The Municipal and Sanitary Engineer_s Handbook H. Percy Boulnois 777 downloads.pdf

396 pages · Make another flipbook

Page 1

Page 2

Page 3

The Project Gutenberg eBook of The Municipal and Sanitary

Engineer's Handbook

This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online at
www.gutenberg.org. If you are not located in the United States, you
will have to check the laws of the country where you are located
before using this eBook.

Title: The Municipal and Sanitary Engineer's Handbook

Author: H. Percy Boulnois

Release date: November 11, 2017 [eBook #55935]
Most recently updated: October 23, 2024

Language: English

Other information and formats: www.gutenberg.org/ebooks/55935

Credits: Produced by Chris Curnow, Harry Lamé and the Online
Distributed Proofreading Team at http://www.pgdp.net (This
file was produced from images generously made available
by The Internet Archive)

*** START OF THE PROJECT GUTENBERG EBOOK THE
MUNICIPAL AND SANITARY ENGINEER'S HANDBOOK ***

Page 4

Please see the Transcriber’s Notes at the
end of this text.

Page 5

THE

MUNICIPAL AND SANITARY

ENGINEER’S HANDBOOK.

THE

MUNICIPAL AND SANITARY

Page 6

ENGINEER’S HANDBOOK.

BY
H. P E RC Y B OU L NO I S, M. Inst. C.E.,
M. San. Inst. Gt. Britain;
BOROUGH ENGINEER, PORTSMOUTH; LATE CITY SURVEYOR, EXETER;
AUTHOR OF “DIRTY DUST-BINS AND SLOPPY STREETS,” “ANNIHILATION OF SEWER GASES,” ETC.

“SALUS POPULI SUPREMA LEX.”

LONDON:

E. & F. N. SPON, 16, CHARING CROSS.
NEW YORK:

35, MURRAY STREET.
1883.

Page 7

PREFACE.

In carrying out the many duties devolving upon a Borough Surveyor, it has

so often been my wish to turn to a practical book of reference upon the

many subjects connected with these duties, that I have written the following
pages; and I trust that they will form a useful Handbook.

H. PERCY BOULNOIS.

Portsmouth,
May, 1883.

Page 8

TABLE OF CONTENTS.

CHAPTER I.
THE TOWN SURVEYOR.
Office of surveyor first legalised — Clause of Public Health Act 1875,
making appointment — Division of England into districts —
Surveyor to Rural Authority — Clauses of Act referring to
surveyor — Title of “Surveyor” is an erroneous one — List of
subjects on which he has often to advise — Want of Government
protection for surveyor — Mr. Lewis Angell on protection —
Reasons for Government refusal — Time will effect a change
page 1

CHAPTER II.
THE APPOINTMENT OF SURVEYOR.
Sub-committee to fix salary and duties — Specimen report and list of
duties — Test of merit necessary — Examination by Sanitary
Institute of Great Britain — Particulars of these examinations —
Syllabus of subjects — Specimens of examination papers —
Authoritative examination, however, still necessary — Methods
to be adopted to obtain appointment of surveyor — Canvassing
10

CHAPTER III.
THE SURVEYOR’S DUTIES.
Public Health Act and surveyors of highways — List of duties
devolving upon surveyor in consequence — Meetings of boards
and committees — List of suitable names for committees —
Punctuality — Reports — Methodical habits 20

CHAPTER IV.

Page 9

TRAFFIC.
Interests involved in construction and maintenance of streets —
Requirements of a good roadway — Wearing effect of traffic —
Mr. Deacon’s standard — Effect of horses’ hoofs on roadways —
Remarks on shoeing — Traction on roads — Tables of resistance
— Forces tending to destroy momentum — Table of tractive
force, etc. — Another table giving inclinations — Proper
gradients of roadways — Table of resistance by Crompton —
Wheel resistance — Mr. Haywood and safety of traffic —
Stopping and starting vehicles — Safe width of roadways —
Vehicles and pedestrians passing each other — Sanctuaries —
Danger of crossings 25

CHAPTER V.
MACADAMISED ROADWAYS.
Laying out new roads — Macadamised roads a luxury — Telford and
Macadam — Specification of roadway, fifty years ago — Modern
specification of roadway — Advantages of Telford’s system —
Hard core — Concrete — Table of depths of materials — Ellice
Clarke’s tables of comparative cost — Further particulars of
comparative cost — Streets of Paris — Cross section of roadway
— Objections to macadamised roadways — Notes on
maintenance — Bituminous roadways 34

CHAPTER VI.
ROAD METAL AND BREAKING.
Test of fitness of stone — Primary investigations — Qualities
necessary — List of stones used as road metal — Variety of
materials used — Table of comparative efficiency of road metal
in France — Hand-broken stone — Gauging the size — Quantity
broken per diem — Machines for breaking stones — Price of
machines — Work effected by machinery — Precautions
necessary — Objections to machinery — Weight of broken stone
— Specification for supply of road metal 48

CHAPTER VII.
ROAD ROLLING.
First introduction of rollers — Mr. Parry on steam rolling — Cost for
repairs — Number of men necessary — Fuel used — Other uses
for engine power — Spikes for chequering — Binding material
— Gradients — Work effected — Description of manner in which

Page 10

roller should be applied — Method adopted in the United States
— Use of roller for repairs of roads — Method adopted at
Gloucester — Effect of weight of roller on roads — Advantages
of steam rolling — Mr. Paget on rolling — Disadvantages of
steam rolling — Horse rollers 60

CHAPTER VIII.
PITCHED PAVEMENTS.
Economy under heavy traffic — Noise and slipperiness —
Improvements effected — Size of setts — Description of best
class of stones — Mr. Walker and wear of stones — The Euston
pavement — The Guidet paving — Manchester pavement —
Concrete foundations — Grouting — Bituminous mixture —
Stone tram-tracks 73

CHAPTER IX.
WOOD PAVING.
First introduced into metropolis — Improvements since — List and
description of many various modern methods — Sanitary
objections to wood pavement — Power of absorption of wood —
Preserving processes — Wear of wood paving — Different
estimates of life — Woods employed — Advantages of this
description of paving — Objections to it — Cost of wood
pavement — Tables of cost and life — Specification of wood
pavement 81

CHAPTER X.
COMPRESSED ASPHALTE ROADWAYS.
Description of asphalte — Mr. Deland’s test — Percentage of bitumen
necessary — Method of construction of compressed asphalte
roadway — Advantages of this description of pavement —
Objections to it on account of slipperiness — Gradient — Cost of
asphalte pavement — Tables on the subject — Specifications for
a compressed asphalte roadway — Other descriptions of asphalte
roadways — Hints on the success or the reverse of asphalte
roadways 96

CHAPTER XI.
FOOTPATHS.

Page 11

Foundation — List of materials for footpaths — Mastic asphalte —
Description of manner of laying — Proportions of asphalte,
bitumen, and grit — Yorkshire flagging — Specification for York
flagging — Caithness flagging — Its advantages — Blue lias
flagging — Concrete footpaths — Description of American
concrete path — Artificial stone pavements — Brick footpaths —
Granite slabs — Artificial asphalte paths — Specification of tar
pavement — American tar pavement — Gravel footpaths —
Sections of paths — Tarred paths 106

CHAPTER XII.
KERBING AND CHANNELLING, ETC.
Necessity for kerb — Section of granite kerb and channel — Setting
kerb — Cost of kerb and channelling — Necessity for gutter or
channel crossings — Gully gratings — Objects to be attained —
Drawing of a gully-pit — Drawing of a buddle-hole — Mr.
Baldwin Latham on the subject 123

CHAPTER XIII.
LIGHTING STREETS.
Gas v. Electricity — Public Health Act on lighting — Different hours
at which public gas lamps are lighted — Hints for a contract with
a gas company — Supply by meter — Objections to meters —
Regulators — Lamp-posts — Lanterns — Burners — Numbering
lamps — Formula for determining distance of lamps — M.
Servier on spreading light uniformly — Tables of different lights
— Points to be considered in public lighting by electricity —
Motive power required — Machinery necessary — Regulations
as regards fire risks — Lamps — Value of electric light —
Difficulty of photometrical measurement — Cost of electric light
— Mr. Shoolbred’s tables — Comparative cost on Thames
embankment — Value of these investigations — Acme of all
lighting 129

CHAPTER XIV.
STREET NAMING AND NUMBERING.
Necessity of naming and numbering streets — Public Health Act on
the subject — Different methods of naming — Minton’s china
letters — Cast iron plates — Painted names — Enamelled iron —
Wooden figures — Enamelled glass tablets — Size of letters —
Association of names — Methods of numbering — Forms of
notice to number 149

Page 12

CHAPTER XV.
BREAKING-UP STREETS.
The law on the subject — Water Works Clauses Act, 1847 —
Consideration of the clauses — What is meant by “plan” —
Specimen of specification or plan — Damage caused to roads by
opening them — Private individuals breaking-up streets —
Clauses of the Public Health Act — Telegraphs Act, 1863 —
Clauses of this Act — Advantages and disadvantages of subways
— Power of individuals to open streets for drains — Clauses of
the Public Health Act on the subject — Uncertainty on the subject
— Forms of notices necessary — Customs prevailing in different
towns 157

CHAPTER XVI.
OBSTRUCTIONS IN STREETS.
List of subjects discussed — Improving line of frontages — Assessing
value of compensation — Removing projections of buildings —
What are legal projections? — Doors or gates opening outwards
— Forms of notice necessary — Vaults or cellar coverings —
Forms of notice necessary — Advantages of an “Easement book”
— Rain water from shutes or down pipes — Form of notice
necessary — Blinds or awnings over paths — Trees overhanging
roadways — Form of notice necessary — Surface water from
premises — Hoardings and scaffolds — Dangerous Buildings —
Tall chimney shafts — Dangerous rock — Forms of notice
necessary — Temporary obstructions 174

CHAPTER XVII.
IMPROVEMENT OF PRIVATE STREETS.
The 150th section of the Public Health Act — Criticisms of this
section — Duties of the surveyor in connection with it —
Specimen forms of notices — Carrying out the work — Taking
over private streets — Agreement to take over a road — What is a
“road”? — Legal definition of the term street 193

CHAPTER XVIII.
NEW STREETS AND BUILDINGS.
Important duty of surveyor — Clauses of the Public Health Act —
Model bye-laws — What is a new building? — The term “ground
floor” — Alteration of existing buildings — Deposit of plans —

Page 13

Clauses of the Public Health Act — Clauses necessary in the bye-
laws with regard to deposit — Form of notice in respect of
deposit of plans — Suggestions for town surveyor in connection
with this duty and examination of plans — Supervision of
buildings in course of erection — Stringency of bye-laws —
Protection of life from fire necessary — Party walls through roofs
— Space at back — Fee for inspection 206

CHAPTER XIX.
SCAVENGING.
The Public Health Act on the subject — List of duties involved by the
clauses of the Act — What is house refuse? — Removal of trade
or garden refuse — Position of dust bin — Objections to fixed bin
— Different methods of collection of refuse — Public dust bins
— House to house call — Receptacles brought out into streets —
Carts employed for scavenging — Life and cost of wooden carts
— Improved sanitary carts — Disposal of refuse — Methods
adopted in various towns — Destruction by fire — Cleansing of
streets — Machinery v. hand labour — Durability of brooms —
Scavenging at Liverpool — Quantity of material removed from
roads — Cleansing private courts and alleys — Removal of snow
— Mr. Hayward on the subject — Clarke’s apparatus — Hints on
removal of snow — Street watering — Several methods
described — Brown’s system — Mr. Parry on hand-watering —
Headley’s machine — Street watering in Paris — Bayley’s
Hydrostatic Van — Mr. Scott on watering and stand-pipes —
Advantage of using disinfectant with water — Cost of
scavenging, &c. — Heads for a contract — Administration of
work without intervention of contractor the best 221

CHAPTER XX.
SEWERAGE.
Public Health Act on the subject — Definition of sewer — Definitions
of sewerage and sewage — Requirements of good system of
sewerage — Position of sewers should be at back of houses —
Form of notice to carry sewer through private lands — Hints for
carrying out sewerage — Stamford’s joint — Pipe sewers —
Drawing of various pipes — Causes of breakage — Causes of
chokage — Separate system — Advantages of partial separation
— List of different methods of sewerage — Dry systems 251

CHAPTER XXI.

Page 14

SEWAGE DISPOSAL.
Magnitude of question — Interception — List of methods of disposal
— Tidal outfalls — Broad irrigation — Crops for sewage —
Intermittent filtration — Action of earth on sewage —
Mechanical subsidence — Artificial filters — Screening —
Precipitation — List of chemical processes — List of chemical
ingredients — Disposal of sludge — Effect of plants on sewage
263

CHAPTER XXII.
VENTILATION OF SEWERS.
Duty of dealing with noxious sewer vapours — Germ theory and open
ventilation — Open shafts and objections to them — Shafts
against dwellings — Use of rainwater pipes — Use of lamp posts
— Charcoal trays — Use of chimney shafts — Lofty shafts —
Failure of furnaces — List of methods tried — Annihilation of
sewer gas — Composition of sewer gas — Direction of flow —
Importance of disconnecting house drains 271

CHAPTER XXIII.
PUBLIC CONVENIENCES.
Clause of Public Health Act empowering their erection — Selection of
site — Construction of Urinals — Why iron is preferable —
Description of urinals — Public w. c. accommodation —
Description of a simple w. c. — Jennings and Macfarlane for
urinals 280

CHAPTER XXIV.
ARTIZANS AND LABOURERS’ DWELLINGS.
The Act of 1868 — Mode of procedure under it — Amendment of Act
in 1879 — Further amendment in 1882 — Importance of this
amendment — Act of 1875 for improvement of dwellings of
working classes — Mode of procedure under it — Amended by
Act of 1879 — Further amended, 1882 — Duties of surveyor
under these acts — Health of model dwellings — Description of
industrial dwellings — Labouring classes’ Lodging Houses Acts
— Copy of bye-laws under them — Table of sizes of rooms 284

CHAPTER XXV.

Page 15

DEFECTS IN DWELLING-HOUSES, ETC.
Cellar dwellings — Clauses of the Public Health Act on the subject —
Insufficient w. c. accommodation — Clauses on the subject —
Forms of notice to be served — W. C. accommodation for
factories — Houses without a proper supply of water — Clauses
on the subject — Mode of procedure — Disadvantages of cistern
storage 295

CHAPTER XXVI.
HOUSE DRAINAGE.
Definition of drain — Difficulty of always deciding what is a drain —
Duties of surveyor in connection with house drainage —
Inspection of new drains — Form of “regulations” necessary by a
local authority — Difficulty of efficient inspection — Drains of
new buildings — Inspection of defective drains — Several
clauses of the Public Health Act on the subject — Procedure
necessary to carry them out — List of a few requirements of good
house drainage — Necessity of register of all house drains 303

CHAPTER XXVII.
PUBLIC PLEASURE GROUNDS AND STREET TREES.
Law empowering acquisition and maintenance of parks, &c. — Duties
of surveyor in connection therewith — Public playgrounds — A
few hints — List of a few useful shrubs — Trees in gales —
Planting trees at sides of streets — Qualities necessary in trees for
this purpose — List of suitable trees — Precautions necessary —
Grating and grill — Description of Paris planting — Cost of trees
in Paris — Damage to street trees 318

CHAPTER XXVIII.
PUBLIC ABATTOIRS.
Necessity and law for their establishment — Defects of private
slaughter-houses — Legal powers to close private slaughter-
houses — Particulars of London private slaughter-houses — Site
of public abattoir — The Manchester abattoir — Accommodation
necessary — Lairs and pens — The killing-house — Floor,
drainage, rings, pole-axe, lighting, &c. — Machinery for hoisting
— Plans of public abattoir — Condemned meat department —
Pig-killing department — Blood-house — Tripery — Tallow
market — Other accommodation — Dr. Chancellor on slaughter-
houses — Difference between public and private slaughter-houses

Page 16

328

CHAPTER XXIX.
MARKETS.
Law authorizing their establishment — Site for a cattle market —
Accommodation necessary — Paving — Cattle enclosures —
Sheep pens — Dimensions of pens and lairs — Weighing
machine — Markets for general merchandise — List of
requirements — A few hints on their accommodation 344

CHAPTER XXX.
CEMETERIES.
The surveyor’s duties in connection with these — Some legal points to
be remembered — Selection of site on sanitary grounds — Mr.
Eassie on soils — Dr. Parsons on requirements of cemeteries —
Unsuitability of clay soil — Amount of land necessary — Points
to be considered in laying out a cemetery — Division of cemetery
— Description of sections — Cemetery rules and regulations —
Suitable trees for cemeteries — Regulations by Secretary of State,
1863 — Cremation — Its great advantages over burial — Area of
some existing cemeteries — Necessity for reliable information as
to causes of death 350

CHAPTER XXXI.
MORTUARIES.
Evils arising from keeping corpses — Some clauses of the Public
Health Act on the subject — List of different descriptions of
mortuaries — A German Leichenhaus — Requirements of a
mortuary — The chapel — The dead-house — The post-mortem
room — The coroner’s court — Other accommodation necessary
— Plan of a model mortuary — Disinfection — Apparatus
necessary — Dr. Ransom’s machine — Fetching infected clothing
365

CHAPTER XXXII.
BORROWING UNDER THE LOCAL GOVERNMENT BOARD.
Clauses of the Public Health Act — Stimulus to public works — List
of time for which money can be borrowed — Mr. Rawlinson on
procedure and plans, &c., necessary — Responsibility of Local
Government Board — Captain Galton on Government
responsibility 375

Page 17

CHAPTER XXXIII.
CONTRACTS.
Clauses of Public Health Act — Public contracts different from private
ones — Specifications necessary — Conclusion — A list of
useful books 381

MUNICIPAL
AND

SANITARY ENGINEERS’
HANDBOOK.

Page 18

CHAPTER I.
THE TOWN SURVEYOR.

The office of town surveyor was first legalised by the Towns Improvement
Clauses Act 1847 (10 & 11 Vic. c. 34, s. 7),[1] although for some
considerable period prior to this date similar appointments had been made
in several of the more important English towns, notably in the case of
Liverpool. In the following year the legal office of surveyor was confirmed
by the Public Health Act 1848 (11 & 12 Vic. c. 63, s. 37), and it is now law
under the Public Health Act 1875 (38 & 39 Vic. c. 55): that comprehensive
statute, under which all Sanitary Acts are now included, and which Act will
be frequently alluded to in the course of this book.
The clause which specially refers to the appointment of the surveyor is as
follows:—
“Every urban authority shall from time to time appoint fit and proper
persons to be medical officer of health, surveyor, inspector of nuisances,
clerk, and treasurer: Provided that if any such authority is empowered by
any other Act in force within their district to appoint any such officer, this
enactment shall be deemed to be satisfied by the employment under this Act
of the officer so appointed, with such additional remuneration as they think
fit, and no second appointment shall be made under this Act. Every urban
authority shall also appoint or employ such assistants, collectors, and other
officers and servants as may be necessary and proper for the efficient
execution of this Act, and may make regulations with respect to the duties
and conduct of the officers and servants so appointed or employed . . .” (38
& 39 Vic. c. 55, s. 189), and these officers (except the medical officer of
health and the inspector of nuisances, when any portion of their salary is
paid out of moneys voted by Parliament to the powers of the Local
Government Board), may be removed by the urban authority at their
pleasure, which was not the case when the appointment was first made in
1847.

Page 19

Here it is necessary to state that for sanitary purposes England and Wales
are divided into two divisions—viz. urban sanitary districts and rural
sanitary districts, the former of these divisions being further subdivided into
boroughs, where the urban sanitary authority is the mayor, aldermen, and
burgesses acting by the council, and districts, which are under the authority
of improvement commissioners or local boards; the rural sanitary districts
are the areas of unions not included in urban districts, and they are under
the authority of the guardians of the union.
It is my intention to deal more particularly with the duties of a surveyor
acting under an urban authority, but the following section of the Public
Health Act 1875 relates apparently to the appointment of a surveyor to a
rural authority, although no mention is made in this or any other clause of
the Act directly of such an officer by name, except that amongst the
definitions of the Public Health Act the following appears:—
“‘Surveyor’ includes any person appointed by a rural authority to
perform any of the duties of surveyor under this Act” (38 & 39 Vic. c. 55, s.
4).
The clause I have above referred to is as follows:—
“Every rural authority shall from time to time appoint fit and proper
persons to be medical officer or officers of health and inspector or
inspectors of nuisances; they shall also appoint such assistants and other
officers and servants as may be necessary and proper for the efficient
execution of this Act . . .” (38 & 39 Vic. c. 55, s. 190).
The following clauses apply to officers of rural as well as urban
authorities:—
“The same person may be both surveyor and inspector of nuisances . . .”
(38 & 39 Vic. c. 55, s. 192).
“Officers or servants appointed or employed under this Act by the local
authority shall not in any wise be concerned or interested in any bargain or
contract made with such authority for any of the purposes of this Act . . .”
(38 & 39 Vic. c. 55, s. 193).
“Before any officer or servant of a local authority enters on any office or
employment under this Act by reason whereof he will or may be entrusted
with the custody or control of money, the local authority by whom he is
appointed shall take from him sufficient security for the faithful execution
of such office or employment and for duly accounting for all moneys which
may be entrusted to him by reason thereof” (38 & 39 Vic. c. 55, s. 194).

Page 20

In addition to these clauses there are several regulating the receipt of
money by officers, but these should not affect the town surveyor. Although
in many places he has the onerous duty of paying workmen, certifying
tradesmen’s accounts, and other financial transactions, he ought under no
circumstances to have anything to do with the receipt of money.
Unfortunately, in some of the smaller towns the surveyor is also employed
as rate collector; but as this is evidently a very improper proceeding, I shall
not further allude to it in any manner.
It will be observed that in the foregoing clauses of the Public Health Act
the word “surveyor” is always used, and thus this is the legal title of those
holding such appointments. It is obvious, however, that, although this title
may have well suited the office up to the year 1847, when it was made the
legal title, the prodigious growth of municipal work during the last 35 years
has made it necessary that some change should be made, and the title
altered to that of “engineer,” or some other similar suitable name. At the
present time several different meanings and occupations are attached to the
word “surveyor,” as the following list will show:—“land surveyor,”
“district surveyor,” “county surveyor,” “road surveyor,” “surveyor of
taxes,” “surveyor of customs,” “quantity surveyor,” “fire insurance
surveyor,” “Lloyd’s surveyor,” and a still more curious instance where an
urban authority is itself dubbed “surveyor of highways” by the 144th
section of the Public Health Act 1875; and the title of town surveyor as now
applied cannot but lead to confusion and to perfectly erroneous impressions
as to his work and duties.
Dr. Ackland, in a paper read before the Association of Municipal and
Sanitary Engineers and Surveyors, at a district meeting held at Oxford,
makes the following remarks on this point:—“In the Public Health Act 1875
(the summary of all health enactments) the name of ‘engineer’ does not
once occur in the 343 clauses. He is still the old ‘surveyor’ we all
remember, the plodding, energetic man of highways and byeways . . . but
then the surveyor of the present day may be called on to advise on anything,
from the form and cost of an earthen syphon trap to the calculation of work
to be done by engines which are to supply half a million of persons with
water; to be responsible for the construction of sanitary mechanisms, from a
housemaid’s sink to an intermittent downward filtration farm.”
There can be but little doubt that it is absolutely necessary for the town
surveyor of the present day to be a competent civil engineer of great

Page 21

knowledge and varied experience, for he may at any moment be called upon
to advise his corporation upon any of the following subjects, or to act in any
one of the following capacities, in addition to the multifarious ordinary
duties legally devolving upon him as surveyor under the Sanitary Acts:—
(1.) As engineer for sewerage and sewage works.
(2.) As engineer for water and gas works.
(3.) As engineer for canals, docks, harbour improvements, and river
navigation, or for the protection of coasts against the encroachments of the
sea, and the prevention of floods by rivers.
(4.) As engineer for the construction and maintenance of roads and
bridges.
(5.) As engineer for the construction and maintenance of lines of
tramways.
(6.) As architect for the construction of lunatic asylums, municipal
offices, hospitals, abattoirs, mortuaries, baths and wash-houses, cemetery
chapels, stables, police stations, and other similar works.
(7.) As landscape gardener for the laying out of public recreation
grounds, parks, and cemeteries.
(8.) As quantity surveyor to make estimates of all works, and often (very
improperly) to furnish bills of quantities to intending contractors.
(9.) As surveyor and valuer to advise his employers on the values, &c., of
corporate or other property.
(10.) As land surveyor to make surveys of any size that may be required.
(11.) As accountant to examine and rectify the workmen’s wages sheets,
and all tradesmen’s accounts for work performed or goods supplied.
The foregoing list is no exaggeration of the onerous duties of the town
surveyor, and it seems to be a grievous mistake that this officer, whose
importance in all practical sanitary work cannot be over-stated (as without
him no useful municipal work could go on) has been left unprotected by the
Public Health Act of 1875.
In that Act both the medical officer of health and the inspector of
nuisances have received Government protection, whereas the surveyor, the
very officer of all others who necessarily is more likely to come into
collision and to be unpopular with his employers in the faithful discharge of
his duties, has been afforded no protection whatever, but has been left to the
tender mercies of an annually changing body of municipal governors, “to be
removable at their pleasure” (38 & 39 Vic., c. 55, s. 189).

Page 22

On this highly important point I cannot do better than quote several
passages from Mr. Lewis Angell’s interesting address to the Association of
Municipal and Sanitary Engineers and Surveyors on the occasion of their
inauguration in the year 1873:[2]
“The ‘town surveyor,’ according to his opportunities, has done the
country good service, but, surrounded as we have been with obstructions
and difficulties, cramped and restricted by popular prejudices and private
interest, subject to clamour and attack, without protection and without
appeal, it is indeed surprising that we have accomplished so much. Had
such officers been from the first judiciously selected, adequately
remunerated, properly supported, and duly protected, our influence upon
sanitary progress would have been more conspicuous and our office better
appreciated.
“As engineers we do not pretend to a knowledge of medical science, but
it is equally within the knowledge of the average sanitary engineer as of a
medical officer of health that pure air, pure water, properly constructed
houses, and an unpolluted soil are the cardinal conditions of health. These
are mere sanitary axioms. The means by which such conditions are attained
are drainage, ventilation, water-supply, and other matters entirely within the
functions of the engineer. It is the function of the sanitary engineer to
prevent that which the medical officer of health is called upon to detect. . . .
“In many cases the unprotected surveyor may be required to report to a
protected medical officer the negligence of his own employers. No local
surveyor or engineer can be expected to give cordial and active assistance
in compulsory sanitary work when he is conscious that his action would be
opposed to the views or the interests of his employers, the public upon
whom he is dependent. The existence of such a distinction between the
medical officer and surveyor under the same board will produce a want of
harmony in interest, and must lead to a divergence of action between the
two departments. . . .”
And speaking of the multifarious duties of the town surveyor, Mr. Angell
says: “Any one section of his duties would, under commercial
circumstances, command fair pay according to its importance; but where
cumulative duties are included in the same office, they demand constant
attention, special knowledge, professional experience, and administrative
ability; to which is added the anxiety which the responsibilities of public
office always involve. Such a position in a commercial concern would

Page 23

receive high remuneration in proportion to the extent of the undertaking,
but unfortunately, our work does not pay a dividend: it is all expenditure
from which the town derives no return excepting in health and comfort,
matters which are neither fairly assessed, nor duly appreciated;
consequently, the municipal engineer is paid less for his professional
knowledge than the contractor’s agent whose work he directs.”
Speaking further on the subject of Government protection, Mr. Angell
says: “Surveyors appointed under the Towns Improvement Clauses Act
were protected during the existence of the General Board of Health. Sir C.
Adderley’s Public Health and Local Government Bill of 1872 proposed
similar protection. Officers employed under the Poor Laws are fully
protected as to position, emoluments, and superannuation. The
administration of the Poor Laws and the Public Health Acts is now united in
one department under the newly established Local Government Board: it is
therefore in my opinion equally due to Local Board officers, that they also
should be recognised and protected. Without such protection, sanitary
legislation cannot, in the words of the Royal Sanitary Commission, be
‘active and effective,’ because local officers are too dependent on their
immediate employers to be thoroughly efficient.
“In advocating protection let me not be misunderstood. I do not mean
centralisation or the removal of that proper control which every local
authority should maintain over its own officers. I would maintain intact the
great principle of local government, which has been the bulwark of our
social and political freedom. But local government may degenerate, and in
small towns deteriorate into littleness: local affairs are too frequently
avoided by those who are most fitted by intelligence and social standing to
take part therein. I would simply control in the most constitutional manner
the short-comings or excesses of local government as is already done in
various other departments. I would require that local officers should be
properly qualified and adequately remunerated; that in the honest discharge
of their duties and during good behaviour they should be protected from the
effects of ignorance, narrow prejudices, and interested clamour, and that
they should have an appeal to a disinterested and judicial body, superior to
local feeling. The demand is reasonable—I ask no more. . . . .”
To these admirable remarks by Mr. Angell on the present position of the
town surveyor I can add but little.

Page 24

I believe that the sole reason which is given why Government protection
is not granted to the surveyor is the argument used by those in authority,
that if a surveyor disagrees with the corporation he serves, it is considered
better that he should resign his appointment rather than be protected by the
Local Government Board or other central office; but if this argument is
sound, why does it not also apply in a similar manner to the medical officer
of health or the inspector of nuisances? The real fact no doubt is, that in
framing the Public Health Act of 1875, medical men were consulted and not
engineers, and this is very apparent in many of the clauses, which will be
fully considered in their proper places in this book.
The time will no doubt come when the necessity for some change in the
position of the town surveyor will be apparent, and adequate protection will
be afforded him; in the meantime let him strive, by attention to work, and
by daily advancement in scientific knowledge, and in courtesy to those with
whom he is associated, to make the position and power of the town
surveyor felt and honoured as it should be throughout the kingdom.

[1] The section is as follows:—“The Commissioners shall appoint, subject to the
prescribed approval, or where no approval is prescribed, subject to approval by one of Her
Majesty’s principal Secretaries of State, a person duly qualified to act as a local surveyor of
the paving, drainage, and other works authorized under the provisions of this and the
special Act . . . . . . and the Commissioners with the like approval may remove any such
surveyor.”
[2] Vide ‘Minutes of Proceedings of the Association of Municipal and Sanitary
Engineers and Surveyors,’ vol. i. p. 18.

Page 25

CHAPTER II.
THE APPOINTMENT OF SURVEYOR.

Whenever a vacancy occurs in the office of surveyor to a town, or upon a
sanitary authority determining to make such an appointment, the question is
usually relegated to a committee or sub-committee to report upon the
subject, to fix the amount of salary proposed to be given, and frame the
duties of the office.
The following report is one that has lately emanated from an important
English borough, and is given in full as a specimen of such reports, and as a
guide on which a report could be framed; altered, of course, to such
requirements as may be locally necessary:—

Report of the Special Sub-Committee as to the Surveyor.

(1.) Your sub-committee report that they have, in compliance with the
resolution of the day of , carefully considered the steps to be taken
with reference to the vacancy caused by Mr. ———’s resignation, and they
have come to the unanimous conclusion that it is desirable that the office of
surveyor should be continued.
(2.) Your sub-committee have also considered the duties which were
assigned to the office of Mr. ———’s appointment, and they beg now to
submit them, revised in accordance with the present circumstances of the
department, and with the recommendations contained in this report.
(3.) Your sub-committee further recommend that the salary of the
surveyor be fixed at £ . . per annum, and that advertisements be issued for
candidates.
Duties of the Surveyor.
(1.) To have charge of the repairs of all highways, and to perform all
duties devolving on the council as surveyors of highways.

Page 26

(2.) To report from time to time to the committee superintending the
same, the state of the several highways and lines of tramway, and as to the
materials wanted or works necessary.
(3.) To prepare all plans, specifications, or instructions necessary in
relation thereto, and as to the materials to be used therein, and to see that all
works are completed according to contracts entered into.
(4.) To engage and dismiss under sanction of the committee all
workmen employed at daily and weekly wages.[3]
(5.) To certify all accounts for work done, materials supplied, and wages
due.
(6.) To have charge of all materials and implements.
(7.) To purchase or contract for, or hire all horses, carts, tumbrils,
stones, flags, gravel, draining pipes, and proper implements and materials,
and all other matters and things, at such prices and in such manner as the
committee shall judge reasonable and expedient, and to sell or otherwise
dispose of the same as he may be directed.
(8.) To have the entire charge and superintendence of the breaking up
and repairing of all streets, for the purpose of laying or replacing gas and
water pipes.
(9.) To inspect and report, in conjunction with the medical officer of
health, upon slaughter-houses preliminary to licences being granted, and to
make the plans and superintend the construction of any slaughter-houses
which the council may hereafter erect.
(10.) To take all levels and surveys which may be necessary for the
purpose of deciding on the best mode of draining the several districts, or
any part thereof, or for the purpose of fixing the levels and inclinations of
any streets or roads, or in anywise relating thereto.
(11.) To carry out the scheme now in course of construction for the
interception of the sewage of the borough, and any future scheme, for its
precipitation, filtration, deodorization, or any other process which the
council may adopt, either within or without the borough.
(12.) To superintend the construction and completion of all tramway lines
and sidings which may be required.
(13.) To prepare, from time to time, schemes for the drainage of the
several districts or any part thereof.
(14.) To prepare all such plans, sections, and specifications as may be
necessary for the due execution of any flagging, paving, sewering, or other

Page 27

works required to be done, or for entering into any contracts in relation
thereto, and to see that all works are executed in accordance therewith.
(15.) To measure up and duly certify the execution of all works, and
apportion the cost to the parties chargeable therewith.
(16.) To see that all house drains, which may from time to time be carried
into any public sewer, are made and connected in accordance with the
regulations.
(17.) To give to the several contractors performing any works, orders for
the same in writing only, keeping duplicates thereof, duly entered in a book
to be kept by him for that purpose.
(18.) To prepare all plans, drawings, and estimates required, and to
superintend the execution of all improvements.
(19.) To see that no encroachments be made on any highway or public
place.
(20.) To advise on, and execute, all engineering works, and prepare all
such plans, specifications, and estimates of, and take out quantities for, such
sewers, buildings, bridges, and works as may be required, and to
superintend the erection and execution thereof.
(21.) To have in his charge, and be responsible for, the proper
management of all buildings and properties belonging to the corporation, or
for the repair and maintenance of which the corporation is liable, except
otherwise directed by the council.
(22.) To examine and report upon all plans and elevations of buildings
proposed to be erected or altered upon land sold or leased by the
corporation.
(23.) To inspect and report on plans of new streets to be laid out, of
houses to be built, and of buildings to be erected or altered.
(24) To see that all streets are properly named, and that the name plates
are kept in good order.
(25.) To act as building surveyor in all matters relating to the execution of
the Sanitary and Local Acts, and to examine and certify new houses as fit
for habitation.
(26.) To examine all buildings in a condition dangerous to the public, to
report thereon, and to take such steps as may be necessary to prevent
accidents arising therefrom.
(27.) To prepare all plans and sections for deposit, pursuant to Standing
Orders, with respect to all street improvements, tramways, gasworks,

Page 28

waterworks, or other works, unless otherwise ordered by the council, and to
prepare all other surveys, plans, and sections required.
(28.) To attend the meetings of the several committees when required.
(29.) To prepare all returns relating to his office that may be required by
the Government.
(30.) To attend in London or elsewhere when required, without extra
charge, excepting only his travelling and hotel expenses.
(31.) To keep accurate permanent records and plans relating to all
properties purchased, leased, or sold, or in possession.
(32.) To devote the whole of his time to the duties of his office, and not to
be engaged in any other office, business, or employment whatever.
(33.) To report from time to time all and every matter connected with any
branch of his office which, in his opinion, may require the attention of any
committee, and take their instructions thereon.

Clauses 18 and 20 in the above list of duties are very comprehensive, and
as a rule a town surveyor’s duties may be summed up in a very few words
—“to do anything that he is requested.” It is, however, better that some
definite instructions should be laid down, and those which I have given may
be taken as a fair specimen of what such duties may be.
Unlike the medical officer of health, who by Act of Parliament is
required to hold a diploma of competency,[4] it is open to anyone to apply
for and obtain the appointment of a town surveyor. This is no doubt
unfortunate, as some test of merit is desirable, and of late years the
necessity of some examination as to competency has been much discussed.
In order to meet this requirement, the Sanitary Institute of Great Britain
has instituted examinations and granted certificates of competency for both
town surveyors and inspectors of nuisances. The following particulars of
these examinations, and the reasons given for their necessity, may be of
interest, and are given in full.[5]

Examination of Local Surveyors and Inspectors of Nuisances.

The great and increasing importance of the duties devolving upon local
surveyors and inspectors of nuisances in connection with the various
statutes relating to Public Health and the Sale of Food and Drugs Act, has
led the council of the Institute to establish voluntary examinations for local

Page 29

surveyors and inspectors of nuisances, and for persons desirous of
becoming such, or of obtaining the certificate of the Institute.
Each examination occupies a portion of two days. On the first day the
examination of surveyors is continued for four hours, viz. from 2 to 4 and 6
to 8 P.M. and consists of written papers only. Inspectors of nuisances have
two hours’ written examination on the first day, viz. from 4 to 6 P.M. On the
second day the examination for both classes commences at 11 A.M., and is
vivâ voce; with one or more questions to be answered in writing if deemed
necessary. A certificate of competence signed by the examiners is granted to
successful candidates.
As rural sanitary authorities are able under the Public Health Act 1875 to
obtain almost all the powers of urban sanitary authorities, it is not
considered advisable to make any distinction in the examination of the two
classes of surveyors.
As one person may, under the Public Health Act 1875, be both local
surveyor and inspector of nuisances, candidates wishing to obtain the
double qualification may enter for both examinations on the same occasion.
Candidates are required to furnish to the council of the Institute
satisfactory testimonials as to personal character, and to give two weeks’
notice to the secretary previous to presenting themselves for examination,
stating whether they wish to be examined as surveyors or inspectors of
nuisances, or as both.
The fee for the examination must be paid to the secretary, by post-office
order or otherwise, at least six days before the the day of examination. On
receipt of the fee a ticket will be forwarded admitting to the examination.
The fees payable for the examination are as follows:—

For Surveyors £5 5 0
For Inspectors of Nuisances 2 2 0

Unsuccessful candidates are allowed to present themselves a second time
for one fee.

Syllabus of Subjects for Examination for Local Surveyors.

Laws and Bye-Laws.—A thorough knowledge of the Acts affecting
sanitary authorities, so far as they relate to the duties

Page 30

of local surveyors; also of the model bye-laws issued by the Local
Government Board.
Sewerage and Drainage.—The sanitary principles which should be
observed in the preparation of schemes for, and
the construction of sewerage works; the ventilating and flushing of sewers
and drains; the internal drainage and other sanitary arrangements of houses,
privies, water-closets, dry-closets, and the removal of refuse; the sanitary
details of builders’ and plumbers’ work.
Water Supply of Towns and Houses.—The sanitary principles which
should be observed in the preparation
of schemes for, and the construction of water-works; the various ways in
which water is likely to become polluted and the best means of ensuring its
purity.
Regulations of Cellar Dwellings and Lodging Houses.—General
principles of
ventilation; the amount of air and space necessary for men and animals; the
means of supplying air, and of ensuring its purity.
Highways and Streets.—The sanitary principles which should be
observed in the construction and cleansing of
streets and roads.

Examination Papers, November 6, 1879.

Questions for Surveyors, November 6, 1879, 2 to 4 o’clock.
1. Define street; state the law applicable to every description of street in
an urban sanitary authority district, and the rights and obligations and duties
of sanitary authorities, owners and occupiers therein.
2. What are the relative advantages of circular and egg-shaped sewers; in
what case are they respectively preferred?
3. Give a specification of a water-tight sewer. Describe and give a sketch
of the form of man-hole which you consider best adapted for ordinary town
sewers, and state the rule which you adopt for determining the amount of
ventilation to be afforded in a main street sewer.
4. In what way does the size and shape of the sewer affect the velocity of
sewage flowing through it? If a nine-inch pipe sewer, laid at an inclination
of 1 in 200, gives a velocity of 3 feet per second, what velocity will it give
when laid at an inclination of 1 in 800, the pipe running full in each case?

Page 31

Will this velocity suffice to keep it clear from deposits? Describe the
various modes which may be resorted to for flushing sewers.
5. Give a description of the process termed intermittent downward
filtration. State what area of land you would require, with a gravelly soil,
for applying this method of purifying sewage to a town with a population of
1000 inhabitants, and state the arrangements you would adopt for dealing
with the rain-water falling on the roofs, yards, and streets.
November 6, 1879, 6 to 8 o’clock.
1. In reporting upon the source of water supply for a town, what are the
points to which you would direct your attention?
2. Give a sketch of a D trap, an S trap, a P trap, and a pan water closet
(plan of a dwelling-house annexed).
3. Criticise the arrangements of this residence as to position of rooms,
walls, doors, fire places, windows, &c., from a sanitary point of view.
4. Describe the drainage arrangements shown on the plan. Say whether
they are satisfactory; if not, in what way are they faulty?
5. Sketch on the plan any other system of drains which you would think
preferable.
6. Describe in detail the arrangements necessary for the water supply of
the residence, a bath being fixed in the room over the serving room, a W.C.
on the first floor over that on the ground floor, and a housemaid’s sink near.

It is, of course, open to consideration whether the Sanitary Institute of
Great Britain is the proper authority to hold these examinations or not; but
there is no doubt that some such examination is necessary, and would be
welcomed by nearly all town surveyors in order to more firmly secure their
positions; and the Sanitary Institute is entitled to every credit for having
taken the initiative step in the matter.
Under the present system of appointment to the office of town surveyor
those seeking that office must be prepared to work hard to obtain it, and to
give up some considerable time to its acquisition. Tact, patience, and
perseverance are indispensable qualities when seeking such appointments,
and the following suggestions on this matter may be of use.
The appointment usually rests finally with the whole body of the town
council or corporation, even if a sub-committee or committee has been

Page 32

appointed in the first case to make some selection of candidates. The
candidates thus selected by the committee are usually requested to appear
before the whole body of the town council, who then make the appointment
from amongst them.
The first thing a candidate should do when he hears of a vacancy
occurring in the office of a town surveyor, or sees an advertisement
requiring a surveyor’s services, is to obtain fresh testimonials from those
persons of position and influence for whom he has worked or who know
him professionally. These testimonials, with any very good old ones (but
not too many of either), should be sent by post to the town clerk or person
mentioned in the advertisement, with a formal, carefully-worded
application for the appointment.
If canvassing is not prohibited, a list of the members of the town council,
with their addresses, should then be procured, to whom printed copies of
the application and testimonials should be sent, accompanied by an
autograph letter asking that the application and testimonials should be read.
This should be followed up (if possible, immediately), by a journey to the
town and a personal visit to each member of the council or corporation, not
necessarily for the purpose of soliciting a vote, but with a view to making
the acquaintance of the members of the corporation and to identify the
applicant with his testimonials; and in these visits great tact and patience
are necessary. It is also of importance to seek and obtain all the outside
influence that is possible, in order to bear upon the members of the
corporation, by means of letters of introduction, and informal testimonials
as to eligibility for the appointment, and personal character and position,
&c.
Canvassing on behalf of oneself is extremely unpleasant and harrassing
work; but wrong as the system may appear to be, it is not easy to see how,
in municipal government, any other method can be adopted, and the visit of
the candidate to each member gives the latter an opportunity of asking him
questions and satisfying himself as to his qualifications, and thus he will not
feel he is acting blindly when he gives his vote in favour of that candidate
whom he thinks, after a personal interview, the most suitable for the
appointment.

[3] This seems to be an undue interference with the control which a surveyor should
always have over his men.

Page 33

[4] “A person shall not be appointed Medical Officer of Health under this Act unless he
is a legally qualified medical practitioner” (38 & 39 Vic. c. 55, sec. 191).
[5] Vide ‘Calendar of the Sanitary Institution of Great Britain for the year 1880.’

Page 34

CHAPTER III.
THE SURVEYOR’S DUTIES.

It will be observed on reference to the list of the duties of the surveyor,
given in the preceding chapter, that the first on the list is as follows:—
“To have charge of the repairs of all highways, and to perform all duties
devolving on the council as surveyors of highways.”
The necessity for these duties are obvious when we turn to the Public
Health Act 1875, and read the following sections:—[6]
“Every urban authority shall within their district, exclusively of any other
person, execute the office of and be surveyor of highways, and have,
exercise, and be subject to all the powers, authorities, duties, and liabilities
of surveyors of highways under the law for the time being in force, save so
far as such powers, authorities, or duties are or may be inconsistent with the
provisions of this Act; every urban authority shall also have, exercise, and
be subject to all the powers, authorities, duties, and liabilities which by the
Highway Act 1835, or any Act amending the same, are vested in and given
to the inhabitants in vestry assembled of any parish within their district.
“All ministerial acts required by any Act of Parliament to be done by or
to the surveyor of highways may be done by or to the surveyor of the urban
authority, or by or to such other person as they may appoint” (38 & 39 Vic.
c. 55, s. 144).
“All streets being or which at any time become highways repairable by
the inhabitants at large within any urban district, and the pavements, stones,
and other materials thereof, and all buildings, implements, and other things
provided for the purposes thereof, shall vest in and be under the control of
the urban authority. The urban authority shall from time to time cause all
such streets to be levelled, paved, metalled, flagged, channelled, altered,
and repaired as occasion may require; they may from time to time cause the
soil of any such street to be raised, lowered, or altered as they may think fit,
and may place and may keep in repair fences and posts for the safety of

Page 35

foot-passengers. Any person who without the consent of the urban authority
wilfully displaces, or takes up, or who injures the pavement, stones,
material, fences, or posts of, or the trees in, any such street shall be liable to
a penalty not exceeding five pounds, and to a further penalty not exceeding
five shillings for every square foot of pavement, stones, or other materials
so displaced, taken up, or injured; he shall also be liable, in the case of any
injury to trees, to pay to the local authority such amount of compensation as
the court may award” (38 & 39 Vic. c. 55, s. 149).
The duties thus devolving upon the town surveyor by reason of these
sections and the orders of the council are very considerable. The following
table gives a list of the principal subjects which will require his attention;
all of which will be considered in due course in this book.

List of Duties devolving upon a Town Surveyor as “Surveyor of Highways.”

(1.) The construction and maintenance of highways or streets,
including—
(a.) Roads formed of broken stones or “metal,” commonly called
macadamised roadways;
(b.) Streets paved with granite cubes or setts;
(c.) Streets paved with wood;
(d.) Streets paved with asphalte.
(2.) The construction and maintenance of footwalks or footpaths,
including the different materials of which these are formed.
(3.) The breaking of stone for road metal.
(4.) Steam rolling.
(5.) The necessary notices and specifications under the 150th Section of
the Public Health Act 1875, for the purpose of compelling private streets to
be properly sewered, levelled, paved, metalled, flagged, channelled, lighted,
and made good.
(6.) The lighting, cleansing, and watering of streets.
(7.) The naming and numbering of streets.
(8.) The planting of trees along the sides of footwalks.
(9.) Obstructions caused by builders’ rubbish or by hoardings and
scaffold poles; and also by dangerous or defective cellar coverings.
(10.) The damage caused to footpaths by allowing water from private
premises to flow over them, and the nuisance caused by defective rain-

Page 36

water gutters or shutes.
(11.) The damage caused to roadways by the laying or removal of gas
and water mains and services, and the surveyor’s powers and duties in
connection therewith.
(12.) The importance, especially in old towns, of laying down improved
building lines of frontage in the narrower or crooked streets.
(13.) The examination of all plans of proposed new streets or buildings.
(14.) The supervision of all new streets and buildings whilst their
construction is in progress.
(15.) Dealing with all buildings in a condition dangerous to the public.
Each of the foregoing list of duties will be dealt with in separate chapters
in addition to other matters which will be treated, but before closing this
chapter a few words upon the subject of “meetings” may be of use.
It will be observed upon reference to the list which I have given of the
duties of the surveyor, that there is one which says, “To attend all meetings
of the board, and committee meetings, except where his attendance has
been previously dispensed with; to attend upon the chairman when so
required.”
The result of this order is that a very large percentage of the surveyor’s
time has to be devoted to attendances at long meetings of the Board or town
council, and at the numerous committee and sub-committee meetings which
are appointed under it.
This work is doubled where, as in some towns, the corporation and their
committees sit in a dual capacity, viz. as the council proper, and the council
as the urban sanitary authority; this generally involves two ordinary
meetings of the whole body each month, and probably at least six
committee meetings a week, leaving the surveyor but scanty time to look
properly after his works.
With regard to these committee meetings it is necessary that each should
have some distinguishing title descriptive of the class of work over which it
has jurisdiction, and in selecting names for them the following list may be
of some service:—Finance Committee, General Purposes Committee, Law
and Parliamentary Committee, Surveyor’s Committee, Land and Estates
Committee, Rates and Taxes Committee, Streets Committee, Lighting and
Cleansing Committee, Navigation of Port Committee, Public Grounds
Committee, Sanitary Committee, Drainage and Sewerage Committee,
Markets Committee, Properties for Sale Committee, Works Committee,

Page 37

Water Committee, Gas Committee, Watch Committee, Health Committee,
Library Museum and Arts Committee, Baths Committee, Parks, Gardens,
and Improvement Committee, Streets Improvement Committee, etc. etc.
The surveyor should always endeavour to be punctual in his attendance at
the council meetings and those of the committees, as to be late is always
looked upon with disfavour. His reports should as much as possible be in
writing, so that there should be no misunderstanding as to what his advice is
on any subject. To save trouble and expense it is well that all drawings of
new schemes should be first submitted to a committee in pencil, as they are
frequently much altered; this is very vexing if they have been neatly and
highly finished. It must not be forgotten that the gentlemen who form
municipal bodies give their time gratuitously, and everything should be
done to save it as much as possible. It is an excellent plan and a great
convenience, if a surveyor will have a series of named and numbered
pigeon holes in his office corresponding to his committees, in which to
place all papers, drawings, correspondence etc., which he intends to bring
up to the next meeting of a committee; thus saving himself flurry at the last
moment before the meeting, in endeavouring to find the papers he wants.
With his varied duties, correspondence, interviews, meetings, inspections,
investigations, reports, drawings, and calculations, the motto of a surveyor’s
office should be “method.”

[6] For full particulars and explanations of the various Highway Acts see ‘The Powers
and Duties of Surveyors of Highways and of other Authorities with regard to the
Management of the Public Highways,’ by Alex. Glen, M.A., etc.

Page 38

CHAPTER IV.
TRAFFIC.

Before a surveyor can decide upon the best material with which the streets
of his town shall be paved, it will be well to consider the question of the
class of traffic they will have to bear.
It must be remembered that three distinct interests have to be considered
in dealing with this question, viz. (1.) The rate-payers, upon whom the cost
of construction and maintenance of streets falls. (2.) The owners and
employers of horses and vehicles who principally use the streets; and (3.)
The inhabitants of the adjoining premises, who would be annoyed if the
material selected were unduly noisy or dirty. In addition to these
considerations, much depends upon local circumstances; the class of trade
upon which the welfare of a town is dependent must not be lost sight of. A
pavement suitable for a busy, pushing manufacturing city may not be
suitable for a quiet agricultural or cathedral town, or for a town which is
used as a health resort. Again, the question of the most adaptable materials
must be considered, and the climate and physical character of a town should
enter largely also into this question.
To condense the requirements of a good roadway into as small a compass
as possible, the following may be given as some of its principal
requisites:—
(1.) It must not be extravagantly costly in its first construction.
(2.) It must be durable and require the least possible amount of repairs
at the least cost.
(3.) It must be safe, firm and hard, with an even face and yet giving
sufficient foothold to horses.
(4.) It must be as noiseless as possible.
(5.) It must be so constructed as to be quickly laid down and repaired
when broken up for water, gas, drains, or other purposes.

Page 39

(6.) It must be of strong foundation, so as to carry the heaviest weight
without subsidence.
(7.) It must be of such a shape as will throw off all surface water at
once.
(8.) It must be of such materials as will make a minimum of dust or
mud.
(9.) It must be easily cleansed.
(10.) It must be non-absorbent of impurities or moisture of any kind.
(11.) It must give easy traction upon its surface.
(12.) It must not cause jolting to the traffic.
(13.) It must not injure horses’ legs or hoofs.
Of the above requirements No. 1 affects the ratepayers alone; Nos. 3, 11,
12, 13, affect the traffic only, except that the occupiers of shops are
indirectly affected by them; No. 4 affects both traffic and occupiers, and
No. 10 affects the occupiers principally. The remainder of the requirements
affect all three interests.
With reference to the wearing effect of traffic upon the surface of the
roadway, no standard has yet been arrived at by which this can be
determined with accuracy. In France a great number of observations and
experiments have been made from time to time by the engineers of the
Ponts et Chaussées, but their practice has been to count the number of
“collars” passing a given section of a roadway in a given time, irrespective
of the weights, speeds, or number of wheels such collars may be drawing.
Mr. Deacon, the former Borough Engineer of Liverpool, has, however,
reduced traffic to a standard of tons per yard width of roadway per annum.
This he effected by having the traffic in any street carefully watched for a
certain definite time, the number of vehicles, their character and
approximate weight being noted as well as the number of horses by which
they were drawn, and their number of wheels.
The effect of the traffic thus tabulated, arranged, and reduced to ton yards
per annum, can be ascertained upon any roadway, and Mr. Deacon has
given the results of his observations in a valuable paper on the subject of
street carriage pavements which he read before the Institution of Civil
Engineers.[7]
Sir John MacNeill has estimated that 80 per cent. of the total wear of a
road is due to traffic, the remaining 20 per cent. being due to atmospheric
causes. Of this 80 per cent. 60 per cent. he considers is due to the action of

Page 40

horses’ hoofs where the traffic is fast, and 44·5 per cent. where the traffic is
slow. General Morin estimates the wear of a road due to horses’ feet to be
two-thirds of all causes. There can be no doubt that the action of horses’
feet, shod as they are with heavy iron shoes with long toe pieces and heels,
must have a destructive effect upon the surface of a carriage-way, and this
may be easily observed when watching the ruts formed by any continuous
line of traffic in a roadway.
The following remarks from a report of the Society of Arts on this subject
may here be of interest. “It may be mentioned that as respects the horses’
shoes, attention has long been called to its defects by Sir Francis Head and
others, but Sir Joseph Whitworth now points out the achievement of a
decided and important improvement, which will have a large effect in road
conservancy, as well as the reduction of noise. The improvement consists in
the fastening of a rim of hardened steel, of about half-an-inch square, to the
horses’ feet, and letting the frog grow to its natural size. One effect is to
reduce by five-sixths the weight of the old shoe, or in other words to reduce
by five-sixths the weight of the iron hammers constituted by the common
horses’ shoes, pounding the road surface, and creating road dust and dirt,
and distributing it about. The saving in this respect, as well as the reduction
of noise by the reduction of the weight of rim, and also the saving of road
wear, would warrant the imposition of the stimulus of a tax, or a toll upon
heavy horses’ shoes to hasten this removal.”[8]
Up to the present date, however (1883), no general change has been
effected in the manner of shoeing horses, notwithstanding these admirable
remarks of Sir Joseph Whitworth upon the subject.
With reference to the question of traction upon roads General Morin, in
his ‘Expériences sur le Tirage des Voitures,’ states that the resistance to the
rolling of vehicles upon solid metalled roads and pavements is proportional
to the weight and inversely proportional to the diameter of the wheels. On
solid roads he states that the resistance is nearly independent of the width of
the tires when they exceed 3 or 4 inches, but on a compressible face it
decreases in proportion to the width of the tire; the resistance further
increases with the velocity on hard roads, but does not do so when they are
soft.
The following table is almost universally now adopted as showing the
traction upon level roads formed of different materials, asphalte being taken
as the standard of excellence in this respect.

Page 41

Asphalted roadway 1·0
Paved roadway, dry and in good order 1·5 to 2·0
„ „ in fair order 2·0 „ 2·5
„ „ but covered with mud 2·0 „ 2·7
Macadamised roadway, dry and in good order 2·5 „ 3·0
„ „ in a wet state 3·3
„ „ in fair order 4·5
„ „ but covered with mud 5·5
„ „ with the stones loose 5·0 „ 8·2

There are four forces constantly at work tending to destroy the
momentum of vehicles passing along a roadway: they are gravity, collision,
friction, and the resistance of the air.
The first of these is lessened by easy gradients in a road, the second can
be overcome to a great extent by evenness of surface, the third by hardness,
and the fourth, as well as all the others, by giving sufficient foothold to the
animal drawing the vehicle.
Another excellent table[9] prepared from experiments made by Mr. Amos
on different descriptions of pavement in the City of London may be useful,
and is here given:—

Tractive
Speed in Force in
Draught Fraction
Road Material. Miles Decimals
in lbs. of Load.
per hour. of the
Load.

1
6·945 126·6 ·0219
45·3
Gravelly Macadam in a side street -
1
3·45 114·322 ·0197
50·3

1
5·15 70·963 ·0123
81·1
1
Granite pitching by side of tramway - 3·196 41·932 ·0072
137·3
1
2·557 47·572 ·0082
121

Granite Macadam “freshly laid” - 1
4·239 262·886 ·0456
21·9

Page 42

1
2·775 242·726 ·0421
23·7

1
5·025 91·525 ·0158
64·9
1
Asphalte Pavement - 3·56 69·753 ·0121
82·5
1
5·687 84·268 ·0111
68·3

1
3·932 118·163 ·0205
48·7
1
Wood Pavement - 3·278 102·412 ·0177
56·2
1
3·827 100·066 ·0173
57·5

Macadam road, very good on Victoria 1
- 6·65 109·06 ·0181
Embankment 52·7

The following table from Law’s ‘Rudimentary Treatise on Civil
Engineering’ shows the force required to move a load of a ton weight on
different descriptions of roadway, the limiting angle of resistance, and the
greatest inclination which should be given to the road being also stated.

Force Greatest
in lbs. Limiting inclination
Description
required angle of which should
of the Road.
to move resistance. be given
a ton. to the road.
° ′
Well laid pavement 33 0 50 1 in 68
Broken stone surface on a bottom of
46 1 11 1 „ 49
rough pavement or concrete
Broken stone surface laid on an old
65 1 40 1 „ 34
flint road
Gravel road 147 3 45 1 „ 15

As a matter of fact, however, the gradient of a macadamised road should
not, if possible, exceed 1 in 20,[10] experience having shown that a horse,
unless the hill is a very long one, is able to draw his ordinary load for a

Page 43

level up such an inclination, whereas, if it is steeper he is sometimes
stopped altogether, even though the carter tries the zigzag route so as to
obtain an artificial ease of gradient.
The table given in ‘Molesworth’ upon the same subject is too well known
to be repeated, and another table may be found in Sir Henry Parnell’s work
on roads, which gives a comparison between the draught necessary on a
well-paved road at 2, on a well-made, clean macadamised road at 5,
whereas on a wet and muddy gravel or flint road it rises to 32!
Mr. T. D. Hope, of Liverpool, assuming the power of traction at 100,
gives the following table:—

Weight
drawn.
Level macadamised road 27 cwt.
„ granite pavement 30·5 „
„ wood „ 54·75 „

And Lieut. Crompton has given the resistance of wheels in lbs. per ton on
different surfaces as follows:—

Very good pavement 35 lbs.
Good macadam 60 „
Ordinary ditto 90 „
Newly-laid gravel 200 „
Soft grass land 300 „
Newly-laid metal 440 „

Here “newly-laid metal” comes out very badly, and points to the necessity
of rolling, of which I shall speak in a future chapter.
Whilst on the question of wheel resistance, it may be well to note that the
small front wheels of a waggon cause considerably more harm to a
macadamised road than the larger hind wheels. In the smaller diameter any
loose stone or obstruction is pushed along in front for a considerable
distance, often tearing up the surface of the road, whereas in the other case
the stone is forced into its place or crushed as under a roller.
On the question of “safety” to traffic, Mr. Haywood, the eminent
Surveyor of the City of London, has caused several most complete
observations to be made from time to time, the results of such observations

Page 44

being detailed by him in various reports. Amongst other useful information
compiled by him, he has ascertained that a horse will travel 446 miles upon
a roadway paved with blocks of wood without a fall, 191 miles upon
asphalte, and 132 miles upon granite setts. I cannot do better than give
verbatim his remarks upon this point:—
“Slight rain makes both asphalte and wood more slippery than they are at
other times. On asphalte the slipperiness begins almost immediately the rain
commences, wood requires more rain before its worst condition ensues. The
slipperiness lasts longer upon wood, on account of its absorbent nature, than
it does upon the asphalte; when dry weather comes after the rain, when
asphalte is in its most slippery state, and the horses fall on it very suddenly,
on wood their efforts to save themselves are more effectual; wood also is
frequently in that peculiar condition of surface in which horses slip or glide
along it without falling. A small quantity of dirt upon asphalte makes it very
slippery, wood requires a large quantity. Slipperiness can be temporarily
cured on both pavements; on the asphalte by sprinkling it with sand, on the
wood by sprinkling it with gravel. The result in both cases is dirt. The sand
thrown on asphalte helps to wear it out, the gravel thrown on wood tends to
preserve it. When a horse falls on asphalte it has difficulty in getting up; on
wood it rises more readily.”[11]
In streets crowded with traffic, the constant stopping and starting,
especially on any surface that is slippery, is very trying to horses. Attention
has lately been directed to this point with a view to the storage of some
power in a vehicle, either by the compression of a spring in stopping or by
some other mechanical means, in order that in starting the driver may at
will liberate this power so as to assist the horse in overcoming the inertia of
his load. These trials, however, have not at present met with much success.
Before closing this chapter on traffic, it will be well to point out that
nearly all vehicles travelling rapidly can pass each other safely if allowed a
clear space of eight feet; hence all roadways should, if possible, be made of
a width between the kerbs of some multiple of eight: a convenient width for
the footpaths, so far as foot-passenger traffic is concerned, is found to be
one-fifth of the entire width of street. It is scarcely necessary to add that
vehicles pass each other on the left side, pedestrians on the right. It is not
easy to assign a cause for the former beyond custom, except that the whip is
held in the right hand, and in consequence free play is given for its use as
the driver sits on that side and can watch his wheels in passing. In France

Page 45

and other countries the right side is the “rule of the road.” In the case of
pedestrians it is perhaps more convenient for many reasons to pass on the
right side, one being that the umbrella or parasol is always carried in the
right hand, which is also used to remove the hat when bowing, and another
because one’s tendency in passing any obstacle is to give way with the left
shoulder. For regulating the traffic and for the protection of foot passengers,
“sanctuaries,” as they are termed, have often to be constructed by surveyors
in broad streets or awkward centres of traffic, and it is well to place a lamp-
post on these sanctuaries, on which may be advantageously fixed a notice,
“Keep to the Left,” so as to regulate vehicular traffic. On the lamp-posts at
the edge of the footpaths it is also sometimes customary to fix small
enamelled iron plates bearing the inscription on both sides, “Keep to the
Right,” so as to regulate the pedestrian traffic.
Of the danger to life and limb to pedestrians in London much has
frequently been said, and no wonder, when we consider the number of
persons who are daily injured and sometimes killed according to the
Registrar-General’s returns. Some years ago it was proposed to erect light
iron bridges over the most dangerous crossings approached by winding
stairs, but “time is money” in the mighty metropolis, and the scheme was
abandoned because it was felt that most persons would prefer the risk of
being run over rather than spend the time in ascending and descending the
necessary steps for this purpose.

[7] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. lviii.
[8] Vide Report of the Society of Arts on the application of Science and Art to street
paving and street cleansing of the metropolis, 1875.
[9] Ibid.
[10] Experiments made by the direction of the French Government on the tramway
between Sèvres and Versailles, showed that a horse on a level tramway draws three-and-a-
half times the weight, at the same speed and with the same expenditure of power, that he
can do on an ordinary road. Up a gradient of 1 to 100, he is capable of drawing 2·25 times
the weight he can do up the same gradient on an ordinary road, and up a gradient of 1 to 25
he can draw one-and-a-half times the load he can do under similar circumstances on the
ordinary road.
[11] ‘Report on accidents to Horses on Carriageway Pavements,’ by William Haywood
(1874).

Page 46

CHAPTER V.
MACADAMISED ROADWAYS.

I do not propose in this work to speak of any of the engineering operations
necessary to lay out or construct long lines of connecting roadways, as that
is a duty which seldom falls to a town surveyor to perform, and there are a
great number of treatises and books upon the subject already published. The
object of this chapter will be to give some information and hints upon the
construction and maintenance of what are known as macadamised roads,
suitable for urban and suburban traffic.
There can be little doubt that roadways of this description are expensive
luxuries where the cost of their maintenance, owing to excessive traffic or
other causes, exceeds 2s. per square yard per annum, but they are often
necessary luxuries when the requirements of the locality are considered, a
point to which I drew attention in the preceding chapter upon “Traffic.” For
purposes of what may be styled “pleasure traffic,” macadamised roadways
are unequalled when well constructed and maintained, but there are many
objections to them which will be considered in their place in this chapter.
The word macadamised is, as is well known, derived from one John
Loudon Macadam, who in the year 1816 first took up the question of
putting broken metal upon a road instead of the boulders previously used.
[12] His name, being rather a peculiar one, has been attached to this
description of road ever since.
As a matter of fact, the “macadamised” roadways of the present day are
constructed after a method introduced by Thomas Telford as an
improvement upon Macadam’s principles, and a perusal of the two
following specifications will, I think, show that there is not very much
difference between the method introduced by Telford and that followed at
the present time.

Page 47

Specification of a Roadway as designed by Thomas Telford more than fifty
years ago.[13]

“Upon the level bed prepared for the road materials, a bottom course or
layer of stones is to be set by hand in form of a close, firm pavement; the
stones set in the middle of the road are to be seven inches in depth; at nine
feet from the centre five inches; at twelve feet from the centre four inches;
and at fifteen feet three inches. They are to be set on their broadest edges
lengthwise across the road, and the breadth of the upper edge is not to
exceed four inches in any case. All the irregularities of the upper part of the
said pavement are to be broken off by the hammer, and all the interstices to
be filled with stone chips firmly wedged or packed by hand with a light
hammer, so that when the whole pavement is finished there shall be a
convexity of four inches in the breadth of fifteen feet from the centre.[14]
“The middle eighteen feet of pavement is to be coated with hard stones to
the depth of six inches. Four of these six inches to be first put on and
worked in by carriages and horses; care being taken to rake in the ruts until
the surface becomes firm and consolidated, after which the remaining two
inches are to be put on.
“The whole of this stone is to be broken into pieces, as nearly cubical as
possible, so that the largest piece in its longest dimensions may pass
through a ring of two and a half inches inside diameter.
“The paved spaces on each side of the eighteen middle feet are to be
coated with broken stones or well-cleaned stony gravel up to the foot path
or other boundary of the road, so as to make the whole convexity of the
road six inches from the centre to the sides of it, and the whole of the
materials are to be covered with a binding of an inch and a half of good
gravel free from clay or earth.”
If the above specification, written more than fifty years ago, is compared
with one of the present date, it will be seen that there is a strong
resemblance between them.

Specification of a Roadway as now executed.

The cross section of the roadway when finished is to be an arc of a circle,
with a rise of 1 in 27 from kerb to the centre of the roadway each way.[15]
The roadway, when consolidated and finished, to be 12 inches in depth at

Page 48

the gutters and 15 inches at the centre, diminishing gradually from this
point right and left to the depth named. The gutters to be 2 feet in width,
formed of stone setts 6 inches by 6 inches, and laid in sand, on a firmly
consolidated surface of small broken stone or gravel.
The earth road-bed on which the surface formation is to rest is to be
excavated to the required depth, and when graded and shaped to its proper
form, it is to be thoroughly and repeatedly rolled with a steam roller, and all
depressions which then appear are to be filled with the same material as the
road-bed, and rolled until the whole be uniformly compact and firm.
On the road-bed thus formed and compacted, a bottom layer of stone of a
depth of 8 inches at the centre of the road, and gradually diminishing to 6
inches at the kerb, is to be set by hand, to form a close, firm pavement. The
stones are to be laid, with their largest side down, in parallel lines across the
street, breaking joint as much as practicable.[16] The width of the upper part
of the stone not to be more than 8 inches, nor less than 6 inches. The stone
not to exceed 15 inches in length. After being set closely together, the
stones are to be firmly wedged by inserting a bar in all possible places, and
placing between them stones as nearly as possible of the depth of the
pavement, until the whole is bound in position. Projections of the upper part
of this course are to be broken off, care being taken not to loosen the
pavement; and no wedging is to be done within 20 feet of the face of the
work being laid. The small interstices are to be filled in with stone chips
firmly wedged with hammers. The whole is to be thoroughly rammed and
settled to place, and all undue irregularities of surface broken off.
On the foundation course must be laid an intermediate layer of broken
stones, varying in size from 3 inches in their greatest diameters to 1 inch in
their smallest diameters. These irregular-sized stones may be either the
“tailings” of the screened stones, or may be raked from the quarry, and
placed on the roadway without being machine-broken; but they must
nevertheless be so laid as to compact solidly, and must be clean broken
stone, free from dust and dirt, and within the dimensions given above. This
intermediate course must be 4 inches in depth at the centre of the roadway,
gradually decreasing to 3 inches in depth at the gutters; it is to be
thoroughly rolled with the steam roller until it be firm, compact, and solid.
On its upper surface it must be identical in rise and form to the cross-
section of the finished pavement, as specified above. In the laying of this
course of stone a small quantity of binding material is to be used, sufficient

Page 49

only to fill up the crevices, and render this portion of the pavement solid.
Preferably the binding is to be of fine screened gravel or sand, which is to
be sufficiently watered during the process of rolling, so that the “licking up”
of the road material, and its adherence to the rolling-wheels may be
prevented.
On the intermediate course is to be laid the surface layer of broken stone.
[17] It must be 2¹⁄₂ inches in depth, and the stones must be practically
uniform in quality, and as near an approach to a cube in form as possible.
Each stone used in this layer must have passed through a 2¹⁄₂-inch circular
hole, and all stones that are wedge-shaped, and do not approach uniformity
of measurement on their sides, are to be taken from the road with properly
shaped rakes, and no stones allowed to remain which are not sound, strong,
and equable in size and quality of material. The stones are to be raked into
an even layer, and the steam roller passed over them twice or thrice. After
this a quantity of fine screened gravel or sand is to be thrown on and
sufficiently sprinkled to moisten the mass without “licking up.” The rolling
is then to be continued (working the roller backwards and forwards,
gradually from the gutter to the crown), with an occasional light watering of
the pavement, until the cross-section be exact according to specification, the
interstices filled in, the roadway firmly compacted and solid, and all excess
of binding removed from the surface of the finished pavement.[18]
Telford’s object was the complete separation of the road metal from the
subsoil by a firm and regular foundation, and this system has ever since
held its ground. The advantages to be gained in constructing a roadway in
this manner may be summed up as follows:—
(1.) Economy of construction, as a considerable quantity of metalling is
saved; only 3 inches of properly broken stone and a little binding material
being necessary, the foundation of the roadway (which really carries the
traffic) may be made of a quality of stone unsuitable for road metal, or even
of bricks or stones from old buildings that are being pulled down.
(2.) The prevention of the rising up or “spewing” of the clay or other soft
material on which the roadway rests.
(3.) A solid foundation is secured which will successfully resist the
weight and percussion of the traffic.
(4.) The increased facility for the drainage of the roadway water being
ruinous to it.[19]

Page 50

Instead of forming a paved or “pinned” foundation for macadamised
roadways, sometimes what is called “hard core” is placed at the bottom of
the road upon the surface formation.
This “hard core” is made of very heterogenous materials, often the waste
products of the house refuse depôt, and consists of ashes, old pots and pans,
meat tins, old bottles, shells, and a variety of similar articles; sometimes the
core is made of burnt ballast, but in no case does it make so good a
foundation as stones set by hand.
Concrete has also been employed as a foundation with great success, but
it is very expensive, and is seldom used except under streets paved with
either granite, wood, or asphalte, of which I shall speak hereafter; for if the
traffic was so great as to necessitate the use of concrete for a foundation it
would surely be better to give the roadway a more durable surface than
macadam.
The following tables, showing the thickness of the foundation and
metalling of broken stone roads, is from a paper on roadways, read to the
Association of Municipal and Sanitary Engineers, by Mr. James Hall,
Borough Surveyor of Stockton, and may be of use to those who would like
to know what proportions to use.

Pinned Foundations. Broken Stones. Concrete.
Cover- Con-
Pinning. Metal. Under. Upper. Metal.
ing. crete.
in. in. in. in. in. in. in.
Country roads 6 3 4 9 4 4 3
Suburban „ 9 3 5 9 6 6 5
Town streets 9 6 5 15 6 10 5

Chalk has sometimes been used for the bottom of a roadway, but where
this is likely to be affected by frost it is the worst material that can be used,
as it is likely to blow up the roadway.
With regard to the annual outlay upon macadamised roadways, the
following comparative tables[20] prepared by Mr. Ellice Clark, the then
Surveyor of Derby, may be of interest.

Description Original Annual Outlay.
of Pavement. cost Interest. Sinking Main- Scav- Gravel. Total.
per fund 3 tenance. enging.

Page 51

square per cent.
yard. compound
interest.
s. d. d. d. s. d. s. d. d. s. d.
Wood pavement - 15 1·5 7·5 10·1 0 1·0 0 2·7 5·0 2 2·3

Val de Travers
compressed - 18 0·0 9·7 .. 0 3·6 0 0·4 .. 1 1·7
asphalte

Granite setts 7
inches by 3
inches laid over
a layer of 12 - 17 9·0 9·6 0·5 0 1·3 0 2·5 .. 1 1·9
inches of
cement
concrete

Macadam in
south of - 4 9·0 2·1 .. 3 6·0 1 0·0 .. 4 8·1
England

Traffic per Annum
Load of Mud
Material. per yard
per area.
of width.
superficial
tons.
yards.
Macadam 344 25,000
Granite setts 500 50,000
Wood 1666 25,000
Asphalte 4000 500,000

The following is a table of the cost of streets in Paris per square yard per
annum.[21]

Description Mainte- Cleans-
Total.
of Pavement. nance. ing.
s. d. s. d. s. d.
Stone Pavement 0 4·50 0 3·37 0 7·87
Macadam 0 9·25 0 7·31 1 5·26
Asphalte 0 10·20 0 4·17 1 2·37

Page 52

The cost of maintaining macadamised roadways as compared with that of
granite setts has been said to be as high as 5 to 1 and that this cost if
capitalised for 12 or 13 years will equal the first expense, interest on money,
and the necessary repairs for a granite paved roadway.
The following table gives the cost per annum per square yard for the
maintenance of macadamised roadways in different places, so far as I have
been able to collect them:

s. d. s. d.
Bristol 4 to 1 0
Charing Cross (London) 5 0 (now paved)
Exeter 6 „ 2 6 including cleansing
Glasgow 8¹⁄₂
Leeds 10 „ 1 2
Liverpool 2 „ 2 6
Manchester 6 „ 1 8
Merthyr Tydfil 4¹⁄₂
Newcastle 1 3 including watering
Paris 9¹⁄₄ „ 10 9
Parliament Street (London) 3 6 repairs only
Regent Street (ditto) 3 7 (now paved with wood)
Stockton 9 „ 1 6
Sheffield 1 8 „ 2 0
Wakefield 1 0 all paved streets now.

In Birmingham the macadamised streets have worn down 6 inches in one
year, with a traffic of 2484 vehicles passing in 10 hours.
With reference to the great cost of maintenance in Paris, the following
particulars[22] may here be given;
“The surface of the street is picked by gangs of men, metal from 2¹⁄₂ to 9
inches in thickness is then laid on, a coating of sand is then spread upon it,
it is watered and rolled at per kilometre ton, that is, at per ton weight of
roller per kilometre travelled, at a cost of about 15·33d. per ton mile for the
first 250,000 ton miles, and at reduced rates for additional service. The
materials used for the roads are flints costing 4s. 6¹⁄₂d. per cubic yard for
light traffic roads; for medium traffic, hard millstone at 11s. 4d.; and for the
heaviest and greatest traffic, porphyry at 15s. 9d. The average total cost of
maintenance of the streets is 1s. 8¹⁄₂d. per square yard per annum for the
first-class roads, and 1s. 1¹⁄₂d. for the lighter traffic; the highest cost for

Page 53

maintenance is as high as 10s. 9d. per square yard, the lowest 9¹⁄₄d. per
annum.”
It may be well to mention that 73 per cent. of the streets in Paris are
paved, 5 per cent. are coated with asphalte, and 22 per cent. are
macadamised.
The contour, or best form of cross section that should be given to a
roadway, has often exercised the minds of engineers, but for all practical
purposes evenness of surface and regularity of section in a macadamised
roadway are of more importance than the slight difference between straight
lines and curves, which might only tend to confuse the workmen. Formerly
it was the practice to employ a complicated gauge in the form of a straight-
edge fitted with plummet or level and sliding bars, but a good eye, assisted
by a long straight-edge and spirit-level and three boning rods, is generally
found to be sufficient, and if the centre of the roadway is kept level with the
heel of the footpath, a sightly cross-section is generally the result; or say 6
inches to 9 inches higher in centre of a roadway 30 feet in width between
the kerbs, 3 inches to 4 inches where it is from 18 to 20 feet in width.
The following detailed section of a macadamised roadway is one which I
am in the habit of specifying for suburban districts, as it is easily set out and
constructed, and answers all purposes most admirably.

Large illustration (66kB)

The total width of street is 36 feet, of which the roadway takes 24,
leaving a footpath 6 feet in width on each side.
The surface of the finished roadway is a segment of a circle, the crown
being level with the heels of the footpaths on each side; the formation
surface is parallel with it, and of course the depth of this and the thickness

Page 54

of foundations and metal must depend upon local circumstances. It will be
seen that the haunches are drained with 3-inch common drain-pipes. This
may be omitted if the ground is thoroughly dry, but it is often a great help to
a road.
The paths, kerbing, and channelling will be described in their respective
chapters.
It must be borne in mind that on a perfectly level road a more convex
section is necessary than on a gradient.
It is wrong to make the sides of a roadway weaker than the centre,
especially in streets with shops on each side, or on hills where drags are
likely to be used. On hills, too, be it remembered, the channels should take
the surface water; any ruts from wheel tracks acting as watercourses are
disastrous. Hauling timber on a macadamised roadway is also very
damaging.
The great objections to macadamised roadways are as follows:—
(1.) They manufacture too much mud and dust.[23]
(2.) They are too absorbent.
(3.) They are very noisy and damaging to vehicles and horses when fresh
metalled.
(4.) They constantly require mending, but never seem quite sound.
(5.) They are frequently encumbered by men and carts engaged in either
repairs, cleansing, or watering.
(6.) They are very expensive to maintain and cleanse.
(7.) They are bad for a horse to fall upon, as such falls generally damage
the knees.
The following notes upon the maintenance of macadamised roadways
may here be of service:—
(1.) Roads should be inspected in wet weather, as hollows and other
imperfections are then easily detected; a hollow place extends very rapidly
if neglected.
(2.) All ruts should be filled in at once. If there are three parallel, the
centre rut should be first filled in; the traffic is thus slightly diverted, as a
horse will avoid new metal.
(3.) Ruts should not be allowed to form; the surface of the road ought
never to lose its regular section.
(4.) A road should be thoroughly repaired directly it shows the least sign
of being fairly worn all over.

Page 55

(5.) The right season of the year for repairs is the autumn, although where
a steam roller can be used almost any time will do. If the surface of the road
is very hard it should be “lifted”[24] previous to repairs.
(6.) All loose stones should be picked off at once or put together in
hollow places upon the roadway, as, if allowed to remain, they are not only
dangerous to horses, but are liable to be crushed, or to be forced through the
skin of the roadway, thus causing it damage.
(7.) Water lodging upon a road does great mischief, but it should not be
let off by digging a trench with a pickaxe to the side of roadway, as is
sometimes done.
(8.) A roadway when very dry sometimes suffers through disintegration
of the surface.
(9.) Scraping the mud off a roadway may damage it by loosening stones;
sweeping the surface when wet is best.
(10.) A heavy shower does a road good by washing it; a continuous
drizzle, especially after frost, is very ruinous to a roadway.
(11.) A good cleansing is sometimes worth a coat of metal.[25]

Bituminous Roadways.

In some towns in England bituminous or asphalte macadamised
roadways are made. This consists in mixing ordinary coal tar with the road
metal ordinarily employed for macadamised roads, only it must be borne in
mind that the metal employed must be limestone or some other soft
material, otherwise it will not wear down evenly with the tar, and thus a
lumpy surface will be produced in course of time.
The method of mixing is by heating the stone, which has of course been
previously broken to the required size, and then thoroughly mixing and
incorporating it with the tar. This is then carried to the roadway, is spread in
the ordinary manner and well rolled to the proper contour, a surface being
afterwards given to it by a coating of about 2 inches thick, composed of a
similar mixture, the stones of which are of much smaller size.
Another method is to place about 6 inches of the broken metal described
above upon the necessary foundation. Upon this a boiling mixture
composed of about 50 gallons of creosote oil and 1 ton of pitch is poured
until every interstice is filled with the mixture. Whilst this is still warm, a
thin layer of small broken stone is spread upon the surface and well rolled;

Page 56

more small stones or chippings are added, and the whole is rolled until the
surface of the roadway has attained its proper contour and presents a
perfectly smooth and clean appearance, little inferior to that of real asphalte.
Dry weather is essential whilst this class of roadway is in course of
construction, and they require careful watching, as, upon the skin becoming
broken, the whole roadway soon breaks up. They have, however, many
advantages over ordinary macadamised roadways when finished, not the
least of them being their imperviousness to moisture, and the ease with
which they are cleansed.

Page 57

[12] The first road “engineer” in this country was John Metcalf of Knaresborough, who was born in
1717, and who, although totally blind, was the first person to introduce a methodical system of road
repairs. Vide ‘Roads and Road Makers,’ by Henry Alexander Glass.
[13] Vide ‘A Treatise on Roads,’ by Sir H. Parnell (1833).
[14] The total width of roadway being thirty feet.
[15] It is necessary to give a new roadway more convexity than it will have when finished, for however
carefully it is raked or attended to when being rolled, the top is sure to flatten and spread towards the
haunches.
[16] Instead of parallel lines it is sometimes well to place these stones diagonally from centre to kerb or
“herring-bone” fashion, thus greatly facilitating the under drainage.
[17] In metalling a road it is better to put on the coats gradually, than to give the whole thickness of
metal at once.
[18] The method adopted in Chicago, U.S.A., for forming their roadways is as follows:—The road bed
is prepared of the proper contour and well-rolled with a 15-ton steam roller until it is even, firm, and
compact; on this bed rubble stone is carefully placed by hand with its broadest surface downwards, then
12 inches of metal are added 6 inches at a time, thoroughly rolled to bond it well, it is then topped with 4
inches of crushed trap rock or some other equally hard stone, which will not disintegrate through the
action of the weather, nor pulverise under the pressure and wear of vehicles upon it; this is again,
thoroughly well rolled so as to compact and bind it together.
[19] “If roads be kept dry they will be maintained in a good state with proportionally less expense. It
has been well observed that the statuary cannot saw his marble, nor the lapidary cut his jewels without the
assistance of the powder of the specific materials on which he is acting; this, when combined with water,
produces sufficient attrition to accomplish his purpose. A similar effect is produced on roads, since the
reduced particles of the materials, when wet, assist the wheels in rapidly grinding down the surface.”
Parnell’s ‘Treatise on Roads,’ 1883. More modern writers have likened macadamised roadways to “stone
mills on which the stones are ground into dust when dry, or mud when wet.”
[20] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. lx.
[21] Vide ‘Annales industrielles de Paris,’ Oct. 21st and Nov. 4th, 1877.
[22] Vide ‘Annales industrielles de Paris.’
[23] A report of the Paddington Vestry on “wood and other pavements,” (1878) states macadam as a
mud producing material is twelve times worse than wood, and six times worse than granite cubes.
[24] This is also sometimes called “stocking” or “chequering,” and consists of making furrows across a
roadway with a sharp pickaxe, about a couple of inches in depth, thus removing any irregularities, and
also allowing the new metal to bed properly.
[25] In Birmingham, good cleansing is said to have reduced the amount of metal necessary for the
maintenance of the roadways from 20,000 tons per annum to 13,000 tons.

Page 58

CHAPTER VI.
ROAD METAL AND BREAKING.

The only true test of the fitness of any stone for use as a road metal is by an
experimental trial upon a certain length of roadway; but in making the first selection for
such trials it is well to make the following investigations:—
(1.) Ascertain from local persons, such as masons, quarrymen, and others, their
opinion of the qualities of the stones in the neighbourhood.
(2.) Make a trial of the stone for toughness. This can be done by setting a good stone-
breaker to work upon a heap of the stone as quarried and carefully watching how much
he can break in an hour.[26]
(3.) Ascertain what power the stone has to resist abrasion. This is done in France by
putting the broken metal into a revolving cylinder and then carefully noting by weight
what the cubes lose by contact with each other. Another plan may be adopted by
pressing the stone against a grindstone with a uniform pressure, and noting the loss
caused by such contact.
(4.) The power to resist compression may be easily ascertained by placing small
cubes in an hydraulic press and noting under what pressures each cube will crush.
(5.) The effect of weather is not easily ascertained artificially, although it is suggested
that a good test may be made by soaking the stone in a saturated solution of sulphate of
soda; and then on exposure to the air, if soft, it is said the stone will disintegrate as if
under the action of thaw succeeding frost.[27]
The specific gravity of a stone is no criterion whatever as to its fitness. Clay-slate has
a higher specific gravity than a tough flint, and yet the former is almost useless as a road
metal; the latter, on the contrary, often making excellent roadways.
The qualities necessary for a really good road metal are hardness, toughness, not
easily decomposed or affected by the weather, and at the same time the stone when
broken ought to have some power of cohesion without the necessity of much binding
material. The question of cost I put aside at once, as it is well known that the best road
metal is always the cheapest where there is much or heavy traffic.
Local circumstances must to a great extent determine what stone to use upon a
roadway, but the following list may be of use:—
Syenite.—This is a granite in which hornblende takes the place of mica, and is an
excellent road material; the darker the colour the more durable it is found to
be.
Granite.—This should have more felspar than quartz, and have as little mica as
possible; the closer the grain the better. Coarse-grained granites soon

Page 59

decompose.
Trappean Rocks.—Some of these are excellent for road metal. Basalts of dark colour
and close grain should be selected. Greenstones with similar
characteristics are good; as is also Whinstone.
Gneiss.—Is inferior to granite; it has mica in layers and is not a good road metal.
Clay Slates.—These are useless, as they crumble on exposure or degenerate
into mud.
Limestone.—The Metamorphic, Silurian, and Carboniferous limestones may be used
if crystalline in appearance, but the Lias and Oolitic are of little use.[28]
Sandstones.—Some of these, if cherty or containing a large percentage of iron, may
be used; but as a rule they are quite unfitted for use as a road metal.
Flints. —These, if tough, make excellent roadways; but unfortunately they are
sometimes too brittle for heavy traffic. Surface-picked flints are better than
those from a quarry.[29]
Pebbles.—These are found on sea shores and river beds. They are composed of very
various rocks, and are much water-worn and rounded; when broken they
sometimes answer very well if mixed with gravel to bind them.
Gravel.—This, if of a flinty character, and not too much mixed with earthy matter,
makes good roads for light traffic, if carefully watched or well rolled during
formation. Pit gravel should always be screened through wire screens of 1¹⁄₂ to 1³⁄₄
gauge, and the small can be used for footpaths.
In some places it is difficult to obtain any natural stone for the purposes of road
metal; in these cases slag from blast furnaces or ordinary clinkers from furnaces are
sometimes used. Oyster shells are used on the roadways near the Gulf coasts[30] and
charcoal in Michigan, United States.[31] I have myself made a most excellent roadway
with coral on the coast of Jamaica, and no doubt many strange materials have been, and
still are, used for this purpose.
“I never mix” is an adage that should be followed by surveyors as regards road metal.
Do not mix a soft material with one that is harder for either construction or maintenance
of a roadway; the effect is what is known as a “bumpy” road, arising from the fact of the
soft stone wearing faster than the hard. The hardest metal should be kept for the top or
surface layer of the roadway.
As an instance of the extreme difficulty besetting the question of the best material for
road metal, I will here give a table showing the comparative coefficients of quality
assigned to them by the engineers of the French Department of the Ponts et Chaussées.
[32]

Coefficients of Quality of Road Materials.
Granitic gravel 23·8
Quartz gravel 21·4
Trap 20·0
Quartz 10·0 to 25·0 (in one instance 4·8)
Basalt 12·0 „ 20·0
Porphyry 10·0 „ 20·0 (in one instance 5·0)

Page 60

Quartzite 11·0 „ 18·0
Devonian schist 16·0
Schist 4·0 to 12·0
Sandstone 12·0 „ 16·0
Granite 6·0 „ 20·0 (generally 10·0 to 12·0)
Syenite 12·0
Gneiss 9·0 to 12·0
Silicious pebbles and gravel 8·0 „ 19·0 (in one instance 6·0)
Silex 8·0 „ 16·0
Chalk flints 7·0 „ 11·6
Silicious limestone 6·0 „ 18·0 (generally about 10·0 to 12·0)
Compact limestone 14·0
Magnesian limestone 16·0
Carboniferous limestone 9·0
Oolitic limestone 5·0 to 12·0
Lias limestone 5·0 „ 10·0
Juranic limestone 5·0 „ 8·0
Limestone 5·0 „ 12·0
Mean of all France 10·63

It will be seen by the above table how different are the results obtained from
materials of the same character.
Breaking stone for the purpose of using it as a road metal was, until comparatively
recent years, always effected by hand; now, as in other cases, machinery has stept in and
somewhat supplanted manual labour. Hand-broken road metal, however, still finds
favour with road surveyors; it is better broken, and in some districts, the occupation
finds employment for persons who otherwise would be thrown on the rates for support.
In breaking stone by hand the breaker sits and strikes the stone with a small cast-steel
chisel-faced hammer, weighing about one pound, at the end of a long, straight-grained
but flexible ash stick.[33] The breaker also has another hammer, weighing about five
pounds, with which he reduces the size of the large stones before breaking them into the
proper size for road metal. This latter size is often a matter of choice, some engineers
preferring it to be broken so small as will pass through a ring of only 1¹⁄₂ inch in
diameter; others are content with 3 inches, especially where the roads are steam rolled.
An old method of gauging used to be “such a size as the stone breaker could put in his
mouth,” but this was unsatisfactory to all persons concerned, and “to pass all ways
through a ring of 2¹⁄₂ inches internal diameter” is now the size most generally adopted.
Mr. Codrington says[34] “a good stone breaker will break 2 cubic yards of hard
limestone to the ordinary gauge in a day, and some men will break more. Hard silicious
stones and igneous rocks can only be broken at the rate of 1¹⁄₂ or of 1 cube yard per day;
of some of the toughest, such as Guernsey granite, a man can only break on an average
half a cube yard per day. River gravel, field stones, or flints, which are already of a
small size, can be broken at the rate of 3 or 4 cube yards per day.”
This may be taken as fairly representing a day’s work, the price for breaking however
must vary considerably in different localities on account of the variety of the stones to
be broken and the value of labour; in some districts the road metal does not cost more

Page 61

than 1s. per cube yard, in others 2s. 6d. and 2s. 8d. is not considered too high, and it was
to meet and reduce this great expense that steam stone-breaking machines have been
introduced. These machines are known as “Ellison’s,” “Newall and Archer’s,”
“Hope’s,” and “Blake’s,” the latter being that which is best known and most generally
used in this country.

“ARCHER’S” STONE BREAKER.

“BLAKE’S” STONE BREAKER.

Page 62

“NEWALL AND ARCHER’S” STONE BREAKER.

The foregoing illustrations will give a general idea of the manner in which the stone
is broken or crushed between strong iron jaws; in all cases a revolving perforated screen
is necessary (not shown in the drawings) to separate the stone broken to proper gauge
from that which is too large, and also from the spalls or chippings.
The Blake’s or “Blake Marsden’s” machines are of various sizes and weights; the
following particulars with respect to them, as advertised, may be of use.[35]

Total weight
Approxi- of machine
Size of machine
mate with wheels,
at mouth, Nominal
quantity axles, horse Price of[36]
showing what horse-
of road shafts, machine
size of stone power
metal automatic complete.
each machine required.
broken screening
will take.
per hour. apparatus,
etc.
inches. cube yards. H.P. tons cwt. qrs. £ s. d.
10 × 8 3¹⁄₃ 3 5 6 0 157 0 0
12 × 8 4 3 5 11 0 167 0 0
15 × 8 5 5 6 19 0 200 0 0
15 × 10 6 6 8 5 0 220 0 0
20 × 10 8 8 10 2 0 265 0 0
24 × 13 12 10 15 5 0 390 0 0
24 × 17 13 14 16 2 0 415 0 0
24 × 19 14 16 19 17 0 440 0 0
30 × 13 14 16 16 2 0 440 0 0

Mr. Till, the Borough Engineer of Birmingham, speaking of the work done by one of
Blake’s machines in 1874, says:[37] “The stone-breaking machine at Holliday Street will
break on an average 40 tons of ragstone per day, at a cost, exclusive of wear and tear of
machine, of 10¹⁄₂d. per ton, but it produces 16 per cent. of dust or fine stone; of the
remainder one-fifth has to be rebroken by hand, the whole is very irregular in size and
very flaky in comparison with hand-broken stone. The machine is much more efficient

Page 63

in breaking granites or pebbles. It has, however, been found very useful during the last
two years, in consequence of the difficulty of obtaining labour.”
Mr. Jacob, the Borough Engineer of Barrow in Furness, read an excellent paper on
the subject of stone-breaking machinery to the members of the Association of Municipal
and Sanitary Engineers, at their meeting in Manchester in 1875,[38] giving a full
description of one of Blake’s machines, to which I will refer my readers.
Mr. Codrington[39] gives the result of breaking whinstone in a 16-inch by 9-inch
Hope machine, from which it appears that the total cost, including wages, coal, oil,
cottonwaste, etc., wear and tear of machinery, and, I presume, interest on first cost of
machine, was about 1s. per cube yard. This effected a saving of 10d. per cube yard as
compared with the same stone broken by hand, and the machine broke 40 tons of stone
per diem.
To make a stone-breaking machine pay, it is necessary:
(1.) To give it nearly constant work.
(2.) That the stone to be broken shall be too tough to break economically by hand.
(3.) That the machine shall be at the quarry, so as to save the expense of much
handling.
(4.) To exercise care in feeding, to give it a sufficient supply without allowing an
undue quantity of stone to pass in at one time.
(5.) As about 20 per cent. of grit or dust is produced, this must be used for foot-paths,
or as a binding material for roads, or in asphalte or tar paving.
In addition to the grit which is produced, a great many long and thin pieces of stone
pass through the machine, which have to be again broken by it before they could be
used as road metal; and having once taken this form, they will frequently pass several
times through the machine before they get properly broken.
The wear and tear of a stone-breaking machine is very considerable, as can be easily
imagined; it has been known to reach as high as 62·5 per cent.[40] of the first cost of the
machine in one year. The objections to stone-breaking by machinery are principally:
(1.) In some districts labour can be successfully employed in this manner.
(2.) Hand-broken stone is sharper in fracture, as it is done by a blow and not by
gradual pressure, whereas machine-broken stone is often flaky or with rounded edges,
and frequently each stone may be cracked and shaken by the pressure.
(3.) Want of uniformity in the size of the stones.
The smaller the stone is broken the heavier a cubic yard of it will weigh, as the
percentage of vacant space between each stone will be less. It has been found by
experiment, however, that 55 per cent. of ordinary road metal is solid, so that the weight
of a cubic yard of it can easily be ascertained in the following manner.[41]
Multiply the weight of a cubic foot of any stone by 27 to bring it to a cubic yard, and
then multiply this by 0·55: the result will be the weight of a cubic yard of the same
stone when broken for metalling.
A cubic yard of Guernsey granite broken to pass through a 2¹⁄₂ inch ring has been
weighed, and gives an average of 1 ton 3 cwt. 2 qrs.

Page 64

tons cwt. qrs.
A cube yard of flint weighed 1 1 3
„ „ pit gravel weighed 1 4 3
„ „ limestone weighed 1 3 0

A cubic yard of ordinary broken road metal will, when properly spread, cover an area
of about 30 square yards of surface of a roadway.
The following specimen specification for the supply of stone either unbroken or
broken may be of use.

Specification for the Supply of Road Metal.

(1.) The road metal must at all times be clean and free from clay or other dirt, and
fully equal to the sample; if required to be broken, each cube must have a square face
and sharp edges, and pass all ways through a 2¹⁄₂ inch ring.
(2.) The metal must be delivered in (name of town) free of all charge to the
corporation, either at a railway station or at one of the depôts of the corporation, at the
option of the contractor, such option to be declared in the tender.
(3.) The metal must be supplied on the order of the borough engineer in such
quantities as he may specify, and must be delivered within the time specified in the
order. The contractor shall not be required to supply and deliver more than tons in any
one week; but the corporation will be at all times ready to take the metal in larger
quantities.
(4.) The bill of lading or railway invoice shall be taken as primâ facie evidence of the
weight of metal supplied; but the corporation retain the right to test the accuracy of such
bill of lading or railway invoice, by passing the metal over a weighbridge as it is
received.
(5.) Metal delivered at a depôt by carts shall be measured when broken and paid for at
the rate of cwt. per cubic yard.
(6.) The corporation retain the right to reject all metal which shall not be equal to the
sample, or at their option to pay a reduced price according to its value.
(7.) Quarterly payments will be made by the corporation on the certificate of the
borough engineer, and within one month from the date of such certificate.
(8.) The borough engineer shall be the sole judge as to the fitness of the metal
supplied, and his certificate, in writing, shall be conclusive evidence upon the point as
between the corporation and the contractor.
(9.) If the contractor shall make default in the supply and delivery of road metal in
accordance with the terms of this specification, and within the time specified for the
purpose in the order of the borough engineer, the corporation shall be at liberty to obtain
such road metal as they may deem fit and necessary from another source, and any
excess in price or other loss they may consequently incur, shall be recoverable by them
from the contractor as liquidated and ascertained damages.
(10.) Tenders must be sent in only on the prescribed form, and the person tendering
must insert in his tender the name of two persons who will join him in a joint and

Page 65

several bond to the corporation in the sum of l. for the due performance of the contract.
(11.) Each person tendering must send to the office of the borough engineer a sample
of the road metal he offers, accompanied by a full description, and the name and
position of the quarry from which it is produced; such sample to be not less that one
cwt. in weight, and to be retained by the corporation in the event of the tender being
accepted.
(12.) The corporation do not bind themselves to accept the lowest or any tender; and
they further retain the right to reject a contractor in the event of his failing to find
sureties to their satisfaction in compliance with the 10th condition.
(13.) The word “corporation” shall mean the mayor, aldermen and burgesses, of
in their capacity as the urban sanitary authority for . The word “contractor” shall
mean the person whose tender is accepted, and who has signed these conditions; and the
words “borough engineer” shall mean the engineer to the said corporation for the time
being.
Since writing this chapter my attention has been directed to a stone-breaking machine
which is said to substitute a “knapping” for that of the usual crushing motion which is
so generally the great defect in these machines: I allude to that known as “Baxter’s
patent knapping-motion stone breaker,” by which a rapid jerk or blow is given instead
of the slow crushing movement, thus (it is contended) causing less waste from dust and
chippings, and also less strain of the machinery and less power to drive it.

[26] Toughness is not all that is required. Leather would be very difficult to break with a hammer, but it
would not make a good road metal.
[27] I have tried this experiment, but without success, except on such soft stones as were evidently
unfitted for use as a road metal.
[28] Many hundreds of miles of roadways in this country are made with limestones; they often make an
excellent surface, as they possess a considerable power of binding together, but weather and very heavy
traffic affect them considerably: as they all have a strong affinity for water, their very power of thus
cementing themselves together causes a quantity of dust in dry, and mud in wet weather.
[29] A flinty or quartzose stone seems to harden with exposure. This is notably the case in pebbles; old
pebble paving taken up and broken makes a most hard and durable road metal.
[30] ‘Roads, Streets and Pavements,’ by Q. A. Gillmore, p. 10.
[31] Ibid.
[32] Vide ‘The Maintenance of Macadamised Roadways,’ by Thomas Codrington, p. 33, a most
excellent work upon this subject.
[33] Mr. W. Bold considered a hammer weighing 1¹⁄₄ lb. of an elliptical form, pointed at the ends, the
area of each end being about ¹⁄₁₀₀th of a square inch, to be the most suitable to break hard stones. Vide
‘Minutes of Proceedings, Institution of Civil Engineers,’ vol. i. (1840) p. 50.
[34] ‘The Maintenance of Macadamised Roads,’ by Thomas Codrington, p. 38.
[35, 36] No doubt the price of the machine varies with the price of iron, etc.
[37] Vide ‘Report of the Borough Surveyor of Birmingham to the Paving and Street Improvement Sub-
Committee,’ p. 11.
[38] Vide ‘Proceedings of the Association of Municipal and Sanitary Engineers,’ vol. ii. p. 76.
[39] Vide ‘The Maintenance of Macadamised Roadways,’ by Thomas Codrington, p. 41.
[40] Vide ‘Proceedings of the Association of Municipal and Sanitary Engineers,’ vol. ii. p. 82.
[41] Vide ‘The Maintenance of Macadamised Roadways,’ by Thomas Codrington, p. 45.

Page 66

Page 67

CHAPTER VII.
ROAD ROLLING.

The march of civilisation has decided that road rolling is a necessity for macadamised
roads, instead of allowing the stones of which they are composed to be worn in by the
traffic, as was formerly the custom. In Calcutta bullock rollers were used so long ago as
the year 1855, and it was the cruelty of this operation that suggested to Mr. W. Clark the
necessity for a steam roller,[42] the outcome of which was the well-known roller as
manufactured and supplied by Messrs. Aveling and Porter of Rochester, and now so
generally used throughout this country, as well as in American and other foreign towns.
[43]
Steam rolling saves money as well as suffering, and the legislature have recognised
the importance of a sanitary authority becoming possessed of a steam roller by
permitting money to be borrowed for the purchase of a roller as for a permanent work.
(Sect. 234 Glenn’s Public Health Act 1875, footnote to Sub. Sect. (1).)
Mr. Albert W. Parry, the Borough Surveyor of Reading, has prepared some tables on
the subject of steam road rollers, from information he received on this subject, in answer
to some questions he addressed to the surveyors of a number of towns a few years ago.
It appears from this tabulated statement that thirty-three 15-ton steam rollers were in
use, six 10-ton rollers, one 21-ton roller, one 8-ton roller, one 9¹⁄₂ ton roller, one 14¹⁄₂-
ton roller, one 17-ton roller, and one 25-ton roller; this latter not being much used, as it
was found to be too heavy.
The average gross cost per annum of necessary repairs to the rollers, other than those
which could be effected by the men in charge of it, amounted to 35l. 12s. The number of
men employed to attend to the roller and cost of labour per day varied considerably,
from one case (South Shields) where “one engine-man at 26s. per week, and an old
scavenger with the flag” were found to be sufficient; to another (Gloucester) where the
cost per day is stated as follows: “one man works the engine at 5s. per day, one boy with
signal flag, 1s. 8d., two men spreading gravel or sand at 3s., two men watering and
sweeping to keep water from running off in channels.”
Some of the older rollers require a steersman as well as a driver, and the Locomotives
Amendment Act requires two men with flags, but this is seldom really necessary. The
sweepers, spreaders and sprinklers should be taken as irrespective of the actual cost of
the roller, which may therefore be assumed to be the wages of the engine-man, say 5s.
per diem, and a boy or old man with a flag at 2s., thus making a total for labour of 7s.
per diem.

Page 68

The fuel that is consumed by a 15-ton roller seems to be from 3 to 5 cwt. of coke per
diem, common gas coke being generally used, though steam coal would no doubt
answer equally well, some of the smokeless Welsh descriptions being of course
necessary.
With regard to the question “When not used for rolling roads, to what other use (if
any) do you put the engine power?” there are not many towns that use the machine for
any other purpose than rolling, but the following uses may be enumerated to which the
machines have been applied:—Driving a stone-breaker, a mortar-mill, a saw-bench, a
chaff-cutting machine, a bean-crusher, etc. It has also been used in connection with
pumping, and to produce the necessary power for the electric light, and it is frequently
employed as a traction engine.
The driving rollers usually have provision by which spikes may be fitted into holes in
their faces, in order that they may be used for lifting or chequering roads. These,
however, apparently do not answer; the working of a machine in this manner is said to
shake and strain it considerably, and the holes in the rollers, which are plugged with
wood when not in use, are objectionable, as these plugs wear out and the road metal gets
into the holes, and the surface of the road is picked up as the rolling proceeds; besides
this, the spikes seem to have no effect unless the surface of the roadway being operated
upon is soft.
With reference to the use of binding material, the most commonly used and that
which receives most favour is road grit or scrapings,[44] sharp sand is also employed, as
well as gravel if clean, and also stone chippings and screenings; these should be of the
same material of which the road is made, if possible, and no doubt newly constructed
roads require more care in the binding material than simple repairs. The steepest
gradient upon which a roller will act appears to be 1 in 9 in Blackburn, with a 15-ton
roller, but this must require a very heavy pressure of steam, and 1 in 14 seems to be a
gradient that gives no trouble to roll either up or down; in going down hill, of course it
is a mere question of sufficient break power.
The number of superficial yards rolled per day must vary extremely with
circumstances: the class of material, the amount of binding and water used, the gradient
and pressure of steam maintained, and the amount of rolling considered necessary,[45]
being amongst the various influences. From the above returns I find that the number of
square yards rolled varies from 500 to 3000 per diem, the average for 42 towns being
1105 square yards per diem.
The cost per square yard rolled, including all charges, may be assumed to be between
¹⁄₂d. and 1d., and the cost of binding material about 3d. per square yard. With reference
to the necessity of binding material, the following, facts are interesting.
Mr. Wm. H. Grant, Superintending Engineer of the New York Central Park, in his
report upon the park roads, says:[46] “At the commencement of the macadam roads, the
experiment was tried of rolling and compacting the stone by a strict adherence to
Macadam’s theory, that of carefully excluding all dirt and foreign material from the
stones, and trusting to the action of the roller and the travel of teams to accomplish the
work of consolidation. The bottom layer of stone was sufficiently compacted in this way

Page 69

to form and retain, under the action of the rollers (after the compression had reached
about its practical limit) an even and regular surface; but the top layer, with the use of
the heavy roller loaded to its greatest capacity, it was found impracticable to solidify
and reduce to such a surface as would prevent the stones from loosening and being
displaced by the action of waggon-wheels and horses’ feet. No amount of rolling was
sufficient to produce a thorough binding effect upon the stones or to cause such a
mechanical union and adjustment of their sides and angles together, as to enable them
mutually to assist each other in resisting displacement. The rolling was persisted in with
the roller adjusted to different weights up to the maximum load (12 tons) until it was
apparent that the opposite effect from that intended was being produced. The stones
became rounded by the excessive attrition they were subjected to, their more angular
parts wearing away, and the weaker and smaller ones being crushed.”
“The experiment was not pushed beyond this point. It was conclusively shown, that
broken stones of the ordinary sizes, and of the very best quality for wear and durability,
with the greatest care and attention to all the necessary conditions of rolling and
compression, would not consolidate in the effectual manner required for the surface of a
road while entirely isolated from and independent of other substances. The utmost
efforts to compress and solidify them while in this condition after a certain limit had
been reached, were unavailing.”
From the foregoing it is very evident that some description of binding material is
essential in making a road under a roller. Where traffic is allowed to consolidate a road
it is different, as then the stones are knocked about and are sufficiently abraded against
each other to form a binding material for themselves. Too much binding material or too
much water should not be used in forming a road with a steam roller. It is unfortunately
frequently the case that a road is made quickly only to go to pieces with the traffic in a
few weeks. The surface of a well-constructed macadamised roadway should after being
rolled look almost like an encaustic pavement. If there is too much binding material in
the joints of the stones, the first heavy rain washes it out and the surface of the roadway
quickly goes to pieces.
The following description of the manner in which it is recommended that the roller
should be applied is taken from an excellent little pamphlet on Steam Road Rolling, by
Messrs. Aveling and Porter, the well-known makers of steam-rollers, and although local
circumstances must guide the surveyor in all his works, the particulars may be of use:—
“In the best practice the roadway is excavated, graded, and properly formed to a
depth of 14 inches from the level of the gutters, with a cross section conforming to the
cross section of the road when finished; it is then thoroughly and repeatedly rolled with
the steam roller, all depressions being carefully filled and rolled before the stone is put
on. On the bed thus formed and consolidated a layer of stones 8 inches thick is set by
hand, and rammed or settled to place by sledge hammers, all irregularities of surface
being broken off and the interstices wedged with pieces of stone. The intermediate layer
of broken stone, of a size not exceeding 3 inches in diameter, is then evenly spread to a
depth of 4 inches and thoroughly rolled, and this is followed by rolling in half-an-inch
of sand. The surface layer of stone, broken to a size not larger than 2 inches diameter,

Page 70

and to a form as nearly cubical as possible, is then put on to a depth of 3 inches,
thoroughly rolled, and followed as before by sand, also rolled. Finally, a binding
composed of clean, sharp sand is then applied, well watered and most thoroughly rolled
with the steam roller, until the surface becomes firm, compact and smooth, the
superfluous binding material being swept off and removed.”
And the following account of the method adopted in the United States at Hartford
may also be of interest.[47]
“The surface of the road is excavated to a suitable depth—say, 18 inches; preparing
the form for the pavement with the precautions as for a common pavement; 4 inches of
gravel and proper drainage where required, provided blocks of stone of any irregular
shape are selected for the pavement, of about 7 inches in thickness. The blocks are set
by hand with great care, as closely in contact at their base as practicable. The surface
between the blocks is filled with chippings of stone carefully laid in. A layer of broken
stone, 4 inches thick, is laid over this pavement. The road-covering thus prepared should
be rolled with the steam roller until the upper layer has become perfectly compact and
consolidated. The second layer, about 3 inches in depth, is then laid on; a coating of
clean coarse gravel, 1¹⁄₂ inch thick, termed ‘binding,’ is spread over the surface, and the
whole well rolled as before, and you have the requisites of a good road—viz., clean,
hard, and even at all seasons. No road should be considered made until it is completely
rolled. A road made in the manner above described, and kept perfectly clean, hard, and
even, with materials of a good tough quality, would show extremely little wear on the
surface; indeed, it has been found in France to be less than ¹⁄₂ an inch in a year, on a
road of great traffic.”
In the neighbourhood of New York the steam roller is used as follows:—
Two and a half inches of trap rock is laid and lightly rolled until the stones have
become a little compacted, then coarse screenings are added, and it is again rolled; after
this a layer of about 2 inches of stones are added and rolled with coarse screenings as
before. Fine screenings or stone dust is then applied, and the roadway is then rolled until
every interstice is filled up; it is then well watered and again rolled.
With reference to the employment of the steam roller in repairs of roads, the
following description is given of the method adopted by the Surveyor to the Tottenham
Local Board, near London.[48]
“When a road becomes so full of holes or so worn as to require coating throughout its
entire length and width, it should be hacked completely over and raked into a segmental
form in its transverse section to remove irregularities, and so that the road may have a
fall from the crown to the channel of not less than one inch to a yard. It should then be
coated with stone broken as nearly cubical as possible and to an uniform gauge. When
spread it should be slightly coated with gravel screenings, or the grit sweepings from the
roads, which are equally suitable for the purpose when in proper condition. The road
should then be watered and rolled, beginning with the road at the channels, and ending
at the crown of the road, until a smooth surface is obtained, more stones being added to
fill up any inequalities that may exist, until the whole is consolidated. By constantly

Page 71

sweeping the grit from the sides to the crown of the road as the roller passes over, every
stone is thoroughly grouted into its bed.”
Mr. R. Read, the Surveyor of Gloucester, says:[49] “The road should be thoroughly
well lifted and the metalling spread in three-inch layers evenly, and rolled once or twice
before the gravel or other binding material is spread; then spread gravel or sand evenly
and well watered with fine distributor until the stone is entirely covered, and the sand
does not adhere to the roller. Dam up the road channels to prevent water and sand
running off into sewers and let men scoop up the water, and throw it back on the road,
as it collects in the gutters.”
In all cases the sides should be rolled first to such a degree of firmness that when the
roller passes over the centre or crown of road, its weight, which tends to spread the
metal or make it work off towards the sides, may be resisted by their consolidation.
With reference to the effect of the weight of steam road rollers upon roadways, it may
be well here to compare that of a 15-ton roller with other burdens that a road has to bear,
taking each case at per inch of width of tire.
An ordinary loaded two-wheeled cart presses with a weight of about 9 cwt. per inch
width of tire, a loaded wagon about 7¹⁄₂ cwt., a 9-ton traction engine about 3³⁄₄ cwt., and
a 15-ton steam road roller about 3¹⁄₂ cwt. So that as far as the surface of the roadway is
concerned, a roller affects it the least of any of the above loads.
It has, however, been found that where rollers of more weight than 15 tons are used,
[50] not only are they unwieldy, but, from their great weight, the solidity of the
foundation of the roadway may be interfered with, and also there is great danger of
damaging gas or water mains and services, besides any cellars that may be constructed
under the roadway.
The steam rollers which are principally used in this country, are those manufactured
by Messrs. Aveling and Porter, and those by Messrs. Green and Sons, drawings of both
of which are here represented.

Page 72

MESSRS. AVELING AND PORTER’S 15-TON STEAM ROAD ROLLER.

Page 73

MESSRS. GREEN AND SON’S 15-TON STEAM ROAD ROLLER AND TRACTION ENGINE COMBINED.

In Paris the Gellerat steam roller is used, and another is also known, which is
manufactured by Messrs. Morland and Sons.
A 15-ton steam roller costs about 650l. in the first place, the cost of working it &c.,
has been given in the early pages of this chapter.
The advantages of steam road rolling may be summed up as follows:—
(1.) The saving of wear and tear to vehicles and horses. Roads should be made for the
traffic, and not by it.[51]
(2.) Economy; as it is said that a saving of from 30 to 50 per cent. is effected by
reason of the roads being better made thus obviating the necessity for such frequent
sweeping and scraping.
(3.) The roads can be made or repaired at any season of the year.
(4.) The avoidance of cruelty to horses, cattle, and sheep, as in the case of newly
metalled unrolled roads.
(5.) A saving of road metal. (a) Because it need not be broken so small. (b) Because
there are no loose stones to be kicked about and lost. (c) Because there is no abrasion of
the stones, only one surface of the stone being exposed. (d) Because no ruts can be
formed in which water can lie to rot the stone. (e) Because a thinner coating of metal
can be employed.
(6.) The roller can be advantageously used for other purposes.

Page 74

(7.) Rolled streets have a better appearance, they are easier of traffic as having more
evenness of surface and superior hardness, and it is contended that if steam rollers were
more general there would not be such an outcry for other descriptions of pavement for
roadways.
(8.) The steam roller soon finds out the good from the bad metal for roads, it is also
contended that it also does this with respect to the gas and water mains, the latter,
however may be looked upon as a rather doubtful advantage.
(9.) The avoidance of the necessity of the continued employment of men raking the
metal into the ruts.
In Mr. Paget’s valuable little pamphlet upon the subject of steam rolling[52] may be
found the following remarks:—
“One of the main advantages attending the rolling of roads by steam-power, consists
in the diminished proportion of mud or soluble matter which is then incorporated in the
structure of the road surface. If the surface of an ordinary road that has not been rolled is
broken up and the material washed, it is found that as much as half of it is soluble
matter, mud, dirt, and very fine sand; the stones, having only been thrown loosely upon
the road, have lain so long before becoming consolidated by the traffic, and have
undergone in the meantime such extensive abrasion that the proportion of mud, dirt, and
pulverised material in the metalling is increased to that extent, and the stones are really
only stuck together by the mud. This accounts for the fact that although an unrolled
macadamised road may indeed, after long use, have a surface that is pretty good and
hard in dry weather, and may offer then a very slight resistance to traction, yet it will
quickly become soft and muddy when there is any rain. By the employment, however,
of a steam roller upon the newly-laid metalling of a macadamised road the stones are
rolled in and well bedded at once, and the surface is thus consolidated into a sort of
stone felt, capable of resisting most effectually the action of ordinary traffic, and
containing the smallest quantity of soluble matter to form mud in wet weather.”
Having given the advantages of steam road rolling, I will now proceed to give the
disadvantages.
(1.) The first cost; this to a small borough or town is often the great stumbling block.
It is a pity that two or three of them could not join, and procure one between them at
joint cost, thus avoiding the individually heavy burden.
(2.) The risk of damage to gas and water mains and services; or even of cellars under
the streets in some of the older towns.
(3.) The interference to traffic whilst the roller is at work; the result is generally
unsatisfactory if, to avoid this, the machine is worked during the night.
(4.) The noise and smoke.
(5.) The risk of frightening horses.
(6.) If too heavy a roller is used, the foundation of the roadway may be injured or the
metal may be crushed instead of bedded.
(7.) The necessity of using so much binding material and water.
Before closing this chapter it will be necessary to say a few words upon rollers drawn
by horses.

Page 75

These are always unsatisfactory: they are expensive to use, as a large team of horses
and a number of attendants are necessary; they are difficult to turn, and the horses’ feet
displace almost as many stones as the roller compresses into their beds.
They cannot be of greater weight than 10 tons, even when on the hydrostatic
principle, and they are clumsy and difficult of manipulation.
If a roller is to be used at all, let it be a steam road roller of the most modern
description, and of the best manufacture.

[42] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. lviii. p. 95. (The first
steam roller was made in the year 1864.)
[43] The first steam roller used in England was, I believe, in the year 1872; in Paris about 1864.
[44] This should be collected and “weathered” so as to get rid of mud and any organic matter in it.
[45] In Paris 3 to 3·75 ton miles of roller are applied to every cubic yard of metal; in America 5 ton
miles are thought necessary.
[46] Vide ‘Roads, Streets, and Pavements,’ by Q. A. Gillmore, p. 89.
[47] Vide Aveling and Porter’s pamphlet on ‘Steam Road Rolling,’ p. 32.
[48] Vide Aveling and Porter’s pamphlet on ‘Steam Road Rolling,’ p. 33.
[49] Vide ‘The Use of Steam Rollers,’ by A. W. Parry, Reading.
[50] Some road surveyors contend that for gravelled roads 6-ton rollers are heavy enough, for
macadam roads 12-ton rollers.
[51] Traffic in making a roadway is apt to grind off the sharp edges and spoil the metal before it is set.
[52] ‘Report on the Economy of Road Maintenance and Horse Draught through Steam Rolling, with
special reference to the Metropolis,’ by Frederick A. Paget, C.E., etc. etc., London 1870, to which I refer
my readers for many scientific and useful facts upon this subject.

Page 76

CHAPTER VIII.
PITCHED PAVEMENTS.

It has been asserted that where a roadway has a traffic exceeding 1000 vehicles per
diem, that to maintain it as a macadamised roadway is not economical.[53] However that
may be, it is unquestionable that for very heavy traffic blocks of hammer-dressed stone,
laid upon a concrete or hard gravel bed, have been in use for a great number of years,
and indeed the Romans, who were great road makers, introduced the system (the
Archaic, as it is sometimes called) into this country more than 2000 years ago; the size
of the paving stones was, however, much larger than modern science finds necessary.
There is no doubt that a roadway paved with granite or whinstone setts, upon a hard
concrete foundation, presents a most enduring pavement, costing but a few pence per
annum in repairs[54] and cleansing, and in other respects it answers nearly all the
requirements of traffic except in two very important particulars—it becomes very
greasy and slippery under certain conditions of the weather after having been laid any
time, and it is an intolerable nuisance in any great thoroughfare, from the incessant din
and clatter arising from the wheels of vehicles and the iron shoes of the horses striking
upon it; so great is the noise in some thoroughfares thus paved, that tradesmen are
compelled to keep their doors and windows tightly closed in order that they may be able
to conduct their business, and it is known to injuriously affect the nerves and health of
persons who are obliged to live in the vicinity of such streets. It is a bad pavement too
for horses to travel upon, the jar upon the legs of the unfortunate animals soon telling
upon them.
Great improvements, however, have in recent years been introduced to correct these
faults. The setts are now made very narrow, about 3 inches in width, or 4 setts to 14
inches including the joints: this gives a better foothold for the horse, the hoof having but
a little way to slip before being arrested by a joint; it also lessens the noise, and helps
besides to prevent the edges of the stones becoming worn or the pavement wearing
unevenly.
Running the joints with an asphaltic composition instead of ordinary grouting has
also materially conduced to deaden the noise.
Taking the question of cost into account—and cost of this description of paving, be it
remembered, is considerably affected by weight, when carriage of the stone has to be
considered—the following sizes of stones may be taken as satisfactory.[55]

Depth 6 to 8 inches
Width 2¹⁄₂ „ 3 „

Page 77

Length 5 „ 9 „

The following table,[56] showing the number of square yards that 1 ton in weight of
different sizes of granite setts will cover, may be of use, but this must vary with the
specific gravity of the stone employed.

Depth. Width. Square yards.
5 inches × 3 inches covers 4¹⁄₃
6 „ × 3 „ „ 3²⁄₅
4 „ × 4 „ „ 5¹⁄₃
7 „ × 3 „ „ 3

The question of the best class of stones to employ as a paving material must to a great
measure depend upon local circumstances, but it is important to select such stones as are
very hard and durable, but which will not wear smooth and slippery nor round by reason
of the chipping off of their edges.
Nearly all granites are suitable for this work, but Carnarvonshire syenite[57] is said to
be the best material that can be used, although, being denser than granite, it is heavier
and consequently more expensive.
At one time large quantities of paving stones were used in London and Liverpool
which were brought from Bombay and China, as ballast for ships trading between those
ports.
Mount Sorrel from Leicestershire and the Welsh stones are said to wear slippery[58] as
well as porphyry, whereas the presence of felspar in the granite always keeps it rough
under traffic.
Of the granites, that from Dalbeattie in Scotland is said to be the best.
The table on the next page, prepared by Mr. Walker in 1831, showing the wear of
different stones, may be of interest.

Table showing the Result of Experiments made by Mr. Walker
on the wear of Stones in 1830-31, a period of 17 Months.

Loss Loss
Super-
of per
Name of ficial Original Relative
weight super-
stone. area weight. losses.
by ficial
in feet.
wear. foot.
cwt. qrs. lbs.
Guernsey 4·734 7 1 12·75 4·50 0·951 1·000
Herm 5·250 7 3 24·25 5·50 1·048 1·102
Budle 6·336 9 0 15·75 7·75 1·223 1·286
Peterhead (blue) 3·484 4 1 7·50 6·25 1·795 1·887
Heytor 4·313 6 0 15·25 8·25 1·915 2·014
Aberdeen (red) 5·375 7 2 11·50 11·50 2·139 2·249
Dartmoor 4·500 6 2 25·0 12·50 2·778 2·921
Aberdeen (blue) 4·823 6 2 16·0 14·75 3·058 3·216

Page 78

The Aberdeen granite as at present laid in the City of London, 3 inches wide by 9
inches in depth, has a life of about 15 years.[59] In the City of Durham whinstone setts
of the same width last 17 or 18 years, in Manchester similar granite setts last 15 to 20
years. On this subject Mr. Deacon, the then Borough Engineer of Liverpool, has
collected some most valuable information, and I refer my readers to a paper read by him
before the Institution of Civil Engineers in 1879,[60] for a great deal of useful
information on this and other subjects connected with roadways.
Various methods have been adopted for constructing granite paved streets, some of
which I will proceed to describe.
One of the first really good granite pavements introduced into London was that
known as the “Euston Pavement,” and it was constructed in the following manner: The
foundation was shaped to the intended surface of the finished roadway; upon this a layer
of coarse gravel was spread 4 inches in thickness, this was well rammed,[61] and upon it
was spread 4 inches of gravel mixed with a small quantity of chalk to bind it; this again
being well rammed, upon it was placed a similar layer only composed of finer gravel,
and upon this foundation the stones were placed, being bedded upon about an inch of
fine sand. The stones used were Mount Sorrel granite, which were hammer-dressed and
squared, 3 inches in width by 4 inches in depth; they were set close together at right
angles with the lines of the kerb, they were then thoroughly rammed by the pavior. The
whole surface was afterwards covered with screened gravel which was allowed to find
its way into the joints and thus steady the entire pavement.
The following section will explain this.

In many cases the foundation is simply formed by shaping the soil to the required
contour, and covering this with 3 or 4 inches of gravel or cinders, which is afterwards
either rammed or consolidated by the traffic; upon this the setts are placed as closely as
possible, the joints are then filled with fine gravel well worked in with a “cramming
iron,” the whole surface being then covered with a grouting of lime and sand, which is
brushed into the joints with a stumpy broom.[62]

Page 79

In Leeds, Manchester, Salford, and many other important cities, I believe the
foundations are formed in the manner just described, but of greater depth, the grouting
also is a bituminous mixture, which I will presently describe, instead of the ordinary
lime grouting.
The paved streets of Manchester are proverbial for their excellence, which is
attributable to the manner in which the foundations of the streets are consolidated by the
traffic before any setts are placed on them; in many cases the old macadamised surface
of a street being utilised as a foundation, this process being almost identical with that
recommended by Sir Henry Parnell fifty years ago.[63]
Where the traffic is heavy, however, a firmer foundation even than this is necessary,
and up to the present time no better foundation has been introduced than that of good
Portland cement concrete. This should be at least 9 inches in thickness, and be
composed of one part of Portland cement, two parts of clean sharp river sand, and four
parts of clean river ballast, or broken stones, or other suitable material. The surface of
the concrete, after having been placed in position, should be smoothed over with the
shovel, so as to present the proper convexity and have an even surface for the granite
setts to be bedded upon.
Another description of foundation now very extensively used where the traffic is
heavy, is that known as “Bituminous Concrete,” which is made as follows:
The ground being excavated to the proper depth and contour, broken stone as for
macadam is spread for a depth of 6 or 9 inches; this is then levelled and thoroughly
rolled with a light roller, a boiling mixture of pitch and tar, or creosote oil is then poured
over the whole surface until every interstice is filled, when a thin layer of small broken
stone is spread upon it, and then well rolled until it consolidates.
It may be well to observe here that in all works involving concrete foundations and
paving in streets, the traffic should be entirely stopped if at all possible. Streets paved
half at a time are never quite satisfactory, and the concrete should have at least a week
to set before the pavement is placed upon it.
Upon a foundation of either Portland cement or bituminous concrete, the granite setts
themselves should be grouted with a bituminous mixture instead of cement or lime
grouting. This renders the pavement more impervious to moisture, makes it less noisy,
and adds considerably to its strength; the mode of applying it is nearly similar to that of
ordinary grouting. The setts are placed on about an inch of sand and well rammed, the
boiling mixture is then poured over the whole surface, which is then covered with a thin
coating of small, sharp gravel.
The following table of the proportions necessary for the bituminous mixture may here
be of use.

Proportions for Bituminous Mixture.[64]
Creo-
Pitch. Tar. Pitch. sote
oil.
For grouting in pavements 1 to 1 or 3 to 1
For foundations or lower layer of asphalte macadam 3 to 1 or 3¹⁄₂ to ¹⁄₂

Page 80

For upper layer of asphalte macadam and for foot paths 2¹⁄₂ to 1¹⁄₂ or 3¹⁄₄ to ³⁄₄

The objections to this method of paving are only temporary: the nuisance arising
from the fumes of the boiling mixture whilst it is being applied, and the necessity for
dry weather to make the operation successful. Healey’s Patent Pitch Boilers[65] are said
to moderate, if not entirely to do away with the former, and the latter can be arranged by
only doing the work at favourable seasons, or if the worst come to the worst, to cover
the work with tarpaulins raised on trestles.
Before closing this chapter I should like to draw attention to the question of provision
for wheel tracks, or tramways paved with stone, asphalte, or other hard material, and a
track for horses giving a firmer foot-hold, similar to those so highly spoken of in Milan
and other Italian cities. An excellent description is given of them by Mr. P. le Neve
Foster, Jun., in an appendix to a report on the Application of Science and Art to Street
Paving and Street Cleansing of the Metropolis (1872).
The roadway where stone tramways are employed cannot be of convex section; on
the contrary, it should be concave, with the channel, gutter, or water table in the centre.
This is in itself an obvious advantage, and I trust that the question of these tramways
may at some future date receive more attention from English engineers; the great
objection to them in this country being that the smooth tram-track would be very
slippery and apt to throw horses down when passing on and off, but they have many
advantages which should not be passed over without consideration.[66]

[53] Birmingham in 1854 had not, I believe, a single mile of paved streets; the principal ones are now
nearly all paved with granite setts, and over 20,000 square yards were so paved in 1880.
[54] It is said that the cost per annum per square yard of granite paved roadways is but 3d., whereas the
same cost for macadamised roadways under the same circumstances is 1s. 6d.
[55] In Paris after considerable research into the question, the engineers of the Ponts et Chausseés,
decided that the size of the paving stones, which used formerly to be 9 inches square should be 4 inches
wide by 6¹⁄₄ inches long by 6¹⁄₄ inches deep, the stone that is used being a grit sandstone, from the forest
of Fontainebleu.
[56] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. lviii. p. 66.
[57] Syenite is a hard, greenish-grey metamorphic rock, composed principally of silica, alumina, and
lime, in conjunction with magnesia, iron, etc. Its specific gravity is 2·96.
[58] Mr. Boyle, District Surveyor of Manchester, says: “I would caution you against the use of the old
blue Penmaenmawr stone as being an extremely slippery stone, and one which makes a dangerous
pavement.” Vide ‘Proceedings of the Association of Municipal and Sanitary Engineers,’ vol. iii. p. 58.
[59] The old granite paving of London used only to last eight years. Vide ‘Minutes of Proceedings of
the Institution of Civil Engineers,’ vol. ix. p. 222.
[60] Vide ‘Street Carriageway Pavements,’ by George Frederick Deacon, M. Inst. C.E., ‘Minutes of
Proceedings of the Institution of Civil Engineers,’ vol. lviii. p. 1 et seq.
[61] The pavior’s rammer is about 55 lb. in weight, with an iron ring at its foot; this is swung with
some dexterity between the legs, and is allowed to fall with great force upon the earth or stones it is in use
upon.
[62] The usual specifications for the Guidet paving blocks (in New York) require that they shall be of
granite, equal in hardness to the Quincy granite, of durable and uniform quality, each measuring not less
than 3¹⁄₂ nor more than 4¹⁄₂ inches in width on the upper surface or face, and not less than 10 nor more
than 15 inches in length, and not less than 8 nor more than 9 inches in depth. Blocks of 3¹⁄₂ inches in
width on the face to be not less than 3 inches in width at the base; all other blocks to measure on the base

Page 81

not more than 1 inch less in width or in length than on the face. The blocks are set upright in close contact
on their edges in courses, with the longest dimensions and the continuous joints running across the street,
breaking joints lengthwise of the street.
The ends of the blocks are dressed off so as to give close joints in the direction of the draught, while
the broad vertical sides of the blocks are left rugged or uneven, or with the split rock-face so that the
continuous joints running across the street are somewhat open. Vide ‘Roads, Streets, and Pavements’ by
Q. A. Gillmore, p. 157.
[63] Vide ‘A Treatise on Roads,’ by Sir Henry Parnell, p. 130.
[64] As these ingredients often vary very much in their constitution, the surveyor must use his
judgment to a great extent as to these proportions.
[65] These boilers are now much used for such purposes, they hold from 60 to 500 gallons and are light
and portable; the temper of the bituminous mixture also remains uniform whilst being drawn off, and
there is very little evaporation or waste arising from them.
[66] Since writing the above, the Liverpool and Manchester tram-road was designed I believe on this
principle.

Page 82

CHAPTER IX.
WOOD PAVING.

In the year 1843 Mr. Charles Cochrane, the President of the ‘Association for the
promotion of Improved Street Paving, etc.,’ in a paper which he read before the
Institution of Civil Engineers, on the State of the Streets of the Metropolis, said that
there existed at that date 100,000 yards of wood pavement.[67] He further states that it is
said to be slippery, but that he approves of it as the best material hitherto used, “both as
regards its general economy and durability as well as its facility of traction, and more
especially its extreme cleanliness.”
Two years previous to this date, Mr. Edward Lomas condemned wood pavement as
slippery, and recommended granite pavement for horses with wood tram-tracks for the
wheels of vehicles.[68]
Since these dates the question of wood paving has made giant strides, many
companies and private firms having started business as wood paviors, with many
various methods, which they strongly advocate as being superior to the others; amongst
them I will enumerate and describe the following:
The Improved Wood Pavement Company.—The ground being consolidated, a layer of
sand is made the basis of the pavement, and
assumes the shape the surface of the street is intended to take. Red-wood boards 1-inch
in thickness are then laid across the roadway, from kerb to kerb, placed together so as to
break joint; boards of the same material and thickness are then laid longitudinally, and
breaking joint in the same manner.[69] On this foundation red-wood blocks are placed in
rows, taking the same direction as the under flooring.
Between each row of blocks, a strip of wood ³⁄₄ × ³⁄₄ inch is nailed to the block and
flooring, the blocks in all cases breaking joint; the spaces thus formed between the rows
of blocks are then run with a thick composition which fills all vacant spaces there may
be between the strip and the block, covering the strip about ¹⁄₈ of an inch. Gravel, dried
and sifted through ³⁄₄-inch mesh, is then put in, solidly rammed, and composition poured
in; the pavement is then covered to a depth of ¹⁄₂ an inch with dried gravel and
composition for the purpose of indurating the surface, and filling the spaces flush with
the top of the block, a slight covering of sand is then spread, when the traffic may
immediately pass over.
The Asphaltic Wood Pavement Company.—After the ground is properly prepared, 6
or 9 inches of concrete is laid, on this is laid
a bed of asphalte not less than ¹⁄₂-inch in thickness; then wood blocks 3 by 8 by 5 inches
or 3 by 9 by 5 inches, of good, sound, yellow Baltic timber are laid with joints ¹⁄₂-inch

Page 83

in width, these joints are filled from 2 inches up with heated asphalte, the remaining 3
inches being filled with a grouting of hydraulic lime, and clean, sharp, fine river grit or
sand, the whole being covered with a top dressing of fine, sharp sand, which wears in
with the traffic.
Croskey’s Wood Pavement.—Upon a bed of concrete, cross grained planks were to be
placed side by side and be forced together by pressure so
as to form a compact homogeneous surface of wood.[70]
Lloyd’s Patent Keyed Wood Pavement.—The special feature of this system is that
Pitch Pine blocks are used laid direct upon the
concrete foundation, the blocks being grooved on each side so that the grouting
(composed of Portland cement) shall run in and form a key.
Harrison’s Wood Pavement.—This system consists of a concrete foundation, upon
which strips of wood 2 inches wide by ¹⁄₂ an inch in
thickness are laid. Upon these, wood blocks 3 inches in breadth are placed, and then hot
asphalte is poured into the joints, which conglomerates the whole.
Henson’s Wood Pavement.—The main feature of this patent consists in placing
common felt on the concrete bed, and between the joints of
the wood blocks; thus, it is contended, giving elasticity and allowing for the expansion
and contraction of the blocks. The blocks are also bevelled on the top and grooved in a
particular manner.
Carey’s Wood Pavement.—In this case the blocks are cut 4 inches wide by 9 inches
long, and 5 or 6 inches deep, according to the traffic; these
blocks are shaped with alternate convex and concave ends, and are laid on a bed of sand
about 2 inches thick, the joints between the blocks, which have been left about ³⁄₈ inch
wide, being filled with a grouting of lime and sand.
Messrs. Mowlem and Company’s method of laying wood paving is to form a
foundation of concrete, varying in thickness
according to the nature of the subsoil and the traffic; then to pave with blocks of yellow
deal, 3 inches wide and 6 or 7 inches deep; the joints, which vary from ³⁄₈ to ¹⁄₂ inch, are
filled in with sand and lias lime, and the surface is afterwards indurated by strewing it
with shingle.
Patent Ligno-Mineral Paving Company.—This company lays claim to the speciality
of using hard woods as well as pine, and that
the pine blocks they employ are preserved or mineralised so as to be more durable than
the wood in its natural state.[71]
Nicholson’s Wood Pavement.—This is principally in use in the United States, and
consists of rectangular blocks of pine laid upon a close
flooring of pine boards, 1 inch thick, laid lengthwise with the line of street, their ends
resting on similar boards laid transversely from kerb to kerb, the boards being
thoroughly tarred and laid upon a bed of sand. The joints of the wood blocks are run
with an asphaltic mixture, and the whole surface is finally covered with hot coal tar and
sprinkled with fine sand and gravel.
Stowe’s Wood Pavement.

Page 84

—This is also American, the blocks resting directly upon sand or gravel about 6 inches
in thickness.[72] “The blocks are set in courses transversely across the street, so as to
break joint lengthwise of the street, the courses being separated from each other 1 inch
by a continuous course of wooden wedges placed close together edge to edge, and
extending from kerb to kerb. These wedges are set in the first instance with their tops
flush with the top surface of the blocks. After the whole pavement shall have been well
rammed, so as to give each block a firm bed, the wedges are driven down about 3
inches, and the open joints thus formed above them between the courses are filled in
with a concrete composed of hot coal tar and fine roofing sand and gravel. The surface
of the pavement may then be coated with coal tar prepared by boiling with pitch, and
finished off with a thin layer of sand.”
Wood Paving in Norwich.—Mr. P. Marshall, the City Surveyor of Norwich, states[73]
that the wood pavement in that city is “simply laid on the
road formation levelled up with shingle. The blocks are grouted in with blue lias lime
and well rammed down. This makes a splendid road, and is superior to any portion of
the road that has been laid with concrete. This wood paving, 5 inches deep, laid as
described, costs 7s. per yard super. We have had some down here now for 2 years, and
have had no settlement whatever. It is a very important matter, for it makes wood paving
possible for country towns.”
Shiel’s Composite Block Paving.—This pavement consists of composite blocks 12
inches by 15 inches, cast in iron moulds with two
rows of wood placed at an equal distance from either side and each other, the vacant
spaces being filled with granite broken as for macadam; over all is poured a boiling
composition of pitch, chalk, and sand. The blocks are thus treated at the works, and are,
when cool, taken to the street, laid on a concrete foundation, and grouted with cement
grouting.
Prosser’s Wood Pavement.—This is composed of blocks sawn at an angle of 60°, the
grain of the wood running in the same direction. Each end
of the block rests on the other, transversely to line of street. Between the rows of blocks
a plank, the same depth as the blocks, but with the grain of the wood horizontal, is
placed. The blocks, which on one side of the plank lean in an opposite direction to those
on the other, are secured or dowelled together by wooden pins running through the
plank and piercing the blocks about an inch.
In Chicago, U.S.A., cedar blocks 6 inches square, set on a composition of tar and
gravel, are used, and are said to make a very durable pavement.
The following sanitary objections to wood as a material for pavements are made in
the Report on the Application of Science and Art to Street Paving and Street Cleansing
of the Metropolis (1872) page 17.
“The General Board of Health set aside wood as an ineligible material for this
amongst other reasons, that street surfaces ought to be impermeable; and for roads of
light traffic and cheap construction, they looked to modifications of macadam, with
bituminous binders of mineral tar. Since then wood has been reproduced for the
purpose, and strongly pressed in improved forms for trial. It certainly offers the

Page 85

advantage of a great gain in noiselessness over granite, more especially from the horses’
feet, though with some disadvantage from a dead rumble and vibration; and further it
has the advantage of being more available than smooth pavements for inclines. But
hygienists object to its use on grounds which, in the absence of sanitary science, are
overlooked, but which it is important to particularise as showing the dangerous state of
ignorance and incompetency of the authorities by whom they are not entertained or are
disregarded.”
The sum total of these charges against wood as a pavement consists in the following:
“Wood is porous, it is composed of bundles of fibres, it absorbs and retains wet, foul
wet especially.” Why foul wet should be absorbed more than ordinary wet does not
transpire.
There is no doubt that wood in its natural state does absorb a large quantity of water,
[74] but this can be avoided in wood paving by preserving the wood of which it is
composed by one of the following processes.

(1) Burnetising Chloride of zinc is used in this process.
(2) Kyanising Corrosive sublimate is used.
(3) Renwickising Boiling in coal tar.
(4) Boucherising Sulphate of copper is used.
(5) Bethelising Creosote heated to 200° F. is used.
(6) Seelyising Creosote is also used, the wood being first boiled.
(7) Hayfordising Creosote is also used, wood being unseasoned.

The fibres of the wood are also compressed, and no open joints between the blocks
are permitted, by paving the blocks transversely, with butt joints closely packed
together, and by filling the cross joints with an asphaltic or other impervious grouting.
Wood paving should, however, be laid in streets with moderate traffic, and plenty of
sun and air. In confined spaces such as courts, it soon rots and becomes a source of
much unhealthiness.[75]
Many reports have been from time to time made on the advantages and disadvantages
of wood paving, and much has been said and written upon the subject, so that I will only
touch upon some of the principal questions at issue.
The first of importance is that of durability, and although the life of a hard wood
constantly exposed to attrition is amazing, as may be seen on the stairs of the
Metropolitan Railway Stations, and in many cog wheels of old machinery, still some
diversity of opinion exists as to what may be fairly put down as the wear per annum of
the surface of a street paved with wood blocks.
It must be remembered that to arrive at any fixed ratio of wear, a standard of traffic
should be fixed; but this unfortunately has not hitherto been done, so that the results of
observations are bound to differ considerably. It must also not be lost sight of that the
reason of excessive wear in a wood pavement generally arises from wide joints being
the means of causing the edges of the blocks to abrade and become worn.
Mr. D. T. Hope, in a paper he laid before the Scottish Society of Arts, upon some
most careful investigations he had made on this subject, gives the wear as ¹⁄₈ of an inch

Page 86

in 18 months on blocks laid with vertical fibre, which he proved was the best manner of
laying them to ensure the longest life.
Mr. Deacon estimated the wear at from 1³⁄₈ inch to 2⁵⁄₁₆ inches per annum.[76]
Mr. Copland estimated the wear at ³⁄₁₆ of an inch per annum.[77]
Mr. Howorth estimates the life of wood paving at 25 years per inch of wood, if an
absolutely uniform quality of wood fibre could be assumed.[78]
Mr. Haywood says,[79] “Wood pavements with repairs have in this City (London) had
a life varying from 6 to 19 years, and that with repairs, an average life of about 10 years
may be obtained.”
The life of wood is no doubt extended by being preserved by one of the processes I
have enumerated, but as its life may be taken as an average of 8 to 10 years, and as the
blocks are bound to wear unevenly, they should be made as shallow as is consistent with
stability; as it is an undisputed fact that the foundation of a roadway is the important
carrier of the traffic, the surface material, of whatever it may be constructed, only acting
as a skin to preserve it. If the blocks are too thick, unnecessary capital is locked up.
Wood pavement was laid in Sunderland[80] in 1859 with strips of creosoted red pine,
creosoted beech wood, and unpreserved oak, the bulk of the paving being unpreserved
red deal, and this was replaced in 1867.
In 1877, on renewing the pavement, it was found that the creosoted wood suffered
less from wear and tear than the unpreserved, so the whole was done with creosoted red
pine, the original strip of creosoted red pine was left untouched, the strip of oak was
turned, and the beech was merely raised; and there is no doubt that the best wood
pavement is that which can be constructed in the simplest manner, as for instance deal
blocks 4 or 5 inches deep, laid with a close joint upon a Portland cement concrete bed,
the blocks being well grouted in with Portland cement grouting, their surface being
afterwards sprinkled or strewn with sand or sharp gravel.
The woods employed for paving are beech and oak, both of which are said to be too
slippery, elm, which is not durable, pitch pine and Baltic fir. Memel and Dantzic timber
is better than Riga, the best wood for the purpose being said to be Wyborg or St.
Petersburgh red deals.
All sappy wood must be at once rejected as unsuitable. This is a great objection to
creosoting or other preserving processes, as it hides defects in the wood.
The advantages of wood paving may be summed up as follows:—
(1.) It is the quietest of all known pavements, wheels make scarcely any noise upon it
and there is no clatter of horses’ hoofs.
(2.) It is much safer than either asphalte or granite pavements for horses travelling
upon it and if a horse falls he can rise more easily.
(3.) The traction necessary upon it, though slightly greater than upon asphalte, is
compensated for by the better foothold given to horses.
(4.) It is clean. If well constructed there should be no mud made upon it; all that
appears upon its surface should arise either from its being imported upon it, or from the
gravel with which it is sometimes necessary to dress the surface.

Page 87

(5.) It presents a uniform and slight elasticity, which is of great benefit to vehicles
passing over it.
(6.) It may be laid on a gradient of 1 in 20 with safety to the traffic.
The principal objections to wood as a paving are:—
(1.) It is said to absorb moisture and to smell offensively, but this has often been
refuted.[81]
(2.) It is said to be difficult to cleanse without the aid of water, as dirt adheres to the
wood, and lingers in the joints.
(3.) It is not easy to open it or repair it, for the purposes of gas and water pipes, etc.,
and rather a large surface has to be removed for this purpose, and it has to be left a little
time after repairs before traffic is again allowed on it.
(4.) The wood swells if wet, and cases are on record of the side kerbs of streets being
raised, and lamp posts thrown down, by the pressure of the wood thus swelling.[82]
With regard to the cost of wood paving. This must vary in different localities,
according to the value of labour, of materials, and in the manner in which the work is
done.
The practice of most of the companies engaged in this class of work is to make a
fixed charge per square yard for the pavement, including the concrete but excluding the
excavation, and they also guarantee to keep the pavement in repair free of charge for
one or two years, and then for so many years after, at so much per yard per annum.
About 14s. per square yard is generally the first charge for constructing, and 1s. per
square yard is the annual charge for maintenance.
Upon the subject of cost the following tables[83] may be useful.

Table showing the Actual Duration and Cost
of certain Wood Pavements in the City of London.

Total Cost
Average Cost
First Cost of Repairs
Date when per
Situation. Life. per per
laid New. Square Yard
Square Yard. Square Yard
per Annum.
during Life.
Yrs. Mths. £ s. d. £ s. d. £ s. d.
May, 1855 10 2 0 12 2 0 17 4¹⁄₂ 0 2 11
Cornhill -
July, 1865 6 8 0 11 6 0 8 9³⁄₄ 0 3 0¹⁄₂

Nov. 1853 11 7 0 12 8 0 17 1¹⁄₂ 0 2 6³⁄₄
Gracechurch Street -
June, 1865 6 0 0 11 6 0 6 11 0 3 0³⁄₄

May, 1851 9 4 0 9 6 0 6 0 0 1 7³⁄₄
Lombard Street -
Sept. 1860 10 7 0 9 2 1 0 2 0 2 9

May, 1854 12 3 0 12 6 1 8 4³⁄₄ 0 3 4
Lothbury -
Aug. 1866 6 1 0 12 6 0 3 5³⁄₄ 0 2 7¹⁄₂

July, 1841 19 1 0 14 4 0 13 4 0 1 5¹⁄₄
Mincing Lane -
Aug. 1860 13 0 0 9 2 1 2 6³⁄₄ 0 2 5¹⁄₄

Page 88

May, 1854 12 3 0 12 6 0 17 5³⁄₄ 0 2 5¹⁄₄
Bartholomew Lane -
Aug. 1866 5 5 0 12 6 0 3 11¹⁄₄ 0 3 0¹⁄₄

Foundations are included, but no excavation.

Table showing First Cost, and Tendered Cost per Annum
for Maintaining Certain Wood Carriageway Pavements in the City of London.

Years Total Cost
to be of Pavements Average
Agreed Cost of
Date main- First Cost during Cost
Name of maintenance per
Situation. when tained per Contract per
Contractor. Square Yard for
Laid. by Square Yard. Term, Square Yard
the Contract Term.
Con- per per Annum.
tractor. Square Yard.
£ s. d. £ s. d. £ s. d.
Improved 1 year free
King William Feb.
Wood Paving 16 0 18 0 15 years at 1s. 6d. = 2 0 6 0 2 6¹⁄₄
Street 1873
Co. 1l. 2s. 6d.
1 year free
Nov.
Ludgate Hill Ditto 16 0 18 0 15 years at 1s. 6d. = 2 0 6 0 2 6¹⁄₄
1873
1l. 2s. 6d.
Portions of 1 year free
Great Tower
Sept.
Street and Ditto 16 0 16 0 15 years at 1s. 3d. = 1 14 9 0 2 2
1873
Seething 18s. 9d.
Lane
No
Bartholomew Jan.
Carey agree- 0 12 6 —— —— ——
Lane 1872
ment
Improved
Dec.
Ditto Wood Paving 3 0 16 0 3 years free 0 16 0 ——
1871
Co.
May, Mowlem and [84]5
2 years free
Duke Street 0 15 0
1873 Co. 3 years at 1s. = 3s.
2 years free These pavements will no
Not yet [84]7 doubt last some years longer
Houndsditch Ditto 0 17 0 5 years at 9d. = 3s.
laid than the contract term of
9d.
maintenance.
[84]
2 years free
Ditto Ditto Carey 7 0 13 6
5 years at 1s. = 5s.
In the wood pavements the cost of the foundation is included, but no excavation.
The pavements at the end of each financial year are to be in a good sound condition.

The following table[85] is also given as showing the comparative cost of wood paving
with macadam and bituminous concrete paving in Liverpool.

Description Original Deductions from Interest Sinking Mainte- Scav- Gravel- Total
of Cost First Cost to on Fund in- nance per enging ling Annual
Pavement. per determine Cost of Original vested Square per per Cost
Square Renewal. Cost at at 3 Yard Square Square per

Page 89

Yard at Cost of 4¹⁄₂ per cent. per Yard Yard Square
present Allowances per cent. Com- Annum. per per Yard.
Foun-
prices. for old per pound Annum. Annum.
dation
Materials Square Interest.
not
at date of Yard
requiring
renewal. per
renewal.
Annum.
s. d. s. d. s. d. d. d. s. d. d. d. s. d.
No. 6.
Bituminous
Concrete 3 9 Nil Nil 2·0 Nil 0 9 2·4 .. 1 1·4
Pavement
No. 7.
Wood
15 1·5 2 0 Nil 7·5 4·3 0 1·0 2·7 5·0 1 8·5
Pavement
No. 8.
Macadam
6 9 Nil Nil 3·4 Nil 1 0 8·0 Nil 1 11·4
Pavement

In concluding this chapter upon wood paving, I will give a specimen specification for
work of this description.
Excavation.—Excavate the ground to a depth of — inches below the level of the
proposed finished surface of the roadway.[86] The formation surface thus
excavated must be well watered and rolled or punned if found necessary, and any soft or
made earth removed to such a depth as may be found to be sufficient.[87]
Foundation.—Upon the excavated formation surface a bed — inches thick of
concrete is to be laid, composed of one part of good approved Portland
cement to two of fine, sharp river sand, and three of clean river ballast or broken stone.
The concrete to be finished off with an even and smooth top surface conforming with
the contour line of proposed finished roadway.
Wood Blocks.—Upon the concrete thus laid, and after it has sufficiently set, wood
blocks are to be laid.[88] These blocks must be of the best description of
Baltic red timber[89] (or such other timber as shall be specified), sound and thoroughly
well seasoned, free from all sap, shakes, large and loose knots or other defects, and any
that may be rejected by the surveyor as unfitted for the work shall be at once removed
from the works or broken up. The blocks must not be less than 6 inches or more than 12
inches in length by 3 inches in width and 6 inches in depth, they are to be carefully laid
with the fibre of the wood placed vertically, their ends must butt with close joints to
each other, and each course must be kept ³⁄₈ of an inch apart by means of wooden laths,
which are afterwards removed.
Joints.—The joints are then to be carefully run with a grouting composed of one part
of best approved Portland cement to two parts of fine, sharp, clean river sand.
(In some cases a hot bituminous mixture or asphalte is run between the joints as a
grouting.)
Top Dressing.—The whole surface of the pavement is then to be spread with a
coating, at least ¹⁄₂-inch in thickness, of fine sharp gravel or chippings.
The following heads of general conditions under such a contract may also be useful.

Page 90

Alteration of gullies, sewer man-holes etc., will be done at the expense of the sanitary
authority.
Contractor must make good at once any damage caused to gas or water mains or
services—time penalty for delay.
Maintenance of work after completion for a specified time.
Power must be reserved to surveyor to suspend work during bad weather or from
other causes.
Heavy time penalties for non-completion of contract by a certain date.
Payments to be made to contractor on surveyor’s certificate, up to 80 per cent. of
whole contract, remaining 20 per cent. to be paid at end of (say) 2 years after
completion.
With the above specimen specification I conclude the chapter on Wood Paving.

Page 91

[67] The first wood pavement laid in London was in front of the Old Bailey, in 1839.
[68] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. i. p. 131.
[69] This specification is the company’s own, as advertised when they first began business; for many
reasons the boards have since been discontinued, and other alterations introduced into the system.
[70] I am unable to ascertain if this plan has ever been tried anywhere.
[71] It is also affirmed by the Borough Surveyor of Sunderland that this process dispenses with watering.
Vide ‘Proceedings of the Association of Municipal and Sanitary Engineers and Surveyors,’ vol. iii. p. 72.
[72] Vide ‘A Practical Treatise on Roads, Streets, and Pavements,’ by Q. A. Gillmore, p. 166, which see
also for a good account of wood pavements in the United States.
[73] Vide ‘Wood Pavements,’ by Henry Allnutt, 1880, p. 22.
[74] The power of absorbing water by wood varies from 9·37 to 174·86 per cent. in dry wood. In its
ordinary state the power varies from 4·36 to 150·64 per cent. The quantity of water contained in wood in
its natural state varies from 4·61 to 13·56 per cent. Vide ‘Minutes of Proceedings of the Institution of Civil
Engineers,’ vol. lvi. p. 300.
[75] Vide ‘Roads and Roadways,’ by George Waller Wilcocks, 1879, p. 34.
[76] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. lviii. p. 82.
[77] Ibid, vol. lx. p. 293.
[78] Ibid, vol. lviii. p. 45.
[79] ‘Report upon Asphalte and Wood Pavements,’ by William Haywood, (1874) p. 44.
[80] See ‘Paper on Wood Pavements,’ by R. S. Rounthwaite, Boro’ Surveyor, Sunderland, ‘Proceedings
of the Association of Municipal and Sanitary Engineers and Surveyors,’ vol. vii. p. 48.
[81] The surveyor of the parish of St. George’s Hanover Square, London, says, “My experience of wood,
and I have laid down 25,000 yards, is that it is perfectly free from smells, even on a cab rank.” Report of a
Committee of the Paddington Vestry on Wood and other Pavements (1878) p. 30.
[82] Mr. Allnutt says on this: “As to the swelling of the wood, it has been remarked that even brick walls
have been forced out. We do not see what provision can be made for this; but leaving the channel by the
kerb stone for the last work may relieve the lateral pressure, and perhaps it would be as well for the blocks
not to be so dry when being laid down.” Vide ‘Wood Pavement as carried out on Kensington High Road,
Chelsea, etc.’ by Henry Allnutt (1880) p. 15.
[83] Vide ‘Report on Asphalte and Wood Pavements,’ by William Haywood, 1874, pp. 38 and 41.
[84] The Ligno-Mineral Paving Company and the Improved Wood Paving Company offered to maintain
their pavements, if laid, for terms of ten years and fourteen years respectively; their tenders were not
accepted.
[85] Vide ‘Paper on Street Carriageway Pavements,’ by G. F. Deacon, ‘Minutes of Proceedings of the
Institution of Civil Engineers,’ vol. lviii. p. 23.
[86] If the road material thus excavated is macadam, it may be screened and used as concrete in the
foundation, if approved by the surveyor. The granite pitching of crossings, channel gutters, etc., must
remain the property of the sanitary authority, as well as the surplus macadam.
[87] It is important to give sufficient notice to gas and water companies in order that they may attend to
their mains and services before the foundations are put in.
[88] Sometimes about half an inch of fine sand is spread upon the surface of the concrete upon which the
wood blocks are bedded.
[89] If the blocks are to be creosoted, the number of pounds of creosote that should be absorbed in a
cubic foot of the wood should be specified; this is generally about 10 lb. of creosote to 1 cubic foot of
wood.

Page 92

CHAPTER X.
COMPRESSED ASPHALTE ROADWAYS.

The word asphalte in its generally accepted sense implies a natural rock consisting of
pure carbonate of lime, intimately combined and impregnated with mineral bitumen in
very variable proportions; that used for roads or footpaths should not contain less than 7
or more than 12 per cent. of bitumen.
The rock when broken takes an irregular fracture without definite cleavage; it is
principally derived from Val de Travers, Seyssel, Sicily, Chieti, Auvergne, Lobsann, and
Limmer. Its grain should be regular and homogeneous, the finer the grain the better.[90]
When exposed to the atmosphere asphalte gradually assumes a grey tint, by reason of
the bitumen evaporating from the surface leaving a thin film of limestone behind. The
stone is usually taken from open quarries, but at Val de Travers shafts are sunk and the
general treatment is similar to a coal mine.
Bitumen, it must be borne in mind, is itself a mineral product found in Trinidad and
some other places; it is composed of carbon, hydrogen, and oxygen.
The weight of a cubic yard of natural asphalte is about 3874 lbs., its specific gravity is
2·114, but this of course varies with its percentage of bitumen.
The following is a test for asphalte given by Mr. Deland in a paper he read before the
Institution of Civil Engineers in the year 1880.[91]
“A specimen of the rock freed from all extraneous matter, having been pulverised as
finely as possible, should be dissolved in sulphurate of carbon, turpentine, ether or
benzine, placed in a glass vessel and stirred with a glass rod. A dark solution will result,
from which will be precipitated the pulverised limestone. The solution of bitumen should
then be poured off. The dissolvent speedily evaporates, leaving the constituent parts of
the asphalte, each of which should be weighed so as to determine the exact proportion.
The bitumen should be heated in a lead bath and tested with a porcelain or Baumé
thermometer to 428° Fahr. There will be little loss by evaporation if the bitumen is good,
but if bituminous oil is present the loss will be considerable—gritted mastic should be
heated to 450° Fahr. The limestone should next be examined. If the powder is white and
soft to the touch it is a good component part of asphalte, but if rough and dirty on being
tested with reagents it will be found to contain iron pyrites, silicates, clay, etc. Some
asphaltes also are of a spongy or hygrometrical nature. Thus, as an analysis which merely
gives so much bitumen and so much limestone may mislead, it is necessary to know the
quality of the limestone and of the bitumen.
“For a good compressed roadway an asphalte composed of pure limestone and 9 to 10
per cent. of bitumen, non-evaporative at 428° Fahr., is the most suitable. Asphaltes
containing much more than 10 per cent. of bitumen get soft in summer and wavy, those

Page 93

containing much less have not sufficient bind for heavy traffic, although asphalte
containing 7 per cent. of bitumen properly heated does well for court yards, as it sets hard
when cold.”
For roadways “compressed” asphalte should be used and not “mastic,” which is only
fitted for footpaths, court-yards, etc. Compressed asphalte roadways are constructed as
follows:
The asphalte rock is first crushed in a “Blake’s” or other suitable crusher, then
pulverised in what is known as a “Carr’s disintegrator,” until it is reduced to a powder;
this powder is then heated up to between 212° and 250° Fahr. in revolving cylinders and
is laid about 2¹⁄₂ inches in thickness upon a concrete foundation previously prepared for
its reception, the powder is carefully raked to the required contour and then either rolled
or punned with iron punners previously heated to prevent the adhesion of the powder to
them.
A roadway thus prepared presents many advantages over macadam, granite setts or
wood, the following passage amply describing one of them:[92]
“An indispensable feature of a weight-carrying pavement must be the absolute
exclusion of water at the surface as nearly as it can be insured, and in this one respect it
cannot be questioned that a surface like asphalte has no equal, the absorption being so
gradual as to be inappreciable during any possible continuance of moisture.”
In addition to this indisputable fact the advantage of durability is claimed for asphalte,
but this must vary considerably with the quality of the material and of the work. Mr.
Hayward estimates the life of an asphaltic Val de Travers compressed roadway at 17
years, and it is claimed for it that it will wear until it becomes quite thin, very heavy
traffic breaking it up when it is worn to about ³⁄₄ of an inch thick. Another advantage
claimed for asphalte is cleanliness, and this is evidently indisputable, as, being
impervious, none but imported mud or dust can be formed upon it.
In addition to the foregoing the following advantages are also claimed:
Pedestrians can walk on asphaltic roadways as well as on the footways.
It is comparatively noiseless under traffic, though in this case wood is better, as the
clatter of the iron-shod horses’ feet upon asphalte is very apparent.
It is expeditiously laid, and when repairs are necessary they can easily be effected; no
pavement shows less signs of openings being made in it for gas and water-pipe repairs
than asphalte.
The rapid laying causes less inconvenience to traffic in the streets.
Ease of traction; but here steps in the one great objection to asphalte as a roadway
paving, viz. danger to horses by slipping and falling, of which I shall say more hereafter.
Cellars and vaults under the streets are kept dry, by reason of its impermeability to
moisture.
Easily cleansed, especially by mechanical sweeping, and snow is easily removed.
It is very pleasing to the eye, being so uniformly regular and of good colour.
There is no vibration or concussion in travelling over it, and apart from the question of
safety it is delightful to drive over it.

Page 94

It is a cool pavement at night; it does not absorb heat during the day, and consequently
none radiates from it after the sun has gone down.[93]
The great objection to asphalte as a material for roadways arises from the fact that it is
extremely slippery when damp,[94] irrespective of temperature, and this in the climate of
England is frequently the case. The result of this slipperiness is, that not only do horses
frequently fall upon it, but it is also difficult to stop a horse when drawing a load, thus
causing more risk to foot-passengers of being run over, and straining the horse
considerably in its efforts. Again, in thoroughfares crowded with vehicular traffic,
constant stoppages occur, and in starting again it is painful to witness the struggles of the
horses to keep their footing and overcome the inertia of their load. When a horse falls he
has very great difficulty in rising, but on the other hand, although he may be strained, a
horse never breaks his knees upon this class of pavement. How far this might be altered
if all the streets of a town were paved with asphalte, is a fair matter for argument, as it is
asserted that horses are very nervous on going from one pavement to another, and
accidents frequently happen in consequence.
The strewing of sand upon asphalte renders it less slippery, but in addition to the
interference of the traffic whilst this is being done, there are the further objections, of the
possible injury of the sand cutting into the asphalte, the expense of labour and materials,
and the mud caused thereby which has afterwards to be removed. Another plan is to
frequently wash the asphalte with water, but this is expensive and only of temporary
benefit.
Another objection to asphaltic roadways is that they cannot with safety be constructed
of greater gradient than 1 in 60, and it must also be borne in mind that fine weather is
necessary both for the construction and repairs of a roadway of this description.
Very little smell, and that not of an unpleasant character, arises from the work when
compressed asphalte is being used, the mastic is however temporarily unpleasant to those
who dislike the odour.
With reference to the question of the cost of compressed asphalte for roadways: it is of
course a matter depending upon local circumstances as to the first cost, but it must be
remembered that the compressed asphalte hitherto laid has been nearly all that of the Val
de Travers Company, who charge a fixed price per square yard for laying according to
thickness required, the distance of the locality from London, and other local
circumstances. With reference to maintenance, this is a question dependent mainly upon
traffic, but here again the company will undertake to keep in repair at so much per square
yard per annum for a certain number of years.
It would, however, perhaps be a better plan not to enter into such an agreement, but to
arrange for repairs under a schedule of prices, but this must greatly depend upon the
character of the work in the first place, and other local considerations.
Mr. Ellice Clarke gives the following as the cost of Val de Travers compressed
asphalte.[95]
The cost is reduced to 100,000 tons per annum per yard of width.

Original Cost Interest on Maintenance Scavenging Total.
per original per per

Page 95

Square Yard. Cost. Square Yard. Square Yard.
s. d. d. d. d. s. d.
18 0 9·7 3·6 0·4 1 1·7

Nothing is charged for renewal, as the annual sum for maintenance provides the
asphalte in perpetuity.[96]
The following table[97] may here be of use:

Table showing the agreed Cost per Annum of certain
Asphalte Carriageway Pavements in the City of London.
Total Cost
Years Agreed Cost
of Pavements Average Cost
Description to be First Cost of maintenance
during per
Situation. of maintained per per Square Yard
Contract Term Square Yard
Asphalte. by Square Yard. for the
per per Annum.
Contractor. Contract Term.
Square Yard.
£ s. d. £ s. d. £ s. d.
2 years free
Cheapside Val de 15 years = £1
and Travers 17 0 18 0 - at 2s. - 2 0 6 0 2 4¹⁄₂
Poultry (Compressed) 1s. 6d.
6d.

2 years free
Gracechurch 15 years = 15s.
Ditto 17 0 17 0 - - 1 12 0 0 10 1¹⁄₂
Street at 0d.
1s.

2 years free
Finsbury 15 years = 11s.
Ditto 17 0 16 0 - - 1 7 3 0 1 7¹⁄₄
Pavement at 3d.
9d.

2 years free
Moorgate 15 years = 11s.
Ditto 17 0 16 0 - - 1 7 3 0 1 7¹⁄₄
Street at 3d.
9d.

2 years free
Limmer 15 years = 11s.
Ditto 17 0 16 0 - - 1 7 3 0 1 7¹⁄₄
(Mastic) at 3d.
9d.

2 years free
Lombard 15 years = 11s.
Ditto 17 0 16 0 - - 1 7 3 0 1 7¹⁄₄
Street at 3d.
9d.

2 years free
15 years = 11s.
Cornhill Ditto 17 0 15 0 - - 1 6 3 0 1 6¹⁄₂
at 3d.
9d.

Page 96

2 years free
Mincing 15 years = 11s.
Ditto 17 0 12 0 - - 1 3 3 0 1 4¹⁄₂
Lane at 3d.
9d.

The cost of foundations is included in this table, but their thickness is not mentioned;
the excavation was done for the contractors.
With the one serious objection of slipperiness, compressed asphalte seems a most
suitable material for the surface of a roadway, but that objection is of considerable weight
when we reflect that the great object of roadways is that of “traffic,” and it is for that
purpose they are constructed; still, in cities where a heavy business traffic is going on,
this class of roadway has so many advantages that where cheap horses are driven it might
be used; where, however, valuable horses are used for pleasure driving, as in the west
end of London and the corresponding better parts of cities, some other description of
roadway should be maintained.
Mastic asphalte will be described in the chapter on footpaths.

Specimen Specification for a Compressed Asphalte Roadway.

Excavation and Concrete.—The excavation and concrete[98] foundation may be
specified to be executed in a manner similar to that
contained in the specimen specification for wood paving,[99] except of course that the
excavation will be shallower in this case.
Asphalte.—The asphalte to be used shall be the pure unadulterated natural rock known
as the Val de Travers, and be unmixed with any foreign or other matter
whatever. The rock after being properly broken, shall be ground in a Carr’s disintegrator
to a powder of such fineness, that not more than per cent. shall be left on a sieve
containing meshes to the square inch and decrepitation by heat will not be accepted.
This powder shall be heated to 240° F. or such other temperature as shall be found
desirable, so as to eliminate all moisture, and carefully transported to the street in
covered iron carts, in order that not more than 20° F. of heat shall be lost in transit. The
powder must be spread upon the concrete inches in thickness[100] and carefully raked
so as to have regularity of depth and surface.
Ramming.—The powder must then be rammed with iron punners of not less weight
than 10 lb. heated so as to prevent the adhesion of the asphalte. The
ramming must be done lightly at first, so as to ensure equality of thickness, and
afterwards augmented to heavy blows. Where the rammers are not available a T tool
must be employed.
To meet some of the objections to compressed asphalte as a material for roadways the
“Imperishable Stone Paving Blocks” have been introduced in America; they consist of
asphalte formed into rectangular blocks under pressure of about one ton to the square
inch, these are laid close together without any grouting, and a pavement of this

Page 97

description is said to combine all the advantages of wood and asphalte, though sufficient
time has not yet elapsed to prove this.
In Salford, Manchester, etc., I believe “Woodward’s Patent Molten Ironstone Blocks”
are used with some success where there is not any very exceptionally heavy traffic.
One of the principal reasons of durability in asphalte pavement is its elasticity, and it
should be remembered that compressed asphalte does not begin to “wear” until all
compression has ceased; this is the case with no other system of pavement—stone and
wood both begin “wearing” from the day the traffic commences. Under ordinarily heavy
traffic it may be estimated that it will take two years to complete the compression of
asphalte, and the weight of a square foot of this pavement will at the expiration of that
time be nearly the same as on the day it was laid, though the thickness is reduced during
the first two years as much as it will be in the following eight.
Much is said about the advisability of good and dry concrete, but it may be as well to
explain the reasons that necessitate so much care in the foundation. First, it should be
always borne in mind that asphalte pavement is nothing more than a tough “carpet,” and
has no power of itself of offering resistance to heavy traffic; consequently, if the
substratum or concrete is not thoroughly solid and resisting, the weight of traffic will
crush it, and the asphalte will at once give way in all directions. The concrete should be
made strong enough to resist the traffic, and the asphalte is a simple covering to protect
the concrete from direct contact with the wear and friction caused by the traffic. So much
for the strength, but the dryness is of even still greater importance; for the best asphalte,
laid by skilled workmen, on thoroughly first-rate but damp concrete, will rapidly go to
pieces—a phenomenon takes place, which, although quite natural, is little realised by
most engineers. When the hot asphalte is laid, the water is immediately sucked up and
turned into steam, which tries to escape through the heated powder, and the result is that
although the surface of the asphalte is smooth, the mass is really disintegrated from
underneath by its bitter enemy “water,” and as soon as the surface begins to wear, the
fissures formed by the passing of the steam appear on the surface and the whole
pavement falls to pieces: thus accounting for some of the failures this description of
roadway has met with under unskilled treatment.
This completes the subject of roadways; I will turn to that of footpaths in the next
chapter.

[90] In this respect the Seyssel is the best, being of a very fine grain.
[91] Vide ‘Minutes of Proceedings of Institution of Civil Engineers,’ vol. lx.
[92] Vide Mr. Howarth’s paper on ‘Wood as a Paving Material under Heavy Traffic,’ ‘Minutes of
Proceedings of the Institution of Civil Engineers, vol. lviii. p. 35.
[93] In Paris and other cities liable to civil war or internal commotions, it is contended as an advantage
of asphalte that it cannot be used for the construction of barricades, breastworks, or rifle pits.
[94] Vide Mr. Haywood’s Report upon Asphalte and Wood Pavements, also Report on the Application of
Science and Art to Street Paving and Cleansing of the Metropolis,’ and numerous other pamphlets and
reports by eminent authorities upon the subject.
[95] Vide ‘Asphalte and its Application to Street Paving,’ by E. B. Ellice Clarke, ‘Proceedings of the
Association of Municipal and Sanitary Engineers,’ vol. vi. p. 52.

Page 98

[96] The asphaltic roadways of Paris, of which there were 290,000 square yards in the year 1878, cost
from 10s. to 12s. per square yard to lay, and about 8·83 pence per square yard per annum to maintain,
including the charge for renewing ¹⁄₁₅th part of the surface every year, which is the method adopted there.
Vide ‘Annales Industrielles,’ 1878.
[97] Vide Mr. Haywood’s report on asphalte and wood pavements, 1874.
[98] “Lime concrete ruins compressed work.” Vide ‘Asphalte and its Application to Street Paving,’ by B.
Ellice Clarke. ‘Proceedings of the Association of Municipal and Sanitary Engineers and Surveyors,’ vol. vi.
p. 46.
[99] See p. 94 ante.
[100] It must be ²⁄₅ths more in thickness than that specified as finished.

Page 99

CHAPTER XI.
FOOTPATHS.

As in the case of roadways, so with footpaths: the foundation is of primary importance,
whatever material may be used for the surface. Where this material may be classed under
the head of “Paving,” concrete[101] makes the best foundation. For gravel, tar paving, or
other similar surface, a hard core bottom well drained is sufficient. The materials of
which a footpath can be formed are almost innumerable, but the following may be given
as embodying most of them:
(1.) Natural asphalte, compressed and mastic.
(2.) Yorkshire flagging—Caithness flagging.
(3.) Blue lias, and Devonian limestone flagging.
(4.) Concrete.
(5.) Bricks.
(6.) Granite slabs.
(7.) Artificial asphaltes, including tar pavement.
(8.) Gravel.
First on the list stands natural asphalte, compressed and mastic.
The compressed has been thoroughly described in the preceding chapter; it is
sometimes used for footpaths where there is a very heavy traffic, and answers admirably.
I will, however, now deal solely with mastic asphalte, which means the rock ground to
powder, mixed with a certain proportion of bitumen to act as a flux, and then subjected to
heat; this is sometimes used in conjunction with fine sharp clean river sand, but more
often with finely crushed stone about the size of peppercorns, and is styled “gritted
asphalte.”
As long ago as the year 1838, Mr. F. W. Simms speaks of asphalte mastic from
Pyrimont, near Seyssel, and says “it may be considered a species of mineral leather”[102]
—a very good description of its surprisingly tough, hard, durable and pliant properties.
The usual method of the preparation of the mastic is as follows:—
According to the amount of bitumen contained in the natural stone, from 5 to 8 per
cent. of refined Trinidad bitumen[103] is placed in a large caldron which is usually
provided with agitators driven by steam power; when this is thoroughly melted, the
powdered asphalte is added little by little, the heat being raised to between 390° and 480°
F., the mixture kept well stirred and “cooked” for about five hours. It is then turned out
into iron moulds, most companies having a special pattern with a trade mark for this
purpose.
The caldrons generally used contain from 1¹⁄₂ to 2 tons of mastic.

Page 100

Some companies in large towns are provided with caldrons on wheels, commonly
called “Locomobiles,” in which case the grit is mixed with the mastic in the fixed
caldrons, and the whole mass run out into the locomobiles (which are also provided with
agitators worked by an endless chain attached to the axle of the wheels), and transported
direct to where the work has to be done. This system, though undoubtedly the best, is not
practicable except in large towns; the more usual method of laying mastic footpaths is to
send the asphalte cakes to the works, where they are remelted in small round street
caldrons, containing from 8 to 12 cakes each, weighing from 40 to 50 lbs., the grit being
sometimes added in the fixed caldrons, sometimes in the street caldrons, this amount of
grit varying from 20 to 60 per cent. according to the nature of the work.
The grit makes the asphalte more difficult to spread, but it lessens the cost and makes a
very durable path. The affinity between the asphalte and grit is so great that, in breaking
a sample, the actual pieces of grit will be found broken in half.
The asphalte should be spread from ¹⁄₂ to ⁷⁄₈ of an inch in thickness (if compressed 1
inch is the minimum), and should be brought hot on to the works in covered caldrons on
wheels, the test of its being ready and fit to lay being made by plunging a wooden spatula
into it, which should come out without any of the asphalte adhering to it, and also by jets
of light smoke darting out of the mixture.
The mastic should be taken from the caldron with a warmed ladle, and put into buckets
previously heated, then thrown out on the concrete (which should be perfectly dry) near
the spreader, who spreads it skilfully with a wooden stave, spreader, or spatula. The
surface should then be floated and dusted over with fine sand, portland cement, or stone
dust.
Dishonest contractors sometimes substitute inferior materials for natural asphalte, such
imitations being made of ground chalk, fire-clay, and pitch or gas tar, or ground
limestone mixed with bitumen.
A sample of the footpath after it is laid should be cut out (this is easily effected by
heating the surface with a piece of hot mastic), in order to see that the proper thickness is
given, and by applying a light to the sample, the smell will readily tell if real asphalte or
any inferior material has been used. Stockholm tar or common pitch should not be
allowed to be substituted for Trinidad bitumen, or it will spoil the mastic.
Asphalte mastic footpaths are excellent in every way, the only objections to them
being the necessity for the grit, and the temporary unpleasant smoke and smell whilst
being laid. It is also necessary to put stone sills round the cellar openings and coal shutes,
etc., for it to butt against, but it makes an invaluable pavement, especially for courts,
alleys, back yards, etc., for sanitary and other reasons.
The proportions of asphalte, bitumen and grit are given as follows by Mr. Delano in
his translation of a paper by M. Ernest Chabrier, on the applications of asphalte.[104]
“One ton of sanded mastic requires 13 cwt. of pure block mastic, 2 qrs. 12 lb. of
bitumen, 7 cwt. of grit or sand washed and dried,” and it takes 2 cwt. of coal to heat it.
He further says that one workman can easily prepare 3 tons of material in 12 hours.
The following table gives the number of square yards that a ton of prepared Sicilian
rock asphalte will spread.

Page 101

With about
Without grit. 25 per cent. Thickness.
of grit.
square square
inches.
yards. yards.
63 80 ³⁄₈
51 65 ¹⁄₂
32 40 ³⁄₄
26 33 1
16 20 1¹⁄₂
12¹⁄₂ 16 2

A skilled workman properly assisted can lay 140 to 180 square yards in a day.[105]
With regard to the price of asphalte mastic footpaths, this is quite a local question, and
is not worth while discussing. The life of a footpath thus treated may be reckoned at
about 15 years under ordinary traffic; the concrete will remain untouched and what is left
of the asphalte may be remelted, so that a renewal is not so costly as the first expense.
Yorkshire Flagging.—This pavement is too well known to need any description from
me; it is an excellent pavement in many ways, and is most pleasant
to walk upon, there being a cling or foothold not experienced in any other material.
The objections to this description of pavement are:—
(1.) Its first cost, which is undoubtedly high as compared to its durability.
(2.) The fact of uneven wearing: one stone will be found soft next to a hard one; the
former wears, leaving a pit which forms a pool for water in due course, and has to be
removed.
(3.) Unless very carefully bedded, a stone will see-saw; this is very unpleasant in wet
weather, water accumulates beneath, and as the pedestrian treads on one end of the stone
a squirt of dirty water up to his knees, and a stumble, remind him that the stone is loose.
(4.) Liability to crack when any heavy goods are thrown upon it.
The following specimen specification for Yorkshire flagging pavement may be of use.
Specimen Specification for Yorkshire Flagging Foot Pavements.
The old flagging (where and when directed) to be taken up, refaced, squared, and
relaid.
The new flagging is to be chisel-dressed to a fair face, true, out of winding, and not
less than 3 inches thick,[106] to be properly squared and not pitched off only, or undercut,
but to hold good to the square; to have not more than fourteen pieces to the hundred
superficial feet; the joints must be set flush, and bedded and pointed with the best blue
lias mortar.
The bed for the flagging both old and new, if any is required, to be made with proper
earth, gravel, or dry rubbish, and all surplus earth and rubbish to be carted from the
streets as it arises from the works.
The flagging to be properly cut and rebated to receive all area gratings, coal shoots,
rain water troughs, &c.

Page 102

Any damage done to gas or water service pipes in digging for the flagging, or in any
way connected with the work, to be made good by the contractor, as also all and every
other damage to windows, wood, or glass work; and the contractor will be held
responsible for, and will make compensation for any injury that the public may sustain
through the negligence of his workmen, or otherwise.
The whole of the flags to be of the very best quality, from Halifax, the quarries in the
neighbourhood of Bradford or in Yorkshire, and subject to the approval of the surveyor.
The contractor to provide all lights and proper guards at night, and when old paving is
to be taken up the work is to be done under the direction of the surveyor, and if
considered necessary, the stones are to be removed from the streets to be re-faced and
squared. No stone to be stacked in the streets.
The flagging to be measured after the work is completed.
The contractor to provide all stone, materials, tools, implements, horse and cart hire,
and pay all railway dues, freightages, etc., and also to provide all labour of every kind for
properly completing the work to the full and entire satisfaction of the surveyor. Payment
will be made as the work proceeds, on the certificate of the surveyor.
Should the contractor fail to perform the work to the satisfaction of the surveyor, he
then shall have power to execute the work and charge the same to the contractor, and
deduct the cost from any amount that may be due to him; and in the event of the cost
being more than the amount due, or if there shall then be no sum due to the contractor,
such cost shall be paid by the contractor to the mayor, aldermen, and citizens, and the
same shall be recoverable from him as liquidated and ascertained damages.
Caithness Flagging is now used very largely instead of Yorkshire; it comes from
Thurso in Scotland, and it is contended for it that it possesses many
excellent qualities, amongst others may be enumerated the following:
(1). It is impervious to wet.
(2.) It is not slippery nor does it wear so.
(3.) It does not scale or flake.
(4.) It dries rapidly after rain.
(5.) Its appearance is cheerful.
(6.) Great durability, as it does not abrade.
(7.) Frost has no effect upon it.
(8.) Can be re-used when half worn.
(9.) Cleanliness; for, not being porous, no dirt or dust can adhere to it.
(10.) Vehicular traffic may be turned over it without injury to the path.
(11.) Economy; as natural forces can be used, thus saving labour, and it can be laid
from 1¹⁄₂ to 2 inches thick only.
(12.) Having sawn edges, the joints are expeditiously and well made.
(13.) Its whole surface wears evenly.
The following table was compiled by the well-known firm of Kirkaldy, by direction of
Mr. Tarbotton the Borough Engineer of Nottingham, in order to ascertain the resistance to
a gradually increased bending stress upon Yorkshire flagging as compared with
Caithness.

Page 103

Yorkshire.
Dimensions.
Test Ultimate
Weight. Thick-
No. Length. Breadth. Stress.
ness.
K lbs. inches. inches. inches. lb.
1918 184 36 24·07 2·46 4·744
1919 163 36 24·03 2·22 3·398
1920 107 36 23·90 1·50 1·459
Mean 151 36 24·00 2·06 3·200

Caithness.
Dimensions.
Test Ultimate
Weight. Thick-
No. Length. Breadth. Stress.
ness.
K lb. inches. inches. inches. lb.
1921 215 36 24·06 2·59 17·274
1922 178 36 24·05 2·15 12·711
1923 114 36 23·90 1·38 6·211
Mean 169 36 24·00 2·04 12·065

By which it appears that the balance in favour of Caithness flagging is 8·865 lbs.
The objection to this style of flagging is, that however varied the sizes of the stones
selected may be, as they have sawn edges and are very hard to cut with a chisel, a
difficulty sometimes arises in finishing rounded corners of footpaths, and against uneven
frontages of shops or buildings abutting on the footpath; this is especially the case in old
towns.
Blue Lias Flagging.—A blue lias flagging does not make a first-rate pavement, as
although it is very cheap, durable, clean, and has many other good
qualities, it sometimes wears slippery and is then dangerous to pedestrians; but the
Devonian limestone, which is much used in the west of England, has not apparently this
defect.
Concrete Footpaths.—These have been tried in this country, but generally without
success; the concrete or cement cracks, and in addition to this the
paths wear slippery and greasy, and as some time is necessary in order to allow the
concrete to thoroughly set before the traffic can be allowed on them, they have not found
much favour.
In the United States, however, concrete footpaths seem to be made successfully; the
following detail particulars of such a foot-pavement will, I think, be of great interest and
use.[107]
“Concrete footpaths should be laid upon a form of well-compacted sand, or fine
gravel, or a mixture of sand, gravel and loam. The natural soil, if sufficiently porous to
provide thorough sub-drainage, will answer.[108]
“It is not usual to attempt to guard entirely against the lifting effects of frost, but to
provide for it by laying the concrete in squares or rectangles, each containing from 12 to

Page 104

16 superficial feet, which will yield to upheaval individually, like flagging stones,
without breaking and without producing extensive disturbance in the general surface.
“When a case arises, however, where it is deemed necessary to prevent any movement
whatever, it can be done by underlying the pavement with a bed of broken stone, or a
mixture of broken stone and gravel, or with ordinary pit gravel containing just enough of
detritus and loam to bind it together. In high latitudes this bed should be 1 foot and
upwards in thickness, and should be so thoroughly subdrained that it will always be free
from standing water. It is formed in the usual manner of making broken stone or gravel
roads already described, and finished off on top with a layer of sand or fine gravel, about
1 inch in depth, for the concrete to rest upon.
“The concrete should not be less than 3¹⁄₂, and need rarely exceed 4 to 4¹⁄₂ inches in
thickness, the upper surface to the depth of ¹⁄₂ an inch should be composed of hydraulic
cement and sand only. Portland cement is best for this top layer. For the rest, any natural
American cement of standard quality will answer. The following proportions are
recommended for this bottom layer.

Rosendale or other American cement 1 measure
Clean sharp sand 2¹⁄₂ „
Stone and gravel 5 „

“It is mixed from time to time as required for use, and is compacted with an iron-shod
rammer in a single layer to a thickness less by ¹⁄₂ an inch than that of the required
pavement. As soon as this is done and before the cement has had time to set, the surface
is roughened by scratching, and the top layer, composed of,
1 volume of Portland cement, and
2 to 2¹⁄₂ volumes of clean fine sand,

is spread over it to a uniform thickness of about 1¹⁄₂ inch, and then compacted by rather
light blows, with an iron-shod rammer. By this means its thickness is diminished to ¹⁄₂ an
inch. It is then smoothed off and polished with a mason’s trowel and covered up with
hay, grass, sand, or other suitable material to protect it from the rays of the sun, and
prevent its drying too rapidly.
“It should be kept damp and thus protected for at least 10 days, and longer if
circumstances will permit; and even after it is opened to travel, a layer of damp sand
should be kept upon it for two or three weeks, to prevent wear while tender.
“At the end of one month from the date of laying, the Portland cement mixture
forming the top surface will have attained nearly one-half its ultimate strength and
hardness, and may then be subjected to use by foot-passengers without injury.
“The rammers for compacting the concrete should weigh from 15 to 20 lb., those used
on the surface layer from 10 to 12 lb. They are made by attaching rectangular blocks of
hard wood shod with iron to wood handles about 3 feet long, and are plied in an upright
position. Certain precautions are necessary in mixing and ramming the materials in order
to secure the best results. Especial care should be taken to avoid the use of too much

Page 105

water in the manipulation. The mass of concrete, when ready for use, should appear quite
incoherent, and not wet and plastic, containing water however in such quantities that a
thorough ramming with repeated though not hard blows will produce a thin film of
moisture upon the surface under the rammer, without causing in the mass a gelatinous or
quicksand motion.”
Under the head of Concrete may be included many artificial stone pavements, such as
“Bucknell’s Granite Breccia” “Ransome’s Artificial Stone,” “Eureka Concrete,”
“Granolithic,” and the “Silicated Victoria Stone,” this last being worth a description. The
stone is really a concrete, formed by mixing very superior Portland cement with crushed
Thames gravel, furnace or iron slag, Kentish rag-stone, granite chippings, or other
suitable material carefully washed. This fine concrete, after being mixed in the moulds
forming the slabs, is thoroughly incorporated by being rocked or jiggled in a trembling
machine; this motion, as can be easily understood, making the whole mass even and
homogeneous when it sets. The cost of the slabs is about 9d. per square foot, 3 inches in
thickness, and they make an excellent footpath.
Brick Footpaths.—These are sometimes constructed of ordinary bricks laid on their
sides, but soon wear, and are unsuitable for the purpose.[109]
Staffordshire blue paving bricks make an excellent footpath. These are bricks made of
stoneware highly vitrified; they should be about 12 inches in length by 6 inches wide, by
about 2⁷⁄₈ inches in thickness, their surface being chequered with a diamond pattern so as
to prevent their being slippery. They are exceedingly hard and durable if well burnt, and
to ascertain this a brick should be broken across and the colour, etc., noted.
They should be laid in cement mortar upon a bed of concrete or sand. The objections
to this class of pavement are as follows:
(1.) The colour is objectionable; being very dark, the footpaths give a street the
appearance of mourning.
(2.) The difficulty of breaking up the path for gas or water services, or for other
purposes.
(3.) The hardness of the bricks makes them awkward to cut to rounded corners, or for
water trunks, coal-holes, etc.
(4.) A loaded hand-barrow driven over them will sometimes break off the chequered
pattern.
(5.) They are slippery in a frost after snow.
But notwithstanding these disadvantages, they make a most wonderfully durable and
useful pavement for back streets.
Granite Slab Pavement.—This is sometimes adopted, large granite slabs, 6 inches in
thickness being laid; they are very useful when there are
cellars underneath, or where heavy vehicular traffic is intended to cross the foot
pavement. Granite is of course excessively durable, but it wears very slippery with traffic
and must then be tooled or axed; in process of time this wears it out, and its first cost is
heavy.
This description of pavement can be laid with advantage in front of markets or similar
buildings.

Page 106

Artificial Asphalte Pavements.—The cost of obtaining natural rock asphalte from the
mines, and the knowledge that it is composed of two
very simple ingredients, limestone and bitumen, has led to a great number of artificial
asphaltes being introduced, especially for foot pavements. “British Rock Asphalte” is a
name by which many of the compositions are known; “Beauchamp’s Mendip Mountain
Machine-made Granite Asphalte” is a high-sounding title; “Prentice’s Mineral Foreign
Rock Asphalte” is another.
All these, and many more of the same description, are really what may be better and
more correctly described as “tar concrete” or “tar paving,” and consist of different
modifications of the homely coal-tar and limestone.
So long ago as the year 1840, “Lord Stanhope’s Composition” was well known; it was
made as follows:
Three gallons of Stockholm tar, 2 bushels of well-dried chalk, 1 bushel of fine, sharp,
clean sifted sand, the whole being boiled in an iron caldron.
Tar paving is now made in many and various ways by different surveyors of towns,
some making it with hot compositions, some with cold. A description will be found in the
chapter on Macadamised Roadways, page 46, of one method of making it, a modification
of this being all that is necessary for foot pavements.
The best paths of this description that I have seen are to be found at Torquay, and by
the kind permission of Mr. John Little, County Surveyor of Devon, and late Surveyor of
Torquay, I give his useful specification in detail, as follows:

Tar Concrete for Footpaths.

Proportions of Materials.
12 barrow loads of engine ashes.
4 „ „ screened slaked blue lias lime.
4 „ „ small spar or sharp grit.
34 gallons of best gas tar.
20 bucketsful, say 70 to 80 gallons of water.

Method of Mixing.—On a clean flagged or wooden floor spread three barrow-loads of
ashes, then about one barrow-load of lime, and so on until the whole
of the dry materials (or one mixing) has been spread; then throw over them about three
bucketfuls of tar, and before mixing it with them add (say) six bucketfuls of water; then
mix as for concrete, and when the liquids are pretty well absorbed add a similar quantity,
mix again, and so on until all the liquids have been absorbed; the mass will then be
something of the consistency of ordinary mortar. Next pass the whole three times at least
through a pug mill: if this be not done the concrete will be a failure. An ordinary hand
pug-mill will not be sufficient; the knives are not strong enough, nor will it incorporate
the materials thoroughly, but an upright pug-mill, worked by steam power where
practicable, or by at least one horse, should be used.
It will be found that as the mass emerges from the pug-mill a large proportion of the
water will run from it; means should therefore be provided for allowing the water to

Page 107

escape freely from the floor.
Method of Laying.—Prepare the path for a layer of concrete 3 inches in thickness, on a
hard dry bottom, inclining from the inside to the kerb, at the rate of
¹⁄₂ an inch to a foot for pathways not more than 6 or 7 feet wide, but for wider pathways
an inclination of ³⁄₈ of an inch to a foot will be sufficient.
A template the full width of the path having been provided, lay concrete with a shovel
on the inner side of the path for a length of (say) 15 feet and a width of 1 foot, at such a
height that when it has been well rammed and patted with shovels it shall be the exact
height intended for the path; this is to form a resting-place for one end of the template,
the kerb forming that for the other end; then fill the intervening space with concrete up to
the template, treading and ramming it solidly for about twenty minutes, and as it gets into
shape, patting it with shovels and smoothing with a trowel; then, with an iron (not stone)
roller weighing about 5 cwts., roll for two hours, trimming and filling up hollows where
necessary; then go on with another length, and occasionally roll the first for half-an-hour,
and so on. Experience alone will decide the quantity of rolling necessary after the first
day or two, as weather and other causes tend to a more rapid solidification of the
concrete at some times than at others.
On the third day, sprinkle a small quantity of sea or other very fine sand on the
concrete, and allow it to remain for two or three days after the path has been in use—it
should then be removed.
General Remarks.—The ashes should not be those from a saw-mill or other place
where wood ashes would be mixed with them. All ashes, spar or grit,
and lime, should be passed through a screen of ³⁄₈-inch mesh. The lime should be the best
blue lias, slaked under cover; it should be allowed to lie for at least four days, but not
more than six days, before it is used. The spar or grit should be sharp and angular.
Great care should be taken to keep the concrete free from mud or dust; it should be
tipped from the carts or barrows, either directly into place, or, if this cannot be done, a
few slabs or boards should be laid down, on which it may be tipped.
The path should not be used until the concrete is sufficiently solid to bear a man’s
weight without taking the impression of his boots.
It has been found by experience that the laying of this concrete should not be
commenced before May, and that it should not be continued beyond the end of
September (or middle of October, if the weather is very fine). Frost is fatal to it before it
has become hard, and continuous cold wet weather retards considerably the hardening.
There can be no doubt that a pavement of this description for traffic that is not too
heavy answers every requirement; for streets of greater traffic, genuine mastic asphalte
should be used.
Before closing my remarks on artificial asphalte pavements, the following description
of an American method may be interesting:
On a dry foundation is placed a coat of rough clinkers from anthracite coal or iron
clinkers from a foundry, mixed with sand and tar in the proportions of 15 cubic feet of
fine sifted ashes, 14¹⁄₂ cubic feet of pit sand, and 1¹⁄₂ cubic feet or 9 gallons of tar. This is
laid about 3 to 4 inches thick and well rolled. Over this is placed a coating from 1 inch to

Page 108

1¹⁄₂ inch thick, composed of 15 cubic feet of coarse sifted ashes, 15 cubic feet of clinkers,
and 1¹⁄₄ cubic feet or 8 gallons of tar. It must be then well rolled and sanded, care having
been taken that the materials are thoroughly mixed.
Gravel Footpaths.—For the suburbs of a town and in the country, nothing looks so
pretty as a gravel footpath.
The same rules that apply to a macadamised roadway apply to a gravel footpath. They
must be well “bottomed,” and well drained and well rolled. Limestone or other stone
chippings may with advantage be used with a pit gravel for constructing paths of this
description, and a barrelled surface looks better and is more enduring than a hanging
path. The following cross sections of footpaths will explain themselves better than any
long description:

Large illustration (163 kB)

Gravel footpaths are sometimes tarred over when thoroughly consolidated. This must
be done only when the weather is quite settled and fine: the least rain will spoil the whole
operation; it consists in simply tarring over the surface of the footpath in the same
manner that a gate or wall or any other substance would be tarred. The surface of the path

Page 109

must previously have been swept perfectly clean, and immediately as the tarring is
completed, fine stone dust must be sprinkled on its surface; the traffic should be diverted
from it for a few hours, and it is then ready.
Care must be taken that the tar is not too thin in consistency, and that the coat is not
put on too thick. Treating a path in this manner saves gravel, which is washed or kicked
off it if left with an ordinary surface; but a cold night, a slight shower, or inferior tar will
make the whole process abortive, and the path will be in a fearful mess in the winter.

[101] Concrete is especially necessary as a foundation for asphalte, as it has little or no power of
resistance to vertical pressure in itself, and indentations in its surface would be very unsightly as well as
hold water. The concrete should be perfectly dry and thoroughly set before the asphalte is laid on it.
[102] Vide ‘Proceedings of the Institution of Civil Engineers,’ vol. i. p. 6.
[103] Trinidad bitumen is best, but it has to be refined before it can be used. This is done by cooking it
with shale oil, then straining it and decanting it, which is a troublesome and tedious process, and there is
great danger of fraud being practised. Good bitumen can be detected by its elasticity and softness when
rolled between the finger and thumb, and also by its smell.
[104] Vide ‘Proceedings of the Institution of Civil Engineers,’ vol. xliii. p. 293.
[105] Ibid, vol. xliii. p. 293.
[106] A rule is sometimes made that York flags should be ¹⁄₂-inch thick for every square foot of surface,
but they should never be less than 2 inches thick.
[107] Vide ‘Roads, Streets, and Pavements,’ by Q. A. Gillmore, p. 208.
[108] Sawdust 2 feet in thickness has sometimes been used, well rammed and rolled.
[109] The town of Brighton is an instance of this. Ordinary red bricks used to be laid as a footpath, no
doubt to give a rural appearance for the eye of the jaded Londoner, but these are giving place to more
modern materials.

Page 110

CHAPTER XII.
KERBING AND CHANNELLING, ETC.

For all footpaths both urban and sub-urban a kerb of some description is necessary to be
fixed on the outside of the footpath, for the following reasons:
(1.) It acts as a sill against which the material of which the footpath is paved may butt.
(2.) It retains both the foundation and surface of the footpath.
(3.) Whether there is a paved channel gutter or not, a kerb is necessary in order to
finish the haunches of the roadway.
(4.) The appearance of a footpath without kerbing is very unsightly.
(5.) Unless a footpath is raised above the roadway it is liable to be flooded.
Many materials are used for kerb, of which granite being the best is generally used in
streets where there is much traffic, as the kerb is often subjected to severe blows from the
passing vehicular traffic as well as a grinding action from the wheels of waggons and
other heavy vehicles, especially on gradients where “hugging” the kerb acts as a drag or
break. In such cases granite, although the most expensive in the first case, is certainly the
most economical, and no other material should ever be used.
Granite kerb varies in dimensions considerably in different localities and according to
the width of the footpaths, the wider the path the wider should be the kerb. It should
however never be of less depth than 9 inches, nor narrower than 4 inches; depth is
necessary to prevent the kerb turning over towards the channel gutter, or water table as it
is sometimes termed, and the filling in on the gutter side must also be well rammed with
a bar to prevent this. Kerb should never be in less lengths than 3 feet, and when 8 inches
and broader it is better that the top surface should be bevelled off to conform with the
slope of the footpath, but in narrower kerbing such a practice is unnecessary, and if
carried to an extreme may even be dangerous.
The kerb should be drafted about 1 inch along both top edges and hammer dressed
about 5 inches on the face, in addition to the whole surface of the top and for 3 inches at
the back, in order that there may be a smooth surface visible against the channel gutter,
and also for the flagging or other paving to butt fair against, besides giving a clean
appearance to the aris of kerb both inside and out.
The following section of an 8-inch granite kerb will explain this:

Page 111

Large illustration (106 kB)

The top surface should always be tooled or axed whenever it has worn smooth and
slippery, as a slip from a kerbstone often causes a very bad fall to a pedestrian.
Setting kerb requires a very experienced hand, for as it is set dry great care must be
shown, or it will sink, turn slightly over, or move even months after it has been set. In
addition to this it is heavy stuff to handle, but unless the line is accurate both as regards
level and contour, the appearance will be exceedingly bad. Of course the skillet line and
boning rods are freely used in setting kerb, but even with these helps one mason will set
kerb in a pleasing manner, whilst another, with even more care, does not seem able to
make it appear graceful.
Deep and narrow kerb should be bedded on good clean river gravel, and beaten into its
place with hard blows from a heavy wooden setting maul or beetle weighing not less than
50 lbs.
Broader and shallower kerb should be bedded on concrete.
In addition to granite, kerbing is also made of Endon or Yorkshire stone, limestone,
and for brick pavements a kerb specially made of the same material is generally used; it
is also, though not often in this country, constructed of wood, old railway sleepers being
used for the purpose. In the more rural districts grass sods are used with good effect for
gravel paths.
It is difficult to estimate the cost of kerbing, as local questions must interfere, carriage
of the material and value of labour entering so largely into the question.
Mr. Codrington[110] states that “A limestone kerb about 1 foot deep and 4 inches wide
costs from 2s. 6d. to 3s. 6d. per lineal yard, and a channel 10 inches wide by 6 inches
thick rather more.
“Granite kerbs 12 inches wide by 9 inches deep, 6s. 6d. to 7s. per yard run.
“Granite channel 12 inches wide by 6 inches deep, 4s. 6d. per lineal yard.
“A channel 12 inches wide, formed of granite cubes 4 inches by 7 inches, costs about
the same.”
I have found that granite kerb 6 by 12 inches could be fixed “in situ” at 3s. 3d. per
yard run, and 8 by 12 inches at 4s. 6d. per lineal yard.
Granite channelling composed of 3 courses of granite pitchers 6 by 8 inches, costing
5s. 6d. per lineal yard.
Limestone channelling 15 inches in width by 3 inches in depth, costing 3s. per lineal
yard.

Page 112

A paved channel, gutter, or water table is of the greatest use to a roadway, besides
adding greatly to its appearance. Without such a channel the haunches of a road become
sadly damaged by the wash of the surface water, which is sometimes so extreme as to
undermine the kerb and cause it to fall out.
These channel gutters are made of different materials for macadamised roads, granite
setts laid in the direction of the gutter being the best. A channel gutter should not be less
than 18 inches wide, so that if made with ordinary 3-inch setts, 6 courses will be
necessary; they should be bedded on gravel and well grouted in with lime or cement
grouting. Sometimes granite slabs 18 inches wide by 3 or 4 inches thick are used and
make an excellent gutter, they are however liable to tip under heavy loads. Limestone
slabs can also be used in roads of light traffic with advantage.
In streets paved with granite setts, wood blocks or asphalte, the same material is used
for the channelling, the setts or blocks being however bedded in line with the channel
instead of transversely as in the street itself.
The channel gutter should take the slope of the roadway and the granite kerb should
show from 3 to 5 inches above it. At paved crossings it is well to keep them level with
the kerb so that pedestrians may step off the path on to the crossing without any drop, or
if there is any water in them at such points, it is a good plan to let the edge of the crossing
drop rather suddenly towards the kerb, so that the ordinary stride of the pedestrian carries
him on to the level.
Gulley gratings or buddle holes should be placed along the line of channel at such
intervals as may be found necessary. A great number of different forms have been from
time to time introduced for this purpose, the objects to be considered being:
(1.) Sufficient area to carry off all the water.
(2.) Not easily choked on surface by leaves or other debris.
(3.) Sufficiency of pit to retain all sand or road detritus and prevent it being washed
into the sewer.
(4.) The least possible obstruction to the traffic.
(5.) Constructed so that the pit may easily be cleaned out.
(6.) Trapped so as to prevent the escape of sewer gas.[111]
(7.) The drain from it should be easily freed of any obstruction.
One of the best forms of gully pit is that manufactured by Messrs. Oates and Green of
Halifax, as it meets nearly all the requirements which I have summarised as being
necessary for this description of work. The following drawing will explain itself:

Page 113

What is called a “buddle hole,” which is an opening under the kerb, has much to
recommend it as giving a free unobstructed waterway and at the same time avoiding the
necessity of a grating in the street itself. The following drawing will explain the general
features of this “buddle-hole:”

Large illustration (92 kB)

A great number of different descriptions and forms of gully pits are shown in Mr.
Baldwin Latham’s excellent book on sanitary engineering, to which I refer my readers for
any further information upon this subject.

[110] ‘The Maintenance of Macadamised Roads,’ by Thomas Codrington, p. 18.

Page 114

[111] In many towns the gully gratings are purposely in direct communication with the sewers, so as to
act as ventilators.

Page 115

CHAPTER XIII.
LIGHTING STREETS.

At the present moment the question of lighting streets by electricity is gaining so much
attention, that it must necessarily be first considered in connection with the subject of
lighting streets: but to enter fully into all the details and comparative merits of electricity
and gas as applied to street lighting would entail more space than can be afforded in this
work. It may however be of some use, even under the present state of uncertainty, if I
attempt to condense as much information upon this necessary part of a surveyor’s duty
into as small a compass as possible. Nor must it be forgotten that electric lighting will not
easily be adapted in old cities and towns, where, in addition to the main streets being
narrow and crooked, there are few large open spaces suitable for intense lights, and there
are numerous small courts and alleys which require lighting, and this for a long time to
come will probably be effected with gas.[112]
Section 161 of the Public Health Act 1875 enacts as follows:
“Any urban authority may contract with any person for the supply of gas or other
means of lighting the streets, markets, and public buildings in their district, and may
provide such lamps, lamp-posts and other materials and apparatus as they may think
necessary for lighting the same. . . .” (38 and 39 Vic. c. 55, s. 161.)
I do not propose to entertain the question of lighting where the gas works are the
property of the corporation, but only to give information that may be of use where a
contract has to be entered into between the corporation and a company. These contracts
are based nearly always upon the length of time at which the public lamps are to be kept
lighted, and may be summarised as follows:
(1.) The public lamps are lighted from sunset to sunrise every night throughout the
year; this averages 12 hours per diem, or about 4000 hours per annum.
(2.) The public lamps are not lighted on the nights of full moon, nor for two or three
nights before and after this period; the rest of the year they are lighted at sunset.
(3.) Similar to the preceding, except that the public lamps are not lighted during the
five nights of full moon, the night after they are lighted for one hour and extinguished on
the rising of the moon; this lighting increases from night to night about three quarters of
an hour until the moon has entirely disappeared, when the lamps are lighted during the
whole of the night for five consecutive nights. Then again on the appearance of the new
moon the lamps are extinguished the first night for about an hour that the moon is visible,
and this extension increases nightly about three quarters of an hour according as the
moon appears until the period of full moon, the intention being to profit by every hour of
the moon’s light.

Page 116

By this arrangement the lighting is about 2000 hours per annum, instead of 4000
hours, when it is continued throughout the night during the whole of the year.
(4.) Sometimes, in addition to the foregoing, the lamps are not lighted at all during the
summer months.
(5.) Occasionally the public lamps are extinguished at midnight all the year round, if
not for the whole, for some portions of the district, it being assumed that all respectable
citizens being in bed, no light is required.
(6.) In some cases every other lamp only is lighted in the summer months, and many
other similar variations for the sake of economy may be practised.
(7.) The public lamps are sometimes supplied by gas through meters, which is then
paid for at so much per 1000 cubic feet consumed.
Of all the above methods the first is undoubtedly the most satisfactory to the
inhabitants, the urban authority, their officers, and the gas company; it is the least likely
to introduce disputes, and although something may be saved by adopting the more
parsimonious methods enumerated, it is found in practice that the first is the best.
In drawing up an agreement with the gas company to light the public street lamps for
any length of time, the following points must be considered.

Hints for a Contract with a Gas Company.

The company to provide a sufficient supply of gas of the full illuminating power and
quality as provided by their Act.
Payment to be at so much per lamp, or per 1000 cubic feet consumed, or at per hour, or
whatever may be determined on.
Payment to be made by urban authority for lighting, extinguishing, cleaning, repairing,
etc., as may be agreed, such payments to be made quarterly, or at such times as may be
agreed upon.
The hours or times throughout the year during which the lamps shall be lighted to be
determined by a table, every lamp to be fully lighted within one hour of the time named,
and not extinguished before that named for extinguishing. The consumption of the gas to
be regulated and determined by Sugg’s or Borradaile’s street lamp governors, or such
other mode as is agreed upon.
The company to keep the governors and burners in repair, and also the lanterns, at a
fixed sum per lamp per annum.
The company to light and extinguish, and keep all lanterns clean, and all pipes, valves,
etc., in repair.
The company to keep the lamp posts etc., properly painted after they are fixed by the
urban authority. Lamps may be shifted or fresh lamps erected by the urban authority, on
their paying the cost.
The company not to be compelled to supply gas to lamps which are beyond a certain
distance of their existing mains, without compensation.
A certain pressure of gas must be maintained, to be ascertained by water gauges fixed
at certain public places, or at such points as may be determined.

Page 117

Any lamps burning under size or out, shall be immediately attended to by the
company. A deduction in payment for gas by the urban authority to be made if neglect
can be proved. An arbitration clause is necessary for this or other matters that may be
disputed, and also a clause for determining the agreement upon notice being given.
In supplying gas to the public lamps by meter, either wet or dry meters may be
employed, and these are fixed either in the lamp posts themselves or under the footpath.
Sometimes each lamp has a separate meter, but in the generality of cases one meter fixed
to a lamp gives the average of gas consumed by ten or a dozen of its fellows at the same
level, and in the same neighbourhood. The difficulties arising from this system are:
(1.) The liability of the meters to get out of repair, especially in times of severe frost,
or by vibration of traffic.
(2.) The first cost of providing and fixing the meters, and subsequent cost of repairs.
(3.) The trouble and cost of inspection and keeping the accounts.
And it is found that by employing either “Borradaile’s,” “Sugg’s,” or other regulators
the consumption of the gas can be readily adjusted to consume from 3 to 6 cubic feet per
hour, according to the requirements of the situation of the lamp.[113]
Lamp posts and lanterns are of innumerable sizes, shapes, and patterns, but the
following hints in connection with them may be of some service.
The lamp must not only be ornamental by day, but useful by night.
The light must not be placed either too high or too low.
The post must not be too clumsy so as to interfere with the pedestrian traffic, nor too
fragile so as to be easily broken if driven against. Bracket lamps have advantages in these
respects, and also in the very important one of throwing no downward shadow,[114] as
well as being cheaper.
The lantern should be made with the lightest possible amount of metal frame
compatible with sufficient strength, the angle bars should be very narrow to avoid
shadow, trap doors of perforated zinc or glass should be provided at the bottom for the
admission of the torch, and a good outlet at the top is essential for the escape of the
heated air. Flat glass is much cheaper and easier of repair than curved. The top of the
lantern should be furnished with a reflector cover, otherwise a large percentage of the
light is lost: this is very observable on approaching a large city, by the glare which is
thrown upwards. Some hundreds of different patterns of lanterns for street lamps have
been designed from time to time, and it is not necessary, nor have I space, to describe
them.
The burners should have steatite tips and be of varying size to suit the requirements of
the locality, the regulators which I have previously mentioned must be kept in good
repair. A lever tap is indispensable with the torch for lighting, as well as the trap door or
opening in the bottom of the lantern through which the torch is inserted.
Each public lamp post should be legibly numbered, and the surveyor should keep a
register in his office of all the public lamps in his town.
In order to determine the distance apart of the public lamps in a street, it must be
remembered that the intensity of light is directly proportional to the illuminating power
of the light, and inversely proportional to the square of the distance of the light, if

Page 118

unreflected. For instance, the illumination of any point between lamps may be arrived at
by adding all the quotients obtained by dividing the illuminating power in standard sperm
candles of each lamp, by the square of its distance in yards from the point.
Thus a point midway between two lamps of 15 candles each, 20 yards apart, would be
reckoned thus:
15 15
X= + = ·30
100 100
In this country, the rule has generally been adopted that public street lamps burning 5
cube feet per hour of 15 candle gas should not be placed at a greater distance than 60
yards apart, the average distance in most English towns being about 40 yards.
On this question, the following interesting particulars by Monsieur Servier will be of
special interest.[115]
It appears to M. Servier that up to the present there has been too much straining after
intensity, with insufficient care for the object of obtaining a proper quantity of light
uniformly spread over the surface of the ground. The paper in question is therefore
intended in the first place to elucidate this latter subject, so as to determine beforehand
the necessary intensity for luminous centres, gas or electric, and also their height from
the ground and distance from each other required to produce a certain effect. With this
purpose M. Servier proposes to determine for any point of the road-surface, by the law of
the squares of the distances, the intensity of light, in terms of the Carcel standard, which
is spread at that point by one or more lights of given power. Representing these
intensities by proportional ordinates, the extremities of these ordinates form an irregular
surface, and the volume contained between this surface and that of the roadway
represents a specific value equivalent to the total luminous intensity distributed over the
soil. In default of a better term, M. Servier calls this a volume of cubic Carcels, a cubic
Carcel being the intensity of a Carcel (9·5 standard candles) multiplied by a square mètre
of surface. The different cases capable of being valued in this manner are as follows:
1. A burner consuming 140 litres (5 cubic feet nearly), and of 1·1 Carcels (10·45
candles) illuminating power, placed at the height of 3 mètres (9 feet 6 inches). This
burner gives at the foot of the lamp-pillar a maximum intensity of 0·122 Carcel (1·159
candles), and at 10 mètres (32·8 feet) away the illuminating power is reduced to 0·01
Carcel (0·095 candle). The distance of 20 to 30 mètres kept between the street lamps,
even in the best-lighted towns, is therefore excessive, for these should not be more than
13 mètres (14 yards) apart in order to obtain between them the minimum illuminating
power of 0·05 Carcel (0·475 candle), sufficient for enabling passengers to read.
2. The second case is that of a burner consuming 1400 litres (50 cubic feet nearly) of
gas, with an illuminating intensity of 14 Carcels (133 candles), placed at the height of
3·20 mètres; this being the class of burner fixed in the Rue du Quatre Septembre. The
intensity of light at the foot of the lamp-pillar is 1·367 Carcels (13 candles nearly), and to
obtain the light of 0·05 Carcel (0·475 candle) already mentioned as the least intensity
enabling one to read, a point must be fixed in a circle of 16 mètres radius from the lamp
as a centre. Taking now a group of six lamp-columns, three on each side of the street, and

Page 119

overlapping, as in the Rue du Quatre Septembre, it will be found that the distribution of
light is defective. The most brilliantly lighted point at the foot of the column has an
intensity of 1·367 Carcels (13 candles), or more than triple that of the darkest point,
which has an intensity of 0·5 Carcel (4·75 candles) at 4·58 mètres distance.
3. A lamp of 50-Carcel (475-candle) power, gas or electric, fixed at the height of 8
mètres (26·24 feet). The illuminating intensity at the point vertically under the light is
reduced to 0·7 Carcel (6·65 candles); but the light of 0·5 Carcel (4·75 candles) is to be
found in a circle of 6 mètres radius from this point. It will therefore be observed that the
distribution of light over the ground is better in proportion as the luminous centre is
higher; but conversely also, the amount of light thrown on the ground is greater as the
luminous centre is lower. It consequently results that the power of the light and its height
should be determined in every case with reference to the effect desired. The method
shortly described shows that, in the case of the lighting of the Rue du Quatre Septembre,
the mean amount of light per square mètre of the roadway is 855 décicarcel-cubes, the
best lighted parts having an intensity of 1·62 cubic Carcels, and the darkest portions an
intensity of 0·50 cubic Carcel.
M. Servier has examined the question of lighting a street 20 mètres wide and one or
more kilomètres long, with the condition that the illumination of the ground shall present
a mean determinate quantity of light per square mètre, or a given intensity at the darkest
points. Some interesting results are thus obtained. Thus, by substituting for the 14-Carcel
(133-candle) lamps in the Rue du Quatre Septembre, burners of 50-Carcel (475-candle)
power, with the condition of giving the same intensity of 0·5 Carcel (4·75 candles) to the
darkest points, a quantity of light more considerable than before will be required. That is,
a greater number of Carcels (3000 as against 1848 per kilomètre in length) will be
necessary in the larger burners than were required in the original smaller lamps. It is
therefore imperative, in order that the lighting shall be equally economical, that the unit
of intensity—the Carcel or candle power—shall be less costly in a lamp of 50 Carcel (or
475-candle power) than in the smaller lamps. By fixing lamps of 50-Carcel (475-candle)
power in the centre of the street, instead of along the side walks, maintaining the
condition of giving the light of 0·5 Carcel (4·75 candles) in the darkest parts of the
thoroughfares, it is found that the pillars must be 8 mètres high and 20 mètres apart. The
best-lighted part of the road would then have the intensity of 1 Carcel (9·5 candles), and
would therefore be only twice as brilliantly lighted as the darkest corner; the mean
quantity light per square mètre would be 755 décicarcel-cubes.
Lastly, the same method of lighting has been applied to the “ordinary,” as
distinguished from the “luxurious” lighting of the public thoroughfares, assumed to be 20
mètres wide, giving a light of 0·05 Carcel (0·475 candle) at the darkest points. With
ordinary street burners consuming 200 litres (7 cubic feet) of gas per hour, and giving
1·72-Carcel (16·34-candle) power, it is found that the lamps should be 18 mètres (20
yards nearly) apart, the burners being 3 mètres (9 feet 10 inches) high. With burners of
14-Carcel (133-candle) power placed at the height of 3·20 mètres (10 feet 6 inches), the
lamp-pillars would be 106 mètres (115 yards) apart. Or with lamps of 50-Carcel (475-

Page 120

candle) power placed at a height of 8 mètres (26·24 feet), the distance between the pillars
may be increased to 270 mètres (494 yards).
In the case of electric lighting M. Servier has studied two examples—the Jablochkoff
candle, and an arc light (system not stated). The former is credited with the illuminating
power of 16 Carcels (152 candles), and is fixed at the height of 5 mètres (16 feet 3
inches), on pillars 110 mètres (120 yards) apart. This would give a light of 0·65 Carcel
(6·27 candles) at the foot of the pillar, and a minimum intensity of 0·05 Carcel (0·475
candle) midway between the lights. The arc light is purposely made exactly equal in
computed efficiency to the larger Siemens burner of 50 Carcels (475 candles). In the
matter of expense, however, using the data applicable to Paris, with 12-candle gas at 6s.
6d. per 1000 cubic feet, M. Servier makes a striking comparison. The cost of lighting a
kilomètre of road in the “ordinary” manner last described varies very little for the three
classes of gas lamps—small, large, and very powerful—included in the calculation, and
ranges from 3·33 frs. to 3·96 frs. per hour. The cost of the same work done by the
Jablochkoff candle is estimated at about double, or 6·91 frs. per hour; and with the arc
light the cost would be 4 frs., or still higher than with the most costly system of gas
lighting, although less than the expense of the Jablochkoff electric light.
The following table will show the particulars of different lights so placed that persons
may see to read ordinary print in any part of the street, which may be taken as then being
a well-lighted street.

Con-
Greatest Least
Distance Number Total sump-
Illumi- Height Intensity Intensity
Description of of Illumi- tion
nating of of Light of Light
of Light. Lamps Lamps nating of Gas
Power. Lamps. on on
apart. per Mile. Power. per
Ground. Ground.
Mile.
Gas. candles. ft. in. yards. candles. cub. ft. candles. candles.
Batswing, 7 cubic feet 16·34 9 10 20 176 2876 1232 2·15 0·47
Cluster, 50 „ „ 133·00 10 6 115 29 3857 1450 13·10 0·47
Siemens, 100 „ „ 475·00 26 3 294 10 4750 1000 7·46 0·47
Electricity
Jablochkoff candle 152·00 16 3 120 29 4408 .. 6·18 0·47
Arc light 475·00 26 3 294 10 4750 .. 7·46 0·47

It must not be lost sight of, that the illuminating power of the gas in Paris is very low,
and is thus fixed. Under a pressure of 12 hundredths of an inch, gas burning at the rate of
4·05 cubic feet per hour (or 115 litres) shall give a light of 9·5 standard sperm candles (or
a “Carcel” lamp burning 42 grammes of pure colza oil) per hour.
The competition which has been started by the electric lighting companies has given a
great impetus to gas lighting. A large number of improved street gas lamp burners and
lanterns having been invented and brought into general use, the following particulars
with reference to some of those which were tried in the City of Exeter may be of use as a
comparison.

Page 121

Cost
Con-
per Hour,
sumption
Candle gas being
Description of gas
Power supplied
of Lamp. in
of Light. at 3s.
cubic feet
per 1000
per hour.
cubic feet.
pence.
Ordinary street lamp with batswing burner 15 5 ³⁄₁₆
Siemens’ 330 50 1³⁄₄
Ditto 130 25 ⁷⁄₈
Ditto 45 10 ³⁄₈
Sugg’s 50 16 ⁵⁄₈
Ditto 30 10 ³⁄₈
Bray’s 80 20 ³⁄₄

Having thus far given a few facts upon lighting streets with coal gas, I will now turn to
the question of lighting them by means of electricity, and in doing this the following
points will be considered:
(1.) The motive-power to be employed in producing electricity and its applicability for
the purpose.
(2.) The description of machinery to be employed.
(3.) The value of the light produced, and its adaptability to the requirements of any
town.
(4.) The comparative cost of the electric light as compared with gas.
(1.) Whatever motive power is employed, whether water-power, steam or gas, it is
essential that it should be steady and unfailing; steady, because the regularity and
uniformity of the light depends upon the evenness of the speed with which the power
works, and unfailing, because a stoppage means the immediate extinguishment of the
lights: electricity, unlike gas, is not stored after manufacture, but is used as fast as it
emanates from the producing power.[116]
Sensitive governors and careful bedding of the machinery greatly tend to lessen
unsteadiness, and are points of considerable importance.
(2.) The machinery consists of the dynamo machines, the conducting wires and the
lamps.
I will not here enter into the question of which is the best dynamo machine to employ,
as to discuss the merits of them all would involve a large amount of space; but for this
and other valuable information upon the subject of electric lighting I will refer my
readers to Mr. Hedges’ excellent little book entitled ‘Useful Information on Electric
Lighting,’[117] but the following points should be attended to. The dynamo machine
should be fixed in a dry place, and not be exposed to dust or flyings, it should be kept
perfectly clean, and its bearings well oiled, its coils and conductors should be perfectly
insulated, and it should, where practicable, be fixed on an insulated bed. With regard to
the wires, the following ‘Regulations for the prevention of Fire Risks arising from
Electric Lighting,’ published by the Society of Telegraph Engineers and of Electricians,

Page 122

are given in full, as they leave nothing to be desired in the way of their careful selection
and fixing:
“(7.) Every switch or commutator used for turning the current on or off should be
constructed so that when it is moved and left to itself it cannot permit of a permanent arc
or of heating, and its stand should be made of slate, stoneware, or some other
incombustible substance.
“(8.) There should be in connection with the main circuit a safety fuse constructed of
easily fusible metal which would be melted if the current attain any undue magnitude,
and would thus cause the circuit to be broken.
“(9.) Every part of the circuit should be so determined that the gauge of wire to be
used is properly proportioned to the currents it will have to carry, and changes of circuit,
from a larger to a smaller conductor, should be sufficiently protected with suitable safety
fuses, so that no portion of the conductor should ever be allowed to attain a temperature
exceeding 150° F.
“N.B.—These fuses are of the very essence of safety. They should always be enclosed
in incombustible cases. Even if wires become perceptibly warmed by the ordinary
current, it is a proof that they are too small for the work they have to do and that they
ought to be replaced by larger wires.
“(10.) Under ordinary circumstances complete metallic circuits should be used, and the
employment of gas or water pipes should in no case be allowed.
“(11.) Where bare wire out of doors rests on insulating supports, it should be coated
with insulating material, such as india-rubber tape or tube, for at least two feet on each
side of the support.
“(12.) Bare wires passing over the tops of houses should never be less than seven feet
clear of any part of the roof, and they should invariably be high enough, when crossing
thoroughfares, to allow fire-escapes to pass under them.
“(13.) It is most essential that the joints should be electrically and mechanically
perfect. One of the best joints is that shown in the annexed sketches. The joint is whipped
around with small wire, and the whole mechanically united by solder.

“(14.) The position of wires when underground should be efficiently indicated, and
they should be laid down so as to be easily inspected and repaired.
“(15.) All wires used for indoor purposes should be efficiently insulated.
“(16.) When these wires pass through roofs, floors, walls, or partitions, or where they
cross or are liable to touch metallic masses, like iron girders or pipes, they should be

Page 123

thoroughly protected from abrasion with each other, or with the metallic masses, by
suitable additional covering; and where they are liable to abrasion from any cause or to
the depredations of rats or mice, they should be efficiently encased in some hard
material.
“(17.) Where wires are put out of sight, as beneath flooring, they should be thoroughly
protected from mechanical injury, and their position should be indicated.
“N.B.—The value of frequently testing the wires cannot be too strongly urged. It is an
operation skill in which is easily acquired and applied. The escape of electricity cannot
be detected by the sense of smell as can gas, but it can be detected by apparatus far more
certain and delicate. Leakage not only means waste, but in the presence of moisture it
means destruction of the conductor and its insulating covering by electric action.”
The lamps may take either the “arc” form, or the “incandescent.” The former is
produced by the electric current passing between carbon points, and requires
considerable electrical pressure; they give a light of from 1500 to 4000 candle power; the
mechanism of arc lamps has to be of the most delicate kind to ensure the proper distance
of the carbon points being maintained. The lamps should be guarded by globes of frosted
glass, not only to prevent incandescent pieces of carbon from falling, but to lessen the
glare of the light. “Incandescent” lamps are of small size, giving a light of from 8 to 50-
candle power, which is produced by the heating of a filament of carbon in a vacuum
owing to the resistance caused to the electric current by this contraction of the conductor.
(3.) With regard to the value of the light produced, and its adaptability to the
requirements of any town, it will be seen on reference to the opening of this chapter that
at present considerable doubt exists as to its adaptability for general public lighting, and
as each town varies in the length, straightness, and width of its streets, the number of its
large squares or confined courts and alleys, the surveyor must use his own judgment as to
the suitability of the light before recommending his corporation to adopt it.
As to the value of the electric light, there can be no doubt that a most brilliant and
powerful light is produced by the voltaic arc: so brilliant indeed, as to render it necessary
to screen it nearly always behind frosted or opalescent glass globes, the former being
found to be much the best for many reasons.
As to the photometrical value of the light, some considerable difficulty has hitherto
been experienced in obtaining accurate observations, principally owing to the peculiar
colour of the electric light, and also from its fluctuating character; but these difficulties
are being steadily overcome, and with a photometer mounted on a light frame with
wheels, some excellent experiments have been made in the public streets upon the
comparative values of different lights.
(4.) The last and really one of the most important questions remaining to be discussed
is that of the cost of the electric light as compared with gas.
With reference to the cost of the electric light, the following table may be of use; it is
compiled from an excellent paper on electric lighting, by Mr. James N. Shoolbred:[118]

Table of Comparative Estimates of First Outlay and
of Working Expenses of some Systems of Electric Lighting.

Page 124

First Cost, including
Name of Machine. Working Expenses per hour.
Engine to drive it.
One Two Three Five One Two Three Five
light. lights. lights. lights. light. lights. lights. lights.
£ £ £ £ s. d. s. d. s. d. s. d.

Gramme single light “A” with
- 330 535 725 935 1 6 2 1 2 7 3 0
Siemens lamp

Cost per light per hour - — — — — 1 11·4 1 4·8 1 2·2 0 10·2

Siemens single light
“medium” with Siemens - 365 611 835 1185 1 7¹⁄₂[119] 2 4 2 10 3 9
small-sized lamp

Cost per light per hour - — — — — 2 1·4 1 6·8 1 3·84 1 0·8

Six Twenty
Six lights. Twenty lights.
lights. lights.
£ £ s. d. s. d.
Gramme “many light”
- 576 1155 2 8 6 3
machine with candles

Cost per light per hour - — — 0 6·4 0 4·2

Mr. Shoolbred has also given another table[120] of street lighting which partly deals
with the question of cost, it is as follows:

Illuminating
Annual
Cost to Power
Date of Length of Cost No. of
Municipal of each Remarks.
Lighting. Street Lit. per mile Lamps.
Authority. (on
of street.
horizontal).

City of London.

District No. 1. (Ludgate Hill, &c.).—“Brush” Electric Light Co.
yards
£ £ candles.
lineal.
Mar. 31, 1881
to - 660[A] 1750 660 32 arc 950 1 40-light Brush machine.
Mar. 30, 1882
[A] Add £750 to cost, for fixing
and final removal of
apparatus.
District No. 2. (King William Street, &c.).—Siemens Bros. & Co., Ld.
Mar. 31, 1881
to - 2270[B] 1960 2026 6 arc 4000 6 continuous current machines.
Mar. 30, 1882

Page 125

23 arc 330 2 alternating ditto.
[B] Add £1450 to cost, for fixing
and removal of apparatus.
Metropolitan Board of Works (Thames Embankment).—“Jablochkoff” Co.
Dec. 13, 1878
2¹⁄₂d. per light 60 3 Gramme double-machine (“A”
to - 2540 1131 380
per hour. candles and divider).
June 30, 1881
1 Ransome’s steam engine. 20
HP nominal.
July 1, 1881
1¹⁄₂d. per light
to - .. 753
per hour.
June 30, 1884}
City of Norwich (Prince of Wales’ Road, &c.).—R. E. Crompton & Co.
Aug. 15, 1881
to - 710 1700 531 5 arc 2000 4 Bürgin machines.
Jan. 31, 1883
1 Ransome’s steam engine, 20
9 arc 500
HP nominal.
Chesterfield (Market Place, &c.).—Brush (Hammond) Electric Light Co.
Nov. 1, 1881
to - 855 3500 .. 22 arc 950 2 40-Light “Brush” machines.
Oct. 31, 1882
100 2 Fowler’s semi-portable
Incan- 16 compound engines 20 HP
descent. nominal.

As to the comparison of cost between the electric light and gas, this has only, I believe,
been properly estimated on the Thames Embankment, London, by Sir Joseph Bazalgette,
the results of whose investigations upon this important point I shall give presently; it has,
however, been stated generally, and without contradiction, that arc lights can be produced
of about 2000 candle power, with 1 HP at a cost of from 3d. to 6d. per candle per annum
of 4000 hours, gas costing from 1s. 9d. to 3s. 6d. per candle according to the price of the
gas.
Incandescent lamps cost 3s. to 4s. per candle per annum, as their life is short, and only
200 candle power can be got from 1 HP.[121]
The latest investigations into the comparative cost of lighting by gas and electricity
upon the Victoria Embankment and Waterloo Bridge in London, show that the lighting as
effected by 96 gas burners for an average of 12 hours burning all night, and 121 gas
burners for 6 hours lighted after the electric lights are put out, together with the electric
lighting 40 lights on the parapet of Embankment, and 10 on the bridge, costs 834l. for the
gas and 663l. for the electric light per annum. Gas costing 3s. 2d. per 1000 cubic feet
showed a cost of nearly 1s. per hour for every 1000 candle power of light. The electric
lights cost 1¹⁄₂d. per light per hour, which is stated to represent 5·66 pence per 1000
candle power of light; each electric light as now used, it is said, gives a photometric light
of 265 candles, frosted glass globes being found to pass much more light than the
opalescent globes.

Page 126

These are by far the most important and reliable comparisons that have hitherto been
made, and it will be seen that the cost is in favour of the electric light.
There is no doubt that the acme of all artificial lighting is the prolongation of the light
of day, and whether this is proposed to be effected by electricity or gas, it should be the
goal aimed at by all who make this question their study.

Page 127

[112] Since writing these lines the following letter has appeared in the Standard and has
never been refuted, which shows that electric lighting for streets is not yet all that can be
desired:
Electric Lighting.

To the Editor of the Standard.
Sir,—At this time, when the question of lighting by means of electricity is receiving so
much attention, and as Chesterfield is the only town in England whose lighting is done
throughout by electricity, it may be interesting to your readers to know what our experience
has been.
I need not detail the stages which led to our abandoning gas, and taking up the electric
light after being in darkness some months. I may briefly state that, after going carefully
into the question, we decided to adopt the system whose praise was in everyone’s mouth a
year ago, namely, “The Brush,” and, though we were applied to by other companies, we
placed the execution of the work in the hands of the one that we considered the most
suitable—the Hammond Company. During the negotiations of the contract, Mr. Hammond
particularly pressed us not to stipulate for incandescent lamps, as he acknowledged that
their Company were not in a position to cope with incandescent lighting for public
purposes. We, however, decided upon the town being lighted with the Lane-Fox
Incandescent Lamps, as well as the Brush Arc Lights.
After waiting many weary months for the completion of the incandescent lighting, it is
now, when declared by the contractors complete, in my opinion a decided failure. The
Lane-Fox lamps, which have been supplied by the Brush Company, are most variable in
their lighting power; whilst some are good, others only give a feeble light instead of a light
equal to that of fifteen candles, as expected. The arc lights are doing good service in some
of the large streets, but as a whole I think it has been fully demonstrated in a year’s trial in
Chesterfield, that the field for arc lighting is very limited indeed.
Though the tradesmen have been canvassed by the Hammond Company with a view to
introducing the arc lights into their shops and hotels, in not one single case has the light
been adopted. Indeed, it is evident to us who have them under our eyes every night, that
they are only fit for lighting works and large, open spaces. The experience that has been
thus gained at Chesterfield at the present juncture must be of value to all towns intending
to adopt the electric light, and is my reason for troubling you with this letter, although I
believe the time will shortly come when lighting by electricity may be advantageously
adopted, both for public and private purposes.
I am, Sir, your obedient servant,
Geo. Edwd. Gee,
Alderman of the Borough of Chesterfield.
High Street, Chesterfield, October 10, 1882.
[113] The Surveyor of Folkestone says: “Sugg’s self-acting regulator is used, adjusted as
nearly as may be practicable to consume 4 feet per hour, and so very satisfactory is this
apparatus that for the last two years, after burning 7294 hours, it is found by the average
meter to have consumed 29,227 feet, as against 29,176 feet as per regulator, being only 51
feet in excess of that which the apparatus is adjusted to consume.” Vide Ellice Clark on gas

Page 128

in Public Streets, ‘Proceedings of the Association of Municipal and Sanitary Engineers and
Surveyors,’ vol. ii. P. 193.
[114] Bracket lamps may not be fixed by an urban authority to houses within their
district without the previous consent of the owners of such houses. Vide ‘Fitzgerald’s
Public Health Act,’ third edition, p. 182.
[115] Meeting of the ‘Société Technique de l’lndustrie du Gaz en France’ in 1882.
[116] “Faure’s” batteries can store electricity, but at present this cannot be manipulated
on a very large scale.
[117] Published by Messrs. Spon, 16 Charing Cross, London.
[118] Vide ‘Proceedings of the Association of Municipal and Sanitary Engineers and
Surveyors,’ vol. vi. p. 9 et seq.
[119] Siemens’ light at Blackburn cost 2s. per hour per lamp of 6000 candle power.
[120] Vide ‘Proceedings of the Association of Municipal and Sanitary Engineers and
Surveyors,’ vol. viii. p. 171, &c.
[121] On this point Mr. W. G. Laws, Borough Engineer, Newcastle-upon-Tyne, says:
“Taking as an example a street a mile long, lighted by the arc system, the arrangement
would probably be lamps 60 yards apart, placed alternately on either side, giving 30 lamps
or 60,000 candles at a cost of about 800l. per annum. If lighted by ‘incandescent lamps’ we
should have them placed about 30 yards apart on both sides: that is, 120 lamps giving 2400
candles at a cost of about 420l. per annum. The number of gas lamps for the same distance
might be 150, giving about 2250 candles at a cost of 300l. per annum.” (‘Proceedings of
the Association of Municipal and Sanitary Engineers and Surveyors,’ vol. viii. p. 65.)

Page 129

CHAPTER XIV.
STREET NAMING AND NUMBERING.

It was not until the commencement of the present century that
inconvenience was apparently felt from the want of any distinguishing
names of streets, or numbers to houses, either in London or provincial
towns; the first Act of Parliament on the subject being one passed in the
year 1819, which gave powers to vestries and district boards to put up the
names of streets, and even then for some considerable period afterwards
houses or premises were not marked with numbers, but with distinguishing
trade signs or names.
The Towns Improvement Clauses Act 1847, however, contains the
following clauses which are incorporated with the Public Health Act 1875,
by the 160th section of that act:
“The commissioners shall from time to time cause the houses and
buildings in all or any of the streets[122] to be marked with numbers as they
think fit, and shall cause to be put up or painted on a conspicuous part of
some house, building or place at or near each end, corner, or entrance of
every such street the name by which such street is to be known; and every
person who destroys, pulls down, or defaces any such number or name, or
puts up any number or name different from the number or name put up by
the commissioners, shall be liable to a penalty not exceeding 40s. for every
such offence” (10 & 11 Vic. c. 34, sec. 64).
“The occupiers of houses and other buildings in the streets shall mark
their houses with such numbers as the commissioners approve of, and shall
renew such numbers as often as they become obliterated, or defaced; and
every such occupier who fails within one week after notice for that purpose
from the commissioners to mark his house with a number approved of by
the commissioners, or to renew such number when obliterated, shall be
liable to a penalty not exceeding 40s.; and the commissioners shall cause
such numbers to be marked or to be renewed as the case may require, and

Page 130

the expense thereof shall be repaid to them by such occupier, and shall be
recoverable as damages” (10 & 11 Vic. c. 34, s. 65).
Some difference even now exists as to the manner in which streets are
named, there being considerable diversity in the sizes, colours, and
materials of the name plates, as well as in the spaces allowed for the letters.
The following list is given to show how this diversity existed in the
metropolis even so late as the year 1870.
Table taken from a “Memorandum by the Superintending Architect of the
Metropolitan Board of Works, relative to the enforcement of the Law
regulating the naming of Streets and numbering of Houses in the
Metropolis” (1871):

Parish A. Parish B.
Names on houses at corners of streets 237 281
„ on piers of railings 24 36
„ on iron plates 6 44
„ on wooden boards 18 36
„ on enamelled plates 1 2
„ impressed in terra cotta 2 3
„ in cement letters 14 9
„ in Minton’s china letters 2 1
„ engraved on stone 5 13
„ on porcelain plates 1 1
„ with raised letters on iron girder 1
„ on board on posts 11
„ on zinc 2

And to this table are added the words “Some names are completely hidden
by vines, names given for ‘streets’ are put up as ‘roads.’” Since this table
was prepared however, the confusion has been rectified by the energetic
action of the Metropolitan Board of Works.
It is no doubt essential that for postal, telegraphic, and social reasons
there should be uniformity in the manner in which the naming and
numbering of streets is carried out, and the following particulars and
suggestions may be of use.
Names of streets should be marked up in such a manner as to be legible
both by day and lamp light, and the materials of which the name-plates are
composed should be of sufficient strength to prevent any damage accruing
to them from stone-throwing or other wilful or accidental injury, or from the

Page 131

action of changes of temperature or climatic influences of any kind, and the
following list is given descriptive of some of the modern methods of
effecting this:
Minton’s China Tiles.—These are white glazed china tiles 6 inches
square, on which either blue or black letters are
burnt in, one letter on each tile (except in the case of St. which is on one
tile); they are fixed by chasing them into walls of buildings, and setting
them in cement. They are the best description of name-plate with which I
am acquainted, their cost being only 6d. each, with the additional
advantages of being not easily broken, they can be removed and re-used
with facility, weather has no effect upon them, and they require no attention
whatever after they are once fixed.
Cast-iron Plates with Embossed Letters.—These are generally painted
with a white ground, and black
letters; they are liable to become broken, and as they are fixed with screws
these rust through in course of time, when the plate may suddenly fall in a
dangerous manner into the street; another disadvantage is that they require
to be painted about once every three years.
Painted Names on Walls of Buildings.—This method requires no special
mention; it is an economical plan
and is more adopted than any other, but the letters must be painted every
three years at least, and they are apt to be defaced if the premises are
painted by the owner or occupier.
Enamelled Iron Plates.—These look very well, but they are apt to get
loose, and a blow from a stone will shiver them.
Wooden or Metal Figures cut out and fastened on to Boards or against
Walls.
—The same objection holds good with this method as with others of the
same description, the fastenings fail in time, and the name disappears.
Enamelled Glass Tablets in Street Lamps.—This is an excellent method
of recent introduction, and has
many advantages. The name can be seen very plainly either by day or night,
no private premises have to be interfered with in fixing them,[123] a
uniformity of position or “where to look” for the name of the street is
secured, and there is no limit to the number of times the name may be
repeated.

Page 132

Where the names of streets are placed against buildings the letters which
compose the name should not be less than 4 inches in height by 2 inches in
breadth, with a space between each letter of not less than 1 inch; a light
colour should always where practicable be used for the back ground, and
black or blue for the letters. One great objection to painted letters is that
they must be frequently repainted, and in order to do this, ladders have to be
raised against the building, which the occupiers naturally object to without
previous notice: it is always very annoying to any citizen to have the head
of a painter appearing outside his bed-room window at any time, and more
especially at an inconvenient hour in the morning.
In selecting names for streets it is very important that they should not be
duplicated in a town, and also that there should be some sense in their
nomenclature; generally some local association can be found with a family
or historical name which is suitable for the street. Nothing is more
ridiculous than to see such names as Bath Street or York Road given to
streets which have as much association with such places as with Jericho.
The street having been properly and conspicuously named, the next point
to consider is that of the manner in which it shall be numbered, there being
three methods in vogue by which this can be effected.
(1.) By allotting even numbers on one side of the street and odd numbers
on the other side.
(2.) By allotting consecutive numbers up one side of the street, and down
the other side.
(3.) By allotting corresponding numbers to both sides of the street, which
are distinguished by a prefix of north and south, or east and west, as the
case may require.
The first is by far the best method to pursue, for the following reasons:
If the street is ever extended after being numbered, the sequence is in no
way disturbed. By this method any house can be more easily found, as on
reference to a directory it will at once be seen at which end of the street it is
situated. If the second method had been adopted this would be impossible,
except for the first few numbers, and where a street is of considerable
length with branch streets running into it this is of the greatest importance.
It is the best method also for the Post-Office officials, as it facilitates the
district sorting of the letters.
Giving each side of the street distinctive prefixes to its name, such as
north and south, &c., is evidently a bad plan, and leads to much confusion.

Page 133

In allotting numbers to premises in a street, if it has been already
numbered care should be taken to disturb existing numbers as little as
possible, for an altered number involves considerable expense as well as
inconvenience to the occupier of business or trade premises, owing to the
necessity of altering bill heads, letter paper, &c., and sometimes even
considerable trouble and expense in order to secure the validity of the title.
Avoid numbering from right to left, and take care to allot sufficient
numbers to vacant spaces which may eventually be built upon, and to do
this the length of frontage may be divided into such lengths as (in the
surveyor’s judgment) will represent the new frontages. In any case it is
better to have too many numbers in a street than too few, and large
premises, and any public or other buildings which may be removed, and
other buildings substituted should have numbers allotted to them, although
it will not be necessary to serve the notices to have them affixed. Most large
shops prefer to have more than one number, although I have heard the
rather far-fetched contention urged, that more than one number means extra
rating.
Considerable care must be exercised to ensure that no separate premises
are passed over in allotting the numbers, often only a door or side passage
denoting the existence of another claimant for a number. Nothing looks
worse in a freshly numbered street than to see such numbers as 37A or 96¹⁄₂
placed upon premises that should have had a distinct numeral, and thus
showing that they must have been left out.
The manner in which streets are numbered is generally as follows:
The town surveyor or one of his assistants walks through the street, and
with a piece of chalk legibly marks each house with its correct number,
taking care to observe the precautions I have enumerated; having done this
throughout its entire length, these numbers must be entered in a book with
the name of the occupier written opposite to the number. Upon returning to
the office the surveyor must then fill up and serve the necessary notice upon
each of these occupiers, the following being given as a specimen of such
notice:

Urban Sanitary Authority for the .
Town Surveyor’s Office, 188 .
____________

Page 134

I beg leave to give you notice, that the Town Council of , as the
Urban Sanitary Authority, have approved of the number for the house
in your occupation, in .
You are therefore required, within one week from the date of this notice
[to obliterate the present number, and][124] to mark the said house with the
number so approved of, and to renew the same from time to time in the case
of its becoming obliterated.
A penalty of 40s. will be incurred in the event of default in compliance
with this notice.
I am,
Your obedient Servant,
_________________________
Town Surveyor.
To __________________
No. __________________

In the event of the old number with which any premises were marked not
being obliterated by the occupier, the following notice may be served:

Urban Sanitary Authority for the .
Town Surveyor’s Office, 188 .
____________
It has been reported to the Town Council that you have neglected to
obliterate the old number of your premises, No.
Street, after receiving notice of a new number being allotted to such
premises by the Town Council, whereby you have incurred a penalty of 40s.
The duplication of numbers in the same street was found to be the
occasion of so much inconvenience, that the Council were obliged to re-
number the street in question, and it is manifest that if a number allotted to
another house is retained by you, the inconvenience sought to be removed
will still remain.
I am therefore instructed to inform you that unless the old number of
your premises is obliterated within seven days from the date of this notice,
proceedings will be taken against you for the recovery of the penalty
incurred.
Yours faithfully,

Page 135

_________________________
Town Surveyor.

Of course, if nothing is done after service of this second notice, it only
remains to summon the offender as provided by the sections of the Act,
which I have given in the early part of this chapter.

[122] “Street” includes any highway (not being a turnpike road), and any public bridge
(not being a county bridge), and any road, lane, footway, square, court, alley, or passage,
whether a thoroughfare or not. (38 & 39 Vic. c. 55, s. 4.)
[123] The law apparently gives the Sanitary Authority power to fix names of streets
against any premises they may choose, without first applying for or obtaining any consent
from either the occupier or owner of such premises. (Vide 10 & 11 Vic. c. 34, s. 64.)
[124] If the premises have no existing number, these words can be left out.

Page 136

CHAPTER XV.
BREAKING UP STREETS.

In nearly every city and town of the United Kingdom, except those where
the gas and water undertakings are the property of the urban authority, the
town surveyor is constantly annoyed by having some portions of his streets
broken up and greatly damaged by the action of the gas or water companies
of the district.
With regard to the lasting character of the damage caused to the street by
this disturbance of its surface, I shall have something to say in this chapter,
but it is first necessary to see what legal powers the companies have to
break up the streets, and what powers the surveyor has to enforce the work
being properly carried out.
It will be found that the sections bearing upon this point are almost
precisely similar in their wording in the following Acts:
“The Gas Works Clauses Act 1847” (10 & 11 Vic. c. 15).
“The Water Works Clauses Act 1847” (10 & 11 Vic. c. 17).
“The Electric Lighting Act 1882” (45 & 46 Vic. c. 56).
but with regard to the powers of the Government to lay telegraph and
telephone wires, &c., the clauses are different, and are contained in,
“The Telegraphs Act 1863” (26 & 27 Vic. c. 112).
As the clauses on this subject of “the Water Works Clauses Act” are those
which are incorporated with the Public Health Act 1875, I shall select the
sections from that Act, the first of importance being as follows:
“The undertakers, under such superintendence as is hereinafter specified,
may open and break up the soil and pavement of the several streets and
bridges within the limits of the special Act, and may open and break up any
sewers, drains, or tunnels, within or under such streets or bridges, and lay
down and place within the same limits pipes, conduits, service pipes, and
other works, and engines, and from time to time repair, alter, or remove the
same, and for the purposes aforesaid remove and use all earth and materials

Page 137

in and under such streets and bridges, and do all other acts which the
undertakers shall from time to time deem necessary for supplying water[125]
to the inhabitants of the district included within the said limits; doing as
little damage as can be[126] in the execution of the powers hereby or by the
special Act granted, and making compensation for any damage which may
be done in the execution of such powers” (10 & 11 Vic. c. 17 s. 28).
The next clause deals only with the powers of laying pipes, &c., in
private property, and here it will be well to remark that if the water
undertaking is in the hands of the urban authority they have much more
power of entry for these purposes than companies possess (Vide ss. 16, 18,
32, and 54, 38 & 39 Vic. c. 55), but this is a matter which does not affect
the questions dealt with in this chapter.
The next clause is upon the subject of giving the necessary notices, and is
as follows:
“Before the undertakers[127] open or break up any street, bridge, sewer,
drain, or tunnel, they shall give to the persons under whose control or
management the same may be, or to their clerk, surveyor, or other officer,
notice in writing of their intention to open or break up the same, not less
than three clear days before beginning such work, except in cases of
emergency arising from defects in any of the pipes or other works, and then
so soon as is possible after the beginning of the work or the necessity for
the same shall have arisen” (10 & 11 Vic. c. 17, s. 30).
The next clause is of great importance, as it gives the surveyor the
necessary powers to dictate the manner in which the interference with his
streets is to be conducted.
“No such street, bridge, sewer, drain, or tunnel shall, except in the cases
of emergency aforesaid, be opened or broken up except under the
superintendence of the persons having the control or management thereof,
or of their officer, and according to such plan[128] as shall be approved of by
such persons or their officer, or in case of any difference respecting such
plan, as shall be determined by two justices; and such justices may, on the
application of the persons having the control or management of any such
sewer or drain, or their officer, require the undertakers to make such
temporary or other works as they may think necessary for guarding against
any interruption of the drainage during the execution of any works which
interfere with any such sewer or drain. Provided always, that if the persons
having such control or management as aforesaid, and their officer fail to

Page 138

attend at the time fixed for the opening of any such street, bridge, sewer,
drain, or tunnel, after having such notice of the intention of the undertakers
as aforesaid, or shall not propose any plan for breaking up or opening the
same, or shall refuse or neglect to superintend the operation, the undertakers
may perform the work specified in such notice without the superintendence
of such persons or their officer” (10 & 11 Vic. c. 17, s. 31).
There are several points to which it is necessary to draw attention whilst
considering the above clause. I am afraid that the “attendance” of the
surveyor “at the time fixed for the opening” or even of one of his assistants
could not always be managed, nor would it be practicable to prepare a
“plan” for every opening that might be made by a gas or water company for
new services, leaks in mains, &c.; but where it is proposed to carry out any
extensive works, such as laying a considerable length of new main or
removing an old one, it is certainly necessary that there should be some
“plan” of the manner in which such work is proposed to be carried out by
the company.
On referring to the clause it is evident that the first “plan” mentioned
must be prepared by and on behalf of the company proposing to carry out
the work, and this plan must show the exact position on each street of the
proposed excavations, and their depth, &c., which “shall be approved of by
such persons (having the control of the streets) or their officer,” their officer
really being the surveyor.
Lower down in the clause another “plan” is referred to in the following
words: “or shall not propose any plan for breaking up or opening the same.”
This plan, or more correctly speaking, a specification of the manner in
which the company shall proceed with the work, must be prepared by the
surveyor, and if it meets with the approval of his corporation it can be
enforced.
In order to assist town surveyors who may be required to act under this
clause, I now give a verbatim copy of a “plan” or specification under which
I compelled a gas company to work after they had given me the usual
statutory notice of their intention to break up certain macadamised streets
for the purpose of removing some disused mains.

Plan of the manner in which the Gas Light and Coke
Company shall take up and remove the old mains in street,
commencing at or near street.

Page 139

A trench to be excavated of not greater width than inches and of no
greater length than feet at a time.
Great care must be taken to keep the top facing metal separate from the
lower formation of the roadway, so that they may not become mixed
together; no metal is on any account to be removed from the street.
The mains must be taken up with all possible speed and instantly
conveyed away, without being allowed to remain at the sides of the streets.
[129]
The trench to be then at once filled in, care being taken to replace all the
materials of which the roadway is formed in their proper positions. All extra
filling in that may be required owing to the removal of the mains shall be
done on the surface with the best stone, broken so as to pass all
ways through a ring of 2¹⁄₂ inches internal diameter, the top of the trench
being always kept flush with the surface contour of the roadway. No earth,
rubbish, or other material shall be allowed to be brought on to the ground
by the gas company for the purpose of filling in, nor shall any material of
any kind be allowed to be brought from any other excavations that may be
being made by the gas company in other parts of the town for the purpose
of laying or removing mains.
The filling in to be done in the proportion of one man filling to two men
ramming with punners of not less weight than lbs. each. During dry
weather a plentiful supply of water must be allowed to run into the trench
whilst the filling in is in progress, for the purpose of consolidating the
ground.
The traffic must not in any case be impeded, and planks must be placed
across the excavations, where necessary, for the convenience of foot
passengers.
The work shall if necessary be suspended on market days, or any other
days that the surveyor may deem proper for the convenience of the public.
* * * * * * * * *
The next clause of the Act deals with the manner in which the companies
shall reinstate and make good the road or pavement, and is as follows:
“When the undertakers open or break up the road or pavement of any
such street, or bridge, or any sewer, drain, or tunnel, they shall with all
convenient speed complete the work for which the same shall be broken up,
and fill in the ground and reinstate and make good the road or pavement, or

Page 140

the sewer, drain, or tunnel so opened or broken up, and carry away the
rubbish occasioned thereby; and shall at all times whilst any road or
pavement shall be so opened or broken up cause the same to be fenced and
guarded, and shall cause a light sufficient for the warning of passengers to
be set up, and kept there against every night during which such road or
pavement shall be continued open or broken up, and shall after replacing
and making good the road or pavement which shall have been so broken up,
keep the same in good repair for three months thereafter, and such further
time, if any, not being more than twelve months in the whole, as the soil so
broken up shall continue to subside” (10 & 11 Vic. c. 17, s. 32).
The conditions embodied in the above clause are easier written than
carried out.
It is well known that a trench cut longitudinally through a street takes a
very long time to heal. Asphalte shows it the least if there is a good backing
of concrete, but all other pavements suffer considerably in the process, as it
is almost impossible to maintain their strict contour, and with macadamised
roadways the result is simply disastrous.
Opening a macadamised roadway does it more harm than the heaviest
and most persistent traffic, and it is surprising for what a length of time the
surface will show the treatment it has received.
It is unfortunately the practice generally for the men in the employ of a
gas or water company, after laying a pipe, to try and ram into the trench all
the material they have removed, without allowing for the cubical contents
taken up by the pipe, or if they do condescend to cart anything away it is
generally the metal, which they think will come in nicely for the repairs of
the trench during their liability for such repairs. What ought to be done is
that no filling of ordinary earth, &c., should be allowed to come within at
least six inches of the top of the trench, which should then be filled in with
good road metal, and as this wears down it should be brought up to the
proper level with more metal. In the former plan a hump is seen over the
trench, and this hump is a mass of mixed dirt and road-metal for which
there is no cure but its entire removal to a depth of at least six inches, and
the substitution of good clean road-metal, which would have been the best
and most economical plan in the first place.
The clauses following those I have quoted are “penalty clauses” for non-
compliance with the provisions of the Act, and need not be here given, but
there is one more clause of the Water Works Clauses Act 1847, dealing with

Page 141

the powers of private individuals to break up streets for the purpose of
laying service pipes, which it is necessary to give in extenso.
On the question of similar powers to private individuals to break up
streets for drains, &c., I shall speak later on in this chapter:
“Any such owner or occupier may open or break up so much of the
pavement of any street as shall be between the pipe of the undertakers and
his house, building or premises, and any sewer or drain therein, for any
such purpose as aforesaid, doing as little damage as may be and making
compensation for any damage done in the execution of any such work;
provided always, that every such owner or occupier desiring to break up the
pavement of any street or any sewer or drain therein, shall be subject to the
same necessity of giving previous notice, and shall be subject to the same
control, restrictions, and obligations in and during the time of breaking up
the same, and also reinstating the same, and to the same penalties for any
delay in regard thereto, as the undertakers are subject to by virtue of this or
the special Act” (10 & 11 Vic. c. 17, s. 52).
It would also seem that the consent of the urban authority must be
obtained (as well as notice given to them) before a street is broken up (38 &
39 Vic. c. 55, s. 149).
Very often, however, the companies prefer to execute all this work
themselves, as they do not like anyone else to interfere with their mains or
put in services which may be unfitted for the purpose; consequently they
give the necessary notices, execute the work themselves, and charge the
owner or occupier with the expense.
The powers under which streets are broken up for telegraphic or
telephonic purposes are, as I have previously stated, contained in the
“Telegraphs Act 1863,” the following being the clauses which refer to this
subject:
“The company shall not place a telegraph under any street within the
limits of the district over which the authority of the Metropolitan Board of
Works extends, or of any city or municipal borough or town corporate, or of
any town having a population of thirty thousand inhabitants or upwards
(according to the latest census), except with the consent of the bodies
having the control of the streets within such respective limits” (26 & 27 Vic.
c. 112, s. 9).
“Where the company has obtained consent to the placing, or by virtue of
the powers of the company under this Act intends to proceed with the

Page 142

placing of a telegraph under a street or public road, the depth, course and
position at and in which the same is to be placed shall be settled between
the company and the following bodies:
“The body having the control of the street or public road.
“The body having the control of the sewerage or drainage thereunder.
“But if such settlement is not come to with any such body, the following
provisions shall take effect:
“(1.) The company may give to such body a notice specifying the depth,
course and position which the company desires.
“(2.) If the body to whom such notice is given does not, within 28 days
after the giving of such notice, give to the company a counter-notice
objecting to the proposal of the company, and specifying the depth, course
and position which such body desires, they shall be deemed to have agreed
to the proposal of the company.
“(3.) In the event of ultimate difference between the company and such
body, the depth, course and position shall be determined in England or
Ireland by two Justices, and in Scotland by two Justices or the Sheriff” (26
& 27 Vic. c. 112, s. 10).
“Subject to any special stipulations made with a company by the body
having the control of a street or public road, and to any determinations,
orders, or directions of the Justices, or Sheriff, as aforesaid, where the
company proceeds to open or break up a street or public road, the following
provisions shall take effect.
“(1.) The company shall give to the bodies between whom respectively
and the company the depth, course and position of a telegraph under such
street or public road are hereinbefore required to be settled or determined,
notice of their intention to open or break up such street or public road,
specifying the time at which they will begin to do so, such notice to be
given in the case of an underground work ten days at least, and in the case
of an above-ground work five days at least before the commencement of the
work, except in case of emergency, in which case notice of the work
proposed shall be given as soon as may be after the commencement thereof.
“(2.) The company shall not (save in case of emergency) open or break
up any street or public road except under the superintendence of the bodies
to whom respectively notice is by the present section required to be given,
unless such bodies respectively refuse or neglect to give such

Page 143

superintendence at the time specified in the notice for the commencement
of the work or discontinue the same during the work.
“(3.) The company shall pay all reasonable expenses to which such
bodies respectively may be put on account of such superintendence” (26 &
27 Vic. c. 112, s. 17).
It will be seen by the above section that the time required before the work
is commenced after service of the notice is considerably longer than that for
gas or water mains or for electric lighting wires, and subsection 3 authorises
a payment for the services of the surveyor or other officer attending to
superintend the work, which is not the case in the other Acts.
The next clauses are as follows:
“Subject to any such special stipulations as aforesaid, after the company
has opened or broken up a street or public road they shall be under the
following further obligations:
“(1.) They shall with all convenient speed complete the work on account
of which they opened or broke up the same, and fill in the ground and make
good the surface, and generally restore the street or public road to as good a
condition as that in which it was before being opened or broken up, and
carry away all rubbish occasioned thereby:
“(2.) They shall in the meantime cause the place where the street or
public road is opened or broken up to be fenced and watched, and to be
properly lighted at night:
“(3.) They shall pay all reasonable expenses of keeping the street or
public road in good repair for six months after the same is restored, so far as
such expenses may be increased by such opening or breaking up” . . . (26 &
27 Vic. c. 112, s. 18).
“Whenever the permanent surface or soil of any street or public road is
broken up or opened by the company it shall be lawful for the body having
the control of the street or road, in case they think it expedient so to do, to
fill in the ground, and to make good the pavement or surface or soil so
broken up or opened, and to carry away the rubbish occasioned thereby,
instead of permitting such work to be done by the company; and the cost
and expenses of filling in such ground and making good the pavement or
soil so broken up or opened, shall be repaid on demand to the body having
the control of the street or road by the company, and in default thereof may
be recovered by the body having the control of the street or road from the

Page 144

company, as a penalty is or may be recoverable from the company” (26 &
27 Vic. c. 112, s. 19).
“The company shall not stop or impede traffic in any street or public
road, or into or out of any street or public road, further than is necessary for
the proper execution of their works. They shall not close against traffic
more than one third in width of any street or public road or of any way
opening into any street or public road at one time; and in case two-thirds of
such street or road are not wide enough to allow two carriages to pass each
other, they shall not occupy with their works at one time more than fifty
yards in length of the one-third thereof except with the special consent of
the body having the control thereof” (26 & 27 Vic. c. 112, s. 20).
It will be seen that these are much more elaborate clauses, restricting the
rights of the telegraph companies than those of the gas and water
companies, &c., and as the Telegraphs Act containing these strict clauses
was passed in the year 1863 and the Water Works Clauses Act in 1847, it is
fair to assume that the clauses of the Telegraphs Act 1863 were framed to
meet certain objections to these clauses and upon experience of their
working, and are consequently better and more adapted for the case in
point.
To obviate all the difficulties and complications arising out of this
constant breaking up of streets, with the attendant inconvenience to the
public and damage to the surfaces of the roadways, it was suggested many
years ago that subways should be constructed under the surface of the
principal streets, in which should be placed all the gas and water mains then
existing.
There is no doubt that there are many advantages in this plan as well as
some disadvantages. It must be recollected that probably the subways
would have been constructed of sufficient capability to carry all the mains
and wires then existing, with a margin for future extensions of size, but
when we see the enormous growth of many towns, notably that of the
metropolis, and the consequent increase necessary in the number and
diameters of the mains, it is to be feared that sufficient space would not
have been left, and competition between rival gas and water companies
might consequently have been crippled.
Still there would be great convenience in many respects if all water and
gas mains, telegraph and telephone wires could be carried in subways, as
they would be easily accessible for repairs, and hidden leaks would be

Page 145

unknown. With regard to the one great objection so constantly urged, that in
the case of a leaky gas main or service a most terrible and damaging
explosion might take place, it is true that this is a very grave and serious
objection, but it must also be recollected that although this danger may be
enhanced by the necessarily solid masonry of which the subway is
constructed, still there would be every precaution taken to prevent leakage
of gas, and in the present system liability to explosion is not altogether
remote. In Percy Street, Tottenham Court Road, only a year or two ago,
there was a terrible explosion in trenches and mains which had become full
of gas and atmospheric air in the proportions of one volume of gas to fifteen
volumes of air, and if gas mains were laid in subways greater precautions
would no doubt be taken.
There would be also great danger in conveying the wires used for electric
lighting purposes in these subways, as they might fuse and thus cause
danger, and at all events they would have some considerably disturbing
influence upon the wires of the telegraph and telephone systems, if laid too
near.
I will now pass on to consider the powers of individuals to break the
surface of public streets for the purpose of putting new drains to their
premises or of repairing existing drains.
With regard to the former question I have given full particulars with
regard to new drains or connections with sewers in the chapter upon “house
drainage,” but with regard to the latter question it will be necessary to make
a few remarks.
There is no doubt that the public streets vest in the urban authority, and it
is contended that the following clause of the Public Health Act 1875
prevents any person from breaking up any street without their permission,
although it is sometimes questioned whether the words “wilfully displaces”
do not mean the doing of an illegal act, such as taking up a stone in a street
to annoy or injure a neighbour or from sheer mischief, rather than that of a
legal act for a proper purpose; the clause in question is as follows:
“All streets being or which at any time become highways repairable by
the inhabitants at large within any urban district, and the pavement stones
and other materials thereof and all building implements and other things
provided for the purposes thereof, shall vest in and be under the control of
the urban authority. . . . Any person who without the consent of the urban
authority wilfully displaces or takes up, or who injures the pavement,

Page 146

stones, materials, fences or posts of or the trees in any such street, shall be
liable to a penalty not exceeding five shillings for every square foot of
pavement, stones or other materials so displaced taken up or injured; he
shall also be liable in the case of any injury to trees to pay to the local
authority such amount of compensation as the court may award” (38 & 39
Vic. c. 55, s. 149).
Even, however, granting that application must be made before any
individual can break up a street, the urban authority would not be likely to
withhold their consent if it was for a legitimate purpose, and having
disturbed the street, a person must light and guard the opening, and the
“hole,” as it is called in the clauses following must be “filled up or
otherwise made secure;” but it is very doubtful if he can be called upon to
keep the surface of the road in repair for any length of time, as can be done
in the case of water and gas companies, &c.; the following are the clauses
in question:
“When any building materials, rubbish or other things are laid or any
hole made in any of the streets, whether the same be done by order of the
commissioners or not, the person causing such materials or other things to
be so laid or such hole to be made, shall at his own expense cause a
sufficient light to be fixed in a proper place upon or near the same, and
continue such light every night from sun-setting to sun-rising while such
materials or hole remain. And such person shall at his own expense cause
such materials or other things and such hole to be sufficiently fenced and
enclosed until such materials or other things are removed or the hole filled
up or otherwise made secure” . . . (10 & 11 Vic. c. 34, s. 81).
“In no case shall any such building materials or other things or such hole
be allowed to remain for any unnecessary time.” . . . (10 & 11 Vic. c. 34, s.
82).
“If any building, or hole, or any other place near any street be for want of
sufficient repair, protection or inclosure, dangerous to the passengers along
such street, the commissioners shall cause the same to be repaired,
protected, or inclosed, so as to prevent danger therefrom, and the expenses
of such repair, protection, or inclosure shall be repaid to the commissioners
by the owner of the premises so repaired, protected or inclosed, and shall be
recoverable from him as damages” (10 & 11 Vic. c. 34, s. 83).
These three sections are incorporated in the Public Health Act 1875, by
38 & 39 Vic. c. 55, s. 160, and the last clause undoubtedly gives power to

Page 147

the urban authority to repair a “hole” which for want of “sufficient repair”
is “dangerous to passengers” but not otherwise, in however unsightly a
manner the trench may have been repaired.
The result of this uncertainty has been that a great many towns have
inserted in their private improvement Acts, clauses making it compulsory
upon all persons to give them from 3 to 7 days’ notice of their intention to
break up the streets, specifying the manner in which the work shall be done,
and also compelling them to deposit a sum of money in order to secure that
the repairs of the street are properly executed.[130] A better method than this
is to insert in any private improvement Act a clause giving powers to the
urban authority to execute all drain-work themselves and charge it upon the
owners of the property, thus ensuring that any interference with the surface
of the street shall be done in a proper manner by men accustomed to the
work, and also that the drain itself shall be of perfect workmanship.
Where the town surveyor has no private improvement Act dealing with
this question, it is well to frame some regulations as to the manner in which
the notice of intention to break up the surface of the street shall be given to
him by the person intending to do the work, and if possible to obtain a
deposit of a few shillings as a guarantee that the surface of the street shall
be kept in something like decent repair. Although this may not be strictly
legal, it is a very universal practice amongst town surveyors.
The following forms of notices are given as specimens of the description
of notice now in use, and are copied verbatim from those which are now
enforced in a very large borough in this country:

Borough of .
To the Borough Surveyor,
I hereby apply for permission to break up the footway or roadway, and
make excavations in for the purpose of , and I hereby
undertake to light, watch and fence the place during the progress of the
works, to temporarily make good the surface of the footway or roadway, to
remove all rubbish, and to execute and complete the work to the satisfaction
of the borough surveyor. I also deposit the sum of five shillings for the
repair of the surface, and agree to pay the balance if it should cost more
than that sum.

Page 148

(Signature)
(Address)
Witness and receiver .
Received by accountant 188 .
Surface repaired 188 .
At a cost of .

Borough of .
188 .
To Mr.
This is to certify that you have paid a deposit of five shillings, and that
you are hereby permitted to take up the footway or roadway and make
excavations in for the purpose of on the undertaking
you have given to light, watch and fence the place during the progress of
the works, to temporarily make good the surface of the footway or roadway,
to remove all rubbish, and to execute and complete the work to the
satisfaction of the borough surveyor; also that you will pay the balance if
the surface repairs should cost more than the aforesaid sum of five shillings.
________________________
______
Borough Surveyor.
Note.—If the surface repairs should cost less than the deposited sum, the
balance will be returned to you by the accountant, who will notify you of
the fact.

Notice must be given to the Building Inspector when the work is ready for inspection, and no
drainage work must be covered up until it has been examined by the Inspector.

It may be well to add to this authority to break up the streets, the
following words—
“This authority may be revoked at any time if found necessary, and it
does not in any way relieve the person to whom it is granted from any
liabilities he may incur in respect of accidents from anything done in
pursuance thereof.”
In some towns the following custom prevails in regard to this question.

Page 149

The person desirous of opening the street for the execution of any work
has to apply to the surveyor for a licence, and at the same time deposit a
sum sufficient to cover the expense of the work, such sum being estimated
and fixed by the surveyor. The corporation then supply one labourer whilst
the job is in hand, who, whilst working, takes care that the soil is properly
rammed and the surface made good; a mason is also supplied to make any
drainage or sewer connections. The deposit is kept for about 3 months, and
the cost of the labourer and mason, and of any subsequent making good the
surface of the street, is then deducted, and the balance returned to the
person who made the deposit.
This arrangement seems an excellent plan, and is said to work
remarkably well where it is in vogue, but whether it is strictly legal is open
to considerable question.

[125] Or gas or electricity, as the case may be.
[126] These words apply only to the manner of doing the work, not to alternative ways
of doing it. (Vide ‘Fitzgerald’s Public Health and Local Government Act, 1875,’ 3rd
edition, p. 45.)
[127] In the “Electric Lighting Act 1882,” the words “proceed to” have been inserted
before the word open, which is an obvious improvement.
[128] It is incumbent upon the undertakers intending to break up a road to communicate
beforehand their proposed plan or method of executing the work to the road authority, and
this in a sufficient manner to enable the road authority to judge whether what is proposed
ought to be done without modification. The plan should, therefore, show the position on
the road of the proposed excavation, and its depth. (Edgware Highway Board v. Colne
Valley Water Company, 46 L. J. ch. 889.)
[129] This precaution was necessary, as the smell of the old mains was naturally very
offensive and a nuisance.
[130] In some towns it is the practice to give the builder a junction pipe or block for
nothing, thus ensuring his calling to give notice, but this is only successful in the case of
new attachments to sewers, in which case the law is much more strict.

Page 150

CHAPTER XVI.
OBSTRUCTIONS IN STREETS.

For convenience, I propose to treat in this chapter some subjects which,
strictly speaking, do not come under the head of “obstructions,” but they are
all questions which have to be considered by the town surveyor; temporary
obstructions and other offences with which it is the province of the police to
deal are omitted.
The following subjects will therefore be discussed:
(1.) Improving the line of frontages of streets.
(2.) Removing projections.
(3.) Doors and gates opening outwards.
(4.) Vault or cellar coverings.
(5.) Rain-water shutes and down-pipes.
(6.) Blinds or awnings over footpaths.
(7.) Trees over-hanging roadways.
(8.) Surface water from private premises running over footpaths.
(9.) Hoardings and scaffolds.
(10.) Dangerous buildings.
(1.) Improving the Line of Frontages of Streets.—By the Towns
Improvement Clauses Act
1847, certain powers were granted which enabled the commissioners to
agree with owners of property to set back for the purpose of widening any
street,[131] but this was often found to be difficult and wearisome of
accomplishment, consequently in the Public Health Act 1875, the following
important clause bearing upon this point was inserted.
“Where any house or building situated in any street in an urban district,
or the front thereof, has been taken down in order to be rebuilt or altered,
the urban authority may prescribe the line in which any house or building,
or the front thereof, to be built or rebuilt in the same situation shall be
erected, and such house or building or the front thereof shall be erected in

Page 151

accordance therewith. The urban authority shall pay or tender compensation
to the owner or other person immediately interested in such house or
building for any loss or damage he may sustain in consequence of his house
or building being set back or forward, the amount of such compensation in
case of dispute to be settled by arbitration in manner provided by this Act”
(38 & 39 Vic. c. 55, s. 155).
This clause gives an excellent power to the sanitary authority, especially
in older towns, to lay down improved building lines upon the plan of their
town, and thus set back the line of buildings as opportunity offers.
In assessing the value of compensation to be paid to the owner for setting
back his property, the following points should be considered:
(1.) The value of the area of the land given up to the public.
(2.) The loss of available and useful space to the premises.
(3.) If any use is made by the owner of the land given up to the public by
constructing cellars underneath, the amount of compensation should be less.
(4.) The amount the owner will have to expend to make good the sides of
the neighbouring premises thus exposed by his setting back must be
considered.
A surveyor should be very careful to recollect if any building line has
been laid down in any street when the plans of new buildings are deposited
with him for approval. If these plans are approved without any notice being
given to the owner to set back, it is questionable whether he can afterwards
be called upon to do so.[132]
(2.) Removing Projections of Buildings.—The Towns Improvement
Clauses Act 1847 made provision
for setting back any house or building, or any part which projected beyond
the regular line of street when taken down, on payment of compensation,
[133] and this and the following sections were incorporated in the general
Public Health Act 1875.[134]
“The commissioners may give notice to the occupier[135] of any house or
building to remove or alter any porch, shed, projecting window, step, cellar,
cellar-door, or window, sign, sign-post, sign-iron, show-board, window
shutter, wall, gate, or fence, or any other obstruction or projection erected or
placed after the passing of the special Act, against or in front of any house
or building within the limits of the special Act, and which is an obstruction
to the safe and convenient passage along any street, and such occupier shall
within fourteen days after the service of such notice upon him, remove such

Page 152

obstruction or alter the same in such manner as shall have been directed by
the commissioners, and in default thereof shall be liable to a penalty not
exceeding forty shillings; and the commissioners in such case may remove
such obstruction or projection, and the expense of such removal shall be
paid by the occupier so making default, and shall be recoverable as
damages; provided always, that except in the case in which such
obstructions or projections were made or put up by the occupier, such
occupier shall be entitled to deduct the expense of removing the same from
the rent payable by him to the owner of the house or building.”
The wall of a garden in front of a house, and shrubs in the garden, which
encroach on the street, come within the words “any other obstruction” in
this section.[136]
It is doubtful, however, if trade signs projecting at such a height as not to
be “an obstruction to the safe and convenient passage along any street” can
be removed under this section, however unsightly they may be, nor does it
appear that flag poles or flags can be ordered to be removed when at such a
height as to cause no obstruction.
The following clause, however, of the Public Health Act 1875 affects the
question of new projections much more closely.
“It shall not be lawful in any urban district, without the written consent of
the urban authority, to bring forward any house or building forming part of
any street or any part thereof, beyond the front wall of the house or building
on either side thereof, nor to build any addition thereto beyond the front of
the house or building on either side of the same. Any person offending
against this enactment shall be liable to a penalty not exceeding 40s. for
every day during which the offence is continued after written notice in this
behalf from the urban authority” (38 & 39 Vic. c. 55, s. 156).
Here some difficulty is frequently experienced as to the question if the
building has really been brought beyond the common line of neighbouring
buildings, especially where the houses are detached; but it is apparently left
to the tribunal before whom the case is heard to decide this point, and the
surveyor can only give his evidence, as in many other cases, to the best of
his ability and knowledge, and trust to obtaining a verdict in his favour.
With regard to obstructions erected before the passing of the special Act,
the commissioners may cause the same to be removed or altered as they
think fit—

Page 153

“Provided that they give notice of such intended removal or alteration to
the occupier[137] of the house or building against or in front of which such
alteration or removal is begun; and if such obstructions or projections shall
have been lawfully made, they shall make reasonable compensation to
every person who suffers damage by such removal or alteration.”[138]
Here the words “reasonable compensation” are difficult of construction
and lead frequently to long litigation.
(3.) Doors or Gates opening outwards.—
Section 71 of the Towns Improvement Clauses Act 1847 enacts that “All
doors, gates and bars put up after the passing of the special Act within the
limits thereof, and which open upon any street, shall be hung or placed so
as not to open outwards, except when in the case of public buildings the
commissioners allow such doors, gates or bars to be otherwise hung or
placed; and if (except as aforesaid) any such door, gate or bar be hung or
placed so as to open outwards on any street, the occupier of such house,
building, yard or land shall, within eight days after notice from the
commissioners to that effect, cause the same to be altered so as not to open
outwards; and in case he neglect so to do the commissioners may make
such alteration, and the expenses of such alteration shall be paid to the
commissioners by such occupier, and shall be recoverable from him as
damages, and he shall in addition be liable to a penalty not exceeding 40s.”
Section 72 of the same Act further enacts, “If any such door, gate or bar
was before the passing of the special Act hung so as to open outwards upon
any street, the commissioners may alter the same so that no part thereof
when open shall project over any public way.”
It is naturally necessary that doors or gates of all public buildings should
hang so as to open outwards, so as to give a free and easy exit in case of
panic, many serious accidents having arisen from a want of this precaution;
but with regard to private premises the case is altogether different, and if
doors and gates were allowed to open outwards, they would soon become a
dangerous and intolerable nuisance.
It will be seen that there are two courses to be pursued in connection with
this offence.
The first is where the door, gate or bar has been placed before the passing
of the Towns Improvement Clauses Act in 1847, in which case the
“commissioners may alter the same, so that no part thereof when open shall
project over any public way.” This duty of course rests with the town

Page 154

surveyor, and in many cases it is not easy of execution, as structural
difficulties may have to be encountered and overcome.
In the second case, where the door, gate or bar has been placed since the
passing of the Act in 1847, certain penalties are incurred by the occupier or
owner, and the commissioners may also alter the door, gate or bar at his
expense.
The following specimen form of notice to be served in connection with a
case of this description may be of use:

Town Surveyor’s Office.
Sir,
I beg leave to give you notice that of the premises in your
occupation opens outwards, and when open, projects into the street called or
known as .
I have therefore to require that you will be good enough to have such
altered so that it shall not open outwards into the said street,
within eight days next after your receipt of this notice.
I beg leave also to give you notice that if you neglect to make the
alteration required within the period specified by this notice, you render
yourself liable to a penalty of 40s., and I shall proceed to make the
necessary alterations, and recover the costs and penalties from you as the
law directs.
I am, Sir, your obedient Servant,
______________________________
Town Surveyor.
To______________________________

(4.) Vault or Cellar Coverings.—
Section 73 of the Towns Improvement Clauses Act 1847 enacts, “When
any opening is made in any pavement or footpath within the limits of the
special Act, as an entrance into any vault or cellar, a door or covering shall
be made by the occupier[139] of such vault or cellar, of iron, or such other
materials, and in such manner as the commissioners direct, and such door or
covering shall from time to time be kept in good repair by the occupier of
such vault or cellar: and if such occupier do not within a reasonable time
make such door or covering, or if he make any such door or covering
contrary to the directions of the commissioners, or if he do not keep the

Page 155

same when properly made in good repair, he shall for every such offence be
liable to a penalty not exceeding five pounds.”
Besides the penalty, the person negligently leaving the covering in a
dangerous condition would be liable to an action for damages at the suit of
anyone who had sustained an injury in consequence of the covering being
so kept.[140]
There is another clause incorporated in the Public Health Act 1875 from
the Towns Police Clauses Act 1847 upon this subject, which is as follows:
“Every person who leaves open any vault or cellar, or the entrance from
any street to any cellar or room underground, without a sufficient fence or
hand rail, or leaves defective the door, window or other covering of any
vault or cellar . . . . shall be liable to a penalty not exceeding 40s. for each
offence, or in the discretion of the justice before whom he is convicted may
be committed to prison, there to remain for a period not exceeding 14 days”
(10 & 11 Vic. c. 89, s. 28).
But the former section I have quoted is that upon which the town
surveyor generally acts.
In connection with this duty the following is given as a specimen notice:

Sir,
I beg to call your attention to the fact that the door or covering to the
vault or cellar in your occupation, No. Street, is not in
good repair (and is slippery and dangerous to foot-passengers),[141] you are
in consequence liable to a penalty of 5l.
I must request you will be good enough to have such door or covering
properly repaired and made good in accordance with the construction
required by law, within days from the date hereof, and in the event of
your failing to do so, proceedings will be taken to enforce the penalty to
which you are liable without further notice.
I am, your obedient Servant,
______________________________
Town Surveyor.
To _______________

In accordance with the provisions contained in the section of the Towns
Improvement Clauses Act 1847 which I have quoted, that the “door or
covering shall be made by the occupier of such vault or cellar of iron or

Page 156

such other materials, and in such manner as the commissioners direct,”
most towns in this country have prescribed the size and materials of which
they shall be made, the size being often limited to 6 feet in length, by 20
inches projection, from the line of plynth of the building, for cellar
coverings or pavement lights as they are sometimes called, and 12 inches in
diameter for coal plates.
Hayward’s patent hexagonal and semiprismatic pavement lights,
however, have obviated the danger of slipping upon this description of
covering, and consequently little or no inconvenience is experienced, even
if the greater portion of the foot pavement is covered by them.[142]
Coalhole plates should be so firmly fixed as to prevent the possibility of
their shifting, even when the rebate of the flag stone into which they are
dropped is worn, and also to prevent mischievous persons from raising
them.
Here let me state that no person can without the written consent of the
urban authority cause “any vault, arch or cellar to be newly built or
constructed under the carriageway of any street” (38 & 39 Vic. c. 55, s. 26);
but from this section it does not appear illegal to construct a vault, arch or
cellar under the footpath, which would generally be the extent to which
such constructions would be extended. However, the more general powers
contained in section 149 of the same Act, by which all “streets and the
pavement stones and other materials thereof” vest in and are under the
control of the urban authority, give the necessary powers to prevent the
construction of cellars under any portion of the foot-pavement without the
consent of the urban authority.
The usual practice adopted is for any person who requires to construct a
cellar under the foot-pavement or carriageway of any street, to apply to the
urban authority for the necessary permission to do so. In granting the
permission, the urban authority call upon the owner of the premises to
which the proposed vault or cellar is attached, to enter into an agreement
acknowledging that the cellar or vault is only an easement, and agreeing to
remove the encroachment whenever called upon by the urban authority to
do so.
These agreements and any other similar easements should be kept
together in a book, which may be called the “Easement Book,” and indexed
in such a manner that a reference can be easily made at any time to any
easement that has been granted.

Page 157

(5.) Rain-water from Shutes or Down Pipes.—
Water may not be allowed to drip on to the pavements of the streets from
the adjoining houses, and the following clause from the Towns
Improvement Clauses Act 1847 has been incorporated with the Public
Health Act 1875:
“The occupier of every house or building in, adjoining, or near to any
street shall, within seven days next after service of an order of the
commissioners for that purpose, fit up and keep in good condition a shoot
or trough of the whole length of such house or building, and shall connect
the same either with a similar shoot on the adjoining house, or with the pipe
or trunk to be fixed to the front or side of such building from the roof to the
ground, to carry the water from the roof thereof in such a manner that the
water from such house or any portico or projection therefrom shall not fall
upon the persons passing along the street or flow over the footpath; and in
default of compliance with any such order within the period aforesaid, such
occupier shall be liable to a penalty not exceeding 40s. for every day that he
shall so make default” (10 & 11 Vic. c. 34, s. 74).
In many private Town Improvement Acts, the cost of the repair necessary
under an order to do so from the urban authority may be deducted by the
occupier from the rent payable to the owner of the premises, thus ensuring
the work being done more quickly.
The following is a specimen notice to be served upon the occupier to
repair or put new shuting to his house:

I beg to give you notice that the eaves, shuting, or projecting cornice[143]
to the house or building No. in your occupation, is out of
repair. A penalty of 40s. will be incurred if this shuting be not repaired
within seven days from the date of this notice (and under the Special
Improvement Act the cost of such repair may be deducted from the rent
payable to the owner).[144]
I am, your obedient Servant,
______________________________
Town Surveyor.
To______________________________

It is a common practice in most towns for the urban authority to provide
and fix trunks or troughs across their footpaths into which the down pipes

Page 158

from the rain-water shutes can empty their contents.
(6.) Blinds or Awnings over Footpaths.—
These may be dealt with as obstructions under sec. 69 of the Towns
Improvement Clauses Act 1847, which I have already quoted,[145] but they
are more particularly alluded to in the Police Clauses Act 1847 in the
following section:
“Every person who . . . places any blind, shade, covering, awning, or
other projection over or along any such footway, unless such blind, shade,
covering, awning or other projection is 8 feet in height at least in every part
thereof from the ground, shall be liable to a penalty not exceeding 40s. for
each offence, &c.” . . . (10 & 11 Vic. c. 89, s. 28).
Thus legalising the fixing of shop-blinds, &c., provided they are at least 8
feet in height and consequently no obstruction to the traffic.
In order to make the blinds or awnings sufficiently secure where they are
of large dimensions, it is very usual for the owner or occupier of the
premises to which the blind or awning is to be attached, to seek and obtain
the consent of the local authority to fix iron sockets in the kerb of the
footpath into which iron or wood standards are inserted for the purpose of
supporting the outer part of the blind or awning, and there can be no
objection to this practice provided that the work is efficiently performed
and to the satisfaction of the town surveyor.
(7.) Trees overhanging Roadways.—
It used formerly to be considered by road surveyors and others[146] that
great injury was caused to roadways by overhanging branches of trees or
bushes, which were supposed to exclude the light and air from the roadway
and thus damage it, hence powers were given to local authorities, as
surveyors of highways, to compel occupiers of premises adjoining the
roadways to cut back and prune their trees or hedges in order to prevent this
damage. The following being the form of notice usually adopted for this
purpose:

To___________________________
You are hereby required to cut, prune, and trim your hedges adjoining the
highway leading from to and also to cut down, prune,
or lop the branches of trees, bushes and shrubs growing in or near such
hedges and other fences adjoining thereto, in such manner that the said
highway shall not be prejudiced by the shade thereof, and that the sun and

Page 159

wind may not be excluded therefrom. And you will further take notice, that
if you shall neglect so to do within five days of the delivery hereof, I shall
proceed to have the said hedges, trees, and bushes cut and pruned,
according to the power and provisions of the various Acts of Parliament
relating thereto. And further, that I shall also proceed to recover from you
the penalties in this respect imposed by the said Acts of Parliament.
Dated this day of
____________________________
Surveyor.

It is however now very seldom that overhanging branches of trees or
hedges cause any damage to the roadways within an urban district, and
unless they are an actual obstruction to the traffic, the growth of trees near
urban roads and streets should be encouraged; indeed it is now a common
practice to plant trees close alongside the roadway, the branches of which
must of necessity hang over it, and cause no damage if the roadway is
properly formed and attended to.
(8.) Surface Water from Private Premises running over Footpaths.—
It frequently happens that the rain-water which falls upon a front garden
or courtyard finds its way, for want of a sufficient drain, out of the gate and
across or along the public footpath, thus causing annoyance to pedestrians
even if it does no injury to the path. There does not seem to be any clause in
the Public Health Act 1875 to meet this objection, for the section which I
have given with reference to rain-water shutes and down pipes (10 & 11
Vic. c. 34, s. 74), does not apply to such cases, as it only refers to water
from the “roof or any portico or projection” and not to water falling upon
the surface of a garden or courtyard, nor is there anything in the Highways
Acts which can be brought to bear upon the subject.
If, however, any injury is caused to the footpath, no doubt the cause of
offence may be stopped or the perpetrator prosecuted or indicted in default.
(9.) Hoardings and Scaffolds.—
When buildings are in course of erection, or repairs are being carried out
to them, it is generally necessary that the person engaged in the work
should construct either a hoarding or inclosure, or at all events a scaffold, so
as to execute the work properly. Upon this point the following clause of the
Towns Improvement Clauses Act has been incorporated with the Public
Health Act 1875:

Page 160

“Every person intending to build or take down any building within the
limits of the special Act, or to cause the same to be so done, or to alter or
repair the outward part of any such building, or to cause the same to be so
done, where any street or footway will be obstructed or rendered
inconvenient by means of such work, shall, before beginning the same,
cause sufficient hoards or fences to be put up in order to separate the
building where such works are being carried on from the street, with a
convenient platform and handrail if there be room enough, to serve as a
footway for passengers, outside of such hoard or fence, and shall continue
such hoard or fence with such platform and handrail as aforesaid standing
and in good condition, to the satisfaction of the commissioners, during such
times as the public safety or convenience requires, and shall, in all cases in
which it is necessary in order to prevent accidents, cause the same to be
sufficiently lighted during the night.[147] And every such person who fails to
put up such fence or hoard or platform with such handrail as aforesaid, or to
continue the same respectively standing and in good condition as aforesaid,
or who does not, while the said hoard or fence is standing, keep the same
sufficiently lighted in the night, or who does not remove the same when
directed by the commissioners within a reasonable time afterwards, shall for
every such offence be liable to a penalty not exceeding 5l., and a further
penalty not exceeding 40s. for every day while such default is continued”
(10 & 11 Vic. c. 34, s. 80).
Hoardings and scaffoldings are now so scientifically erected as to be little
or no inconvenience to foot-passengers. Care must, however, be taken to
see that in the erection of a hoarding the doors or gates in it shall not open
outwards, and the police should be instructed to prevent carts being backed
in and left standing across the footpath.
The surveyor must exercise great discretion in the length of time he
allows a hoarding to remain; without undue hardship on the builder, he
must study at the same time the more important question of the public
convenience.
(10.) Dangerous Buildings.—
This is the last, although by no means the least, of the series of
“obstructions” I have enumerated. Here, again, very grave responsibility
rests with the surveyor to determine what is a dangerous building, and in
what manner it shall be rendered safe and secure, for his opinion is
apparently legally conclusive on this matter.

Page 161

The following is the clause of the Towns Improvement Clauses Act
which deals with ruinous or dangerous buildings:
“If any building or wall, or anything affixed thereon, within the limits of
the special Act, be deemed by the surveyor of the commissioners to be in a
ruinous state and dangerous to passengers or to the occupiers of the
neighbouring buildings, such surveyor shall immediately cause a proper
hoard or fence to be put up for the protection of passengers,[148] and shall
cause notice in writing to be given to the owner of such building or wall, if
he be known and resident within the said limits, and shall also cause such
notice to be put on the door or other conspicuous part of the said premises,
or otherwise to be given to the occupier thereof, if any, requiring such
owner or occupier forthwith to take down, secure or repair such building,
wall or other thing, as the case shall require. And if such owner or occupier
do not begin to repair, take down or secure such building, wall or other
thing, within the space of three days after any such notice has been so given
or put up as aforesaid, and complete such repairs or taking down or
securing as speedily as the nature of the case will admit, the said surveyor
may make complaint thereof before two justices to order the owner, or in
his default the occupier (if any) of such building, wall, or other thing, to
take down, rebuild, repair or otherwise secure, to the satisfaction of such
surveyor, the same, or such part thereof as appears to them to be in a
dangerous state, within a time to be fixed by such justices. And in case the
same be not taken down, repaired, rebuilt or otherwise secured within the
time so limited, or if no owner or occupier can be found on whom to serve
such order, the commissioners shall with all convenient speed cause all or
so much of such building, wall, or other thing as shall be in a ruinous
condition and dangerous as aforesaid, to be taken down, repaired, rebuilt or
otherwise secured in such manner as shall be requisite, and all the expenses
of putting up every such fence, and of taking down, repairing, rebuilding or
securing such building, wall or other thing shall be paid by the owner
thereof” (10 & 11 Vic. c. 34, s. 75).
Great care must be observed in seeing that the notices are properly
prepared and served in accordance with sections 266 and 267 of the Public
Health Act 1875, and the town clerk, as the legal adviser of the sanitary
authority, should be consulted (in this as in all cases requiring notices) by
the surveyor.

Page 162

It sometimes happens that a tall chimney shaft, wall, or other erection
may apparently be perfectly safe, whereas in a high gale of wind it may be
blown down.
Many tall chimney shafts rock in an alarming manner in a high wind,[149]
but he would be a bold surveyor who would order some of these expensive
structures to be pulled down in the face of the opposition he would receive.
[150]
A curious case of some difficulty in connection with dangerous buildings
has come under my notice, where a house was built with the approval of the
urban authority, and after completion and occupation the attention of the
surveyor was called to the fact that a large piece of rock at the back of the
house, from which the site had been excavated for the purpose of its
erection, was in a dangerous condition and likely to fall at any moment and
cause great damage to property, or even loss of life. The clerk to the urban
authority, when consulted, was of opinion that the surveyor could do
nothing in the matter, as the case was not met in any way by the Act.
The following is given as a specimen notice to serve with reference to a
dangerous structure:

Notice.
To (A) the Owner of the ruinous and dangerous (B)
under-mentioned and the occupier thereof.

Whereas a certain (B) situated at within
the borough of , in the county of , is deemed by me,
the undersigned, the surveyor of the mayor, aldermen and burgesses of the
said borough of , acting by the council as the urban sanitary
authority for the same, to be in a ruinous state and dangerous to passengers
or to the occupiers of neighbouring buildings:
Therefore take notice, that you are hereby required, in pursuance of the
provisions in that behalf of the Public Health Act 1875, and the Towns
Improvement Clauses Act 1847, to take down, repair or secure the said (B).
And that if you do not or if neither of you does begin to take down,
repair, or secure the said (B) within the space of three days after
this notice has been served upon you or put upon the said premises, and
complete such taking down, repairing or securing as speedily as the nature

Page 163

of the case will admit, I shall cause complaint thereof to be made before
two justices in accordance with the provisions of the statutes aforesaid.
Dated this day of 18 .
____________________
Surveyor of the said Urban Sanitary
Authority.
A. The name and description of the owner or occupier, or the names, &c., of both should
be here inserted.
B. Building, wall, or anything affixed thereon.

Before closing this chapter upon “Obstructions in Streets” I give the
following clause from the “Towns Improvement Clauses Act,” which comes
after two other sections of the same Act principally dealing with building
materials, rubbish, or holes in streets, and although in this clause the word
“building” is used, the section cannot be taken as referring to dangerous
buildings, although it may undoubtedly be used where it is required on
account of waste land, &c., being left in an unprotected and dangerous
state:—
“If any building or hole or any other place near any street be, for want of
sufficient repair, protection or inclosure, dangerous to the passengers along
such street, the commissioners shall cause the same to be repaired,
protected or inclosed so as to prevent danger therefrom; and the expense of
such repair, protection or inclosure shall be repaid to the commissioners by
the owner of the premises so repaired, protected or inclosed, and shall be
recoverable from him as damages” (10 & 11 Vic. c. 34, s. 83).
I have purposely omitted any reference to temporary obstructions in the
streets, which are naturally subjects for the interference of the police, but I
think I have enumerated all those which require the attention of the town
surveyor.

[131] Vide 10 & 11 Vic. c. 34, s. 67.
[132] Vide Fitzgerald’s ‘Public Health and Local Government Act 1875,’ 3rd edition, p.
166.
[133] Vide 10 & 11 Vic. c. 34, s. 68.
[134] Ibid. ss. 69 and 70.
[135] Or Owners, see s. 160, 38 & 39 Vic. c. 55.
[136] Vide Fitzgerald’s ‘Public Health and Local Government Act 1875,’ 3rd edition, p.
174.

Page 164

[137] Or owner, see 38 & 39 Vic. c. 55, s. 160.
[138] Towns Improvement Clauses Act 1847, s. 70.
[139] Or owner.
[140] Vide ‘Fitzgerald’s Public Health and Local Government Act 1875,’ 3rd edition, p.
175.
[141] Care must be taken that the mode of construction “directed by the commissioners”
authorises this part of the notice.
[142] In the City of London these patent lights have been fixed in the pavement round
the whole of the frontage of Mansion House Buildings, at the corner of Queen Victoria
Street, and also over the whole of the pavements in Draper’s Gardens, besides many other
equally crowded thoroughfares, without the least inconvenience being experienced.
[143] In the Act the words used are “shoot” and “trough.”
[144] These words must be omitted if there is no special Improvement Act.
[145] Vide p. 176.
[146] Sir Fred. Parnell in his celebrated work upon roads has the following paragraph
upon this subject:—
The great advantage of having a road perfectly exposed to the action of the sun and wind
will be more accurately conceived by referring to writers of science on evaporation. Dr.
Hailey states that one-tenth of an inch of the surface of the sea is raised per diem in vapour.
He also says that the winds lick up the water somewhat faster than it exhales by the heat of
the sun. Other writers say the dissipation of moisture is much accelerated by the agency of
sweeping winds, the effects being sometimes augmented five to ten times.
Trees are particularly injurious by not allowing the sun and wind to have free action on
the surface of roads producing evaporation. Besides the benefit which a road receives from
its drying rapidly by an open exposure to the atmosphere, there is another of great
importance, namely, that of affording to horses the advantage of free respiration; for it is
well known that the powers of a horse to perform work with ease, particularly when
moving rapidly, depends upon the quantity of cool and fresh air that he can pass through
his lungs. If the cause of horses tiring or becoming ill under their work be carefully
examined into, it will often be found that it is not their muscles or limbs that fail them, but
their wind; and therefore, it is particularly important to have a road so circumstanced that a
horse may on all parts of it have the benefit of a free current of air.
[147] No person can put up hoards or scaffolds in the streets without first obtaining the
consent of the urban authority, vide sections 144 and 149 of the Public Health Act 1875.
Many towns also have private improvement Acts with very binding clauses on this subject,
empowering the surveyor to demand a fee for a licence to erect a hoarding, and
empowering him to remove these after notice, &c.
[148] This is scarcely ever feasible, or of the slightest use if done.
[149] Mr. Cooper states that “a tall chimney will rock 1 inch in a moderate wind, and
even to an extent of ¹⁄₈th of an inch at a distance of only 16 feet up from its base, and yet be
safe.” (Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. xxvii. p.
100.)
[150] Whilst this work was in the press the terrible disaster arising from the falling of an
immense chimney shaft at Bradford took place, the result of which was the death of
upwards of forty persons and great destruction of property.

Page 165

Page 166

CHAPTER XVII.
IMPROVEMENT OF PRIVATE STREETS.

Prior to the passing of the Public Health Act 1875 the improvement of
private roads and streets was dealt with under section 69 of the Public
Health Act 1848, but the clause under which the town surveyor now works
is that which is so well known as the 150th section of the Public Health Act
1875, and is as follows:
“Where any street within any urban district (not being a highway
repairable by the inhabitants at large) or the carriageway, footway, or any
other part of such street is not sewered, levelled, paved, metalled, flagged,
channelled and made good, or is not lighted to the satisfaction of the urban
authority, such authority may, by notice addressed to the respective owners
or occupiers of the premises fronting, adjoining or abutting on such parts
thereof as may require to be sewered, levelled, paved, metalled, flagged or
channelled, or to be lighted, require them to sewer, level, pave, metal, flag,
channel or make good, or to provide proper means for lighting the same
within a time to be specified in such notice.
“Before giving such notice the urban authority shall cause plans and
sections of any structural works intended to be executed under this section,
and an estimate of the probable cost thereof, to be made under the direction
of their surveyor, such plans and sections to be on a scale of not less than
one inch for eighty-eight feet for a horizontal plan, and on a scale of not
less than one inch for ten feet for a vertical section, and, in the case of a
sewer, showing the depth of such sewer below the surface of the ground:
such plans, sections and estimate shall be deposited in the office of the
urban authority, and shall be open at all reasonable hours for the inspection
of all persons interested therein during the time specified in such notice;
and a reference to such plans and sections in such notice shall be sufficient
without requiring any copy of such plans and sections to be annexed to such
notice.

Page 167

If such notice is not complied with, the urban authority may, if they think
fit, execute the works mentioned or referred to therein; and may recover in
a summary manner the expenses incurred by them in so doing from the
owners in default, according to the frontage of their respective premises,
and in such proportion as is settled by the surveyor of the urban authority,
or (in case of dispute) by arbitration in manner provided by this Act; or the
urban authority may by order declare the expenses so incurred to be private
improvement expenses.
“The same proceedings may be taken and the same powers may be
exercised in respect of any street or road of which a part is or may be a
public footpath or repairable by the inhabitants at large, as fully as if the
whole of such street or road was a highway not repairable by the inhabitants
at large” (38 & 39 Vic. c. 55, s. 150).
One has only to look at the number of footnotes that follow this clause
both in “Glenn” and “Fitzgerald” to see that it requires some considerable
interpretation. I propose in this chapter to call attention to some of its
engineering discrepancies and to point out the duties of the town surveyor
in connection with its enforcement.
First then, I conclude that it is the duty of the surveyor to call the
attention of the urban authority to the fact that any street within his district
(not being a highway repairable by the inhabitants at large) is not “sewered,
levelled, paved, &c.” but there is no express order for him to do so, but with
whoever this duty rests, it is no doubt the surveyor’s duty to be certain that
the street in question has never been dedicated to the public or repaired at
the cost of the rates, but is really a private street within the meaning of the
Act.
Before proceeding to give the manner of putting the 150th section into
force, it is necessary to draw attention to some of its wording.
The word “sewered” no doubt is also meant to include all drains both for
house sewage and surface water falling on the street, &c., and may be used
in the same comprehensive manner that the word “sewerage” is generally
employed.
“Levelled” is also rather a vague term, but it has been held to refer only
to the level or cross section of the street itself, there being no power to
charge the adjacent owners with the expense of altering the level of the
street so as to make it conform to a street with which it connects. The word
“formed” would in this case have therefore been a more appropriate phrase.

Page 168

“Paved, metalled, flagged, channelled and made good” are very precise
directions, but why both the words “paved” and “metalled” are used is not
clear. Is the paving to be placed on the top of the metalling or vice versâ? It
seems ludicrous to have used both words. The word “kerbed” also ought no
doubt to have been inserted, as no street either urban or suburban can be
formed without this necessary adjunct.
These very precise directions, if carried out in their entirety, would cause
great injustice to the adjacent owners of the property who had to bear the
expense, for although “paving” and “flagging” may be necessary for streets
situated in a town itself, they would be perfectly unnecessary for a suburban
road, and it is to this latter class of work that the section is more frequently
applied. There are generally very few badly maintained private streets in the
heart and busiest parts of a town, much difference of opinion consequently
exists in different localities as to what the requirements shall be.
Some urban authorities insist that the roadways shall be paved with
granite setts or wood blocks, the footpaths being flagged or paved with
asphalte, while others are content with ordinary macadamised roadways and
gravelled paths.
There can be no doubt that the town surveyor must use considerable
discretion in deciding what class of work should be demanded, and he must
be greatly guided by the situation and requirements of the street in question
and the description and value of the adjoining property.
With reference to the words “or is not lighted,” my opinion is that nearly
all private streets are at once lighted by the urban authority out of the rates,
so soon as buildings are erected at its sides or it is found necessary for the
public convenience to do so. A reference to section 161 of the Public Health
Act 1875 will show that there is no exclusion of private streets for that
purpose, and for many obvious reasons it is better that the urban authority
should themselves undertake this duty rather than throw it upon private
individuals.
Having thus far drawn attention to some of the wording of the clause, it is
now necessary to discuss the duties of the town surveyor in connection with
it.
It will be seen that notice has to be addressed to the owners or occupiers
of “premises fronting, adjoining or abutting on such parts thereof as may
require to be sewered, levelled, paved, &c.” It is often found that although
the greater portion of a certain private street may be in a shocking state of

Page 169

repair, perhaps just a small length here and there opposite portions of
different frontages may not be so bad: for instance, the path may be well
gravelled and kerbed and a narrow channel gutter inserted against a
wretchedly constructed roadway. It is often open to question if the owners
of these properties against which these partial improvements have been
effected can expect to escape their liability. If they can, it complicates still
more the working of an already greatly complicated clause.
“Before giving such notice the urban authority shall cause plans and
sections . . . to be made under the direction of their surveyor.”
This order involves some considerable amount of work. Very accurate
surveys must be made and plotted to a large scale, levels must be taken, and
where sewers have to be included in the notice it is often necessary to
extend the survey considerably, in order to make provision for future
extensions of streets or buildings or for the existing sewerage system. The
clause is very particular in stating that the “depth of such sewer below the
surface of the ground” must be shown, but no mention is made about the
size. The latter point being of quite as great importance it would be thought
as the depth, the question also at once arises, whether the new sewer must
be specified of such a size as only to meet the requirements of the street
alone, or may it be made of such an area as will carry the sewage of a
considerable district? It would be most unjust to expect the owners of
property to pay for a sewer larger than was required for the street in respect
of which they were responsible, and if legal, the better plan would be for
them to be charged with the cost of such a sewer as would be sufficient for
their purpose and let any extra size that the surveyor found was requisite be
paid for out of the public rates.
It should be noted that in addition to the plans and sections “an estimate
of the probable cost” must also be prepared by the surveyor, and this must
be very carefully prepared, for it has been held to be a “condition precedent
to the recovery of the expenses, that such estimate should have been
properly made” (Vide ‘Fitzgerald’ p. 160, 3rd edition).
No mention is however made in the Act of a specification, which is of
course absolutely essential.
It may here be of use if I give a specimen form of notice to be served in
connection with carrying out the duties involved by this clause; of course
each town surveyor must alter the work specified to meet the requirements
of the case;

Page 170

To the Owner or Owners of certain premises fronting, adjoining, or abutting
upon a certain street, called in the parish of
in the borough of in the county of

Whereas the said street is not levelled, paved, metalled, channelled and
made good to the satisfaction of the mayor, aldermen and burgesses of
, the urban sanitary authority of the above-named borough:
And whereas your said premises front, adjoin, or abut on certain parts of
the said street which requires to be levelled, paved, metalled, channelled
and made good as aforesaid:
Now therefore, the mayor, aldermen and burgesses of , the
urban sanitary authority of the said borough as aforesaid, hereby give you
notice (in pursuance of the statute in that case made and provided) to level,
pave, metal, channel and make good the portion of the said street in which
your said premises front, adjoin, or abut as aforesaid, within the space of
one month from the date hereof, in manner following, that is to say:
(If a sewer is to be formed, fill in this first.)
The carriage-way and water tables thereof to be formed in the mode,
according to the sections, and on the levels and at the rates of inclination
shown upon the plan, sections, and in accordance with the specification of
the work prepared by the surveyor to the said urban sanitary authority, and
now open for public inspection at his office, during the
usual office hours.
The carriage-way to be bottomed, formed, and carefully levelled up to
the form shown by the said sections; and in the following manner:
(Here fill in specification of method.)
Construct gullies, fitted with five-bar cast-iron gratings and
frames of the form and pattern to be seen at , these gullies to
be placed in such positions as are shown on the aforesaid plan and sections;
each gully to have a six-inch glazed stoneware socket-pipe drain connecting
it with the sewer, to be laid on a solid bed, and at an uniform inclination
from gully to sewer, with joints made of neat Portland cement.
The existing kerb to be taken up and replaced by inches by
inches granite kerb in lengths of not less than inches, to the lines
shown on plan, and to the levels marked on sections.

Page 171

The water-tables or gutter to be channelled with properly
laid, and bedded on fine gravel to the levels and inclinations marked on
sections.
The footpaths shall be properly formed, bottomed, and drained where
required; the formation level made to the inclination shown on section, and
afterwards coated with .
The whole of the above-mentioned works to be executed by you in
accordance with the plan and sections hereinbefore referred to and now
open for inspection at the surveyor’s office as aforesaid, and of the
dimensions, widths and levels shown thereon, and to be done in a good,
workmanlike and substantial manner, to the satisfaction of the said urban
sanitary authority and of their surveyor.
An estimate of the probable cost of the said work, prepared under the
direction of the surveyor to the said urban sanitary authority, is also lying
for inspection at the office of the said surveyor, in manner required by
section 150 of the Public Health Act 1875.
Dated this day of 18 .
_________________________
Town Clerk.

The clause then goes on to say “If such notice is not complied with.”
It would be a most difficult and costly proceeding for any individual
owner of property to execute the work for half the width of the street
opposite his length of frontage, and the result would be anything but
satisfactory if the owners of the properties were to comply with the notices
in this manner.
If the owners do intend to comply with the notice, and carry out the work
themselves, the best method for them to adopt is to hold a meeting and
decide upon having it done, then to appoint one of their number, or some
other person to superintend or carry out the work, and afterwards collect the
money, but this is very seldom done, and the wisest course (which is
generally adopted) is not to comply with the notice, but let the urban
authority execute the work themselves. This again entails considerable
labour upon the town surveyor, who has to superintend the work and see
that all the details contained in the statutory notices are properly carried out,
but his labour does not end here. Upon the completion of the work the
amount expended has to be recovered “from the owners in default

Page 172

according to the frontage of their respective premises, and in such
proportion as is settled by the surveyor of the urban authority, or (in case of
dispute) by arbitration.”
It is scarcely necessary to point out what an immense amount of
responsible work this involves. First, a separate account of all the labour
and materials employed on the street must be most carefully kept and
totalled at the end of the work, with such additional sum for supervision,
&c., as the urban authority may think necessary.[151] The exact length of
each property “fronting, adjoining or abutting” on the street, must be most
carefully measured. A proportionate sum has then to be calculated for each
of these, and this sum is often complicated by cross roads, cul-de-sacs,
narrow passages, strips of land intervening between the street and the
properties, and many other perplexing intricacies, in addition to those
persons who are legally exempted from any payment under the following
clause of the Public Health Act 1875:
“The incumbent or minister of any church, chapel, or place appropriated
to public religious worship, which is now by law exempt from rates for the
relief of the poor, shall not be liable to any expenses under the last
preceding section as the owner or occupier of such church, chapel, or place,
or of any churchyard or burial ground attached thereto, nor shall any such
expenses be deemed to be a charge on such church, chapel or other place, or
on such churchyard or burial ground . . .” (38 & 39 Vic. c. 55, s. 151.).
The town surveyor, having ascertained what is the amount of the sum due
from each owner, shall proceed to fill in the amount upon a form a
specimen of which is now given:

To the Owner of certain premises fronting, adjoining or abutting upon a
certain street called in the parish of
in the borough of in the county of

Whereas the mayor, aldermen and burgesses of the urban sanitary
authority for the said , by a notice in writing pursuant to the
statute in that behalf made and provided, dated the day of
, 18 , required you being the owner of certain premises
fronting, adjoining or abutting upon a street or highway called
, within the said (and not being a street or

Page 173

highway repairable by the inhabitants at large) to level, pave, metal, channel
and make good the said street or highway within the time and in the manner
specified in the said notice, and according to the plans and sections
deposited at the office of the surveyor to the said urban sanitary authority at
:
And whereas the said notice not having been complied with by you
within the time limited by the said notice, the said urban sanitary authority
have executed the works mentioned or referred to therein:
And whereas the expenses incurred by the said urban sanitary authority
in levelling, paving, metalling, channelling and making good the said street,
amount to pounds shillings and pence:
Wherefore take notice that I the undersigned, being the surveyor of the
said urban sanitary authority, in pursuance of the statutes in that case made
and provided, do hereby apportion the sum of pounds, shillings
and pence as the proportion of the said sum of pounds,
shillings and pence, to be paid by you as such owner aforesaid, such
apportionment being according to the frontage of your said premises,
fronting, adjoining or abutting upon the said street or highway.
Further take notice that the aforesaid apportionment will be binding and
conclusive upon you unless within the period of three months from the day
of the date of this notice you shall by written notice to the said urban
sanitary authority dispute the same.
Dated this day of , 18 .
______________________
Surveyor to the said Urban Sanitary
Authority.
______________________
Clerk of the said Urban Sanitary
Authority.

There seems to be no power on the part of any owner to dispute the
question as to whether the works carried out have been necessary or not, or
whether the cost of the works have been excessive; the only point upon
which they can go to arbitration is that as to whether the proportion settled
by the surveyor is accurate or not, and this point the arbitrator is left to
decide.

Page 174

It must not be lost sight of that there is a clause in the Public Health Act
1875, which makes the expenses so settled by the surveyor very binding
upon the owner of the property in question, unless he appeals within three
months from the service of the notice, as the following extract from the
clause will show:
. . . “Where such expenses have been settled and apportioned by the
surveyor of the local authority as payable by such owner, such
apportionment shall be binding and conclusive on such owner, unless
within three months from service of notice on him by the local authority or
their surveyor of the amount settled by the surveyor to be due from such
owner, he shall by written notice dispute the same” . . . (38 & 39 Vic. c. 55,
s. 257)[152] and it must also be borne in mind that the person from whom
these expenses may be recovered “is the owner of the premises at the time
when the work was done, not the owner to whom notice requiring the work
to be done may be given” (vide Fitzgerald’s Public Health Act, p. 301, 3rd
edition); so that the town surveyor must be very careful to make sure that
any of the property abutting on the street has not changed hands before he
commences the work.
After the 150th section of the Public Health Act has been carried out and
a private street has been thus put into thorough repair, the urban authority
may take possession of it and declare it to be a highway repairable by the
inhabitants at large; the following section of the Act gives the modus
operandi necessary to effect this:
“When any street within any urban district, not being a highway
repairable by the inhabitants at large, has been sewered, levelled, paved,
flagged, metalled, channelled and made good and provided with proper
means of lighting to the satisfaction of the urban authority, such authority
may if they think fit, by notice in writing put up in any part of the street,
declare the same to be a highway, and thereupon the same shall become a
highway repairable by the inhabitants at large, and every such notice shall
be entered among the proceedings of the urban authority.
“Provided that no such street shall become a highway so repairable if
within one month after such notice has been put up, the proprietor or the
majority in number of proprietors of such street, by notice in writing to the
urban authority, object thereto, and in ascertaining such majority, joint
proprietors shall be reckoned as one proprietor” (38 & 39 Vic. c. 55, s. 152).

Page 175

The necessary notices in conformity with this section are usually
prepared by the town clerk, so that the town surveyor has nothing to do with
this proceeding except to maintain the street after it has been declared a
highway repairable by the inhabitants at large, in the same manner as he
does the rest of the public streets within his district.
There is still one other clause of the Public Health Act 1875, which deals
with the question of private roads, and it is as follows:
“Any urban authority may agree with any person for the making of roads
within their district for the public use through the lands and at the expense
of such person, and may agree that such roads shall become and the same
shall accordingly become on completion, highways maintainable and
repairable by the inhabitants at large within their district; they may also
with the consent of two-thirds of their number agree with such person to
pay and may accordingly pay any portion of the expenses of making such
roads” (38 & 39 Vic. c. 55, s. 146).
This clause is very explicit and requires no comment, it would however
be much better for the urban authority in contemplating a case of this
description to execute the necessary works themselves and agree with the
person about the expense, for if they are intended to be afterwards taken
over it is to be feared that the roads would be very improperly constructed
in the first place by the person intending to hand them over. It must be
noted that the word “roads” is used in the above clause instead of “streets”
as in the other clauses I have quoted, and also that the word “maintainable”
is added to repairable.
Street is the term legally used in the Public Health Act 1875, and is thus
defined:
“Street includes any highway (not being a turnpike road) and any public
bridge (not being a county bridge), and any road, lane, footway, square,
court, alley or passage, whether a thoroughfare or not” (38 & 39 Vic. c. 55,
s. 4.) so that whereas in the 150th section of the Public Health Act 1875,
any of the above can be dealt with, it is only open for the urban authority to
deal with roads under the 146th section of the Act, and it is sometimes
rather difficult to define a road for the purposes of the latter section.

[151] In some districts the urban authority make an additional charge of 5 per cent. upon
the total outlay to cover the cost of preliminary surveys and supervision of the work by
their surveyor; this 5 per cent., however, is not paid to him, but is paid to the city treasurer,
and thus becomes a set off against his salary.

Page 176

[152] See also 38 & 39 Vict. c. 55, s. 268, where a person who deems himself aggrieved
may memorialise the Local Government Board, &c.

Page 177

CHAPTER XVIII.
NEW STREETS AND BUILDINGS.

One of the most important duties devolving upon a “town surveyor” is that
of exercising control over any new streets that may be constructed, or any
new buildings that may be erected, within the limits of his jurisdiction.
This duty is imposed on him by the following clause of the Public Health
Act 1875:
“Every urban authority may make byelaws with respect to the following
matters; (that is to say,)
“(1.) With respect to the level, width and construction of new streets, and
the provisions for the sewerage thereof;
“(2.) With respect to the structure of walls, foundations, roofs, and
chimneys of new buildings, for securing stability and the prevention of
fires, and for purposes of health;
“(3.) With respect to the sufficiency of the space about buildings to
secure a free circulation of air, and with respect to the ventilation of
buildings;
“(4.) With respect to the drainage of buildings, to waterclosets, earth
closets, privies, ashpits, and cesspools, in connexion with buildings, and to
the closing of buildings or parts of buildings unfit for human habitation, and
to prohibition of their use for such habitation;
“And they may further provide for the observance of such byelaws by
enacting therein such provisions as they think necessary as to the giving of
notices; as to the deposit of plans and sections by persons intending to lay
out streets or to construct buildings; as to inspection by the urban authority,
and as to the power of such authority (subject to the provisions of this Act)
to remove, alter, or pull down any work begun or done in contravention of
such byelaws. Provided that no byelaw made under this section shall affect
any building erected in any place (which at the time of the passing of this
Act is included in an urban sanitary district) before the Local Government

Page 178

Acts came into force in such place, or any building erected in any place
(which at the time of the passing of this Act is not included in an urban
sanitary district) before such place becomes constituted or included in an
urban district, or by virtue of any order of the Local Government Board
subject to this enactment.
“The provisions of this section, and of the two last preceding sections,
shall not apply to buildings belonging to any railway company, and used for
the purposes of such railway under any Act of Parliament” (38 & 39 Vic. c.
55, s. 157).
The result of this power having been so given to urban authorities, is that
they have all framed sets of byelaws, which having received the sanction of
the Local Government Board, are now law in the several districts.
In the year 1877, it being found that considerable variation existed in the
requirements set forth in the byelaws, according to the districts from which
they emanated, and experience having shown that the forms of byelaws
previously issued by the Local Government Board were inadequate, the
Local Government Board in order to assist urban authorities issued a series
of model byelaws; amongst the series being a set of byelaws regulating the
manner in which new streets should be constructed and buildings erected.
[153]
These model byelaws are too extensive to give in detail, as they contain
99 clauses, but every town surveyor should at once procure a copy, even if
his corporation have not adopted them, nor intend to do so.
One of the first difficulties that often presents itself to those who have to
enforce the observance of the necessary “giving of notices and deposit of
plans and sections by persons intending to construct new buildings” is to
prove that the building is “new” so as to bring it under the operations of the
Act.
In many cases, of course, there can be no doubt where bare land is being
built upon, but often after buildings have been partially destroyed by fire, or
where extensive alterations are being carried out, some considerable
elements of uncertainty as to what is a “new building” are introduced.
The law attempts to settle the question as follows:
“For the purposes of this Act, the re-erecting of any building pulled down
to, or below the ground floor, or of any frame-building of which only the
frame-work is left down to the ground floor, or the conversion into a
dwelling house of any building not originally constructed for human

Page 179

habitation, or the conversion into more than one dwelling house of a
building originally constructed as one dwelling house only, shall be
considered the erection of a new building” (38 & 39 Vic. c. 55, s. 159).
But the difficulty at once presents itself as to what is meant by the words
“ground floor.” Does this mean the actual floor level, or the cubical space
contained by the walls, floor and ceiling of the “ground floor” (or as it is
sometimes called “ground story”) of the building? The latter may be
assumed to be the correct interpretation, for if we order a man to hang a
picture, or to fix a chandelier on the “ground floor,” we certainly do not
expect to find them placed upon the floor.
It is important that this point should be settled definitely, or some more
explanatory term employed in the Act in order to determine what is a new
building, for in the present state of uncertainty it may be urged that the
whole building must be razed to the ground, whereas if the proper meaning
of “ground floor” is taken, would the removal of the superstructure and
destruction of the ceiling only of the “ground floor” bring the new work
under the definition of a new building and within the operation of the
byelaws?
This uncertainty is now taken advantage of by builders and others, who
sometimes find it irksome and inconvenient to be obliged to construct a
building in accordance with the byelaws of any town. Somewhat sharp
practices are consequently resorted to in order to evade the law, and old
buildings are converted into new ones without any powers of interference
by the urban authority or their surveyor. This is greatly to be regretted, as
unless the building comes within the operation of the byelaws, it is
frequently erected without any sanitary precautions or even stability.
Sometimes a so-called repair of a building is commenced by adding a
new roof perhaps, at a higher level than the old one; when sufficient time
has elapsed to allay suspicion, a new front is erected, and then new back
and side walls in due course, the alteration of the interior floors not
attracting much attention.
Cases of this description are very troublesome to the town surveyor, as if
legal proceedings are to be taken against the offender, it is necessary for the
surveyor to make surveys and drawings of the works as they are in progress
in order to prove his case, and these might extend over a considerable
period of time.[154] In order to make these surveys it would be necessary for
him to enter the premises whilst the works were in progress, but there does

Page 180

not seem to be any powers conferred on him by any Act of Parliament for
such a purpose, so that really he has no power to prevent the occurrences I
have mentioned.
It must also not be forgotten that what may sometimes appear to be an
entirely new building, may only be an addition to one that existed before
the passing of the Act, and although the new work may be ten times as large
as the old, still much conflicting evidence may be brought to bear before it
can be proved to be a “new building” within the meaning of the Act.
Turning again to section 159 of the Public Health Act 1875, these words
will be found as defining also what is a new building: “or the conversion
into a dwelling house of any building not originally constructed for human
habitation.”
It would have been better in the interests of sanitation if the Act had
prohibited the conversion of any building at all into a dwelling house
without the approval of the urban authority, for as the law stands at present,
it is open for an owner of property to convert stables or warehouses, &c.,
into dwelling houses, by simply asserting and bringing witnesses or other
evidence to prove that they were “originally constructed for human
habitation” irrespective of whether they are adapted for the purpose or not,
thus defeating the intention of the Public Health Act to secure a better
description of dwellings than those that were erected before the passing of
the Act.
When a dispute does arise with anyone as to whether a building comes
within the definition of “new” or not, it is well if possible to agree upon
certain points of fact and upon plans, &c., before the case comes into court,
and then to endeavour to get the magistrates to “view.” This course if
pursued often saves lengthy litigation, and a great waste of time and money.
With reference to the deposit of plans of new streets or buildings, the
following clause of the Public Health Act 1875 provides that this shall be
done:
“Where a notice, plan or description of any work is required by any
byelaw made by an urban authority to be laid before that authority, the
urban authority shall, within one month after the same has been delivered or
sent to their surveyor or clerk,[155] signify in writing their approval or
disapproval of the intended work to the person proposing to execute the
same; and if the work is commenced after such notice of disapproval, or
before the expiration of such month without such approval, and is in any

Page 181

respect not in conformity with any byelaw of the urban authority, the urban
authority may cause so much of the work as has been executed to be pulled
down or removed” . . . (38 & 39 Vic. c. 55, s. 158.).
The result of these clauses of the Act with reference to new streets and
buildings is, that some of the most arduous and irksome duties of the town
surveyor are embodied in the few words they contain. These duties consist
of, first, the careful examination of, and report upon all plans of new streets
and buildings; secondly, the constant supervision of these streets and
buildings whilst the works are in progress; and each of these duties will be
considered in the course of this chapter.
First then, as to the deposit and examination of the plans of new streets or
buildings.
The byelaws of which I have already made mention should contain some
such clause as the following:
“Every person who shall intend to make or lay out any new street,
whether the same shall be intended to be used as a public way or not, shall
give notice to the urban authority of such intention, by writing delivered to
them at their office, or at the office of their surveyor, and shall at the same
time leave or cause to be left at the office of the urban authority, or of their
surveyor, a plan and section of such intended new street, drawn to a scale of
not less than 1 inch to every 44 feet, and shall show on every such plan the
names of the owners of the land through or over which such street shall be
intended to pass, the level, width, direction, the proposed mode of
construction, the proposed name of such intended new street, and its
position relatively to the streets nearest thereto; the size and number of the
intended building lots, and the proposed sites, height, class, and nature of
the buildings to be erected therein, and the proposed height of the division
and fence walls thereon; and the name and address of the person intending
to lay out such new street, and he shall himself sign such plan, or cause the
same to be signed by his duly authorised agent.
“Such person shall show on every such section the level of the present
surface of the ground above some known fixed datum, the level and rate or
rates of inclination of the intended new street, the level and inclination of
the streets with which it will be connected, and the level of the lowest floors
of the intended new buildings.
“Every person who shall intend to erect any new building shall give
notice to the urban authority of such intention by writing delivered to them

Page 182

at their office or at the office of their surveyor, and shall at the same time
leave or cause to be left at the said office detail plans and sections of every
floor of such intended new building, drawn to a scale of not less than 1 inch
to every 8 feet, showing the position, form and dimensions of the several
parts of such building, and of the watercloset, earth closet, privy, cesspool,
ashpit, well, and all other appurtenances; and together with such plans and
sections he shall leave or cause to be left at the office of the urban authority,
or of their surveyor, a description of the materials of which the building is
proposed to be constructed, of the intended mode of drainage, and means of
water supply.
“Such person shall at the same time leave or cause to be left at the office
of the urban authority, or of their surveyor, a block plan drawn to a scale of
not less than 1 inch to every 44 feet, and shall show the position of the
buildings and appurtenances of the properties immediately adjoining, the
width and level of the street in front, and of the street, if any, at the rear of
such building, the level of the lowest floor of such building, and of any yard
or ground belonging thereto.
“Such person shall likewise show on such plan the intended lines of
drainage of such building, and the intended size, depth and inclination of
each drain; and the details of the arrangement proposed to be adopted for
the ventilation of the drains.”
With reference to the deposit of plans as required by the above byelaw,
the following suggestions as to the best manner of effecting this may be of
some use:
(1.) The town surveyor should see that the person, or his agent, intending
to carry out the work, deposits tracings of the proposed street or building
signed by himself, so that there should be no after dispute as to what really
has been deposited; these tracings should be on good paper properly inked
in and coloured so as to be indelible. In some towns it is the practice for
original plans to be deposited temporarily with the surveyor, who is
expected to have them traced and then returned to the owner, but this not
only tends to the possibility of dispute as to the correctness of the tracings,
but it also takes up a large amount of the surveyor’s time, or of such other
officer as may have charge of this branch of the duties.
In order to insure that the plans deposited shall not be afterwards claimed
by the person making the deposit, it might be well to add these words to the
clause of the byelaws which I have quoted:

Page 183

“All such plans and sections so left at the office of the urban authority or
of their surveyor, shall remain the property of the urban authority.”
(2.) It is advisable for the town surveyor to have in his possession a
number of printed forms on which application should be made by the
person intending to erect a new building and filled in and signed by him or
his duly authorised agent. The following is given as a specimen form for
this purpose:

Page 184

To the Surveyor of the Urban Authority of
I hereby give you notice that it is my intention to erect certain buildings
in street, and that the following particulars relate thereto:

No. Questions. No. Answers.

1 Christian and Surname in full, Address 1
and Occupation of persons for
whom buildings to be erected.

2 Number of drawings deposited. 2
3 Name of architect, if any. 3
4 Description of buildings and of the 4
materials to be used in construction
of same.
5 Situation of buildings. 5
6 Level, or intended level of cellar, or 6
ground floor, with reference to
surface of street.
7 Thickness of walls. 7
8 Height of building in stories. 8
9 Area of clear open space at rear or 9
side of buildings exclusively
belonging thereto.
10 Distance across such open space. 10
11 Description of ventilation. 11
12 Width of street or open space opposite 12
buildings.
13 Size and description of drains, and 13
traps, and if ventilated.
14 Inclination of drains. 14
15 Description of outlet to drains. 15
16 How supplied with water. 16
17 Situation, dimensions, and particulars 17
of apparatus of w.c.’s.

Page 185

And I herewith leave detail plans and sections of every floor of such
intended new buildings, drawn to a scale of not less than 1 inch to every 8
feet, showing the position, form, and dimensions of the several parts of such
buildings, and of the watercloset, privy, cesspool, earthcloset, ashpit, well,
and all other appurtenances; and also, a block plan drawn to a scale of not
less than 1 inch to every 44 feet, showing the position of the buildings and
appurtenances of the properties immediately adjoining, the width and level
of the street, the level of the lowest floor of the intended building, and of
the yard or ground belonging thereto.
Dated this day of 18

Signature in full,
Address,
Occupation,

A similar form may be prepared relating to plans of proposed new streets,
but of course the number of the questions contained in it will be less.
(3.) When the necessary notices have been given and the tracings
properly deposited with the surveyor, he should carefully examine them to
see if they are in accordance with the byelaws which are in force in his
district. They should then be folded and placed in a large envelope, which
should be endorsed with the name of the person proposing to carry out the
work, the description of the work proposed, the name of the architect, if
any, the name of the builder, if any, the date of the deposit, and a blank left
for the date of approval. Each envelope should also have a large number
stamped upon it.
(4.) These particulars should be entered in a book of reference against a
corresponding number, so that at any future date it may be easy to find and
refer to any plans that have been deposited by means of an index and the
number on the envelope.
(5.) If on examining the plans the surveyor finds anything in them which
does not conform to the byelaws, he should be empowered by the urban
authority to return them at once to the person depositing them, without
having to wait to lay them before a committee, as this is a great saving of
time. In returning the plans the surveyor should write a letter setting forth a
schedule of his objections and the particulars of the manner in which the
plans and sections fail to comply with the requirements of the byelaws.

Page 186

(6.) If the plans are redeposited unaltered or showing still some non-
compliance with the byelaws, the surveyor must lay them before his
committee and explain in what respects they are defective, leaving it to the
committee to decide whether they shall be approved or not.
(7.) If the plans are in accordance with the byelaws, the surveyor reports
the fact to the committee, whereupon the plans should be at once signed by
the chairman of the committee.
(8.) All plans which the committee decline to approve of should be at
once returned to the person who deposited them with a written notification
of the reasons.
(9.) Plans which are approved of by the committee and afterwards
ratified by the general meeting of the urban authority, should be carefully
put away in pigeon-holes, so that by means of the reference book previously
described they can be easily found at any future time. This is very
important, as no extension of a building the plans of which have been thus
approved by the urban authority can ever afterwards be carried out without
their consent; and the plans of any alteration which would not involve
building upon an increased area must be deposited as in the case of a new
building.
(10.) A notification in writing should be sent to the person who has
deposited the plans when they have been approved by the urban authority;
and in sending this notification it is well to draw his attention to the fact that
notice must be given to the surveyor of the commencement of the work, in
order that the foundations, drains, &c., may be examined by him before the
ground is filled in.
The importance and necessity for the deposit of plans with a sanitary
authority cannot be over-estimated, but this deposit is of but little practical
good unless it can be insured that all the buildings are erected strictly in
conformity with these plans, and this, according to the Act, is the duty also
of the town surveyor. As a matter of fact, it is quite impossible for any
single person in any large town to perform this duty, and a staff of assistants
is consequently necessary if the sanitary authority really wish their byelaws
to be enforced.
Anyone who is practically acquainted with the difficulties that even
architects experience in superintending buildings they have themselves
designed, and how much they have to trust to the clerk of works (of which
there is generally one to every building), will readily see what an absurdity

Page 187

it is to suppose that a town surveyor, with his multitude of other duties and
attendances at committees and meetings, can even pretend to see that the 99
detail clauses of such byelaws as those emanating from the Local
Government Board Office, or even those of a less stringent character, can
possibly be enforced, especially when it is remembered that many of the
buildings he has to inspect have no superintending architect, but are being
erected for purposes of speculation by what are commonly known as jerry
builders.
Laws may be passed, books on sanitary questions may be written, but
until a change is made in the machinery and manner of the inspection of
buildings in the course of erection, and a large staff of inspectors or sanitary
police or some such officials are kept by a sanitary authority, very little real
advancement will be made with the poorer classes of buildings.
It must in fairness to the builder be stated that to erect houses in strict
accordance with the model byelaws would probably mean loss of money to
him, as they could not possibly be built with any prospect of a reasonable
return upon the outlay. This partly arises from the stringent clauses inserted
with respect to the structure of walls and other precautions for the
prevention of fires. I cannot help thinking that too much interference is now
made by sanitary authorities for the protection of property from fire.[156] It
is not a sanitary question, and is certainly one which chiefly affects
insurance companies. Every one should be able to pay his small insurance
premium and the companies should look after their own interests, and not
expect it to be done by others. If the sanitary authority wish to interfere in
the question of fire, why should not the protection of life be considered as
much as property? Yet no clause can be discovered in the model byelaws
rendering it compulsory to make some provision in dwelling-houses or
factories for the easy escape of the inmates in case of fire. Indeed, as the
Public Health Act does not authorise the enactment of a byelaw for such a
purpose, such a clause would most probably be held to be ultra vires.
Another cause of expense to builders is the necessity imposed on them to
provide a comparatively large open space at the back or sides of new
dwelling-houses, thus sacrificing land, and sometimes making it almost
impossible to build at all. This necessity for open gardens or yards at the
back of even small labourers’ dwellings is in some towns pushed to an
extreme. If such houses are erected in a thoroughly sanitary manner in all
points of detail, it is questionable if this open space is really beneficial. My

Page 188

experience has shown me that the space is often misused, animals, such as
rabbits, chickens, pigeons, &c., being kept there, or it is made into a so-
called garden, really a refuse heap which is a receptacle for all the garbage
and filth of the house, soon becoming a fruitful source of disease to the
occupants of the house itself and the neighbours. It is also difficult to ensure
that the space thus provided and approved of in the deposited plans shall not
be built upon at some future period. It would be better if the streets in front
of such dwellings were wide, and a narrow street or “drangway”
constructed at the back for the dust-cart service, supply of coals, &c. The
houses themselves should have their rooms properly and thoroughly
ventilated; underground kitchens or living rooms should be prohibited. The
drainage, water-supply, and all the apparatus in connection with them,
should be perfect but simple. At the back of the house should be a small
yard or court well paved with asphalte or other impervious material, in
which should be placed the wash-house, w.c., &c. These and public parks
and plenty of fresh air in the streets and in the dwelling-houses themselves
should take the place of the large open spaces at the back of small dwelling-
houses, which, as I have already stated, are generally so much misused.
The model byelaws with regard to new streets and buildings issued by
the Local Government Board contain most admirable clauses—valuable
suggestions which should receive attention from any town surveyor who
has to advise his corporation upon the subject of framing a set of byelaws
for his district—but they necessarily contain many clauses which are not
suitable equally well for towns in the north, south, east, and west of
England.
Many of the clauses are too stringent to be enforced, but this arises not
from any fault in the byelaws themselves, but rather from the machinery
employed in carrying them into effect. To secure all that they require
adequate inspection is needed, and this might be effected if there was a fee
charged by the urban authority of any town for the purposes of proper
inspection of buildings in course of construction; and although it must be
admitted that any provision which increases the cost of construction of
small dwelling-houses which shall be complete in all sanitary requisites is
undesirable, the extra cost of such inspection would be too small to be
appreciable, while the advantages arising from such improved supervision
would, even from a pecuniary point of view, be of immense advantage not
only to the community as tending to improve the public health, but also to

Page 189

the owner as ensuring good honest work in return for his money. In larger
and more expensive buildings this supervision is exercised by the architect,
but as a rule there is no architect employed in the case of small houses, and
the builder is accordingly left to his own devices, with frequently
unfortunate results.

[153] ‘Model Bye-laws issued by the Local Government Board for the use of sanitary
authorities. New Streets and Buildings, IV.’ Printed by George E. Eyre and William
Spottiswoode, 1877.
[154] It is open also to question whether in the case of an old building being gradually
altered into a new one, it would be possible to prosecute, as there is the following
limitation as to proceedings in the Public Health Act 1875: “Any complaint or information
made or laid in pursuance of this Act shall be made or laid within six months from the time
when the matter of such complaint or information respectively arose” . . . (38 & 39 Vic. c.
55, s. 252). The complaint could not be made when the work was first commenced, as no
offence would have been committed, and if made after the work was finished, it might be
urged that the offence was commenced more than six months prior, and that the complaint
should have been made “when the matter of such complaint or information respectively
arose.”
[155] Plans are usually deposited with the surveyor as being the officer who would be
most likely to understand them.
[156] Nothing can be more vexatious than the bye-law compelling the party walls of
new buildings to be carried up above the roof to at least 12 inches; not only does this
frequently spoil the architectural appearance of a building, but it causes great expense in
order to keep the wet out: a very difficult thing with a wall treated in this manner.

Page 190

CHAPTER XIX.
SCAVENGING.

In a great number of towns in this country the town surveyor has charge of
the unostentatious, though very necessary sanitary work of the scavenging
of the district over which he has charge, and the following are the clauses of
the Public Health Act 1875, under which he carries out his duties:
“Every local authority may, and when required by order of the Local
Government Board shall, themselves undertake or contract for—
“The removal of house refuse from premises;
“The cleansing of earthclosets, privies, ashpits, and cesspools;
either for the whole or any part of their district: Moreover every urban
authority and any rural authority invested by the Local Government Board
with the requisite powers may, and when required by the said board shall,
themselves undertake or contract for the proper cleansing of streets, and
may also themselves undertake or contract for the proper watering of streets
for the whole or any part of their district.
“All matters collected by the local authority or contractor in pursuance of
this section may be sold or otherwise disposed of, and any profits thus made
by an urban authority shall be carried to the account of the fund or rate
applicable by them for the general purposes of this Act; and any profits thus
made by a rural authority in respect of any contributory place shall be
carried to the account of the fund or rate out of which expenses incurred
under this section by that authority in such contributory place are defrayed.
“If any person removes or obstructs the local authority or contractor in
removing any matters by this section authorised to be removed by the local
authority, he shall for each offence be liable to a penalty not exceeding five
pounds: Provided that the occupier of the house within the district shall not
be liable to such penalty in respect of any such matters which are produced
on his own premises and are intended to be removed for sale or for his own

Page 191

use, and are in the meantime kept so as not to be a nuisance” (38 & 39 Vic.
c. 55, s. 42).
The next clause imposes a penalty on the local authority if they fail
“without reasonable excuse after notice in writing from the occupier of any
house” to cleanse the ashpit, &c., within seven days if they have
“themselves undertaken or contracted for the removal of house refuse” &c.,
and the next clause is as follows:
“Where the local authority do not themselves undertake or contract for,
“The cleansing of footways and pavements adjoining any premises;
“The removal of house refuse from any premises;
“The cleansing of earthclosets, privies, ashpits, and cesspools belonging
to any premises;
“They may make byelaws imposing the duty of such cleansing or
removal, at such intervals as they think fit, on the occupier of any such
premises.
“An urban authority[157] may also make byelaws for the prevention of
nuisances arising from snow, filth, dust, ashes, and rubbish, and for the
prevention of the keeping of animals on any premises so as to be injurious
to health”[158] (38 & 39 Vic. c. 55, s. 44).
There is also another clause in the Public Health Act 1875, which is as
follows:
“Any urban authority may, if they see fit, provide in proper and
convenient situations receptacles for the temporary deposit and collection of
dust, ashes, and rubbish; they may also provide fit buildings and places for
the deposit of any matters collected by them in pursuance of this part of this
Act” (38 & 39 Vic. c. 55, s. 45).
The result of the above comprehensive clauses upon the subject of
scavenging is that the following duties fall upon the town surveyor where
that officer is responsible for such work:
(1.) “The removal of house refuse from premises.”
This work, like all the rest which follows, can be done either by the local
authority themselves or by contract, the former method, as I hope presently
to show, being much the best system.
In connection with this first duty of the removal of house refuse, the
following points will have to be considered:
(a.) What is house refuse?

Page 192

(b.) What is the best manner of storing it on the premises pending the
visit of the scavenger?
(c.) Which are the best methods for its collection?
(d.) Which are the best methods for its disposal?
(2.) “The cleansing of earthclosets, privies, ashpits, and cesspools.”
This work where necessary (owing to the want of a system of sewerage)
can be carried out simultaneously with the collection of house refuse and in
almost the same manner.
(3.) “The proper cleansing of streets.”
In connection with this duty the following points must be considered:
(a.) The best methods for sweeping and cleansing streets.
(b.) If machinery effects such work better and more economically than
hand labour.
(c.) The extra work involved by the bad construction of streets, or the ill
chosen materials of which they are formed.
(d.) Whether private streets, courts and alleys, “not repairable by the
inhabitants at large,” should be swept and cleansed by the local authority?
(e.) The ultimate disposal of excessive accumulations of mud.
(f.) The removal and disposal of snow.
(4.) “The proper watering of streets for the whole or any part of their
district.”
In considering this question it is necessary to note:
(a.) The best form of vehicle for carrying and spreading the water.
(b.) The number, position, and description of standpipes.
(c.) Whether vehicles, or fixed standpipes and hose are best.
(5.) If the local authority do not impose a byelaw they must themselves
cleanse the “footways and pavements adjoining any premises;” and this in
excessively muddy weather, or after a heavy fall of snow, is no
inconsiderable work.
(6.) An urban authority may make provision for the “temporary deposit
and collection of dust, ashes and rubbish.”
This involves public dust-bins being placed in suitable positions in the
town, the points in connection with this work being,
(a.) The most suitable sites for such accommodation.
(b.) The materials and form of which they shall be constructed.
Having thus stated all the heads under which the work of scavenging may
be grouped, it is necessary to decide what is “house refuse;” for unless this

Page 193

is satisfactorily settled, considerable onus and expense will be put upon the
local authority if they are to include in the removal trade, garden, and other
similar refuse.[159]
It may be assumed that all house refuse which it is the duty of the
scavenger to remove, is really so removed by the direction of the local
authority without dispute, but that the following articles, which frequently
find their way into a domestic dust-bin, are not in the strict terms of the Act
expected to be removed by him. (1) Plaster from walls and brick bats, (2)
Large quantities of broken bottles and flower pots, (3) Clinkers and ashes
from foundries and green-houses, (4) Wall paper torn from the rooms of a
house, (5) Scrap tin (but not old tins which have contained meats, &c., and
which, although very useless and bulky, may be fairly assumed to be house
refuse), (6) All garden refuse such as grass cuttings, dead leaves, and the
loppings from trees and shrubs.[160]
As a matter of fact, out of ninety towns with which I communicated on
this subject only thirteen of them directed the removal of both trade and
garden refuse without any special extra payment being made by the
householder, and this is only done when these materials are placed in the
ordinary dustbin or ashpit attached to a house. Several towns, however, it
appears remove such materials on special payments being made of sums
varying from 1s. 6d. to 3s. per load.
Disputes frequently arise between the men employed in scavenging and
the householder on these vexed questions as to the difference between
house, trade or garden refuse: a dispute often raised by the scavengers
themselves, in the hope of obtaining a gratuity or reward for the clearance
of a dustbin, which no doubt, legally, they are perfectly justified in refusing
to empty; and in order to lessen the chance of such disputes and to attempt
to settle this question, the following suggestions may be of value.
It would no doubt be vexatious if any sanitary authority were to
absolutely refuse to remove the “garden” refuse from those houses to which
a small flower garden was attached, whilst it would on the contrary be an
unfair tax upon the general community if the refuse of large gardens was
removed without payment. A good rule would therefore be to remove only
such garden refuse as was contained in the ordinary dustbin or ashpit
attached to a house, and that as the removal of any kind of trade refuse
would no doubt lead to abuses if done gratuitously by the sanitary authority,
that this material should only be removed on payment of some sum, which

Page 194

should be previously fixed by the local authority, and each case should be
reported to the officer superintending the work before it was removed.
The next question is the important one of the manner and place in which
house refuse shall be temporarily stored pending the visit of the scavenger.
The Public Health Act of 1875 enacts that: “Every local authority shall
provide that all drains, waterclosets, earthclosets, privies, ashpits, and
cesspools within their district be constructed and kept so as not to be a
nuisance or injurious to health” (38 & 39 Vic. c. 55, s. 40).
And section 35 of the above Act states, “It shall not be lawful newly to
erect any house or to rebuild any house pulled down to or below the ground
floor without a sufficient watercloset, earth closet, privy, and an ashpit
furnished with proper doors and coverings. Any person who causes any
house to be erected or rebuilt in contravention of this enactment shall be
liable to a penalty not exceeding twenty pounds” (38 & 39 Vic. c. 55, s. 35).
The same Act also gives power to local authorities to enforce provision
of ashpit accommodation for houses where such accommodation does not
already exist, and to frame byelaws with respect to ashpits.
There can be no doubt that the position of the dustbin or ashpit, as
regards its site with reference to the main dwelling-house, is of primary
sanitary importance, for if the garbage and domestic accumulations therein
are allowed to remain for a few days, especially when the weather is close,
damp, and warm, they become very offensive, and the emanations
therefrom may even be highly deleterious and dangerous to health; this
effect is aggravated by persons emptying vegetable refuse and other matters
which are wet into the dustbin, as decomposition of these matters is greatly
assisted by this addition, and it would be well that all such matters should
be burnt on the kitchen or scullery fire along with a large percentage of the
ashes which could be sifted and saved from those which too readily find
their way into the dustbin, and are thus wasted. Care would of course have
to be taken in this process that no smell or nuisance was caused by the
process of burning.
It is open to considerable doubt if the fixed dustbin or ashpit is the best or
most sanitary receptacle for the house refuse; they may be necessary and
suitable for Public Institutions, or for large isolated private dwellings, or for
schools or any places where excessive quantities of refuse may accumulate,
but where this refuse is systematically and properly removed by the order of
the local authority, at such times and in such manner as will be hereafter

Page 195

pointed out, moveable or portable dustbins, boxes or baskets are far
preferable to the large immoveable, inconvenient fixed ashpit,
recommended and enforced under the Act.
The next point to consider is that of the collection of the house refuse,
which should be effected satisfactorily, economically and expeditiously.
The following are the three methods by which this is attempted:
(1.) By a house to house call at intermittent periods.
(2.) By the scavengers giving notice of their approach by ringing a bell or
by other signal, and requiring the householder to bring out the refuse to the
cart.
(3.) By placing public dustbins in different localities, and expecting
householders in their vicinity to place the house refuse in these dustbins,
which are then cleared from time to time by the local authority.
Experience alone can teach which of these is the best method to adopt in
any district, and it is usually found that some modification of all three is
necessary.
It is, however, difficult sometimes to adopt public dustbins not only on
account of their first cost, but from the objections raised by the occupiers of
adjacent houses to their being fixed in their neighbourhood.
If these dustbins were constructed with properly balanced self-closing
lids, these objections might be overcome, and their first cost would be but
trifling when compared with the benefit to be derived by placing them in
some of the thickly populated courts and alleys which are unfortunately to
be found in nearly every town. Where there are no public dustbins the
inhabitants of these courts throw their waste products upon the surface of
the streets or courts, from time to time throughout the day, as it cannot be
expected nor desired that such materials should remain, even for twenty-
four hours, in their one living room, which is frequently over crowded, and
has but little spare space even for the common necessities of life; but that
these waste products should be thus strewn over the surface of the street or
court is almost equally objectionable, and points to the advantage to be
gained by placing in convenient situations covered dustbins which could be
easily emptied once a day.
Undoubtedly the best method for the removal of refuse is the house to
house call, but except in suburban districts and for the collection of refuse
from the better class of dwelling-houses and public institutions, the
expense, delay and difficulty which would be incurred in calling at every

Page 196

house throughout a town, would make it almost impracticable, and
consequently this system is universally combined with that which is known
as the bell or signal system, which simply means that the scavenging cart in
going its rounds has a bell attached to it, or the horse, which bell rings
automatically as the cart proceeds on its way; or the man in charge blows a
trumpet, or calls in stentorian tones, “Dust oh!” On hearing this signal, but
not before, the householder is expected to bring out the refuse in some
convenient receptacle, which is then emptied into the cart by the scavenger.
As a matter of fact, the receptacles containing all the waste products of
these householders are brought out and are placed in the gutter of the street
close to the kerb, long before the cart makes its appearance or can be
reasonably expected to do so.
The result of these (generally inappropriate) receptacles filled with
heterogenous collections of house refuse being left unprotected in the
public streets, is that their contents are quickly strewn about the surface of
the street, by their being upset accidentally, or purposely, and the
appearance of the street, which has probably been carefully swept and
garnished during the night or early in the morning, quickly assumes,
especially in a high wind, a very offensive character, and probably has to be
entirely re-swept and cleansed before the ordinary traffic of the day
commences.
To obviate this evil I must refer my readers to a small book on the subject
of scavenging, entitled ‘Dirty Dustbins and Sloppy Streets,’ published by
Messrs. Spon & Co., written by myself, in which I have suggested
moveable iron cylinders being placed in the streets for the reception of the
house refuse.
The “house to house” call system in the suburbs of a town may be greatly
assisted by a very simple remedy, which has already been tried in some
towns with considerable success. It consists in the householder placing a
card bearing the letter D, or some other distinguishing mark, in a
conspicuous place in a window, when the services of the scavengers are
required; these cards should be printed and circulated by the Sanitary
Authority of the district, who should state on the back of the card the days
on which the scavengers would visit each neighbourhood, with the
approximate hour of the day in which they would appear, in order that the
householder may not be unnecessarily inconvenienced by being obliged to
keep the card for any length of time in his window.

Page 197

The scavengers in passing observe the signal, and call at the house;
otherwise they pass on, unless specially called in by the occupants, thus
avoiding any unnecessary delay in their rounds.
A visit from the scavengers either before seven or after ten in the
morning is generally very inconvenient for households of a superior class,
and should be, if possible, carefully avoided by the sanitary authority.
The cart usually employed for scavenging is that known as the ordinary
“tip cart,” strongly, if not clumsily, constructed of an oak frame, with elm or
deal sides of considerable height; it holds about a couple of cubic yards of
material, and costs from sixteen to twenty pounds.
These carts are not only clumsy and heavy, but they give an
overweighted diminutive appearance to the horse between the shafts,
especially as the quality of horses employed for work of this character is
frequently none of the best. The height, too, of the cart is often so great as
to necessitate the use of a short ladder, up which the scavenger has to climb,
the result being a shower of dust when it is being loaded with house refuse,
and spatterings of mud, when it is being used as a slop cart.
It is difficult also to effectually cover a cart of this description. The
imperfect mode at present adopted is to cover it with a tarpaulin, which is
tied down as tightly as the circumstances of the case will admit, but which
as a rule does not effectually answer the purpose for which it is intended. In
towns where the house refuse is not collected separately from the road
scrapings, a judicious mixture of the two in the cart considerably assists in
preventing any mud from splashing over or the dust from blowing about.
The employment of wooden carts for this work is bad economy, their
rough usage, and the mode adopted for emptying them by “tipping,” renders
their life a short one; a cart in constant work frequently costs from 4l. to 5l.
per annum in repairs, and having but little of the original material of which
it was constructed left in it at the end of six years. They are also difficult to
cleanse or disinfect.
With a view to obviate these and other objections, several improved carts
and waggons have been introduced by different makers, who have styled
them by a variety of names. Amongst others they are called dust carts,
general purpose carts, sanitary carts, slush carts, tumbler carts, mud
waggons, tip waggons, slop waggons, &c. These are constructed with iron
bodies fixed upon wooden frames and wheels; they are of various forms
and designs, the principal objects aimed at being lightness of construction

Page 198

combined with strength, so balanced as to bear with a minimum of weight
upon the horse; economy in their cost has not been lost sight of, and they
are usually provided with some special means for emptying, either by being
tipped by a chain and windlass, or by some mechanical arrangement of the
tailboard; they are built very low upon their axles, so as to be easily filled,
are either completely covered over with a moveable lid, or are fitted with
hinged side boards, so as to prevent any splashing over of their contents,
and as they are nearly all constructed with iron; they are easily cleansed and
disinfected whenever it is thought necessary to do so.
With reference to the important question of the ultimate disposal of house
refuse, street sweepings &c., no rules can be laid down, as so much depends
upon the position of every town and the character of the district in which it
is situated, as the following replies to some questions which I addressed to
several English towns will show.
In many towns it is stated that the whole of the refuse is used by brick
makers, in others it is simply “tipped to waste.” In one case the answer is,
“Sold by auction twice a year,” but to whom it is sold, and for what
purpose, does not transpire. In some towns it appears to be mixed with lime
and used as manure upon the fields, and in others it is mixed with the
sludge of the sewage farms, and is then ploughed or dug into the soil of the
farm. This seems a better plan than that of another town, where it is “given
or thrown away,” although the difficulty of disposing of the old iron, tins,
&c., is not touched upon in any of the foregoing answers. The next reply
states that “it is riddled, and the cinders and vegetable refuse are burnt to
generate steam, the fine dust is used with the manure manufactory (tub
system), the old iron is sold, and the pots, &c., used for the foundations of
roads.” In one case the whole of the refuse is taken out to sea in hopper
barges, and sunk in deep water.[161] In a great number of towns it is sold by
tender for the year, but what eventually becomes of it does not transpire.
But the most favoured methods, where it cannot be sold as manure to
farmers, seem to be either that of carting it away to some spot outside the
town, and there using it for the purpose of filling up hollows and
depressions, or that of giving or selling it to brick-makers.
The practice of filling up hollow places with such materials cannot be too
strongly deprecated if there is any chance of dwelling houses being erected
on them, as the unsanitary condition of sites thus formed has been
frequently demonstrated.

Page 199

Where towns are unable to dispose of their refuse by sale to farmers or
market gardeners, the best method, and one which is gaining in popularity
every day, is that of its destruction by fire.
With this object in view a Mr Fryer has invented an apparatus which he
styles a “Patent Carboniser, for the conversion of garbage, street, and
market sweepings, also other vegetable refuse, into charcoal.” This
apparatus consists of a structure somewhat resembling, externally, a brick
kiln. It is divided into hopper-shaped compartments, which at the bottom
are furnished with a furnace, fitted with a reverberatory arch. A fire is
lighted in this furnace, the necessary combustion being obtained, and the
heat maintained, by burning the cinders, which are sifted out of the house
refuse for this purpose. All the street sweepings, refuse, garbage, &c., is
then thrown in at the top of the kiln, and it is there and then completely
destroyed by the action of the fire, and converted into charcoal, which is
withdrawn through a sliding door fixed at the bottom of the kiln.[162]
The next point which has to be considered, and which is the second in
order of the list of duties I have given at the commencement of this chapter,
is “the cleansing of earth closets, privies, ash-pits, and cesspools.”
This is generally effected in conjunction with the collection of the house
refuse and the work is carried out at night. Under the Goux-tub system the
ashes of the house refuse are largely used as a deodorant or absorbent as a
lining for the tub,[163] but in the pail systems this mixture is not effected
until the tubs and refuse arrive together at the depôt.
For descriptions of the manner in which the pail system for the collection
of excreta is carried out in Birmingham, I must refer my readers to an
article written by myself in a number of The Sanitary Engineer of New
York published on the 1st Sept. 1881, in which I have entered fully into the
method there adopted and its advantages and disadvantages, but which are
too long to recapitulate in this chapter.
The next duty which has to be considered is that of “the proper cleansing
of streets.”
There is no doubt that for the sake of the appearance as well as the health
of any town its streets cannot be too well cleansed. Muddy and wet streets
cause dampness in the subsoil of neighbouring dwellings, and dust is not
only injurious to tradesmen’s goods but also to the lungs of those who have
to breathe an atmosphere loaded with silicate and organic impurities.[164]

Page 200

Street cleansing is effected either by hand-sweeping and hand-scraping,
or by machinery. As to which is the most economical much depends upon
the value of labour, and also upon the condition of the roads to be dealt
with, but in point of time and as a general rule the value of a horse rotary
brush-sweeping machine is undoubted, the only time at which such a
machine fails to do effective work is on the occasions when the mud to be
removed (owing to a peculiar condition of the atmosphere), has attained a
semisolidity, and is of a stiff and sticky consistency, when it either adheres
to and clogs the brushes of the machine, or is flattened by them on to the
road instead of being removed.[165]
The brushes of a machine last about 180 hours constant work, and then
the old stocks can be easily refilled with bass at no great cost. The
comparative work which can be done by a sweeping machine is about 11 to
1 of that effected by manual labour, so that the economy involved by the
former method is evident.
The strength and durability of the brooms used for the work of sweeping
the streets is of some importance, as affecting the ultimate cost of the work,
and some care and skill is required in their selection. Bass brooms are better
than birch brooms for this purpose, and the bass of which the brooms are
made should be sufficiently stout and of regular thickness; it should be
tough and elastic, not old, dry, and brittle, each knot should be of uniform
size and be firmly set, and the number of knots in each broom head is also a
matter of choice. A convenient and fair test of the soundness of a broom is
to soak it for a few days in water before issuing it to the sweeper, and then
note the time it will last. The handles of the brooms should be made of alder
wood.
On the question of the extra work involved in street cleansing by its bad
construction or by the materials of which it is constructed, climate must be
considered, as well as the amount of traffic it has to bear, and also its
gradient and the habits of the people residing in it.[166]
The Superintendent of the Scavenging Department at Liverpool has made
some observations and obtained some valuable information on these points,
which he has detailed in a report he presented to the Health Committee of
that borough in the year 1877, an abstract of which is as follows:

Gross Cost for Each Time of Cleansing 10,000 Yards Superficial of
Different Descriptions of Roadway in the Borough of Liverpool.

Page 201

Gross Cost
per
Condition Loads Times
Description Area of 10,000
When of removed swept
Street. of Carriage- Yards
paved. repair of in one in one
Pavement. way. Superficial
Roadway. Month. month.
for each
cleansing.
Yds.
£ s. d.
supr.
Granite
setts,
Lord Street - - 1877 Very good 4,503 15 26 0 6 5¹⁄₂
asphalte
joints

North John
- Ditto - 1872 Good 3,287 17¹⁄₂ 26 0 810¹⁄₂
Street

Granite
Tithebarn setts, 1872 and
- - Bad 5,150 38 26 0 11 2
Street ordinary 1874
joints

Ditto,
West Derby
- asphalte - 1876 Very good 11,980 35 13 0 9 4³⁄₄
Road
joints

Great
Howard - Ditto - 1877 Good 16,860 85 13 0 14 4¹⁄₂
Street

Great Ditto, Not
Homer - ordinary - ascertain- Moderate 15,900 85 13 0 14 1
Street joints able

Macadam
Kensington
- breasted - Ditto Good 14,540 76 13 0 14 3³⁄₄
Street
with setts

Stanley
- Ditto - Ditto Bad 16,534 186 13 1 8 9¹⁄₄
Road

He adds that the full benefit of the impervious pavements as regards the
cost of scavenging has not yet been felt, for almost all the lines of streets so
paved are intersected at short distances by streets of ordinary jointed granite

Page 202

setts or macadam, whence a quantity of mud and refuse is dragged by the
traffic on to the asphalted jointed roadways, which are consequently debited
with the cost of removal of some effete material not intrinsically belonging
to them.
Mr. Till, the Borough Surveyor of Birmingham, from investigations he
has made on this subject, says that for granite pavement 2 cart loads of mud
have to be removed from every 1000 square yards of surface, one third of a
load for wood pavement[167] and 4 loads three times a day (a total of 12
loads) for macadamised roadways.
The ultimate disposal of the material removed from the surfaces of
roadways especially when they are macadamised is a difficult matter, as,
being chiefly composed of silicate, it is valueless as a manure.
In small towns, except during abnormally muddy weather, it may be
mixed with the house refuse and sold to farmers, or the road scrapings
themselves may be used as an excellent sand, if thoroughly washed, to mix
with lime or cement to form mortar for public works; excessive
accumulations of mud, however, must be got rid of in the most economical
and speedy manner possible, and this is effected either by filling up old
disused quarries with it, or depositing it upon waste lands, or forming
embankments for new roads, but in no case should it be used, as I have
before stated, upon building sites; it is difficult and expensive to destroy it
or partially convert it into other matters by fire, so that if these methods
which I have enumerated are impracticable, the only other method left for
the disposal of the sweepings or scrapings from the streets is to take them
out to sea in hopper barges and sink them in deep water.
The last question that arises on the subject of scavenging before we
consider the disposal of snow, is whether the onus of cleansing private
courts and alleys which are not repairable by the urban authority should be
borne by them or not.
The great difficulty attached to this duty arises from the fact that these
private courts and alleys are generally very badly paved, if paved at all, full
of pits, where pools of stagnant mud and water collect, and even in the best
cases, the interstices between the pebbles, or other paving, are filled with
filth arising in great measure from the dirty habits of the people, and this
filth it is found exceedingly difficult to dislodge. The remedy for this is to
compel the owners of the abutting properties to have the courts and alleys
properly paved with asphalte, or other equally impervious material, after

Page 203

which it would be easy for the urban authority to cause them to be swept at
least once a day, and flushed with water in the hot weather once a week, but
in order to compel the owners to execute this very desirable work it would
be necessary to put the complicated machinery of section 150 of the Public
Health Act 1875 in force, and the expense to the landlords would be in
many cases very disproportionate to the value of their property.
Out of the ninety towns to which reference has before been made, the
authorities of only nineteen of them cleanse the private courts and alleys in
their jurisdiction, although for the sake of sanitation it is very desirable that
such work should be so undertaken by them.
In most towns it is necessary to cleanse its principal streets at least once a
day, and this appears to be the practice of nearly all the ninety towns I have
referred to; only seven of them, however, appear to have this operation
repeated more frequently; in several towns, the horse droppings, &c., are
removed at once, under what is called the “orderly” system, and this is
especially necessary in streets that are paved with such materials as wood
paving, asphalte, or granite setts. The suburban streets of a town need only
be cleansed once or twice a week, except in special cases of extremes of
mud or snow, and I will now proceed to discuss the questions involved by a
heavy fall of the latter.
Experiments have shown that a cubic yard of fresh fallen snow may
weigh as much as 814 pounds or as little as 71 pounds. Assuming that a
cubic foot will weigh 16·38 pounds, I estimate that for a fall of 3 inches of
snow upon a street 36 feet in width, 20 tons, representing a bulk of about
100 cubic yards, would have to be removed for every 100 yards of length of
street if it was thought necessary to clear it away.
Assuming that there are 30 miles of street in a town from which the snow
must be removed; 21,144 loads must be carted somewhere, at a cost of at
least 1,500l., assuming that each cart could make ten trips a day, and even
then it would take 352 carts a whole week to effect it.
It may be contended that I have taken an extreme case, and that, of
course, the snow does not lie for very long upon the ground in the condition
in which it fell, and that hourly it is reducing in bulk and weight by being
ground up by the traffic, and finding its way in the form of water into the
sewers. This may be so, but at the same time it must not be forgotten that
the bulk is also being constantly increased by that which is shovelled off the
house tops[168] and brought out from private premises adjoining the streets.

Page 204

Upon this point Mr. Hayward, the Engineer to the Commissioners of
Sewers of the City of London, says[169]:—
“Snow readily compresses under the traffic, and when removed in carts
and shot down elsewhere it may be assumed that on an average four cubic
yards of snow measured as it has fallen is equal to one cubic yard when
placed on the apparatus.” This computation, however, does not make any
allowance for the snow thrown from off the roofs, &c., and it of course
greatly consolidates whilst travelling in the cart.
Fortunately for a town surveyor in this country, exceptionally heavy falls
of snow are not very frequent, but when they do happen great pressure is
put upon his department to cope with it, and one of the greatest difficulties
he has to contend against is the disposal of the snow after it has been placed
in the cart.
If there is a river close by, it can be taken there and tipped, but this is
objectionable if it is a navigable river where dredging has to be done, as it is
surprising what a quantity of road scrapings and other matters are always
removed with the snow, and these materials naturally sink to the bottom,
and add considerably to the cost of dredging.
If there are public parks the snow may be heaped in them, provided no
damage is done to the grass or paths, but the snow thus heaped takes a
considerable time to melt, the first effect of a thaw being to consolidate it: a
better plan is to deposit it upon waste spots, if these are not too far from the
streets which have to be cleared.
Tipping the snow down the manholes into the sewers has been tried in
London and other cities, but has failed through the snow consolidating, and
although lighted gas jets have been turned on to the snow, it has still melted
too slowly to be of any practical utility.
Speaking of Clarke’s apparatus for melting snow, Mr. Haywood, in the
same report from which I have already quoted, says:
“It is seldom that a fall of snow occurs sufficiently large to cause serious
interruption to the traffic; heavy snowstorms in fact occur only once in six
or seven years; for some years therefore these apparatuses if fixed might not
be required. They would either have to be taken out, stored and refixed
yearly or maintained in their places and kept in order there, in either case at
an annual expense.”
In perusing Mr. Hayward’s report it also appears that the cost of this
apparatus fixed is about 120l., and the cost of melting the snow 9d. per

Page 205

cubic yard.
In order to grapple with this question of the removal of snow, I am of
opinion that it is useless to attempt to cart it away while falling, but try to
make clear crossings for the foot passengers and to keep the traffic open. If
there should be a high wind at the time, and the snow drifts in consequence,
cut through the drifts so as to allow the vehicular traffic to continue.
Directly the snow ceases to fall put on all available hands to clear the
channel gutters and street gratings, in preparation for a sudden thaw, when,
if these precautions were not taken, serious flooding and great damage to
property might ensue; for the same reason cart away all the snow you can at
the bottom of gradients and in the valleys, and also from very narrow streets
and passages, &c. In the wider streets use the snow plough, or with gangs of
men (in the snow season there is generally plenty of labour obtainable),
shovel the snow into a long narrow heap on each side of the street, taking
care to leave the channel gutters and gratings quite clear, and a sufficient
space between the heaps for at least two lines of traffic. Passages must also
be cut at frequent intervals through the heaps, in order to allow foot
passengers to cross the street, and also to let the water reach the channel
gutters as soon as the snow begins to melt.[170]
The next point to be considered in this chapter is that of “The proper
watering of streets for the whole or any part of their district.”
One of the earliest methods for watering streets, but one which has, I
think, almost entirely died out, on account principally of the large quantity
of water used in the process, was that of allowing the water to run down the
channel gutters, ponding it back by means of canvas or leather aprons
placed across the gutter, and then spreading the water on to the surface of
the street by throwing it with wooden shovels. This method, which at first
sight may appear clumsy, is an exceedingly good one upon sanitary
grounds. It not only lays the dust, but it washes the surface of the street, and
it most effectually scours out the gutters and at the same time flushes the
sewers, which at the season that watering is necessary is also of great
importance to any town. By this process a delightful freshness is given to
the air, and the appearance of the cool and limpid water rushing along on
each side of the street acts favourably upon the inhabitants. The great
objections to this system are (1) the enormous quantity of water that is used
in the process, and (2) the difficulty of doing the work after the traffic of the
day has commenced.

Page 206

Somewhat of a modification of this process is what is known as
“Brown’s System of Street Watering,” which may be described as follows:
—A lead pipe is laid in the footpath at the back of the kerb on each side of
the street to be watered, small gratings or shields being fixed in the pipe at
intervals of twelve inches, and the remaining space filled with asphalte;
small holes are then bored in the pipe through the openings in the shields.
The pipe is connected with the water main in the street, and is provided
with the necessary stopcocks, &c. On the water being turned on, fine jets
are thrown in different directions upon the surface of the street. The width
of roadway that can be watered by this process depends upon the pressure
of the water, but it may be fairly assumed that in most towns streets of fifty
feet width could be effectually watered in a few minutes by a pipe on each
side of the street.
This process has not gained much favour hitherto, principally on account
of the large first cost involved, which would amount to upwards of 800l. per
mile of street, but the expense afterwards should not much exceed the
wages of one man at about 3s. 6d. per day to manipulate the necessary
work, and the interest on the outlay and depreciation of the pipes, &c.
The other objections to this system are:—
(1.) The liability of the pipes and perforations to get out of order,
especially when allowed to lie idle for so many months in each year.
(2.) The unpleasantness to pedestrians which must be caused whilst the
watering is proceeding.
(3.) The inconvenience to the traffic during the process.
(4.) The effect upon the water by high winds, when in all probability it
would be blown back across the foot pavement.
(5.) In very broad streets it would be inoperative.
In Paris and other continental cities, and also in several towns in this
country, the watering is effected by hose and reels, or by portable iron
tubes.
Mr. Parry, C.E., the Borough Surveyor of Reading, has given the
following particulars of the system of hand watering adopted in that
borough, in which he gives the cost, and describes the utility of that method
as compared with the use of water carts:
A water cart (he states) will water twice a day a superficial area of 23,849
yards, and for a length watered one width that means 5,962 lineal yards, or
for a double width 2,981 yards, the cost per day of laying on being as

Page 207

follows:—Horse, cart, and man, 8s. cost of maintenance of cart, harness,
shoeing, &c., 1s. 5d., making 9s. 5d. per day.
With respect to the hand machines he states that he has one of Headley’s
drum machines, and three of special make, somewhat similar to those used
in Paris. They are equal in point of work; and one machine will water
23,740 square yards twice a day, which, it will be observed, is very close to
the amount of work performed by a cart.
“Headley’s machine cost us (he continues), five years ago when new, 31l.
7s. 3d., and the repairs and maintenance since that date have been 22l., or
an average of 4l. 8s. per annum, and is just now almost past repair. The
other description of hand machine cost each when new 20l., and the repairs
and maintenance have amounted to an average of 3l. 18s. each year. They
were in use some time before Headley’s was obtained, and they will be of
use for a long time yet. The cost of labour per day by the hand machines is
for two men at 2s. 10d. each—5s. 8d.—as it requires two men to work the
machine properly, one to distribute the water, and the other to move the
machine and to attach and detach the apparatus to and from the hydrants;
add to this 7d. per day for maintenance and repairs, will make 6s. 3d. per
day. The quantity of water delivered by the water carts is 0·51 gallons per
square yard, and by the hand machine 1·30 gallons.”
It will thus be seen that in the case of the cart 24,324 gallons of water are
used per diem, and 61,724 gallons by the hand machines, the surface
watered being very nearly the same in both cases. Assuming that the water
has a commercial value of 6d. per 1000 gallons, and adding this to the cost
per diem in each case, the total cost stands thus:

Hand machines £1 10s. 10d.
Carts £1 1s. 7d.

the advantage in point of cost being in favour of the carts; but the hand
machine may water better, especially in broad streets, although in narrow
streets or where there is much traffic, this method would be impracticable.
In Paris both hose and carts are used for watering the thoroughfares, the
former for the boulevards, the avenues, and a certain number of first-class
streets.
The most commonly known method in this country for watering the
streets and roads of our towns is that of carrying the water in wheeled

Page 208

barrels, carts, or vans, and distributing it therefrom through a perforated
pipe upon the surface of the road as the vehicle is drawn along by a horse
attached to the shafts.[171]
The old barrel upon wheels gave place to a cart, and now we have
“Bayley’s Patent Hydrostatic Van,” which is too well known to almost all
town surveyors to need much description. It holds about 450 gallons of
water and takes about 9 minutes to fill (this time of course varying with the
size of main and pressure of water), and ten minutes to spread the water
upon the surface of the road.
With regard to the work that one of these vans will accomplish in
comparison to that effected by an ordinary cart, the following table,
compiled from experiments on the question, will be useful:

No. of
Total
Cart Contents Loads Gain
quantity Differ-
or in to Time. per
of ence.
Van. Gallons. cover Cent.
Water.
beat.
Hrs. Mnts. Hrs. Mnts.
Bayley’s van 450 5¹⁄₂ 2475 1 23 .. ..
Ordinary cart 225 11 2475 1 50 0 27 24¹⁄₂
Bayley’s van 450 5¹⁄₂ 2475 1 38 .. ..
Ordinary cart 237 11 2607 2 10 0 32 25
Bayley’s van 450 6 2700 1 45 .. ..
Ordinary cart 290 11 3190 2 10 0 25 19¹⁄₄
Bayley’s van 450 8 3600 2 15 .. ..
Ordinary cart 260 17 4420 3 30 1 15 36

This shows a mean gain of 26 per cent. in favour of the van, and the
following tables, made by an inspector in 1873, showing the actual
occupation of the ordinary carts and Bayley’s vans during a day’s work, are
extremely interesting, as showing that while the van is engaged in spreading
the water the time of the cart is wasted in travelling to and from the stand
posts, and when it is borne in mind also that the van spreads water more
widely than the cart, there can be no doubt that a saving of at least 30 per
cent. can be effected by the substitution of these vans for the old-fashioned
cart.
CARTS

Page 209

Travelling Travelling Waiting,
Filling. Spreading.
Full. Empty. &c.
H. M. H. M. H. M. H. M. H. M.
Paddington 1 45 2 9 1 58 0 20 1 30
St. Saviour’s 1 29 2 16 2 4 0 26 1 29
Strand 1 11 2 30 2 18 0 17 1 3
Kensington 4 40 2 2 1 57 0 0 1 54
Chelsea 2 44 1 15 2 14 0 35 1 6

VANS.

Paddington 3 33 1 9 1 3 0 0 3 0
St. Saviour’s 2 20 1 4 1 21 0 23 2 58
Strand 2 30 1 25 1 14 0 20 2 23

In the year 1856, Mr. Scott, C.E., the Chief Surveyor of the parish of St.
Pancras, kept an account of the daily round of an ordinary water cart, when
he found that through an average working day of 10¹⁄₄ hours, exclusive of
the breakfast and dinner hours, the cart took one hour and twenty minutes
filling, fifty minutes only in distributing the water on the roads, and eight
hours and seven minutes in travelling to spread the water and back to the
stand posts. It was obvious that these were placed too far apart, and by the
subsequent introduction of additional standposts Mr. Scott found, in the
year 1867, that the filling occupied two hours, the distribution one hour and
thirty minutes, and the travelling to and fro six hours and thirty minutes; so
that it may be assumed, with an ordinary two-wheeled water cart, that two-
thirds of the day is spent in travelling, one fifth in filling, and about one-
seventh in the actual spreading. But a watch should be kept upon the man
who is engaged in this work, otherwise he will idle away his time and the
streets remain unwatered. A good check upon this is Mr. Bayley’s Tell-Tale,
which registers automatically on a dial at the side of the van the number of
rounds a man goes each day.
Watering the streets with sea water should be adopted whenever it is
feasible, as it not only gives a delightful freshness to the air and dispels
iodine, but it also causes the surface of the street to maintain its humidity
for a longer period than when fresh water is used, as it impregnates the soil
with hygrometric matter. This has been often attempted artificially, by
adding common salt to the water used for watering, but it is rather too
expensive for the benefit derived.[172]

Page 210

Watering the roads with a largely diluted disinfectant such as “Sanitas” in
the liquid form, is frequently of great benefit, and where it can be afforded,
it should be occasionally done, especially in the narrower streets and more
crowded districts of a city or town, or when an epidemic has broken out.
With reference to the very important question as to the cost of
scavenging, street-cleansing and watering. It is, of course, not possible to
lay down any hard and fast lines, as it must necessarily vary considerably
according to circumstances; much depends upon whether the district is an
urban one, consisting of houses closely packed together, or whether it is
suburban, with scattered villas and mansions standing in their own grounds;
the question, also, of the distance of the depôts to which the material has to
be carted, considerably affects the result of any estimate, as also does the
cost of horse hire, the rate of wages, and whether the district is of a hilly or
flat nature, and, as I have before shown, the manner in which the streets are
formed and paved, the habits of the people, the requirements as to cleansing
streets and watering, and last, but not least, the manner of the eventual
disposal of the rubbish after removal; all these points must bear with great
weight upon any question of cost, and make the results widely different.
On referring to the returns to which I have more than once alluded, it is
found that the cost of removing the house refuse and cleansing and
sweeping the streets combined, varies considerably in different localities. In
one case the sum amounts only to the rate of one half-penny per annum per
head of the population of the town, whereas in another case the amount is at
the rate of three shillings and sixpence per head. On calculating the average
cost per head of population per annum of the ninety towns from which I
received replies on this point, I find that it amounts to about tenpence half-
penny, after giving credit for any sum of money realised by the sale of the
refuse to farmers and others; so that if this work is costing the ratepayers of
a town or city anything under a shilling per head of the whole population
every year, they have no cause to grumble.
Before closing this chapter I will make a few observations upon the
subject of contracts for work of this description.
There is no doubt that the “dust and slopping” contractor is fast going out
of fashion,[173] as it has been found that the work is far more carefully and
systematically carried out without the intervention of a contractor; for if we
turn to the articles of agreement or contract usually drawn up between a
sanitary authority and a contractor for scavenging, we find that they must be

Page 211

very binding in their phraseology, and enter fully into the details of the
work; they should state very clearly the number of times in every week that
the contractor shall cause all the ashpits in the districts enumerated to be
emptied and cleansed, the manner in which this work shall be performed,
and how the materials thus removed shall be disposed of and the place of
their ultimate destination. The conditions should further specify what
amount of manual, team labour, and carts, are necessary for the work, and
also what plant the contractor must keep in the way of ladders, baskets,
shovels, and brooms, &c. The conditions should also contain a carefully
prepared list of the streets to be swept, and the manner and number of times
this work must be executed, and arrange for the disposal of the materials
thus removed.
In many such contracts it is found necessary to insert clauses binding the
contractor, under all sorts of penalties, to be always at the disposal of and
under the commands of the inspector of nuisances, or such other officer or
officers as the sanitary authority may appoint. The contractor’s men also are
forbidden to accept gratuities, and are directed on no account to remove
either trade or garden refuse, and they are also enjoined to be “careful to
consult the convenience of the householders in their visits, and to
thoroughly clean up all dirt and litter that they may cause in the discharge of
their duties. If they fail in any or either of these injunctions and commands,
or for any other dereliction of duty, the inspector of nuisances, or such other
officer as the sanitary authority shall appoint, may summarily dismiss them,
without any reference being made on the subject to their employer the
contractor, and in fact the conditions have necessarily to be made so
stringent and binding as to be either totally inoperative or open to grave
abuses, or, on the other hand, the work can be carelessly and improperly
executed by the contractor.
The consequence of such binding clauses is that the officers, if they do
their strict duty, will probably be engaged in constant disputes and litigation
with the contractor as to the due and proper observance of the terms of his
contract, and thus their time is much occupied instead of in other more
important matters, which is naturally detrimental to the interests of the
ratepayers.
I am strongly of opinion that the work of the collection of house refuse
and cleansing the streets should be carried out by the local authority with
their own officers and staff, and that executing this work by contract is a

Page 212

mistake and a false economy. It is, perhaps, true that it may be done in the
latter manner at less actual cost to the ratepayers, but all public work should
be done in the best manner possible, irrespective of cost, thoroughly, but
without extravagance, and the result of such work, especially where it
affects the cleanliness and the appearance of a town, soon fully repays any
moderate extra cost that may thus have been incurred, irrespective of the
enormous benefit that is conferred upon any community by the reduction of
disease and the death-rate by a proper attention to such necessary sanitary
work.

[157] A rural authority cannot apparently make any byelaw with regard to the
prevention of such nuisances.
[158] A byelaw under this section “must be limited to imposing upon the occupier the
duty of cleansing or removal at such intervals as the sanitary authority may think fit. The
mode of cleansing or removal and the precautions to be observed in connection with the
process are not matters within the range of such byelaws.” Vide ‘Memorandum to the
Model Byelaws issued by the Local Government Board for the use of Sanitary Authorities,
No. 1, Cleansing of Footways and Pavements, &c.,’ 1877.
[159] In Glenn’s ‘Law of Public Health and Local Government,’ 8th edition, in a
footnote to section 44, p. 39, several instances are given of what is not refuse, such as ashes
from furnaces, &c., and it is stated that “the intention of the Act was that only the rubbish
arising from the domestic use of houses should be removed.”
[160] The Bromley Local Board issue a card on which is printed, amongst other
information with reference to the contract for the removal of house refuse, the following
suggestions:—“It is hoped that householders will as far as possible facilitate the systematic
removal of refuse by providing suitable dust-bins, and directing their servants that ordinary
house refuse only shall be deposited in such receptacles. The following are some of the
items of refuse which the contractors are bound to remove, viz.:—cinder ashes, potatoe
peelings, cabbage leaves, and kitchen refuse generally. But the contractors are not required
to remove the refuse of any trade, manufacture, or business, or of any building materials or
any garden cuttings or sweepings.”
[161] In New York about 800,000 tons of refuse are disposed of annually in this manner.
[162] For a description of the manner in which this is effected at Manchester, see my
book on scavenging, to which I have before referred.
[163] The ashes are mixed with chaff, chopped straw, refuse hay, grass cuttings, dry
street sweepings, wool and hair, shoddy, &c., and a small percentage of sulphate of iron or
lime.
[164] Professor Tyndall, in his beautiful experiments, has proved that dusty air is alive
with the germs of the bacteria of putrefaction, whilst the pure fresh air which he gathered
on a mountain peak in the Alps is innocent of such germs, and is absolutely powerless to
produce any organisms.
[165] Dry dust will absorb about ten times its bulk of water, thus swelling considerably
and producing the greasy mud so often seen after rain.

Page 213

[166] In Boston, U.S.A., the macadamised roads are not swept at all, as it is considered
that by sweeping off the sand and detritus their durability is much lessened, but their
gutters are cleansed as required, and rubbish picked up. (Vide ‘Minutes of Proceedings
Institution of Civil Engineers,’ vol. lxiii. p. 368.)
[167] In Regent Street, London, in November 1881, I saw four loads of mud removed
from about 1000 square yards of surface, it being then almost new wood pavement.
[168] See note under “Other Obstructions and Nuisances,” p. 155, 8th edition, Glen’s
‘Law of Public Health and Local Government.’
[169] Vide ‘Report to the Streets Committee of the Honourable the Commissioners of
Sewers of the City of London on Melting Snow by Clarke’s Apparatus,’ by William
Haywood, Engineer and Surveyor to the Commission, 1881, p. 9.
[170] With regard to the removal of snow from the footpaths, it is highly desirable that
this should be effected by the occupiers of the premises adjacent to the street, as otherwise
it adds immensely to the work of the local authority. The following interesting remarks by
the superintendent of the scavenging department of Liverpool will be no doubt read with
great interest:
“The only way to compass the removal of snow from the footwalks of the principal
thoroughfares within a comparatively short time, is by sprinkling them with salt, such as is
commonly used for agricultural purposes. It is certain that, unaided by the salt, a sufficient
number of men cannot be procured for the emergency of clearing snow from the footways
of the most important thoroughfares. It has been stated by medical authorities that the
application of salt to snow is detrimental to the health of people who have to walk through
the ‘slush’ produced by the mixture, and that the excessive cooling of the air surrounding
the places where the application has been made is injurious to delicate persons. It therefore
seems that the application of salt to snow should not be undertaken during the day time, but
should be commenced not before 11 p.m., nor continued after 6 a.m., and that only such an
area of footwalks should be so treated on any one night as the available staff of men can
clear by an early hour the following morning.
“To sweep snow from the footwalks whilst the fall of snow continues, and especially
during business hours, appears to be wasteful and futile, and to apply salt during the same
periods may be held to be injurious to health.
“That the snow of an ordinary fall can be removed from the footwalks by an application
of salt an hour or so before they are scraped is an ascertained fact, except at least when a
moderately severe frost has preceded, accompanied, or followed the snow-fall, or when the
snow has drifted into extensive accumulations. Were it not for the danger to health by
excessive cooling of the air, and for the expense attending the operation, all the impervious
pavements could be cleared of snow (unless the fall was a heavy one) in a comparatively
short time by a liberal application of salt and the employment of the horse sweeping
machines as soon as the snow had become sufficiently softened to admit of their use.”
[171] In the metropolis of London alone, the watering of the streets and roads employs,
in addition to a staff of inspectors and foremen, about 1500 men, and an equal number of
horses and carts; and in order to lay the dust effectually, about 30,000 tons of water must
be spread upon the streets every dry day, the cost of this gigantic work being nearly
200,000l. per annum upon an average of 120 days when watering becomes necessary.
[172] In Rouen, where chloride of calcium is obtained from the manufactories of
pyroligneous acid in the neighbourhood, it is mixed with the water for use on the roads,
and it is stated that on a mile of road, 16 feet in width, 5630 gallons of water were
necessary daily, but that the same result was attained with 1480 gallons of chloride

Page 214

solution, marking 30° Baumé, and costing about ¹⁄₂d. per gallon, the humectation
remaining good for five or six days with the solution of chloride. With water only in 1093
yards, in four rounds daily, 3520 gallons were used, the cost being 48s.; with chloride of
calcium the cost was 32s. per day.
[173] Amongst the questions which I addressed to the surveyors of the principal towns
of England in 1879 was the following:—“Is the house refuse collected by the sanitary
authority or by a contractor?” and out of the ninety towns from which I received replies,
only thirty were found to employ contractors for this purpose, and of these the authorities
of two of them proposed to dispense with the services of the contractor, and to administrate
the work with their own staff, as they found the existing state of things was thoroughly
unsatisfactory.

Page 215

CHAPTER XX.
SEWERAGE.

The Public Health Act 1875 contains a considerable number of clauses
dealing with the subject of the sewers of a town, but two of the shortest
sections in the whole Act, and yet those that involve a considerable amount
of work in the town surveyor’s department, are the following:
“Every local authority shall keep in repair[174] all sewers belonging to
them, and shall cause to be made such sewers as may be necessary for
effectually draining their district for the purposes of this Act”[175] (38 & 39
Vic. c. 55, s. 15).
“Every local authority shall cause the sewers belonging to them to be
constructed, covered, ventilated,[176] and kept so as not to be a nuisance or
injurious to health, and to be properly cleansed and emptied”[177] (38 & 39
Vic. c. 55, s. 19).
As to what sewers do “belong” to the local authority, the following
section of the Public Health Act 1875 states:
“All existing and future sewers within the district of a local authority,
together with all buildings, works, materials, and things belonging thereto,
“Except
“(1.) Sewers made by any person for his own profit, or by any company
for the profit of the shareholders; and
“(2.) Sewers made and used for the purpose of draining, preserving, or
improving land under any local or private Act of Parliament, or for the
purpose of irrigating land; and
“(3.) Sewers under the authority of any commissioners of sewers
appointed by the Crown,
shall vest in and be under the control of such local authority.
“Provided that sewers within the district of a local authority which have
been, or which may hereafter be constructed by or transferred to some other
local authority, or by or to a sewage board or other authority empowered

Page 216

under any Act of Parliament to construct sewers, shall (subject to any
agreement to the contrary) vest in and be under the control of the authority
who constructed the same, or to whom the same have been transferred” (38
& 39 Vic. c. 55, s. 13).
And as to the definition of the word “sewer,” the same Act states:
“‘Sewer’ includes sewers and drains of every description, except drains
to which the word ‘drain’[178] interpreted as aforesaid applies, and except
drains vested in or under the control of any authority having the
management of roads and not being a local authority under this Act.”
The result of this acquisition by the local authority of the sewers in their
district is, that in most of the old cities and towns a legacy of very defective
and imperfect sewers has been inherited, and considerable expense in their
repair and maintenance has thus been entailed.
A great number of books have been written on the subject of sewerage,
and much valuable information has been published from time to time, so
that it almost seems superfluous to say much upon the subject; however, a
few remarks which are particularly applicable to the work of a town
surveyor may be of some service.
The word sewerage may be taken as meaning a system of sewers
carrying sewage which is the fluid and feculent refuse from dwellings and
their yards, &c. Sewage is generally found mixed with rain water from the
surface of the streets and roofs of houses, together with the liquid waste
products from manufactories,[179] and sometimes, although very
improperly, with subsoil water.
A good system of sewerage should embrace the whole of the following
requirements:—
(1.) Each sewer should be laid at such a depth as will readily drain the
basements of the adjoining buildings.
(2.) Its area and gradient must be so regulated as to make it self-
cleansing, and at the same time carry off effectively the maximum quantity
of liquid for which it is intended.[180]
(3.) Each sewer should (unless quite impracticable) be laid in straight
lines and with even gradients between man- or lamp-holes, and these
gradients must not be excessive, or damage may be caused to the sewer. A
velocity of about 6 feet per second is sufficient.
(4.) Sewers must be laid at proper levels in respect of their intersection
with each other, bearing in mind that they are all generally converging to

Page 217

one point.
(5.) Manholes should be of simple construction; circular brickwork upon
concrete is a convenient description. They may be made to serve the
additional purposes of ventilating shafts, flushing chambers, junction shafts,
storm overflows, and side entrances.
(6.) Tributary sewers or drains should not join the main sewers at right
angles unless the bottom of the manhole is so constructed as to give the
required curve in the direction of the flow of the sewage, and they should
join at a height (if of unequal section) equal to the difference of their
sectional diameters, the aim of all junctions being to cause as little
disturbance as possible in the proper flow of the liquids along their
respective channels.
(7.) Sewers should not be constructed of too large a sectional area, but
none should be less than 6 inches internal diameter, as house-drains in this
country are never less than 4 inches diameter, and the main sewer should of
course be larger than its tributaries. It is also rather difficult to ventilate a
smaller sewer than 6 inches, and very little is saved by putting in a smaller
sewer than that.
Stoneware pipes of greater diameter than 18 inches should never be used.
Where larger sewers are constructed they should be either concrete pipes,
[181] or brickwork or concrete should be employed.
The position of the sewer should, if possible, be behind the houses for the
following reasons:—
(1.) The waterclosets, sinks, &c., being nearly always at the back, a drain
under the house (which is always objectionable) is avoided.
(2.) Economy is secured to the owner of the property, as a shorter length
of drain is required than if the sewer was in the front.
(3.) A better fall is usually obtained.
(4.) Where there is a separate or partially separate system of sewerage, a
double sewer in the street is avoided.
The only objection to this method being that of the chance of the sewer
becoming choked or broken when entry has to be made into private
property to repair it, but this ought never to happen after once the sewer has
been properly constructed. Of course, where houses are closely packed
together it would not be possible to carry the sewer at the back, but where it
can be done I agree thoroughly with Mr. Rawlinson, C.B., C.E., &c., who,
speaking of this method, says, “I know nothing but good of it.”

Page 218

Where the sewer is proposed to be taken through any private lands it is
necessary to act in accordance with the following clause of the Public
Health Act 1875, and serve the necessary notices, a specimen form of which
also follows:
“Any local authority may carry any sewer through, across, or under any
turnpike road, or any street or place laid out as or intended for a street, or
under any cellar or vault which may be under the pavement or carriageway
of any street, and, after giving reasonable notice in writing to the owner or
occupier (if on the report of the surveyor it appears necessary), into,
through, or under any lands[182] whatsoever within their district. They may
also (subject to the provisions of this Act relating to sewage works without
the district of the local authority) exercise all or any of the powers given by
this section without their district for the purposes of outfall or distribution
of sewage” (38 & 39 Vic. c. 55, s. 16).
The form of notice necessary to be served before entry upon any lands
for the purpose of carrying out any sewerage works may be on the
following pattern:—

“Notice is hereby given.
“1. That the mayor, aldermen, and burgesses of the borough of
, in execution of the powers and authorities given to and vested
in them by virtue of the Public Health Act 1875, upon the report of their
surveyor, whereby it appears to the said authority to be necessary to enter
into, through, or under the lands and premises particularly described in the
schedule hereunder written, for the several purposes hereinafter mentioned,
the said mayor, aldermen, and burgesses will immediately after the
day of enter into and upon the premises described in the said
schedule hereto, and on the plan hereinafter mentioned numbered , for
the purpose of in, through, or under the said lands and premises
, and to construct all other necessary works for all or any of the
purposes aforesaid.
“2. The course of the said sewer is indicated by a line drawn on the said
plan from the point to .
“And notice is hereby further given that a plan of the intended works, and
of the lands and premises upon which it is intended to enter for the
construction of the same, is now open for inspection, between the hours of

Page 219

10 in the forenoon and 4 in the afternoon, and may then be seen at the
offices of the borough surveyor, Street, , and a tracing
thereof is hereunto annexed.
Dated this day of 18 .
______________________________
__
Town Clerk.”[183]

The Schedule Referred to.
Description
No. on plan. Where situate. Owner. Occupier.
of premises.

In carrying out works of sewerage the greatest care is necessary in the
materials selected and the manner in which the work is executed. Tunnels
and shafts must be most carefully timbered, levels very accurately given
and adhered to, and for this purpose sight rails and long boning rods can be
used with great advantage. In running sands, or where the line of an old
sewer is being followed, or in fact anywhere where a good and quick joint
is required, “Stanford’s” patent jointed pipes should be used.
“This joint is made by casting, upon the spigot and in the socket of each
pipe, rings of durable material, which, when put together, fit mechanically
into each other, as in a bored and turned joint; it needs no skilled labour in
fixing, only a little grease, allows of slight settlement of the pipes without
injury, and requires neither cement, clay, nor other extraneous material, the
pipes containing a perfect joint within themselves.”

Page 220

Breakages sometimes occur in stoneware pipe sewers after they are laid,
which generally are found on examination to arise from one of the
following causes:
(1.) Laying the pipes on a rigid foundation without recessing the sockets
so as to give an even bearing.
(2.) Laying the pipes on foundations which afterwards yield or settle.
(3.) Laying the pipes at too great a depth without protection by concrete
or otherwise to resist the pressure of the superincumbent earth, or by not
sufficiently punning the filling-in, when a sudden settlement will often
crack or crush a pipe.
(4.) Accidental or wilful injuries to pipes which are not noticed before the
trench is filled in.
(5.) Laying the pipes at too shallow a depth without protection, when
heavy traffic or a falling weight upon the surface will crush or crack a pipe.
(6.) Defective or weak pipes.[184]
The following plates give the different forms of sewerage pipes that are
now manufactured in this country, in addition to those of common shapes:

BROOKE’S PATENT SUBSOIL DRAINS AND PIPE-RESTS.

CREEKE’S PATENT CAPPED PIPES.

Page 221

MAWBEY’S PATENT GROOVED SOCKET-PIPES. HENRY SHARP, JONES,
& CO.’S ROCK-
CONCRETE PIPES.

JENNING’S PATENT CHAIR AND SADDLE PIPES.

The chokage in pipe sewers generally arises from one or more of the
following causes:—
(1.) Improper gradients.
(2.) Insufficient flush.[185]
(3.) Foreign articles finding their way into and choking the sewer.
(4.) Defective joints through which the liquid runs leaving solid matters
behind.

Page 222

(5.) An excess of road detritus or of ashes, through the house closets of
the poor, finding their way into the sewer.
(6.) Improper bends in the line of sewer.
(7.) Right-angle or improper junctions being formed with the sewer.
(8.) A collapse of the sewer.
A temporary chokage in a small-sized sewer which does not arise from
any structural defect can be speedily and effectually remedied by the use of
Ben Reed’s patent drain-cleaning rods, which are probably too well known
to every town surveyor to need any description, but in conjuction with man-
or lamp-holes and straight lines of sewers they are very valuable.
Before closing this chapter, a few words upon what is called the “separate
system of sewerage” may be of use.
The mistake hitherto made has been to try to absolutely separate all
rainfall from the sewers, and there is no doubt that a partial separation of
the rain-water from the sewage proper has many advantages; but it must be
understood that a great deal of the rain-water that falls upon roofs of
buildings and in back yards and small back streets must of necessity be
carried into the sewers, as well as liquid refuse from manufactories. A
partial separation thus carried out has the following advantages:
(1.) It is not necessary to have sewers of enormous diameter.
(2.) The depth of the surface water conduits need not be so great as that
which is necessary for sewers.
(3.) The avoidance of road detritus being washed into the sewers.
(4.) Where the sewage has to be pumped or treated chemically or put on
the land, the combined system causes an immense unwieldy bulk of liquid
to be at times dealt with.[186]
(5.) The sewers may be placed at the back of the houses, a great
advantage which cannot be carried out under the combined system.
(6.) The regularity in the amount of flow of sewage.
(7.) The accuracy with which the quantity of sewage may be calculated
and the sizes of sewers apportioned.
(8.) Economy both to the general rates and also to individuals in carrying
out their connections.
(9.) Where old and defective sewers exist they are often fitted to carry
surface water, but are quite inappropriate as sewers.
No rules, however, can be laid down with regard to this question, as each
town or district must be treated as the case requires.

Page 223

In conclusion, I will mention the different methods at present in vogue
for the sewerage of towns.
(1.) The combined system, where all sewage, surface water,
manufacturers’ refuse, and subsoil waters are carried in the same sewer.
(2.) Similar to the above, the subsoil water, however, being carefully
excluded.
(3.) The partially separate system.
(4.) The absolutely separate system, where there are three sets of sewers,
one for sewage proper, one for surface water, and one for subsoil water.
(5.) The “Lieurner” system, which professes to remove all sewage by
exhausting the air in the sewers and drains.
(6.) “Shone’s” pneumatic ejector system, which is described as
follows:—
“The ejectors are cast-iron receivers of a suitable form, placed
underground at depths to suit the locality, into which ejectors the sewage
flows through the ordinary pipe drains from the houses. As the liquid rises
in the interior of the ejector, and when full, it lifts a valve and admits
compressed air from an engine which supplies the entire district. The
ejectors are thus emptied of their contents, which are blown out in about
eighty seconds of time, and the sewage passes through cast-iron main pipes
of suitable diameters to the land, or other outlet provided to receive it, or it
may be distributed upon the waste land as it passes through.”
(7.) The dry systems, which consist of—
(a.) Earth closets;
(b.) Tubs, as the Goux, &c.;
(c.) Pails, as the Rochdale;
(d.) Middens.
But all these dry systems require some system of sewers to carry off rain-
water, slop-water, &c., and in my opinion are not suitable for very large
communities.

[174] If the sewers vested in and belonging to a local authority are allowed by their
negligence to get out of repair, they are liable to an action for damages (Vide ‘Fitzgerald’s
Public Health Act,’ 3rd edition, p. 19). Keeping in repair does not, however, include
construction of entirely new works. (Ibid.)
[175] The sewers provided by a local authority must be sufficient to carry off the
ordinary sewage and rainfall of the district, but they need not be sufficient to carry off an
extraordinary flow of water caused by a storm; damage caused by that comes under the

Page 224

definition of damage caused by the act of God, for which there is no individual
responsibility (Ibid. p. 20). This clause seems to insist upon sewers carrying the rainfall.
[176] See chapter on “Ventilation of Sewers.”
[177] A local authority is not to be held liable for not keeping their sewers cleansed at all
events and under all circumstances, but only where by the exercise of reasonable care and
skill they can be kept cleansed. They are, however, liable, in case they make default in
observing the requirements, to have an injunction filed against them and to be restrained by
injunction from allowing the continuance of the nuisance. (Ibid. p. 23.)
[178] For the legal definition of “drain,” see the chapter on “House Drainage.”
[179] Facilities must be given to enable manufacturers to send the liquids proceeding
from their works into the public sewers, provided the sewers are more than sufficient for
the requirements of the district, or if the liquids would not prejudicially affect the sewers,
or from their temperature or otherwise be injurious in a sanitary point of view. Vide Rivers
Pollution Act 1876 (39 & 40 Vic. c. 75, s. 7). But this question is often greatly disputed,
and has led to much litigation.
[180] If everything has to be carried in a sewer, the following provisions must be
made:—
(a) The house sewage which may be calculated from the water supply.
(b) Manufacturers’ refuse.
(c) Rainfall, which is a very uncertain quantity.
(d) The subsoil water should certainly be dealt with, but it should on no account be
permitted to enter the sewers themselves; separate provision under the main sewers should
be provided for this purpose.
[181] Messrs. Sharp, Jones and Co., of Bournemouth, make most excellent concrete
pipes up to 36 inches in diameter, which can be economically and advantageously used in
many instances, and are gaining every day in popularity with engineers.
[182] The definition of “lands” as given in the Public Health Act 1875, is as follows:
—“‘lands’ and ‘premises’ include messuages, buildings, lands, easements, and
hereditaments of any tenure” (38 & 39 Vic. c. 55, s. 4).
[183] Notices may be signed either by the clerk to the local authority or their surveyor
(38 & 39 Vic. c. 55, s. 266).
[184] The thickness of stoneware pipe sewers should be as follows:

Internal Thickness
diameter of
of pipe. material.
in. in.
3 ¹⁄₂
4 ⁵⁄₈
6 ³⁄₄
9 1
12 1¹⁄₈
15 1¹⁄₄
18 1³⁄₈

Page 225

The thickness of fire clay or earthenware pipes should be slightly in excess of those
given for stoneware.
[185] The patent automatic flushing arrangement by Mr. Rogers Field, C.E., is an
excellent apparatus for lessening the chances of a sewer becoming choked from this cause.
[186] It is necessary in many towns where the combined system is in force, and the
sewage has to be pumped when heavy rains commence, to put temporary clay dams round
the street gratings to prevent the surface water from entering the sewers, thus at once
showing the inability of the system to deal with flood waters.

Page 226

CHAPTER XXI.
SEWAGE DISPOSAL.

The magnitude of the question of “sewage disposal” almost decided me to
refrain from making any remarks upon it, but on reconsideration I thought a
few might be serviceable.
Sewage disposal means the getting rid of the foul water contained in the
sewerage system of any community.
Where a dry method is in force for the collection of the excrementitious
matters it is called “interception”; the following are some of the systems
which effect it:—
Privies, ashpits, middens, cesspools, pails, troughs, the “Rochdale,” the
“Eureka,” the “Goux,” Fosses Permanentes, Fosses Mobiles, and Moule’s,
Taylor’s, and Phillip’s earth closets.
The collection and disposal of the mass of excrement under these dry
systems is found to be a very troublesome matter, and they are at their best
but inferior substitutes for water carriage, nor must it be forgotten that
sewers and drains are necessary even if a good interception process is in
force. I shall therefore confine my remarks to the disposal of water-carried
sewage.
Many books have been written, many valuable reports have been
prepared and issued, lengthy papers and discussions have been frequent at
the meetings of scientific societies, and almost innumerable pamphlets have
been published upon this important sanitary subject. Some millions of
money have also been spent in trying to deal satisfactorily with this
question, not only with a view to the purification of the effluent of the
sewage, but also to endeavour to make a profit out of the residuals.[187] The
result of this literature, discussion, and experiment has led to the following
conclusions:
No hard and fast lines can be laid down as to the best method to be
adopted for the disposal of the sewage of any town, but the peculiar

Page 227

circumstances of each case must be considered before advice could be
given on the subject: geographical position, physical arrangement, habits of
the population, and the character and quantity of the sewage of the town
being some of the most important.
In any case it is necessary that the transmission of the sewage to the
outfall should be effected as speedily as possible, and that the position of
this outfall should be such as to cause no nuisance. The contents of the
sewers should, if possible, be emptied by gravitation, as pumping is a
constant expense, and economy with efficiency must of course be studied.
Up to the present time the following are the methods adopted in this
country for the disposal of sewage:
(1.) Passing the sewage in its crude state into the sea or tidal river.
(2.) Passing the sewage in its crude state over large tracts of land; this is
called broad irrigation.
(3.) Passing the sewage in its crude state on to small tracts of land
previously prepared by deep drainage; this is called intermittent downward
filtration.
(4.) Mechanical subsidence of the sewage in large tanks, the effluent
passing on to land or into a river.
(5.) Mechanical filtration of the sewage, the effluent passing on to land or
into a river.
(6.) The introduction of lime or other precipitant into the sewage, which
is allowed to settle in tanks, the effluent passing on to land or into a river.
Very little need be said upon the first of these methods. Many engineers
of high standing contend that, where practicable, the sea or the tidal estuary
of a river is the right place for the sewage, as no costly works are necessary,
and an abominable nuisance is thus got rid of at once and for ever. To
ensure this, however, great care must be exercised in the selection of the site
for the outfall. Float observations should be made, not only of the surface
tides and currents, but also of those at different depths, and the effect upon
the sewage by its different specific gravity from that of the salt water must
be allowed for, as well as the difference of level of the tides and the
configuration of the adjoining coast line.
The second method, that of broad irrigation, is one that finds
considerable favour with a large number of engineers and agriculturists.
The great sewage-disposal cry has always been, “Put back on the land what
you have taken from it, or some day there will be no beef and no bread.”

Page 228

The difficulty is to always find land in sufficient quantity and so situated as
to be available for this purpose. Almost any soil is, however, suitable for
irrigation, provided it is well and properly drained. The quantity of sewage
which should be used for this purpose per acre of land varies considerably,
as will be seen on reference to a table prepared by Mr. Henry Robinson,[188]
where the number of inhabitants to each acre irrigated is in one case
(Leamington) stated to be 55, in another (Blackburn) 208,[189] the average
being 137, the number of gallons per head of population per diem being 38.
It may be useful to state here that a hundred tons of sewage will cover an
acre of land 1 inch in depth, and that the value of sewage as a manure is
said to vary from ¹⁄₂d. to 2d. per ton, or, calculated in another manner, about
10d. per head of population per annum.
The best crops for a sewage farm (in addition to nearly all kinds of
market-garden produce) are rye-grass, mangolds, beetroot, cabbages,
carrots, potatoes, turnips, rabi, parsnips, lucerne, beans, wheat, oats, and
barley; the cereals, however, are apt to run rather to straw, and some care is
also necessary not to oversewage potatoes and some other root crops.
Grazing cattle or cows can also be carried on with advantage, the presence
of sewage having no effect either on the milk or flesh of animals fed on
sewage farms.
The third method, that of intermittent downward filtration, is really
irrigation of land to such an extent as the land will filter or purify the
sewage, the effluent passing off pure, irrespective of any effect upon the
crops which may be growing upon the land.
Great discussions have arisen (the principal battle-ground being Merthyr
Tydvil) as to the maximum quantity of sewage which an acre of properly
prepared land will treat, some of the champions of this system contending
that a good porous soil properly drained to a depth of six feet will purify the
sewage of 6000 persons per acre, others that only the sewage of 250
persons can be so treated.[190]
There can be no doubt that earth has a most powerful deodorising power.
Laboratory experiments have shown that as much as eight gallons of
sewage can be filtered through a cubic yard of loamy soil in twenty-four
hours, the soil being drained at a depth of six feet, the effluent therefrom
having obtained a wonderful degree of purity. Much, however, must depend
upon the character of the soil of the filtering area and the strength of the
sewage which is being operated upon.

Page 229

The following description of the manner in which the earth acts upon
sewage will be of interest:
“The fæcal matters and other impurities attached themselves to the
surfaces of the particles of earth by a kind of cohesive attraction, and in this
state were readily attacked by the oxygen of the air. Their organic carbon
became carbonic acid, their nitrogen was converted into nitrous or nitric
acid, which united with the lime, magnesia, and other basic matters present.
Mechanically suspended impurities were arrested as by a sieve, and the
water issued from beneath—not indeed fit for dietetic or domestic purposes,
but at any rate in a fair state of purity and quite inoffensive to the senses.”
(Vide W. Crookes in the discussion on the Sewage Question by Norman
Bazalgette, ‘Min. of Proceedings of the Institution of Civil Engineers,’ vol.
xlviii. p. 164.)
The land thus used as a sewage filter requires constant aëration by being
dug over or ploughed, and if this precaution is taken, it is surprising to what
a wonderful extent the land will take sewage without becoming what is
called “sewage sick.” Clay soils are, however, stated to be ill-adapted for
this purpose.
The next method, that of mechanical subsidence of the sewage in large
tanks, has been attempted in conjunction with irrigation and filtration
without much benefit, nor has the fifth method I have mentioned, viz., that
of mechanical filtration of the sewage, met with any better result. Artificial
filters have been constructed of burnt clay, cinders, coke, charcoal, peat,
chalk, gravel, broken stone, sand, spongy iron (this is now being applied
very successfully for the purification of water), straw, cocoa-nut matting,
wicker-work, and wire gauze of different degrees of fineness of mesh.
The late Mr. Odams spent a considerable sum in endeavouring to strain
sewage through revolving screens of wire gauze with but little success, and
Mr. Bannehr has striven to achieve the same object by passing sewage over
oscillating screens of the like material.
In all these cases of mechanical filtration, however, the effluent has either
not been sufficiently pure or the screens and filters have become clogged
and refused to act.[191]
The last method that I have mentioned for the disposal of sewage is that
of precipitation, or what may be more properly called the chemical
treatment of sewage.

Page 230

Precipitation means the production, by the introduction of chemical
substances within the body of the sewage, of certain solid compounds,
which, in settling, drag down with them the suspended matters in the
sewage, together with a small proportion of the polluting matters which are
in solution in the sewage, this proportion varying with the quantity of solid
matters deposited. The effluent from the tanks in which this precipitation
takes place is then allowed to flow direct into a river or stream, or is still
further purified by being passed over land or filtered through deep-drained
soils.
Chemical treatment of sewage was first tried in Paris in the year 1740,
and since then every effort has been made to extract a valuable and
commercial manure from sewage and purify the effluent. Between the years
1865 and 1875 more than 400 patents were taken out in respect of these and
other matters in connection with the sewage question.
It is almost needless to say that but few of these patents were of any
practical value. Those processes which have some merit and are now best
known are, I believe, included in the following list:—

List of Chemical Processes for
the Treatment of Town Sewage.

Page 231

The A. B. C. (or Sillar’s) process
Anderson’s process
Bird’s „
Blyth’s „
Campbell’s „
Collin’s „
Forbes and Price’s process
Fulda’s process
Goodall’s „
Hanson’s „
Higg’s „
Hille’s „
Holden’s „
Lenk’s „
Lundy’s „
Manning’s „
Scott’s „
Smith’s „
Spence’s „
Stothert’s „
Suvern’s „
Whitthread’s process
Wickstead’s „

Space will not permit me to describe these processes, and probably most
of them, if not all, are familiar to my readers. Suffice it to say that in nearly
all cases the modus operandi is that of mixing certain chemicals with the
sewage by mechanical agitation, or by passing the sewage over “salmon
ladders,” &c., then allowing the sewage to remain perfectly still whilst the
solids are gravitating, and then dealing with the effluent in different
manners.
Amongst the numerous chemical ingredients which are used for this
purpose may be mentioned the following:—
Alum, animal charcoal, ashes, blood, bone ash, carbolic acid, chalk,
chloride of lime, chloride of zinc, chloride of iron, clay, creosote, hæmatite,
hydrate of lime, lead nitrate, magnesian salts, oxide of manganese,
perchloride of iron, salt, soda, sulphate of zinc, sulphate of iron, sulphuric
acid, and tar.
One of the great difficulties in connection with the precipitation of
sewage is the disposal of the sludge which is left behind in the tanks.
This sludge contains about 90 per cent. of moisture, and if left to dry
atmospherically, a thin crust forms over it, thus protecting that which is

Page 232

underneath, and it will not dry for many months. In some cases it is sought
to dispose of the accumulations of sludge by digging it into the land; in
others it is mixed with house ashes, &c., and sold as manure. Its bulk,
however, in proportion to its manurial value is so excessive as to render it
almost valueless, and it is difficult to get rid of it for this purpose even when
fortified with ammonia or other chemical. A frequent practice now adopted
is to reduce its bulk by exposure or by presses to a semi-dried condition; in
other cases it is dried to a powder by heat, and General Scott has patented a
method where, in connection with the lime process, it is burned and
manufactured into cement. Sometimes it is squeezed in presses, such as
Needham and Kite’s or Johnson’s, or it is filtered by Milburn’s or Weare’s
apparatus. For drying the sludge by heat, Borwick’s or Forrest’s machines
have been used with some success, but there is no doubt that the slimy,
glutinous, albuminous, offensive mixture technically known as sludge is a
difficult matter to dispose of in all sewage works.
In connection with the chemical treatment of sewage, it is of advantage to
pass the effluent over land filters on the intermittent downward filtration
principle. Another very effective plan is to pass the effluent (or even crude
sewage) through land which is thickly planted with the Anacharis or
American weed, duckweed, sedges, rushes, reeds, &c., or through beds of
osiers or alder trees. An acre of land thus planted is said to purify more than
three million gallons of sewage per diem.[192]
There is no doubt that plants of this description have a powerful action in
purifying sewage or foul water of any kind, and where land is scarce this
method has many advantages.
It is almost unnecessary to add that where sewage is treated in any other
manner than that of throwing it into the sea or river, bulk is a great
objection, especially if it has to be pumped.
To obviate this bulk the separate system is of great advantage, and Isaac
Shone’s new method for ejecting sewage along pipes seems also to be a
most desirable invention in connection with this subject.

Page 233

[187] It is computed that every ton of liquid sewage which is treated chemically costs
about three-quarters of a farthing.
[188] Vide ‘Sewage Disposal,’ by Henry Robinson, C.E., &c., 2nd edition, p. 79.
[189] I purposely omit (Kendal) 856, as this is, properly speaking, “filtration.”
[190] For much interesting information upon this and other subjects in connection with
sewage disposal, see ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol.
xlviii. p. 105 et seq. Also the report of a committee of the Local Government Board on
Modes of Treating Town Sewage, 1876. ‘Sewage Disposal,’ by Henry Robinson, C.E., and
other works on the subject.
[191] Under the Rivers Pollution Act, no effluent is allowed to enter a stream &c., if it
contains more than three parts of suspended inorganic matter, and one part organic matter
for every 100,000 parts of liquid.
[192] Vide ‘Minutes of Proceedings of the Institution of Civil Engineers,’ vol. xlviii. p.
179.

Page 234

CHAPTER XXII.
VENTILATION OF SEWERS.

The necessity for some manner of dealing with the noxious vapours
emanating from sewage other than that of letting it find its way from the
sewers into the house drains and thence into dwelling houses, has induced
the legislature of this country to introduce the following clause in the Public
Health Act 1875, which imposes on every local authority the duty of
causing their sewers to be ventilated so as not to be a nuisance or injurious
to health.
“Every local authority shall cause the sewers belonging to them to be
constructed, covered, ventilated and kept, so as not to be a nuisance, or
injurious to health, and to be properly cleansed and emptied” (38 & 39 Vic.
c. 55, s. 19).
The result of this compulsion upon local authorities to ventilate their
sewers has been the introduction of many methods to effect the purpose, the
great difficulty being to “ventilate so as not to be a nuisance or injurious to
health,” the advocates of open ventilation contending that this is effected by
having a sufficient number of openings in a sewer to dilute and safely
disseminate the foul gas with atmospheric air so that no nuisance is caused.
[193]
Many other methods have been from time to time suggested, some of
which have been carried into effect, and I will now proceed to give them in
detail, discussing their merits and objections in each case.
(1.) Open shafts are carried up from the crown of the sewer to the centre
or side of the roadway, and there protected by an open iron grid or grating
at the level of the street surface.
This is the system which has hitherto found most favour with town
surveyors, and is sometimes modified or worked in conjunction with the
practice of untrapping all the gully pits and buddle holes at the sides of the
roadway, which is an excellent plan if the theory of the atmospheric air

Page 235

dilution at which this system aims is a correct one; in fact, if this dilution by
air is all that is necessary to render the foul air in a sewer innocuous and
inoffensive, there cannot be too many openings into it.
The objections to this system are as follows:
(a.) The foul air escaping into the public streets is often very injurious to
persons passing a ventilator, and sewers are buried out of sight, but they are
not out of mind so long as we are constantly and unpleasantly reminded of
their existence.
(b.) It is found that a change of temperature either of the atmosphere, or
of the air in a sewer, will seriously affect the action of a shaft, causing it
sometimes to have upcast currents of air, sometimes downcast; the effect of
this latter action, especially when it arises from the direction of the wind
blowing over or into the shaft, is frequently to drive the impure gases
contained in the sewer into the house drains, and from thence into the
houses, unless they are so trapped and ventilated as to prevent it.
(c.) They are also affected by the fluctuations of the flow of sewage in
the sewer, or by barometric changes in the atmosphere.
(d.) The situation of the open grids in the street is sometimes somewhat
awkward for traffic, and horses will frequently shy at them, they also admit
solid road detritus into the sewer unless they are protected by a catch plate
of some description.
(e.) They are tempting places for children to play over, with what results
may be imagined.
(2.) Open shafts are carried up the sides (gable ends if possible) of
buildings in the neighbourhood of the sewer; these shafts may be either
open at the top, or be furnished with exhaust cowls. This system is
sometimes employed in conjunction with inlet shafts at the sides of the
street, in the manner shown by the drawing which follows:

Page 236

This method has the advantage over the first system I have mentioned of
carrying the smells further from our reach, but it also has the following
disadvantages:
(a.) The distance and the number of bends and elbows the gases have to
traverse before reaching the external air.
(b.) The difficulty of fixing them just at the points where they are most
required with reference to the gradients of the sewer, especially if they are
to be constructed of such an internal diameter as will ensure their efficiency.
(c.) The great objection raised by occupiers and owners of premises
against having them fixed on their premises, both on sanitary and legal
grounds.
(d.) Their great expense.
(e.) The effect of weather upon their currents.
(3.) By making use of the rain-water pipes from adjoining buildings.

Page 237

This method commends itself as being very economical, and the
opportunities thus given for ventilation are so numerous. If sewers are to be
ventilated at all[194] it would seem at first sight that there could not be too
many openings from and into them, but this system has the following
serious objections:
(a.) When raining, little or no ventilation can take place, and this is the
very time, owing to the rising of the water in the sewer, that the gases
should be allowed free egress if such is considered the best manner of
dealing with them.
(b.) The position of the head of the rain-water pipe is generally the worst
that could be chosen for the egress of the gases, both on sanitary and
pneumatic grounds.
(c.) The joints of a rain-water pipe are usually none of the best.
(d.) The objections persons naturally have to allow the rain-water pipes
of their houses to be used for such a purpose.
(4.) By utilising the lamp posts or columns adjacent to the sewer.
The objects of this system are first to obtain a constant upward current
from the sewer, and secondly to secure that the foul gases and air shall be
consumed and rendered innocuous by being burnt. The objections to this
system are—
(a.) The lamps are only lit at night, consequently little or no ventilation
would be going on during the day.
(b.) The number and diameter of the lamps are generally too small to
make any appreciable effect upon the ventilation of the sewer.
(5.) By passing or filtering the foul air through charcoal placed in trays or
other receptacles in shafts.
The theory of this method is admirable, as the charcoal would arrest all
the impurities and flocculent organic matters contained in the foul air, and
allow only the pure filtered air to pass into the atmosphere.
It has been found, however, where this method has been adopted, that the
charcoal very soon becomes so caked and consolidated from damp and the
vibration of the traffic, that it will neither allow the air to filter through, nor
absorb the impurities contained in it; these objections and the amount of
attention this system requires, has not rendered it very popular with town
surveyors, although it has much to recommend it.
(6.) By making use of ordinary chimney shafts.

Page 238

This method and the one which follows have some merits, the principle
being that an upward current is established as an exhaust from the sewer,
and also that the foul air is purified by being passed through fire, but both
these advantages are only gained when the fires are actually burning; the
objections to this system are—
(a.) Structural difficulties must often be encountered and overcome.
(b.) Possibility of explosion arising from leaks of gas mains into sewers
(a by no means uncommon occurrence, as all who have charge of sewers
frequently find to their cost).
(c.) The objections of owners and occupiers to allow their premises to be
thus made use of to carry off a public nuisance for which they as individuals
are in no way responsible.
(7.) By lofty shafts erected at convenient positions which are either in
connection with furnaces or are simply open to the air.
For a long outfall sewer with no connections this method has many
advantages, notably so in the large furnace and shaft erected on the
Brighton outfall sewer by the borough surveyor, Mr. Lockwood. But in a
general system of sewerage, it was found by experiments made by Sir
Joseph Bazalgette, C.B. that the effect of trying to reduce the gases by the
action of furnaces was but very small, and that the area over which the
effect extended was but very limited: in fact, a sewer may be compared to a
perforated tube, the house drains, gully drains, &c., representing the
perforations; the effect of an exhaustion by the action of the furnace is
simply to suck fresh air into the sewer at all these points instead of
removing the foul air for any distance.
High shafts at different points effect a partial clearance of sewer gases,
but they are very costly, and the reasons I have previously given against the
system of open shafts are practically the same in this and all other
modifications of the principle.
Many other methods have been tried from time to time, either to prevent
the formation of gases in the sewers, or neutralize or destroy them, some of
which are as follows:
By giving a quick velocity of discharge in a sewer; by placing materials
within sewers which would absorb the gases as fast as they were generated;
by passing deodorants or disinfectants into sewers; by deodorizing or
disinfecting all materials before they are allowed to enter a drain or sewer;
by placing chemical agents within sewers to give off certain gases which

Page 239

would then, it was conjectured, destroy the noxious properties of the sewer
gases; by introducing charcoal into sewers to absorb the foul gases; by
laying pipes within the sewers for the purpose of discharging chlorine into
the sewer; by employing galvanic agency to disengage or to produce ozone
from the sewer gas; by passing the foul air through shafts into which water
was constantly injected, and by endeavouring to extract the foul air by fans
driven by machinery.
I have myself patented a plan for “annihilating sewer gases” by allowing
them to be absorbed into dry earth, and have tried the system with some
very marked and successful results.[195]
Having thus far considered all the known methods for dealing with the
noxious emanations which proceed from sewers, the next point to consider
is what these noxious emanations are, and whether they exist in all sewers.
It has been found that even in sewers of the best and most modern
construction what is called “sewer gas” is generated in more or less
quantity; this arises even from fresh sewage, but is far more noxious and
dangerous to health when the sewage has begun to decompose. Even where
the sewers are so constructed as to remove all the sewage to the outfall
within 24 hours (which has been decided to be the maximum time it should
take), there is still an accumulation of slime on the inner periphery of the
sewers, owing to the rise and fall of the sewage line, which is constantly
manufacturing gases of decomposition.
It is no doubt true that the more perfect the system of sewerage is the less
foul air there is in the sewers, but in very few towns will there be found no
sewers or drains where temporary obstructions of the sewage do not occur,
and where gases are generated, which then find their way into other parts of
the sewage system unless they are dealt with in some effective manner.
As to what is the actual composition of this foul air in a sewer little or
nothing seems to be known, except that it is highly dangerous to health if
breathed, and is also very offensive to the smell.
The “fœtid organic vapour,” or sewer gas proper, has for its companions
in a sewer, sulphuretted hydrogen, a most poisonous as well as unpleasant
smelling gas, carburetted hydrogen, due very often to leaky gas mains or
services, or to decomposing vegetable matters, carbonic acid gas or
carbonic anhydride (choke damp), and some ammoniacal compounds.
The actual component parts, however, of any gases in a sewer must vary
considerably with its conditions and locality, &c., in the same manner as

Page 240

they would in any public building or room, and it is impossible to tell,
without costly experiments, what gases may be prevalent in any particular
portion of a sewer. But whatever may be the analysis of this foul air, there
can be but little doubt that it contains organic matter floating about in it as
solids, and that it is excessively injurious and even dangerous to breathe,
and that it should be caught and destroyed or rendered innocuous, and not
be permitted to pass into and contaminate and poison the air we breathe.
Some engineers are of opinion that this foul air always finds its way to
the upper portions of the sewerage system, but my investigations into this
subject have led me to believe that no rule of this kind can be laid down, for
with quick velocities of flow, in some sewers, the gases are carried by
friction in the direction of the flow of the sewage, and do not ascend as has
been imagined.
Whatever system of ventilation of the main sewers in any town may be
adopted, it is imperative that the house drains connected with them should
be properly trapped and ventilated, and this is in my judgment of even
greater importance than the ventilation of the main sewers. On this point I
have given more explanations in the chapter upon “House Drainage.”
In conclusion, let me refer my readers to a most exhaustive discussion,
and very valuable information contained in the chapter entitled “Ventilation
of Sewers and Drains” in Mr. Baldwin Latham’s ‘Sanitary Engineering,’ in
which may be found almost everything that is at present known upon this
important subject.

[193] If there is any truth in the “germ theory” of disease, how dangerous must be the
practice of open sewer ventilation, a waft of foul air from a sewer carrying with it a germ,
and the unsuspecting passer-by is inoculated just as surely as if he had handled or been
near the excrements of the diseased person whose evacuations have been passed into the
public sewer.
[194] The important city of Bristol has no system of sewer ventilation, and yet the death
rate of the city, which is by no means specially healthily situated, has not been abnormally
high up to this year (1883).
[195] For further information upon my system for the annihilation of sewer gases, I must
refer my readers to a pamphlet written by myself in 1880, entitled ‘Sewer Ventilation, or a
New and Improved System for the disposal of the Noxious Gases generated in Sewers and
Drains,’ and also to a paper I read on this subject at the meeting of the Sanitary Institute of
Great Britain, held in Exeter in the year 1881.

Page 241

CHAPTER XXIII.
PUBLIC CONVENIENCES.

In almost every town in the United Kingdom public urinals are now erected,
although it is not often that good watercloset accommodation is provided,
except at hotels and railway stations, over which the local authority have no
jurisdiction; or perhaps if they do provide any accommodation of this
description it is only in connection with the public parks or in the markets,
museums, &c.
The clause of the Public Health Act which empowers an urban authority
to spend money out of the district rates for this purpose is as follows:
“Any urban authority may if they think fit provide and maintain in proper
and convenient situations, urinals, waterclosets, earthclosets, privies and
ashpits and other similar conveniences for public accommodation” (38 &
39 Vic. c. 55, s. 39).
It is not my intention to enter into the merits or otherwise of the many
descriptions of urinals and latrines that have been brought to the notice
from time to time of every town surveyor by enterprising manufacturers and
patentees, but only to give a few suggestions upon the subject.
Public urinals ought to be erected by the urban authority as a matter of
convenience to the peripatetic portion of any community, and also to
prevent nuisances being committed in improper places.
In selecting sites for urinals the town surveyor must take care that after
erection they shall not be offensive or a nuisance to any persons living in
the vicinity, and that they shall be so placed that although they may be
easily found, the persons using them shall be effectually screened.[196]
Urinals are better constructed of iron rather than of brickwork or more
solid workmanship, in order that they can be readily removed. It is
surprising what an uproar is sometimes raised in a neighbourhood by the
erection of a urinal; this clamour occasionally has so much effect upon the
urban authority that they order the removal of the urinal, although it may

Page 242

not have been erected many days, and if it has been substantially built a
considerable waste of the public money is thus involved.
Where a urinal is constructed with basins, as by the following plan, the
basins may be of iron or good stone ware or similar construction, these
being always kept full of water which is constantly although slowly
changing.

Stall urinals may be some modification of the following plan, and be
constructed of iron with slate partitions, or the partitions may be of iron
covered with plate glass where soiled, the stalls should not be less than 24
in. in the clear, and water must be kept constantly flowing over the soiled
portion either from a perforated pipe or a spreader.[197] A very excellent
arrangement is to have a trench or trough cut at the foot of the stall for the
whole length of the urinal, which is kept constantly full of water and
occasionally flushed, thus avoiding nuisance in a very satisfactory manner.

Page 243

Provision must of course be made to efficiently drain and light all public
urinals, and arrangements should be made by which they can be thoroughly
washed once or twice a day, so as to keep every part scrupulously clean.
Urine after a very short exposure exhales a most fœtid and unpleasant
odour, from the decomposition of its nitrogenous matter. Carbolic acid,
chloride of lime, sanitas, or other disinfectant should also be used,
especially in warm weather.
If the interior of a public urinal or latrine has to be painted a light colour,
it is well to mix a little sand with the paint, so as to prevent as much as
possible that literature and art which so often disfigures establishments of
this description. An excellent composition with which to treat urinals,
although it is of a somewhat dark tint, is a mixture of common coal tar and
naphtha, which not only gives a clean and polished appearance to the place,
but is also an excellent deodorant and disinfectant.
With regard to public W.C. accommodation, this, as I have before stated,
is not very often provided by an urban authority,[198] although common
public latrines are sometimes erected. These are generally used by rather
rough persons, and should be constructed in a strong and simple manner.
For this purpose stoneware bowls or basins placed over a drain and
fitting into ordinary right-angled junctions placed vertically are simple and
effective as well as very economical in construction. Slate, iron, or wood
seats may be placed on these basins, which should be kept half full of water.
A periodical and sudden flush which carries the whole contents into the
nearest sewer can be arranged for so as to work automatically by the
introduction of a cistern and one of Mr. Roger Field’s flush syphons at the
upper end of the system.
For further information on the subject of urinals, waterclosets, latrines,
and all similar subjects, let the town surveyor refer to Mr. George Jennings
or Messrs. Macfarlane, who have an endless variety of designs and
appliances in connection with such matters.

Page 244

[196] The urban authority have an absolute discretion as to the sites they select. They
cannot, however, erect public conveniences so as thereby to cause a nuisance, even though
the convenience is wanted and the locality chosen suitable. (Vide ‘Public Health and Local
Government Act,’ by F. V. Fitzgerald, 3rd edition, p. 33.)
[197] The quantity of water usually required to each stall when kept constantly running
is about half a gallon per minute.
[198] For an excellent specimen of such public accommodation, that at Liverpool near
the St. George’s Hall should be inspected.

Page 245

CHAPTER XXIV.
ARTIZANS AND LABOURERS’ DWELLINGS, &c.

The Artizans and Labourers’ Dwellings Act 1868 (31 & 32 Vic. c. 130) was
in effect incorporated in the Public Health Act 1875 so that “every urban
authority shall within their district, . . . have, exercise and be subject to all
the powers, rights, duties, capacities, liabilities, and obligations within such
district exercisable or attaching by and to the local authority” (38 & 39 Vic.
c. 55, s. 10).
The mode of procedure is as follows:
Where the “officer of health”[199] finds any premises in a condition or
state dangerous to health so as to be unfit for human habitation, he shall
report the same in writing to the clerk of the local authority. The local
authority must then refer such report to a surveyor or engineer,[200] who
shall thereupon consider the report so furnished to him, and report to the
local authority what is the cause of the evil so reported on, and if such evil
is occasioned by defects in any premises, whether the same can be remedied
by structural alterations and improvements or otherwise, or whether such
premises or any or what part thereof ought to be demolished (31 & 32 Vic.
c. 130, s. 6).
Upon the receipt of this report from the surveyor the local authority sends
copies to the owner of the premises, giving him opportunities of attending
before them and of appealing against the report, and if his objections are
overruled, a plan and specification of the works (if any) and an estimate of
the cost of such works, must be prepared by the surveyor, and these in turn
may be inspected by the owner and objected to by him in writing, and he
may also attend before the local authority, and if he makes good his
objections the local authority may direct the plan, specification and estimate
to be amended, and the works would then be executed in accordance with
the amended plans, &c. (31 & 32 Vic. c. 130, s. 8).

Page 246

Persons who are aggrieved by any order of the local authority may appeal
against it, but failing this, if the owner does not within two months
diligently proceed with and complete the same in conformity with the
specification to the satisfaction of the surveyor, the local authority may
either order the premises to be shut up, or to be demolished, or may
themselves execute the required works in conformity with the specification
(31 & 32 Vic. c. 130, s. 18).
If the requirements of the order involve the total demolition and not the
improvement of the premises, the owner shall within three months proceed
to take down and remove them, and if he fail to do so, then the local
authority may pull down and recoup the expenses by a sale of the old
material (31 & 32 Vic. c. 130, s. 20).
The above Act was amended in 1879 by the “Artizans and Labourers’
Dwellings Act (1868) Amendment Act 1879” (42 & 43 Vic. c. 64), the most
important clause affecting the action of the town surveyor being as follows:
“Notwithstanding anything in the Act of 1868, the owner of any premises
specified in an order of the local authority made under that Act, and
requiring him to execute any works or to demolish such premises, may
within three months after service on him of the order, require the local
authority in writing to purchase such premises” (42 & 43 Vic. c. 64, s. 5).
The amount of compensation to be paid to the owner is to be settled by
arbitration if no agreement can be arrived at, such arbitration to be carried
out in a manner provided for by certain clauses in this Amendment Act
1879.
Sec. 9 of the same Act also provides for the repayment (by sale of old
materials, &c.) of the cost incurred by the local authority in executing any
works under the Acts.
This Act has again been amended quite recently (August 1882) by “An
Act to Amend the Artizans and Labourers’ Dwellings Acts” (45 & 46 Vic. c.
54), the most important clause affecting the working of this Act being as
follows:
(1.) “If in any place to which the Artizans and Labourers’ Dwellings Act
1868 applies the officer of health finds that any building, although not in
itself unfit for human habitation, is so situate that by reason of its proximity
to or contact with any other building it causes one of the following effects,
that is to say:

Page 247

“(1.) It stops ventilation or otherwise makes or conduces to make
such other buildings to be in a condition unfit for human habitation; or
“(2.) It prevents proper measures from being carried into effect
for remedying the evils complained of in respect of such other
buildings,
in any such case the officer of health shall make a report to the local
authority in writing of the particulars relating to such first-mentioned
building (in this Act referred to as ‘an obstructive building’) stating that in
his opinion it is expedient that the obstructive building should be pulled
down, and shall deliver the report to the clerk of the local authority.
“(2.) The local authority shall refer such report to a surveyor or engineer
to report thereon, and to report as to the cost of acquiring the lands on
which such obstructive building is erected, and of pulling down such
building.”
The local authority then consider the reports of the officer of health and
of the surveyor, and proceed to give copies to the owner of the lands in
question, who has liberty of appeal, &c., as before given in the Act 1868.
The lands may be acquired by the local authority by agreement or
compulsorily under the Lands Clauses Consolidation Acts, and the
obstructive building, “or such part thereof as may be obstructive,” may be
pulled “down, and the whole site, or such part thereof as may be required to
be kept open for the purpose of remedying the evils” kept as an open space.
The owner of the land may, by giving due notice, declare that “he desires
to retain the site of the obstructive building, and undertake either to pull
down or to permit the local authority to pull down, the obstructive
building,” in which case he retains the site, and is compensated only for the
building.
These recent amendments to the old Act of 1868 are of the greatest
importance, for they aim at the easy improvement of courts and alleys, by
opening them where houses have been erected across the entrance, in some
cases depriving the courts and alleys of light and air, and leaving only a
small covered archway through which the occupants can enter.
The Act has only too recently become law for me to give any particulars
with regard to its working, but it appears to be a most valuable sanitary Act.
Prior to these amendments of the Act 1868, it was felt that it dealt only
with isolated buildings, and consequently, in order to improve large areas,
the “Act for Facilitating the Improvement of the Dwellings of the Working

Page 248

Classes in Large Towns” was passed in 1875 (38 & 39 Vic. c. 36), since
which date, like the Act 1868, it has been twice amended, once in 1879 (42
& 43 Vic. c. 63), and again in 1882 (45 & 46 Vic. c. 54).
The object of the Act of 1875 was to facilitate the removal of portions of
towns, especially of the courts and alleys in the poorer and more densely-
populated parts.
The Act is to be put in force where an official representation is made by
the medical officer of health to the local authority of an urban sanitary
district (which must contain a population of at least 25,000) that “any
houses, courts, or alleys within a certain area” are “unfit for human
habitation, or that diseases indicating a generally low condition of health
amongst the population have been from time to time prevalent in a certain
area,” and that this is attributable to the bad arrangement or bad condition
of the streets and houses, or “other sanitary defects,” which can only be
remedied by “an improvement scheme for the rearrangement and
reconstruction of the streets or houses” (38 & 39 Vic. c. 36, s. 3).
The improvement scheme to be prepared on receipt of this report by the
local authority must be accompanied by “maps, particulars, and estimates”
(no doubt these must be prepared by the surveyor, although no mention is
made as to who shall prepare them), and this scheme may “provide for
widening any existing approaches to the unhealthy area, or otherwise for
opening out the same for the purposes of ventilation or health.” It must
distinguish “the lands proposed to be taken compulsorily,” and by the Act
1875 it was necessary to “provide for the accommodation of at the least as
many persons of the working class as may be displaced in the area with
respect to which the scheme is proposed in suitable dwellings, which,
unless there are any special reasons to the contrary, shall be situate within
the limits of the same area or in the vicinity thereof” (sec. 5).
So much practical difficulty was experienced in carrying this latter part
of the clause into effect, that in 1879 a short Act was passed (42 & 43 Vic.
c. 63), which by the 4th section amended that part of the original clause as
to the provision of accommodation for the working classes as follows:
“Where it is proved to the satisfaction of the confirming authority . . . .
that equally convenient accommodation can be provided . . . . at some place
other than within the area or the immediate vicinity . . . . and it is also
proved to the satisfaction of such authority that the required
accommodation has been or is about to be forthwith provided.” The

Page 249

confirming authority may be satisfied with such provision, and for this
purpose the local authority may make use of any lands belonging to them,
or purchase any that are suitable (42 & 43 Vic. c. 63, s. 4).
This part of the Act has again been amended in the year 1882 by 45 & 46
Vic. c. 54, which in section 3 enacts as follows:
“. . . . and where any such improvement scheme comprises an area situate
elsewhere than in the metropolis or the City of London, it shall, if the
confirming authority so require (but it shall not otherwise be obligatory on
the local authority so to frame their scheme), provide for the
accommodation of such number of those persons of the working class
displaced in the area with respect to which the scheme is proposed in
suitable dwellings to be erected in such place or places either within or
without the limits of the same area as the said authority, on a report made
by the officer conducting the local enquiry, may require . . . .”
Having thus far given the modus operandi under which the Act has to be
enforced, it is necessary to see what are some of the town surveyor’s duties
in connection therewith.
First, there are the “maps, particulars, and estimates” which have to be
prepared, and these involve—
(a.) Accurate surveys of the area;
(b.) A reference of all the properties included:
(c.) A census of the population of the area;
(d.) A valuation of all the properties;
(e.) A plan of the proposed new streets, &c.
(f.) An estimate of the cost of the whole work.
In addition to this it is necessary for the local authority to “impose
suitable conditions and restrictions as to the elevation, size, and design of
the houses and the extent of the accommodation to be afforded thereby, and
to make due provision for the maintenance of proper sanitary
arrangements,” and this naturally involves detailed drawings of the
buildings to be erected.
In the same clause (38 & 39 Vic. c. 36, s. 9) it is stated that the local
authority may engage with any society, &c., to carry the whole or any part
of the scheme into effect, but “the local authority shall not themselves,
without the express approval of the confirming authority, undertake the
rebuilding of the houses or the execution of any part of the scheme, except
that they may take down any or all of the buildings upon the area, and clear

Page 250

the whole or any part thereof, and may lay out, form, pave, sewer, and
complete” all the necessary streets, &c., which shall thenceforth be public
streets repairable by the inhabitants at large.
It is scarcely necessary to say that the enforcement of this Act involves a
considerable expenditure of work and time in the office of the town
surveyor.
The buildings which are erected on the sites dealt with under this Act are
generally of the “high block” class, as it is found that the labouring man
prefers to live near his work, and land is generally too expensive in such
localities to admit of the erection of any other description of buildings.
As to whether this class of dwelling is as healthy as ordinary cottages or
houses, the following death-rates for the year 1879 will be some guide:

The London Improved Industrial Dwellings 16·4 per 1000
The Peabody Trust Dwellings 17·2 „ „
The Metropolitan Association Dwellings 14·3 „ „
The Newcastle Improved Industrial Dwellings 12·0 „ „
The general death rate for the Metropolis at the same date being 21·2 „ „

It is of course necessary that the sanitary arrangements of industrial
dwellings of the block type should be very perfect, and as to the manner in
which they should be erected the following words of Mr. John Price, who
for twelve years had lived in one of them himself, can be here given with
advantage:[201]
“Model dwellings are therefore most appreciated by working men when
placed near the scene of their daily labour. The arrangements most preferred
are those which bring the fewest families or persons in contact with one
another on a flat or landing. As a rule the buildings should not exceed four
stories in height; the staircases should be about four feet in width, and
broken by short landings, lighted by large windows open to the external air;
the window-sills should not be less than three feet from the floors for the
safety of young children, and for the same reason well staircases should be
avoided. The steps of the stairs should only have a 6-inch ‘rise,’ for the
more easy accommodation of old people and young children; they should
be fire-proof, and well lighted with gas on an evening. There should be a
thick layer of deafening between the floors. The waterclosets should be
placed in an offshoot from the main building, opening on to each landing,

Page 251

and well ventilated by open windows and air bricks. The watercloset
apparatus should be as simple and effective as possible. Patents depending
upon the proper working of valves and ball-cocks should be avoided, as the
fruitful cause of trouble and expense; little reliance must be placed on their
proper use by tenants where more than one family have access to them. I
have seen excellent closets stopped up with cloths and all manner of
earthenware and hardware, children of careless parents being the principal
offenders; what is everybody’s duty is often most neglected. It will be found
most economical in large buildings of this class to appoint a person whose
duty it should be to attend to the proper flushing of waterclosets daily. I
would suggest that there should be a large cistern under the roof (distinct
from the cistern used for domestic purposes), a ³⁄₄-inch feed pipe should
lead to each w.c., which should consist of a simple metal or earthenware
pan, provided only with a tap, flushing rim, and plug, placed under the seat
securely, and under the sole control of the attendant, who, by the necessary
daily inspection, would detect any stoppage or injury to the fittings. The
expense of such supervision would probably be soon saved in plumbers’
bills. Of course the soil-pipes should be well ventilated above the roof of
the building, and all drains and sinks should be properly trapped. The
attendant on his daily rounds would also be able to see that these are kept in
proper order. The dust-shaft, extending to the full height of the building,
should have proper hoppers connected with it to prevent the dust coming
from the lower or upper landings; a nuisance sometimes complained of in
block dwellings. The washhouses should be placed on the roof or in the
yards, fitted with set pots and requisite conveniences. The soft water from
the roofs should be stored in tanks for washing and domestic purposes—it
will be much appreciated by sensible tenants, and save the water bill
greatly.
“The great desiderata of these large blocks of buildings is ample
playground for the children, without which they play upon the stairs, and
are often the cause of strife amongst neighbours. I know those who have
experience in the matter may say that it is more easy to state what is
desirable than what is practical. The enhanced value of land in all our large
towns precludes any liberal investment on what appears so financially
unremunerative as playgrounds, yet they are essential adjuncts wherever
there is an infantile population. Mr. Powell, on behalf of the London
Trades’ Unions, enumerated before Sir Richard Cross’s Committee certain

Page 252

objections which the working classes of London entertained against the
earliest erected blocks of dwellings, amongst which was their barrack-like
and uninviting appearance, and also their want of playgrounds for children.
Recently these defects have been greatly remedied.”
A few words are necessary upon the “Labouring Classes’ Lodging
Houses Acts” (14 & 15 Vic. c. 34; 29 & 30 Vic. c. 28; 30 & 31 Vic. c. 28).
The object of these Acts was to empower urban authorities, under certain
restrictions and after certain formalities, to appropriate any lands vested in
them or at their disposal, or to purchase or rent the necessary lands for the
purpose of erecting suitable buildings for lodging-houses for the working
classes, or to convert any buildings into lodging-houses, and “repair and
improve the same respectively with all requisite furniture, fittings, and
conveniences”; and further powers are given in the Acts for the urban
authority to contract with persons for different objects, &c.
I am unable to give any experiences of the working of these Acts, for I do
not know of any urban authority which has carried them into effect, the
Artizans and Labourers’ Dwellings Improvement Acts having virtually
superseded them.
The following copy of the bye-laws as sanctioned by the Treasury in
1867 in connection with the Labouring Classes’ Lodging Houses Acts may,
however, be of interest, as well as the table of sizes of rooms which follows:
Separate watercloset accommodation to be provided for each tenement,
or else, where watercloset accommodation is to be used in common by the
occupants of two or more tenements, separate accommodation must be
provided for each sex. Such accommodation may be either watercloset,
earthcloset, or privy.
Each tenement to have a dustbin or the use of a dustbin common to
several buildings.
Each tenement to be well lighted by external windows made to open.
Each tenement to have ready access to water.
Where several tenements in one building, proper ventilation to be
provided for the passages, staircases, &c.
The drains to be well constructed.
Parties to whom moneys to be advanced to enter into covenants with the
Public Works Loan Commissioners, that where there are several tenements
in one building they
(a.) Will cause the passages, staircases, &c., to be kept clean;

Page 253

(b.) Will cause the waterclosets, &c., to be kept in good repair;
(c.) Will cause the dustbins to be emptied at intervals of seven days;
(d.) Will take precautions against any interruption in the supply of water;
(e.) Will keep the windows in good order and repair, and the chimneys
swept;
(f.) Will keep the drains in proper order;
(g.) Will allow inspection by Commissioner of Works to see that the
above covenants are observed.
Number of cubic feet in each room of the several classes of tenements
(none of less than two rooms) for which money has been authorised to be
advanced:

One One One One One
Room Room Room Room Room
Class. of of of of of
cubic cubic cubic cubic cubic
feet. feet. feet. feet. feet.
Class I. of two rooms 715 1,219
Ditto 816 994
Ditto 995 1,020
Class II. of four rooms 960 960 960 960
Class III. of five rooms 372 675 1056 1056 1232
Ditto 446 459 459 781 1468

It may be information valuable to a town surveyor, if before closing this
chapter I draw attention to the provisions of the Municipal Corporations Act
1882, sec. 3, which gives corporations power to convert any corporate land
into sites for working men’s dwellings, although the corporation are not
authorised to erect the dwellings thereon.

[199] The term “officer of health,” as respects any urban sanitary district in England,
means the medical officer of health appointed by the urban sanitary authority under the
Public Health Act 1875 (42 & 43 Vic. c. 64, s. 3).
[200] The town surveyor is usually employed for this work.
[201] Vide ‘Industrial Dwellings from a Sanitary point of View,’ by John Price, Resident
Agent, Newcastle-on-Tyne Industrial Dwellings Company, read September 28th, at the
Congress of the Institute, held at Newcastle-on-Tyne.

Page 254

CHAPTER XXV.
DEFECTS IN DWELLING-HOUSES, &C.

There are many defects in dwelling-houses with which it is the duty of the
sanitary inspector to deal, such as the Bakehouse Regulations Act, offensive
trades, nuisances rendering houses unfit for human habitation, &c., but I
propose to give in this chapter, in addition to those with which I have
already dealt, such subjects under this head as come within the duties of the
town surveyor.
The first which I propose to treat is that of the question of
Cellar Dwellings.—These are at all times objectionable even if the
clauses of the Public Health Act 1875 be strictly carried
out, and the surveyor should discourage them as much as possible. Nothing
more can be said with reference to them than is contained in the provisions
of the above Act, which are as follows:[202]
“It shall not be lawful to let or occupy or suffer to be occupied separately
as a dwelling, any cellar (including for the purposes of this Act in that
expression any vault or underground room) built or rebuilt after the passing
of this Act, or which is not lawfully so let or occupied at the time of the
passing of this Act” (38 & 39 Vic. c. 55, s. 71).
And with regard to existing cellar dwellings they are only to be let or
occupied on the following conditions:—
“Unless the cellar is in every part thereof at least seven feet in height,
measured from the floor to the ceiling thereof, and is at least three feet of its
height above the surface of the street or ground adjoining or nearest to the
same; and
“Unless there is outside of and adjoining the cellar and extending along
the entire frontage thereof, and upwards from six inches below the level of
the floor thereof up to the surface of the said street or ground, an open area
of at least two feet and six inches wide in every part; and

Page 255

“Unless the cellar is effectually drained by means of a drain, the
uppermost part of which is one foot at least below the level of the floor
thereof; and
“Unless there is appurtenant to the cellar the use of a watercloset,
earthcloset, or privy, and an ashpit, furnished with proper doors and
coverings, according to the provisions of this Act; and
“Unless the cellar has a fireplace with a proper chimney or flue, and an
external window of at least nine superficial feet in area clear of the sash
frame, and made to open in a manner approved by the surveyor (except in
the case of an inner or back cellar let or occupied along with a front cellar
as part of the same letting or occupation, in which case the external window
may be of any dimensions, not being less than four superficial feet in area
clear of the sash frame).
“Provided that in any area adjoining a cellar there may be steps necessary
for access to such cellar, if the same be so placed as not to be over, across,
or opposite to the said external window, and so as to allow between every
part of such steps and the external wall of such cellar a clear space of six
inches at the least, and that over or across any such area there may be steps
necessary for access to any building above the cellar to which such area
adjoins, if the same be so placed as not to be over, across, or opposite to any
such external window” (38 & 39 Vic. c. 55, s. 72).
Where two convictions in respect of the same cellar have taken place
within three months, the local authority may close it, and recover any
expenses incurred by them in the execution of this duty (38 & 39 Vic., c.
55, s. 75).
The next defect in a dwelling-house which will be considered is that of
Insufficient W.C. accommodation.—A new house may not be erected
without “a sufficient watercloset,
earthcloset,[203] or privy” under a penalty not exceeding twenty pounds[204]
(38 & 39 Vic. c. 55, s. 35).
And with regard to existing premises:
“If a house within the district of a local authority appears to such
authority by the report of their surveyor or inspector of nuisances to be
without a sufficient watercloset, earthcloset, or privy . . . . the local
authority shall by written notice require the owner or occupier of the house
within a reasonable time therein specified, to provide a sufficient
watercloset, earthcloset, or privy . . . . or either of them as the case may

Page 256

require. If such notice is not complied with the local authority may, at the
expiration of the time specified in the notice, do the work, provided that
where a watercloset, earthcloset, or privy has been and is used in common
by the inmates of two or more houses, or if in the opinion of the local
authority a watercloset, earthcloset, or privy may be so used, they need not
require the same to be provided for each house” (38 & 39 Vic. c. 55, s. 36).
If the local authority approve, an earthcloset may be constructed instead
of a watercloset, but in this case they should make arrangements for the
supply of the dry earth and the removal of its contents.
The necessary form of notice to be served in connection with insufficient
w.c. accommodation may be as follows:

To the owner of the house No. in the borough of .
Whereas the above-mentioned house is situate within the district of the
mayor, aldermen, and burgesses of , the urban sanitary authority
for the borough of : And whereas it appears to the said urban
sanitary authority that the said house is without a sufficient watercloset,
earthcloset, or privy: Now the said urban sanitary authority do hereby
require you, the said owner, within from the date of this notice to
provide a sufficient watercloset for the use of the inhabitants of the said
house. And take notice, that if you do not within the time above specified
provide a sufficient watercloset, as aforesaid, to the satisfaction of the said
urban sanitary authority, they will themselves, at the expiration of such
time, do the necessary work to provide such closet accommodation as
aforesaid, and proceed to recover the costs and expenses thereby incurred in
manner provided by the Public Health Act 1875.
Dated this of , 188 .
______________________________
_____
Surveyor to the said Mayor, Aldermen
and Burgesses.

And where the case demands, the following note may be added below the
above notice:

“Note.—The urban sanitary authority may, if they so determine, require
a separate watercloset to be provided for each house, or they may permit a

Page 257

watercloset to be used in common by the inmates of two or more houses,
[205] but in either case the closet itself must be properly constructed and
provided with due means of ventilation. The urban sanitary authority will
approve of the existing closet accommodation if it is perfected by means of
the following works being carried out. (Specification of work required to be
done must here be inserted.) The whole of the work to be executed in a
workmanlike manner and to my entire approval.
“It is, however, to be understood that the above notice requiring the work
to be executed within one month will be rigidly enforced; and if at the
expiration of that time the work be not completed, the urban sanitary
authority will themselves proceed to execute the necessary work to provide
proper closet accommodation in such manner as they may deem most
advisable, without pledging themselves to the adoption of the method above
suggested.”
______________________________
_____
Surveyor to the said Mayor, Aldermen
and Burgesses.

With regard to watercloset accommodation for factories, it appears to rest
entirely with the town surveyor to draw the attention of the sanitary
authority to any case where he considers this is deficient, as by the
following clause:
“Where it appears to any local authority by the report of their surveyor
that any house is used or intended to be used as a factory or building in
which persons of both sexes are employed or intended to be employed at
one time in any manufacture, trade, or business, the local authority may, if
they think fit, by written notice require the owner or occupier of such house,
within the time therein specified, to construct a sufficient number of
waterclosets, earthclosets, or privies and ashpits for the separate use of each
sex.
“Any person who neglects or refuses to comply with any such notice
shall be liable for each default to a penalty not exceeding twenty pounds,
and to a further penalty not exceeding forty shillings for every day during
which the default is continued” (38 & 39 Vic. c. 55, s. 38).
In providing closet accommodation which is to be used in common by
the occupants of a number of houses, it must be remembered that it should

Page 258

be of the most simple description. Any one acquainted with the working of
waterclosets situated in courts and alleys will know how badly they are
treated, and into what a fearful state of disrepair and filth they speedily fall,
as the great difficulty the sanitary inspector always finds is to have them
kept clean; “What is everybody’s business is nobody’s.” And although by
clauses 40, 41, 46, &c., of the Public Health Act 1875 persons causing a
nuisance can be punished, it is a difficult matter to detect the person in fault,
unless of course it is a structural defect, when the owner can be summoned
if it is allowed to remain uncured.
For this reason what are known as “Fowler’s closets,” or some
modification of this principle, should be adopted in all such localities where
earthclosets or some of the dry systems are not in force, as they are without
any complicated valve apparatus or anything of the kind.
The last point to consider in this chapter is that of Houses without a
proper supply of water.
“Where on the report of the surveyor of a local authority it appears that
any house is without a proper supply of water, and that such a supply can be
furnished at a cost not exceeding that authorised by any local Act, or where
there is not any local Act, not exceeding twopence a week, or at such other
cost as the Local Government Board may determine, the local authority
shall give notice in writing to the owner, requiring him, within a time
specified, to obtain such supply, and to do all such works as may be
necessary for that purpose,[206] and in default of his doing so may carry out
all necessary works themselves for obtaining such supply” (vide 38 & 39
Vic. c. 55, s. lxii.).
It is not very often that a house is found without any supply of water at
all, for if that from the mains is not laid on it is generally found that the
house is supplied from a well or from a stand-pipe in a court, or some
similar source. If the water is derived from an impure well or other
contaminated source, the following clause of the Public Health Act 1875
must be enforced in order to close the well or compel the discontinuance of
the polluted supply, when a “proper” supply of water can be enforced in the
manner I have described:
“On the representation of any person to any local authority that within
their district the water in any well, tank, or cistern, public or private, or
supplied from any public pump, and used or likely to be used by man for
drinking or domestic purposes, or for manufacturing drinks for the use of

Page 259

man, is so polluted as to be injurious to health, such authority may apply to
a court of summary jurisdiction for an order to remedy the same; and
thereupon such court shall summon the owner or occupier of the premises
to which the well, tank, or cistern belongs if it be private, and in the case of
a public well, tank, cistern or pump, any person alleged in the application to
be interested in the same, and may either dismiss the application, or may
make an order directing the well, tank, cistern, or pump to be permanently
or temporarily closed, or the water to be used for certain purposes only, or
such other order as may appear to them to be requisite to prevent injury to
the health of persons drinking the water.
“The court may, if they see fit, cause the water complained of to be
analysed at the cost of the local authority applying to them under this
section.
“If the person on whom an order under this section is made fails to
comply with the same, the court may, on the application of the local
authority, authorise them to do whatever may be necessary in the execution
of the order, and any expenses incurred by them may be recovered in a
summary manner from the person on whom the order is made.
“Expenses incurred by any rural authority in the execution of this section,
and not recovered by them as aforesaid, shall be special expenses” (38 & 39
Vic. c. 55, s. 70).
It is an established fact that wells within a town must always be regarded
with some suspicion, and where they exist either publicly or privately the
local authority would do well to have the water from them analysed with a
view to having them closed. Even cisterns, if not frequently examined and
cleansed, will cause the water that is stored in them to become polluted, not
only from the dust of the air settling in them and the natural impurities of
the water passing through them, but frequently from foreign objects falling
into them and decaying, such as rats, mice, cats, and in one case that I know
of, a sirloin of beef, and in another a plumber! These remained in the cistern
until the colour, smell, and taste of the water drew the attention of the
drinkers to “something being the matter!” The cure for the chance of such
cases as these is of course the constant supply.

[202] Any cellar in which any person passes the night shall be deemed to be occupied as
a dwelling within the meaning of this Act (38 & 39 Vic. c. 55, s. 74).

Page 260

[203] “In this Act (P. H. Act 1875) the term ‘earth closet’ includes any place for the
reception and deodorization of fæcal matter constructed to the satisfaction of the local
authority” (38 & 39 Vic. c. 55, s. 37).
[204] In case of several houses together, it has been held as not necessary to have
separate accommodation for each house, if there is sufficient for them collectively. (Clutton
Guardians v. Pointing, 4 Q. B. Division 340, 48 L. J. M. C. 137.)
[205] It is not always possible for a separate w.c. to be provided for each house, hence
the wisdom of the law which makes it permissive for a local authority to allow a group of
tenements to be provided for by several waterclosets close together.
[206] A similar provision is made requiring the keeper of a common lodging house to
obtain a proper supply of water (38 & 39 Vic. c. 55, s. 81), but it does not appear to be the
express duty of the town surveyor to draw attention to this, as it does in the more general
clause.

Page 261

CHAPTER XXVI.
HOUSE DRAINAGE.

It would not be possible in one chapter of a book of this description to enter
into all the details and necessary apparatus in connection with house
drainage. I propose only to point out some of the town surveyor’s duties in
connection with this subject, and to add a few remarks which may be of
some service.
The definition of the word “drain” as given in the Public Health Act 1875
is as follows:
“‘Drain’ means any drain of and used for the drainage of one building
only, or premises within the same curtilage, and made merely for the
purpose of communicating therefrom with a cesspool or other like
receptacle for drainage, or with a sewer into which the drainage of two or
more buildings or premises occupied by different persons is conveyed” (38
& 39 Vic. c. 55, s. 4).
Although this definition is very clear, it occasionally happens, especially
in old towns, that some doubt arises as to whether an existing conduit for
sewage is a “drain” or a “sewer”[207] for though a conduit is of small size it
maybe found to be carrying the sewage of two or more buildings, and thus
is really “a sewer belonging to the local authority.”
This difficulty often leads to litigation where a notice having been served
upon an owner of property to put in a new drain in place of one that has
been found on examination to be defective, the new work is of course
commenced at the junction with the main sewer, and it is not until the new
so-called drain is nearly completed that it is found to be “used for the
drainage” of more than one building, and is in fact “a sewer into which the
drainage of two or more buildings or premises, occupied by different
persons is conveyed” (see clause quoted above), and is therefore repairable
by the local authority (38 & 39 Vic. c. 55, s. 13).

Page 262

Where the town surveyor is in any doubt as to whether the conduit is a
drain or a sewer, he should test from whence the sewage comes by passing
diluted white lime or carbolic acid down the adjacent water-closets and
watching whether it flows through the conduit or not, but even here he is
sometimes at fault if the drains are old and dilapidated, as they do not reach
the point he is watching and he is thus misled.
In connection with the question of house drainage the town surveyor has
the following duties to perform:
(1.) To inspect all new drains that are constructed in connection with
existing buildings within his district.
(2.) To inspect all drains of new buildings that are constructed within his
district.
(3.) To inspect all defective drains within his district, serve the necessary
notices in respect thereof, and inspect the works he has required to be
executed whilst they are in progress.
(1.) With reference to the first of these duties the following is the clause
of the Public Health Act 1875 which bears upon the point:
“The owner or occupier of any premises within the district of a local
authority shall be entitled to cause his drains to empty into the sewers of
that authority on condition of his giving such notice as may be required by
that authority of his intention so to do, and of complying with the
regulations of that authority in respect of the mode in which the
communications between such drains and sewers are to be made, and
subject to the control of any person who may be appointed by that authority
to superintend the making of such communications. Any person causing a
drain to empty into a sewer of a local authority without complying with the
provisions of this section shall be liable to a penalty not exceeding twenty
pounds, and the local authority may close any communication between a
drain and sewer made in contravention of this section . . . .” (38 & 39 Vic. c.
55, s. 21).
The first thing therefore that a local authority has to do is to frame the
necessary regulations and appoint a “person to superintend the making of
such communications.”
The following is given as a specimen form of the manner in which these
regulations may be compiled:[208]

Page 263

Regulations made and ordained by the Urban Sanitary Authority for
, as to the giving of notice before any drains are made to
communicate with the sewers of the said Urban Sanitary Authority;
regulating the mode in which such communications are to be made;
and appointing the person under whose superintendence and control
the work is to be executed.

1.—No communication shall be made with any sewer belonging to the
said Urban Sanitary Authority, nor any drain made to empty therein, unless
notice of an intention so to do, signed by the owner or occupier of the
premises to which such drains belong, be left at the office of the borough
surveyor two days previously; and such notice must specify the point at
which it is desired that communication shall be made, and the time at which
it is proposed the work shall be commenced, and any person not complying
with these regulations will be liable to a penalty not exceeding twenty
pounds.
2.—Work required to be done in connecting any house drain or drains
with the main or public sewer, shall be executed in the following manner:
The ground to be excavated to the required depth with all possible
expedition, the work to proceed by night and day; and there shall be
maintained during the progress of the work all such fencings, hoardings,
struttings, and shorings, as may be necessary for or in consequence of any
of the works, for the protection of the public, and of all buildings and
property whatever, near to or liable to be affected by the work, which shall
also be well watched and lighted.
The shoring and strutting of the excavation is to be done in such manner,
with poling boards, waling pieces and struts, as the surveyor shall consider
necessary.
All surplus earth or material is to be carted away as speedily as possible.
Care must be taken where the excavation is made in a road or path to keep
separate the surface material from the lower, so as to replace them in their
proper positions.
The excavation shall in all cases where practicable be in open cutting,
and not by shafts and headings.
The junction with the main sewer to be done in the following manner:—
The drain shall in no case be less than four inches internal diameter, and
shall be constructed of well-burnt glazed socketed stoneware pipes, circular,

Page 264

perfectly true in bore, and straight, with whole socket joints free from flaws,
blisters, cracks, or other defects, set in Portland cement joints with a
uniform fall, well bedded on well-rammed and solid ground, the sockets
being sunk into it so as to give an even bearing. No shafts or sudden falls
will be allowed.
Where the junction is with a sewer constructed of pipes, one length of the
sewer (or more if necessary) shall be removed and an oblique proper glazed
socket junction pipe, set in Portland cement, inserted in its place.
The junction with the sewer shall be of the same size as the drain.
Where the junction is with a brick or stone sewer, the connection shall be
made at such height above the invert as the surveyor shall determine, and be
made with a glazed socket pipe obliquely in line of current of main sewer,
properly bedded in with cement, cut off so as to take the form of the main
sewer and offer no obstruction to the proper flow of sewage therein, or with
a properly constructed stoneware block junction.
On completion of the junction, which shall be made before any of the
pipe drain is laid, it shall be inspected by the surveyor, and the work must
not be further proceeded with until such inspection has been made and the
junction pronounced satisfactory. The drain shall be properly trapped
between the sewer and the house, with a syphon of such form as the
surveyor shall direct, and be at its inlet end or other extremity carried up
open its full diameter to above the roof line.
The excavation is to be filled in within six inches of the surface of the
ground, with layers of earth not more than six inches in thickness, carefully
rammed or punned with iron punners of not less weight than 10 lbs.
The surface of a roadway must be brought up to its proper level with the
surface material kept separate, and properly broken or other approved road
metal, and the roadway where broken shall be kept in repair by the person
opening the ground for a period of twelve months after the completion of
the work.
If the excavation is made under a footpath or paved road, the paving must
be made good and kept in repair for a similar period.
3.—A. B. C., the present borough surveyor, and his successors in office,
or the person for the time being acting as or discharging the duties of
borough surveyor, are hereby appointed as the person or persons to
superintend the making of such communications with the public sewers as
aforesaid.

Page 265

(1.) Notwithstanding the stringency of the above regulations it is very
difficult to ensure that the whole of the new drain is properly executed by
the person who is carrying out the work, for if he wishes to deceive the
surveyor’s department it is not very difficult to do so in works of this
description. It would be far better if all drains of dwelling houses could be
constructed solely by the staff of the local authority, and failing any general
act upon the subject, that they should be able to obtain private powers to do
so.
It is illegal for anyone to touch the surface of either roadway or footpath
for any purpose whatever[209] without the consent of the urban authority
(see 38 & 39 Vic. c. 55, sec. 149), and especially to touch or interfere with
the main sewers. All such work could be done better and cheaper, both for
the ratepayers and the owners of property, if carried out by the trained staff
of the local authority; nothing would be gained by scamping the work, and
one of the worst stumbling blocks in the interests of sanitation would be
removed by this simple and effective measure. Gas and water companies
invariably refuse to allow anyone to interfere with their mains or services,
but execute the work with their own men; how much more important is it
that house drains and sewers should be equally protected. If a gas or water
main or house service leaks through defective work it is quickly detected
and remedied; not so with a drain or sewer, the deadly gases may be oozing
through defective joints or the foul liquid may be poisoning the soil under
the adjacent dwelling houses, and many victims may suffer before the cause
is ascertained, and even then laborious legal machinery has to be put in
force before it can be rectified.
The only objections that can be raised to the plan I so strongly advocate
are, first, the interference with the trade connections and interests of
builders and others; and secondly, the responsibility incurred by the local
authority to execute thoroughly sound and good work, and the difficulty
they might afterwards experience if it was necessary to find fault with their
own work. The first objection should really have no weight when lives are
at stake, and the responsibility incurred by the second objection ought not to
be shirked.
Until some alteration is made in the present law the town surveyor must
be as vigilant as he can, and endeavour to induce the public to look more
closely themselves into such all-important points.

Page 266

(2.) The next duty of the town surveyor is to inspect all drains of new
buildings that are being constructed in his district.
I have dealt with this subject in the chapter on “New Buildings.” The
model bye-laws to which I have there referred contain some excellent
principles in reference to this matter, and too much power cannot be given
to a local authority in respect of house drains, even to the extent of
prohibiting any one else to construct them. The main sewer, shared in
common as it is by all the inhabitants of a town, must be looked upon as a
common danger, and each house that connects with it should so far as
possible be severed from it; at the same time the drain must be so
constructed that the sewage reaches the sewer as quickly and as completely
as possible, without any nuisance or knowledge of the unpleasant nature of
its contents or those in the sewer reaching the inhabitants of the house: this
is the key-note of all house drainage, and many excellent books and
descriptions of this class of work have been from time to time written.
(3.) The next duty of the town surveyor is to inspect all defective drains
within his district, and serve the necessary notices, &c.
This duty is embodied in the following clauses of the Public Health Act,
1875:
“Where any house within the district of a local authority is without a
drain sufficient for effectual drainage, the local authority shall by written
notice require the owner or occupier of such house, within a reasonable
time therein specified, to make a covered drain or drains emptying into any
sewer which the local authority are entitled to use, and which is not more
than one hundred feet from the site of such house; but if no such means of
drainage are within that distance, then emptying into such covered cesspool
or other place not being under any house as the local authority direct; and
the local authority may require any such drain or drains to be of such
materials and size, and to be laid at such level and with such fall, as on the
report of their surveyor may appear to them to be necessary.
“If such notice is not complied with, the local authority may, after the
expiration of the time specified in the notice, do the work required, and may
recover in a summary manner the expenses incurred by them in so doing
from the owner, or may by order declare the same to be private
improvement expenses.
“Provided that where, in the opinion of the local authority, greater
expense would be incurred in causing the drains of two or more houses to

Page 267

empty into an existing sewer pursuant to this section, than in constructing a
new sewer and causing such drains to empty therein, the local authority
may construct such new sewer, and require the owners or occupiers of such
houses to cause their drains to empty therein, and may apportion as they
deem just the expenses of the construction of such sewer among the owners
of the several houses, and recover in a summary manner the sums
apportioned from such owners, or may by order declare the same to be
private improvement expenses” (38 & 39 Vic. c. 55, s. 23).
The above clause is the most simple under which this duty can be carried
out, provided it can be proved that the house[210] is “without a drain
sufficient for effectual drainage,” and for this purpose it would probably be
necessary to enter the premises and open up and examine the drain, unless,
of course, it was a case where no drain existed to the house at all, or was
evidently and notoriously without “effectual drainage.” In order to enter for
this purpose the requisite powers are conferred in the following clause of
the Public Health Act 1875:
“The local authority, or any of their officers, shall be admitted into any
premises for the purpose of examining as to the existence of any nuisance
thereon, or of enforcing the provisions of any Act in force within the district
requiring fireplaces and furnaces to consume their own smoke, at any time
between the hours of nine in the forenoon and six in the afternoon, or in the
case of a nuisance arising in respect of any business, then at any hour when
such business is in progress or is usually carried on.
“Where under this Act a nuisance has been ascertained to exist, or an
order of abatement or prohibition has been made, the local authority or any
of their officers shall be admitted from time to time into the premises
between the hours aforesaid, until the nuisance is abated, or the works
ordered to be done are completed, as the case may be.
“Where an order of abatement or prohibition has not been complied with,
or has been infringed, the local authority, or any of their officers, shall be
admitted from time to time at all reasonable hours, or at all hours during
which business is in progress or is usually carried on, into the premises
where the nuisance exists, in order to abate the same.
“If admission to premises for any of the purposes of this section is
refused, any justice on complaint thereof on oath by any officer of the local
authority (made after reasonable notice in writing of the intention to make
the same has been given to the person having custody of the premises),

Page 268

may, by order under his hand, require the person having custody of the
premises to admit the local authority, or their officer, into the premises
during the hours aforesaid, and if no person having custody of the premises
can be found, the justice shall, on oath made before him of that fact, by
order under his hand authorise the local authority or any of their officers to
enter such premises during the hours aforesaid.
“Any order made by a justice for admission of the local authority or any
of their officers on premises shall continue in force until the nuisance has
been abated, or the work for which the entry was necessary has been done”
(38 & 39 Vic. c. 55, s. 102).
The above clause also gives the necessary powers of entry where the
following clause of the Public Health Act is enforced with reference to
defective house drainage, instead of the 23rd section which I have quoted.
“On the written application of any person to a local authority, stating that
any drain, watercloset, earthcloset, privy, ashpit, or cesspool on or
belonging to any premises within their district is a nuisance, or injurious to
health (but not otherwise), the local authority may, by writing, empower
their surveyor or inspector of nuisances, after twenty-four hours’ written
notice to the occupier of such premises, or in case of emergency without
notice, to enter such premises, with or without assistants, and cause the
ground to be opened, and examine such drain, watercloset, earthcloset,
privy, ashpit, or cesspool. If the drain, watercloset, earthcloset, privy, ashpit,
or cesspool on examination is found to be in proper condition, he shall
cause the ground to be closed, and any damage done to be made good as
soon as can be, and the expenses of the works shall be defrayed by the local
authority. If the drain, watercloset, earthcloset, privy, ashpit, or cesspool on
examination appear to be in bad condition, or to require alteration or
amendment, the local authority shall forthwith cause notice in writing to be
given to the owner or occupier of the premises requiring him forthwith or
within a reasonable time therein specified to do the necessary works; and if
such notice is not complied with, the person to whom it is given shall be
liable to a penalty not exceeding ten shillings for every day during which he
continues to make default, and the local authority may, if they think fit,
execute such works, and may recover in a summary manner from the owner
the expenses incurred by them in so doing, or may by order declare the
same to be private improvement expenses” (38 & 39 Vic. c. 55, s. 41).

Page 269

In acting upon the above clause it is well to note the machinery that is
necessary in order to secure success in the event of a prosecution.
(1.) The notice to the local authority of the existence of a nuisance arising
from a drain, &c., must be in writing, and that authority must then proceed
to consider the notice.
(2.) If they agree to take action the local authority may empower their
surveyor to enter the premises (with or without notice as the case may
require) but this order to him must also be in writing.[211]
(3.) If the surveyor is allowed by the occupier of the premises to enter
(and in default he must put the 102nd section which I have quoted in force)
he may then open the ground “with or without assistants.”
(4.) If he finds a defective drain he must then report to the local authority
in writing, unless he has been primarily invested by the local authority with
such powers as will dispense with such report.[212]
(5.) The local authority shall “forthwith cause notice in writing to be
given to the owner, &c.” to do the work.
(6.) If the owner executes the work the surveyor must supervise its
execution.
(7.) If this work is not done within a reasonable time the local authority
“may if they think fit” execute the works; the surveyor has probably to
carry them out, after having obtained the necessary permission to enter for
the purpose.
(8.) The costs of the work have to be recovered.
Anyone acquainted with local government will know how difficult and
tedious such processes must necessarily be, the delay between the meetings
of the local authority being quite sufficient to make the matter in dispute
last a considerable time, and this delay is extremely undesirable where a
nuisance arising from a defective house-drain is in existence.
There seems to be no doubt that the clauses which are given in the Public
Health Act 1875 empower the local authority to specify without dispute the
class of work they think necessary in order to remedy any evils arising from
a defective drain, but it is a pity that some more simple process cannot be
introduced to improve the sanitary condition of a house without the
necessity of so much laborious legal machinery.
There is still one other clause in the Public Health Act 1875, which refers
to house drainage, and it is as follows:

Page 270

“Every local authority shall provide that all drains, waterclosets,
earthclosets, privies, ashpits, and cesspools within their district be
constructed and kept so as not to be a nuisance, or injurious to health” (38
& 39 Vic. c. 55, s. 40). But this clause is usually taken to apply rather to
nuisances arising from temporary defects than to more important structural
defects in a drain, and such nuisances come more under the cognizance and
duties of the inspector of nuisances than those of the town surveyor.
It would not be possible, as I have already stated, in one chapter to give
all the detail descriptions of house drains and the necessary apparatus in
connection therewith, and besides very many excellent books, pamphlets
and papers have been from time to time written on this important subject.
[213] Before, however, bringing this chapter to a conclusion, I will give a list
of the essential requirements of all good house drainage which may be of
some use to the town surveyor:
(1.) A house drain should be constructed of stoneware pipes (not
earthenware or fire clay), these are generally salt glazed, and should be
perfectly smooth or even slippery inside, the pipes must be of true circular
section and thickness of material, and straight in the direction of their
length, with whole sockets of proper depth, and free from any cracks,
blisters, sand holes, or other defects. As even the most carefully
manufactured pipes vary somewhat in diameter of sockets; &c., it is well to
have them sorted before commencing the work; it is scarcely necessary to
add that no “seconds” should be allowed on the works.
(2.) The internal diameter of the drain should not be too large; 6 inches
may be considered as a maximum, 4 inches is generally quite sufficient to
carry off all the sewage from an extensive establishment, even if all the
water from the roofs or a portion of them is included.
(3.) The inclination is governed by circumstances, but about 1 in 60 is
found to be a very convenient fall for many hydraulic, and other reasons.
(4.) The jointing of the pipes should be executed with great care; if
cement joints are made each pipe should be jointed separately, and it should
be seen that no cement is left in the drain. Sometimes tarred gaskin is used
to prevent this, and Stanford’s patent joints are excellent where running
water or sewage has to be contended with, or great despatch of the work is
necessary.[214]
(5.) The sockets of the pipes should be sunk into the ground at the bottom
of the trench so as to give an even bearing, which amongst other benefits

Page 271

dispenses with the chance of settlements.
(6.) No pipes should be allowed to be covered in until they have been
inspected by the town surveyor or his assistants, and in order to test the
soundness of the joints, it is a good plan to fill the drain with water, having
first stopped up the lower end, and note the effect.
(7.) Drains should not pass under buildings if it can be avoided, but if
unavoidable they must be buried in good concrete, and relieving arches
turned to any walls passing over them. In America iron pipes are used under
houses.
(8.) Care must be exercised, in filling in over pipes, not to break or injure
them.
(9.) The trap to a house drain should be a “Buchan” or other similar
syphon with a good cascade action, its position must be guided by
circumstances.
(10.) The drain should end at the outside wall of the house and be carried
up the wall its full diameter to above the roof for ventilation, an inlet for
fresh air being essential on the house side of the trap; if the drain has to pass
under the house it must be similarly carried up on the other side.
(11.) The connection with the main sewer has been already described.
In conclusion I would urge the necessity of a register of all drains being
kept that are examined by the surveyor’s department. This can be done by
having a series of numbered notebooks kept solely for this purpose, and all
the information thus acquired should also be plotted on the map of the town
if on a sufficiently large scale.
The necessity of correct plans of the drainage of buildings cannot be
over-estimated, especially for hospitals, asylums, workhouses, schools, or
other public buildings, and even for the smallest dwelling house such a plan
would often prove to be the greatest boon to the occupier or owner as well
as at all times to the town surveyor, the medical officer of health, and the
inspector of nuisances.

[207] For definitions of the word “sewer,” see the chapter on Sewerage.
[208] The New York Board of Health require that earthenware drain pipes connecting
dwellings with street sewers shall be hard and salt glazed, sound and cylindrical; at least
⁵⁄₈ths of an inch thick if 5 inches in diameter, and ³⁄₄ of an inch thick if 6 inches in diameter.
Pipe must be connected with hydraulic cement of the best quality. No “tempered up”
cement can be used. The pipes must be laid with such good alignment that the inspector
can see through the entire line from the house to the sewer, and every section must be
bedded in cement so as to have a firm bearing, not only at the hub, but along its entire

Page 272

length. The inside of the drain must be freed from all cement which may have oozed
through at the joints, and from all other obstructions. Before the drain is covered notice
must be sent to the Health Department, by the owner or plumber, that the inspector may
visit and examine the work, and the Board of Health will not approve or permit a drain
which has not been examined by one of its inspectors and found to be properly constructed.
[209] See chapter on “Breaking up Streets.”
[210] The definition of house is as follows:—“House” includes schools, also factories
and other buildings in which more than twenty persons are employed at one time. (38 & 39
Vic. c. 55, s. 4)
[211] Notices, orders, and other such documents under this Act may be in writing or
print, or partly in writing and partly in print; and if the same require authentication by the
local authority, the signature thereof by the clerk to the local authority or their surveyor or
inspector of nuisances shall be sufficient authentication (38 & 39 Vic. c. 55, s. 266).
[212] Having obtained admission to the premises, the inspection of the alleged nuisance
should be so conducted as to enable the local authority to determine whether it exists, or
whether it existed at the time the notice was given, and whether, although it has since been
removed or discontinued, it is likely to recur or to be repeated; and in all cases it will be the
most expedient course to reduce to writing the result of the inspection. When the inspection
is made by an officer of the local authority, it will also be expedient for that authority, on
receiving the report of their officer formally and in writing, to record the conclusions to
which they have come after considering his report in order to ground further proceedings.
(Vide ‘Law of Public Health and Local Government,’ by W. C. and A. G. Glen, 8th edition,
p. 81.)
[213] For ample information on the subject of house drainage and similar subjects see
the following books, etc.:— Bailey Denton’s ‘Sanitary Engineering’; Baldwin Latham’s
‘Sanitary Engineering’; Buchan’s ‘Plumbing’; Slagg’s ‘Sanitary Work’; Hart’s ‘Manual of
Public Health’; Hellyer’s ‘Plumber and Sanitary Houses’; Galton’s ‘Healthy Dwellings’;
‘House Drainage,’ by W. A. Tylor; Philbrick’s ‘American Sanitary Engineering,’ and many
others, besides the numerous reports of the “Health of Towns Commission,” and several
articles in the Sanitary Record, the Sanitary Engineer of New York, and Mr. Rawlinson’s
‘Hints,’ all of which should be studied by the town surveyor.
[214] In some parts of the north of England taper pipes are used about 20 inches in
length, the internal diameter of the larger end being slightly greater than the external
diameter of the smaller end, thus allowing the small end of one pipe to enter the large end
of another. Continuous lengths of cement pipes made in situ are also now being introduced.

Page 273

CHAPTER XXVII.
PUBLIC PLEASURE GROUNDS AND STREET TREES.

Amongst the clauses of the Public Health Act 1875 which affect the duties
of the town surveyor will be found the following:
“Any urban authority may purchase or take on lease, lay out, plant,
improve, and maintain lands for the purpose of being used as public walks
or pleasure grounds, and may support or contribute to the support of public
walks or pleasure grounds provided by any person whomsoever.
“Any urban authority may make bye-laws for the regulation of any such
public walk or pleasure ground, and may by such bye-laws provide for the
removal from such public walk or pleasure ground of any person infringing
any such bye-law by any officer of the urban authority or constable” (38 &
39 Vic. c. 55, s. 164).
There are very few, if any, cities or towns in this country that have not
availed themselves of this clause, even if they did not already possess one if
not more public parks or pleasure grounds of some description, these
having either been given by some benevolent citizen or acquired in some
other manner by the urban authority.[215]
Included in the powers given by the above clause are no doubt those
regulating the acquisition and support of recreation or public playgrounds,
public walks, or old city walls or other places, and disused burying grounds.
[216]
In connection with the above clause of the Public Health Act, the town
surveyor may have the following duties to perform:
To advise his corporation upon the value, suitability, and desirability of
any site that is intended for use as a public park or recreation ground, and
after its acquisition to adapt it for the requisite purposes. To effect this it
must be drained and laid out with carriage-drives, walks, lawns, flower-
beds, plantations, and sometimes streams, waterfalls, and lakes. He must
design and erect the necessary lodges, entrance gates, fences, shelters, seats,

Page 274

[217] band-stands, and fountains, and must afterwards superintend the
maintenance of these and the rest of the works in connection with the
pleasure ground.
It would be impossible to lay down any rules for the guidance of a
surveyor in carrying out these works, for each case must be dealt with as its
exigencies require, and a great deal of common sense, as well as
engineering, architectural, and artistic skill must be displayed by him in
carrying out any works of this description, details of which could not
possibly be given in a book of this size dealing with so many subjects.[218]
A few suggestions may, however, be of some service on these points.
Public playgrounds for children should be composed of large, level, well-
rolled, gravelled spaces, with a few trees for shade, and some sheds for
shelter. Turf soon gets spoiled and worn bare, when it is not so pleasant as
well-rolled gravel, as it is far more dusty in dry weather and very damp in
wet, besides having an uncared-for appearance.
In public parks, shrubs planted singly directly on the lawns without any
beds around them have a very pleasing look, although it adds somewhat to
the difficulty of mowing the grass. The grass itself is greatly improved if it
is well dressed with manure in the spring and constantly watered all the
year round.
Paths should be gravelled in the autumn, care being taken to wait until all
the leaves have fallen, which are swept up and removed at once. A good
fence for a path, if any protection is necessary, is either a strained wire
fence or cast-iron hoops representing bent sticks. They are both cheap, and
stand well against weather and rough treatment.
A very economical and neat border to the footpaths can be made from the
old used-up flagstones from the foot pavements of the streets, these cut up
and placed on edge, especially if in conjunction with a pitched channel
gutter of pebbles, look remarkably well.
Ornamental flints make a pretty border, but they are nasty things for a
child to fall upon.
For flower-beds a flat border or edge of ivy has a very telling effect. If
there are ponds or lakes in the park there should be a broad path or road
close to the water’s edge. It is surprising what a great advantage in effect
this has over the plan of leaving a strip of green between the path and the
water.

Page 275

The selection of the proper shrubs for a park and their distribution is a
matter that requires the advice of an expert gardener. The following list of
ordinary shrubs that will thrive well almost anywhere in this country may
however be of use for reference:
Aucubas.
Azaleas.
Box.
Berberises.
Euonymus.
Hollies.
Ivies.
Laurels.
Lilacs.
Mahorrias.
Pampas grass.
Privet.
Rhododendrons.
Thorns.
Yuccas.

With regard to the selection of trees, this also requires skilled advice, but
a list is given further on in this chapter, of trees suitable for street planting,
which may be also some guide in this respect.
In high gales of wind the surveyor may be expected to endeavour to save
valuable trees in a public park from being blown down. This may
sometimes be effected by a judicious application of chains or ropes, but the
better plan is to keep all trees well pruned and as free as possible from “top
hamper” and undue leverage from overhanging limbs.
On the pruning of trees and the removal of large limbs I must refer my
readers to a most admirable little book recently published in America, being
a translation from the celebrated ‘Treatise on Pruning Forest and
Ornamental Trees, by A. des Cars,’ which enters most fully into the subject,
and being of great practical value, should be studied by anyone who has
anything to do with the care of forest or other trees.[219]
With regard to the planting of trees along the sides of streets, our French
neighbours are much in advance of us.[220] It is true that in this country,
owing to the much larger consumption of coal as a domestic fuel, there is
more soot in the air, but it is erroneous to suppose that trees will not thrive
well in England. No doubt the moisture of our climate causes the soot or
“blacks” to adhere to the leaves and limbs of the trees, but for that reason

Page 276

deciduous and not evergreen trees should be selected for planting in towns,
and these, if well chosen and carefully planted, will most undoubtedly fully
repay their first cost and maintenance by the additional beauty to the street,
the agreeable shade they cast, and their generally healthful action on the
population.
In selecting trees to plant along the sides of the streets or roads in any
towns, it is well to bear in mind that the following qualities are
necessary:—
The tree must be hardy; it must not be affected by a long-continued
drought; heat must not wither it nor make it look rusty; it must be able to
withstand dust, smoke, soot, foul air, and the insidious attacks of insects,
and be able to recover from any malicious or accidental injury it may
receive.
The tree must be of rapid growth, and develope a straight, clean stem
with shady foliage. It must be graceful either in full leaf or when bare as in
winter; its roots must not require too much room, and they must be able to
withstand the effects of pollution or rough treatment.
Although the foregoing list of requirements may seem rather formidable,
yet amongst the trees whose names now follow there will be found some
which meet many, if not all of these requirements, and which, if properly
planted with all reasonable care, may be expected to thrive if planted at the
sides of the streets in any town in this country.

List of Trees suitable for Planting
at the Sides of Streets.

Page 277

Western Plane.
Lime.
Maple.
Horse Chestnut.
Elm.
Tulip tree.
Lombardy Poplar.
Ash.
Willow.
Beech.
Birch.
Oak.
Sycamore.
Copper Beech.
Pawlonia.
Ailantus Glandulosa.
Laburnum.
Lilac.
Almond.
Peach.
Hawthorn.
Acacia.
Double Cherry, etc.

Of the above list the western plane for many reasons is the most
desirable. Its freshness when it bursts into green buds is well known, and it
is proverbial for its hardiness.
The lime was at one time the most popular tree for this purpose, but it has
several defects, the most notable being that its leaves wither before the
summer is over, and the tree assumes a lifeless look at a time when most
shade and freshness are required of it.
Of the remainder of the trees I have enumerated some are slow in growth,
which is a considerable drawback; others are not wholly free from being
affected by cold winds in the spring or by lice in the winter, and the
assistance of an expert is very necessary in selecting trees for this important
purpose.
Whatever trees are selected, the following precautions should be taken:
The young tree should have been well nourished in its nursery before
removal, and should on no account be planted in the street until its stem is
nearly 10 feet in height and about 3 inches in diameter. The stem should be
clean and straight, and the whole tree symmetrical.

Page 278

The great difficulty in this country is to obtain sufficient numbers of trees
of the exact size and description, when it becomes necessary to plant out a
street. They have often to be imported, when it is found that they are
frequently unsuited both for soil and climate, besides being very costly;
thus many failures have arisen in consequence. To obviate this necessity in
Paris the Government have for many years instituted and maintained special
nurseries where trees are grown for this purpose alone, these nurseries
being situated at Passy, the Jardin Fleuriste, and Petit Buy, no less than 115
men being constantly employed in the work. Some further particulars will
be given presently on the cost of this work.
The trees thus nourished and selected should be planted in the autumn,
for there is a well-known saying that “a tree planted before Christmas can
be ordered to grow; if planted after Christmas it must be asked to do so”;
and there is no doubt that if trees are planted too late in the season great
difficulty in getting them to grow is generally experienced.
The excavated pits must be well drained, and filling the bottom of the pit
with rubble is a good plan. The further the tree can be planted from the kerb
the better, so as not only to give it a larger body of soil, but to lessen the
risk of killing the tree by the pollution of the ground with gas from a
defective main, and also excess of moisture from the channel gutters. The
distance apart of the trees is a matter of choice. In Paris this is only 16 to 18
feet, but I think half a chain (33 feet) is quite close enough; it economises
trees and gives plenty of room for the limbs of each tree to spread, and the
intermediate lamp-posts, watering hydrants, or other standards are not
crowded out.
Each tree should have a cast-iron grating around its roots similar to the
following drawing:—

Page 279

This should be about 4 feet square. It prevents the ground getting hard
about the trees, and permits air and water to enter to the roots. It also makes
it easy to give any attention to the trees that they may require when young,
such as manuring, digging, &c.
The tree should also be protected with a slight iron grill or railing to
prevent mischievous persons from cutting their names on the trunk,
climbing up into the tree, or breaking off its branches whilst still young.
The following sketch shows the description of grill necessary, which is
light, cheap, and at the same time effective.

Page 280

The following interesting particulars of the manner in which street
planting of trees is conducted in Paris will be useful, and are given in
extenso:[221]
“When the boulevarde is marked out and levelled, if the soil is of bad
quality, as is nearly always the case, trenches are dug in the footway from
one end of the boulevarde to the other. The width of this trench is usually
about 6 feet, and its depth 4 or 5; and before filling it in drain-pipes are laid
along the sides made with lapped joints so that the roots shall not enter
between them. The trench is then filled with good garden earth, raising it a
little higher than the level so as to allow for settling. In this ground the trees
are planted about 6 yards apart. They should be carefully chosen with
perfect roots, and moderately pruned. Formerly the stem was cut at about 9
feet from the ground, but this had the bad effect of preventing the top of the
tree from being straight, and the practice has been given up. The trees are

Page 281

next staked and tied with wire over a neat wad of straw, which prevents all
injury to the stem. A protecting cage, neither heavy nor very expensive, is
placed round the tree to prevent accidents; and if the weather be at all dry at
the time of planting, the trees are copiously watered.”
The cost of planting a tree in the Paris boulevarde is thus given:[222]

fr. c.
15 cubic metres of excavation at 4 francs = 60·00
15 cubic metres of vegetable mould at 4 francs = 60·00
Training poles about 5 metres in height = 1·50
121·50
Average deduction of 15 per cent. resulting from letting by tender 18·23
Price by contract 103·27
Pipe drainage and materials 11·15
Watering appliance (average) 2·50
Cast iron grating round the base 46·69
Transport of tree from nursery 2·00
Planting, including stakes 3·00
Iron basket (to protect stem) 8·70
The tree 5·00
Labour for planting 1·69
184·00

The maintenance of each tree costs 1·58 francs.
The total cost, therefore, of each tree capitalised reaches about 8l., and its
life is said not to exceed twelve years.
Before closing this chapter it is well to advert to the evident importance
that the legislature attach to the planting and preservation of trees along the
sides of the public streets in this country and their desire to protect them, as
the following clause of the Public Health Act 1875 will show. “. . . Any
person who, without the consent of the urban authority, wilfully displaces or
takes up, or who injures the pavement, stones, materials, fences, or posts of,
or the trees in any such street shall be liable to a penalty not exceeding five
pounds, and to a further penalty not exceeding five shillings for every
square foot of pavement, stones, or other materials so displaced, taken up,
or injured; he shall also be liable in the case of any injury to trees to pay to
the local authority such amount of compensation as the court may award”
(38 & 39 Vic. c. 55, s. 149).

Page 282

It is a great source of regret that mischievous persons can be found who
by their wilful malice injure the trees planted at the sides of streets out of
the public funds and with great expense and trouble.

[215] By the “Commons Act 1876,” powers were given to acquire and lay out commons
for purposes of public recreation, etc.
[216] Upon this latter point Vide 24 & 25 Vic. c. 61, s. 21.
[217] As a preservative against the malicious disfigurement of wooden seats, I have seen
the following inscription placed upon some seats in an old public park, “Never cut a
friend,” and it had apparently the desired effect.
[218] As an instance of the size and importance works of this description may assume,
the Bois de Boulogne, Paris, is an example. It covers an area of 2000 acres, of which one
half is forest, one quarter is grass, one-eighth roads, and about 70 acres is water. One of the
most beautifully arranged public parks in this country is Sefton Park, Liverpool, where the
most perfect arrangements of lawns, plantations, lakes and drives, have been carried out.
[219] ‘A Treatise on Pruning Forest and Ornamental Trees,’ by A. des Cars, translated
from the 7th French edition, with an introduction by Charles S. Sargent, etc. Published by
A. Williams and Co., Boston, U.S.A., 1881.
[220] In Paris in the year 1880, there were 90,000 trees in the streets, besides 20,000
more in the cemeteries. (Vide Report of Mr. Till, the Borough Surveyor of Birmingham,
20th December, 1880.) There are also upwards of 8000 seats in public places; the trees and
seats costing nearly 100,000l. per annum to maintain.
[221] Vide ‘The Parks, Promenades, and Gardens of Paris,’ by W. Robinson, F.L.S.,
1869, p. 128.
[222] Vide ‘L’Architecte,’ 20th November, 1880, p. 370.

Page 283

CHAPTER XXVIII.
PUBLIC ABATTOIRS.

The following is the clause of the Public Health Act 1875 which empowers
an urban authority to establish public slaughter-houses (or “abattoirs“[223] as
they are sometimes called) for the purposes of the district they govern:
“Any urban authority may, if they think fit, provide slaughter-houses, and
they shall make bye-laws with respect to the management and charges for
the use of any slaughterhouses so provided.
“For the purpose of enabling any urban authority to regulate slaughter-
houses within their district, the provisions of the Towns Improvement
Clauses Act 1847, with respect to slaughter-houses, shall be incorporated
with this Act.[224]
“Nothing in this section shall prejudice or affect any rights, powers, or
privileges of any persons incorporated by any local Act passed before the
passing of the Public Health Act 1848, for the purpose of making and
maintaining slaughter-houses” (38 & 39 Vic. c. 55, s. 169).
The great necessity for the establishment of one or more public slaughter-
houses in any town can only fully be realised by persons who will take the
trouble to inspect those which are private; they are generally placed near the
shops of the butchers for the sake of convenience, the result being that they
are situated in the central portions of the town and are thus surrounded by
closely packed dwellings. The private slaughter house often consists of a
stable or shed which has been converted into an ill-designed slaughter-
house, badly paved, with imperfect drainage; they are frequently not
sufficiently lighted, ventilated or drained, and are utterly unfitted for the
purposes for which they are used.
Their position also is often so badly chosen that the children in the
vicinity resort there to see the animals killed, and the poor beasts have in
some cases to be driven through a narrow passage into the slaughter-house
itself, where, trembling at the sight and smell of the blood and carcasses of

Page 284

its dead companions, it remains tethered until its turn comes to fall a victim
to the blow of the slaughter-man: a blow which sometimes has often to be
repeated before its object is attained, owing to the bad light and cramped
surroundings of the place.
As these slaughter-houses are generally rented by the butcher using them
at large rentals (such accommodation being scarce), it is not to be expected
that he will spend much money to improve property which is not his own;
but notwithstanding the loss of weight incurred by the animal to be
slaughtered thus fretting and sweating in its terror, the damage to the meat
by its being dressed in the same locality with the live beast, steaming and
smelling in the vicinity, and the exorbitant rents demanded, still there are
great objections always raised by butchers in towns to the establishment of
public slaughter-houses. These objections are based by them on the
following grounds:
They contend that the carriage of the meat from the slaughter-house to
their shop deprives them of some of their profits; that slaughtering their
animals in the presence of other butchers leads to disparaging remarks and
trade jealousies, and that they sometimes are robbed of fat, tools, &c.
These arguments are groundless if the public abattoir is properly
designed, is in a suitable locality, and is well managed.
There are no powers by which butchers can be compelled to abandon
private slaughter-houses, and use those provided by the urban authority, so
long as the bye-laws of the authority are not infringed; but as the law stands
at present, private slaughter-houses may be licensed (10 & 11 Vic. c. 34, ss.
125, 126) or registered (10 & 11 Vic. c. 34, s. 127), and the only manner in
which they could be closed (which would then compel the butcher to use
the public abattoir) would be by putting the 129th section of the same Act in
force, which states that the justices before whom any person is convicted of
killing or dressing cattle contrary to the provision of the Act, or of the non-
observance of any bye-law or regulation of the local authority, in addition to
the penalty may suspend the licence for any period not exceeding two
months; or in the case of the owner of any registered slaughter-house may
forbid for any period not exceeding two months, the slaughtering of cattle
therein. For a second or other subsequent like offence, in addition to the
penalty the justices may revoke the licence or absolutely forbid the
slaughtering of cattle in the particular house or yard. In such an event the
local authority may refuse to grant any licence whatever to the person

Page 285

whose licence has been revoked, or on account of whose default the
slaughtering of cattle in any registered slaughter-house has been forbidden.
With reference to the establishment anew of the business of a slaughterer
of cattle in London, the following particulars required to be deposited by
the applicant with the Metropolitan Board of Works will be useful.
A plan of the premises and sections of the building drawn to a scale of ¹⁄₄-
inch to the foot and showing the proposed or existing arrangements for
drainage, lighting, ventilation, and water supply, with a key plan of the
locality, have to be deposited, as well as replies to the following questions:
(1.) State what place for the accommodation or poundage of the cattle
about to be slaughtered is provided; if such place has an entrance way for
the cattle otherwise than through the slaughter-house; if separated from the
slaughter-house by a brick partition with a door; and also what provision is
made therein for watering animals.
(2.) State if slaughter-house and its poundage is within 20 feet of an
inhabited building; and if it has any entrance opening directly on a public
highway.
(3.) State if the entrance to the premises is apart from and independent of
any shop or dwelling-house; if from a street at the side or rear; and also the
height of the entrance gates.
(4.) State the dimensions of the slaughter-house, length, breadth, height
to eaves, and construction of the roof; and give similar information about
the poundage.
(5.) State if slaughter-house and poundage are drained by glazed pipes
communicating with public sewer, or how; how drains are trapped; and if
gratings have openings greater than three-eighths of an inch across.
(6.) State if floors are below level of outside road or footway, and if
paved with asphalte, or flag-stone set in cement, or how.
(7.) State how walls of slaughter-house are constructed, and if they are
covered with hard smooth and impervious material to a height of at least 4
feet; and, if so, state what material is used, and to what height it is carried.
(8.) State how slaughter-house and poundage are lighted, if with lantern,
sky, or side-lights, or otherwise.
(9.) State how ventilated, if by openings, windows, louvre boards, or
otherwise.
(10.) State what provision is made for water-supply, the capacity of the
cistern, and at what height it is placed above floor level.

Page 286

(11.) State if any watercloset, privy, urinal, cesspool, or stable, is within,
or communicates directly with the slaughter-house.
(12.) State if any rooms or lofts are constructed, or proposed to be
constructed, over the slaughter-house.
(13.) State if the premises will be provided with all the necessary and
most approved apparatus and tackle for the slaughtering of cattle.
Having thus far dealt with private slaughter-houses, I will now turn to the
question of the provision of public establishments of the kind by the urban
authority, for it is usually the duty of the town surveyor to advise his
corporation upon such a matter.
First, as to the site of the proposed public abattoir, this depends greatly
upon what sites are at the command of the town; it should if possible be
near the cattle market to prevent the passage of animals through the streets,
not only on account of the great public inconvenience, but also the loss of
weight to the animal[225] and the heated and bad state into which its blood
becomes from the exercise, and the violent blows of the drovers’ sticks.
The site would be isolated and yet not too far from the shops of the
butchers, or the cost of carriage of the meat will be considerable; it is
almost needless to say that it should be easily and effectively drained, and
the more air with which it can be surrounded the better. It is imperative that
the entrance for the live beasts should be separate from the exit of the dead
meat, and the approach roads to the site should not be narrow.
In laying out the site every town surveyor must use his own judgment,
but the following plan on which the site of the excellent public abattoir at
Manchester is laid out may serve as some guide for this purpose, although
of course this establishment is on a very large scale indeed, and is in
connection with a carcass market more than 500 feet in length:

Page 287

PLAN OF MANCHESTER SLAUGHTER-HOUSE.
Large illustration (78 kB)

In designing an abattoir on a large scale provision for the following
accommodation should be considered.
(1.) Lairs for cattle and pens for sheep.
These should be separated from the slaughter-house by a smaller
temporary lair in which the beast whose turn has come can be fastened to
the halter by which he is dragged into the slaughter-house, the sides of the
door-way being lined with iron for this purpose. The paving of the lairs may
be of asphalte, but care must be taken that near the door of slaughter-house,
the paving is of pitchers or something that is not at all slippery, as here the
frightened beast often struggles and draws back when he sees the “engines
of destruction” in the slaughter-house, and smells the blood of those who
have gone before.
The lairs must be thoroughly well drained, lighted, and ventilated, and
troughs for hay and water placed for each beast, for although the animals
are not expected to remain long in the lairs before being killed, still it is
very important that they should be well and kindly treated, and rest, so that
they may obtain their normal condition before being killed.

Page 288

A door easily closed should shut off the lair from the slaughter-house, as
it is open to question, if animals do not see with fear the hapless fate of their
comrades; for this and other obvious reasons the animals must on no
account be permitted to pass through the slaughter-house to reach the lair.
The lairs should be well lighted artificially, as a great deal of slaughtering
is conducted before and after daylight.
(2.) The slaughter-houses.
These may be separate or in one long building used in common by the
butchers; both systems have their advantages and disadvantages.
The long building has the advantage of greater economy in erection and
of management, as one inspector can see from end to end of it. Where also a
large site is not available greater advantage can be taken of a slaughter-
house erected on this plan, as several butchers can slaughter in turn; the
lairs, however, must be kept separate. The butchers do not like this plan, but
prefer privacy, and a great deal of “horse play” is sometimes indulged in by
the slaughtermen at work in a large building. The method of payment for
the use of a slaughter-house of this description cannot well be by rent, but
by head of animal slaughtered, and this is open to the objection of possible
fraud. It is necessary also to have separate slaughter-houses for the sheep
and the pigs.
Whether the slaughter-houses are constructed separately or in one long
building, the detail requirements are much the same.
The pavement of the floor should be placed on concrete and it should be
constructed of some material that is easily cleansed, is impervious to
moisture, and is not slippery either wet or dry. It must also be of sufficient
durability, and be strong enough to bear the weight of the dead-meat carts
which have to back in over it under the beams carrying the carcasses,
should there be no dead meat market in connection with the slaughter-house
as at Manchester, Dundee, &c.
The requirements of such a floor are met by good natural compressed or
mastic asphalte. The necessary holes for the reception of the flaying sticks
used in many parts of England can be easily managed by inserting either
small brass sockets specially made, or more simply by pieces of gas-pipe
cut into lengths of about an inch set tight in the asphalte.
The walls of the slaughter-house must be of sufficient strength to carry
the beams or girders of the overhead hoisting gear, as well as some tons of
hanging carcasses, as will presently be explained.

Page 289

The inside of these walls must be lined to a height of about 6 feet above
the floor line with some material which is impervious and easily cleansed.
Glazed white tiles or bricks are sometimes used for this purpose, but are apt
to get chipped or broken, and I have found that asphalte, although dark in
colour, answers the purpose admirably, and is much cheaper.
With regard to the drainage of the slaughter-house, this should, if
possible, be so arranged that there are no gratings or gully-pits in the house
itself. The floor should fall about 1 in 30 from the lairs to the cart doors, so
that everything should pass outside into a gutter in which the necessary
gratings and gully-pits can be arranged. If this is thought to be
objectionable, pits with double gratings, the lower one being only a plate
with perforated holes, can be placed in the slaughter-house so as to prevent
any solid matter whatever from entering the drains, and these pits can be
united by short drains with gully-pits outside. The double grating should in
any case be inserted, as by this means all solid matter is kept out of the
drains: a very important consideration.
The cart doors should be made sliding, and not hinged, or great
inconvenience will be experienced, and they must be made wide enough for
the carts to back in easily.
In some slaughter-houses the killing ring to which the beast is attached
whilst the blow from the poleaxe is given[226] consists of a strong horse-
shoe shaped piece of iron projecting about 24 inches from the wall at a
height of about 18 inches, and having a ring in the top curve, thus—

Page 290

whilst in others the killing ring is on the floor, thus—

and in others an iron pillar standing up from the floor is used, which is
considered the best plan, as the beast should stand in a natural and easy
position at about a right angle from the feller.
The lighting of the slaughter-house should be effected from the roof, as a
good and steady light is essential to the men engaged in this business. An
awkward cut may seriously damage good beef or mutton. Care must,
however, be taken to exclude the glare of the sun, and the ventilation should
be carefully arranged by louvres easily manipulated.
Water should be plentifully laid on at a good pressure, so as to ensure
thorough flushing, &c., and the necessary taps should be recessed in the
walls, as everything in a building of this description should be kept as flush
as possible, or it will be damaged. In some slaughter-houses hot water is
laid on, and this is a great boon to the butchers and much appreciated by
them.
Gas must of course be laid on, as much slaughtering takes place during
the night.
The machinery for hoisting the beasts and slinging the carcasses requires
to be effective, simple, and very strong, as it is subjected to the roughest
treatment, and such machinery has been patented and is erected by Messrs.
John Meiklejon and Son, of Dalkeith, on very reasonable terms.[227]

Page 291

This machinery hoists the beast by simply pulling on an endless chain. It
remains suspended at any height, and can be equally easily lowered. The
divided carcass can be placed upon hooks at any point along the girders
above without being touched, and it can be taken off again and lowered on
to a man’s shoulders or into the cart direct, and in fact, speaking from my
own experience, this machinery is very perfect.
The carcasses of the sheep are hung by hand upon hooks projecting from
rails which are placed at a convenient height around the walls of the
slaughter-house.
In some abattoirs the sheep slaughter-houses are distinct from those used
for killing beasts, and this method has many advantages.
Before proceeding to describe the further requirements of an abattoir or
group of slaughter-houses, I think the following plan will be of use to show
the arrangement which I have described with regard to lairs and
slaughter-houses:—

Page 292

Large illustration (133 kB)

The following plan shows the arrangements adopted in the Metropolitan
Cattle Market slaughter-houses:

Page 293

METROPOLITAN CATTLE MARKET SLAUGHTER-HOUSES.

(3.) The condemned meat department.
This should consist of a lair for suspected cattle, a lair and slaughter-
house for the condemned cattle similar to that already described, and a
condemned meat store: this being the place where not only all the diseased
animals’ carcasses are temporarily stored pending destruction, but also any
meat of sound beasts that may have gone bad after killing, &c. The whole
of the meat thus placed in the condemned store must be taken to the
boiling-down house, where it is destroyed by being boiled down to fat,
which is disposed of for various trade purposes.

Page 294

The following description of the method employed for this purpose at the
Deptford Foreign Cattle Market will here be of use:[228]
“There are several killing houses for diseased cattle, and excellent
apparatus for boiling down condemned meat. For this purpose two boilers
are suspended from a strong platform through which they pass, and the
bottoms of them are several feet above the floor. They are each 4 feet 6
inches in diameter and 10 feet in length under platform. At the bottom the
cylinder tapers to 2 feet 8 inches in diameter. Under this there is a
semispherical bottom to the boiler hinged and kept shut by a back-weighted
lever and screws. On the top of each there is a semispherical cover and
safety valve.
“There is an iron crane and windlass for lifting off and on the covers.
After the boilers are charged with diseased meat the covers are made secure
and steam let into them near the bottom. There is a cock in the bottom of
each for running off the liquid at certain stages into a trap grating in the
floor under it, and conducted into a cement cistern outside of the boiling-
house, from which it is periodically removed. Whether any use is made of
the tallow produced I am not informed. The bones when removed are quite
porous, of a very white colour, and nearly as light as cork. I presume that
they will be sold for being converted into bone manure. I understand these
large boilers are not very often used, and that a small close galvanized iron
cylinder, 2 feet 9 inches in diameter, and 2 feet 6 inches high, placed 15
inches above the ground, having cock at bottom, steam pipe at side, and
portable lid, does most of the work very efficiently.”
(4.) The pig-killing department.
This should be separate from the ordinary slaughter-house, as the styes
for pigs must be differently arranged to the cattle lairs, and a boiler house is
necessary, as boiling water must be had for scalding and dressing the
carcasses. Special iron troughs with false bottoms have been arranged by
Messrs. Meiklejon, which greatly facilitate this part of the butcher’s work,
and simple hoisting apparatus over these troughs lifts the carcase in and out,
and carries it off to the cooling or hanging room, which must of necessity
be separate from the killing and scalding rooms. Drainage, lighting,
ventilation and floors should be similar to those described for the slaughter-
houses, and plenty of lime wash can be used with advantage here as well as
in the main slaughter-house.
(5.) The blood house.

Page 295

The blood of the slaughtered animals, which formerly was allowed to run
away, has been found to contain a most valuable aniline dye, and for this
purpose it is now collected and taken to the blood-houses, where in order to
obtain this dye it is necessary to place the blood in shallow tins, where it is
warmed by steam-pipes, the liquid is then drawn off, which is the albumen
from which the dye is extracted, the residuum left in the trays is of the
consistency of jelly, and is sold for manure.
(6.) The tripery.
This is provided in large abattoirs for the purpose of preparing the tripe
and feet of the slaughtered animals, and in the Glasgow public slaughter-
houses this is effected by the corporation free of charge by special
machinery adapted for the purpose.
(7.) The tallow market.
Where tallow is melted down, and moulded in shapes for manufacturers’
uses.
(8.) The hide store.
This is where the hides and sheep skins are weighed and temporarily
stored, sometimes in connection with this are—
(9.) Sale rooms; for the hides, skins of sheep, &c., and tallow.
In addition to the above requirements may be mentioned,
(10.) A superintendent’s dwelling-house and office.
(11.) A gate keeper’s dwelling-house and office.
(12.) A weighing machine and office.
(13.) A convenient room for the meetings of the committee of the
corporation having charge of the slaughter-house.
(14.) Waiting rooms for dealers, drovers, slaughtermen, and butchers, &c.
(15.) Store-rooms and a joiner’s workshop.
(16.) Stables and shedding for the horses and carts of the jobbers and
butchers, &c.
(17.) Lofts for straw and hay; the former should be provided free by the
corporation, the latter on payment of so much per diem for each beast.
(18.) The necessary urinal and w. c. accommodation.
With regard to the provision to be made for storing the dung and waste
refuse from public slaughter-houses, I am strongly of opinion that there
should not be any fixed receptacle for such matters, but that covered carts
should be provided, which could stand in convenient positions and be

Page 296

removed every day, a fresh and clean cart being substituted at once for the
one removed; by this means all nuisance is avoided.
Speaking of public abattoirs, in a recent lecture on Industrial Nuisances,
Dr. C. W. Chancellor, of the Maryland State Board of Health U.S.A., gives
some advice on the management of slaughter-houses. He says: “During the
process of slaughtering as much care as possible should be taken to prevent
the discharge of blood or other animal matter upon the floor of the
slaughter-house, upon the surrounding earth, or into an open stream. The
contents of the viscera should, with the blood, offal and other garbage, be
placed in impervious, covered, moveable receptacles, constructed of
galvanized iron or other non-absorbent material, and removed from the
premises without undue delay. Where hides or skins are necessarily retained
for a day or two before they can be removed, they might without injury be
advantageously brushed over on the fleshy side with a solution of carbolic
acid or some other antiseptic. Fat should be freely exposed to the air in a
cool place. As soon as the slaughtering is completed the whole slaughter-
house, floor and walls, should be thoroughly washed. All the vessels and
implements used in the slaughtering should be kept clean and sweet.
Deodorizers may sometimes be used with advantage.”
There can be no doubt that whereas private slaughter-houses are
frequently a most injurious nuisance to the neighbourhood in which they are
placed, owing to their situation and construction, and a visit to one of them
is likely to give a strong impetus to vegetarianism, the public abattoir, on
however large a scale, if properly constructed and managed, need be no
nuisance whatever, and every town in the kingdom should endeavour to
obtain one, not only on account of the nuisance caused by private slaughter-
houses, but for the incentive which is given to butchers to abstain from
slaughtering diseased or unwholesome animals, the prevention of cruelty,
and the material benefits derived in a proper establishment for the best
methods of dressing the meat.

[223] The word “abattoir” is a French word from “abattre” to fell, it is used in this
country to designate a group of slaughter-houses.
[224] The clauses referred to are contained in 10 & 11 Vic. c. 34, and are ss. 125, 126, et
seq.; they refer to the registration, licensing and management of private slaughter-houses,
and need not be commented upon here.
[225] An ordinary beast is said to lose 3 cwt. in weight in a journey from Edinburgh to
London.

Page 297

[226] The pole-axe should be of the American pattern, which has a head hollow and very
sharp round the periphery. The practise is, after the blow is struck and the animal felled, to
plunge a thin cane into the wound, which passes down the spine, causing instantaneous
death whilst the animal is lying stunned.
[227] The following is from the patent specification of this machinery:
“Letters patent to John Meiklejon, of Westfield Iron Works, Dalkeith, in the County of
Mid-Lothian, Scotland, for the invention of new or improved machinery and appliances to
be used in hoisting, removing, dividing, and hanging on hooks, taking off these hooks
again, and loading carcasses and other bodies in abattoirs, carcass and meat markets, and
other places.”
“The machinery and appliances above referred to enable the operations above named to
be performed without the necessity of the butchers touching the meat. Also enables
carcasses to be conveyed from abattoirs to carcass market on a travelling hoist (hereafter
described), same being provided with rows of fixed jointed hooks or loops, attached to rails
on which the hoist runs, so that the travelling hoist is enabled to hang the carcasses or
bodies on to such hooks or loops. Also enables a butcher to hang a carcass on any of these
hooks or loops, and pick them off again, and load on a vehicle, without moving or touching
any of the other carcasses hanging on the other hooks. Also enables all operations to be
performed, from hoisting when killed to loading when sold or removed from market.”
[228] Vide ‘Report on the New Cattle Market and Abattoirs proposed to be erected at
Carolina Port, Dundee,’ by William Mackison, F.R.I.B. A., &c.

Page 298

CHAPTER XXIX.
MARKETS.

Under certain conditions urban authorities are empowered to provide
markets in their district by the following clause of the Public Health Act
1875:
“Where an urban authority are a local board or improvement
commissioners, they shall have power, with the consent of the owners and
ratepayers of their district, expressed by resolution passed in manner
provided by Schedule III. to this Act, and where the urban authority are a
town council they shall have power, with the consent of two thirds of their
number, to do the following things, or any of them, within their district:
“To provide a market place, and construct a market house and other
conveniences, for the purpose of holding markets:
“To provide houses and places for weighing carts:
“To make convenient approaches to such market:
“To provide all such matters and things as may be necessary for the
convenient use of such market:
“To purchase or take on lease land, and public or private rights in markets
and tolls for any of the foregoing purposes:
“To take stallages, rents and tolls in respect of the use by any person of
such market:
“But no market shall be established in pursuance of this section so as to
interfere with any rights, powers, or privileges enjoyed within the district by
any person without his consent” (38 & 39 Vic. c. 55, s. 166).
In many towns, markets both for cattle and general merchandise have
been already established, and the duties of the town surveyor are simply to
execute the necessary alterations and maintenance of the buildings in
connection with them, but there may be occasions on which he has to
advise his corporation upon the acquisition of land for the purpose of laying

Page 299

it out as a cattle market, and afterwards the erection of the necessary pens
and buildings, and a few remarks upon the subject may be of some service.
The site for a cattle market should be selected, if practicable, near to a
railway station, so as to avoid as much as possible the dangerous and
objectionable practice of driving cattle and sheep through the streets, and
for the same reasons it should be near the public slaughter-houses if there
are any in the town. Plenty of space should be provided in the market for
the cattle to move about in, for it must be remembered that many of them
which are sent to market are unused to the bustle of a town, and are wild
and untractable, and have never in their lives been subjected to either
penning or tethering.
The site must be easily and effectively drained, it should be somewhat
isolated with respect to neighbouring buildings, the more air that can be got
to sweep through it the better.
The accommodation necessary in a cattle market must vary considerably
with the requirements of the district, but the following list may be given for
selection:
(1.) Pens or lairs for fat beasts.
(2.) Pens or lairs for store cattle.
(3.) Pens or lairs for cows with calves.
(4.) Pens or lairs for calves.
(5.) Pens for sheep.
(6.) Pens or styes for pigs.
(7.) Covered sheds or stables for horses.
(8.) A space for showing horses off.
(9.) Sheds for agricultural implements.
(10.) Shops for the display of seeds, ropes, tarpaulins, sacks, etc.
(11.) Accommodation for auctioneers.
(12.) Lodges and offices for the superintendent or gate keeper.
(13.) A weighing machine and office.
(14.) A corn exchange (this is sometimes provided in the general market).
The entrance to a cattle market may with advantage be provided with
double sets of gates, with a space between in which flocks of sheep or herds
of cattle can be temporarily penned; a wicket gate in the second set of gates
will enable the toll collecter to count the number of animals easily as they
pass through into the market.

Page 300

The paving of the market should be of granite pitches, as it is essential
that it should not be slippery, or the cattle, which usually arrive in a very
excited condition, will fall and injure themselves; this description of paving
is also fairly impervious, and is easily cleansed.
The paving of the lairs and pens may, however, be of asphalte.
For the cattle there may be enclosures for loose bullocks as well as
divisions in which the cattle are tethered; these divisions and enclosures
may be constructed of brick walls about 4 feet 6 inches in height, or posts
and rails of wood and iron, strongly fastened iron rings about 4 feet apart
are necessary to which the beasts must be tethered.
The paving must be kept high towards the head of the beast in order to
show him off to the greatest advantage.
Large painted signboards should be fixed over the entrance of each
compartment, to designate to which class it belongs, in order to avoid
confusion or mistake. There should be drinking troughs for all cattle, and
hydrants should be fixed all about the market, so that it can be thoroughly
flushed and washed down.
The sheep-pens can be constructed with iron or wood posts and rails with
the whole of one side opening as a gate, they should be about 3 feet in
height, and the floor should slope up from the point at which the purchaser
will stand in order that the sheep at the far end of the pen may not appear
diminutive.[229]
The gates of the sheep-pens should be strongly stayed, as they make most
convenient seats on which the drovers and heavy farmers sit whilst they
drive their bargains.
With regard to the dimensions of the pens and lairs, the following sizes
are suggested as sufficient spaces for different animals, in the modern bye-
laws, emanating from the Local Government Board in 1877, with respect to
markets:

For every horse 8 feet by 2 feet.
For every ox or cow 8 „ „ 2 „
For every mule or ass 5 „ „ 1 feet 6 inches.
For every calf 5 „ „ 1 „ 3 „
For every sheep, goat or pig (of medium size) 4 feet superficial.

Page 301

The pens for calves and the styes for pigs should be covered, and their
floors should be about 3 feet 6 inches above the general level of the market,
as animals of this description are generally brought in carts, and they could
thus be easily moved out and in.
These pens and styes must of course be thoroughly well drained and
ventilated.
With regard to the weighing machine, this should be of the best
manufacture, and be of sufficient size to weigh a large wagon. It is better to
have what is called a “self contained” iron foundation, and pit for the
weighbridge rather than one of masonry. A convenient size for this
weighbridge would be 15 feet in length by 12 feet in breadth.
With reference to the rest of the provisions I have enumerated, they
require no special comment, but must necessarily be left to the discretion of
the town surveyor and the wishes of his corporation.
Markets for general merchandise are usually handsome buildings, which
are erected in the most central positions of the town; they contain:
(1.) The corn exchange (this is sometimes erected in the cattle market).
(2.) The fish market.
(3.) The dead meat market (this is sometimes erected in connection with
the public slaughter-houses).
(4.) The game and poultry market.
(5.) The fruit, vegetable and flower market.
(6.) The butter, eggs and cheese market.
(7.) The miscellaneous goods market.
(8.) Public conveniences.
(9.) Offices and dwelling for the clerk of the market.
(10.) Committee room for the market committee.
The floor of the market should be on a level as much as is practicable
with the adjacent streets; steps up or down are objectionable for the public,
and galleries or upper floors should also be avoided unless the available
area of the site is limited.
The interior of the building should be lofty, and it must be thoroughly
well ventilated; the great fault with nearly all existing markets is the cutting
draught to which buyers and sellers are usually subjected.
Plenty of light is essential, but the rays of the sun should be excluded by
frosted glass or other contrivance, or the goods exposed for sale will be
damaged.

Page 302

The floor should be of asphalte or other similar material; it is surprising
what a “mess” is always made in a market.
The stalls must be so arranged as to show to best advantage the goods
offered, and plenty of “gangway” should be left between them for the
passage of the public.
Fish stalls should be constructed of iron, slate or similar material, plenty
of water being provided in this department; fish-washing troughs filled with
running water are very desirable, and a fountain can be introduced with
pleasing effect.
Butchers’ stalls should be of thick wood to resist the chopping, and
plenty of standards and rails provided with iron hooks must be fixed above
them.
A great number of moveable iron “offal boxes” should be placed in
different parts of the market, which must be cleared at least once a day, and
the market should be frequently flushed and cleansed with water from
hydrants fixed in different parts of the building.
Many other points will no doubt suggest themselves to town surveyors,
who have the important work of designing either cattle or general markets
to undertake, but the few suggestions which have been given may be of
some use.

[229] The following is a description of the manner in which the sheep are penned in the
cattle market of la Villette at Paris:—“The enclosures or pens are all of iron, those for the
sheep have a centre railing 3 feet 3 inches high, and cross railings 1 foot 9 inches high; the
former with three horizontal rails and vertical rods, and the latter two horizontal rails and
vertical rods. There is a distance of 15 feet betwixt the high railings, which is divided into
three by iron posts 21 inches high. The first row of these posts is placed at a distance of 3
feet from the low cross railing at the passage, the second row 18 inches from the first, the
third 3 feet from the second, and so on. The sheep are placed in line side by side as close as
they can stand, with their heads up to the low rail. A moveable hurdle of wood is then set
on edge between the sheep in rear and the iron posts just described. A passage of 18 inches
is left clear, and then another row of sheep and another passage, and so on. In this manner a
great number of sheep are put into little space, in such a way as all can be examined with
the greatest ease.” (Vide ‘Report on the New Cattle Market and Abattoirs proposed to be
erected at Carolina Port, Dundee,’ by W. Mackison, F.R.I.B.A., &c., Town Surveyor,
Dundee).

Page 303

CHAPTER XXX.
CEMETERIES.

Amongst the many duties that a town surveyor has to perform is sometimes
included that of laying out land for a large burial ground or cemetery, and
its management after construction. Power is given to all local authorities to
become burial authorities by the Public Health Interments Act 1879, and so
strongly is the need felt for what is called extramural interment, that the
Local Government Board may compel a local authority to provide and
maintain cemeteries. Power is also given for the compulsory purchase of
land for this purpose (see sections 175, 176, of the Public Health Act 1875),
and the cemetery may be placed either within or without the district over
which the local authority exercise their jurisdiction, and many other
privileges are granted in order to encourage the acquisition of land so far
removed from habitations as to make the burial ground as sanitary as the
practice of burying human bodies can be made.
Land once consecrated or used for burial cannot afterwards be sold or
used for secular purposes, except of course by an Act of Parliament;
“footpaths may, however, be provided in a consecrated but disused burial
ground, and the ground may be planted, so as in effect, though not
nominally, to make it a public garden.”[230]
A cemetery must not be constructed within 200 yards of any dwelling
house, without the consent in writing of the owner, lessee, and occupier of
such house; but there is no prohibition upon anyone to prevent their
building a house close to a cemetery after it has been established.[231]
Chapels may be built in cemeteries for the performance of the burial
services, and the grounds may be laid out and embellished as the local
authority may deem fit. The cemetery must be enclosed by walls or other
sufficient fences or iron railings 8 feet in height; it must be properly
sewered and drained, but such drainage must not flow into any “stream,
canal, reservoir, aqueduct, pond or watering place.”[232]

Page 304

Cemeteries are divided into consecrated and unconsecrated portions by
bond stones or other suitable marks; a chapel must be built upon the
consecrated portion, although it does not seem to be compulsory to do so
upon the unconsecrated portion.
The selection of a proper site on sanitary and other grounds for a
cemetery is one of the greatest importance, and a town surveyor, or anyone
who has this duty to perform, cannot do better than keep the following
words of the well-known sanitary engineer Mr. Eassie before him:[233]
“A well-chosen cemetery is one whose soil is dry, close, and yet porous,
permitting the rain and its accompanying air to reach a reasonable depth,
and so expedite decay. The formation is also well covered with vegetable
mould, which assists in neutralising any hurtful emanations, and encourages
the growth of shrubs. The subsoil is also of such a kind as to need no under
draining, and such as will prevent the water lodging in any grave or vault. It
will also stand exposed to the north or north east winds which are dry, and
which do not hold the putrefactive gases in solution, like the moist south or
south westerly winds.”
“An improperly chosen graveyard may be said to be one where the soil is
dense and clayey, and impervious to moisture. It will be insufficiently
drained, necessitating the use of planks to walk upon in wet weather. It will
be too close to the abodes of the living, too small to permit proper planting,
the graves covered, it may be with flat stones which prevent the passage
downwards of the air and rain, and surrounded moreover by high walls
which exclude the fresh air. The ground will be stony and insufficiently
covered with vegetable soil. No natural outfall will exist, and the drainage
water must be pumped up, the bare idea of which is horrible. It will be near
also to water-bearing strata, or to a reservoir. Long before decomposition
has taken place owing to the smallness of the site, and the impossibility of
obtaining any more land except at high building prices, the organic matter
hidden out of sight will be far too large in proportion to the area.”
Dr. Parsons, in a memorandum prepared by him on the “Sanitary
Requirements of Cemeteries” and published by the Local Government
Board in their eleventh annual report, says:
“The soil of a cemetery should be of an open, porous nature, with
numerous close interstices, through which air and moisture may pass in a
finely divided state freely in every direction. In such a soil decay proceeds
rapidly, and the products of decomposition are absorbed or oxidised. The

Page 305

soil should be easily worked, yet not so loose as to render the work of
excavation dangerous through the liability to falls of earth. It should be free
from water or hard rock to a depth of at least 8 feet. If not naturally free
from water, it should be drained if practicable to that depth: to this end it is
necessary that the site should be sufficiently elevated above the drainage
level of the locality, either naturally, or, where necessary, by filling it up to
the required level with suitable earth.”
“Loam, and sand with a sufficient quantity of vegetable mould, are the
best soils; clay and loose stones the worst. A dense clay is laborious to work
and difficult to drain; by excluding moisture and air it retards decay, and it
retains, in a concentrated state, the products of decomposition, sometimes to
be discharged into graves opened in the vicinity, or sometimes to escape
through cracks in the ground to the surface. A loose, stony soil, on the other
hand, allows the passage of effluvia.”
And with reference to the site to be chosen for a cemetery he further
states:
“Nevertheless, in view of the evils which in former times have
undoubtedly arisen from the practice of intramural sepulture, and also
because the erection of houses near a cemetery interferes with the free play
of air around and over it, it is desirable that the site of the cemetery should
be in a neighbourhood in which building is not likely to take place, and also
that so far as practicable a belt of ground should be reserved between the
graves and the nearest land on which a house may be built, in order to
obviate to some extent the risk of contamination of ground-air and subsoil
water with decomposing matters. This is especially necessary where houses
are constructed with cellars. It is, therefore, highly desirable that interments
should not be made up to the extreme edge of the cemetery, and it would be
possible without great waste of space to reserve in all cases a strip of
ground free from interments, 15 to 30 feet in width, around the whole
cemetery on the interior of the boundary fence. This strip would afford
room, on the inside for a gravel or asphalte walk to give access to all parts
of the cemetery, and on the outside next the fence to a belt of shrubs or
trees, the rootlets of which, penetrating the soil, would arrest and assimilate
any decomposing matters percolating to the exterior of the cemetery.
Obviously a cemetery should not be placed on elevated ground above
houses, where the soakings from it may percolate to the sites and
foundations of the dwellings below. . . .”

Page 306

“Sites are of course unsuitable which are liable to be flooded or to
landslips, or which are in danger of being washed away, or encroached
upon by streams or the sea. Very steep sites are not desirable. The cemetery
should be accessible by good roads from all parts of the district.”
As to the unsuitability of clay as a soil for cemeteries, Louis Créteur in
“Hygiene in the Battle Field” says, that the bodies of soldiers slain during
the Battle of Sedan were buried in chalk, quarry rubble, sand, argillite, slate,
marl, or clay soils, and the work of disinfection lasted from the beginning of
March till the end of June. In rubble the decay had fully taken place, but in
the clay the bodies kept well, and even after a very long time the features
could be identified.
With regard to the amount of land necessary for a cemetery, Dr. Parsons
calculates that about a quarter of an acre of land for every thousand of the
population of the community to whom the cemetery belongs, is the “usually
estimated minimum,” but this is far too small a proportion even for a
cemetery possessing every advantage, and he further states, “The
desirability of providing more than this bare minimum of space is obvious,
and is generally recognized.” It must be remembered that as a rule, quite
one-sixth of the total area of a cemetery is taken up by the roads, paths,
ornamental grass or beds of flowers and shrubs, the chapels, mortuaries,
lodges, &c., and sufficient width should be allowed between each grave
space to permit every grave being reached without trampling on others: a
standard of 110 burials per acre has sometimes been taken, but this appears
to me to be rather a small one.
In laying out ground for a cemetery, the following are some points that
require careful attention:
(1.) The position of the entrance or entrances; there should if possible be
only one, as a lodge is necessary at each, which entails expense.
(2.) The best position for the lodge or lodges, the chapels and mortuary.
(3.) The direction of the roads in the cemetery: these must be wide
enough for the hearses and mourning coaches, and there must be convenient
places provided for turning round.
(4.) The direction of the paths:[234] these and the roads should be as
straight as possible, so as to economise available burial ground, paths
should be sufficiently wide to allow an entrance to be made in them to the
adjoining vaults or walled graves, these being frequently covered with a
massive tomb or ledger very difficult to remove. The vaults and walled

Page 307

graves, being of a better class, are generally put in the borders of the burial
ground, close to the paths.
(5.) In some soils deep and careful drainage is necessary. This should be
carried out with ordinary drain pipes laid at a depth of at least 10 feet, and
so communicating with each other and the grave spaces, that even in a clay
soil each grave as it is sunk should be found free from water.
(6.) Surface drainage, especially of the roads and paths, is also necessary.
(7.) Provision must be made for the disposal of the soil excavated from
the graves, as very little punning or ramming of the soil thrown in after a
burial should be permitted, and thus there is always a large quantity of
material to be otherwise disposed of.
The cemetery must be divided into Church or consecrated ground,
Dissenters’ ground, and Roman Catholic ground, in such proportions as
may be found to suit the particular requirements of the locality in which the
cemetery is placed.
These divisions must again be subdivided into sections according to the
class and description of the proposed grave, and each of these subdivisions
and grave-spaces must be accurately marked with a distinguishing letter and
number, so that on reference to a plan and a register book, any person’s
grave may be easily found, however long a time may have elapsed since the
interment took place, and although no headstone or mark over the grave is
there. It is needless to say, that the plan of the cemetery has to be most
carefully prepared, and the ground equally carefully set out, to prevent any
chance of error occurring, or serious consequences might result. It may be
well to remark that no body can be removed after burial without an order
from one of Her Majesty’s principal Secretaries of State, or by faculty from
the Bishop in consecrated ground.[235]
The following description of the different sections necessary in a large
cemetery may here be of use, the fees chargeable for the privilege of
burying in each section advancing with the letters appropriated to the
sections.
Section A. This is appropriated to workhouse paupers or very poor
persons only,[236] the depth[237] of the grave may be limited to 6 feet, and
the size should be 9 feet by 4 feet; only coffins made of wood should be
allowed in this section.[238]
Section B. This is of a slightly superior class to the last, the depth and
size may however be the same, but a larger fee can be charged, and the

Page 308

position of the section with reference to the paths should be better and more
convenient.
Section C. This is again superior to either of the former sections. Extra
depth and size may be allowed, and the position should also be better.
Section D. In the previous sections only “common” graves as they are
called should be allowed. In this section either walled graves, vaults, tombs
or common graves may be placed, the common graves may be of extra
depth and size, the space for a vault may be 8 feet 6 inches by 6 feet.[239]
This section should be exclusively the borders of the paths and other
spots easily accessible and prominent to view.
Section E. This is the best section. No common graves should be allowed
in it, and the spaces allotted for burial may be isolated and of various sizes
according to agreement and payment. Here costly tombs and monuments
are erected, the position of the section being generally near the chapels.[240]
In all the above sections it is necessary to provide for the burial of
children: these require smaller space and in some instances they can be
buried with their mother, but in separate coffins. Unfortunately it is
necessary to allow rather a large percentage of available space for the
interment of children, as the infant mortality in this country is so excessive.
In connection with the question of the plan and the sections for burial, it
may be well to give the following rules and regulations for the management
of a cemetery:
Cemetery Rules and Regulations.
(1.) All charges for interment, monuments, and gravestones must be paid
at the time the order is granted; no kind of work allowed to be done, or any
corpse brought on the ground without the production of an order.
(2.) Certificates of death to be produced (showing the name of the parish,
&c., and all other requisite information) on paying the fees.
(3.) Two days’ notice to be given for interment in graves, (exclusive of
Sunday,) and three days if a vault or brick grave be required. In default, an
extra charge will be made for working by night.
(4.) The time when the funeral procession will be on the ground to be
named in the notice. An extra fee of will be charged when the funeral
procession is minutes later than the time appointed, and for
every minutes afterwards.

Page 309

(5.) The hours of interment are from A.M. to P.M. from
Michaelmas to Lady-day, and from A.M. to P.M. from Lady-day
to Michaelmas.
(6.) All brick or stone work in the graves, and all foundations and fixing
of memorials, or planting, shall be under the supervision and control of the
local authority or their appointed agent.
(7.) No grave or vault shall be re-opened by other persons than members
of that family without the written consent of the parties interested and of the
local authority. An extra fee for the interment of strangers will be charged at
the discretion of the local authority.
(8.) In all unbricked graves, coffins of wood only shall be used. No
interment will be allowed nearer the surface than four feet for an adult, or
three feet for a child under 12 years. Every coffin in a bricked grave or vault
to be separately entombed in an air-tight manner.
(9.) No palisades or iron railings to exceed feet in height, except with
the special consent of the local authority; and no palisades, or enclosure of
any description will be permitted to a grave until a headstone or tomb has
been erected.
(10.) A drawing of every monument or gravestone to be submitted for
approval, and a copy of the intended inscription, if it contains more than
name, age, and date. Inscriptions to be arranged so as to face the paths as
far as practicable. Any question which shall arise touching the fitness of any
monumental inscription, placed in any part of the consecrated portion of the
ground, shall be determined on appeal by the Bishop of the Diocese.
(11.) All graves and vaults, monuments, gravestones, fencing or other
enclosures, to be kept in repair by the persons interested in their
preservation. If suffered to go out of repair and become unsightly, the local
authority will remove them altogether, and they will not be allowed to be
replaced without the consent of the local authority. Graves will be kept in
order by the local authority for a fee of per annum.
A plan of the ground, showing each grave space, is kept at the office of
the surveyor to the local authority and may be seen without charge.
The public are admitted to the cemetery, on weekdays, from 7 A.M. to 8
P.M. from Lady-day to Michaelmas, and from 8 A.M. to 5 P.M. from
Michaelmas to Lady-day. On Sundays, from 2 to 8 P.M. in summer and 2 to
5 P.M. in winter.
All further information may be obtained at the office.

Page 310

The local authority forbid any gratuity being received by their servants.
The local authority reserves a right, from time to time, to make any
alteration in the foregoing charges and regulations.
In connection with the above rules, a scale of fees of the charges for
interments must be prepared as well as for headstones, foot-stones, ledgers,
and tombs, or for enclosing any grave with kerbing, iron-railings, posts and
chains, &c.
The practice of allowing persons to plant small shrubs and trees upon the
graves of their friends, should be deprecated, as not only do they tend
eventually to make a cemetery look untidy but they are placed so close to
the graves that when they grow up their roots often split open a vault or
walled grave, and even damage valuable tombstones.
Trees which are suitable for cemeteries, and which would thrive even in a
town atmosphere, are the weeping willow, cypress, yew, cedar, juniper,
birch, ash, weeping elm, and a considerable number and variety of drooping
and other deciduous trees. These should, however, be planted under the
control of the local authority, as otherwise a cemetery would soon be
overrun by them.
The regulations issued by the Secretary of State for the Home
Department in January 1863, for burial grounds provided under the Burial
Acts, may be of use for reference, and are given in extenso:
(1.) The burial ground shall be effectually fenced, and, if necessary,
under-drained to such a depth as will prevent water remaining in any grave
or vault.
(2.) The area to be used for graves shall be divided into grave spaces, to
be designated by convenient marks, so that the position of each may be
readily determined, and a corresponding plan kept on which each grave
space shall be shown.
(3.) The grave spaces for the burial of persons above 12 years of age shall
be at least 9 feet by 4 feet, and those for the burial of children under 12
years of age, 6 feet by 3 feet, or if preferred, half the measurement of the
adult grave space, namely, 4¹⁄₂ feet by 4 feet.
(4.) A register of graves shall be kept in which the name, age, and date of
burial in each shall be duly registered.
(5.) No body shall be buried in any vault or walled grave unless the
coffin be separately entombed in an air-tight manner; that is, by properly
cemented stone or brickwork, which shall never be disturbed.

Page 311

(6.) One body only shall be buried in a grave at one time, unless the
bodies be those of members of the same family.
(7.) No unwalled grave shall be re-opened within 14 years after the burial
of a person above 12 years of age, or within eight years after the burial of a
child under 12 years of age, unless to bury another member of the same
family, in which case a layer of earth not less than 1 foot thick shall be left
undisturbed above the previously buried coffin; but if on reopening any
grave the soil be found to be offensive, such soil shall not be disturbed, and
in no case shall human remains be removed from the grave.
(8.) No coffin shall be buried in any unwalled grave within 4 feet of the
ordinary level of the ground, unless it contains the body of a child under 12
years of age, when it shall not be less than 3 feet below that level.
For further information upon the subject of the Interments Act 1879 and
much useful information in connection with cemeteries, I refer my readers
to ‘Notes and Practical Suggestions upon the Interment Act 1875,’ by T.
Baker, Esq.
I cannot close this chapter upon cemeteries without a few words upon a
subject which is analogous, cremation; and although I am aware that this is
a debateable question, still it is impossible for me to be silent, as from my
official experience on the practice of burial, I am so deeply convinced that
cremation should be substituted for it for very many weighty reasons, that I
feel it is necessary for me to give them.
They are as follows:
(1.) Nothing can be more unsanitary or dangerous to the living than the
burial of the dead. This has been enlarged upon over and over again by men
who have well studied the subject and are competent to give an opinion and
to that opinion I add my testimony.
(2.) Nothing can be more loathsome and degrading to the dead bodies of
our friends or more revolting to our feelings, than the horrible practice of
placing the remains of those we love in the soil of a common churchyard or
cemetery, to be devoured with other bodies by worms.
(3.) In placing a dead body under ground we can never be sure how long
the remains will be left undisturbed, a new street or railway will soon
destroy all traces of its resting place,[241] and even the law only allows a
grave to remain undisturbed for a short 14 years.
(4.) In the event of friends or relations dying abroad their remains cannot
be sent home for burial except at great expense, cremation would reduce the

Page 312

body to a few beautiful silvery ashes which could easily be brought home
and secured on arrival in a suitable and safe position.[242]
(5.) Cremation is the most respectful and beautiful manner for the
disposal of dead bodies, and need not alarm (on religious grounds[243]) any
more than the practice at sea of lowering the dead bodies overboard to be
eventually eaten and digested by marine animals.
(7.) Cremation would settle at once and for ever the vexed question of
burial in consecrated or unconsecrated ground, and all the unseemly
quarrels which have taken place in connection with it from time to time.
(8.) The great extent of land that is now wasted in public burial grounds
and cemeteries.[244]
There is no reason, even if cremation should take the place of burial, why
the fees for clergymen and others should not remain as at present, and the
unpleasant assistance of the British-ghoul, the undertaker, with his long face
at the ceremony and still longer bill afterwards, could easily be dispensed
with.
The opponents of cremation urge that it would be more expensive than
burial, and consequently out of the reach of the poorer classes, and also that
it would cause so much difficulty in detecting cases of poisoning, that it
would tend to encourage persons to poison others who happened to be in
their way, or objectionable to them, and thus crime would go unchecked.
If these are the only objections they are easily to be overcome.
First, by constructing public crematories, where for a few shillings a day
sufficient heat could be maintained to consume almost any number of
bodies, whilst the present great expense of maintaining large cemeteries
with their attendant guardians and other costs would be dispensed with; and
Secondly, by instituting a scientific and independent enquiry as to the
cause of every death which occurs. This is so much required at the present
day for the sake of the public health, that even if cremation is never
introduced it should be at once enforced, so that those who have charge of
the public health could have exact and reliable knowledge of the causes of
all the deaths throughout the United Kingdom, and thus obtain such
valuable information as would greatly assist in the daily fight to subdue and
overcome deaths from preventable causes.

[230] Vide ‘Fitzgerald’s Public Health Act,’ p. 130, 3rd edition.

Page 313

[231] Vide ‘Fitzgerald’s Public Health Act,’ p. 131, 3rd edition. Foot note to clause x.
Cemetery Clauses Act 1847.
[232] Cemetery Clauses Act 1847, s. 20.
[233] Vide ‘Cremation of the Dead,’ by William Eassie, C.E. &c. &c., p. 50.
[234] The roads and paths in a cemetery require to be carefully made, in order that they
may be available during any weather.
[235] 20 & 21 Vic. c. 81, s. 25.
[236] The following is a description of the manner of burying the poorer people in the
cemetery of Pere la Chaise, near Paris. (Vide ‘The Parks, Promenades, and Gardens of
Paris,’ by W. Robinson, F.L.S., &c., p. 109.) “A very wide trench or fosse is cut wide
enough to hold two rows of coffins placed across it, and 100 yards long or so. Here they
are rapidly stowed in one after another, just as nursery labourers lay in stock ‘by the heels,’
only much closer, because there is no earth between the coffins, and wherever the coffins,
which are very like egg-boxes, only somewhat less substantial, happen to be short so that a
little space is left between the two rows, those of children are placed in lengthwise between
them to economise space; the whole being done exactly as a natty man would pack
together turves or mushroom spawn bricks.”. . . Let us hope that whatever else may be
“taken from the French,” we may never imitate them in their cemetery management.
[237] Depth of burial varies from 6 to 10 feet, but there must be 4 feet of earth upon the
top of the last coffin if an adult, 3 feet if a child.
[238] A proper grave should be dry when opened, and have a sufficiency of soil over the
coffin to absorb any gases of decomposition; it should allow an adjoining grave to be
opened without collapsing, and should if possible dispense with the necessity of shoring or
close timbering the sides, and should allow sufficient space for a headstone to be placed
over it.
[239] In a tomb or walled grave, the coffin should be enclosed in an air-tight case, by
means of a stone cemented down which must never again be moved; or concrete may be
used. It is a good plan to put some charcoal with the coffin to absorb any gases of
decomposition in case of the vault opening accidentally at any future time, and in order to
guard against such an occurrence it is better to leave at least 2 feet of earth on the top of the
grave below the surface of the ground in walled graves.
[240] “No body shall be buried in any vault under any chapel of the cemetery or within
15 feet of the outer wall of any such chapel.” (Vide s. 39, Cemetery Clauses Act 1847.)
[241] In a beautiful out-of-the-way valley in Wales, there is a pretty village with a quiet
churchyard far from the “busy haunts of man,” yet here it is found necessary to disinter all
the bodies, as this churchyard will soon be 30 feet under the surface of the water of an
immense reservoir now being constructed to supply the living with drinking water, and it
would not be right to leave the bodies there.
[242] The body of Lord Balcarres was (as is now history) removed from the mausoleum
in his own grounds, and only recovered after a most painful interval; this desecration could
not have happened had his body been cremated and the ashes suitably secured.
[243] I believe it was Lord Shaftesbury whose remark on this point was, “What would
have become of the blessed martyrs, if destruction by fire was to annul their chances of
resurrection?”
[244] The metropolis alone has in addition to the numerous burying grounds near its
parish churches, &c. (many of which have been, however, dug up and destroyed), the

Page 314

average of which it would be difficult to determine, the following cemeteries, which may
be called extra mural:
Woking Cemetery 500 acres
Ilford and Leytonstone Cemetery 168 „
Norwood and Nunhead Cemetery 40 „
Highgate Cemetery 40 „
West London at Brompton 40 „
Abney Park Cemetery 32 „
Kensal Green Cemetery 18 „
Victoria Cemetery ——
Tower Hamlets Cemetery ——
Colney Hatch Cemetery ——

Page 315

CHAPTER XXXI.
MORTUARIES.

As the Public Health Act 1875 contains several clauses bearing upon
mortuaries, a few words upon this subject will not be altogether
inappropriate.
The great and terrible evils arising from the practice of keeping corpses
in inhabited rooms by the poorer classes were pointed out by Mr. Chadwick
in the year 1843[245] and the following clauses upon this subject and the
necessity imposed upon the local authority to provide proper mortuaries are
contained in the Public Health Act 1875:
“Any local authority may, and if required by the Local Government
Board shall provide and fit up a proper place for the reception of dead
bodies before interment (in this Act called a mortuary), and may make bye-
laws with respect to the management and charges for use of the same; they
may also provide for the decent and economical interment, at charges to be
fixed by such bye-laws, of any dead body which may be received into a
mortuary (38 & 39 Vic. c. 55, s. 141).
“Where the body of one who has died of any infectious disease is
retained in a room in which persons live or sleep, or any dead body which is
in such a state as to endanger the health of the inmates of the same house or
room is retained in such house or room, any justice may, on a certificate
signed by a legally qualified medical practitioner, order the body to be
removed, at the cost of the local authority, to any mortuary provided by
such authority, and direct the same to be buried within a time to be limited
in such order; and unless the friends or relations of the deceased undertake
to bury the body within the time so limited, and do bury the same, it shall
be the duty of the relieving officer to bury such body at the expense of the
poor rate, but any expense so incurred may be recovered by the relieving
officer in a summary manner from any person legally liable to pay the
expense of such burial.

Page 316

“Any person obstructing the execution of an order made by a justice
under this section shall be liable to a penalty not exceeding five pounds”
(38 & 39 Vic. c. 55, s. 142).
From these clauses it would appear that a mortuary or mortuaries are an
absolute essential in every town, although it does not appear necessary to
have a separate mortuary for any “body of one who has died of any
infectious disease,” but it may be taken to the mortuary which has been
provided for the reception of dead bodies generally. It may also be assumed
that bodies may be viewed by a coroner’s jury in the mortuary, although a
post-mortem examination cannot be made in it, as by the following section:
“Any local authority may provide and maintain a proper place (otherwise
than at a workhouse or at a mortuary) for the reception of dead bodies
during the time required to conduct any post-mortem examination ordered
by a coroner or other constituted authority, and may make regulations with
respect to the management of such place; and where any such place has
been provided, a coroner or other constituted authority may order the
removal of the body to and from such place for carrying out such post-
mortem examination, such costs of removal to be paid in the same manner
and out of the same fund as the costs and fees for post-mortem
examinations when ordered by the coroner (38 & 39 Vic. c. 55, s. 143).”
It will be observed that the above clause apparently forbids a post-
mortem room being provided at the mortuary, although this would appear to
be the most appropriate situation for it, and indeed such a room is
frequently provided at or near the mortuary. The reason for this prohibition,
especially as it is associated with a workhouse, is evidently to overcome the
prejudice which would exist in the minds of the ignorant that the fact of
taking a body to a mortuary necessitated dissection: a practice which is
looked upon with much disfavour by such persons.
Mortuaries in this country generally consist of one of the following
descriptions:
(1.) Elaborate groups of buildings, comprising mortuary chapel,
coroner’s room, post-mortem room, dead house, waiting rooms, &c., and
the necessary care-taker’s rooms, and offices.
(2.) Mortuaries in connection with infectious hospitals.
(3.) Mortuaries in connection with general hospitals.
(4.) Mortuaries at cemeteries or licensed burial grounds.
(5.) Dead-houses provided by the sanitary authority.

Page 317

In arranging for the erection of a dead-house or mortuary in any town,
the surveyor may find the following particulars and suggestions of some use
to him:
A mortuary must be provided in the grounds or near all cemeteries that
are in active operation, but in addition to these, others ought to be erected in
central positions of the town, so that bodies can be easily conveyed there,
not only with a view to meet the objections mentioned in the opening of this
chapter, but also to avoid the unseemly practice at present so largely in
vogue of taking any cases of sudden death, suicide, accidental drowning,
violence or accident, &c., that may occur, to the nearest public house, there
to await identification and the coroner’s inquest.[246]
It has been computed that for every 50,000 of the population of any town,
a mortuary should be provided.
In Frankfort mortuaries have been for some years in existence; they are
simple buildings, with a separate room for each corpse, intended not only to
prevent bodies from being kept in private houses, but also to lessen the
chance of any person being buried alive. The following is a plan of one of
these institutions:

Page 318

PLAN OF A GERMAN LEICHENHAUS OR DEAD-HOUSE.

To prevent the chance of burying any person alive, each corpse as it is
placed in its little dead-house has a ring placed upon its finger; this ring is
attached to a string which is in communication with a bell which hangs in
the attendant’s room, who is there night and day, a window communicates
with each dead-house, so that on the alarm being given he is at once ready
to render assistance.
In Paris, as is well known, all bodies that are found are placed in the
“Morgue” behind “Notre Dame,” where they are publicly exhibited, thus
assisting identification, although the exposure of bodies in this manner is
not very attractive.
In preparing designs for a group of buildings such as are set forth in the
first on the list which I have given, the following requirements should be
considered:
The Mortuary Chapel should be of such dimensions as are suitable for
the requirements of the district, bearing in mind that if an epidemic of a

Page 319

fatal character was to unfortunately break out, it could either provide
accommodation for the extra strain upon it or be capable of being easily
extended. It should be designed so as to combine the characteristics of a
chapel with the most perfect sanitary arrangements.[247] The walls should be
of stone and are better lined with cement or glazed tiles, and everything
should be kept as flush as possible so as to avoid projections on which dust
could accumulate, the whole being easily and readily cleansed and
disinfected. The floor may be of asphalte or other impervious material, and
be well drained, great care being of course taken to exclude rats.
The ventilation must be perfect, the building should always be of low
temperature even in the hottest days of summer. All the group of buildings
should, if possible, be surrounded by a free belt of air. Their position should
be isolated with respect to other buildings, and of course it is highly
necessary that they should be as far away as possible from any dwelling-
houses, a disused burial ground being sometimes selected as a convenient
site. The furniture of a mortuary chapel should consist only of trestles or of
brackets against the walls upon which to rest the shells containing the
corpses.
The Dead-house should be a room smaller than the mortuary chapel, but
its construction may be the same. It is here that all bodies should be brought
uncoffined for the purpose of awaiting identification, or preparatory to post-
mortem examination, or of bodies of those who have died from dangerous
contagious maladies, and rendering immediate removal necessary; these are
placed upon slabs provided for the purpose, which may be of slate, zinc, or
other suitable material. In conjunction with the dead-house should be
The Post-Mortem Room, which requires plenty of light; it must also, like
the mortuary chapel and dead-house, be thoroughly ventilated and drained
and be easily cleansed. Its furniture must consist of the necessary post-
mortem table of slate, zinc, or wood covered entirely with lead: this table
must slightly dish towards the centre and be drained into a pail or on to a
grating. Plenty of water is essential, conveniently laid on, and the room
must be fitted with good arrangements for gas or other means of artificial
lighting. Some method is also necessary for the purpose of heating water
whenever it is required.
The Coroner’s Court may be simply a large room with convenient
seatings and tables for the coroner and his jury, accommodation being also

Page 320

provided for the press, witnesses, &c. with the necessary retiring rooms and
offices.
In addition to the above requirements the following accommodation
should also be provided:
A caretaker or resident attendant should have accommodation at or near
the main group of buildings.
A Laboratory and Weighing Room should also be provided in connection
with the post-mortem room; and a Store Room for spare shells and
disinfectants, &c.
If possible also it is well to provide a Hearse House; and in connection
with the mortuary establishment, the disinfecting of bedding, clothing, &c.,
which have become infected, should also if possible be carried on.
Before, however, proceeding to discuss the question of disinfection I will
give the following drawing of a mortuary chapel, &c., as proposed by the
late Dr. W. Hardwicke, the well-known Coroner, in a valuable paper upon
the subject of Public Mortuaries which he read before the Royal Institute of
British Architects in the year 1869:

Page 321

I am, however, not aware that any public mortuary even of this size has
yet been actually carried out in this country, greatly as they are needed.
With reference to the question of disinfection, which as I stated can be
conveniently taken in connection with that of mortuaries, the following is
the clause of the Public Health Act 1875 which deals with it:
“Any local authority may provide a proper place, with all necessary
apparatus and attendance, for the disinfection of bedding, clothing or other
articles which have become infected, and may cause any articles brought

Page 322

for disinfection to be disinfected free of charge (38 & 39 Vic. c. 55, s. 122).
See also 38 & 39 Vic. c. 55, ss. 120 and 121.”
The first duty here involved is to provide a proper place for this purpose,
and this place cannot be better than that of the mortuary, so as to centralize
as much as possible the spots to which infection has to be carried, and the
necessary attendant can also here be found, as well as convenient places to
put the hand carts, &c., presently described.
The next duty is to provide the necessary apparatus, which is now done
almost exclusively by the action of heat. This is sometimes effected by
building brick-work chambers which can be heated up to about 350° Fahr.
after the doors are closed, by means of coal or coke furnaces. Within these
chambers are moveable horses on which are placed the articles to be
disinfected: these are exposed to the necessary heat for varying times
according to the nature of the articles, the horse is then drawn out, when the
articles should be thoroughly washed with a disinfecting soap and returned
to their owners. Great care is necessary in this operation to ensure evenness
of heat, as otherwise the clothes, bedding, &c., may be scorched and
injured, and the local authority will then have to make compensation.
A more convenient form of disinfecting machine, and one that is less
costly to work and more even in its temperature, is one that can be heated
by gas, this is sometimes effected by the use of an iron box with counter-
balanced lid into which the articles are put, heat being applied by means of
gas jets burning underneath. A more elaborate and effective method has
however been patented, and is now manufactured by Messrs. Goddard and
Massey of Nottingham, which is known as Dr. Ranson’s system. The
following drawing shows the arrangement of this machine, and some of the
advantages claimed for it are as follows:
Its heat is maintained automatically within certain limits in all parts of
the chamber, and has great drying power, which is important, as securing
from the long period of time at which this steady heat can be maintained,
that penetration into bedding and other bad conductors which is so desirable
to secure the necessary destruction of all disease germs or chances of after
inoculation:

Page 323

There can be no doubt that where a machine is not required to be
constantly at work gas is the cheapest and most convenient heat-producer
that we have.
It is of course necessary that the infected bedding and clothing should be
fetched from the owners’ houses in such a manner as will lessen the risk of
spreading infection as much as possible, and for this purpose it is necessary
for the local authority to keep a covered hand-cart which should be lined
with tin and closed hermetically. It should be sufficiently large to take a
mattrass, and be of light construction, so that one man can draw it when
full.
Before concluding my remarks on disinfection, it is well to state that
plenty of carbolic acid should be kept in a mortuary. Sheets saturated with
carbolic acid are used to wrap around the dead bodies of infected persons,
and sawdust saturated with carbolic acid is also freely used, besides large
quantities of that excellent disinfectant, “Sanitas.”

Page 324

[245] Vide ‘A Supplementary Report on the Results of a Special Enquiry into the
Practice of Interments in Towns,’ by Edwin Chadwick, 1843.
[246] There is no law that can compel any one to receive a dead body into his house.
[247] It is important to remove the idea of a “parish dead-house,” otherwise its object
will be defeated, as persons will object to allow the bodies of their deceased friends to be
taken to it.

Page 325

CHAPTER XXXII.
BORROWING UNDER THE LOCAL GOVERNMENT BOARD.

There are a number of clauses in the Public Health Act 1875, which
empower a local authority to borrow money on the credit of the rates for the
purpose of “defraying any costs, charges and expenses incurred or to be
incurred by them in the execution of the Sanitary Acts.” (Vide 38 & 39 Vic.
c. 55, s. 233).
The exercise of these powers of borrowing are subject to the following
regulations:
(1.) Money shall not be borrowed except for permanent works.[248]
(2.) The sum borrowed shall not exceed at any time, including all
outstanding debts, the assessable value for two years of the district.
(3.) Where it exceeds the value of one year, the Local Government Board
will not give their sanction until one of their inspectors has held a local
enquiry.
(4.) The money cannot be borrowed for a longer time than 60 years, and
it must be paid off within that time.
(5.) Certain regulations as to sinking funds, &c. (Vide 38 & 39 Vic. c. 55,
s. 234 et seq.)
The power to borrow money thus granted to local authorities has
undoubtedly given a considerable stimulus to the execution of important
sanitary works which could not be carried out if they had to be paid for out
of the current rates. It is also a fair and equitable arrangement that
permanent works should be paid for by those that reap the benefit of them,
and it is now so arranged that the money borrowed is repaid within a certain
specified time by equal annual payments, in order that the ratepayer of the
present shall not be unduly taxed for the benefit of posterity.
No regular or fixed times have been settled by the Local Government
Board over which they will allow the repayment of loans to be spread, but it
appears that the duration of the proposed works somewhat guides the length

Page 326

of time allowed, as will appear from the following list which I have
prepared from the eighth Annual Report of the Local Government Board:

Description Number
of Work. of Years.
Purchase of land 50 to 60
Sewage disposal 30 „ 50
Sewerage works 30 „ 50
Water supply 20 „ 50
Fire brigade purposes 30 and 60
Market Purposes 30 „ 60
Plan of district 20 „ 30
Lamps for public lighting 10 „ 20
Artizans and Labourers’ Dwellings Act 50
Erection of hospital 30
„ „ public baths 30
„ „ slaughter-houses 30
„ „ buildings at sewage farm 30
A public park 50
Cemeteries 30
Gas supply 30
Street improvements 15 to 30
Paving[249] and channelling 15 „ 20
Stables, urinals, enginehouse 20
Construction of a new road 20
Disinfecting apparatus 20
Mortuary and weighing machine 15
Steam road roller 10

Whenever a local authority decide to make application to the Local
Government Board for power to borrow money for any proposed
improvements or works within their district, it is the duty of the town
surveyor to prepare the necessary drawings and obtain the required
information in order to fill in the forms which are supplied from the Local
Government Board office.
With reference to this important part of his duty, I cannot do better than
give the following Suggestions as to the Preparation of Plans of Proposed
Works, by Robert Rawlinson, C.B., C.E., &c. (Chief Engineering Inspector
to the Local Government Board), prepared by him in 1878:
“It will in all cases be necessary, upon application being made for
sanction to a loan, for the execution of works, that plans (or tracings of the

Page 327

plans), sections, estimates in detail and specifications be submitted with the
application, accompanied by information as to the population at the two last
periods of the taking of the census, the rateable value of the district, and the
amount of outstanding loans.”
“Such plans or tracings may be used for showing lines of main sewers,
drains, water-pipes and gas-mains. The lines of main sewers and drains
should have the cross sectional dimensions of the sewers and their gradients
distinctly marked (written and figured) upon them. The dimensions of water
and gas pipes should also be shown in figures or by writing.”
“N.B.—No general map should be submitted which is drawn to a scale of
less than 6 inches to a mile, except when the inch ordnance map is used.”
“Maps upon which sewerage works or water works are to be shown, or
for street improvements, should be not less than the ordnance scale of
¹⁄₂₅₀₀th.”
“The sections should be drawn to the same horizontal scale, and to a
vertical scale of 20 feet to 1 inch.”
Any detailed plan for the purposes of house drainage, paving, the
purchase of land &c., should be “constructed to a scale of not less than 10
feet to a mile, and upon this plan should be exhibited all houses and other
buildings, bench marks, the levels of streets and roads, of cellars, of the sea
at high and low tide level, and the summer and flood levels of rivers. 3 feet
by 2 feet will be a convenient size for the sheets of this plan.”
“Enlarged detail plans and sections of sewers, side entrances, man-holes,
sewer sluices, sluice valves, water-pipe joints, and similar details, should be
to a scale not less than 8 feet to 1 inch, and for some details 4 feet to 1
inch.”[250]
“As it may occasionally be desired to carry out works piecemeal, with a
view to save the time which would be occupied in the preparation of a
complete plan from actual survey, it will be sufficient in the first instance to
furnish any available general plan of streets and roads, with the surface
levels and those of the deepest cellars figured in feet and inches, and the
proposed scheme of works shown (or sketched) thereon, after which the
works can proceed in sections. It should be understood, however, that a
complete plan of the entire district must be proceeded with, so that when
the works are finished, the sanitary authority and this Board may possess a
proper record of them.”

Page 328

And again, Mr. Rawlinson in the same year, at a meeting of the
Association of Municipal and Sanitary Engineers, writes as follows:
“Plans should be neatly and clearly drawn, the cross sectional dimensions
and the gradient being written on the plan of sewers; there should be a title
and scale on each plan, as also on each sheet, and the date with the name of
the engineer or surveyor clearly written so as easily to be read; this as a rule
should be in the right-hand corner. Many names are so written that experts
cannot read them, and plans are frequently sent out having no title, nor any
scale, nor any name.”
“Plans of details, such as side entrances, man-holes, flushing chambers,
and sewer ventilating arrangements, should be at 4 feet to an inch, larger
works may be at 4, 10 to 20 feet to an inch. Clear understandable and
measurable details are desirable . . . I have much trouble in looking over
defectively prepared plans and crude ill-understood and ill-digested
schemes as they are submitted to the Local Government Board, for approval
and sanction to a proposed loan. One great fact connected with the Board
must not, however, be overlooked. It is not an office of works, it does not
undertake to devise neither does it make itself responsible in any degree for
the plans or for the estimates which may have been sanctioned. Each
engineer and each local authority must both devise and execute the local
works, and the district must alone be responsible for the local expenditure.
The Board neither dictates as to works, nor superintends works, but reserves
the power of refusing sanction to a proposed loan, and of requiring full
explanations as to failures in the works, or as to expenses over estimates
before sanctioning a supplemental loan. The reason that the Board declines
responsibility ought to be clearly manifest; plans and details may be the
best possible, but the ultimate result depends on daily local supervision, and
this the Board does not give; neither local action nor local responsibility is
superseded.”
Speaking on this point at the first meeting of the Sanitary Institute of
Great Britain held at Croydon in 1879, Captain Douglas Galton, C.B., says:
[251]
“Where a loan is applied for, the plan upon which the money is to be
spent is submitted for Government approval. The Government only lends
the money after the approval of the proposed scheme of expenditure by one
of their inspectors.”

Page 329

“The Local Authorities of the towns to be drained cannot therefore be
responsible for the plan selected, for the Local Authorities must alter their
plans to suit the views of the inspector. The responsibility of the engineer is
diminished, because he may be compelled to modify his plan in a manner in
which he may not thoroughly approve, and the inspector has no
responsibility in the matter, because, after having approved of the general
scheme, he has no control over the details or the execution of the work, nor
can he be in any way held responsible, if the result were a failure.”

[248] The Local Government Board have held a steam roller, a steam fire-engine, a
disinfecting apparatus, and lamp columns to be permanent works.
[249] For asphalte pavements twelve years have been allowed.
[250] “Details may be drawn to any scale larger than the dimensions named. Engraved
or lithographed diagrams, if clear and distinct, will be accepted. A new plan of any town or
district cannot be used for main sewering, water supply, gas supply, pavements, footwalks,
and other purposes without spoiling it; consequently it had better be retained as a standard
and be zincographed, there may then be copies for all local purposes. The zinc plates to be
the property of the local authority.”
[251] Vide ‘Transactions of the Sanitary Institute of Great Britain,’ vol. i. p. 116.

Page 330

CHAPTER XXXIII.
CONTRACTS.

Contracts being principally a legal question, it is not my intention to say
much on the matter.
In the Public Health Act 1875 will be found the following clauses:
“Any Local Authority may enter into any contracts necessary for carrying
this Act into execution (38 & 39 Vic. c. 55, s. 173).
“With respect to contracts made by an Urban Authority under this Act,
the following regulations shall be observed (namely):
“(1.) Every contract made by an Urban Authority whereof the value or
amount exceeds fifty pounds shall be in writing, and sealed with the
common seal of such authority:
“(2.) Every such contract shall specify the work, materials, matters or
things to be furnished, had or done, the price to be paid, and the time or
times within which the contract is to be performed, and shall specify some
pecuniary penalty to be paid in case the terms of the contract are not duly
performed:
“(3.) Before contracting for the execution of any works under the
provisions of this Act, an Urban Authority shall obtain from their surveyor
an estimate in writing, as well of the probable expense of executing the
work in a substantial manner as of the annual expense of repairing the
same; also a report as to the most advantageous mode of contracting, that is
to say, whether by contracting only for the execution of the work, or for
executing and also maintaining the same in repair during a term of years or
otherwise:
“(4.) Before any contract of the value or amount of one hundred pounds
or upwards is entered into by an Urban Authority ten days’ public notice at
the least shall be given, expressing the nature and purpose thereof, and
inviting tenders for the execution of the same; and such authority shall
require and take sufficient security for the due performance of the same:

Page 331

“(5.) Every contract entered into by an Urban Authority in conformity
with the provisions of this section, and duly executed by the other parties
thereto, shall be binding on the Authority by whom the same is executed
and their successors, and on all other parties thereto and their executors,
administrators, successors or assigns to all intents and purposes: Provided
that an Urban Authority may compound with any contractor or other person
in respect of any penalty incurred by reason of the non-performance of any
contract entered into as aforesaid, whether such penalty is mentioned in any
such contract, or in any bond or otherwise, for such sums of money or other
recompense as to such Authority may seem proper” (38 & 39 Vic. c. 55, s.
174).
In reading the numerous foot-notes that follow the above clauses in
Glen’s ‘Law of Public Health and Local Government,’ it will be seen that
contracts with corporations have been held to be very different from
ordinary ones between individuals or companies. All contracts should be by
deed under the seal of the corporation, or “there is no safety or security for
anyone dealing with such a body on any other footing,” and this applies
also in “respect of any variation or alteration in a contract which has been
made.”
“A committee of the corporation has no power to enter into any contract”
(38 & 39 Vic. c. 55, s. 200).
A member of a corporation may not be “concerned in any bargain or
contract” entered into by the corporation, although this would not vitiate the
contract (38 & 39 Vic. c. 55, sch. 11, clause 64), neither may an officer of
the corporation be “concerned or interested in any bargain or contract” (38
& 39 Vic. c. 55, s. 193).
It is, of course, necessary before any contract can be entered into, that the
town surveyor should prepare the specification, schedule of prices and
drawings where necessary; this entails a considerable amount of work.
In addition to ordinary specifications for works, the town surveyor has
often to prepare specifications and schedules for the supply of the following
goods:

Page 332

Ironmongery.
Paints, etc.
Disinfectants.
Castings.
Coals.
Harness.
Fodder.
Road metal.
Paving.
Clothing.
Stationery.
Horse hire.

and a host of other things too numerous to mention.
A well-written, clear, and comprehensive specification is a most difficult
thing to write, but it should be “common sense” from beginning to end, any
legal phraseology being left to the town clerk to introduce in his “deed” as
required by the Act.
For sewer and drain work lump sum contracts are often undesirable: it is
better to work according to a schedule of prices, and periodical
measurements.
It must not be forgotten that in all contracts the contractor seeks to make
a profit out of the work; if there is no intermediate contractor this profit
goes to the ratepayers. In most sanitary works also the men employed by
the local authority are more skilled in that particular class of work than the
chance men employed by a contractor, and for this and many other reasons,
administration by the local authority is in most cases preferable to contracts.
[252]
Where tenders have been invited by advertisement or otherwise, the
successful person should be written to, apprising him of the fact, and
requesting him to call, sign the necessary specification, deeds, and
drawings; an intimation should also be made to the unsuccessful
competitors that their tenders have not been accepted.
In conclusion, let me thank the authors of the following books for the
useful information which I have gained in perusing them for the purposes of
this work, and, let me add, they can be studied with advantage by every
“Town Surveyor”:

Page 333

‘American Sanitary Engineering,’ by E. S. Philbrick.
‘Annales des Ponts et Chaussées,’ published in Paris.
‘Annual Reports of the Local Government Board,’ published in London.
‘A Practical Guide for Inspectors of Nuisances,’ by F. R. Wilson.
‘A Treatise on Roads,’ by Sir H. Parnell.
‘Cremation of the Dead,’ by W. Eassie.
‘Experience sur le tirage des Voitures,’ by M. Morin.
‘Healthy Dwellings,’ by D. Galton.
‘Health of Towns Commission,’ sundry reports.
‘Law of Public Health and Local Government,’ by W. C. and A. Glen.
‘Local Board Manual,’ by Owen Harris.
‘New Mode of Constructing Streets,’ by J. Edgworth.
‘Plumbing and House Draining,’ by W. P. Buchan.
‘Practical Treatise on Roads,’ by A. Penfold.
‘Repair of Main Roads,’ by W. H. Wheeler.
‘Roads and Streets,’ by D. Kinnear Clark.
‘Roads, Streets, and Pavements,’ by Q. A. Gillmore.
‘Roads and Roadways,’ by G. W. Willcocks.
‘Remarks on the Present System of Road Making,’ &c., by John Loudon
McAdam.
‘Sanitary Engineering,’ by Baldwin Latham.
‘Sanitary Engineering,’ by Bailey Denton.
‘Sanitary Work,’ by Charles Slagg.
‘Suggestions as to the Preparation of District Maps and of Plans for Main
Sewerage, Drainage, and Water Supply,’ by Robert Rawlinson, C.B., &c.
‘Street Pavements,’ by G. F. Crosby Dawson.
‘Steam Road Rolling,’ by Fred. A. Paget.
‘The Parks, Promenades, and Gardens of Paris,’ by W. Robinson.
‘The Public Health and Local Government Act,’ by J. Vesey Fitzgerald.
‘The Interments Act 1879,’ by T. Baker.
‘The Plumber and Sanitary Houses,’ by S. S. Hellyer.
‘The Maintenance of Macadamised Roads,’ by Thomas Codrington.
‘The true system of Wood Pavement,’ Anonymous.
‘The Surveyor of Highways,’ by Alex. Glen.
‘Tree Pruning,’ by A. des Cars.
Various papers in the Proceedings of the Institution of Civil Engineers.
Various papers in the Proceedings of the Sanitary Institute of Great Britain.
Various papers in the Proceedings of the Association of Municipal and Sanitary
Engineers and Surveyors.
Various papers from the Journal of the Royal Agricultural Society.
Various papers from the Reports on the Application of Science and Art to Street
Paving.
Various reports by Mr. Haywood, Engineer to the Commissioners of Sewers of
the City of London.
Various reports by Mr. Till, Surveyor of Birmingham.
Various reports of Commissions, etc.

Page 334

[252] Mr. Parry, C.E., Borough Surveyor of Reading, says, “My experience of such
works is that town authorities can obtain both labour and materials cheaper than
contractors, and with efficient supervision the work costs less money.” (Vide ‘Proceedings
of the Association of Municipal and Sanitary Engineers and Surveyors,’ vol. iv. p. 89.)

Page 335

INDEX.

Abattoirs, 328
Abrasion of stone, 48
Accidents to horses, 31
Accommodation in Cattle Market, 345
Acland, Dr., on the surveyor, 4
Acquisition of sewers, 252
Acreage of sewage farms, 265
Action of earth on sewage, 266
Additions to old buildings, 210
Advantage of plants for sewage, 270
Advantages of asphalte, 99
—— public abattoirs, 343
—— separate system, 261
—— steam rolling, 70
—— wood paving, 89
Alleys and courts if cleansed, 238
Allotting numbers, 154
Alteration of old building to new, 209
American footpath, 114
—— paving, 77
—— road rolling, 65
Analysis of asphalte, 97
Angell Lewis on the surveyor, 6
Angles of roads, 30
Annihilation of sewer gases, 277
Application to borrow, 376
Appointment of surveyor, 1, 3, 10, 18
Arc lights, 144
Area of cemeteries, 354, 363

Page 336

—— sewers, 253, 254
Artificial asphalte, 117
—— stone pavements, 116
Artizans’ dwellings, 284, 291
Ashpits, 226
Asphalte, Mac Adam, 46
—— mastic, 107
—— roadways, 96
Asphaltic wood pavement, 82
Automatic flushing, 262
Aveling and Porter’s roller, 68
Awnings over paths, 184
Bargains. See Contracts
Bars opening outwards, 178
Bayley’s hydrostatic van, 245
Best stones for pitchers, 75
Bitumen, 96
Bituminous concrete, 78
—— mixture, 79
—— roadways, 46
Binding for roads, 62
Blinds over paths, 184
Blood-house, 341
Books on drainage, 315
—— useful, 384
Borrowing, 375
Borders for paths, 320
Bottles and brickbats, 225
Bottoming roadways, 37
Breakages in pipe sewers, 258
Breaking stone, 48, 51
Breaking-up streets, 157
Brick footpaths, 116
Bridges over streets, 33
Broad irrigation, 265
Brown’s street watering, 243

Page 337

Buildings, dangerous, 188
—— projections of, 176
—— new, 206
—— setting back, 175
Buddle hole, 128
Bullock lairs, 346
—— rollers, 60
Burial fees, 356
—— in clay, 354
Burners, gas, 140
Burning refuse, 233
Butchers, 329, 334
Byelaws for new streets, &c., 206
Cage for trees, 325
Caithness flagging, 112
Caldrons, 107
Candle power, 136
Canvassing, 19
Capacities of surveyor, 5
Carcel power, 136
Carey’s wood pavement, 83
Cart for scavenging, 230
Cast-iron name plates, 151
Cattle lairs, 333
Cattle Market, 345
Causes of breakages in pipes, 258
Cellar coverings, 180
—— door projecting, 176
—— dwellings, 295
Cemeteries, 350
Channelling, 123
Chapel mortuary, 369
Chapels in cemeteries, 351
Charcoal sewer ventilators, 275
Chemical treatment of sewage, 268
Chesterfield lighting, 129

Page 338

Chicago roads, 38
Chimney shafts, 190
—— —— ventilators, 275
Chloride of calcium for watering, 247
Choice of street names, 152
Chokages in pipe sewers, 260
Cisterns, objectionable, 302
Clarke’s apparatus, 240
Clay slate, 49
Cleansing of streets, 234
—— private courts, &c., 238
Climate and trees, 321
Clinkers, 225
Closing polluted well, 301
—— slaughter-houses, 330
Coal plates, 182
Coefficients of road metal, 51
Collection of house refuse, 228
Combined system of sewerage, 261
Committees, 23
Common line of frontage, 177
Compensation for setting back, 175
Composition of sewer gas, 278
Compressed asphalte, 96
Concrete, 78
—— footpaths, 113
—— pipes, 254
Condemned meat, 339
Connection with main sewers, 305
Construction of asphalte roads, 98
Contour of roadways, 43
Contract with Gas Company, 132
Contracts, 381
—— for scavenging, 249
—— surveyor must not be interested in, 3, 382
Conversion into new building, 210
Cost of asphalte, 101

Page 339

—— chemical treatment, 264
—— electric light, 145
—— kerbing, 125
—— maintenance of macadamised roads, 34, 41
—— melting snow, 241
—— pipes, 254
—— scavenging, 248
—— tree planting, 326
—— watering, 244
—— wood pavement, 91
—— working steam rollers, 61, 63
Core hard, 39
Coroner’s court, 370
Cremation, 361
Crops for sewage farm, 265
Croskey’s wood pavement, 82
Damage to roads, 161
—— trees, 327
Dangerous buildings, 188
—— crossings, 33
Deacon on streets, 76
Dead-house, 367, 369
Declaration of public streets, 204
Defacing numbers or names, 149
Defects in dwellings, 295
Defective cellar covers, 181
—— drains, 310
Definition of new building, 208
—— sewer, 252
—— street, 149, 205
Demolition of premises, 285
Deposit of plans of streets, 210
Depth of sewers, 253
Diameter of drains, 315
Diary of water-cart, 247
Dimensions of lairs and pens, 347

Page 340

Disadvantages of steam rolling, 72
Diseased meat, 339
Disinfection, 371
Disposal of refuse, 232
—— road scrapings, 237
—— sewage, 263
Distance of lamps, 135
—— trees, 324
Division of cemeteries, 355
—— England, 2
Doors opening outwards, 178
Down pipes, 183
Drainage, 303
—— definition of, 303
—— of cemeteries, 351
—— slaughter-house, 335
Drain-cleaning rods, 260
Drains under houses, 316
Draught on roads, 29
Dry systems, 263
Drying sludge, 269
Dust-bins, 226
Dusty streets, 234
Duties of surveyor, 5, 7, 11, 20
Dwellings and cemeteries, 350
Dynamos, 141
Earth as a sewage filter, 266
Easements, 182
Eaves shuting, 183
Effect of traffic, 27
Elasticity of asphalte, 104
Electric lighting, 129, 140
Enamelled name plates, 152
Entrance to cattle market, 346
Erection of hoardings or scaffolds, 187
Escape from fire, 218

Page 341

Euston pavement, 77
Evasion of Building Acts, 209
Examination of surveyor, 14
Fees for burials, 356
Fences, 320
Filling-in over pipes, 317
Filters for sewage, 267
Filtration of sewage, 266
Fire protection, 218
Fitness of stone, 48
Flagging, York, 110
—— Caithness, 112
—— blue lias, 113
Flag poles, 177
Flints, 50
Float observations, 265
Flushing courts and alleys, 238
Footpaths, 106
—— and snow, 241
Force required on roads, 30
Forms of Notice. See Notice
Foundation of macadamised roads, 39
French burial, 356
Frontage of streets, 174
Fryer’s destructor, 233
Fuel for rollers, 61
Furnaces as sewer ventilators, 276
Furniture of mortuary, 369
Gales and trees, 321
Galton on borrowing, 379
Garden refuse, 225
Gas-burners, 140
—— lighting, 130
Gates opening outwards, 178
Gauge of stone, 52
General markets, 348

Page 342

German dead-house, 368
Germ theory, 271
Glass name tablets, 152
Gneiss, 49
Good house drainage, 315
Goux system, 233
Gradients of house-drains, 316
—— roads, 30
—— sewers, 253
—— for rollers, 62
Granite, 49
—— foot-pavement, 117
—— kerb, 124
Grass, 320
Grating for trees, 324
Gravel footpaths, 121
—— 50
Grave spaces, 360
—— yards, 350
Green and Son’s roller, 69
Grill for trees, 325
Gritted asphalte, 108
Ground floor, 208
Grouting, 79
Gulley gratings, 126
Hammer-broken stone, 52
Hand or hose watering, 244
Hard core, 39
Harrison’s wood pavement, 83
Hayward on snow, 239
Hayward’s pavement lights, 181
Heads of scavenging, 224
Healey’s boilers, 80
Health of district, 288
Henson’s wood pavement, 83
Hide store, 341

Page 343

Highways, surveyor of, 20
Hoardings, 187
Hoisting machinery, 337
Horse-shoes, 27
House, definition of, 311
—— drainage, 303
—— refuse collection, 228
—— —— disposal, 232
—— —— destruction, 233
—— —— removed, 223
Houses unfit for habitation, 284
Hydrostatic van, 245
Illuminating power, 135
Imperishable stone-paving blocks, 104
Importation of trees, 322
Improper water supply, 300
Improved wood pavement, 81
Improvement of courts and alleys, 287
—— streets, 174
—— private streets, 193
Incandescent lamps, 144
Inclination of roads, 30
Individuals breaking-up streets, 169
Industrial dwellings, 290
Inertia of load, 32
Ingredients used for precipitation, 269
Inlets for fresh air into sewers, 273
Inspection of drains, 305, 314
—— buildings, 217, 219
Insufficient w.c. accommodation, 297
Interception or dry systems, 263
Intermittent filtration, 266
Intersection of sewers, 254
Iron name plates, 151
Irrigation, 265
Joints of pipe drains, 316

Page 344

Junction of drains, 307
—— sewers, 254
Keeping sewers clean, 251
Kerbing and channelling, 123
Killing rings, 336
Labourers’ dwellings, 284, 291
Lairs for cattle, 333, 346
Lamp-posts, 134
—— —— as sewer ventilators, 274
Land necessary for cemetery, 354
Latrines, 282
Laying out a cemetery, 354
Leaky drains, 309
Leaves as refuse, 225
Letters for names, 152
Lias flagging, 113
Licence to break-up street, 172
Lieurner system, 262
Life of brooms, 235
—— carts, 231
—— paving stones, 76
—— wood, 88
Lighting of slaughter-house, 336
—— streets, 129
Ligno mineral pavement, 83
Limestone, 49
Lime-tree, 322
Line of frontage, 177
Lining of slaughter-house, 335
List of borrowing powers, 376
—— chemical processes for sewage, 268
—— duties of surveyor, 5, 21
—— persons called surveyors, 4
—— road metal, 49
—— shrubs, 320
—— trees, 322

Page 345

—— useful books, 384
Liverpool scavenging, 235
Lloyd’s wood pavement, 82
Locomobiles, 107
Loose stones on road, 45
Macadamised roadways, 34
Machinery for electricity, 141
—— in slaughter-house, 337
Machines for sweeping, 234
—— stone-breaking, 53
Management of cemetery, 358
Manchester abattoir, 333
—— pavement, 78
Manholes for sewers, 253
Manufacturers’ refuse, 253
Markets, 344
Mastic asphalte, 107
Materials of sewage filters, 267
Mechanical subsidence of sewage, 267
Meetings of committees, 23
Melting snow, 240
Merit, test of, 14
Metal road, 48
Meters for public lamps, 133
Method of appointment, 18
Methods of disposal of sewage, 264
—— lighting, 131
—— numbering, 153
—— sewerage, 261
—— sewer ventilation, 276
Minton’s name plates, 151
Model bye-laws, 207
—— lodging-houses, 291
Metropolitan slaughter-house, 339
Money, receipt of, 3
Mortuaries, 365

Page 346

Mount Sorrel, 75
Mowlem’s wood pavement, 83
Muddy streets, 234
Names of committees, 23
Naming and numbering streets, 149
Necessity for kerb, 123
—— slaughter-house, 328
Newcastle lighting, 147
New streets and buildings, 206
Nicholson’s wood pavement, 84
Norwich wood pavement, 84
Notices to repair private streets, 198
—— of assessment of cost of ditto, 201
—— of defective drainage, 313
—— for breaking-up streets, 158
—— cellar coverings, 181
—— for dangerous building, 190
—— defective shuting, 183
—— doors and gates opening outwards, 179
—— insufficient w.c. accommodation, 298
—— numbering, 155
—— overhanging trees, 185
—— permission to break-up streets, 172
—— to construct sewers on private lands, 256
—— to erect buildings, 214
—— to open slaughter-house, 321
—— signature of, 313
Number of graves in cemetery, 354
Objections to asphalte, 100
—— macadamised roadways, 44
—— steam rolling, 72
—— York flagging, 110
Observations of tides, 265
Obstruction in streets, 174
Obstructive buildings, 286
Old tins, 225

Page 347

Opening graves, 356, 361
Open space at back of buildings, 218
—— ventilating shafts, 272
Ornamental shrubs, 320
Outfalls of sewers, 265
Overhanging trees, 185
Paget on steam rolling, 71
Pail system, 234
Pails, 263
Painted names, 151
Painting urinals, 282
Pamphlet on steam rolling, 65
Papers, examination, 16
Paris lighting, 135
—— roadways, cost of, 41
—— tree planting, 326
Parks, 318
Parry on contracts, 383
—— watering, 244
Party walls through roofs, 218
Paths in cemeteries, 355
Partially separate system, 262
Paving of Cattle Market, 346
—— lairs, 333, 346
Pebbles, 50
Pedestrian traffic, 33
Pens for sheep, 333, 346
Permission to break-up streets, 172
—— construct cellar, 182
Persons called surveyor, 4
Pig killing, 340
Pinned roadways, 36, 39
Pipe drains, 315
—— sewers, thickness, &c., 258
—— —— diagrams, 259
Pitch boilers, 80

Page 348

Pitched pavements, 73
Plan for breaking-up streets, 160
Plans of new streets or buildings, 210
—— of house drains, 317
—— for borrowing, 377
—— slaughter-house, 338
Plane tree, 322
Plants for sewage, 270
Plaster not house refuse, 225
Plates, name, 151
Playgrounds, 318
Pleasure grounds, 318, 350
Paving of slaughter-house, 334
Pole-axe, 336
Polluted water supply, 291
Porch, 176
Portable dust-bins, 227
Position of sewer, 254
Post-mortem room, 370
Powers to close slaughter-houses, 330
Power to borrow, 375
—— make contracts, 381
Precipitation of sewage, 268
Preservation of wood, 86
Private lands and sewer, 255
—— roads improvements, 204
—— slaughter-houses, 329
—— street improvements, 193
Privies, 263
Processes of chemical treatment, 268
Projections, 176
Proportions for asphalte, 109
Prosser’s wood pavement, 85
Protection of surveyor, 6, 8
Pruning trees, 321
Public abattoirs, 328
—— conveniences, 280

Page 349

—— dust-bins, 228
—— lighting, 131
—— mortuaries, 365
—— works, 376
Punctuality, 24
Qualities of road metal, 49, 51
Quantity of land for sewage farm, 265
Rain-water pipes as ventilators, 274
—— —— shutes, 183
Rate collecting by surveyor, 3
Rawlinson on borrowing, 377
Receipt of money, 3
Refuse, disposal of, 232
—— from manufactories, 253
—— receptacles, 229
—— trade and garden, 225
Register of drains, 317
—— graves, 360
Regulation of traffic, 33
Regulations of cemeteries, 358, 360
—— connections with sewers, 305
Regulations for breaking-up streets, 171
Reinstating trenches, 162
Removal of snow, 239
—— house refuse, 223
Removing projections, 176
Requirements of artizans’ dwellings, 291
—— drains, 317
—— roadways, 25
Remuneration of surveyor, 7
Reports, 24
—— on duties of surveyor, 10
Resistance of wheels, 31
Roads, private, improvement of, 204
—— in cemeteries, 355
Roadway, specifications of, 35, 36

Page 350

Road metal, 48
—— —— list of, 49
—— —— specification of, 57
—— —— weight of, 56
—— repairs, 66
—— rolling, 60
—— Roman, 73
Ruts in roads, 45
Safety in traffic, 31
Sale rooms, 341
Sanctuaries, 33
Sandstone, 50
Sanitary Institute of Great Britain, 14
Scaffolds, 187
Scavenging, 221
—— cart, 230
Sea-water for watering, 247
Section of roadway, 43
—— footpaths, 121
Sections of cemetery, 356
Security to be entered into, 3
Selection of trees, 321, 322
Separate system, 260, 262
Setting back buildings, 175
—— kerb, 124
Sewerage, 251
Sewerage, system of, 253
Sewer through private lands, 255
Sewered, 195
Sewage and plants, 270
—— crops for, 265
—— disposal, 263
—— filtration, 266, 267
—— irrigation, 265
—— mechanical subsidence, 267
—— precipitation, 268

Page 351

—— screening, 267
—— value of, 265
Sewer gas, 277
—— ventilation, 271
Shafts for ventilation, 273
Shed, 176
Sheep pens, 333, 346
Shiel’s composite pavement, 85
Shone’s system, 262
Shop blinds, 184
Shrubs projecting, 176
—— 320
—— in cemeteries, 360
Shutes, 183
Shutter projecting, 176
Sight rails, 257
Sign projecting, 176
Site for abattoir, 332
—— of Cattle Market, 345
—— for cemetery, 351
Size of cellar covers, 181
—— drains, 316
—— graves, 356
—— pitchers, 74
—— rooms, 294
—— trees, 323
Slaughter-houses, 328, 334
Slaughtering, 342
Slippery roads, 32
Sludge, treatment of, 269
Snow, removal of, 239, 241
—— on footpaths, 241
Soil for cemetery, 352
Soot on trees, 321
Specific gravity of road metal, 49
Specifications of roadway, 35, 36
Specification for asphalte, 103

Page 352

—— flagging, 110
—— for breaking-up streets, 161
—— of wood pavement, 94
—— road metal, 57
—— scavenging, 249
—— tar pavement, 118
Stalls in markets, 349
Stanford’s joint, 257
Step projecting, 176
Stone breaking, 48
Store for hides, 341
Stowe’s wood pavement, 84
Street, breaking-up, 155
—— cleansing, 234
—— definition of, 149, 205
—— lighting, 129
—— lines, 174
—— private, improvements, 193
—— trees, 318
—— watering, 242
Streets, new, 206
Stringent bye-laws, 219
Subjects requiring attention, 21
Subways, 168
Sugg’s regulator, 133
Supervision of new buildings, 217
Surface water over paths, 186
Subsoil water, 261
Surveyor, office first legalised, 1
—— appointment of, 1, 3, 10, 18
—— and private streets, 194
—— as rate collector, 3
—— duties of, 5, 7, 11, 20
—— examination of, 14
—— entry of, to see if new building, 209
—— may be also inspector of nuisances, 3
—— must not be interested in contracts, 3

Page 353

—— of highways, 20
—— protection of, 6, 8
Sweeping machines, 234
Syenite, 49, 75
Tables of cost of roadways, 41
Table of scavenging, 236
—— watering, 246
Tallow market, 341
Tar paving, 118
Telegraphs under or across roads, 164
Telford, Thomas, 35
Tell-tale on water-cart, 247
Temporary obstructions, 192
Testimonials, 18
Test for asphalte, 97
—— brooms, 235
—— of good drains, 316
—— merit, 14
Thames Embankment, lighting, 147
Tides and outfalls, 265
Tins as refuse, 225
Title of surveyor, 4
Town surveyor. See Surveyor
Traction on roads, 28
Trade refuse, 225
Traffic, 25
Tram track, 80
Trap for drain, 317
Trappean rock, 49
Treatment of sludge, 269
—— wood, 86
Trees, 318
—— in cemeteries, 360
—— overhanging, 185
Trenches cut in roads, 161
Toughness of stone, 48

Page 354

Tripery, 341
Troughs for pig-dressing, 340
Unhealthy areas, 288
Urinals, 280
Useful books, 384
Use of steam rollers, 61
Vacancy in office of surveyor, 10
Value of sewage, 265
Vans for watering, 245
Vault or cellar coverings, 180
—— —— under-path, 182
Velocity in sewers, 254
Ventilation of house drain, 317
—— mortuaries, 369
—— sewers, 271
Vigilance of drain inspection, 309
Visit of scavengers, 230
Walls of cemeteries, 351
—— mortuaries, 369
Wall projecting, 176
—— slaughter-house, 335
Water and asphalte, 105
—— companies and streets, 157
—— for slaughter-house, 337
—— over footpaths, 186
—— supply to dwellings, 300
W.C. accommodation, 280, 297
—— in factories, 299
Watering streets, 242
Wear of paving stones, 76
Wearing effect of traffic, 27
Weather on stone, 48
Wheels, resistance of, 31
Weighing machines, 348
Weight of asphalte, 96

Page 355

—— road metal, 56
—— rollers, 67
—— snow, 239
Widening streets, 174
Width of roadways, 32
Window projecting, 176
Wires for electricity, 141
Wooden name plates, 152
Wood paving, 81
—— treatment, 86
—— wear of, 88
Yards behind buildings, 218
York flagging, 110

LONDON: PRINTED BY WILLIAM CLOWES AND SONS, LIMITED,
STAMFORD STREET AND CHARING CROSS.

Page 356

BOOKS RELATING

TO

APPLIED SCIENCE

PUBLISHED BY

E. & F. N. SPON,

LONDON: 16, CHARING CROSS.

NEW YORK: 44, MURRAY STREET.

A Pocket-Book for Chemists, Chemical Manufacturers,
Metallurgists, Dyers, Distillers, Brewers, Sugar Refiners,
Photographers, Students, etc., etc. By Thomas Bayley, Assoc. R.C. Sc.
Ireland, Analytical and Consulting Chemist and Assayer. Second
edition, with additions, 437 pp., royal 32mo, roan, gilt edges, 5s.
Synopsis of Contents:

Atomic Weights and Factors — Useful Data — Chemical Calculations — Rules for Indirect
Analysis — Weights and Measures — Thermometers and Barometers — Chemical Physics —
Boiling Points, etc. — Solubility of Substances — Methods of Obtaining Specific Gravity —
Conversion of Hydrometers — Strength of Solutions by Specific Gravity — Analysis — Gas
Analysis — Water Analysis — Qualitative Analysis and Reactions — Volumetric Analysis —
Manipulation — Mineralogy — Assaying — Alcohol — Beer — Sugar — Miscellaneous
Technological matter relating to Potash, Soda, Sulphuric Acid, Chlorine, Tar Products, Petroleum,
Milk, Tallow, Photography, Prices, Wages, Appendix, etc., etc.

Page 357

The Mechanician: A Treatise on the Construction and
Manipulation of Tools, for the use and instruction of Young Engineers
and Scientific Amateurs, comprising the Arts of Blacksmithing and
Forging; the Construction and Manufacture of Hand Tools, and the
various Methods of Using and Grinding them; the Construction of
Machine Tools, and how to work them; Machine Fitting and Erection;
description of Hand and Machine Processes; Turning and Screw
Cutting; principles of Constructing and details of Making and Erecting
Steam Engines, and the various details of setting out work, etc., etc. By
Cameron Knight, Engineer. Containing 1147 illustrations, and 397
pages of letter-press. Third edition, 4to, cloth, 18s.

On Designing Belt Gearing. By E. J. Cowling Welch, Mem.
Inst. Mech. Engineers, Author of ‘Designing Valve Gearing.’ Fcap.
8vo, sewed, 6d.

A Handbook of Formulæ, Tables, and Memoranda, for
Architectural Surveyors and others engaged in Building. By J. T.
Hurst, C.E. Thirteenth edition, royal 32mo, roan, 5s.
“It is no disparagement to the many excellent publications we refer to, to say that in our opinion
this little pocket-book of Hurst’s is the very best of them all, without any exception. It would be
useless to attempt a recapitulation of the contents, for it appears to contain almost everything that
anyone connected with building could require, and, best of all, made up in a compact form for
carrying in the pocket, measuring only 5 in. by 3 in., and about ¹⁄₄ in. thick, in a limp cover. We
congratulate the author on the success of his laborious and practically compiled little book, which has
received unqualified and deserved praise from every professional person to whom we have shown
it.”—The Dublin Builder.

The Cabinet Maker; being a Collection of the most approved
designs in the Mediæval, Louis-Seize, and Old English styles, for the
use of Cabinet Makers, Carvers, &c. By R. Charles. 96 plates, folio,
half-bound, 10s. 6d.

Quantity Surveying. By J. Leaning. With 42 illustrations,
crown 8vo, cloth, 9s.
Contents:

A complete Explanation of the London Practice.
General Instructions.

Page 358

Order of Taking Off.
Modes of Measurement of the various Trades.
Use and Waste.
Ventilation and Warming.
Credits, with various Examples of Treatment.
Abbreviations.
Squaring the Dimensions.
Abstracting, with Examples in illustration of each Trade.
Billing.
Examples of Preambles to each Trade.
Form for a Bill of Quantities.
Do. Bill of Credits.
Do. Bill for Alternative Estimate.
Restorations and Repairs, and Form of Bill.
Variations before Acceptance of Tender.
Errors in a Builder’s Estimate.
Schedule of Prices.
Form of Schedule of Prices.
Analysis of Schedule of Prices.
Adjustment of Accounts.
Form of a Bill of Variations.
Remarks on Specifications.
Prices and Valuation of Work, with Examples and Remarks upon each Trade.
The Law as it affects Quantity Surveyors, with Law Reports.
Taking Off after the Old Method.
Northern Practice.
The General Statement of the Methods recommended by the Manchester Society of Architects for
taking Quantities.
Examples of Collections.
Examples of “Taking Off” in each Trade.
Remarks on the Past and Present Methods of Estimating.

A Practical Treatise on Heat, as applied to the Useful Arts; for
the Use of Engineers, Architects, &c. By Thomas Box. With 14 plates.
Third edition, crown 8vo, cloth, 12s. 6d.

A Descriptive Treatise on Mathematical Drawing Instruments:
their construction, uses, qualities, selection, preservation, and
suggestions for improvements, with hints upon Drawing and
Colouring. By W. F. Stanley, M.R.I. Fifth edition, with numerous
illustrations, crown 8vo, cloth, 5s.

Page 359

Spons’ Architects and Builders’ Pocket-Book of Prices and
Memoranda. Edited by W. Young, Architect. Royal 32mo, roan, 4s.
6d.; or cloth, red edges, 3s. 6d. Published annually. Tenth edition. Now
ready.

Long-Span Railway Bridges, comprising Investigations of the
Comparative Theoretical and Practical Advantages of the various
adopted or proposed Type Systems of Construction, with numerous
Formulæ and Tables giving the weight of Iron or Steel required in
Bridges from 300 feet to the limiting Spans; to which are added similar
Investigations and Tables relating to Short-span Railway Bridges.
Second and revised edition. By B. Baker, Assoc. Inst. C.E. Plates,
crown 8vo, cloth, 5s.

Elementary Theory and Calculation of Iron Bridges and Roofs.
By August Ritter, Ph.D., Professor at the Polytechnic School at Aix-
la-Chapelle. Translated from the third German edition, by H. R.
Sankey, Capt. R.E. With 500 illustrations, 8vo, cloth, 15s.

The Builder’s Clerk: a Guide to the Management of a Builder’s
Business. By Thomas Bales. Fcap. 8vo, cloth, 1s. 6d.

The Elementary Principles of Carpentry. By Thomas
Tredgold. Revised from the original edition, and partly re-written, by
John Thomas Hurst. Contained in 517 pages of letter-press, and
illustrated with 48 plates and 150 wood engravings. Third edition,
crown 8vo, cloth, 18s.
Section I. On the Equality and Distribution of Forces — Section II. Resistance of Timber —
Section III. Construction of Floors — Section IV. Construction of Roofs — Section V. Construction
of Domes and Cupolas — Section VI. Construction of Partitions — Section VII. Scaffolds, Staging,
and Gantries — Section VIII. Construction of Centres for Bridges — Section IX. Coffer-dams,
Shoring, and Strutting — Section X. Wooden Bridges and Viaducts — Section XI. Joints, Straps, and
other Fastenings — Section XII. Timber.

Our Factories, Workshops, and Warehouses: their Sanitary and
Fire-Resisting Arrangements. By B. H. Thwaite, Assoc. Mem. Inst.
C.E. With 183 wood engravings, crown 8vo, cloth, 9s.

Page 360

Gold: Its Occurrence and Extraction, embracing the
Geographical and Geological Distribution and the Mineralogical
Characters of Gold-bearing rocks; the peculiar features and modes of
working Shallow Placers, Rivers, and Deep Leads; Hydraulicing; the
Reduction and Separation of Auriferous Quartz; the treatment of
complex Auriferous ores containing other metals; a Bibliography of
the subject and a Glossary of Technical and Foreign Terms. By Alfred
G. Lock, F.R.G.S. With numerous illustrations and maps, 1250 pp.,
super-royal 8vo, cloth, 2l. 12s. 6d.

Progressive Lessons in Applied Science. By Edward Sang,
F.R.S.E. Crown 8vo, cloth, each Part, 3s.
Part 1. Geometry on Paper — Part 2. Solidity, Weight, and Pressure — Part 3. Trigonometry,
Vision, and Surveying Instruments.

A Practical Treatise on Coal Mining. By George G. André,
F.G.S., Assoc. Inst. C.E., Member of the Society of Engineers. With 82
lithographic plates. 2 vols., royal 4to, cloth, 3l. 12s.

Sugar Growing and Refining: a Comprehensive Treatise on the
Culture of Sugar-yielding Plants, and the Manufacture, Refining, and
Analysis of Cane, Beet, Maple, Milk, Palm, Sorghum, and Starch
Sugars, with copious statistics of their production and commerce, and
a chapter on the distillation of Rum. By Charles G. Warnford Lock,
F.L.S., &c., and G. W. Wigner and R. H. Harland, FF.C.S., FF.I.C.
With 205 illustrations, 8vo, cloth, 30s.

Spons’ Information for Colonial Engineers. Edited by J. T.
Hurst. Demy 8vo, sewed.
No. 1, Ceylon. By Abraham Deane, C.E. 2s. 6d.
Contents:
Introductory Remarks — Natural Productions — Architecture and
Engineering — Topography, Trade, and Natural History — Principal
Stations — Weights and Measures, etc., etc.
No. 2. Southern Africa, including the Cape Colony, Natal, and the Dutch
Republics. By Henry Hall, F.R.G.S., F.R.C.I. With Map. 3s. 6d.

Page 361

Contents:

General Description of South Africa — Physical Geography with reference to Engineering
Operations — Notes on Labour and Material in Cape Colony — Geological Notes on Rock
Formation in South Africa — Engineering Instruments for Use in South Africa — Principal Public
Works in Cape Colony: Railways, Mountain Roads and Passes, Harbour Works, Bridges, Gas Works,
Irrigation and Water Supply, Lighthouses, Drainage and Sanitary Engineering, Public Buildings,
Mines — Table of Woods in South Africa — Animals used for Draught Purposes — Statistical Notes
— Table of Distances — Rates of Carriage, etc.

No. 3. India. By F. C. Danvers, Assoc. Inst. C.E. With Map. 4s. 6d.
Contents:

Physical Geography of India — Building Materials — Roads — Railways — Bridges — Irrigation
— River Works — Harbours — Lighthouse Buildings — Native Labour — The Principal Trees of
India — Money — Weights and Measures — Glossary of Indian Terms, etc.

A Practical Treatise on Casting and Founding, including
descriptions of the modern machinery employed in the art. By N. E.
Spretson, Engineer. Third edition, with 82 plates drawn to scale, 412
pp., demy 8vo, cloth, 18s.

The Clerk of Works: a Vade-Mecum for all engaged in the
Superintendence of Building Operations. By G. G. Hoskins, F.R.I.B.A.
Third edition, fcap. 8vo, cloth, 1s. 6d.

Tropical Agriculture; or, the Culture, Preparation, Commerce,
and Consumption of the Principal Products of the Vegetable Kingdom,
as furnishing Food, Clothing, Medicine, etc., and in their relation to
the Arts and Manufactures; forming a practical treatise and Handbook
of Reference for the Colonist, Manufacturer, Merchant, and Consumer,
on the Cultivation, Preparation for Shipment, and Commercial Value,
etc., of the various Substances obtained from Trees and Plants entering
into the Husbandry of Tropical and Sub-Tropical Regions. By P. L.
Simmonds. Second edition, revised and improved, 515 pages, 8vo,
cloth, 1l. 1s.

Steel: its History, Manufacture, and Uses. By J. S. Jeans,
Secretary of the Iron and Steel Institute. 860 pages and 24 plates, 8vo,
cloth, 36s.

Page 362

American Foundry Practice: Treating of Loam, Dry Sand, and
Green Sand Moulding, and containing a Practical Treatise upon the
Management of Cupolas, and the Melting of Iron. By T. D. West,
Practical Iron Moulder and Foundry Foreman. Second edition, with
numerous illustrations, crown 8vo, cloth, 10s. 6d.

The Maintenance of Macadamised Roads. By T. Codrington,
M.I.C.E, F.G.S., General Superintendent of County Roads for South
Wales. 8vo, cloth, 6s.

Hydraulic Steam and Hand Power Lifting and Pressing
Machinery. By Frederick Colyer, M. Inst. C.E., M. Inst. M.E. With 73
plates, 8vo, cloth, 18s.

Pumps and Pumping Machinery. By F. Colyer, M.I.C.E.,
M.I.M.E. With 23 folding plates, 8vo, cloth, 12s. 6d.

Tables of the Principal Speeds occurring in Mechanical
Engineering, expressed in metres in a second. By P. Keerayeff, Chief
Mechanic of the Obouchoff Steel Works, St. Petersburg; translated by
Sergius Kern, M.E. Fcap. 8vo, sewed, 6d.

Girder Making and the Practice of Bridge Building in Wrought
Iron, illustrated by Examples of Bridges, Piers, and Girder Work, etc.,
constructed at the Skerne Iron Works, Darlington, by Edward
Hutchinson, M. Inst. M.E. With 35 plates, demy 8vo, cloth, 10s. 6d.

Spons’ Dictionary of Engineering, Civil, Mechanical, Military,
and Naval; with technical terms in French, German, Italian, and
Spanish, 3100 pp., and nearly 8000 engravings, in super-royal 8vo, in
8 divisions, 5l. 8s. Complete in 3 vols., cloth, 5l. 5s. Bound in a
superior manner, half-morocco, top edge gilt, 3 vols., 6l. 12s.
See page 15.
A Treatise on the Origin, Progress, Prevention, and
Cure of Dry Rot in Timber; with Remarks on the Means of Preserving
Wood from Destruction by Sea-Worms, Beetles, Ants, etc. By Thomas

Page 363

Allen Britton, late Surveyor to the Metropolitan Board of Works,
etc., etc. With 10 plates, crown 8vo, cloth, 7s. 6d.

Metrical Tables. By G. L. Molesworth, M.I.C.E. 32mo, cloth,
1s. 6d.
Contents.
General — Linear Measures — Square Measures — Cubic Measures —
Measures of Capacity — Weights — Combinations — Thermometers.

A Handbook of Electrical Testing. By H. R. Kempe, Member of
the Society of Telegraph Engineers. New edition, revised and enlarged,
with 81 illustrations. Crown 8vo, cloth, 12s. 6d.

Electro-Telegraphy. By Frederick S. Beechey, Telegraph
Engineer. A Book for Beginners. Illustrated. Fcap. 8vo, sewed, 6d.

Handrailing: by the Square Cut. By John Jones, Staircase
Builder. Fourth edition, with seven plates, 8vo, cloth, 3s. 6d.

Handrailing: by the Square Cut. By John Jones, Staircase
Builder. Part Second, with eight plates, 8vo, cloth, 3s. 6d.

The Gas Consumer’s Handy Book. By William Richards, C.E.
Illustrated. 18mo, sewed, 6d.

Steam Heating for Buildings; or, Hints to Steam Fitters, being a
description of Steam Heating Apparatus for Warming and Ventilating
Private Houses and large Buildings; with Remarks on Steam, Water,
and Air in their relation to Heating; to which are added miscellaneous
Tables. By J. W. Baldwin, Steam Heating Engineer. With many
illustrations. Second edition, crown 8vo, cloth, 10s. 6d.

A Pocket-Book of Useful Formulæ and Memoranda for Civil
and Mechanical Engineers. By Guilford L. Molesworth, Mem. Inst.
C.E., Consulting Engineer to the Government of India for State

Page 364

Railways. With numerous illustrations, 744 pp. Twenty-first edition,
revised and enlarged, 32mo, roan, 6s.
Synopsis of Contents:

Surveying, Levelling, etc. — Strength and Weight of Materials — Earthwork, Brickwork,
Masonry, Arches, etc. — Struts, Columns, Beams, and Trusses — Flooring, Roofing, and Roof
Trusses — Girders, Bridges, etc. — Railways and Roads — Hydraulic Formulæ — Canals, Sewers,
Waterworks, Docks — Irrigation and Breakwaters — Gas, Ventilation, and Warming — Heat, Light,
Colour, and Sound — Gravity: Centres, Forces, and Powers — Millwork, Teeth of Wheels, Shafting,
etc. — Workshop Recipes — Sundry Machinery — Animal Power — Steam and the Steam Engine
— Water-power, Water-wheels, Turbines, etc. — Wind and Windmills — Steam Navigation, Ship
Building, Tonnage, etc. — Gunnery, Projectiles, etc. — Weights, Measures, and Money —
Trigonometry, Conic Sections, and Curves — Telegraphy — Mensuration — Tables of Areas and
Circumference, and Arcs of Circles — Logarithms, Square and Cube Roots, Powers — Reciprocals,
etc. — Useful Numbers — Differential and Integral Calculus — Algebraic Signs — Telegraphic
Construction and Formulæ.

Spons’ Tables and Memoranda for Engineers; selected and
arranged by J. T. Hurst, C.E., Author of ‘Architectural Surveyors’
Handbook,’ ‘Hurst’s Tredgold’s Carpentry,’ etc. Fifth edition, 64mo,
roan, gilt edges, 1s.; or in cloth case, 1s. 6d.
This work is printed in a pearl type, and is so small, measuring only 2¹⁄₂ in. by 1³⁄₄ in. by ¹⁄₄ in.
thick, that it may be easily carried in the waistcoat pocket.
“It is certainly an extremely rare thing for a reviewer to be called upon to notice a volume
measuring but 2¹⁄₂ in. by 1³⁄₄ in., yet these dimensions faithfully represent the size of the handy little
book before us. The volume—which contains 118 printed pages, besides a few blank pages for
memoranda—is, in fact, a true pocket-book, adapted for being carried in the waistcoat pocket, and
containing a far greater amount and variety of information than most people would imagine could be
compressed into so small a space. . . . . The little volume has been compiled with considerable care
and judgment, and we can cordially recommend it to our readers as a useful little pocket
companion.”—Engineering.

Analysis, Technical Valuation, Purification and Use of Coal
Gas. By the Rev. W. R. Bowditch, M.A. With wood engravings, 8vo,
cloth, 12s. 6d.
Condensation of Gas — Purification of Gas — Light — Measuring — Place of Testing Gas —
Test Candles — The Standard for Measuring Gas-light — Test Burners — Testing Gas for Sulphur
— Testing Gas for Ammonia — Condensation by Bromine — Gravimetric Method of taking Specific
Gravity of Gas — Carburetting or Naphthalizing Gas — Acetylene — Explosions of Gas —
Gnawing of Gaspipes by Rats — Pressure as related to Public Lighting, etc.

Page 365

A Practical Treatise on Natural and Artificial Concrete, its
Varieties and Constructive Adaptations. By Henry Reid, Author of the
‘Science and Art of the Manufacture of Portland Cement.’ New
Edition, with 59 woodcuts and 5 plates, 8vo, cloth, 15s.

Hydrodynamics: Treatise relative to the Testing of Water-
Wheels and Machinery, with various other matters pertaining to
Hydrodynamics. By James Emerson. With numerous illustrations, 360
pp. Third edition, crown 8vo, cloth, 4s. 6d.

The Gas Analyst’s Manual. By F. W. Hartley, Assoc. Inst.
C.E., etc. With numerous illustrations. Crown 8vo, cloth, 6s.

Gas Measurement and Gas Meter Testing. By F. W. Hartley.
Fourth edition, revised and extended. Illustrated, crown 8vo, cloth, 4s.

The French-Polishers Manual. By a French-Polisher;
containing Timber Staining, Washing, Matching, Improving, Painting,
Imitations, Directions for Staining, Sizing, Embodying, Smoothing,
Spirit Varnishing, French-Polishing, Directions for Repolishing. Third
edition, royal 32mo, sewed, 6d.

Hops, their Cultivation, Commerce, and Uses in various
Countries. By P. L. Simmonds. Crown 8vo, cloth, 4s. 6d.

A Practical Treatise on the Manufacture and Distribution of
Coal Gas. By William Richards. Demy 4to, with numerous wood
engravings and 29 plates, cloth, 28s.
Synopsis of Contents:

Introduction — History of Gas Lighting — Chemistry of Gas Manufacture, by Lewis Thompson,
Esq., M.R.C.S. — Coal, with Analyses, by J. Paterson, Lewis Thompson, and G. R. Hislop, Esqrs. —
Retorts, Iron and Clay — Retort Setting — Hydraulic Main — Condensers — Exhausters —
Washers and Scrubbers — Purifiers — Purification — History of Gas Holder — Tanks, Brick and
Stone, Composite, Concrete, Cast-iron, Compound Annular Wrought-iron — Specifications — Gas
Holders — Station Meter — Governor — Distribution — Mains — Gas Mathematics, or Formulæ
for the Distribution of Gas, by Lewis Thompson, Esq. — Services — Consumers’ Meters —
Regulators — Burners — Fittings — Photometer — Carburization of Gas — Air Gas and Water Gas
— Composition of Coal Gas, by Lewis Thompson, Esq. — Analyses of Gas — Influence of

Page 366

Atmospheric Pressure and Temperature on Gas — Residual Products — Appendix — Description of
Retort Settings, Buildings, etc., etc.

Practical Geometry and Engineering Drawing; a Course of
Descriptive Geometry adapted to the Requirements of the Engineering
Draughtsman, including the determination of cast shadows and
Isometric Projection, each chapter being followed by numerous
examples; to which are added rules for Shading, Shade-lining, etc.,
together with practical instructions as to the Lining, Colouring,
Printing, and general treatment of Engineering Drawings, with a
chapter on drawing Instruments. By George S. Clarke, Lieut. R.E.,
Instructor in Mechanical Drawing, Royal Indian Engineering College.
20 plates, 4to, cloth, 15s.

The Elements of Graphic Statics. By Professor Karl Von Ott,
translated from the German by G. S. Clarke, Lieut. R.E., Instructor in
Mechanical Drawing, Royal Indian Engineering College. With 93
illustrations, crown 8vo, cloth, 5s.

The Principles of Graphic Statics. By George Sydenham
Clarke, Lieut. Royal Engineers. With 112 illustrations. 4to, cloth, 12s.
6d.

The New Formula for Mean Velocity of Discharge of Rivers
and Canals. By W. R. Kutter. Translated from articles in the ‘Cultur-
Ingenieur,’ by Lowis D’A. Jackson, Assoc. Inst. C.E. 8vo, cloth, 12s.
6d.

Practical Hydraulics; a Series of Rules and Tables for the use
of Engineers, etc., etc. By Thomas Box. Fifth edition, numerous plates,
post 8vo, cloth, 5s.

A Practical Treatise on the Construction of Horizontal and
Vertical Waterwheels, specially designed for the use of operative
mechanics. By William Cullen, Millwright and Engineer. With 11
plates. Second edition, revised and enlarged, small 4to, cloth, 12s. 6d.

Page 367

Aid Book to Engineering Enterprise Abroad. By Ewing
Matheson, M. Inst. C.E. The book treats of Public Works and
Engineering Enterprises in their inception and preliminary
arrangement; of the different modes in which money is provided for
their accomplishment; and of the economical and technical
considerations by which success or failure is determined. The
information necessary to the designs of Engineers is classified, as are
also those particulars by which Contractors may estimate the cost of
works, and Capitalists the probabilities of profit. Illustrated, 2 vols.,
8vo, 12s. 6d. each.

The Essential Elements of Practical Mechanics; based on the
Principle of Work, designed for Engineering Students. By Oliver
Byrne, formerly Professor of Mathematics, College for Civil
Engineers. Third edition, with 148 wood engravings, post 8vo, cloth,
7s. 6d.
Contents:

Chap. 1. How Work is Measured by a Unit, both with and without reference to a Unit of Time —
Chap. 2. The Work of Living Agents, the Influence of Friction, and introduces one of the most
beautiful Laws of Motion — Chap. 3. The principles expounded in the first and second chapters are
applied to the Motion of Bodies — Chap. 4. The Transmission of Work by simple Machines — Chap.
5. Useful Propositions and Rules.

The Practical Millwright’s and Engineer’s Ready Reckoner; or
Tables for finding the diameter and power of cog-wheels, diameter,
weight, and power of shafts, diameter and strength of bolts, etc. By
Thomas Dixon. Fourth edition, 12mo, cloth, 3s.

Breweries and Maltings: their Arrangement, Construction,
Machinery, and Plant. By G. Scamell, F.R.I.B.A. Second edition,
revised, enlarged, and partly rewritten. By F. Colyer, M.I.C.E.,
M.I.M.E. With 20 plates, 8vo, cloth, 18s.

A Practical Treatise on the Manufacture of Starch, Glucose,
Starch-Sugar, and Dextrine, based on the German of L. Von Wagner,
Professor in the Royal Technical School, Buda Pesth, and other
authorities. By Julius Frankel; edited by Robert Hutter, proprietor of

Page 368

the Philadelphia Starch Works. With 58 illustrations, 344 pp., 8vo,
cloth, 18s.

A Practical Treatise on Mill-gearing, Wheels, Shafts, Riggers,
etc.; for the use of Engineers. By Thomas Box. Third edition, with 11
plates. Crown 8vo, cloth, 7s. 6d.

Mining Machinery: a Descriptive Treatise on the Machinery,
Tools, and other Appliances used in Mining. By G. G. André, F.G.S.,
Assoc. Inst. C.E., Mem. of the Society of Engineers. Royal 4to,
uniform with the Author’s Treatise on Coal Mining, containing 182
plates, accurately drawn to scale, with descriptive text, in 2 vols.,
cloth, 3l. 12s.
Contents:

Machinery for Prospecting, Excavating, Hauling, and Hoisting — Ventilation — Pumping —
Treatment of Mineral Products, including Gold and Silver, Copper, Tin, and Lead, Iron, Coal,
Sulphur, China Clay, Brick Earth, etc.

Tables for Setting out Curves for Railways, Canals, Roads,
etc., varying from a radius of five chains to three miles. By A.
Kennedy and R. W. Hackwood. Illustrated, 32mo, cloth, 2s. 6d.

The Science and Art of the Manufacture of Portland Cement,
with observations on some of its constructive applications. With 66
illustrations. By Henry Reid, C.E., Author of ‘A Practical Treatise on
Concrete,’ etc., etc. 8vo, cloth, 18s.

The Draughtsman’s Handbook of Plan and Map Drawing;
including instructions for the preparation of Engineering,
Architectural, and Mechanical Drawings. With numerous illustrations
in the text, and 33 plates (15 printed in colours). By G. G. André,
F.G.S., Assoc. Inst. C.E. 4to, cloth, 9s.
Contents:

The Drawing Office and its Furnishings — Geometrical Problems — Lines, Dots, and their
Combinations — Colours, Shading, Lettering, Bordering, and North Points — Scales — Plotting —
Civil Engineers’ and Surveyors’ Plans — Map Drawing — Mechanical and Architectural Drawing —
Copying and Reducing Trigonometrical Formulæ, etc., etc.

Page 369

The Boiler-maker’s and Iron Ship-builder’s Companion,
comprising a series of original and carefully calculated tables, of the
utmost utility to persons interested in the iron trades. By James Foden,
author of ‘Mechanical Tables,’ etc. Second edition revised, with
illustrations, crown 8vo, cloth, 5s.

Rock Blasting: a Practical Treatise on the means employed in
Blasting Rocks for Industrial Purposes. By G. G. André, F.G.S., Assoc.
Inst. C.E. With 56 illustrations and 12 plates, 8vo, cloth, 10s. 6d.

Surcharged and different Forms of Retaining Walls. By J. S.
Tate. Illustrated, 8vo, sewed, 2s.

A Treatise on Ropemaking as practised in public and private
Rope-yards, with a Description of the Manufacture, Rules, Tables of
Weights, etc., adapted to the Trade, Shipping, Mining, Railways,
Builders, etc. By R. Chapman, formerly foreman to Messrs. Huddart
and Co., Limehouse, and late Master Ropemaker to H.M. Dockyard,
Deptford. Second edition, 12mo, cloth, 3s.

Laxton’s Builders’ and Contractors’ Tables; for the use of
Engineers, Architects, Surveyors, Builders, Land Agents, and others.
Bricklayer, containing 22 tables, with nearly 30,000 calculations. 4to,
cloth, 5s.

Laxton’s Builders’ and Contractors’ Tables. Excavator, Earth,
Land, Water, and Gas, containing 53 tables, with nearly 24,000
calculations. 4to, cloth, 5s.

Sanitary Engineering: a Guide to the Construction of Works of
Sewerage and House Drainage, with Tables for facilitating the
calculations of the Engineer. By Baldwin Latham, C.E., M. Inst. C.E.,
F.G.S., F.M.S., Past-President of the Society of Engineers. Second
edition, with numerous plates and woodcuts, 8vo, cloth, 1l. 10s.

Screw Cutting Tables for Engineers and Machinists, giving the
values of the different trains of Wheels required to produce Screws of

Page 370

any pitch, calculated by Lord Lindsay, M.P., F.R.S., F.R.A.S., etc.
Royal 8vo, cloth, oblong, 2s.

Screw Cutting Tables, for the use of Mechanical Engineers,
showing the proper arrangement of Wheels for cutting the Threads of
Screws of any required pitch, with a Table for making the Universal
Gas-pipe Threads and Taps. By W. A. Martin, Engineer. Second
edition, royal 8vo, oblong, cloth, 1s., or sewed, 6d.

A Treatise on a Practical Method of Designing Slide-Valve
Gears by Simple Geometrical Construction, based upon the principles
enunciated in Euclid’s Elements, and comprising the various forms of
Plain Slide-Valve and Expansion Gearing; together with Stephenson’s,
Gooch’s, and Allan’s Link-Motions, as applied either to reversing or to
variable expansion combinations. By Edward J. Cowling Welch,
Memb. Inst. Mechanical Engineers. Crown 8vo, cloth, 6s.

Cleaning and Scouring: a Manual for Dyers, Laundresses, and
for Domestic Use. By S. Christopher. 18mo, sewed, 6d.

A Handbook of House Sanitation; for the use of all persons
seeking a Healthy Home. A reprint of those portions of Mr. Bailey-
Denton’s Lectures on Sanitary Engineering, given before the School of
Military Engineering, which related to the “Dwelling,” enlarged and
revised by his Son, E. F. Bailey-Denton, C.E., B.A. With 140
illustrations, 8vo, cloth, 8s. 6d.

Treatise on Valve-Gears, with special consideration of the
Link-Motions of Locomotive Engines. By Dr. Gustav Zeuner. Third
edition, revised and enlarged, translated from the German, with the
special permission of the author, by Moritz Müller. Plates, 8vo,
cloth, 12s. 6d.

A Pocket-Book for Boiler Makers and Steam Users, comprising
a variety of useful information for Employer and Workman,
Government Inspectors, Board of Trade Surveyors, Engineers in
charge of Works and Slips, Foremen of Manufactories, and the general

Page 371

Steam-using Public. By Maurice John Sexton. Second edition, royal
32mo, roan, gilt edges, 5s.

The Strains upon Bridge Girders and Roof Trusses, including
the Warren, Lattice, Trellis, Bowstring, and other Forms of Girders, the
Curved Roof, and Simple and Compound Trusses. By Thos. Cargill,
C.E.B.A.T., C.D., Assoc. Inst. C.E., Member of the Society of
Engineers. With 64 illustrations, drawn and worked out to scale, 8vo,
cloth, 12s. 6d.

A Practical Treatise on the Steam Engine, containing Plans and
Arrangements of Details for Fixed Steam Engines, with Essays on the
Principles involved in Design and Construction. By Arthur Rigg,
Engineer, Member of the Society of Engineers and of the Royal
Institution of Great Britain. Demy 4to, copiously illustrated with
woodcuts and 96 plates, in one Volume, half-bound morocco, 2l. 2s.;
or cheaper edition, cloth, 25s.
This work is not, in any sense, an elementary treatise, or history of the steam engine, but is
intended to describe examples of Fixed Steam Engines without entering into the wide domain of
locomotive or marine practice. To this end illustrations will be given of the most recent arrangements
of Horizontal, Vertical, Beam, Pumping, Winding, Portable, Semi-portable, Corliss, Allen,
Compound, and other similar Engines, by the most eminent Firms in Great Britain and America. The
laws relating to the action and precautions to be observed in the construction of the various details,
such as Cylinders, Pistons, Piston-rods, Connecting-rods, Cross-heads, Motion-blocks, Eccentrics,
Simple, Expansion, Balanced, and Equilibrium Slide-valves, and Valve-gearing will be minutely
dealt with. In this connection will be found articles upon the Velocity of Reciprocating Parts and the
Mode of Applying the Indicator, Heat and Expansion of Steam Governors, and the like. It is the
writer’s desire to draw illustrations from every possible source, and give only those rules that present
practice deems correct.

Barlow’s Tables of Squares, Cubes, Square Roots, Cube Roots,
Reciprocals of all Integer Numbers up to 10,000. Post 8vo, cloth, 6s.

Camus (M.) Treatise on the Teeth of Wheels, demonstrating the
best forms which can be given to them for the purposes of Machinery,
such as Mill-work and Clock-work, and the art of finding their
numbers. Translated from the French, with details of the present
practice of Millwrights, Engine Makers, and other Machinists, by
Isaac Hawkins. Third edition, with 18 plates, 8vo, cloth, 5s.

Page 372

A Practical Treatise on the Science of Land and Engineering
Surveying, Levelling, Estimating Quantities, etc., with a general
description of the several Instruments required for Surveying,
Levelling, Plotting, etc. By H. S. Merrett. Third edition, 41 plates
with illustrations and tables, royal 8vo, cloth, 12s. 6d.
Principal Contents:

Part 1. Introduction and the Principles of Geometry. Part 2. Land Surveying; comprising General
Observations — The Chain — Offsets Surveying by the Chain only — Surveying Hilly Ground —
To Survey an Estate or Parish by the Chain only — Surveying with the Theodolite — Mining and
Town Surveying — Railroad Surveying — Mapping — Division and Laying out of Land —
Observations on Enclosures — Plane Trigonometry. Part 3. Levelling — Simple and Compound
Levelling — The Level Book — Parliamentary Plan and Section — Levelling with a Theodolite —
Gradients — Wooden Curves — To Lay out a Railway Curve — Setting out Widths. Part 4.
Calculating Quantities generally for Estimates — Cuttings and Embankments — Tunnels —
Brickwork — Ironwork — Timber Measuring. Part 5. Description and Use of Instruments in
Surveying and Plotting — The Improved Dumpy Level — Troughton’s Level — The Prismatic
Compass — Proportional Compass — Box Sextant — Vernier — Pantagraph — Merrett’s Improved
Quadrant — Improved Computation Scale — The Diagonal Scale — Straight Edge and Sector. Part
6. Logarithms of Numbers — Logarithmic Sines and Co-Sines, Tangents and Co-Tangents — Natural
Sines and Co-Sines — Tables for Earthwork, for Setting out Curves, and for various Calculations,
etc., etc., etc.

Saws: the History, Development, Action, Classification, and
Comparison of Saws of all kinds. By Robert Grimshaw. With 220
illustrations, 4to, cloth, 12s. 6d.

A Supplement to the above; containing additional practical
matter, more especially relating to the forms of Saw Teeth for special
material and conditions, and to the behaviour of Saws under particular
conditions. With 120 illustrations, cloth, 9s.

A Guide for the Electric Testing of Telegraph Cables. By Capt.
V. Hoskiœr, Royal Danish Engineers. With illustrations, second
edition, crown 8vo, cloth, 4s. 6d.

Laying and Repairing Electric Telegraph Cables. By Capt. V.
Hoskiœr, Royal Danish Engineers. Crown 8vo, cloth, 3s. 6d.

Page 373

A Pocket-Book of Practical Rules for the Proportions of
Modern Engines and Boilers for Land and Marine purposes. By N. P.
Burgh. Seventh edition, royal 32mo, roan, 4s. 6d.

Table of Logarithms of the Natural Numbers, from 1 to
108,000. By Charles Babbage, Esq., M.A. Stereotyped edition, royal
8vo, cloth, 7s. 6d.
To ensure the correctness of these Tables of Logarithms, they were compared with Callett’s,
Vega’s, Hutton’s, Briggs’, Gardiner’s, and Taylor’s Tables of Logarithms, and carefully read by nine
different readers; and further, to remove any possibility of an error remaining, the stereotyped sheets
were hung up in the Hall at Cambridge University, and a reward offered to anyone who could find an
inaccuracy. So correct are these Tables, that since their first issue in 1827 no error has been
discovered.

The Steam Engine considered as a Heat Engine: a Treatise on
the Theory of the Steam Engine, illustrated by Diagrams, Tables, and
Examples from Practice. By Jas. H. Cotterill, M.A., F.R.S., Professor
of Applied Mechanics in the Royal Naval College. 8vo, cloth, 12s. 6d.

The Practice of Hand Turning in Wood, Ivory, Shell, etc., with
Instructions for Turning such Work in Metal as may be required in the
Practice of Turning in Wood, Ivory, etc.; also an Appendix on
Ornamental Turning. (A book for beginners.) By Francis Campin.
Second edition, with wood engravings, crown 8vo, cloth, 6s.
Contents:

On Lathes — Turning Tools — Turning Wood — Drilling — Screw Cutting — Miscellaneous
Apparatus and Processes — Turning Particular Forms — Staining — Polishing — Spinning Metals
— Materials — Ornamental Turning, etc.

Health and Comfort in House Building, or Ventilation with
Warm Air by Self-Acting Suction Power, with Review of the mode of
Calculating the Draught in Hot-Air Flues, and with some actual
Experiments. By J. Drysdale, M.D., and J. W. Hayward, M.D. Second
edition, with Supplement, with plates, demy 8vo, cloth, 7s. 6d.

Treatise on Watchwork, Past and Present. By the Rev. H. L.
Nelthropp, M.A., F.S.A. With 32 illustrations, crown 8vo, cloth, 6s.
6d.

Page 374

Contents:

Definitions of Words and Terms used in Watchwork — Tools — Time — Historical Summary —
On Calculations of the Numbers for Wheels and Pinions; their Proportional Sizes, Trains, etc. — Of
Dial Wheels, or Motion Work — Length of Time of Going without Winding up — The Verge — The
Horizontal — The Duplex — The Lever — The Chronometer — Repeating Watches — Keyless
Watches — The Pendulum, or Spiral Spring — Compensation — Jewelling of Pivot Holes —
Clerkenwell — Fallacies of the Trade — Incapacity of Workmen — How to Choose and Use a
Watch, etc.

Spons’ Engineers’ and Contractors’ Illustrated Book of Prices
of Machines, Tools, Ironwork, and Contractors’ Material; and
Engineers’ Directory. Third edition, 4to, cloth, 6s.

Algebra Self-Taught. By W. P. Higgs, M.A., D.Sc., LL.D.,
Assoc. Inst. C.E., Author of ‘A Handbook of the Differential Calculus,’
etc. Second edition, crown 8vo, cloth, 2s. 6d.
Contents:

Symbols and the Signs of Operation — The Equation and the Unknown Quantity — Positive and
Negative Quantities — Multiplication — Involution — Exponents — Negative Exponents — Roots,
and the Use of Exponents as Logarithms — Logarithms — Tables of Logarithms and Proportionate
Parts — Transformation of System of Logarithms — Common Uses of Common Logarithms —
Compound Multiplication and the Binomial Theorem — Division, Fractions, and Ratio — Continued
Proportion — The Series and the Summation of the Series — Limit of Series — Square and Cube
Roots — Equations — List of Formulæ, etc.

JUST PUBLISHED.
In super-royal 8vo, 1168 pp., with 2400 illustrations, in 3 Divisions, cloth, price 13s. 6d. each; or 1
vol., cloth, 2l.; or half-morocco, 2l. 8s.

A SUPPLEMENT
TO

SPONS’ DICTIONARY OF ENGINEERING,

Page 375

Civil, Mechanical, Military, and Naval.
Edited by ERNEST SPON, Memb. Soc. Engineers.

The success which has attended the publication of ‘Spons’ Dictionary of Engineering’ has
encouraged the Publishers to use every effort tending to keep the work up to the standard of existing
professional knowledge. As the Book has now been some years before the public without addition or
revision, there are many subjects of importance which, of necessity, are either not included in its
pages, or have been treated somewhat less fully than their present importance demands. With the
object, therefore, of remedying these omissions, this Supplement is now being issued. Each subject in
it is treated in a thoroughly comprehensive way; but, of course, without repeating the information
already included in the body of the work.
The new matter comprises articles upon
Abacus, Counters, Speed Indicators, and Slide Rule.
Agricultural Implements and Machinery.
Air Compressors.
Animal Charcoal Machinery.
Antimony.
Axles and Axle-boxes.
Barn Machinery.
Belts and Belting.
Blasting.
Boilers.
Brakes.
Brick Machinery.
Bridges.
Cages for Mines.
Calculus, Differential and Integral.
Canals.
Carpentry.
Cast Iron.
Cement, Concrete, Limes, and Mortar.
Chimney Shafts.
Coal Cleansing and Washing.
Coal Mining.
Coal Cutting Machines.
Coke Ovens.
Copper.
Docks.
Drainage.
Dredging Machinery.
Dynamo—Electric and Magneto-Electric Machines.
Dynamometers.
Electrical Engineering, Telegraphy, Electric Lighting and its practical details,
Telephones.
Engines, Varieties of.
Explosives.
Fans.
Founding, Moulding and the practical work of the Foundry.

Page 376

Gas, Manufacture of.
Hammers, Steam and other Power.
Heat.
Horse Power.
Hydraulics.
Hydro-geology.
Indicators.
Iron.
Lifts, Hoists, and Elevators.
Lighthouses, Buoys, and Beacons.
Machine Tools.
Materials of Construction.
Meters.
Ores, Machinery and Processes employed to Dress.
Piers.
Pile Driving.
Pneumatic Transmission.
Pumps.
Pyrometers.
Road Locomotives.
Rock Drills.
Rolling Stock.
Sanitary Engineering.
Shafting.
Steel.
Steam Navvy.
Stone Machinery.
Tramways.
Well Sinking.

NOW COMPLETE.
With nearly 1500 illustrations, in super-royal 8vo, in 5 Divisions, cloth. Divisions 1 to 4, 13s. 6d.
each; Division 5, 17s. 6d.; or 2 vols., cloth, £3 10s.

SPONS’ ENCYCLOPÆDIA
OF THE

INDUSTRIAL ARTS, MANUFACTURES, and
COMMERCIAL PRODUCTS.
Edited by C. G. WARNFORD LOCK, F.L.S.

Among the more important of the subjects treated of, are the following:—
Acids, 207 pp. 220 figs.
Alcohol, 23 pp. 16 figs.

Page 377

Alcoholic Liquors, 13 pp.
Alkalies, 89 pp. 78 figs.
Alloys.
Alum.
Asphalt.
Assaying.
Beverages, 89 pp. 29 figs.
Blacks.
Bleaching Powder, 15 pp.
Bleaching, 51 pp. 48 figs.
Candles, 18 pp. 9 figs.
Carbon Bisulphide.
Celluloid, 9 pp.
Cements.
Clay.
Coal-tar Products, 44 pp. 14 figs.
Cocoa, 8 pp.
Coffee, 32 pp. 13 figs.
Cork, 8 pp. 17 figs.
Cotton Manufactures, 62 pp. 57 figs.
Drugs, 38 pp.
Dyeing and Calico Printing, 28 pp. 9 figs.
Dyestuffs, 16 pp.
Electro-Metallurgy, 13 pp.
Explosives, 22 pp. 33 figs.
Feathers.
Fibrous Substances, 92 pp. 79 figs.
Floor-cloth, 16 pp. 21 figs.
Food Preservation, 8 pp.
Fruit, 8 pp.
Fur, 5 pp.
Gas, Coal, 8 pp.
Gems.
Glass, 45 pp. 77 figs.
Graphite, 7 pp.
Hair, 7 pp.
Hair Manufactures.
Hats, 26 pp. 26 figs.
Honey.
Hops.
Horn.
Ice, 10 pp. 14 figs.
Indiarubber Manufactures, 23 pp. 17 figs.
Ink, 17 pp.
Ivory.
Jute Manufactures, 11 pp., 11 figs.
Knitted Fabrics—Hosiery,
15 pp. 13 figs.
Lace, 13 pp. 9 figs.
Leather, 28 pp. 31 figs.

Page 378

Linen Manufactures, 16 pp. 6 figs.
Manures, 21 pp. 30 figs.
Matches, 17 pp. 38 figs.
Mordants, 13 pp.
Narcotics, 47 pp.
Nuts, 10 pp.
Oils and Fatty Substances, 125 pp.
Paint.
Paper, 26 pp. 23 figs.
Paraffin, 8 pp. 6 figs.
Pearl and Coral, 8 pp.
Perfumes, 10 pp.
Photography, 13 pp. 20 figs.
Pigments, 9 pp. 6 figs.
Pottery, 46 pp. 57 figs.
Printing and Engraving, 20 pp. 8 figs.
Rags.
Resinous and Gummy Substances, 75 pp. 16 figs.
Rope, 16 pp. 17 figs.
Salt, 31 pp. 23 figs.
Silk, 8 pp.
Silk Manufactures, 9 pp. 11 figs.
Skins, 5 pp.
Small Wares, 4 pp.
Soap and Glycerine, 39 pp. 45 figs.
Spices, 16 pp.
Sponge, 5 pp.
Starch, 9 pp. 10 figs.
Sugar, 155 pp. 134 figs.
Sulphur.
Tannin, 18 pp.
Tea, 12 pp.
Timber, 13 pp.
Varnish, 15 pp.
Vinegar, 5 pp.
Wax, 5 pp.
Wool, 2 pp.
Woollen Manufactures, 58 pp. 39 figs.

London: E. & F. N. SPON, 16, Charing Cross.
New York: 44, Murray Street.

Page 379

Transcriber’s Notes

Depending on the hard- and software used and their
settings, not all elements may display as intended;
some of the larger tables are best viewed on a wide
screen in a wide window.
Inconsistent spelling, hyphenation, lay-out and use of
accents and thousands separators have been retained
except as listed below.
The (inconsistent) use of spaces, underscores, hyphens
etc. to indicate blanks where names, data etc. need to
be inserted has not been standardised.
page 4, Dr. Ackland: possibly Henry Acland.
page 137, 855 décicarcel-cubes: probably the decimal
point is missing.
page 372, Ranson’s: should possibly be Ransom’s (cf.
Table of Contents) or vice versa.
Index: not all items are given in alphabetical order, this
has not been corrected.

Changes made:
Footnotes have been moved to the end of each chapter.
Some obvious minor punctuation and typographical errors
have been corrected silently.
Vide has been standardised to Vide.
page xv: Leichenhauser changed to Leichenhaus
page 1: c. 63 s. 37 changed to c. 63 s. 37
page 14: closing quotes removed from after ...
instructions thereon.
page 16: opening quotes removed from before
Syllabus of Subjects ...
page 38: closing quote removed from after ...
finished pavement.

Page 380

page 52: Ellisons changed to Ellison’s
page 85, footnote [73]: Henry Allnut changed to
Henry Allnutt
page 93: 5 0 changed to 5·0
page 137: décicarcel-tubes changed to décicarcel-
cubes
page 164: closing quote removed from after ... is
broken up.
page 184: nor exceeding changed to not exceeding
page 233: depot changed to depôt as elsewhere
page 247, footnote [172]: Beaumé changed to
Baumé
page 322: Oilantus changed to Ailantus
page 334: (2.) added before The slaughter-houses.
page 357: footnote anchor [227] inserted
page 368: LEICHENHAUSER changed to
LEICHENHAUS
page 371: closing quote added after ... ss. 120 and
121.
page 379: closing quotes added after ... nor any
name. and after ... one of their inspectors.
catalogue page 11: Lord Lindsay changed to Lord
Lindsay as other authors
catalogue page 15 and 16: several list items moved
to new lines as the other list items.

Page 381

*** END OF THE PROJECT GUTENBERG EBOOK THE MUNICIPAL
AND SANITARY ENGINEER'S HANDBOOK ***

Updated editions will replace the previous one—the old editions will
be renamed.

Creating the works from print editions not protected by U.S. copyright
law means that no one owns a United States copyright in these works,
so the Foundation (and you!) can copy and distribute it in the United
States without permission and without paying copyright royalties.
Special rules, set forth in the General Terms of Use part of this license,
apply to copying and distributing Project Gutenberg™ electronic
works to protect the PROJECT GUTENBERG™ concept and
trademark. Project Gutenberg is a registered trademark, and may not
be used if you charge for an eBook, except by following the terms of
the trademark license, including paying royalties for use of the Project
Gutenberg trademark. If you do not charge anything for copies of this
eBook, complying with the trademark license is very easy. You may
use this eBook for nearly any purpose such as creation of derivative
works, reports, performances and research. Project Gutenberg eBooks
may be modified and printed and given away—you may do practically
ANYTHING in the United States with eBooks not protected by U.S.
copyright law. Redistribution is subject to the trademark license,
especially commercial redistribution.

START: FULL LICENSE

Page 382

THE FULL PROJECT GUTENBERG™ LICENSE
PLEASE READ THIS BEFORE YOU DISTRIBUTE OR USE THIS WORK

To protect the Project Gutenberg™ mission of promoting the free
distribution of electronic works, by using or distributing this work (or
any other work associated in any way with the phrase “Project
Gutenberg”), you agree to comply with all the terms of the Full Project
Gutenberg License available with this file or online at
www.gutenberg.org/license.

Section 1. General Terms of Use and Redistributing
Project Gutenberg electronic works

1.A. By reading or using any part of this Project Gutenberg electronic
work, you indicate that you have read, understand, agree to and accept
all the terms of this license and intellectual property
(trademark/copyright) agreement. If you do not agree to abide by all
the terms of this agreement, you must cease using and return or destroy
all copies of Project Gutenberg electronic works in your possession. If
you paid a fee for obtaining a copy of or access to a Project Gutenberg
electronic work and you do not agree to be bound by the terms of this
agreement, you may obtain a refund from the person or entity to whom
you paid the fee as set forth in paragraph 1.E.8.

1.B. “Project Gutenberg” is a registered trademark. It may only be
used on or associated in any way with an electronic work by people
who agree to be bound by the terms of this agreement. There are a few
things that you can do with most Project Gutenberg electronic works
even without complying with the full terms of this agreement. See
paragraph 1.C below. There are a lot of things you can do with Project
Gutenberg electronic works if you follow the terms of this agreement
and help preserve free future access to Project Gutenberg electronic
works. See paragraph 1.E below.

Page 383

1.C. The Project Gutenberg Literary Archive Foundation (“the
Foundation” or PGLAF), owns a compilation copyright in the
collection of Project Gutenberg electronic works. Nearly all the
individual works in the collection are in the public domain in the
United States. If an individual work is unprotected by copyright law in
the United States and you are located in the United States, we do not
claim a right to prevent you from copying, distributing, performing,
displaying or creating derivative works based on the work as long as
all references to Project Gutenberg are removed. Of course, we hope
that you will support the Project Gutenberg mission of promoting free
access to electronic works by freely sharing Project Gutenberg works
in compliance with the terms of this agreement for keeping the Project
Gutenberg name associated with the work. You can easily comply with
the terms of this agreement by keeping this work in the same format
with its attached full Project Gutenberg License when you share it
without charge with others.

1.D. The copyright laws of the place where you are located also govern
what you can do with this work. Copyright laws in most countries are
in a constant state of change. If you are outside the United States,
check the laws of your country in addition to the terms of this
agreement before downloading, copying, displaying, performing,
distributing or creating derivative works based on this work or any
other Project Gutenberg work. The Foundation makes no
representations concerning the copyright status of any work in any
country other than the United States.

1.E. Unless you have removed all references to Project Gutenberg:

1.E.1. The following sentence, with active links to, or other immediate
access to, the full Project Gutenberg License must appear prominently
whenever any copy of a Project Gutenberg work (any work on which
the phrase “Project Gutenberg” appears, or with which the phrase
“Project Gutenberg” is associated) is accessed, displayed, performed,
viewed, copied or distributed:

This eBook is for the use of anyone anywhere in the United States
and most other parts of the world at no cost and with almost no

Page 384

restrictions whatsoever. You may copy it, give it away or re-use it
under the terms of the Project Gutenberg™ License included with
this eBook or online at www.gutenberg.org. If you are not located
in the United States, you will have to check the laws of the
country where you are located before using this eBook.

1.E.2. If an individual Project Gutenberg electronic work is derived
from texts not protected by U.S. copyright law (does not contain a
notice indicating that it is posted with permission of the copyright
holder), the work can be copied and distributed to anyone in the United
States without paying any fees or charges. If you are redistributing or
providing access to a work with the phrase “Project Gutenberg”
associated with or appearing on the work, you must comply either with
the requirements of paragraphs 1.E.1 through 1.E.7 or obtain
permission for the use of the work and the Project Gutenberg
trademark as set forth in paragraphs 1.E.8 or 1.E.9.

1.E.3. If an individual Project Gutenberg electronic work is posted
with the permission of the copyright holder, your use and distribution
must comply with both paragraphs 1.E.1 through 1.E.7 and any
additional terms imposed by the copyright holder. Additional terms
will be linked to the Project Gutenberg License for all works posted
with the permission of the copyright holder found at the beginning of
this work.

1.E.4. Do not unlink or detach or remove the full Project Gutenberg
License terms from this work, or any files containing a part of this
work or any other work associated with Project Gutenberg.

1.E.5. Do not copy, display, perform, distribute or redistribute this
electronic work, or any part of this electronic work, without
prominently displaying the sentence set forth in paragraph 1.E.1 with
active links or immediate access to the full terms of the Project
Gutenberg License.

1.E.6. You may convert to and distribute this work in any binary,
compressed, marked up, nonproprietary or proprietary form, including
any word processing or hypertext form. However, if you provide

Page 385

access to or distribute copies of a Project Gutenberg work in a format
other than “Plain Vanilla ASCII” or other format used in the official
version posted on the official Project Gutenberg website
(www.gutenberg.org), you must, at no additional cost, fee or expense
to the user, provide a copy, a means of exporting a copy, or a means of
obtaining a copy upon request, of the work in its original “Plain
Vanilla ASCII” or other form. Any alternate format must include the
full Project Gutenberg License as specified in paragraph 1.E.1.

1.E.7. Do not charge a fee for access to, viewing, displaying,
performing, copying or distributing any Project Gutenberg works
unless you comply with paragraph 1.E.8 or 1.E.9.

1.E.8. You may charge a reasonable fee for copies of or providing
access to or distributing Project Gutenberg electronic works provided
that:

• You pay a royalty fee of 20% of the gross profits you derive from the
use of Project Gutenberg works calculated using the method you
already use to calculate your applicable taxes. The fee is owed to the
owner of the Project Gutenberg trademark, but he has agreed to donate
royalties under this paragraph to the Project Gutenberg Literary
Archive Foundation. Royalty payments must be paid within 60 days
following each date on which you prepare (or are legally required to
prepare) your periodic tax returns. Royalty payments should be clearly
marked as such and sent to the Project Gutenberg Literary Archive
Foundation at the address specified in Section 4, “Information about
donations to the Project Gutenberg Literary Archive Foundation.”

• You provide a full refund of any money paid by a user who notifies
you in writing (or by e-mail) within 30 days of receipt that s/he does
not agree to the terms of the full Project Gutenberg™ License. You
must require such a user to return or destroy all copies of the works
possessed in a physical medium and discontinue all use of and all
access to other copies of Project Gutenberg™ works.

• You provide, in accordance with paragraph 1.F.3, a full refund of any
money paid for a work or a replacement copy, if a defect in the

Page 386

electronic work is discovered and reported to you within 90 days of
receipt of the work.

• You comply with all other terms of this agreement for free distribution
of Project Gutenberg™ works.

1.E.9. If you wish to charge a fee or distribute a Project Gutenberg™
electronic work or group of works on different terms than are set forth
in this agreement, you must obtain permission in writing from the
Project Gutenberg Literary Archive Foundation, the manager of the
Project Gutenberg™ trademark. Contact the Foundation as set forth in
Section 3 below.

1.F.

1.F.1. Project Gutenberg volunteers and employees expend
considerable effort to identify, do copyright research on, transcribe and
proofread works not protected by U.S. copyright law in creating the
Project Gutenberg™ collection. Despite these efforts, Project
Gutenberg™ electronic works, and the medium on which they may be
stored, may contain “Defects,” such as, but not limited to, incomplete,
inaccurate or corrupt data, transcription errors, a copyright or other
intellectual property infringement, a defective or damaged disk or
other medium, a computer virus, or computer codes that damage or
cannot be read by your equipment.

1.F.2. LIMITED WARRANTY, DISCLAIMER OF DAMAGES -
Except for the “Right of Replacement or Refund” described in
paragraph 1.F.3, the Project Gutenberg Literary Archive Foundation,
the owner of the Project Gutenberg™ trademark, and any other party
distributing a Project Gutenberg™ electronic work under this
agreement, disclaim all liability to you for damages, costs and
expenses, including legal fees. YOU AGREE THAT YOU HAVE NO
REMEDIES FOR NEGLIGENCE, STRICT LIABILITY, BREACH
OF WARRANTY OR BREACH OF CONTRACT EXCEPT THOSE
PROVIDED IN PARAGRAPH 1.F.3. YOU AGREE THAT THE
FOUNDATION, THE TRADEMARK OWNER, AND ANY
DISTRIBUTOR UNDER THIS AGREEMENT WILL NOT BE

Page 387

LIABLE TO YOU FOR ACTUAL, DIRECT, INDIRECT,
CONSEQUENTIAL, PUNITIVE OR INCIDENTAL DAMAGES
EVEN IF YOU GIVE NOTICE OF THE POSSIBILITY OF SUCH
DAMAGE.

1.F.3. LIMITED RIGHT OF REPLACEMENT OR REFUND - If you
discover a defect in this electronic work within 90 days of receiving it,
you can receive a refund of the money (if any) you paid for it by
sending a written explanation to the person you received the work
from. If you received the work on a physical medium, you must return
the medium with your written explanation. The person or entity that
provided you with the defective work may elect to provide a
replacement copy in lieu of a refund. If you received the work
electronically, the person or entity providing it to you may choose to
give you a second opportunity to receive the work electronically in lieu
of a refund. If the second copy is also defective, you may demand a
refund in writing without further opportunities to fix the problem.

1.F.4. Except for the limited right of replacement or refund set forth in
paragraph 1.F.3, this work is provided to you ‘AS-IS’, WITH NO
OTHER WARRANTIES OF ANY KIND, EXPRESS OR IMPLIED,
INCLUDING BUT NOT LIMITED TO WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR ANY PURPOSE.

1.F.5. Some states do not allow disclaimers of certain implied
warranties or the exclusion or limitation of certain types of damages. If
any disclaimer or limitation set forth in this agreement violates the law
of the state applicable to this agreement, the agreement shall be
interpreted to make the maximum disclaimer or limitation permitted by
the applicable state law. The invalidity or unenforceability of any
provision of this agreement shall not void the remaining provisions.

1.F.6. INDEMNITY - You agree to indemnify and hold the
Foundation, the trademark owner, any agent or employee of the
Foundation, anyone providing copies of Project Gutenberg™
electronic works in accordance with this agreement, and any
volunteers associated with the production, promotion and distribution
of Project Gutenberg™ electronic works, harmless from all liability,

Page 388

costs and expenses, including legal fees, that arise directly or indirectly
from any of the following which you do or cause to occur: (a)
distribution of this or any Project Gutenberg work, (b) alteration,
modification, or additions or deletions to any Project Gutenberg work,
and (c) any Defect you cause.

Section 2. Information about the Mission of Project
Gutenberg

Project Gutenberg is synonymous with the free distribution of
electronic works in formats readable by the widest variety of
computers including obsolete, old, middle-aged and new computers. It
exists because of the efforts of hundreds of volunteers and donations
from people in all walks of life.

Volunteers and financial support to provide volunteers with the
assistance they need are critical to reaching Project Gutenberg’s goals
and ensuring that the Project Gutenberg collection will remain freely
available for generations to come. In 2001, the Project Gutenberg
Literary Archive Foundation was created to provide a secure and
permanent future for Project Gutenberg and future generations. To
learn more about the Project Gutenberg Literary Archive Foundation
and how your efforts and donations can help, see Sections 3 and 4 and
the Foundation information page at www.gutenberg.org.

Section 3. Information about the Project Gutenberg
Literary Archive Foundation

The Project Gutenberg Literary Archive Foundation is a non-profit
501(c)(3) educational corporation organized under the laws of the state
of Mississippi and granted tax exempt status by the Internal Revenue
Service. The Foundation’s EIN or federal tax identification number is
64-6221541. Contributions to the Project Gutenberg Literary Archive
Foundation are tax deductible to the full extent permitted by U.S.
federal laws and your state’s laws.

Page 389

The Foundation’s business office is located at 41 Watchung Plaza
#516, Montclair NJ 07042, USA, +1 (862) 621-9288. Email contact
links and up to date contact information can be found at the
Foundation’s website and official page at www.gutenberg.org/contact

Section 4. Information about Donations to the Project
Gutenberg Literary Archive Foundation

Project Gutenberg™ depends upon and cannot survive without
widespread public support and donations to carry out its mission of
increasing the number of public domain and licensed works that can be
freely distributed in machine-readable form accessible by the widest
array of equipment including outdated equipment. Many small
donations ($1 to $5,000) are particularly important to maintaining tax
exempt status with the IRS.

The Foundation is committed to complying with the laws regulating
charities and charitable donations in all 50 states of the United States.
Compliance requirements are not uniform and it takes a considerable
effort, much paperwork and many fees to meet and keep up with these
requirements. We do not solicit donations in locations where we have
not received written confirmation of compliance. To SEND
DONATIONS or determine the status of compliance for any particular
state visit www.gutenberg.org/donate.

While we cannot and do not solicit contributions from states where we
have not met the solicitation requirements, we know of no prohibition
against accepting unsolicited donations from donors in such states who
approach us with offers to donate.

International donations are gratefully accepted, but we cannot make
any statements concerning tax treatment of donations received from
outside the United States. U.S. laws alone swamp our small staff.

Please check the Project Gutenberg web pages for current donation
methods and addresses. Donations are accepted in a number of other

Page 390

ways including checks, online payments and credit card donations. To
donate, please visit: www.gutenberg.org/donate.

Section 5. General Information About Project Gutenberg
electronic works

Professor Michael S. Hart was the originator of the Project Gutenberg
concept of a library of electronic works that could be freely shared
with anyone. For forty years, he produced and distributed Project
Gutenberg eBooks with only a loose network of volunteer support.

Project Gutenberg eBooks are often created from several printed
editions, all of which are confirmed as not protected by copyright in
the U.S. unless a copyright notice is included. Thus, we do not
necessarily keep eBooks in compliance with any particular paper
edition.

Most people start at our website which has the main PG search facility:
www.gutenberg.org.

This website includes information about Project Gutenberg, including
how to make donations to the Project Gutenberg Literary Archive
Foundation, how to help produce our new eBooks, and how to
subscribe to our email newsletter to hear about new eBooks.

Page 391

back

Page 392

back

Page 393

back

Page 394

back

Page 395

back

Page 396

back

Page 397

PDF language

简体中文 https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=zh Translating…
Español https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=es Translating…
Français https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=fr Translating…
Deutsch https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=de Translating…
日本語 https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=ja Translating…
한국어 https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=ko Translating…
Português https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=pt Translating…
Русский https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=ru Translating…
العربية https://pdftoflip.com/view.php?t=0281d8eeeea5a4f857fc75600cef0dca&bl=ar Translating…