do not solicit donations in locations where we have
not received written confirmation of compliance. To SEND
DONATIONS or determine the status of compliance for any particular
state visit www.gutenberg.org/donate.

While we cannot and do not solicit contributions from states where we
have not met the solicitation requirements, we know of no prohibition
against accepting unsolicited donations from donors in such states who
approach us with offers to donate.

International donations are gratefully accepted, but we cannot make
any statements concerning tax treatment of donations received from
outside the United States. U.S. laws alone swamp our small staff.

Please check the Project Gutenberg web pages for current donation
methods and addresses. Donations are accepted in a number of other
ways including checks, online payments and credit card donations. To
donate, please visit: www.gutenberg.org/donate.

Page 469

Section 5. General Information About Project Gutenberg
electronic works

Professor Michael S. Hart was the originator of the Project Gutenberg
concept of a library of electronic works that could be freely shared
with anyone. For forty years, he produced and distributed Project
Gutenberg eBooks with only a loose network of volunteer support.

Project Gutenberg eBooks are often created from several printed
editions, all of which are confirmed as not protected by copyright in
the U.S. unless a copyright notice is included. Thus, we do not
necessarily keep eBooks in compliance with any particular paper
edition.

Most people start at our website which has the main PG search facility:
www.gutenberg.org.

This website includes information about Project Gutenberg, including
how to make donations to the Project Gutenberg Literary Archive
Foundation, how to help produce our new eBooks, and how to
subscribe to our email newsletter to hear about new eBooks.

Page 470

PDF language

简体中文 https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=zh Translating…
Español https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=es Translating…
Français https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=fr Translating…
Deutsch https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=de Translating…
日本語 https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=ja Translating…
한국어 https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=ko Translating…
Português https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=pt Translating…
Русский https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=ru Translating…
العربية https://pdftoflip.com/view.php?t=6ab9d79e81ff3980abbe79ae0363be95&bl=ar Translating…